HomeMy WebLinkAbout2017-05-10 City Hall MINUTESMinutes
ad hoc City Hall Advisory Committee
May 10, 2017
Siskiyou Room, 51 Winburn Way 1:30 p.m.
ATTENDANCE
Committee Members: Boldt, Dichiro, Finklea, Kenefick, Kramer, Miller, Nickels, Pearce,
Richards, Shaw, Thalden
Staff: Fleury, Kathol, Morrison, Seltzer
Absent: NA
WELCOME AND INTRODUCTIONS: Dichiro called the meeting to order and asked
Committee Members Nickels and Boldt to introduce themselves.
APPROVAL OF MINUTES: Shaw said that on page 5 of the Minutes from the April 26 meeting,
Rick Vezie’s last name was misspelled. Nickels and Thalden last names will also be corrected
for
spelling.
MOTION by Nickels, second by Boldt to approve as revised the Minutes of the April 26, 2017
ad hoc City Hall Advisory Committee meeting. Carried unanimously.
STAFF PRESENTATION: Public Works Superintendent Mike Morrison presented a
PowerPoint giving an overview of the conditions at City Hall and the Community Development
Building. Morrison
reported that the ComDev building is a major remodel of the old Hillah Temple building. The
remodel was approved in 1999 and ComDev opened for use in September 2002. ComDev
currently
has 9630 square feet with very functional space but little room left for expansion. It also
houses the only shared meeting rooms in all of the City facilities.
Morrison showed the layout of the ComDev 31 workstations in 2002 compared to the 34
workstations and layout in 2017. He showed pictures of the attic space which houses the
HVAC system
and the Planning and Building departments, as well as numerous files that are irreplaceable.
Digitized materials are stored on a hard drive. Morrison stated that the original materials
needed to be retained and stored in a climate-controlled environment, but agreed on
questioning that such storage could be off-site. ComDev is not designed to be a two story
building.
That would require some retro-fitting and bracing and it would be fairly invasive.
Morrison then showed City Hall, which was originally built in 1889. It underwent a major
remodel in 1913 and has had several upgrades since then. The current City Hall building has
7745
square feet.
The City Hall building has been identified since the l960’s as inadequate, and is the most
expensive building to take care of and has the most maintenance problems. Morrison advised
COA050199
that the electrical system is inadequate for modern equipment. The HVAC system is
inefficient and outdated, and is due for a major overhaul. The plumbing drains poorly, requires
high
flow toilets, there is a lack of restrooms for the number of employees and the water heater is
in the
COA050200
attic. The internet/Network system is in a very difficult space to improve. Morrison added that
the structure issues include single pane windows, lack of insulation and seismic issues.
Recent City Hall building issues include a major first floor restroom leak that caused floor
failure and plumbing backup, closing the building at midday. Roof drain issues caused a
backup inside the building. Ongoing issues include 3 restrooms (5 toilets) for 30 employees,
which is inadequate. Security and access are difficult with the layout of the building.
Maintaining aging systems is getting increasingly difficult. Morrison then showed pictures of
the parapet walls which were recommended to be tied off and he added that the parapet
walls could fall if there was an earthquake. He showed bricks in 1913 and 2017 and pictures
of similar Klamath Falls buildings following the 1993 earthquake. He showed photos of the
old City Hall circa 1889-1913 and 1913 to present, with the building housing the Fire Station,
Police Station and City Hall. The current City Hall elevator is shared with OSF and they
maintain it. Kenefick asked if we could get square footage of the current parcel that City Hall
sits on. Kathol said that she had put a drawing of the City Hall plot on the City’s Committee
website link. Kenefick asked what is under the building and Morrison said we are not sure in
all places. Morrison said we had considered redoing the front door but it was cost prohibitive
and there were ADA (Americans with Disabilities Act) issues.
Following Morrison’s presentation, the Committee asked questions. Seltzer pointed out that the
Committee would see two connected buildings during the tour of City Hall and Morrison
explained
how the buildings had been combined over the years. Dichiro asked if going to wireless
Bluetooth has helped and Morrison said that the network is all hard-wired. Kenefick said
several
options the Committee was considering would require employees to be relocated. Kenefick
said we should consider the Plexis property in the old Oak Street Tank and Steel building.
Also,
a modular unit could work well behind the Court building. Kathol said that she will look into the
Plexis site. Morrison said that if we are doing a seismic retrofit, we should concurrently
address all of the other identified building issues. According to Morrison, it would be cheaper
to tear down the current City Hall and rebuild than to retrofit the current building.
