Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
City Index Construction Cost 3-Year 2017 Base MFR
DIV. NO.BUILDING SYSTEMS ALABAMA ANNISTON BIRMINGHAM BUTLER DECATUR DOTHAN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 87.5 75.2 80.2 96.8 75.5 84.2 88.9 74.5 80.4 93.7 72.8 81.4 89.4 75.1 80.9 B10 Shell: Superstructure 96.9 84.4 92.1 98.5 84.6 93.1 95.7 84.9 91.5 100.0 81.9 93.0 96.3 85.4 92.1 B20 Exterior Closure 98.1 74.2 87.1 91.8 69.6 81.6 101.8 74.3 89.1 92.5 73.1 83.6 101.1 74.3 88.7 B30 Roofing 95.9 65.3 84.2 99.1 68.3 87.3 95.9 68.5 85.4 97.9 67.2 86.2 95.9 69.2 85.7 C Interior Construction 89.0 70.8 81.4 96.4 69.4 85.2 90.4 69.7 81.8 98.1 67.0 85.2 91.7 73.4 84.2 D10 Services: Conveying 100.0 74.7 92.3 100.0 87.4 96.2 100.0 82.7 94.7 100.0 74.3 92.2 100.0 74.4 92.2 D20 - 40 Mechanical 100.8 52.1 79.2 100.0 62.5 83.4 97.9 67.8 84.6 100.0 66.6 85.2 97.9 66.4 83.9 D50 Electrical 92.6 61.8 76.3 96.7 60.3 77.4 94.5 69.2 81.1 92.4 66.0 78.4 93.4 78.1 85.3 E Equipment & Furnishings 100.0 68.7 98.2 100.0 68.6 98.2 100.0 69.0 98.2 100.0 63.3 97.9 100.0 70.9 98.3 G Site Work 88.0 93.7 91.8 94.7 94.0 94.2 99.3 88.9 92.3 88.8 93.2 91.7 97.1 89.3 91.9 A-G WEIGHTED AVERAGE 95.7 70.0 84.3 97.5 71.7 86.1 96.0 74.3 86.4 97.5 72.3 86.3 96.1 75.7 87.1 DIV.NO.BUILDING SYSTEMS ALABAMA EVERGREEN GADSDEN HUNTSVILLE JASPER MOBILE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 88.7 74.9 80.6 94.4 75.4 83.2 92.1 73.8 81.3 100.5 75.4 85.7 91.1 75.0 81.6 B10 Shell: Superstructure 95.5 85.2 91.5 98.1 84.5 92.9 99.6 83.4 93.4 99.6 84.7 93.9 98.2 84.8 93.0 B20 Exterior Closure 102.4 74.3 89.4 95.5 69.3 83.4 93.0 67.6 81.3 93.3 74.5 84.6 94.9 67.4 82.2 B30 Roofing 95.9 69.5 85.8 98.1 68.2 86.7 97.8 66.6 85.9 98.1 63.0 84.7 95.5 68.2 85.1 C Interior Construction 90.1 70.7 82.1 95.3 69.4 84.6 98.2 67.4 85.4 95.8 70.8 85.5 93.2 67.7 82.6 D10 Services: Conveying 100.0 74.4 92.2 100.0 87.3 96.1 100.0 86.4 95.9 100.0 75.7 92.6 100.0 88.3 96.4 D20 - 40 Mechanical 97.9 67.8 84.6 102.2 64.1 85.3 100.0 62.8 83.5 102.2 62.5 84.6 99.8 65.1 84.5 D50 Electrical 91.9 69.2 79.9 92.4 60.3 75.4 93.3 65.5 78.6 92.1 60.3 75.2 95.2 58.1 75.5 E Equipment & Furnishings 100.0 70.4 98.3 100.0 68.6 98.2 100.0 66.0 98.0 100.0 68.6 98.2 100.0 70.1 98.3 G Site Work 99.6 88.9 92.5 94.8 93.7 94.1 88.4 93.5 91.8 94.8 93.8 94.1 92.6 90.0 90.9 A-G WEIGHTED AVERAGE 95.7 74.3 86.2 97.5 71.9 86.2 97.4 71.5 86.0 97.9 72.1 86.5 96.6 71.2 85.4 DIV.NO.BUILDING SYSTEMS ALABAMA ALASKA MONTGOMERY PHENIX CITY SELMA TUSCALOOSA ANCHORAGE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 90.3 74.1 80.7 89.7 73.9 80.4 88.7 74.7 80.4 94.6 75.4 83.3 122.7 121.8 122.2 B10 Shell: Superstructure 97.1 84.3 92.2 95.9 83.3 91.1 95.7 84.9 91.6 99.6 84.6 93.8 120.5 111.2 116.9 B20 Exterior Closure 92.2 66.3 80.3 104.9 74.0 90.6 101.9 74.3 89.1 92.6 69.4 81.9 150.3 120.9 136.7 B30 Roofing 94.2 67.3 83.9 96.3 68.5 85.6 95.7 68.5 85.3 97.9 68.2 86.5 167.2 117.1 148.1 C Interior Construction 91.7 67.5 81.7 91.1 72.1 83.3 90.5 70.8 82.3 98.2 69.4 86.3 124.8 120.1 122.9 D10 Services: Conveying 100.0 86.8 96.0 100.0 87.3 96.1 100.0 75.1 92.4 100.0 87.3 96.1 100.0 109.2 102.8 D20 - 40 Mechanical 99.9 65.7 84.8 97.9 66.4 83.9 97.9 66.5 84.0 100.0 66.6 85.2 100.6 105.4 102.7 D50 Electrical 95.6 78.1 86.3 94.0 68.7 80.6 93.1 78.1 85.2 92.9 60.3 75.6 112.9 112.6 112.7 E Equipment & Furnishings 100.0 69.4 98.2 100.0 68.9 98.2 100.0 69.5 98.2 100.0 68.6 98.2 100.0 119.3 101.1 G Site Work 91.0 89.1 89.7 103.2 89.2 93.9 97.0 89.2 91.8 89.1 93.8 92.2 127.0 132.7 130.8 A-G WEIGHTED AVERAGE 95.8 73.6 86.0 96.6 74.0 86.6 95.8 75.2 86.7 97.5 72.5 86.4 119.7 115.0 117.6 DIV. NO.BUILDING SYSTEMS ALASKA ARIZONA FAIRBANKS JUNEAU KETCHIKAN CHAMBERS FLAGSTAFF MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 126.1 122.0 123.7 130.3 121.8 125.3 203.5 121.8 155.2 90.2 78.0 83.0 92.7 76.9 83.4 B10 Shell: Superstructure 125.0 111.4 119.8 124.4 111.2 119.4 140.2 111.2 129.0 99.1 73.5 89.2 99.8 72.5 89.3 B20 Exterior Closure 143.3 121.0 133.0 145.4 120.9 134.1 174.0 120.9 149.5 100.5 60.5 82.1 122.0 61.9 94.3 B30 Roofing 183.0 118.4 158.3 188.2 117.1 161.0 187.7 117.1 160.7 95.0 74.9 87.3 96.9 73.5 87.9 C Interior Construction 131.2 120.5 126.8 128.3 120.1 124.9 129.5 120.1 125.6 99.4 68.9 86.8 101.0 66.3 86.6 D10 Services: Conveying 100.0 109.2 102.8 100.0 109.2 102.8 100.0 109.2 102.8 100.0 85.3 95.5 100.0 85.3 95.5 D20 - 40 Mechanical 100.6 109.0 104.3 100.6 105.4 102.8 98.6 105.4 101.6 97.6 77.7 88.8 100.2 77.9 90.3 D50 Electrical 120.2 112.6 116.2 108.1 112.6 110.5 120.2 112.6 116.2 103.4 88.5 95.5 102.3 63.9 82.0 E Equipment & Furnishings 100.0 119.3 101.1 100.0 119.3 101.1 100.0 119.3 101.1 100.0 73.3 98.4 100.0 68.3 98.1 G Site Work 125.9 132.7 130.4 146.2 132.7 137.1 185.0 132.7 149.9 71.2 96.9 88.4 89.8 96.9 94.6 A-G WEIGHTED AVERAGE 122.3 115.9 119.4 121.5 115.0 118.6 133.4 115.0 125.3 98.3 76.2 88.6 102.3 72.3 89.1 DIV. NO.BUILDING SYSTEMS ARIZONA GLOBE KINGMAN MESA/TEMPE PHOENIX PRESCOTT MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 92.9 78.4 84.4 89.9 78.0 82.9 92.3 78.0 83.9 92.2 77.2 83.3 90.9 78.0 83.3 B10 Shell: Superstructure 95.0 75.1 87.3 99.4 73.3 89.3 95.6 73.8 87.2 96.6 73.6 87.7 99.6 73.3 89.4 B20 Exterior Closure 118.4 60.8 91.9 100.5 61.3 82.4 108.1 61.2 86.5 102.4 61.9 83.7 106.4 60.6 85.3 B30 Roofing 100.9 75.2 91.1 95.0 74.9 87.3 100.7 73.1 90.2 99.7 71.4 88.9 95.6 75.0 87.7 C Interior Construction 96.7 69.0 85.2 98.9 68.9 86.5 96.5 69.0 85.2 98.7 67.1 85.6 99.8 69.0 87.0 D10 Services: Conveying 100.0 85.7 95.7 100.0 85.3 95.5 100.0 85.7 95.7 100.0 86.0 95.7 100.0 85.3 95.5 D20 - 40 Mechanical 96.5 77.8 88.2 97.6 77.7 88.8 100.1 77.9 90.3 100.0 77.9 90.2 100.2 77.7 90.3 D50 Electrical 98.2 64.0 80.0 103.5 63.9 82.5 95.0 63.9 78.5 100.4 63.9 81.1 102.0 63.9 81.8 E Equipment & Furnishings 100.0 71.9 98.4 100.0 72.1 98.4 100.0 71.9 98.4 100.0 68.5 98.2 100.0 72.3 98.4 G Site Work 100.9 98.7 99.4 71.0 96.9 88.3 91.8 97.9 95.9 92.2 98.2 96.2 77.9 96.9 90.6 A-G WEIGHTED AVERAGE 99.3 73.3 87.8 98.3 72.9 87.1 98.4 73.0 87.2 98.8 72.7 87.3 99.8 72.8 87.9 DIV.NO.BUILDING SYSTEMS ARIZONA ARKANSAS SHOW LOW TUCSON BATESVILLE CAMDEN FAYETTEVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 93.9 78.1 84.5 90.3 77.0 82.4 75.4 71.9 73.3 83.2 71.9 76.5 75.0 71.3 72.8 B10 Shell: Superstructure 95.3 73.9 87.0 95.8 72.9 87.0 95.3 70.3 85.6 100.1 70.0 88.5 95.0 69.5 85.2 B20 Exterior Closure 120.2 61.3 93.1 101.1 61.9 83.0 89.8 45.6 69.4 97.5 41.3 71.6 86.1 45.9 67.5 B30 Roofing 101.1 74.7 91.0 101.8 65.6 87.9 104.2 62.9 88.4 96.9 62.6 83.7 105.0 62.8 88.9 C Interior Construction 97.2 69.7 85.8 93.7 66.8 82.6 91.1 55.8 76.5 94.5 54.1 77.8 90.7 56.5 76.5 D10 Services: Conveying 100.0 85.7 95.7 100.0 85.7 95.7 100.0 70.0 90.9 100.0 70.0 90.9 100.0 70.0 90.9 D20 - 40 Mechanical 96.5 77.7 88.2 100.0 71.6 87.5 96.7 51.5 76.7 96.5 57.9 79.4 96.7 62.4 81.5 D50 Electrical 95.3 63.9 78.7 97.2 63.9 79.6 95.9 62.5 78.2 95.2 58.8 75.9 89.8 56.1 71.9 E Equipment & Furnishings 100.0 71.9 98.4 100.0 68.6 98.2 100.0 59.8 97.7 100.0 59.6 97.6 100.0 59.5 97.6 G Site Work 103.0 98.0 99.6 87.6 97.9 94.5 74.8 91.0 85.6 83.6 91.0 88.5 74.1 91.0 85.4 A-G WEIGHTED AVERAGE 99.5 73.2 87.9 97.2 71.0 85.6 93.6 60.9 79.1 96.3 60.9 80.7 92.4 62.3 79.1 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 1COA050497 DIV. NO.BUILDING SYSTEMS ARKANSAS FORT SMITH HARRISON HOT SPRINGS JONESBORO LITTLE ROCK MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 83.8 71.5 76.6 81.3 71.9 75.7 84.2 72.0 77.0 81.8 76.8 78.8 83.9 72.5 77.2 B10 Shell: Superstructure 99.4 69.8 88.0 97.5 70.2 87.0 100.1 70.4 88.6 93.3 79.2 87.9 99.2 71.9 88.7 B20 Exterior Closure 90.8 50.4 72.2 93.0 46.1 71.4 88.6 45.9 68.9 89.0 45.5 68.9 90.1 67.2 79.6 B30 Roofing 105.3 63.0 89.2 104.5 62.9 88.6 97.1 62.9 84.0 110.1 62.6 92.0 99.5 64.2 86.0 C Interior Construction 93.8 57.0 78.6 92.5 55.3 77.1 94.4 56.6 78.8 93.2 55.7 77.7 92.8 60.0 79.3 D10 Services: Conveying 100.0 81.6 94.4 100.0 71.3 91.3 100.0 70.0 90.9 100.0 68.9 90.5 100.0 81.7 94.4 D20 - 40 Mechanical 100.3 48.1 77.2 96.7 49.3 75.7 96.5 52.4 77.0 100.6 50.5 78.5 100.0 52.5 79.0 D50 Electrical 93.2 55.1 73.0 94.5 56.1 74.1 97.4 66.1 80.8 99.0 62.6 79.7 99.9 66.1 82.0 E Equipment & Furnishings 100.0 59.4 97.6 100.0 59.5 97.6 100.0 60.0 97.7 100.0 59.8 97.7 100.0 60.0 97.7 G Site Work 79.4 90.9 87.1 79.5 91.0 87.2 86.8 91.0 89.6 98.5 109.4 105.8 87.1 91.0 89.7 A-G WEIGHTED AVERAGE 96.1 60.2 80.2 94.9 59.6 79.3 95.6 61.8 80.7 95.6 63.7 81.5 96.4 65.7 82.8 DIV.NO.BUILDING SYSTEMS ARKANSAS CALIFORNIA PINE BLUFF RUSSELLVILLE TEXARKANA WEST MEMPHIS ALHAMBRA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 84.6 72.1 77.2 77.9 71.8 74.3 91.5 72.3 80.2 85.7 76.4 80.2 94.2 126.8 113.4 B10 Shell: Superstructure 100.8 71.0 89.3 95.8 70.1 85.9 95.6 70.2 85.8 93.4 78.5 87.7 92.8 119.6 103.1 B20 Exterior Closure 104.4 54.8 81.5 90.0 44.7 69.1 91.0 45.0 69.8 88.3 45.0 68.3 107.2 140.6 122.6 B30 Roofing 97.2 62.8 84.1 105.2 62.8 89.0 97.8 62.8 84.4 110.6 62.6 92.3 100.0 131.4 112.0 C Interior Construction 95.0 57.1 79.3 91.1 55.6 76.4 98.6 55.1 80.6 92.6 55.9 77.4 97.2 131.3 111.3 D10 Services: Conveying 100.0 81.6 94.4 100.0 70.0 90.9 100.0 70.0 90.9 100.0 71.0 91.2 100.0 114.6 104.4 D20 - 40 Mechanical 100.1 50.7 78.3 96.7 51.3 76.6 100.1 56.6 80.9 97.1 65.4 83.1 96.4 125.6 109.3 D50 Electrical 95.3 64.9 79.2 93.2 56.1 73.5 97.3 57.9 76.4 100.6 63.1 80.7 120.7 130.2 125.7 E Equipment & Furnishings 100.0 59.9 97.7 100.0 59.5 97.6 100.0 59.5 97.6 100.0 59.7 97.7 100.0 135.2 102.1 G Site Work 89.0 91.0 90.3 76.0 91.0 86.0 98.9 92.9 94.8 105.1 109.1 107.7 98.8 110.6 106.7 A-G WEIGHTED AVERAGE 98.4 62.9 82.7 93.6 59.8 78.7 97.0 61.4 81.3 95.2 66.8 82.6 99.8 127.1 111.8 DIV.NO.BUILDING SYSTEMS CALIFORNIA ANAHEIM BAKERSFIELD BERKELEY EUREKA FRESNO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 92.0 128.2 113.4 91.6 127.2 112.6 108.3 138.3 126.0 101.3 131.0 118.8 93.9 130.6 115.6 B10 Shell: Superstructure 104.5 121.1 110.9 104.3 120.5 110.6 110.3 130.3 118.0 106.2 125.2 113.5 105.4 123.9 112.5 B20 Exterior Closure 98.4 136.3 115.9 93.8 135.0 112.8 105.1 154.8 128.0 114.6 148.8 130.4 99.4 143.0 119.5 B30 Roofing 106.5 136.1 117.8 101.1 127.3 111.1 103.4 153.4 122.5 110.2 145.3 123.6 92.6 130.0 106.9 C Interior Construction 103.2 131.6 114.9 94.4 130.7 109.4 102.0 159.3 125.7 105.6 145.2 122.0 96.0 141.0 114.6 D10 Services: Conveying 100.0 115.4 104.7 100.0 112.2 103.7 100.0 125.9 107.9 100.0 124.6 107.5 100.0 124.6 107.5 D20 - 40 Mechanical 100.0 130.1 113.3 100.0 123.1 110.2 96.6 156.6 123.1 96.4 123.1 108.2 100.1 124.4 110.9 D50 Electrical 90.7 111.5 101.7 105.3 107.9 106.7 102.4 160.4 133.2 97.2 123.9 111.4 95.6 103.3 99.7 E Equipment & Furnishings 100.0 134.8 102.0 100.0 134.4 102.0 100.0 169.2 104.0 100.0 151.1 103.0 100.0 150.1 102.9 G Site Work 101.7 111.0 107.9 98.0 108.8 105.2 108.8 110.5 110.0 111.0 107.7 108.8 102.4 108.1 106.2 A-G WEIGHTED AVERAGE 100.3 125.5 111.4 99.4 122.6 109.6 103.3 147.7 123.0 103.6 130.6 115.5 99.5 126.1 111.3 DIV. NO.BUILDING SYSTEMS CALIFORNIA INGLEWOOD LONG BEACH LOS ANGELES MARYSVILLE MODESTO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 88.9 127.0 111.4 96.6 127.0 114.6 94.2 127.8 114.0 107.2 130.7 121.1 99.4 130.6 117.9 B10 Shell: Superstructure 100.2 121.0 108.2 101.4 121.1 109.0 106.2 121.6 112.1 106.7 124.4 113.5 102.5 124.2 110.9 B20 Exterior Closure 91.1 140.8 114.0 100.1 140.8 118.8 100.9 139.0 118.5 110.6 140.0 124.2 104.8 139.7 120.9 B30 Roofing 101.5 131.5 113.0 101.8 133.4 113.9 100.9 133.9 113.5 109.6 136.4 119.9 109.2 133.2 118.4 C Interior Construction 98.2 131.6 112.0 97.8 131.6 111.8 103.0 131.8 114.9 103.8 144.3 120.6 102.8 143.6 119.7 D10 Services: Conveying 100.0 115.7 104.8 100.0 115.7 104.8 100.0 116.1 104.9 100.0 124.6 107.5 100.0 124.6 107.5 D20 - 40 Mechanical 96.2 123.0 108.0 96.2 125.7 109.2 100.0 130.2 113.3 96.4 125.7 109.4 100.0 124.3 110.7 D50 Electrical 100.5 130.2 116.3 100.2 130.2 116.1 98.8 129.3 115.0 94.0 121.4 108.5 96.3 106.7 101.9 E Equipment & Furnishings 100.0 135.4 102.1 100.0 135.4 102.1 