Loading...
HomeMy WebLinkAboutAlternatives for First MeetingSummary of City Hall Replacement Alternatives COA050448 Preliminary Options Explored Seismic retrofit Rebuild on- site, in kind Are these the best options for the long term? Are they even the best for the present? What do we really need? What other options are available? Hire an ARCHITECT! COA050449 Space Needs Analysis Existing Space (ft2) Projected Need (ft2) City Hall 7,745 11,808 Community Development 9,630 12,544 TOTAL 17,375 24,352 •What is a space needs analysis? •Why was it part of the feasibility study? •What are the parameters? Q: How do we get to 24,400 ft2? A: Site Evaluation! COA050450 Sites Evaluated (Feasibility Study) Consolidate at City Hall Right Size at City Hall + ComDev Consolidate at ComDev New at Pioneer Parking Lot COA050451 Sites Evaluated (Supplemental) New at Civic Center New at Elks’ Parking LotNew at Railroad Property COA050452 Altogether Now… 1.Seismic Retrofit 2.In-Kind Rebuild 3.Right-Size Rebuild + ComDev 4.Expand ComDev + Consolidate 5.New @ Pioneer Parking 6.New @ Civic Center 7.New @ Elks’ Parking 8.New @ Railroad Property COA050453 Cost Estimates •Estimates in this graph are in 2021 dollars (todays’ estimates have been escalated 5.5% per year) •Hard costs •Soft costs •Moving/rental space •Contractor’s contingency •Prevailing wage •Photovoltaic systemThese need professional cost estimates! COA050454 Alternative Pr o v i d e s C i t y ' s s p a c e n e e d s Pr o v i d e s c e n t r a l i z e d s e r v i c e s Pr o v i d e s o f f - s t r e e t p a r k i n g ( f r e e s u p pu b l i c s t a l l s ) Po t e n t i a l t o i n c r e a s e i n p u b l i c p a r k i n g Re t a i n s p l a z a p r e s e n c e Pr e s e r v e s h i s t o r i c f a ç a d e El i m i n a t e s t e m p o r a r y s t a f f r e l o c a t i o n s Ab o v e H o s l e r D a m i n u n d a t i o n z o n e LE E D p o t e n t i a l n o t l i m i t e d b y e x i s t i n g in f r a s t r u c t u r e Co n s t r u c t i o n w i l l n o t i m p a c t d o w n t o w n to u r i s m o r t r a f f i c f l o w 20 2 1 E s t i m a t e d C o s t (1) Seismic Retrofit $ 6.5 M (2) In-Kind Rebuild $ 4.4 M (3) ComDev: Expand & Consolidate $ 9.5 M (4) Right-Size City Hall + ComDev $ 8.5 M (5) Right-Size/Stucco City Hall + ComDev $ 9.7 M (6) New @ Pioneer Parking & 50 UG Stalls $ 16.1 M (7) New @ Pioneer Parking & 100 UG Stalls $ 19.6 M (8) New @ Civic Center & Consolidate $ 12.9 M (9) New @ Civic Center + ComDev $ 11 M (10) New @ Elks' & Consolidate $ 11.1 M (11) New @ Elks' + ComDev $ 9.2 M (12) New @ Railroad & Consolidate $ 11.1 M (13) New @ Railroad + Com Dev $ 9.2 MCOA050455