Morrison said that the footprint of the City Hall building can only expand in one direction near
the elevator, and it could go higher. The elevator was put in as a cost share with City
Hall and OSF. Kramer said the City owns half of the elevator. Seltzer added that we want to
continue to accommodate OSF. The Committee then toured the ComDev and the City Hall
buildings.
The Committee reconvened following the building tours. Seltzer said that she will post online
the Morrison presentation and photos. Kenefick asked if we could get a cost projection
if we just did what is necessary to the building to make it seismically sound. Shaw asked if we
gut the building, could we use the space more efficiently and maintain the outside walls
and gut the inside, although she was not sure if there were advantages to this strategy.
Kramer said if the building was owned by private money, the only financially viable option
would be to retain the exterior walls and redevelop and rebuild from the inside out, including
seismic and all new systems, and that option needed to be fully vetted. Kramer said that
COA050201
about 20% of the existing footprint currently appeared to be wasted or was being used
inefficiently. He added that if the goal is to add 8 employees and there is 20% wasted space in
the current plan, his belief was
COA050202
that we could accommodate needed growth within the existing building footprint through
improved design. He said the advantage is cost and character. Kathol said the cost to
completely
tear down the building and rebuild it to the appropriate size is about one million dollars less
than to retrofit from the ground up. Boldt added that a retrofit is always more expensive.
Kramer said it depends on the contractor but he has problems with the projected square foot
cost projection. Kramer agreed that we needed to deal with the systems. Renovating the
building
should be looking at the impact 100 years in the future. Dichiro said she needs to know more
about the original deed land transfer and Pearce said he would be happy to work with staff
on looking at where the parcel is and the uncertainties of what the language means. Kathol
has hired a DC in Medford to trace the original descendants of John Helman and if we are not
able to find them we will file an Action to Quiet Title. Pearce said that the reversionary interest
is transferrable and the language is not classical in the Deed, which was posted
on the Committee’s City website link. Seltzer asked Kathol to address which option builds
ComDev up and Kathol confirmed it was the option to expand ComDev and consolidate.
Morrison said that in an earthquake, people have to get out of a building safely. Do we want
the building to be useable the next day? Seltzer noted that Karns has said during the recovery
phase of an emergency, city facilities and staff are essential to assisting businesses and
citizens rebuild their lives and interacting with FEMA and the SBA. Non-emergency personnel
have to be able to get back to work as quickly as possible following an emergency. The City is
not required to build city hall to critical infrastructure standards but it needs to be
useable as quickly as possible following an earthquake. Fire station one and two, and the
police station are built or have been retrofitted to meet the critical infrastructure standards.
Nickels said one problem he has not heard addressed is parking. That is the one thing that
would lead him to support a different site. Seltzer said the parking issue is accommodated
in some of the different scenarios. Shaw said it was important to keep civic functions
downtown. As far as parking, she thought that we had added sufficient parking and we do not
value
enough the importance of encouraging people to walk a few blocks. Sometimes that
inconvenience bolsters the economy in a town. She is considering the functionality of the
building
and it is important that it is an anchor. However, if we find out the Deed restricts use, the
whole conversation of moving City Hall is moot. Searching for errors in the Deed could
be extensive. Dichiro said we need some answers on the restrictions in the Deed. We need to
consider what happens to the City Hall building if we abandon it and what happens to the
core of our downtown. If we could vacate the building, would the City sell or keep the building
if it is seismically unsound.
Kenefick said the Minutes should reflect Shaw’s point that the distance between the library and
City Hall is the same as the Rogue Valley Mall. Shaw pointed out that people should be
encouraged to walk from parking places to the City Hall as they do at the Mall. Kenefick
suggested that the committee keep these points in mind because he was considering the
potential
public relations issue. Dichiro said that the Minutes need to reflect what is said and that there
is a diversity of opinion within the Committee and whatever the Committee puts forward
COA050203
we have to be prepared to address public opinion. Shaw said talking about going up one level
on the ComDev building was met with strong disapproval by neighbors in the past.
COA050204
Seltzer added that whatever the Committee recommends, it has to include one million dollars
for phase two of the police station. Shaw added that no law enforcement bond has passed in
the City of Ashland in 34 years. Dichiro notes that it would be one public facility bond which
would include the police station phase two.
FUTURE AGENDA ITEMS: Future agenda items will include City Hall Deed review by Pearce,
Kathol and Fleury. The next meeting is Wednesday, May 24 in the Otte-Peterson Room at the
Grove,
1175 East Main Street. The Committee will tour the Civic Center and the Police Station and
Morrison will give a brief presentation about the Civic Center and the Police Station.
Dichiro adjourned the meeting at 3:35pm.