100.0 135.4 102.1 100.0 151.0 103.0 100.0 150.3 102.9 G Site Work 93.0 106.9 102.3 100.3 106.9 104.8 99.8 109.1 106.0 108.0 107.7 107.8 103.3 107.7 106.3 A-G WEIGHTED AVERAGE 97.3 126.7 110.3 99.0 127.3 111.5 101.6 128.2 113.4 102.8 129.2 114.5 101.6 126.6 112.6 DIV. NO.BUILDING SYSTEMS CALIFORNIA MOJAVE OAKLAND OXNARD PALM SPRINGS PALO ALTO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 88.9 127.1 111.5 104.5 138.3 124.5 97.2 127.0 114.8 90.8 127.8 112.7 95.5 138.2 120.8 B10 Shell: Superstructure 102.2 120.4 109.3 105.5 130.3 115.0 102.0 120.8 109.2 104.7 121.3 111.1 101.8 130.0 112.7 B20 Exterior Closure 92.4 135.0 112.0 111.9 154.8 131.7 96.9 134.6 114.3 90.9 138.5 112.8 96.7 150.1 121.3 B30 Roofing 98.4 124.6 108.4 102.0 153.4 121.6 101.8 134.5 114.3 105.7 136.3 117.4 101.2 155.0 121.7 C Interior Construction 93.4 130.6 108.8 101.2 159.3 125.2 93.5 131.2 109.1 100.4 132.4 113.6 100.4 159.3 124.8 D10 Services: Conveying 100.0 112.2 103.7 100.0 125.9 107.9 100.0 115.6 104.8 100.0 115.4 104.7 100.0 125.9 107.9 D20 - 40 Mechanical 96.4 122.5 108.0 100.1 156.6 125.1 100.0 130.1 113.3 96.4 125.5 109.3 96.6 156.3 123.0 D50 Electrical 94.1 110.8 102.9 101.6 160.4 132.8 99.4 113.7 107.0 93.7 113.8 104.4 101.5 169.1 137.4 E Equipment & Furnishings 100.0 134.5 102.0 100.0 169.2 104.0 100.0 134.7 102.0 100.0 135.0 102.0 100.0 169.6 104.1 G Site Work 95.3 108.8 104.3 113.4 110.5 111.5 102.7 106.7 105.4 92.9 108.9 103.6 104.9 110.5 108.7 A-G WEIGHTED AVERAGE 96.5 122.7 108.1 103.5 147.7 123.1 98.9 125.1 110.4 98.2 125.1 110.1 99.4 148.3 121.0 DIV.NO.BUILDING SYSTEMS CALIFORNIA PASADENA REDDING RICHMOND RIVERSIDE SACRAMENTO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 90.1 126.7 111.8 120.7 130.7 126.6 107.1 138.1 125.4 95.9 127.7 114.7 90.3 133.8 116.0 B10 Shell: Superstructure 91.5 119.6 102.3 105.8 124.4 113.0 104.8 129.8 114.4 105.4 121.1 111.5 99.4 123.1 108.5 B20 Exterior Closure 98.8 140.6 118.1 128.2 140.0 133.7 108.8 150.1 127.8 94.9 136.0 113.8 102.9 142.4 121.1 B30 Roofing 99.6 131.4 111.8 135.8 136.4 136.0 101.8 150.3 120.4 106.7 135.1 117.5 111.5 136.7 121.1 C Interior Construction 95.8 131.3 110.5 114.4 144.4 126.8 102.7 159.3 126.1 103.2 131.6 115.0 107.5 146.9 123.8 D10 Services: Conveying 100.0 114.6 104.4 100.0 124.6 107.5 100.0 125.9 107.9 100.0 115.4 104.7 100.0 125.2 107.7 D20 - 40 Mechanical 96.4 122.9 108.1 100.5 125.7 111.6 96.6 154.7 122.3 100.0 130.1 113.3 100.0 125.6 111.3 D50 Electrical 117.4 130.2 124.2 99.0 121.4 110.9 102.1 139.5 121.9 90.5 110.9 101.3 97.2 111.0 104.5 E Equipment & Furnishings 100.0 135.2 102.1 100.0 151.0 103.0 100.0 168.2 104.0 100.0 134.8 102.0 100.0 153.5 103.1 G Site Work 95.6 110.6 105.7 133.4 107.7 116.2 112.6 110.5 111.2 100.4 108.9 106.1 94.9 117.0 109.7 A-G WEIGHTED AVERAGE 97.7 126.5 110.4 109.8 129.2 118.4 102.7 143.7 120.8 100.2 125.2 111.2 101.0 129.1 113.4 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 2 COA050498 DIV. NO.BUILDING SYSTEMS CALIFORNIA SALINAS SAN BERNARDINO SAN DIEGO SAN FRANCISCO SAN JOSE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 98.6 132.1 118.4 75.9 127.6 106.5 95.5 116.8 108.1 109.2 139.1 126.9 111.3 136.3 126.1 B10 Shell: Superstructure 106.0 125.8 113.6 101.7 121.1 109.2 106.5 114.9 109.8 110.5 133.9 119.6 103.1 132.6 114.5 B20 Exterior Closure 106.1 147.0 124.9 83.8 136.6 108.1 99.0 128.6 112.7 113.0 156.1 132.9 117.3 150.5 132.6 B30 Roofing 99.1 142.8 115.8 104.8 136.1 116.8 104.7 117.3 109.5 103.2 153.7 122.5 105.6 152.1 123.4 C Interior Construction 95.0 150.3 117.9 101.0 131.6 113.7 102.4 121.9 110.5 104.3 160.3 127.5 97.2 159.1 122.8 D10 Services: Conveying 100.0 124.6 107.5 100.0 109.5 102.9 100.0 112.9 103.9 100.0 126.2 108.0 100.0 125.3 107.7 D20 - 40 Mechanical 96.4 131.8 112.1 96.4 127.3 110.1 100.0 126.3 111.6 100.1 190.7 140.1 100.0 159.5 126.3 D50 Electrical 95.1 123.9 110.4 93.7 111.1 103.0 103.5 102.9 103.2 101.7 172.1 139.0 99.2 168.1 135.8 E Equipment & Furnishings 100.0 154.1 103.2 100.0 134.8 102.0 100.0 121.3 101.2 100.0 169.8 104.1 100.0 169.6 104.1 G Site Work 114.8 108.4 110.5 79.2 108.9 99.1 102.3 104.2 103.6 114.7 111.2 112.3 133.1 102.2 112.4 A-G WEIGHTED AVERAGE 100.2 133.2 114.8 95.8 124.5 108.5 102.0 118.1 109.1 105.6 157.7 128.6 103.6 148.6 123.5 DIV.NO.BUILDING SYSTEMS CALIFORNIA SAN LUIS OBISPO SAN MATEO SAN RAFAEL SANTA ANA SANTA BARBARA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 103.1 127.4 117.4 103.8 138.2 124.1 114.8 139.2 129.2 89.2 127.7 111.9 97.0 127.4 115.0 B10 Shell: Superstructure 105.7 120.8 111.5 103.6 130.1 113.8 107.3 128.2 115.3 104.4 121.2 110.9 102.4 120.8 109.5 B20 Exterior Closure 100.1 134.2 115.9 107.5 152.9 128.4 113.5 152.7 131.6 88.0 138.7 111.4 96.0 135.1 114.0 B30 Roofing 99.2 133.9 112.5 101.6 153.0 121.2 106.1 152.2 123.7 106.1 136.2 117.6 98.7 133.3 111.9 C Interior Construction 95.1 130.8 109.9 101.4 159.3 125.4 109.0 158.7 129.6 101.4 131.5 113.9 94.2 131.2 109.5 D10 Services: Conveying 100.0 123.5 107.2 100.0 125.9 107.9 100.0 125.3 107.7 100.0 115.4 104.7 100.0 115.6 104.8 D20 - 40 Mechanical 96.4 127.4 110.1 96.6 155.7 122.7 96.5 183.8 135.1 96.4 122.1 107.8 100.0 130.1 113.3 D50 Electrical 94.1 113.4 104.3 101.5 160.8 132.9 98.5 123.9 111.9 93.7 112.9 103.9 93.0 112.9 103.6 E Equipment & Furnishings 100.0 134.7 102.0 100.0 169.2 104.0 100.0 167.4 103.9 100.0 134.9 102.0 100.0 134.7 102.0 G Site Work 107.6 108.8 108.4 110.5 110.5 110.5 108.1 116.8 113.9 91.4 108.9 103.1 102.6 108.8 106.7 A-G WEIGHTED AVERAGE 99.3 124.7 110.5 101.8 147.3 121.9 104.9 148.2 124.0 97.9 124.1 109.5 98.2 125.2 110.1 DIV.NO.BUILDING SYSTEMS CALIFORNIA SANTA CRUZ SANTA ROSA STOCKTON SUSANVILLE VALLEJO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 115.4 131.7 125.0 105.0 136.7 123.7 98.1 131.5 117.9 115.3 129.2 123.5 96.5 138.5 121.3 B10 Shell: Superstructure 109.7 128.7 117.0 107.4 130.2 116.2 102.6 124.9 111.2 103.4 123.2 111.1 103.2 127.4 112.5 B20 Exterior Closure 119.3 147.4 132.3 110.2 154.9 130.8 104.7 139.8 120.9 136.2 139.9 137.9 91.4 151.4 119.1 B30 Roofing 105.2 145.6 120.6 106.6 151.8 123.9 109.7 134.6 119.2 137.6 133.3 136.0 104.1 151.5 122.2 C Interior Construction 99.2 150.4 120.4 101.8 156.1 124.3 103.6 145.9 121.1 114.4 141.0 125.4 108.4 158.4 129.1 D10 Services: Conveying 100.0 124.9 107.6 100.0 124.3 107.4 100.0 124.6 107.5 100.0 124.6 107.5 100.0 124.9 107.6 D20 - 40 Mechanical 100.0 132.2 114.2 96.4 183.1 134.8 100.0 124.3 110.8 96.9 125.7 109.6 100.1 143.6 119.3 D50 Electrical 98.3 123.9 111.9 94.0 121.4 108.6 96.3 113.7 105.5 99.4 121.4 111.1 94.7 129.4 113.1 E Equipment & Furnishings 100.0 154.4 103.2 100.0 167.3 103.9 100.0 153.6 103.1 100.0 145.9 102.7 100.0 167.6 103.9 G Site Work 131.5 102.1 111.8 105.7 107.6 107.0 102.9 107.8 106.2 140.5 107.7 118.5 96.8 116.7 110.1 A-G WEIGHTED AVERAGE 105.6 133.6 118.0 102.3 147.1 122.1 101.7 128.2 113.4 109.5 128.3 117.8 100.5 139.9 117.9 DIV. NO.BUILDING SYSTEMS CALIFORNIA COLORADO VAN NUYS ALAMOSA BOULDER COLORADO SPRINGS DENVER MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 95.7 126.7 114.0 104.7 68.8 83.5 106.8 78.2 89.9 108.1 71.1 86.3 104.6 74.3 86.7 B10 Shell: Superstructure 91.9 119.6 102.6 102.5 69.9 89.9 99.3 75.0 90.0 101.5 71.1 89.8 103.0 71.7 90.9 B20 Exterior Closure 118.2 140.6 128.5 128.0 63.4 98.2 105.4 68.4 88.3 110.1 65.9 89.7 106.7 66.1 88.0 B30 Roofing 100.8 131.4 112.5 106.1 68.1 91.6 100.3 74.2 90.3 101.0 69.8 89.1 99.5 69.7 88.1 C Interior Construction 96.9 131.3 111.1 98.6 57.2 81.4 101.5 73.0 89.7 102.4 59.4 84.6 104.3 63.4 87.4 D10 Services: Conveying 100.0 114.6 104.4 100.0 87.8 96.3 100.0 87.5 96.2 100.0 86.8 96.0 100.0 86.5 95.9 D20 - 40 Mechanical 96.4 122.9 108.1 96.4 66.1 83.0 96.4 73.2 86.2 100.1 74.8 88.9 99.9 75.6 89.2 D50 Electrical 117.4 130.2 124.2 98.2 66.8 81.5 94.1 79.5 86.3 97.3 76.6 86.3 98.9 81.5 89.7 E Equipment & Furnishings 100.0 135.2 102.1 100.0 52.2 97.2 100.0 77.0 98.7 100.0 58.5 97.6 100.0 63.2 97.9 G Site Work 112.5 110.6 111.2 140.3 89.7 106.4 97.6 97.1 97.3 99.1 92.0 94.4 98.1 101.3 100.2 A-G WEIGHTED AVERAGE 100.9 126.5 112.2 103.9 67.3 87.8 99.7 76.0 89.2 102.1 71.8 88.7 102.2 74.2 89.8 DIV. NO.BUILDING SYSTEMS COLORADO DURANGO FORT COLLINS FORT MORGAN GLENWOOD SPRINGS GOLDEN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 113.8 68.8 87.2 116.7 76.7 93.0 105.4 70.3 84.7 105.4 70.2 84.7 106.7 73.2 86.9 B10 Shell: Superstructure 105.0 69.9 91.4 102.1 74.2 91.3 98.9 69.2 87.4 102.0 69.5 89.5 98.6 71.3 88.1 B20 Exterior Closure 118.0 62.9 92.6 118.5 66.3 94.4 111.0 65.6 90.1 123.2 65.5 96.6 125.6 67.8 99.0 B30 Roofing 106.0 68.1 91.5 100.6 74.6 90.7 100.2 70.0 88.7 106.0 68.3 91.6 101.3 70.1 89.4 C Interior Construction 103.2 55.9 83.6 100.9 70.9 88.5 101.5 58.0 83.5 104.2 56.5 84.4 100.8 61.9 84.7 D10 Services: Conveying 100.0 87.8 96.3 100.0 86.6 95.9 100.0 86.6 95.9 100.0 87.0 96.0 100.0 87.5 96.2 D20 - 40 Mechanical 96.4 73.4 86.2 100.0 71.9 87.6 96.4 71.9 85.6 96.4 67.3 83.5 96.4 73.2 86.2 D50 Electrical 97.6 63.5 79.5 94.1 79.5 86.3 94.5 77.3 85.4 94.9 63.5 78.3 94.5 79.5 86.5 E Equipment & Furnishings 100.0 52.1 97.2 100.0 74.5 98.5 100.0 52.9 97.3 100.0 52.1 97.2 100.0 60.2 97.7 G Site Work 134.5 89.7 104.5 110.5 96.9 101.4 100.3 96.8 97.9 149.0 97.8 114.7 110.0 97.1 101.4 A-G WEIGHTED AVERAGE 104.3 68.2 88.3 103.2 74.8 90.7 100.3 70.9 87.3 104.2 67.8 88.1 102.1 73.0 89.2 DIV.NO.BUILDING SYSTEMS COLORADO GRAND JUNCTION GREELEY MONTROSE PUEBLO SALIDA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 110.4 78.7 91.7 102.0 78.2 88.0 104.6 69.5 83.8 101.7 70.4 83.2 113.1 69.4 87.3 B10 Shell: Superstructure 105.3 75.9 94.0 99.1 75.3 90.0 101.2 69.7 89.1 104.6 71.4 91.8 103.4 69.5 90.3 B20 Exterior Closure 125.6 69.1 99.6 108.2 66.4 88.9 117.1 62.9 92.1 103.0 62.8 84.5 120.9 63.4 94.4 B30 Roofing 105.0 76.1 94.0 99.9 76.8 91.0 106.1 68.1 91.6 104.5 67.9 90.5 104.9 68.1 90.9 C Interior Construction 105.2 74.5 92.5 100.2 74.3 89.5 102.4 55.8 83.1 99.8 59.3 83.0 99.3 55.8 81.3 D10 Services: Conveying 100.0 87.9 96.3 100.0 86.6 95.9 100.0 87.4 96.2 100.0 87.6 96.2 100.0 87.4 96.2 D20 - 40 Mechanical 99.9 73.6 88.3 100.0 71.9 87.6 96.4 77.8 88.2 99.9 63.3 83.7 96.4 63.5 81.8 D50 Electrical 97.3 54.5 74.6 94.1 79.5 86.3 97.3 51.6 73.1 98.2 66.8 81.5 97.5 62.4 78.9 E Equipment & Furnishings 100.0 77.7 98.7 100.0 79.7 98.8 100.0 51.5 97.2 100.0 57.8 97.5 100.0 52.0 97.2 G Site Work 134.5 98.0 110.0 96.5 96.9 96.8 142.6 93.7 109.9 125.3 89.6 101.4 134.2 93.7 107.1 A-G WEIGHTED AVERAGE 106.2 73.2 91.6 100.2 75.7 89.4 103.0 67.7 87.4 101.9 67.4 86.7 103.6 66.2 87.0 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 3COA050499 DIV. NO.BUILDING SYSTEMS CONNECTICUT BRIDGEPORT BRISTOL HARTFORD MERIDEN NEW BRITAIN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 100.0 120.8 112.3 96.2 120.7 110.7 96.9 120.7 111.0 94.0 120.9 109.9 97.1 120.7 111.1 B10 Shell: Superstructure 94.4 119.8 104.2 93.6 119.7 103.7 97.6 119.7 106.1 91.0 119.7 102.1 91.0 119.6 102.1 B20 Exterior Closure 102.7 129.1 114.9 98.9 129.1 112.8 97.1 129.1 111.9 99.3 129.1 113.0 99.9 129.1 113.4 B30 Roofing 101.1 121.4 108.9 101.3 119.6 108.3 106.4 119.6 111.5 101.3 119.6 108.3 101.3 117.0 107.3 C Interior Construction 95.1 121.6 106.1 95.1 120.9 105.8 93.4 121.5 105.1 96.6 121.0 106.7 95.1 120.9 105.8 D10 Services: Conveying 100.0 112.1 103.7 100.0 112.1 103.7 100.0 112.1 103.7 100.0 112.1 103.7 100.0 112.1 103.7 D20 - 40 Mechanical 100.0 116.0 107.1 100.0 116.0 107.1 100.0 116.0 107.1 96.5 116.0 105.1 100.0 116.0 107.1 D50 Electrical 100.1 109.1 104.9 100.1 109.1 104.9 99.5 109.5 104.8 100.0 108.5 104.5 100.2 109.1 104.9 E Equipment & Furnishings 100.0 116.7 101.0 100.0 116.7 101.0 100.0 116.7 101.0 100.0 116.7 101.0 100.0 116.7 101.0 G Site Work 100.0 104.3 102.9 99.1 104.3 102.6 95.9 104.3 101.5 96.7 105.1 102.3 99.3 104.3 102.6 A-G WEIGHTED AVERAGE 98.3 118.0 107.0 97.5 117.8 106.5 97.9 117.9 106.8 96.3 117.8 105.8 97.1 117.7 106.2 DIV.NO.BUILDING SYSTEMS CONNECTICUT NEW HAVEN NEW LONDON NORWALK STAMFORD WATERBURY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 98.1 120.9 111.5 84.3 120.9 105.9 99.0 121.3 112.2 100.1 121.3 112.6 100.0 120.8 112.3 B10 Shell: Superstructure 91.4 119.7 102.3 88.4 119.7 100.5 94.2 120.3 104.3 94.4 120.3 104.4 94.4 119.7 104.2 B20 Exterior Closure 112.0 129.1 119.9 96.2 129.1 111.4 98.7 130.3 113.3 99.1 130.3 113.5 99.1 129.1 112.9 B30 Roofing 101.3 118.8 108.0 101.2 119.6 108.2 101.3 121.7 109.1 101.3 121.7 109.1 101.3 118.8 108.0 C Interior Construction 95.1 121.6 106.1 95.9 121.6 106.5 95.1 121.0 105.8 95.1 121.0 105.8 95.1 121.6 106.1 D10 Services: Conveying 100.0 112.1 103.7 100.0 112.1 103.7 100.0 112.1 103.7 100.0 112.1 103.7 100.0 112.1 103.7 D20 - 40 Mechanical 100.0 116.0 107.1 96.5 116.0 105.1 100.0 116.1 107.1 100.0 116.1 107.1 100.0 116.0 107.1 D50 Electrical 100.0 108.5 104.5 96.8 110.5 104.1 100.1 159.5 131.6 100.1 162.7 133.3 99.6 114.4 107.4 E Equipment & Furnishings 100.0 116.6 101.0 100.0 116.7 101.0 100.0 119.1 101.1 100.0 119.3 101.1 100.0 117.0 101.0 G Site Work 99.2 105.0 103.0 91.7 105.0 100.6 99.8 104.3 102.8 100.4 104.3 103.0 99.9 104.3 102.8 A-G WEIGHTED AVERAGE 98.7 117.8 107.1 94.4 118.1 104.9 97.8 125.2 109.9 97.9 125.6 110.2 97.8 118.6 107.0 DIV.NO.BUILDING SYSTEMS CONNECTICUT D.C. DELAWARE WILLIMANTIC WASHINGTON DOVER NEWARK WILMINGTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 96.1 120.7 110.6 107.8 81.7 92.4 101.5 107.9 105.3 93.2 107.6 101.7 98.2 107.7 103.8 B10 Shell: Superstructure 93.4 119.7 103.5 100.3 87.6 95.4 99.0 116.0 105.5 98.2 115.9 105.0 98.2 115.9 105.0 B20 Exterior Closure 99.4 129.1 113.1 102.9 76.5 90.7 97.8 103.4 100.4 100.3 103.4 101.7 97.6 103.4 100.2 B30 Roofing 101.4 119.4 108.3 101.2 85.0 95.0 102.4 114.8 107.1 106.4 114.8 109.6 102.9 114.8 107.4 C Interior Construction 96.1 121.5 106.6 96.5 72.7 86.7 88.5 103.5 94.7 90.7 103.5 96.0 86.6 103.5 93.6 D10 Services: Conveying 100.0 112.1 103.7 100.0 98.8 99.6 100.0 106.4 102.0 100.0 106.4 102.0 100.0 106.4 102.0 D20 - 40 Mechanical 100.0 116.0 107.1 100.0 88.4 94.9 100.0 120.5 109.1 100.1 120.5 109.2 100.0 120.5 109.1 D50 Electrical 100.1 111.4 106.1 98.7 101.2 100.0 98.4 113.4 106.3 98.7 113.4 106.5 98.5 113.4 106.4 E Equipment & Furnishings 100.0 116.8 101.0 100.0 71.6 98.3 100.0 101.9 100.1 100.0 101.6 100.1 100.0 101.6 100.1 G Site Work 99.6 104.2 102.7 106.0 95.6 99.1 104.5 115.5 111.9 103.2 114.3 110.6 103.0 114.7 110.8 A-G WEIGHTED AVERAGE 97.7 118.2 106.8 100.2 86.1 94.0 97.6 112.1 104.0 97.9 111.9 104.1 97.0 112.0 103.6 DIV. NO.BUILDING SYSTEMS FLORIDA DAYTONA BEACH FORT LAUDERDALE FORT MYERS GAINESVILLE JACKSONVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 89.8 70.2 78.2 90.8 64.4 75.2 94.9 67.0 78.4 99.4 66.7 80.1 90.3 66.7 76.4 B10 Shell: Superstructure 99.3 78.8 91.4 97.5 75.6 89.1 99.7 75.6 90.4 100.1 75.4 90.6 98.2 75.4 89.4 B20 Exterior Closure 91.3 71.0 81.9 94.5 66.8 81.7 91.8 66.8 80.3 101.2 68.3 86.0 91.1 68.3 80.6 B30 Roofing 97.8 68.1 86.4 101.1 61.7 86.0 100.8 62.1 86.0 98.2 62.7 84.6 98.1 62.7 84.6 C Interior Construction 92.8 64.1 80.9 93.6 61.2 80.2 93.5 60.9 80.0 91.8 59.2 78.3 92.8 59.5 79.0 D10 Services: Conveying 100.0 85.2 95.5 100.0 85.0 95.4 100.0 79.5 93.8 100.0 84.1 95.2 100.0 82.1 94.5 D20 - 40 Mechanical 99.9 72.5 87.7 99.9 57.6 81.2 97.9 57.6 80.1 98.6 60.9 81.9 99.9 60.9 82.6 D50 Electrical 94.4 63.3 77.9 94.3 68.3 80.5 96.3 59.5 76.8 94.7 59.6 76.1 94.1 64.0 78.1 E Equipment & Furnishings 100.0 61.3 97.7 100.0 58.4 97.6 100.0 58.0 97.5 100.0 54.9 97.4 100.0 55.1 97.4 G Site Work 98.6 89.7 92.6 91.5 76.7 81.6 101.4 89.2 93.2 106.0 89.5 94.9 98.6 89.5 92.5 A-G WEIGHTED AVERAGE 96.4 71.8 85.6 96.6 66.4 83.2 96.9 65.9 83.2 98.0 66.7 84.2 96.2 67.3 83.4 DIV. NO.BUILDING SYSTEMS FLORIDA LAKELAND MELBOURNE MIAMI ORLANDO PANAMA CITY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 96.5 70.7 81.3 101.6 70.7 83.4 90.4 64.4 75.0 100.0 70.6 82.6 94.9 62.2 75.6 B10 Shell: Superstructure 99.7 81.5 92.7 108.5 79.8 97.4 97.9 75.7 89.3 99.8 79.1 91.8 99.9 74.5 90.1 B20 Exterior Closure 99.3 68.9 85.3 92.9 70.5 82.5 93.3 66.8 81.1 92.1 71.1 82.4 98.8 62.7 82.2 B30 Roofing 100.7 63.3 86.4 98.3 65.1 85.6 100.7 61.7 85.8 98.6 68.2 86.9 98.4 55.7 82.1 C Interior Construction 92.9 63.5 80.8 92.0 66.4 81.4 94.9 61.2 81.0 95.8 64.9 83.0 92.2 49.4 74.5 D10 Services: Conveying 100.0 80.1 93.9 100.0 84.9 95.4 100.0 85.0 95.4 100.0 85.2 95.5 100.0 72.9 91.8 D20 - 40 Mechanical 97.9 57.8 80.2 99.9 74.9 88.8 99.9 57.9 81.3 100.0 58.1 81.5 99.9 48.4 77.1 D50 Electrical 94.5 65.0 78.9 95.5 62.6 78.0 98.0 71.4 83.9 98.4 64.3 80.3 93.2 59.6 75.4 E Equipment & Furnishings 100.0 60.4 97.7 100.0 62.1 97.8 100.0 58.6 97.6 100.0 62.2 97.8 100.0 41.4 96.6 G Site Work 103.4 89.5 94.0 105.6 89.6 94.9 92.8 76.7 82.0 98.0 89.6 92.4 109.1 88.9 95.6 A-G WEIGHTED AVERAGE 97.6 68.8 84.9 99.3 72.7 87.5 97.1 66.9 83.8 98.1 69.1 85.3 97.7 60.7 81.4 DIV.NO.BUILDING SYSTEMS FLORIDA PENSACOLA SARASOTA ST. PETERSBURG TALLAHASSEE TAMPA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 109.0 72.2 87.3 101.8 70.4 83.3 97.9 69.6 81.2 93.6 66.8 77.8 96.4 71.6 81.8 B10 Shell: Superstructure 103.7 81.3 95.0 102.6 80.9 94.3 101.1 80.5 93.1 97.8 75.5 89.2 100.1 82.0 93.1 B20 Exterior Closure 106.5 70.6 89.9 95.6 68.9 83.3 116.8 66.3 93.5 92.1 68.3 81.1 96.1 71.3 84.7 B30 Roofing 98.3 65.9 85.9 99.0 63.3 85.4 100.9 61.2 85.7 99.7 62.7 85.6 101.2 64.8 87.3 C Interior Construction 91.9 68.0 82.0 96.8 63.4 83.0 93.6 63.3 81.0 94.8 59.5 80.2 94.8 64.1 82.1 D10 Services: Conveying 100.0 76.3 92.8 100.0 80.1 93.9 100.0 76.8 92.9 100.0 80.0 93.9 100.0 83.6 95.0 D20 - 40 Mechanical 99.9 52.9 79.1 99.8 57.8 81.3 99.9 56.1 80.5 99.9 68.3 85.9 99.9 59.3 81.9 D50 Electrical 96.8 53.6 73.9 96.6 64.0 79.3 94.5 63.8 78.2 99.0 59.6 78.1 94.3 63.8 78.1 E Equipment & Furnishings 100.0 66.5 98.0 100.0 60.4 97.7 100.0 61.1 97.7 100.0 54.9 97.4 100.0 60.5 97.7 G Site Work 110.3 89.4 96.3 110.1 89.5 96.3 105.0 89.2 94.4 97.2 89.4 92.0 105.1 89.7 94.8 A-G WEIGHTED AVERAGE 100.4 67.1 85.7 99.4 68.5 85.8 100.6 67.5 86.0 97.2 68.2 84.4 98.1 69.7 85.5 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 4 COA050500 DIV. NO.BUILDING SYSTEMS FLORIDA GEORGIA WEST PALM BEACH ALBANY ATHENS ATLANTA AUGUSTA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 88.2 64.1 73.9 90.3 70.1 78.4 103.5 67.0 81.9 103.2 77.5 88.0 98.9 77.6 86.3 B10 Shell: Superstructure 96.5 75.0 88.3 97.8 84.5 92.7 97.7 69.7 86.9 98.6 79.3 91.2 96.7 78.4 89.7 B20 Exterior Closure 92.5 66.7 80.6 92.3 81.2 87.2 90.6 79.4 85.4 94.5 70.4 83.4 91.7 81.1 86.8 B30 Roofing 100.8 62.5 86.2 99.9 67.9 87.7 95.8 67.6 85.0 95.6 72.4 86.7 95.5 72.6 86.7 C Interior Construction 93.4 60.9 79.9 90.1 69.0 81.3 94.3 54.9 78.0 97.5 77.5 89.2 94.2 76.4 86.9 D10 Services: Conveying 100.0 85.0 95.4 100.0 86.8 96.0 100.0 84.2 95.2 100.0 87.7 96.2 100.0 86.7 96.0 D20 - 40 Mechanical 97.9 57.4 80.0 99.9 70.2 86.8 96.5 68.7 84.2 100.0 70.5 87.0 100.1 69.6 86.6 D50 Electrical 95.4 68.3 81.0 96.7 63.4 79.1 100.4 69.2 83.9 99.5 72.5 85.2 101.1 67.1 83.1 E Equipment & Furnishings 100.0 58.4 97.6 100.0 60.5 97.7 100.0 40.5 96.5 100.0 74.1 98.5 100.0 75.3 98.6 G Site Work 88.7 76.7 80.6 98.6 79.6 85.9 100.2 97.0 98.1 97.2 94.9 95.6 94.0 97.3 96.2 A-G WEIGHTED AVERAGE 95.6 66.2 82.6 96.1 73.8 86.3 96.8 70.0 84.9 98.5 75.9 88.5 97.1 76.1 87.8 DIV.NO.BUILDING SYSTEMS GEORGIA COLUMBUS DALTON GAINESVILLE MACON SAVANNAH MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 90.1 73.3 80.2 100.5 69.2 82.0 107.1 65.9 82.8 89.9 68.8 77.4 93.8 73.9 82.0 B10 Shell: Superstructure 97.5 87.3 93.6 97.9 78.7 90.5 98.1 68.6 86.7 93.6 81.2 88.8 95.4 86.3 91.9 B20 Exterior Closure 92.3 81.9 87.5 94.5 80.6 88.1 93.2 79.3 86.8 96.5 81.0 89.4 89.4 82.1 86.0 B30 Roofing 99.9 71.1 88.9 97.9 67.3 86.2 95.7 67.2 84.8 98.2 68.4 86.8 97.4 70.6 87.2 C Interior Construction 90.0 75.6 84.1 97.2 56.7 80.4 94.6 53.2 77.5 86.0 55.4 73.3 92.8 76.1 85.9 D10 Services: Conveying 100.0 86.8 96.0 100.0 24.4 77.0 100.0 37.6 81.0 100.0 86.9 96.0 100.0 86.5 95.9 D20 - 40 Mechanical 100.0 67.6 85.6 96.6 63.7 82.0 96.5 67.4 83.6 100.0 69.9 86.6 100.0 67.6 85.7 D50 Electrical 96.9 72.5 84.0 108.7 67.4 86.8 100.4 72.4 85.6 95.8 63.2 78.5 101.1 74.3 86.9 E Equipment & Furnishings 100.0 71.4 98.3 100.0 46.0 96.9 100.0 38.0 96.4 100.0 42.9 96.7 100.0 74.0 98.5 G Site Work 98.5 79.8 86.0 100.5 102.2 101.6 100.5 97.0 98.1 99.5 95.7 96.9 98.7 81.3 87.0 A-G WEIGHTED AVERAGE 96.0 76.5 87.4 98.5 69.5 85.7 97.4 68.3 84.5 94.9 71.8 84.7 96.2 76.8 87.6 DIV.NO.BUILDING SYSTEMS GEORGIA HAWAII STATESBORO VALDOSTA WAYCROSS HILO HONOLULU MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 102.1 63.2 79.1 89.7 62.0 73.3 96.6 70.9 81.4 174.8 116.9 140.6 156.1 116.9 132.9 B10 Shell: Superstructure 100.8 72.8 90.0 96.4 76.4 88.7 97.3 80.5 90.8 121.9 110.1 117.3 128.2 110.1 121.2 B20 Exterior Closure 94.6 79.7 87.7 100.3 80.6 91.2 98.0 80.8 90.0 133.3 113.7 124.3 137.5 113.7 126.5 B30 Roofing 96.4 66.8 85.1 100.1 65.6 87.0 99.9 68.6 87.9 136.1 117.7 129.1 154.8 117.7 140.7 C Interior Construction 99.5 58.9 82.7 87.1 53.2 73.1 87.1 70.6 80.3 115.2 123.3 118.5 129.4 123.3 126.9 D10 Services: Conveying 100.0 43.1 82.7 100.0 86.5 95.9 100.0 49.9 84.7 100.0 109.6 102.9 100.0 109.6 102.9 D20 - 40 Mechanical 97.1 67.1 83.8 100.0 69.9 86.6 97.7 64.6 83.1 100.5 106.5 103.1 100.5 106.5 103.1 D50 Electrical 100.4 57.1 77.4 95.0 56.0 74.3 99.3 57.1 76.9 105.6 121.2 113.9 107.1 121.2 114.6 E Equipment & Furnishings 100.0 51.3 97.2 100.0 36.8 96.3 100.0 67.8 98.1 100.0 122.5 101.3 100.0 122.5 101.3 G Site Work 101.3 82.2 88.5 107.5 79.6 88.8 104.8 80.9 88.8 157.3 107.0 123.6 165.3 107.0 126.3 A-G WEIGHTED AVERAGE 98.9 66.9 84.7 96.2 68.0 83.8 96.3 70.4 84.9 117.7 113.9 116.0 122.0 113.9 118.5 DIV. NO.BUILDING SYSTEMS HAWAII IDAHO STATES & POSS., GUAM BOISE COEUR D’ALENE IDAHO FALLS LEWISTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 186.7 77.1 121.9 91.8 85.8 88.3 98.5 85.0 90.5 88.7 84.9 86.4 101.5 85.5 92.1 B10 Shell: Superstructure 147.8 72.9 118.9 104.3 81.6 95.6 100.2 84.3 94.1 110.1 81.0 98.9 100.5 84.9 94.5 B20 Exterior Closure 161.3 39.6 105.2 116.3 85.4 102.1 123.9 80.3 103.8 108.5 83.6 97.0 124.1 83.5 105.4 B30 Roofing 159.7 66.5 124.1 95.7 83.9 91.2 150.8 84.2 125.3 94.9 75.2 87.4 151.1 87.0 126.6 C Interior Construction 153.0 51.2 110.9 95.4 79.2 88.7 134.5 78.5 111.3 95.6 78.2 88.4 132.0 80.4 110.7 D10 Services: Conveying 100.0 73.0 91.8 100.0 87.2 96.1 100.0 100.0 100.0 100.0 88.9 96.6 100.0 100.3 100.1 D20 - 40 Mechanical 103.7 35.3 73.4 100.0 73.0 88.1 99.6 81.2 91.4 101.0 70.7 87.6 101.0 84.3 93.6 D50 Electrical 152.4 38.9 92.2 97.7 69.5 82.8 90.6 88.4 89.4 90.3 68.7 78.8 88.6 79.8 83.9 E Equipment & Furnishings 100.0 48.6 97.0 100.0 80.3 98.9 100.0 78.0 98.7 100.0 79.3 98.8 100.0 77.8 98.7 G Site Work 196.0 103.0 133.7 88.6 97.6 94.6 87.9 91.5 90.3 86.0 97.5 93.7 95.6 92.3 93.4 A-G WEIGHTED AVERAGE 140.4 54.4 102.4 101.1 79.7 91.6 109.0 83.7 97.8 100.7 78.3 90.8 109.1 84.1 98.1 DIV. NO.BUILDING SYSTEMS IDAHO ILLINOIS POCATELLO TWIN FALLS BLOOMINGTON CARBONDALE CENTRALIA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 94.0 85.7 89.1 96.6 75.3 84.0 94.8 113.4 105.8 88.6 106.4 99.1 89.1 112.1 102.7 B10 Shell: Superstructure 111.4 81.3 99.8 111.8 73.7 97.1 97.8 121.6 107.0 96.6 121.0 106.0 96.8 125.4 107.8 B20 Exterior Closure 113.0 83.2 99.3 121.8 79.5 102.3 104.4 124.4 113.6 79.4 116.2 96.4 79.6 118.6 97.6 B30 Roofing 95.5 75.3 87.8 96.3 77.9 89.3 98.8 116.1 105.4 96.1 103.8 99.1 96.2 111.2 101.9 C Interior Construction 96.0 79.2 89.1 97.7 57.1 80.9 92.4 122.6 104.9 91.5 109.8 99.1 91.7 112.2 100.2 D10 Services: Conveying 100.0 87.2 96.1 100.0 89.0 96.6 100.0 106.7 102.1 100.0 106.6 102.0 100.0 106.8 102.1 D20 - 40 Mechanical 99.9 73.0 88.0 99.9 69.6 86.5 96.4 106.7 101.0 96.4 106.9 101.1 96.4 95.1 95.8 D50 Electrical 95.3 68.7 81.2 91.7 58.2 73.9 95.1 96.7 95.9 97.4 110.2 104.2 98.9 108.7 104.1 E Equipment & Furnishings 100.0 80.3 98.8 100.0 46.7 96.9 100.0 117.1 101.0 100.0 106.7 100.4 100.0 112.1 100.7 G Site Work 88.5 97.6 94.6 95.5 97.1 96.5 95.9 101.7 99.8 96.5 102.5 100.5 96.8 103.2 101.1 A-G WEIGHTED AVERAGE 102.1 79.0 91.9 103.5 70.8 89.1 97.1 113.1 104.2 93.7 111.0 101.3 93.9 110.4 101.2 DIV.NO.BUILDING SYSTEMS ILLINOIS CHAMPAIGN CHICAGO DECATUR EAST ST. LOUIS EFFINGHAM MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 106.2 110.1 108.5 106.3 144.5 128.9 93.2 112.6 104.6 89.8 112.9 103.4 94.4 107.7 102.3 B10 Shell: Superstructure 100.3 117.3 106.8 97.8 149.6 117.8 100.7 118.7 107.6 97.6 126.1 108.6 98.7 113.0 104.2 B20 Exterior Closure 120.2 120.5 120.3 100.0 164.6 129.8 86.1 116.8 100.2 80.3 122.8 99.9 88.6 116.5 101.5 B30 Roofing 99.5 115.6 105.7 102.5 148.7 120.1 102.1 113.0 106.3 96.2 109.6 101.3 101.6 111.4 105.3 C Interior Construction 93.6 114.3 102.2 99.8 161.1 125.2 97.7 118.7 106.4 91.4 115.0 101.1 94.7 114.6 102.9 D10 Services: Conveying 100.0 105.8 101.8 100.0 123.3 107.1 100.0 105.8 101.8 100.0 107.3 102.2 100.0 75.3 92.5 D20 - 40 Mechanical 96.4 106.1 100.7 100.0 139.7 117.5 100.0 98.4 99.3 100.0 98.7 99.4 96.5 105.3 100.4 D50 Electrical 98.3 96.8 97.5 96.6 139.1 119.1 101.6 92.8 97.0 98.5 103.1 100.9 99.3 110.2 105.1 E Equipment & Furnishings 100.0 113.7 100.8 100.0 157.3 103.3 100.0 118.3 101.1 100.0 112.5 100.7 100.0 114.3 100.8 G Site Work 104.7 102.8 103.4 98.3 106.6 103.9 93.6 102.7 99.7 98.9 103.3 101.8 97.0 101.7 100.2 A-G WEIGHTED AVERAGE 100.8 110.2 104.9 99.5 146.0 120.0 97.9 108.6 102.6 94.9 111.5 102.3 96.4 109.5 102.2 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 5COA050501 DIV. NO.BUILDING SYSTEMS ILLINOIS GALESBURG JOLIET KANKAKEE LA SALLE NORTH SUBURBAN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 97.2 109.6 104.5 106.5 143.8 128.5 100.7 133.6 120.1 98.4 122.6 112.7 106.3 142.8 127.9 B10 Shell: Superstructure 98.5 119.2 106.5 96.4 146.7 115.7 95.0 139.0 111.9 99.4 137.3 114.0 97.2 147.9 116.7 B20 Exterior Closure 105.8 122.7 113.6 101.3 164.5 130.4 95.6 152.7 121.9 105.8 148.2 125.3 99.9 163.4 129.1 B30 Roofing 99.0 110.9 103.5 102.4 148.5 120.0 101.5 140.4 116.4 99.2 121.8 107.8 102.7 146.1 119.3 C Interior Construction 93.0 117.7 103.2 98.0 165.4 125.9 93.8 149.1 116.7 94.5 128.3 108.5 98.3 160.8 124.2 D10 Services: Conveying 100.0 103.5 101.1 100.0 123.5 107.2 100.0 117.4 105.3 100.0 104.0 101.2 100.0 120.0 106.1 D20 - 40 Mechanical 96.4 104.1 99.8 100.0 135.5 115.7 96.4 131.1 111.8 96.4 125.2 109.1 99.9 134.6 115.3 D50 Electrical 96.0 88.7 92.1 96.0 130.5 114.3 90.9 129.8 111.5 93.1 129.8 112.6 95.7 135.5 116.8 E Equipment & Furnishings 100.0 114.8 100.9 100.0 161.5 103.6 100.0 144.2 102.6 100.0 124.1 101.4 100.0 157.1 103.3 G Site Work 98.4 101.3 100.4 98.3 104.5 102.5 92.2 103.8 100.0 97.7 102.3 100.8 97.6 104.5 102.2 A-G WEIGHTED AVERAGE 97.8 109.4 102.9 99.0 143.9 118.8 95.6 136.3 113.6 98.0 129.1 111.7 99.0 143.5 118.7 DIV.NO.BUILDING SYSTEMS ILLINOIS PEORIA QUINCY ROCK ISLAND ROCKFORD SOUTH SUBURBAN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 95.4 114.6 106.7 94.2 105.8 101.0 95.9 101.7 99.3 96.2 125.9 113.7 106.3 142.7 127.8 B10 Shell: Superstructure 100.5 122.5 109.0 98.6 111.4 103.6 98.3 111.9 103.6 100.7 137.3 114.8 97.2 147.8 116.7 B20 Exterior Closure 105.6 125.5 114.8 98.6 112.2 104.9 104.5 103.5 104.0 94.5 143.0 116.9 99.9 163.4 129.1 B30 Roofing 99.7 114.8 105.5 101.6 106.6 103.5 98.9 101.8 100.0 102.2 133.5 114.1 102.7 146.1 119.3 C Interior Construction 97.3 125.5 108.9 94.8 117.0 104.0 93.2 102.5 97.0 97.3 134.4 112.6 98.3 160.8 124.2 D10 Services: Conveying 100.0 107.0 102.1 100.0 76.8 92.9 100.0 100.8 100.3 100.0 114.7 104.5 100.0 120.0 106.1 D20 - 40 Mechanical 100.0 103.1 101.3 96.5 100.3 98.2 96.4 98.9 97.5 100.0 117.3 107.7 99.9 134.6 115.3 D50 Electrical 97.1 99.1 98.2 96.6 82.6 89.2 88.2 96.3 92.5 97.3 132.5 116.0 95.7 135.5 116.8 E Equipment & Furnishings 100.0 121.5 101.3 100.0 117.5 101.0 100.0 102.3 100.1 100.0 130.7 101.8 100.0 157.0 103.3 G Site Work 98.1 101.8 100.6 95.8 102.2 100.1 96.4 100.7 99.3 97.8 102.9 101.2 97.6 104.2 102.0 A-G WEIGHTED AVERAGE 99.7 113.4 105.8 97.3 103.9 100.2 96.8 102.4 99.2 98.6 128.9 112.0 99.0 143.5 118.6 DIV.NO.BUILDING SYSTEMS ILLINOIS INDIANA SPRINGFIELD ANDERSON BLOOMINGTON COLUMBUS EVANSVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 91.4 111.1 103.1 100.1 84.5 90.8 96.7 83.7 89.0 95.9 82.3 87.9 95.2 93.8 94.4 B10 Shell: Superstructure 98.3 118.4 106.0 97.4 86.5 93.2 99.7 78.0 91.3 99.4 76.8 90.7 93.4 84.7 90.0 B20 Exterior Closure 91.6 123.3 106.2 89.7 79.1 84.8 100.9 74.6 88.8 99.7 74.4 88.1 98.7 82.1 91.1 B30 Roofing 104.1 116.1 108.7 111.0 77.8 98.3 97.0 81.2 91.0 96.4 84.5 91.8 101.4 87.8 96.2 C Interior Construction 98.2 118.8 106.7 93.4 80.1 87.9 96.2 81.2 90.0 93.4 79.3 87.6 92.3 83.2 88.5 D10 Services: Conveying 100.0 105.8 101.8 100.0 92.0 97.6 100.0 90.6 97.1 100.0 90.6 97.1 100.0 97.2 99.2 D20 - 40 Mechanical 100.0 104.0 101.7 100.0 78.1 90.3 99.7 78.3 90.2 96.1 78.1 88.1 100.0 80.2 91.2 D50 Electrical 104.2 91.7 97.6 87.1 88.8 88.0 99.8 89.7 94.5 99.0 88.7 93.6 96.0 88.3 91.9 E Equipment & Furnishings 100.0 118.3 101.1 100.0 81.8 98.9 100.0 82.5 99.0 100.0 80.0 98.8 100.0 84.5 99.1 G Site Work 96.3 102.8 100.6 99.0 94.5 96.0 87.7 93.5 91.6 83.8 93.3 90.1 93.3 124.0 113.9 A-G WEIGHTED AVERAGE 98.4 110.4 103.7 96.2 83.3 90.5 98.8 81.6 91.2 97.1 80.8 89.9 96.4 87.1 92.3 DIV. NO.BUILDING SYSTEMS INDIANA FORT WAYNE GARY INDIANAPOLIS KOKOMO LAFAYETTE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 103.8 80.2 89.9 103.1 113.0 109.0 97.0 86.7 90.9 97.4 84.4 89.8 95.7 83.3 88.4 B10 Shell: Superstructure 98.2 82.3 92.1 97.9 111.8 103.3 95.4 78.8 89.0 94.4 86.1 91.2 98.0 77.4 90.1 B20 Exterior Closure 91.1 75.6 83.9 90.3 116.3 102.3 95.8 78.7 87.9 86.9 78.0 82.8 101.9 78.0 90.9 B30 Roofing 110.8 74.5 96.9 109.4 110.9 110.0 103.0 82.8 95.3 109.9 79.2 98.2 96.4 81.7 90.8 C Interior Construction 93.3 74.9 85.7 92.9 116.9 102.9 96.9 83.4 91.3 92.0 78.8 86.5 92.0 77.6 86.0 D10 Services: Conveying 100.0 90.0 97.0 100.0 104.2 101.3 100.0 92.8 97.8 100.0 91.8 97.5 100.0 90.9 97.2 D20 - 40 Mechanical 100.0 73.7 88.3 100.0 106.9 103.1 99.9 80.1 91.1 96.4 79.6 89.0 96.1 78.6 88.4 D50 Electrical 87.7 78.5 82.8 98.6 115.9 107.8 102.9 89.7 95.9 91.6 81.2 86.1 98.5 82.2 89.9 E Equipment & Furnishings 100.0 75.3 98.6 100.0 117.0 101.0 100.0 85.1 99.1 100.0 77.2 98.7 100.0 76.8 98.6 G Site Work 100.8 94.2 96.4 99.8 98.2 98.7 99.0 93.7 95.4 96.0 94.4 94.9 85.4 93.3 90.7 A-G WEIGHTED AVERAGE 96.7 78.4 88.7 97.5 111.8 103.8 98.2 83.3 91.6 94.4 82.2 89.0 96.8 80.3 89.5 DIV. NO.BUILDING SYSTEMS INDIANA LAWRENCEBURG MUNCIE NEW ALBANY SOUTH BEND TERRE HAUTE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 90.5 84.3 86.9 100.8 83.9 90.8 93.5 80.9 86.1 97.2 85.6 90.4 93.4 92.4 92.8 B10 Shell: Superstructure 94.2 82.3 89.6 101.7 86.2 95.7 96.4 79.7 90.0 98.5 95.4 97.3 93.6 85.3 90.4 B20 Exterior Closure 87.2 74.8 81.5 96.6 79.2 88.6 95.2 70.7 83.9 89.5 79.8 85.0 106.8 78.9 93.9 B30 Roofing 102.2 80.0 93.7 99.6 79.5 91.9 88.2 74.4 82.9 103.7 83.9 96.1 101.5 82.6 94.3 C Interior Construction 89.5 77.6 84.6 90.7 79.6 86.1 91.6 72.5 83.7 93.3 82.5 88.9 92.5 81.6 88.0 D10 Services: Conveying 100.0 89.1 96.7 100.0 90.8 97.2 100.0 88.2 96.4 100.0 94.1 98.2 100.0 93.9 98.1 D20 - 40 Mechanical 97.2 73.1 86.5 99.7 77.9 90.1 96.4 77.3 88.0 99.9 74.9 88.9 100.0 79.0 90.7 D50 Electrical 93.9 74.7 83.8 91.8 79.1 85.0 94.5 77.4 85.4 97.0 86.5 91.4 94.2 90.1 92.0 E Equipment & Furnishings 100.0 78.0 98.7 100.0 81.5 98.9 100.0 77.1 98.7 100.0 81.2 98.9 100.0 82.6 99.0 G Site Work 84.6 109.3 101.2 88.0 93.4 91.6 79.4 95.7 90.3 97.0 94.7 95.4 95.4 124.3 114.7 A-G WEIGHTED AVERAGE 93.5 79.5 87.3 97.2 81.7 90.4 94.8 77.8 87.3 96.9 84.6 91.5 97.2 86.2 92.4 DIV.NO.BUILDING SYSTEMS INDIANA IOWA WASHINGTON BURLINGTON CARROLL CEDAR RAPIDS COUNCIL BLUFFS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 97.0 94.0 95.2 103.3 80.4 89.7 100.6 79.2 88.0 104.2 87.9 94.6 106.9 81.8 92.1 B10 Shell: Superstructure 90.2 86.0 88.6 91.7 87.0 89.9 91.0 85.0 88.7 93.9 90.7 92.7 97.6 86.2 93.2 B20 Exterior Closure 105.8 80.3 94.0 94.1 79.4 87.3 95.3 77.9 87.3 97.2 82.7 90.5 98.7 77.1 88.8 B30 Roofing 101.4 87.0 95.9 105.3 83.8 97.1 105.7 72.8 93.1 106.4 85.5 98.4 105.7 71.5 92.7 C Interior Construction 90.8 80.7 86.6 94.5 84.0 90.1 94.7 83.9 90.3 99.4 86.4 94.0 94.8 77.8 87.8 D10 Services: Conveying 100.0 97.2 99.2 100.0 92.1 97.6 100.0 64.3 89.1 100.0 93.5 98.0 100.0 92.0 97.6 D20 - 40 Mechanical 96.4 81.2 89.7 96.7 80.1 89.3 96.7 74.5 86.9 100.2 80.1 91.3 100.2 74.4 88.8 D50 Electrical 94.7 88.3 91.3 101.1 76.1 87.8 101.9 81.4 91.0 98.6 81.7 89.6 104.1 81.9 92.4 E Equipment & Furnishings 100.0 81.5 98.9 100.0 83.1 99.0 100.0 85.9 99.2 100.0 87.1 99.2 100.0 77.6 98.7 G Site Work 96.0 124.5 115.1 99.1 97.9 98.3 89.5 98.5 95.5 100.1 97.0 98.1 101.5 92.8 95.7 A-G WEIGHTED AVERAGE 95.5 87.0 91.7 96.2 82.7 90.3 96.0 80.6 89.2 98.6 85.6 92.8 99.4 80.4 91.0 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 6 COA050502 DIV. NO.BUILDING SYSTEMS IOWA CRESTON DAVENPORT DECORAH DES MOINES DUBUQUE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 104.3 81.9 91.1 101.5 96.1 98.3 101.1 82.1 89.9 96.6 89.6 92.4 100.7 88.6 93.5 B10 Shell: Superstructure 94.8 85.9 91.3 93.4 99.5 95.7 91.2 84.2 88.5 98.2 92.2 95.9 91.5 90.3 91.0 B20 Exterior Closure 97.9 76.6 88.1 95.8 88.6 92.5 103.6 74.4 90.1 89.6 88.8 89.3 96.6 74.7 86.5 B30 Roofing 105.9 84.2 97.6 105.8 93.9 101.2 105.5 75.6 94.1 97.5 86.6 93.3 106.0 83.7 97.5 C Interior Construction 94.8 83.9 90.3 97.8 96.8 97.4 95.7 77.2 88.1 92.8 88.7 91.1 96.7 79.3 89.5 D10 Services: Conveying 100.0 67.3 90.0 100.0 95.6 98.7 100.0 84.6 95.3 100.0 95.1 98.5 100.0 92.9 97.8 D20 - 40 Mechanical 96.4 82.4 90.2 100.2 92.4 96.8 96.7 73.9 86.6 99.8 83.4 92.6 100.2 75.0 89.0 D50 Electrical 92.6 81.4 86.6 96.7 92.7 94.6 98.6 51.2 73.5 103.9 83.4 93.0 102.6 77.7 89.4 E Equipment & Furnishings 100.0 86.5 99.2 100.0 96.5 99.8 100.0 74.7 98.5 100.0 86.6 99.2 100.0 78.3 98.7 G Site Work 96.1 99.6 98.4 99.1 99.5 99.4 97.7 97.5 97.6 101.0 101.2 101.1 98.4 94.2 95.6 A-G WEIGHTED AVERAGE 96.5 82.9 90.5 97.6 94.7 96.3 97.1 75.5 87.6 97.3 88.4 93.3 97.7 81.5 90.5 DIV.NO.BUILDING SYSTEMS IOWA FORT DODGE MASON CITY OTTUMWA SHENANDOAH SIBLEY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.5 71.2 83.6 101.8 81.2 89.6 103.3 78.9 88.9 104.3 74.4 86.7 103.5 61.3 78.6 B10 Shell: Superstructure 93.9 77.8 87.7 94.1 85.0 90.6 91.5 86.7 89.6 96.4 78.5 89.5 91.1 68.8 82.5 B20 Exterior Closure 94.6 55.4 76.5 98.6 73.6 87.0 96.0 61.9 80.3 95.6 74.8 86.0 105.1 54.1 81.6 B30 Roofing 105.3 68.5 91.2 104.7 76.0 93.8 106.2 71.9 93.1 105.0 66.7 90.4 105.3 53.3 85.4 C Interior Construction 92.8 79.4 87.2 89.3 77.2 84.3 97.5 79.2 89.9 90.8 61.7 78.7 94.7 46.3 74.6 D10 Services: Conveying 100.0 83.0 94.8 100.0 89.6 96.8 100.0 83.9 95.1 100.0 64.5 89.2 100.0 82.1 94.5 D20 - 40 Mechanical 96.4 71.3 85.3 96.4 80.3 89.3 96.7 73.4 86.4 96.7 87.9 92.8 96.7 67.8 83.9 D50 Electrical 99.1 75.2 86.4 98.2 51.2 73.2 100.9 74.7 87.0 98.6 81.3 89.4 98.6 51.2 73.5 E Equipment & Furnishings 100.0 84.6 99.1 100.0 74.7 98.5 100.0 81.6 98.9 100.0 55.9 97.4 100.0 36.9 96.3 G Site Work 102.9 96.2 98.4 103.0 97.4 99.3 98.6 92.0 94.2 100.4 94.1 96.2 107.8 97.5 100.9 A-G WEIGHTED AVERAGE 96.2 73.9 86.4 96.1 76.9 87.6 96.9 77.1 88.2 96.6 77.7 88.3 97.4 61.8 81.7 DIV.NO.BUILDING SYSTEMS IOWA KANSAS SIOUX CITY SPENCER WATERLOO BELLEVILLE COLBY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 105.2 76.8 88.4 104.0 64.1 80.5 108.4 75.2 88.7 109.1 75.9 89.5 105.3 78.2 89.3 B10 Shell: Superstructure 93.8 85.9 90.7 91.4 70.5 83.4 97.7 81.4 91.4 102.7 77.0 92.8 102.3 78.5 93.1 B20 Exterior Closure 94.4 69.1 82.7 107.8 54.2 83.1 94.5 77.9 86.9 102.6 60.3 83.1 105.9 65.1 87.1 B30 Roofing 105.8 70.2 92.2 106.3 54.0 86.3 105.0 76.5 94.1 97.5 66.3 85.6 98.4 69.6 87.4 C Interior Construction 98.5 74.8 88.7 100.7 45.3 77.8 91.2 62.9 79.5 93.9 60.2 79.9 97.1 61.9 82.5 D10 Services: Conveying 100.0 91.5 97.4 100.0 82.1 94.5 100.0 93.5 98.0 100.0 92.2 97.6 100.0 94.6 98.4 D20 - 40 Mechanical 100.2 78.5 90.6 96.7 71.4 85.5 100.0 79.4 90.9 96.3 71.3 85.3 96.4 69.6 84.6 D50 Electrical 98.6 74.5 85.8 100.4 51.2 74.3 94.6 61.8 77.2 99.3 68.0 82.7 99.1 75.7 86.7 E Equipment & Furnishings 100.0 74.9 98.5 100.0 36.7 96.3 100.0 50.0 97.1 100.0 55.5 97.4 100.0 56.7 97.5 G Site Work 109.3 98.5 102.1 107.9 96.2 100.1 108.0 97.2 100.7 108.9 98.2 101.7 108.5 98.9 102.0 A-G WEIGHTED AVERAGE 98.3 78.6 89.6 99.1 62.9 83.1 97.5 75.5 87.8 99.5 71.1 86.9 100.2 73.3 88.3 DIV. NO.BUILDING SYSTEMS KANSAS DODGE CITY EMPORIA FORT SCOTT HAYS HUTCHINSON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 105.6 78.3 89.5 104.7 81.1 90.7 100.5 89.3 93.9 90.3 76.8 82.3 83.0 76.9 79.4 B10 Shell: Superstructure 103.2 78.0 93.5 101.4 81.5 93.7 101.2 93.6 98.3 98.6 77.8 90.6 97.0 76.7 89.2 B20 Exterior Closure 111.6 62.7 89.1 99.3 71.8 86.7 98.1 62.9 81.9 113.9 59.1 88.6 95.6 62.6 80.4 B30 Roofing 98.4 69.4 87.3 95.6 82.2 90.5 96.6 77.8 89.4 98.8 66.7 86.5 97.3 68.5 86.3 C Interior Construction 96.1 63.3 82.6 91.4 69.4 82.3 94.0 83.7 89.7 96.9 62.0 82.5 94.9 59.4 80.2 D10 Services: Conveying 100.0 94.6 98.4 100.0 94.6 98.4 100.0 91.2 97.3 100.0 92.2 97.6 100.0 94.6 98.4 D20 - 40 Mechanical 100.0 70.5 86.9 96.3 76.3 87.5 96.3 69.4 84.4 96.4 67.2 83.5 96.4 70.5 85.0 D50 Electrical 96.0 71.1 82.8 96.6 71.9 83.5 95.8 71.9 83.1 98.0 66.1 81.1 93.1 66.1 78.8 E Equipment & Furnishings 100.0 58.5 97.6 100.0 67.9 98.1 100.0 88.6 99.3 100.0 58.1 97.6 100.0 52.5 97.2 G Site Work 111.1 97.8 102.2 101.5 95.6 97.6 98.4 95.6 96.5 113.5 98.4 103.4 93.9 98.9 97.2 A-G WEIGHTED AVERAGE 101.4 72.6 88.7 97.7 77.1 88.6 97.7 79.3 89.6 99.7 70.3 86.7 95.5 71.0 84.7 DIV. NO.BUILDING SYSTEMS KANSAS INDEPENDENCE KANSAS CITY LIBERAL SALINA TOPEKA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 107.2 83.6 93.2 89.3 99.3 95.2 90.6 73.0 80.2 94.8 76.1 83.8 93.0 84.4 87.9 B10 Shell: Superstructure 102.5 83.0 95.0 105.4 103.4 104.7 98.6 74.4 89.3 100.8 77.4 91.8 102.7 92.6 98.8 B20 Exterior Closure 105.4 67.5 87.9 98.9 99.1 99.0 115.4 57.2 88.6 112.5 59.0 87.8 96.7 65.5 82.3 B30 Roofing 98.5 82.6 92.4 96.2 98.8 97.2 98.9 64.2 85.7 97.9 66.3 85.8 100.4 76.4 91.2 C Interior Construction 97.1 72.0 86.7 92.1 99.0 95.0 96.6 53.7 78.9 95.5 60.2 80.9 97.8 70.2 86.4 D10 Services: Conveying 100.0 94.6 98.4 100.0 98.3 99.5 100.0 92.2 97.6 100.0 90.4 97.1 100.0 84.7 95.3 D20 - 40 Mechanical 96.4 73.1 86.1 99.8 97.4 98.8 96.4 68.6 84.1 100.0 69.2 86.4 100.0 70.9 87.1 D50 Electrical 95.3 71.9 82.9 101.5 95.6 98.4 96.0 71.1 82.8 95.7 74.3 84.4 100.2 71.9 85.2 E Equipment & Furnishings 100.0 70.9 98.3 100.0 99.2 100.0 100.0 45.9 96.8 100.0 55.8 97.4 100.0 70.0 98.3 G Site Work 112.5 98.9 103.4 93.4 95.8 95.0 112.2 98.4 103.0 101.9 98.4 99.5 95.0 94.8 94.9 A-G WEIGHTED AVERAGE 100.0 76.9 89.8 99.0 98.8 98.9 99.6 68.8 86.0 100.2 71.4 87.5 99.4 77.0 89.5 DIV.NO.BUILDING SYSTEMS KANSAS KENTUCKY WICHITA ASHLAND BOWLING GREEN CAMPTON CORBIN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 91.1 83.5 86.6 88.2 93.5 91.3 86.6 81.1 83.4 93.8 81.4 86.5 90.3 78.2 83.2 B10 Shell: Superstructure 102.1 84.5 95.3 94.1 103.8 97.9 95.3 81.4 90.0 96.2 84.9 91.8 95.1 76.3 87.8 B20 Exterior Closure 99.2 71.1 86.2 99.2 94.6 97.1 100.0 74.4 88.2 97.3 63.6 81.8 90.9 62.9 78.0 B30 Roofing 97.3 72.5 87.8 92.5 93.0 92.7 88.2 82.6 86.1 101.5 72.3 90.4 106.3 75.7 94.6 C Interior Construction 99.8 61.4 83.9 85.5 95.0 89.4 91.0 80.2 86.5 92.0 69.3 82.6 86.4 66.9 78.3 D10 Services: Conveying 100.0 96.5 98.9 100.0 82.3 94.6 100.0 91.1 97.3 100.0 45.7 83.5 100.0 90.5 97.1 D20 - 40 Mechanical 99.8 77.7 90.0 96.2 87.5 92.3 100.0 79.2 90.8 96.4 75.9 87.4 96.5 74.9 86.9 D50 Electrical 99.9 74.3 86.3 92.2 95.7 94.0 94.8 79.2 86.5 92.1 95.6 94.0 91.2 95.6 93.5 E Equipment & Furnishings 100.0 53.7 97.3 100.0 93.1 99.6 100.0 79.7 98.8 100.0 79.0 98.8 100.0 74.4 98.5 G Site Work 96.9 100.8 99.5 120.0 83.3 95.5 79.9 95.6 90.4 89.9 96.9 94.6 92.0 97.4 95.6 A-G WEIGHTED AVERAGE 99.7 77.2 89.8 94.3 93.7 94.0 95.5 80.7 88.9 95.5 78.3 87.9 93.5 77.3 86.3 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 7COA050503 DIV. NO.BUILDING SYSTEMS KENTUCKY COVINGTON ELIZABETHTOWN FRANKFORT HAZARD HENDERSON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 89.8 83.1 85.9 80.4 79.9 80.1 92.0 81.7 85.9 91.0 78.6 83.7 80.6 92.2 87.5 B10 Shell: Superstructure 93.7 85.0 90.4 93.3 81.6 88.8 98.0 82.1 91.9 95.6 76.9 88.4 86.5 84.0 85.5 B20 Exterior Closure 103.4 77.5 91.5 89.0 68.8 79.7 90.5 72.2 82.1 95.5 64.1 81.0 102.8 79.4 92.0 B30 Roofing 102.5 81.2 94.4 87.6 73.7 82.3 104.1 77.5 93.9 101.4 74.5 91.1 100.7 81.9 93.6 C Interior Construction 89.4 74.4 83.2 90.4 77.2 84.9 90.9 71.2 82.7 91.8 68.4 82.1 90.1 81.1 86.4 D10 Services: Conveying 100.0 92.0 97.6 100.0 74.5 92.2 100.0 58.4 87.3 100.0 46.5 83.7 100.0 57.0 86.9 D20 - 40 Mechanical 97.2 78.4 88.9 96.6 75.8 87.4 100.1 77.6 90.1 96.4 76.4 87.6 96.6 79.4 89.0 D50 Electrical 96.0 76.5 85.6 91.9 79.2 85.2 100.1 77.5 88.1 92.1 95.6 94.0 94.2 77.8 85.5 E Equipment & Furnishings 100.0 70.6 98.3 100.0 79.4 98.8 100.0 73.8 98.5 100.0 79.4 98.8 100.0 78.9 98.8 G Site Work 85.9 109.5 101.7 74.2 95.3 88.3 88.5 97.7 94.6 87.6 98.0 94.6 83.1 123.4 110.1 A-G WEIGHTED AVERAGE 95.5 81.1 89.2 92.2 78.0 85.9 96.4 77.7 88.1 94.9 76.9 87.0 93.2 83.3 88.8 DIV.NO.BUILDING SYSTEMS KENTUCKY LEXINGTON LOUISVILLE OWENSBORO PADUCAH PIKEVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 94.7 83.6 88.1 92.1 81.1 85.6 89.5 92.2 91.1 83.5 92.5 88.8 95.8 86.8 90.5 B10 Shell: Superstructure 98.5 83.6 92.7 98.7 82.4 92.4 89.2 85.1 87.7 85.8 85.7 85.8 95.8 99.0 97.0 B20 Exterior Closure 90.2 74.5 83.0 89.8 71.9 81.5 105.8 77.3 92.7 102.8 81.7 93.1 107.6 85.5 97.4 B30 Roofing 106.5 78.8 95.9 103.5 75.2 92.7 101.4 81.3 93.7 100.8 85.5 95.0 93.3 82.7 89.2 C Interior Construction 88.2 73.0 81.9 85.8 78.2 82.6 90.2 80.8 86.3 89.4 78.6 85.0 87.0 83.1 85.4 D10 Services: Conveying 100.0 94.1 98.2 100.0 90.6 97.1 100.0 99.1 99.7 100.0 53.4 85.8 100.0 46.0 83.6 D20 - 40 Mechanical 100.1 77.8 90.2 100.1 78.5 90.6 100.0 80.4 91.3 96.6 80.3 89.4 96.2 83.2 90.4 D50 Electrical 93.9 79.2 86.1 99.8 79.2 88.9 94.3 77.8 85.5 96.6 78.6 87.1 95.2 68.5 81.0 E Equipment & Furnishings 100.0 74.2 98.5 100.0 79.6 98.8 100.0 78.9 98.8 100.0 83.6 99.0 100.0 78.7 98.8 G Site Work 93.9 99.3 97.5 87.3 95.5 92.8 93.5 124.0 114.0 86.8 123.3 111.2 131.1 82.3 98.4 A-G WEIGHTED AVERAGE 95.7 80.0 88.8 95.5 79.9 88.6 95.5 84.6 90.7 93.4 83.8 89.1 96.8 83.3 90.8 DIV.NO.BUILDING SYSTEMS KENTUCKY LOUISIANA SOMERSET ALEXANDRIA BATON ROUGE HAMMOND LAFAYETTE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 79.5 83.3 81.8 95.0 71.4 81.0 94.9 76.9 84.3 92.0 67.8 77.7 93.3 72.4 81.0 B10 Shell: Superstructure 93.2 79.1 87.8 95.0 70.5 85.5 98.8 71.6 88.3 89.5 65.4 80.2 90.1 68.8 81.9 B20 Exterior Closure 87.3 67.5 78.2 102.6 65.2 85.4 91.1 64.9 79.0 93.3 57.7 76.9 94.1 60.7 78.7 B30 Roofing 100.8 76.1 91.4 98.3 68.8 87.0 97.9 71.9 88.0 97.2 66.2 85.3 97.7 69.1 86.8 C Interior Construction 91.0 67.1 81.1 99.0 62.7 84.0 96.3 72.5 86.5 95.0 56.5 79.1 98.4 66.6 85.3 D10 Services: Conveying 100.0 90.5 97.1 100.0 83.1 94.8 100.0 88.7 96.6 100.0 82.9 94.8 100.0 87.3 96.1 D20 - 40 Mechanical 96.6 75.2 87.1 100.1 63.7 84.0 100.0 65.0 84.5 96.6 61.7 81.2 100.2 63.1 83.8 D50 Electrical 92.6 95.6 94.2 94.2 66.6 79.6 98.8 60.2 78.3 93.3 72.4 82.2 94.5 64.0 78.3 E Equipment & Furnishings 100.0 74.4 98.5 100.0 62.5 97.8 100.0 76.4 98.6 100.0 58.8 97.6 100.0 70.8 98.3 G Site Work 80.5 97.4 91.9 104.6 93.3 97.0 101.8 92.2 95.3 99.2 91.6 94.1 100.5 93.6 95.9 A-G WEIGHTED AVERAGE 92.7 78.9 86.6 98.3 68.3 85.1 97.7 70.0 85.5 94.2 65.4 81.5 96.0 67.8 83.6 DIV. NO.BUILDING SYSTEMS LOUISIANA LAKE CHARLES MONROE NEW ORLEANS SHREVEPORT THIBODAUX MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 96.6 72.6 82.4 94.7 71.2 80.8 95.5 73.5 82.5 98.7 62.3 77.2 97.7 68.3 80.4 B10 Shell: Superstructure 90.7 69.0 82.3 94.9 69.9 85.3 98.0 65.1 85.3 99.5 62.4 85.2 91.0 66.1 81.4 B20 Exterior Closure 93.9 66.3 81.1 100.2 56.5 80.0 99.6 62.1 82.3 95.9 49.4 74.4 105.6 56.0 82.7 B30 Roofing 97.4 70.2 87.0 98.3 67.8 86.6 93.5 69.9 84.5 95.9 60.8 82.5 97.1 68.9 86.3 C Interior Construction 98.5 68.4 86.0 98.9 61.0 83.2 102.0 68.6 88.2 99.6 45.7 77.3 98.3 61.7 83.2 D10 Services: Conveying 100.0 88.5 96.5 100.0 84.9 95.4 100.0 87.3 96.1 100.0 85.2 95.5 100.0 87.6 96.2 D20 - 40 Mechanical 100.2 64.9 84.6 100.1 55.9 80.6 100.1 64.6 84.4 99.9 58.7 81.7 96.6 62.8 81.7 D50 Electrical 94.0 66.4 79.4 96.1 60.1 77.0 96.7 72.3 83.8 101.5 66.2 82.8 92.1 70.6 80.7 E Equipment & Furnishings 100.0 68.4 98.2 100.0 62.1 97.8 100.0 72.7 98.4 100.0 44.9 96.8 100.0 70.7 98.3 G Site Work 101.3 92.9 95.7 104.5 93.2 97.0 98.8 94.4 95.9 106.1 92.6 97.1 101.5 93.6 96.2 A-G WEIGHTED AVERAGE 96.3 69.6 84.5 98.2 64.3 83.2 99.1 69.3 86.0 99.4 60.2 82.1 96.8 66.5 83.4 DIV. NO.BUILDING SYSTEMS MAINE AUGUSTA BANGOR BATH HOULTON KITTERY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 94.3 87.9 90.5 80.8 92.3 87.6 80.2 88.2 84.9 81.2 91.9 87.5 79.0 88.6 84.7 B10 Shell: Superstructure 97.1 87.2 93.3 86.3 90.5 87.9 84.8 88.3 86.1 85.5 88.9 86.8 81.8 88.7 84.5 B20 Exterior Closure 98.9 59.9 80.9 108.7 88.7 99.5 112.2 77.4 96.2 101.6 66.3 85.4 103.6 79.2 92.4 B30 Roofing 103.8 65.0 89.0 100.8 80.6 93.1 100.7 66.9 87.8 100.9 73.0 90.2 101.9 66.3 88.3 C Interior Construction 98.3 71.2 87.1 94.5 78.8 88.0 93.8 71.2 84.5 94.8 73.4 85.9 94.5 72.9 85.5 D10 Services: Conveying 100.0 101.8 100.6 100.0 106.7 102.0 100.0 101.9 100.6 100.0 106.7 102.1 100.0 102.1 100.7 D20 - 40 Mechanical 99.9 62.2 83.2 100.1 68.9 86.3 96.6 62.2 81.4 96.6 68.9 84.3 96.5 72.5 85.9 D50 Electrical 100.7 78.8 89.1 99.2 74.7 86.2 97.2 78.8 87.4 101.2 78.8 89.3 94.6 78.8 86.2 E Equipment & Furnishings 100.0 75.1 98.5 100.0 75.6 98.6 100.0 75.1 98.5 100.0 75.8 98.6 100.0 75.2 98.6 G Site Work 91.5 99.5 96.8 94.3 99.8 98.0 91.9 99.5 97.0 94.0 100.4 98.3 82.1 99.5 93.8 A-G WEIGHTED AVERAGE 98.6 75.3 88.3 96.1 82.5 90.1 95.0 77.8 87.4 94.6 78.9 87.7 93.0 80.6 87.5 DIV.NO.BUILDING SYSTEMS MAINE LEWISTON MACHIAS PORTLAND ROCKLAND WATERVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 86.1 92.3 89.8 80.9 91.9 87.4 94.3 92.3 93.1 81.5 91.9 87.6 80.6 87.9 84.9 B10 Shell: Superstructure 90.2 90.5 90.3 85.3 88.8 86.7 97.3 90.5 94.7 85.5 88.8 86.8 84.9 87.2 85.8 B20 Exterior Closure 98.3 88.7 93.9 101.3 66.3 85.2 99.5 88.7 94.5 95.1 66.3 81.8 107.2 59.9 85.4 B30 Roofing 100.5 80.7 92.9 100.8 72.1 89.8 104.0 80.7 95.1 100.5 72.1 89.6 100.9 65.0 87.2 C Interior Construction 97.5 78.8 89.8 94.5 73.4 85.8 98.1 78.8 90.1 94.4 73.4 85.7 93.9 71.2 84.5 D10 Services: Conveying 100.0 106.7 102.0 100.0 106.8 102.1 100.0 106.7 102.0 100.0 106.8 102.1 100.0 101.6 100.5 D20 - 40 Mechanical 100.1 69.0 86.3 96.6 68.9 84.3 99.9 69.0 86.2 96.6 68.9 84.3 96.6 62.2 81.4 D50 Electrical 101.3 78.8 89.3 101.2 78.8 89.3 103.3 78.8 90.3 101.2 78.8 89.3 101.2 78.8 89.3 E Equipment & Furnishings 100.0 75.8 98.6 100.0 75.8 98.6 100.0 75.8 98.6 100.0 75.8 98.6 100.0 75.1 98.5 G Site Work 91.1 99.8 96.9 93.3 100.4 98.0 92.5 99.8 97.4 90.0 100.4 96.9 93.4 99.5 97.5 A-G WEIGHTED AVERAGE 96.6 83.1 90.6 94.4 78.9 87.6 99.0 83.1 92.0 93.7 78.9 87.1 94.9 75.3 86.3 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 8 COA050504 DIV. NO.BUILDING SYSTEMS MARYLAND ANNAPOLIS BALTIMORE COLLEGE PARK CUMBERLAND EASTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 109.7 83.2 94.1 107.5 84.3 93.8 107.0 81.8 92.1 93.9 87.9 90.4 101.1 79.3 88.2 B10 Shell: Superstructure 100.8 94.2 98.3 99.6 91.6 96.5 89.5 95.0 91.6 94.0 96.2 94.9 95.5 89.4 93.2 B20 Exterior Closure 95.6 77.0 87.0 105.2 76.6 92.1 108.4 74.0 92.6 97.6 92.0 95.0 106.9 47.9 79.7 B30 Roofing 104.0 81.5 95.4 101.4 82.3 94.1 101.5 81.4 93.8 100.4 80.8 92.9 100.6 76.0 91.2 C Interior Construction 94.1 78.8 87.8 99.0 79.0 90.7 91.3 74.7 84.4 95.9 89.4 93.2 95.2 74.2 86.5 D10 Services: Conveying 100.0 89.4 96.8 100.0 90.1 97.0 100.0 85.0 95.4 100.0 93.7 98.1 100.0 71.9 91.4 D20 - 40 Mechanical 100.0 82.8 92.4 100.0 82.9 92.4 96.6 82.8 90.5 96.3 73.4 86.2 96.3 76.4 87.5 D50 Electrical 99.0 92.4 95.5 98.8 92.4 95.4 98.3 101.2 99.8 96.5 82.1 88.9 95.9 65.8 79.9 E Equipment & Furnishings 100.0 80.1 98.8 100.0 80.2 98.8 100.0 74.7 98.5 100.0 86.5 99.2 100.0 81.4 98.9 G Site Work 105.9 94.7 98.4 105.2 98.1 100.5 103.4 99.1 100.5 97.1 95.5 96.0 104.5 91.7 95.9 A-G WEIGHTED AVERAGE 99.2 85.6 93.2 100.7 85.5 94.0 96.8 86.0 92.0 96.3 86.6 92.0 98.0 74.2 87.5 DIV.NO.BUILDING SYSTEMS MARYLAND ELKTON HAGERSTOWN SALISBURY SILVER SPRING WALDORF MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 87.3 91.4 89.7 90.6 86.2 88.0 102.3 68.3 82.2 107.8 80.3 91.6 118.2 78.9 95.0 B10 Shell: Superstructure 93.1 103.9 97.3 93.4 94.9 94.0 96.5 77.9 89.3 93.5 92.4 93.1 95.9 91.8 94.3 B20 Exterior Closure 93.5 66.0 80.8 98.1 90.7 94.7 106.9 52.2 81.7 104.3 77.6 92.0 100.8 73.8 88.4 B30 Roofing 100.1 83.4 93.7 100.8 86.8 95.4 100.8 70.9 89.4 105.0 89.5 99.1 105.5 86.9 98.4 C Interior Construction 95.3 89.5 92.9 95.0 83.7 90.3 96.9 57.1 80.4 87.0 72.4 80.9 88.1 71.9 81.4 D10 Services: Conveying 100.0 54.6 86.2 100.0 93.7 98.1 100.0 85.6 95.6 100.0 84.8 95.4 100.0 85.4 95.5 D20 - 40 Mechanical 96.3 81.3 89.7 99.9 87.3 94.3 96.3 74.0 86.5 96.6 85.1 91.5 96.6 82.4 90.3 D50 Electrical 97.7 91.5 94.4 96.3 82.1 88.8 94.7 65.1 79.0 95.7 101.2 98.6 93.3 101.2 97.5 E Equipment & Furnishings 100.0 99.9 100.0 100.0 80.2 98.8 100.0 55.1 97.4 100.0 72.5 98.4 100.0 72.2 98.4 G Site Work 91.0 94.3 93.2 95.5 95.6 95.5 104.5 91.7 95.9 92.1 90.4 91.0 98.6 90.1 92.9 A-G WEIGHTED AVERAGE 95.2 86.8 91.5 96.6 88.3 92.9 98.4 68.8 85.4 96.0 85.6 91.4 96.7 84.2 91.2 DIV.NO.BUILDING SYSTEMS MASSACHUSETTS BOSTON BROCKTON BUZZARDS BAY FALL RIVER FITCHBURG MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 99.4 133.0 119.3 94.9 126.9 113.8 79.5 123.8 105.7 92.9 124.0 111.3 82.4 126.6 108.5 B10 Shell: Superstructure 97.2 136.1 112.1 93.6 130.0 107.6 86.6 123.4 100.7 93.1 123.7 104.9 89.0 128.1 104.1 B20 Exterior Closure 103.4 147.2 123.6 100.1 132.9 115.2 91.7 137.2 112.6 100.4 137.2 117.4 92.3 136.2 112.5 B30 Roofing 99.7 134.9 113.1 100.6 128.2 111.1 99.5 125.6 109.5 100.4 124.8 109.7 99.9 122.5 108.5 C Interior Construction 99.8 146.8 119.3 97.0 135.0 112.7 92.7 133.7 109.7 96.9 133.9 112.2 95.7 135.0 112.0 D10 Services: Conveying 100.0 114.2 104.3 100.0 112.6 103.8 100.0 112.6 103.8 100.0 113.3 104.0 100.0 106.5 102.0 D20 - 40 Mechanical 100.1 126.4 111.7 100.3 107.6 103.6 96.8 107.4 101.5 100.3 107.4 103.5 96.9 108.6 102.1 D50 Electrical 101.3 129.4 116.2 99.8 103.0 101.5 97.0 103.0 100.2 99.7 103.0 101.4 100.0 100.7 100.4 E Equipment & Furnishings 100.0 140.5 102.4 100.0 124.5 101.4 100.0 124.5 101.4 100.0 124.4 101.4 100.0 124.4 101.4 G Site Work 99.8 104.1 102.7 93.8 104.7 101.1 85.1 104.7 98.2 92.6 104.8 100.8 85.3 104.7 98.3 A-G WEIGHTED AVERAGE 99.9 133.4 114.7 97.8 120.3 107.7 92.6 119.2 104.3 97.6 119.3 107.2 94.2 120.0 105.6 DIV. NO.BUILDING SYSTEMS MASSACHUSETTS FRAMINGHAM GREENFIELD HYANNIS LAWRENCE LOWELL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 82.7 127.0 108.9 85.3 114.9 102.8 84.4 123.8 107.7 96.1 126.1 113.8 90.6 125.9 111.5 B10 Shell: Superstructure 89.4 130.2 105.1 91.2 113.6 99.8 88.4 123.4 101.9 94.1 128.3 107.3 92.8 126.3 105.7 B20 Exterior Closure 96.9 136.9 115.4 96.5 120.4 107.5 97.3 137.2 115.7 105.6 139.0 121.0 95.5 135.9 114.1 B30 Roofing 100.0 128.3 110.8 99.9 109.9 103.7 100.0 125.6 109.8 100.5 128.7 111.3 100.3 128.5 111.1 C Interior Construction 90.4 134.8 108.8 96.8 116.6 105.0 93.2 133.7 109.9 93.8 134.5 110.7 98.4 134.5 113.3 D10 Services: Conveying 100.0 112.0 103.7 100.0 105.5 101.7 100.0 112.6 103.8 100.0 112.6 103.8 100.0 112.6 103.8 D20 - 40 Mechanical 96.9 121.6 107.9 96.9 100.5 98.5 100.3 107.4 103.4 100.1 124.1 110.7 100.1 124.1 110.7 D50 Electrical 96.6 122.2 110.2 100.0 97.7 98.8 97.4 103.0 100.4 99.1 127.6 114.2 99.6 122.1 111.5 E Equipment & Furnishings 100.0 125.7 101.5 100.0 109.6 100.6 100.0 124.5 101.4 100.0 125.7 101.5 100.0 125.5 101.5 G Site Work 82.2 104.4 97.0 87.6 103.6 98.3 91.4 104.7 100.3 93.4 104.7 101.0 91.8 104.7 100.5 A-G WEIGHTED AVERAGE 93.5 126.5 108.1 95.5 109.1 101.5 94.9 119.2 105.6 97.9 127.6 111.1 97.0 126.1 109.9 DIV. NO.BUILDING SYSTEMS MASSACHUSETTS MICHIGAN NEW BEDFORD PITTSFIELD SPRINGFIELD WORCESTER ANN ARBOR MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 85.9 124.0 108.4 92.3 112.0 103.9 92.8 114.9 105.8 92.5 126.6 112.7 89.6 104.4 98.3 B10 Shell: Superstructure 91.7 123.7 104.0 93.0 112.7 100.6 95.4 113.6 102.4 95.4 128.1 108.0 97.5 113.0 103.5 B20 Exterior Closure 99.6 137.2 116.9 95.8 115.8 105.0 95.7 120.4 107.1 95.5 136.2 114.2 95.8 102.2 98.8 B30 Roofing 100.4 124.8 109.7 100.4 106.0 102.5 100.3 109.9 104.0 100.3 122.5 108.8 104.0 103.7 103.9 C Interior Construction 96.8 133.9 112.1 98.5 115.5 105.5 98.4 116.6 105.9 98.4 133.7 113.0 94.1 108.5 100.0 D10 Services: Conveying 100.0 113.3 104.0 100.0 103.3 101.0 100.0 105.5 101.7 100.0 106.6 102.0 100.0 102.2 100.7 D20 - 40 Mechanical 100.3 107.4 103.5 100.1 97.5 98.9 100.1 100.5 100.3 100.1 108.6 103.8 100.1 95.2 97.9 D50 Electrical 100.6 103.0 101.8 99.6 97.7 98.6 99.6 97.7 98.6 99.6 105.2 102.5 97.5 103.5 100.7 E Equipment & Furnishings 100.0 124.4 101.4 100.0 109.2 100.5 100.0 109.6 100.6 100.0 124.6 101.4 100.0 109.5 100.6 G Site Work 91.0 104.8 100.3 93.1 103.2 99.9 92.4 103.6 99.9 92.3 104.7 100.6 83.0 97.3 92.6 A-G WEIGHTED AVERAGE 96.9 119.3 106.8 97.2 107.1 101.6 97.7 109.1 102.7 97.7 120.4 107.7 97.0 103.6 99.9 DIV.NO.BUILDING SYSTEMS MICHIGAN BATTLE CREEK BAY CITY DEARBORN DETROIT FLINT MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 88.5 85.3 86.6 85.9 91.0 88.9 88.3 105.2 98.2 102.8 104.9 104.0 88.6 92.6 91.0 B10 Shell: Superstructure 100.3 83.0 93.6 97.5 102.9 99.6 97.3 113.3 103.5 99.7 100.1 99.8 97.9 104.1 100.3 B20 Exterior Closure 93.6 80.0 87.4 95.6 85.2 90.8 95.7 104.1 99.6 97.8 102.4 99.9 95.8 92.3 94.2 B30 Roofing 100.4 78.7 92.1 101.3 87.2 95.9 102.3 108.4 104.6 101.5 108.1 104.0 101.6 90.3 97.3 C Interior Construction 90.2 78.4 85.3 94.0 83.0 89.4 94.0 107.9 99.8 98.0 107.9 102.1 93.8 85.4 90.4 D10 Services: Conveying 100.0 97.8 99.3 100.0 89.8 96.9 100.0 103.0 100.9 100.0 102.8 100.9 100.0 90.9 97.2 D20 - 40 Mechanical 100.1 85.8 93.8 100.1 80.9 91.6 100.1 104.0 101.8 100.0 104.5 102.0 100.1 86.7 94.2 D50 Electrical 94.9 82.2 88.1 96.6 92.4 94.4 97.5 97.7 97.6 98.8 97.6 98.2 97.5 94.1 95.7 E Equipment & Furnishings 100.0 75.8 98.6 100.0 84.3 99.1 100.0 109.4 100.5 100.0 109.3 100.5 100.0 84.7 99.1 G Site Work 93.3 86.2 88.5 75.3 96.3 89.4 82.7 97.5 92.6 97.4 100.1 99.2 73.7 96.5 88.9 A-G WEIGHTED AVERAGE 96.5 83.1 90.6 96.4 89.3 93.3 96.8 105.1 100.5 99.3 102.9 100.9 96.7 92.4 94.8 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 9COA050505 DIV. NO.BUILDING SYSTEMS MICHIGAN GAYLORD GRAND RAPIDS IRON MOUNTAIN JACKSON KALAMAZOO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 85.4 81.2 82.9 92.0 85.9 88.4 96.5 81.7 87.7 88.1 88.7 88.4 89.6 85.7 87.3 B10 Shell: Superstructure 101.2 97.5 99.8 98.7 83.2 92.7 102.7 85.7 96.1 101.1 101.8 101.4 100.6 83.0 93.8 B20 Exterior Closure 97.3 80.1 89.3 93.5 82.3 88.3 92.0 79.6 86.3 83.7 85.9 84.7 95.6 79.6 88.2 B30 Roofing 98.9 70.8 88.2 102.0 71.6 90.4 103.0 77.0 93.1 98.2 87.1 93.9 100.4 79.4 92.4 C Interior Construction 89.0 77.5 84.2 96.0 79.5 89.2 93.9 81.8 88.9 89.0 83.9 86.9 90.2 78.4 85.3 D10 Services: Conveying 100.0 84.0 95.1 100.0 91.9 97.5 100.0 81.1 94.3 100.0 101.8 100.5 100.0 91.4 97.4 D20 - 40 Mechanical 96.8 73.9 86.7 100.1 82.4 92.3 96.7 80.5 89.6 96.8 86.7 92.3 100.1 77.7 90.2 D50 Electrical 92.6 75.1 83.3 100.0 74.6 86.5 99.2 83.4 90.8 96.7 102.6 99.9 94.7 80.3 87.1 E Equipment & Furnishings 100.0 72.6 98.4 100.0 76.0 98.6 100.0 81.6 98.9 100.0 82.5 99.0 100.0 75.7 98.6 G Site Work 90.3 82.3 84.9 92.0 86.2 88.2 97.1 92.1 93.8 109.8 84.6 93.0 93.6 86.2 88.6 A-G WEIGHTED AVERAGE 95.7 80.7 89.1 97.8 81.5 90.6 97.7 82.6 91.0 95.0 91.4 93.4 96.8 80.9 89.8 DIV.NO.BUILDING SYSTEMS MICHIGAN LANSING MUSKEGON ROYAL OAK SAGINAW TRAVERSE CITY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 95.1 92.2 93.4 88.4 83.6 85.6 81.3 102.1 93.6 87.8 90.9 89.6 81.1 80.4 80.7 B10 Shell: Superstructure 99.3 103.3 100.9 98.4 81.6 91.9 98.3 97.5 98.0 97.5 102.7 99.5 99.7 82.5 93.1 B20 Exterior Closure 94.4 88.7 91.8 90.6 77.4 84.5 86.9 100.3 93.1 95.9 85.2 91.0 84.8 76.7 81.1 B30 Roofing 99.1 83.7 93.2 99.2 72.9 89.2 99.9 105.2 101.9 102.5 87.5 96.8 102.0 68.6 89.2 C Interior Construction 95.7 83.6 90.7 87.8 77.2 83.4 93.3 107.3 99.1 92.8 83.0 88.7 93.4 74.1 85.4 D10 Services: Conveying 100.0 100.7 100.2 100.0 91.4 97.4 100.0 98.8 99.6 100.0 89.8 96.9 100.0 80.4 94.0 D20 - 40 Mechanical 100.0 86.2 93.8 99.9 81.8 91.9 96.8 100.9 98.6 100.1 80.4 91.4 96.7 79.2 89.0 D50 Electrical 100.3 88.0 93.8 95.1 76.9 85.5 99.6 100.0 99.8 95.6 89.8 92.5 94.3 75.1 84.1 E Equipment & Furnishings 100.0 83.7 99.0 100.0 74.0 98.5 100.0 109.4 100.5 100.0 84.2 99.1 100.0 74.7 98.5 G Site Work 91.8 96.6 95.0 90.9 86.2 87.7 85.8 97.1 93.4 76.3 96.3 89.7 82.6 91.5 88.6 A-G WEIGHTED AVERAGE 98.0 90.7 94.8 95.2 80.3 88.6 95.0 101.0 97.7 96.3 88.8 93.0 94.5 78.7 87.5 DIV.NO.BUILDING SYSTEMS MINNESOTA BEMIDJI BRAINERD DETROIT LAKES DULUTH MANKATO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 99.3 94.5 96.5 104.4 97.7 100.4 97.0 95.9 96.3 97.3 100.6 99.2 98.9 100.1 99.6 B10 Shell: Superstructure 93.1 104.4 97.4 95.2 105.2 99.1 92.5 104.8 97.3 99.2 109.1 103.0 94.4 109.0 100.0 B20 Exterior Closure 93.1 102.8 97.6 102.0 108.9 105.2 102.7 106.7 104.6 98.8 107.8 102.9 96.9 104.3 100.3 B30 Roofing 107.3 93.5 102.0 105.7 101.9 104.3 107.1 100.8 104.7 106.3 103.1 105.1 105.9 89.7 99.7 C Interior Construction 98.2 92.0 95.6 83.9 93.2 87.7 97.9 91.0 95.0 100.7 103.3 101.8 87.2 97.4 91.4 D10 Services: Conveying 100.0 99.3 99.8 100.0 101.1 100.3 100.0 101.1 100.3 100.0 89.5 96.8 100.0 99.5 99.8 D20 - 40 Mechanical 96.9 81.1 89.9 95.9 84.4 90.8 96.9 83.5 90.9 99.9 96.4 98.3 95.9 85.4 91.3 D50 Electrical 104.8 104.7 104.8 102.3 102.1 102.2 104.6 68.3 85.3 100.4 102.2 101.3 109.2 91.1 99.6 E Equipment & Furnishings 100.0 81.8 98.9 100.0 82.4 99.0 100.0 80.4 98.9 100.0 97.4 99.8 100.0 88.7 99.3 G Site Work 95.4 100.5 98.9 99.3 105.6 103.5 93.7 100.8 98.5 97.7 103.7 101.7 96.3 105.3 102.3 A-G WEIGHTED AVERAGE 97.3 95.8 96.6 96.1 98.1 97.0 98.0 92.1 95.4 99.8 102.6 101.1 96.3 97.3 96.7 DIV. NO.BUILDING SYSTEMS MINNESOTA MINNEAPOLIS ROCHESTER SAINT PAUL ST. CLOUD THIEF RIVER FALLS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 99.5 110.7 106.1 98.0 98.3 98.2 101.3 109.8 106.3 95.1 104.9 100.9 98.8 89.3 93.2 B10 Shell: Superstructure 99.1 117.4 106.2 99.2 109.8 103.3 100.1 117.4 106.8 93.8 112.5 101.0 93.1 101.3 96.3 B20 Exterior Closure 101.3 118.0 109.0 95.8 106.7 100.8 97.2 118.0 106.8 93.9 106.8 99.9 92.1 102.8 97.0 B30 Roofing 104.7 117.6 109.6 110.1 92.8 103.5 105.1 116.6 109.5 105.6 103.9 105.0 108.2 86.1 99.7 C Interior Construction 99.6 114.9 106.0 96.6 95.8 96.3 95.8 115.4 103.9 86.3 107.1 94.9 98.1 90.0 94.8 D10 Services: Conveying 100.0 104.7 101.4 100.0 100.4 100.1 100.0 104.1 101.2 100.0 93.8 98.1 100.0 99.3 99.8 D20 - 40 Mechanical 100.0 108.0 103.5 100.0 92.9 96.8 99.9 109.8 104.3 99.5 104.8 101.8 96.9 80.9 89.8 D50 Electrical 101.1 111.7 106.7 100.1 91.1 95.3 99.7 113.0 106.8 102.3 113.0 108.0 101.7 68.3 84.0 E Equipment & Furnishings 100.0 111.4 100.7 100.0 93.3 99.6 100.0 112.3 100.7 100.0 101.4 100.1 100.0 80.1 98.8 G Site Work 98.1 107.7 104.6 98.1 102.7 101.2 95.3 104.4 101.4 94.9 106.3 102.5 94.5 100.5 98.5 A-G WEIGHTED AVERAGE 100.1 112.8 105.7 98.9 98.9 98.9 99.0 113.2 105.3 95.5 107.6 100.9 96.8 89.3 93.5 DIV. NO.BUILDING SYSTEMS MINNESOTA MISSISSIPPI WILLMAR WINDOM BILOXI CLARKSDALE COLUMBUS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 96.1 89.8 92.4 87.0 89.0 88.2 106.5 68.4 84.0 98.8 60.8 76.3 107.9 59.4 79.2 B10 Shell: Superstructure 93.3 102.7 96.9 91.6 101.5 95.4 96.0 76.2 88.4 94.2 71.9 85.6 93.6 66.6 83.2 B20 Exterior Closure 94.5 106.0 99.8 97.3 91.1 94.4 96.8 63.1 81.3 92.8 46.2 71.3 108.5 50.4 81.7 B30 Roofing 105.6 97.7 102.5 105.5 83.3 97.1 97.9 62.8 84.5 96.7 53.1 80.0 97.9 52.2 80.4 C Interior Construction 84.6 86.3 85.3 86.5 84.1 85.5 94.7 65.9 82.8 93.2 48.0 74.5 92.6 48.6 74.4 D10 Services: Conveying 100.0 101.1 100.3 100.0 97.6 99.3 100.0 71.4 91.3 100.0 51.8 85.3 100.0 52.9 85.7 D20 - 40 Mechanical 95.9 102.0 98.6 95.9 81.9 89.7 99.9 51.3 78.4 98.3 53.9 78.7 97.9 55.5 79.2 D50 Electrical 102.3 81.8 91.4 109.2 91.1 99.6 101.0 57.6 78.0 96.4 45.1 69.2 98.2 47.8 71.5 E Equipment & Furnishings 100.0 73.9 98.5 100.0 71.7 98.3 100.0 68.4 98.2 100.0 47.4 96.9 100.0 48.6 97.0 G Site Work 94.1 105.6 101.8 88.2 104.8 99.3 104.3 89.9 94.7 97.0 89.3 91.8 103.3 90.1 94.5 A-G WEIGHTED AVERAGE 94.5 96.4 95.3 94.9 90.4 92.9 98.2 64.7 83.4 95.8 56.4 78.4 98.1 56.8 79.8 DIV.NO.BUILDING SYSTEMS MISSISSIPPI GREENVILLE GREENWOOD JACKSON LAUREL MCCOMB MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.4 68.1 81.7 105.0 57.9 77.2 98.1 70.6 81.9 107.0 63.1 81.0 97.2 57.3 73.6 B10 Shell: Superstructure 95.2 75.8 87.7 95.9 65.1 84.0 99.6 77.1 90.9 93.3 68.2 83.6 91.6 63.7 80.8 B20 Exterior Closure 116.8 70.1 95.3 95.3 45.1 72.1 99.8 70.0 86.1 110.0 48.0 81.4 105.4 44.5 77.3 B30 Roofing 97.2 65.0 84.9 97.1 55.9 81.3 96.3 66.5 84.9 98.0 55.6 81.8 97.4 55.9 81.5 C Interior Construction 93.4 61.5 80.2 95.0 46.7 75.0 94.7 66.6 83.1 91.1 60.5 78.4 92.3 47.8 73.9 D10 Services: Conveying 100.0 74.7 92.3 100.0 51.8 85.3 100.0 74.7 92.3 100.0 32.4 79.4 100.0 55.0 86.3 D20 - 40 Mechanical 100.0 59.3 82.0 98.3 54.1 78.8 99.9 59.3 82.0 97.9 43.8 74.0 97.9 53.3 78.2 D50 Electrical 96.4 57.3 75.7 96.4 42.3 67.7 102.4 57.3 78.5 99.9 57.3 77.3 96.7 48.1 70.9 E Equipment & Furnishings 100.0 67.2 98.1 100.0 47.3 96.9 100.0 67.2 98.1 100.0 68.4 98.2 100.0 50.0 97.1 G Site Work 101.9 90.5 94.3 99.4 89.0 92.4 98.7 90.5 93.2 108.0 89.4 95.5 96.5 89.1 91.6 A-G WEIGHTED AVERAGE 99.5 66.7 85.0 97.1 54.3 78.2 99.0 67.9 85.3 98.2 57.2 80.1 96.4 54.9 78.1 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 10 COA050506 DIV. NO.BUILDING SYSTEMS MISSISSIPPI MISSOURI MERIDIAN TUPELO BOWLING GREEN CAPE GIRARDEAU CHILLICOTHE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.8 69.7 82.8 98.2 64.5 78.3 94.6 95.5 95.1 93.5 86.2 89.2 98.8 95.0 96.6 B10 Shell: Superstructure 93.1 76.7 86.8 93.9 68.4 84.1 94.6 107.9 99.7 94.9 98.3 96.2 92.8 103.3 96.9 B20 Exterior Closure 94.6 67.6 82.1 107.6 48.3 80.3 106.2 98.9 102.9 104.8 80.0 93.4 107.5 95.5 102.0 B30 Roofing 97.6 64.8 85.1 96.7 57.4 81.7 100.9 98.8 100.1 100.3 85.7 94.7 93.0 96.6 94.4 C Interior Construction 92.2 65.9 81.4 93.0 47.7 74.2 100.5 94.1 97.8 99.9 78.6 91.1 96.5 99.3 97.6 D10 Services: Conveying 100.0 73.5 91.9 100.0 52.9 85.7 100.0 83.8 95.1 100.0 93.6 98.0 100.0 84.3 95.2 D20 - 40 Mechanical 99.9 57.7 81.2 98.5 55.1 79.3 96.4 96.3 96.4 100.0 95.1 97.8 96.6 97.6 97.0 D50 Electrical 99.9 58.0 77.7 96.1 47.9 70.6 103.2 81.7 91.8 103.2 91.0 96.7 95.9 79.2 87.0 E Equipment & Furnishings 100.0 67.0 98.1 100.0 48.6 97.0 100.0 91.5 99.5 100.0 78.5 98.7 100.0 99.0 99.9 G Site Work 100.6 90.3 93.7 94.1 89.2 90.8 88.1 94.5 92.4 90.1 94.5 93.0 109.2 93.9 99.0 A-G WEIGHTED AVERAGE 96.5 67.0 83.5 97.3 57.1 79.6 98.7 95.8 97.4 99.2 89.5 95.0 97.5 95.2 96.5 DIV.NO.BUILDING SYSTEMS MISSOURI COLUMBIA FLAT RIVER HANNIBAL HARRISONVILLE JEFFERSON CITY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 87.7 92.4 90.5 97.4 93.3 95.0 90.8 92.6 91.9 99.2 102.6 101.2 93.4 90.9 91.9 B10 Shell: Superstructure 98.8 108.2 102.4 95.4 107.9 100.2 93.8 105.7 98.4 93.3 110.4 99.9 100.1 105.4 102.1 B20 Exterior Closure 113.8 79.7 98.1 106.1 84.5 96.2 101.3 95.9 98.8 99.8 103.5 101.5 97.6 79.3 89.2 B30 Roofing 94.9 87.6 92.1 101.1 97.2 99.6 100.7 94.6 98.4 92.2 103.6 96.6 102.4 87.3 96.6 C Interior Construction 94.2 83.0 89.5 101.4 86.6 95.3 100.3 87.7 95.0 95.2 100.1 97.2 94.2 81.1 88.8 D10 Services: Conveying 100.0 99.2 99.8 100.0 93.4 98.0 100.0 83.5 95.0 100.0 85.9 95.7 100.0 99.2 99.8 D20 - 40 Mechanical 99.9 96.9 98.6 96.4 95.8 96.1 96.4 95.8 96.1 96.5 101.1 98.5 99.9 97.5 98.8 D50 Electrical 94.3 85.1 89.4 108.0 98.4 102.9 101.9 81.7 91.2 102.5 98.7 100.5 99.5 85.1 91.8 E Equipment & Furnishings 100.0 81.6 98.9 100.0 88.3 99.3 100.0 83.2 99.0 100.0 104.3 100.3 100.0 79.6 98.8 G Site Work 96.4 99.6 98.6 90.9 94.5 93.3 86.2 94.4 91.7 100.7 95.0 96.9 95.5 100.2 98.6 A-G WEIGHTED AVERAGE 99.0 92.5 96.1 99.7 95.0 97.6 97.6 93.5 95.8 96.9 101.9 99.1 98.3 91.7 95.4 DIV.NO.BUILDING SYSTEMS MISSOURI JOPLIN KANSAS CITY KIRKSVILLE POPLAR BLUFF ROLLA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 106.3 83.6 92.9 99.3 104.2 102.2 95.2 84.3 88.8 80.9 86.3 84.1 89.9 96.2 93.6 B10 Shell: Superstructure 97.0 91.5 94.9 101.7 112.1 105.7 94.2 93.3 93.9 91.8 92.6 92.1 99.1 105.9 101.7 B20 Exterior Closure 98.1 83.4 91.3 101.3 105.4 103.2 123.3 86.3 106.2 103.2 77.1 91.2 102.4 88.3 95.9 B30 Roofing 92.2 77.9 86.7 92.3 106.4 97.7 107.8 92.1 101.8 106.0 85.8 98.3 95.2 96.3 95.6 C Interior Construction 100.3 77.3 90.8 101.4 105.9 103.2 103.5 77.6 92.8 103.8 81.0 94.4 94.9 94.1 94.6 D10 Services: Conveying 100.0 85.7 95.7 100.0 100.5 100.2 100.0 83.5 95.0 100.0 92.5 97.7 100.0 85.0 95.4 D20 - 40 Mechanical 100.1 70.8 87.2 100.0 101.7 100.7 96.4 94.6 95.6 96.4 93.6 95.2 96.3 97.1 96.7 D50 Electrical 93.8 75.1 83.9 104.2 101.0 102.5 102.2 80.0 90.4 102.4 91.0 96.3 92.7 78.2 85.0 E Equipment & Furnishings 100.0 74.9 98.5 100.0 104.6 100.3 100.0 76.2 98.6 100.0 82.8 99.0 100.0 97.6 99.9 G Site Work 108.4 98.7 101.9 102.0 95.7 97.8 91.6 90.1 90.6 77.7 94.1 88.7 94.9 99.4 97.9 A-G WEIGHTED AVERAGE 98.8 80.8 90.9 100.9 104.4 102.5 101.4 87.1 95.1 97.5 88.2 93.4 97.0 94.1 95.7 DIV. NO.BUILDING SYSTEMS MISSOURI SEDALIA SIKESTON SPRINGFIELD ST. JOSEPH ST. LOUIS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 91.2 89.4 90.1 84.5 85.2 84.9 93.7 86.7 89.5 99.1 97.2 98.0 93.3 102.4 98.6 B10 Shell: Superstructure 98.5 101.1 99.5 92.8 92.2 92.6 104.2 97.9 101.7 98.6 106.8 101.8 99.1 114.2 104.9 B20 Exterior Closure 118.4 86.5 103.7 104.6 77.0 91.9 100.8 86.4 94.2 101.0 96.4 98.9 96.0 108.7 101.9 B30 Roofing 101.2 92.1 97.7 106.1 86.4 98.6 99.5 78.4 91.4 92.7 93.1 92.8 100.9 100.8 100.8 C Interior Construction 96.7 82.9 91.0 104.1 78.4 93.5 100.4 82.3 92.9 100.8 94.2 98.1 102.5 103.8 103.1 D10 Services: Conveying 100.0 92.0 97.6 100.0 89.2 96.7 100.0 96.5 98.9 100.0 98.7 99.6 100.0 101.6 100.5 D20 - 40 Mechanical 96.3 93.6 95.1 96.4 93.7 95.2 100.0 72.8 87.9 100.1 87.9 94.7 100.0 104.8 102.1 D50 Electrical 93.9 98.7 96.4 101.4 133.3 118.3 98.2 72.4 84.5 102.5 98.5 100.4 105.8 91.1 98.0 E Equipment & Furnishings 100.0 80.2 98.8 100.0 80.5 98.9 100.0 77.1 98.7 100.0 91.7 99.5 100.0 103.4 100.2 G Site Work 95.9 95.1 95.4 81.2 94.2 89.9 96.6 97.1 97.0 103.7 92.9 96.5 89.9 97.3 94.9 A-G WEIGHTED AVERAGE 99.4 92.7 96.4 98.1 93.5 96.1 100.5 83.6 93.0 100.1 96.1 98.3 99.8 104.0 101.7 DIV. NO.BUILDING SYSTEMS MONTANA BILLINGS BUTTE GREAT FALLS HAVRE HELENA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 111.8 77.4 91.5 120.9 76.1 94.4 125.7 76.3 96.5 128.0 74.5 96.4 104.4 73.7 86.3 B10 Shell: Superstructure 106.9 80.7 96.8 103.6 80.0 94.5 107.7 80.0 97.0 101.7 79.2 93.1 102.4 78.0 93.0 B20 Exterior Closure 103.8 75.0 90.5 99.5 73.1 87.3 104.0 73.1 89.8 103.7 69.2 87.8 100.6 73.1 87.9 B30 Roofing 110.6 70.4 95.2 110.4 68.4 94.4 111.0 63.1 92.7 110.8 60.8 91.7 104.7 63.7 89.0 C Interior Construction 95.0 69.6 84.5 94.1 68.7 83.6 97.5 68.5 85.5 94.0 67.5 83.1 98.3 63.5 83.9 D10 Services: Conveying 100.0 97.6 99.3 100.0 96.8 99.0 100.0 96.8 99.0 100.0 94.9 98.4 100.0 96.9 99.1 D20 - 40 Mechanical 100.1 72.0 87.7 100.2 68.9 86.4 100.2 68.9 86.4 96.6 66.4 83.3 100.0 69.1 86.3 D50 Electrical 99.4 73.9 85.9 107.0 70.1 87.4 98.8 71.3 84.2 98.8 70.2 83.6 105.5 70.1 86.8 E Equipment & Furnishings 100.0 65.5 98.0 100.0 64.1 97.9 100.0 64.3 97.9 100.0 63.8 97.9 100.0 56.4 97.5 G Site Work 94.2 98.5 97.1 99.3 97.3 98.0 102.8 98.3 99.8 106.0 97.0 100.0 92.7 97.3 95.8 A-G WEIGHTED AVERAGE 101.8 76.4 90.5 101.7 74.5 89.6 103.2 74.6 90.5 100.7 72.7 88.3 101.0 73.0 88.7 DIV.NO.BUILDING SYSTEMS MONTANA NEBRASKA KALISPELL MILES CITY MISSOULA WOLF POINT ALLIANCE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 109.6 76.0 89.7 117.4 73.3 91.3 97.4 75.7 84.6 128.8 73.3 96.0 103.9 75.3 87.0 B10 Shell: Superstructure 98.5 79.7 91.3 99.8 78.7 91.7 96.5 79.5 89.9 101.6 78.5 92.7 103.2 74.6 92.2 B20 Exterior Closure 96.3 73.7 85.9 101.3 66.0 85.1 104.6 73.4 90.2 109.7 66.5 89.8 121.0 70.2 97.6 B30 Roofing 110.0 71.8 95.4 110.3 58.8 90.6 109.5 68.5 93.8 111.3 59.1 91.4 103.2 63.8 88.2 C Interior Construction 94.4 68.7 83.7 95.5 66.7 83.6 93.9 67.2 82.9 95.3 66.8 83.5 93.2 58.7 78.9 D10 Services: Conveying 100.0 96.9 99.1 100.0 93.4 98.0 100.0 96.8 99.0 100.0 93.6 98.1 100.0 63.0 88.7 D20 - 40 Mechanical 96.6 64.5 82.4 96.6 64.9 82.6 100.2 64.2 84.3 96.6 65.2 82.7 96.6 72.5 85.9 D50 Electrical 103.4 69.5 85.4 98.8 75.2 86.3 104.6 69.5 86.0 98.8 75.2 86.3 93.1 67.3 79.4 E Equipment & Furnishings 100.0 64.1 97.9 100.0 63.8 97.9 100.0 64.0 97.9 100.0 63.9 97.9 100.0 52.4 97.2 G Site Work 89.5 97.2 94.7 95.7 96.7 96.4 82.5 97.0 92.2 111.8 96.8 101.7 100.8 101.6 101.3 A-G WEIGHTED AVERAGE 98.4 73.5 87.4 99.5 72.3 87.5 99.0 73.1 87.5 101.7 72.4 88.8 100.9 71.1 87.7 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 11COA050507 DIV. NO.BUILDING SYSTEMS NEBRASKA COLUMBUS GRAND ISLAND HASTINGS LINCOLN MCCOOK MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 104.6 82.8 91.8 109.0 75.8 89.4 109.3 75.8 89.5 92.2 78.4 84.1 109.3 67.1 84.4 B10 Shell: Superstructure 96.9 89.2 93.9 99.0 83.2 92.9 100.0 83.3 93.6 97.2 84.7 92.4 100.1 75.5 90.6 B20 Exterior Closure 105.2 75.5 91.5 104.0 73.0 89.7 108.0 82.3 96.2 95.7 71.8 84.7 102.2 70.5 87.6 B30 Roofing 103.2 80.3 94.5 103.4 80.0 94.4 103.4 79.8 94.4 100.0 79.8 92.2 99.3 76.0 90.4 C Interior Construction 90.5 77.5 85.1 90.5 74.8 84.0 90.8 76.3 84.8 99.1 77.0 90.0 93.4 57.1 78.3 D10 Services: Conveying 100.0 86.8 96.0 100.0 91.1 97.3 100.0 86.8 96.0 100.0 91.1 97.3 100.0 62.2 88.5 D20 - 40 Mechanical 96.5 75.6 87.3 100.1 78.7 90.6 96.5 75.2 87.1 99.9 78.7 90.5 96.4 75.3 87.1 D50 Electrical 91.5 82.3 86.7 90.3 67.4 78.1 89.7 83.6 86.4 100.4 67.4 82.9 95.2 67.3 80.4 E Equipment & Furnishings 100.0 76.0 98.6 100.0 71.0 98.3 100.0 76.1 98.6 100.0 73.4 98.4 100.0 52.3 97.2 G Site Work 102.4 94.4 97.1 107.3 95.3 99.2 105.9 94.6 98.3 91.6 95.3 94.0 103.3 94.3 97.3 A-G WEIGHTED AVERAGE 97.1 81.3 90.1 98.4 77.6 89.2 98.3 80.4 90.4 98.2 78.3 89.4 98.4 70.8 86.2 DIV.NO.BUILDING SYSTEMS NEBRASKA NEVADA NORFOLK NORTH PLATTE OMAHA VALENTINE CARSON CITY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 102.9 73.7 85.6 109.4 74.3 88.7 92.3 80.9 85.6 98.1 66.6 79.5 97.8 88.7 92.4 B10 Shell: Superstructure 99.2 74.3 89.6 99.4 81.2 92.4 97.2 80.6 90.8 107.1 68.3 92.1 106.2 89.2 99.7 B20 Exterior Closure 107.3 73.9 91.9 96.9 71.7 85.3 95.9 76.3 86.8 107.3 70.2 90.2 105.9 72.1 90.3 B30 Roofing 102.0 78.5 93.0 99.2 78.5 91.3 98.4 80.2 91.5 98.9 74.4 89.5 106.8 81.7 97.2 C Interior Construction 99.1 75.7 89.4 93.2 73.3 85.0 99.2 76.1 89.7 104.0 57.7 84.8 95.9 79.4 89.1 D10 Services: Conveying 100.0 85.6 95.6 100.0 62.2 88.5 100.0 89.8 96.9 100.0 60.0 87.8 100.0 82.0 94.5 D20 - 40 Mechanical 96.2 75.3 86.9 100.0 74.8 88.8 99.9 76.0 89.3 96.0 74.7 86.6 100.0 70.1 86.8 D50 Electrical 90.5 82.3 86.2 93.4 67.3 79.6 98.8 82.9 90.4 90.6 67.3 78.3 104.1 91.0 97.2 E Equipment & Furnishings 100.0 75.9 98.6 100.0 70.8 98.3 100.0 76.1 98.6 100.0 52.1 97.2 100.0 80.9 98.9 G Site Work 84.1 93.9 90.6 104.7 94.4 97.8 91.0 94.6 93.4 88.7 100.0 96.3 87.5 98.4 94.8 A-G WEIGHTED AVERAGE 98.6 77.3 89.2 98.2 75.1 88.0 98.0 79.8 90.0 100.9 69.7 87.1 101.6 81.8 92.8 DIV.NO.BUILDING SYSTEMS NEVADA NEW HAMPSHIRE ELKO ELY LAS VEGAS RENO CHARLESTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 95.4 82.8 88.0 99.5 99.3 99.4 96.3 106.5 102.3 101.8 89.7 94.6 87.7 87.6 87.6 B10 Shell: Superstructure 109.3 81.0 98.4 109.7 96.5 104.6 115.7 103.8 111.1 111.3 91.1 103.5 89.1 87.8 88.6 B20 Exterior Closure 107.4 69.9 90.1 115.7 80.5 99.5 107.6 98.3 103.3 110.1 72.3 92.7 97.0 81.6 89.9 B30 Roofing 103.4 74.6 92.4 104.0 103.1 103.6 117.3 100.1 110.8 103.4 81.7 95.1 101.5 71.2 89.9 C Interior Construction 97.8 75.7 88.6 97.3 98.9 98.0 96.1 105.5 100.0 95.5 79.8 89.0 93.8 86.9 91.0 D10 Services: Conveying 100.0 94.9 98.4 100.0 71.2 91.2 100.0 101.7 100.5 100.0 82.0 94.5 100.0 88.7 96.6 D20 - 40 Mechanical 98.4 75.5 88.3 98.4 100.6 99.3 100.3 99.6 100.0 100.1 70.1 86.9 96.5 60.6 80.6 D50 Electrical 101.3 89.3 94.9 101.5 100.8 101.1 105.9 112.4 109.3 102.0 91.0 96.2 95.9 50.4 71.8 E Equipment & Furnishings 100.0 77.5 98.7 100.0 104.0 100.2 100.0 105.2 100.3 100.0 80.9 98.9 100.0 83.9 99.1 G Site Work 71.6 97.1 88.7 77.6 98.6 91.7 80.7 101.0 94.3 77.2 98.4 91.4 85.4 98.1 93.9 A-G WEIGHTED AVERAGE 101.5 80.1 92.0 102.9 96.1 99.9 104.1 103.6 103.9 102.7 82.3 93.7 94.3 76.0 86.2 DIV. NO.BUILDING SYSTEMS NEW HAMPSHIRE CLAREMONT CONCORD KEENE LITTLETON MANCHESTER MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 82.9 91.3 87.9 102.3 99.9 100.9 89.6 92.7 91.4 82.9 92.5 88.6 102.4 100.0 101.0 B10 Shell: Superstructure 88.5 89.5 88.9 97.5 94.4 96.3 90.0 90.5 90.2 89.4 90.4 89.8 98.7 94.5 97.1 B20 Exterior Closure 92.9 81.6 87.7 98.3 94.2 96.4 97.0 85.6 91.7 97.9 84.4 91.7 96.3 95.4 95.9 B30 Roofing 101.3 71.2 89.8 105.7 93.9 101.2 102.0 73.0 90.9 101.4 73.0 90.5 105.1 93.9 100.9 C Interior Construction 94.6 86.9 91.4 94.4 94.2 94.3 94.1 88.9 91.9 97.4 87.6 93.4 96.1 95.5 95.8 D10 Services: Conveying 100.0 88.7 96.6 100.0 109.5 102.9 100.0 90.0 97.0 100.0 97.6 99.3 100.0 109.5 102.9 D20 - 40 Mechanical 96.5 59.7 80.3 99.9 84.5 93.1 96.5 63.9 82.1 96.5 70.4 85.0 99.9 84.5 93.1 D50 Electrical 95.9 50.4 71.8 96.8 81.1 88.5 95.9 60.2 77.0 97.0 53.3 73.8 96.9 81.1 88.5 E Equipment & Furnishings 100.0 83.9 99.1 100.0 91.6 99.5 100.0 84.6 99.1 100.0 84.2 99.1 100.0 91.6 99.5 G Site Work 79.5 98.1 92.0 91.1 102.3 98.6 91.6 98.4 96.1 79.8 98.4 92.2 91.9 102.3 98.8 A-G WEIGHTED AVERAGE 93.4 76.4 85.9 98.0 91.7 95.2 94.7 79.9 88.2 94.8 80.2 88.3 98.4 92.1 95.6 DIV. NO.BUILDING SYSTEMS NEW HAMPSHIRE NEW JERSEY NASHUA PORTSMOUTH ATLANTIC CITY CAMDEN DOVER MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 91.5 100.0 96.5 82.7 99.9 92.9 84.7 133.7 113.7 87.0 133.5 114.5 89.3 134.9 116.2 B10 Shell: Superstructure 94.9 94.5 94.8 89.7 94.6 91.6 91.9 127.3 105.6 96.3 126.3 107.9 90.6 133.4 107.1 B20 Exterior Closure 98.0 95.3 96.8 94.1 92.0 93.2 103.1 140.4 120.3 98.4 140.2 117.7 93.8 141.4 115.7 B30 Roofing 102.4 93.9 99.1 101.9 105.0 103.1 100.9 136.1 114.4 100.8 137.4 114.8 103.2 139.7 117.1 C Interior Construction 98.7 95.6 97.4 96.0 95.6 95.8 94.7 148.8 117.1 95.8 148.6 117.6 97.7 153.6 120.8 D10 Services: Conveying 100.0 109.5 102.9 100.0 109.5 102.9 100.0 116.4 105.0 100.0 116.4 105.0 100.0 129.7 109.0 D20 - 40 Mechanical 100.1 84.5 93.2 100.1 84.5 93.2 99.7 130.6 113.4 100.0 130.6 113.5 99.8 137.9 116.7 D50 Electrical 98.3 81.1 89.2 96.4 81.1 88.3 90.1 144.7 119.0 94.6 139.8 118.6 90.5 143.6 118.7 E Equipment & Furnishings 100.0 91.6 99.5 100.0 91.6 99.5 100.0 145.9 102.7 100.0 145.7 102.7 100.0 146.0 102.7 G Site Work 92.4 102.3 99.0 86.9 102.3 97.2 90.9 106.2 101.2 91.3 106.2 101.3 95.9 106.6 103.1 A-G WEIGHTED AVERAGE 97.8 92.1 95.3 95.1 91.9 93.7 95.8 134.7 113.0 97.0 133.7 113.2 95.4 138.5 114.5 DIV.NO.BUILDING SYSTEMS NEW JERSEY ELIZABETH HACKENSACK JERSEY CITY LONG BRANCH NEW BRUNSWICK MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 82.8 134.9 113.6 87.9 135.1 115.8 81.4 135.0 113.1 82.0 136.2 114.0 98.4 136.4 120.8 B10 Shell: Superstructure 90.8 133.4 107.2 90.4 133.4 107.0 93.6 131.7 108.3 89.3 132.0 105.8 94.3 132.3 109.0 B20 Exterior Closure 102.6 141.4 120.5 94.4 141.4 116.0 92.9 141.2 115.1 101.3 141.1 119.7 108.9 141.1 123.8 B30 Roofing 103.4 139.7 117.3 102.9 135.1 115.2 102.6 139.7 116.8 102.8 131.5 113.8 101.2 138.9 115.6 C Interior Construction 98.6 153.6 121.3 96.5 153.6 120.1 95.9 153.6 119.8 93.2 153.2 118.0 92.3 153.5 117.6 D10 Services: Conveying 100.0 129.7 109.0 100.0 129.7 109.0 100.0 129.7 109.0 100.0 116.5 105.0 100.0 129.5 109.0 D20 - 40 Mechanical 100.1 137.9 116.8 99.8 137.9 116.7 100.1 137.9 116.8 99.8 137.9 116.7 99.7 137.9 116.6 D50 Electrical 91.1 143.6 119.0 90.5 144.6 119.2 95.0 144.6 121.3 90.2 137.5 115.3 90.7 142.3 118.1 E Equipment & Furnishings 100.0 146.0 102.7 100.0 146.2 102.7 100.0 146.2 102.7 100.0 145.8 102.7 100.0 146.1 102.7 G Site Work 99.3 106.6 104.2 97.2 107.4 104.0 87.0 107.4 100.7 91.7 107.3 102.2 102.8 107.4 105.9 A-G WEIGHTED AVERAGE 96.5 138.5 115.1 95.2 138.6 114.4 95.5 138.4 114.5 94.8 137.0 113.4 97.6 138.3 115.6 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 12 COA050508 DIV. NO.BUILDING SYSTEMS NEW JERSEY NEWARK PATERSON POINT PLEASANT SUMMIT TRENTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 100.0 134.9 120.6 94.2 135.1 118.3 97.9 136.2 120.5 80.1 134.9 112.5 99.8 132.0 118.8 B10 Shell: Superstructure 98.7 133.4 112.1 92.7 133.4 108.4 94.0 132.0 108.6 88.8 133.4 106.0 98.9 123.4 108.3 B20 Exterior Closure 96.1 141.4 117.0 94.8 141.4 116.3 104.3 141.5 121.5 96.8 141.4 117.4 98.8 139.9 117.7 B30 Roofing 104.7 139.7 118.1 103.2 135.1 115.4 101.3 136.3 114.6 103.6 139.7 117.4 101.2 136.4 114.7 C Interior Construction 96.9 153.6 120.3 100.5 153.6 122.5 92.4 149.7 116.2 100.2 153.6 122.3 96.6 151.6 119.4 D10 Services: Conveying 100.0 129.7 109.0 100.0 129.7 109.0 100.0 116.0 104.9 100.0 129.7 109.0 100.0 116.5 105.0 D20 - 40 Mechanical 100.1 137.9 116.8 100.1 137.9 116.8 99.7 137.9 116.6 99.8 137.9 116.7 100.0 137.6 116.6 D50 Electrical 98.4 144.6 122.9 95.0 143.6 120.8 90.1 137.5 115.2 91.1 143.6 119.0 97.9 137.7 119.0 E Equipment & Furnishings 100.0 146.0 102.7 100.0 146.1 102.7 100.0 145.8 102.7 100.0 146.0 102.7 100.0 145.8 102.7 G Site Work 99.8 106.6 104.4 98.0 107.4 104.3 104.7 107.3 106.5 97.1 106.6 103.5 90.7 107.3 101.8 A-G WEIGHTED AVERAGE 98.7 138.7 116.4 97.2 138.5 115.5 96.9 136.6 114.4 95.5 138.5 114.5 98.6 134.8 114.6 DIV.NO.BUILDING SYSTEMS NEW JERSEY NEW MEXICO VINELAND ALBUQUERQUE CARRIZOZO CLOVIS FARMINGTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 88.1 133.9 115.2 93.2 76.4 83.3 98.2 76.4 85.3 96.8 76.3 84.7 95.6 76.4 84.2 B10 Shell: Superstructure 91.9 127.4 105.5 104.0 80.8 95.0 102.9 80.8 94.3 102.6 80.7 94.2 102.6 80.8 94.2 B20 Exterior Closure 99.3 140.8 118.4 104.1 62.5 84.9 124.9 62.5 96.2 111.9 62.5 89.2 110.8 62.5 88.6 B30 Roofing 100.7 136.4 114.4 98.1 74.8 89.2 101.1 74.8 91.0 99.8 74.8 90.2 98.4 74.8 89.4 C Interior Construction 91.6 148.9 115.3 94.5 65.6 82.6 95.6 65.6 83.2 95.1 65.6 82.9 95.2 65.6 82.9 D10 Services: Conveying 100.0 116.7 105.1 100.0 89.1 96.7 100.0 89.1 96.7 100.0 89.1 96.7 100.0 89.1 96.7 D20 - 40 Mechanical 99.7 130.9 113.5 100.1 69.0 86.4 97.8 69.0 85.1 97.8 68.7 85.0 100.0 69.0 86.3 D50 Electrical 90.1 144.7 119.0 90.7 74.4 82.1 92.1 74.4 82.7 89.7 74.4 81.6 88.5 74.4 81.0 E Equipment & Furnishings 100.0 146.0 102.7 100.0 66.6 98.0 100.0 66.6 98.0 100.0 66.6 98.0 100.0 66.6 98.0 G Site Work 94.9 106.3 102.5 91.0 103.5 99.4 110.3 103.5 105.7 98.2 103.5 101.7 98.6 103.5 101.9 A-G WEIGHTED AVERAGE 95.1 134.8 112.6 98.9 73.7 87.8 101.7 73.7 89.4 99.5 73.6 88.1 99.6 73.7 88.2 DIV.NO.BUILDING SYSTEMS NEW MEXICO GALLUP LAS CRUCES LAS VEGAS ROSWELL SANTA FE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 92.6 76.4 83.0 92.8 68.7 78.6 93.3 76.4 83.3 97.0 76.4 84.8 96.0 76.4 84.4 B10 Shell: Superstructure 101.0 80.8 93.2 100.6 74.9 90.7 101.2 80.8 93.3 103.6 80.8 94.8 99.6 80.8 92.3 B20 Exterior Closure 114.5 62.5 90.5 89.7 61.8 76.8 102.5 62.5 84.1 117.7 62.5 92.3 96.6 62.5 80.9 B30 Roofing 99.6 74.8 90.1 87.2 69.0 80.2 98.0 74.8 89.1 100.0 74.8 90.3 100.1 74.8 90.4 C Interior Construction 95.8 65.6 83.3 96.7 64.8 83.5 93.3 65.6 81.9 95.0 65.6 82.9 97.2 65.6 84.1 D10 Services: Conveying 100.0 89.1 96.7 100.0 86.2 95.8 100.0 89.1 96.7 100.0 89.1 96.7 100.0 89.1 96.7 D20 - 40 Mechanical 97.8 69.0 85.1 100.5 68.7 86.4 97.8 69.0 85.1 99.9 69.0 86.3 99.9 69.0 86.3 D50 Electrical 87.7 74.4 80.7 91.5 74.2 82.3 90.3 74.4 81.9 91.1 74.4 82.3 102.1 74.4 87.4 E Equipment & Furnishings 100.0 66.6 98.0 100.0 65.9 98.0 100.0 66.6 98.0 100.0 66.6 98.0 100.0 66.6 98.0 G Site Work 106.8 103.5 104.6 97.5 81.7 86.9 98.1 103.5 101.7 100.5 103.5 102.5 101.2 103.5 102.7 A-G WEIGHTED AVERAGE 99.3 73.7 88.0 96.8 70.3 85.1 97.6 73.7 87.0 101.0 73.7 88.9 99.1 73.7 87.9 DIV. NO.BUILDING SYSTEMS NEW MEXICO NEW YORK SOCORRO TRUTH/CONSEQUENCES TUCUMCARI ALBANY BINGHAMTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 92.4 76.4 82.9 98.5 68.7 80.9 96.4 76.3 84.5 85.7 110.8 100.5 104.3 100.3 101.9 B10 Shell: Superstructure 101.3 80.8 93.4 101.7 74.9 91.4 102.5 80.7 94.1 95.3 121.3 105.3 94.6 119.4 104.2 B20 Exterior Closure 101.9 62.5 83.7 90.1 61.8 77.0 116.3 62.5 91.5 91.1 115.5 102.3 94.0 108.2 100.5 B30 Roofing 97.9 74.8 89.1 86.7 69.0 79.9 99.8 74.8 90.2 108.2 108.9 108.5 108.6 95.4 103.5 C Interior Construction 93.2 65.6 81.8 94.8 64.8 82.4 94.9 65.6 82.8 95.3 106.0 99.7 93.4 94.1 93.7 D10 Services: Conveying 100.0 89.1 96.7 100.0 86.2 95.8 100.0 89.1 96.7 100.0 101.7 100.5 100.0 100.7 100.2 D20 - 40 Mechanical 97.8 69.0 85.1 97.8 68.7 84.9 97.8 68.7 85.0 100.0 107.2 103.2 100.6 98.0 99.5 D50 Electrical 88.2 74.4 80.9 92.0 74.4 82.7 92.1 74.4 82.7 95.7 110.1 103.4 99.2 103.5 101.5 E Equipment & Furnishings 100.0 66.6 98.0 100.0 65.9 98.0 100.0 66.6 98.0 100.0 103.8 100.2 100.0 89.9 99.4 G Site Work 93.9 103.5 100.3 112.9 81.7 92.0 97.8 103.5 101.6 84.0 105.4 98.3 96.4 92.9 94.0 A-G WEIGHTED AVERAGE 97.2 73.7 86.8 96.9 70.3 85.2 100.1 73.6 88.4 96.0 110.9 102.6 97.4 103.0 99.9 DIV. NO.BUILDING SYSTEMS NEW YORK BRONX BROOKLYN BUFFALO ELMIRA FAR ROCKAWAY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 92.0 169.9 138.0 107.6 174.3 147.0 108.1 116.1 112.8 99.1 102.4 101.0 112.9 178.2 151.5 B10 Shell: Superstructure 88.4 179.5 123.5 101.3 177.7 130.8 101.3 112.9 105.7 94.8 122.5 105.5 101.7 180.7 132.2 B20 Exterior Closure 93.2 178.5 132.5 110.7 177.7 141.6 101.5 121.3 110.6 93.9 109.6 101.1 115.4 178.1 144.3 B30 Roofing 106.2 169.1 130.2 108.3 166.7 130.6 102.2 113.9 106.7 104.4 95.9 101.2 108.2 168.5 131.2 C Interior Construction 95.0 198.1 137.6 96.8 188.4 134.7 101.7 121.8 110.0 96.6 98.9 97.5 93.7 197.4 136.6 D10 Services: Conveying 100.0 126.7 108.1 100.0 125.8 107.8 100.0 105.4 101.6 100.0 101.4 100.4 100.0 125.8 107.8 D20 - 40 Mechanical 100.2 170.9 131.5 99.7 170.7 131.1 100.0 101.8 100.8 96.7 95.9 96.3 96.1 170.7 129.1 D50 Electrical 90.8 186.2 141.4 98.6 186.2 145.1 101.7 105.5 103.7 98.3 106.6 102.7 105.9 186.2 148.5 E Equipment & Furnishings 100.0 203.6 106.0 100.0 190.0 105.2 100.0 122.1 101.3 100.0 97.4 99.8 100.0 203.6 106.0 G Site Work 97.4 115.4 109.4 123.0 127.5 126.0 98.4 100.2 99.6 101.9 93.2 96.0 125.6 127.5 126.9 A-G WEIGHTED AVERAGE 94.8 175.1 130.3 101.9 174.2 133.8 101.3 111.3 105.7 96.8 104.6 100.3 102.3 176.5 135.1 DIV.NO.BUILDING SYSTEMS NEW YORK FLUSHING GLENS FALLS HICKSVILLE JAMAICA JAMESTOWN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 113.6 178.2 151.8 80.9 106.1 95.8 99.8 165.5 138.6 106.8 178.2 149.0 101.6 93.8 97.0 B10 Shell: Superstructure 102.0 180.7 132.4 89.1 116.5 99.7 100.2 170.1 127.1 100.7 180.7 131.6 93.3 98.6 95.3 B20 Exterior Closure 112.8 178.1 142.9 88.6 111.4 99.1 105.1 172.9 136.3 111.4 178.1 142.2 99.1 103.9 101.3 B30 Roofing 108.2 168.5 131.3 101.6 105.4 103.0 107.9 160.9 128.1 108.0 168.5 131.1 103.9 94.2 100.2 C Interior Construction 94.1 197.4 136.8 88.7 99.9 93.3 93.2 170.3 125.1 93.9 197.4 136.7 95.5 93.8 94.8 D10 Services: Conveying 100.0 125.8 107.8 100.0 98.9 99.7 100.0 124.0 107.3 100.0 125.8 107.8 100.0 101.0 100.3 D20 - 40 Mechanical 96.1 170.7 129.1 96.7 105.5 100.6 99.7 161.1 126.9 96.1 170.7 129.1 96.5 89.9 93.6 D50 Electrical 105.9 186.2 148.5 90.8 110.1 101.0 98.0 146.2 123.6 97.0 186.2 144.3 97.3 96.3 96.8 E Equipment & Furnishings 100.0 203.6 106.0 100.0 96.6 99.8 100.0 164.8 103.8 100.0 203.6 106.0 100.0 89.1 99.4 G Site Work 125.7 127.5 126.9 74.8 105.0 95.0 115.8 126.5 123.0 120.0 127.5 125.0 103.4 94.9 97.7 A-G WEIGHTED AVERAGE 102.1 176.5 135.0 91.4 107.7 98.6 99.8 160.8 126.8 100.3 176.5 134.0 96.9 95.7 96.4 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 13COA050509 DIV. NO.BUILDING SYSTEMS NEW YORK KINGSTON LONG ISLAND CITY MONTICELLO MOUNT VERNON NEW ROCHELLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 102.9 137.0 123.1 109.7 178.2 150.2 98.6 137.1 121.4 98.8 141.8 124.2 99.8 141.8 124.6 B10 Shell: Superstructure 99.0 137.5 113.8 101.5 180.7 132.0 98.5 137.5 113.5 89.1 145.3 110.8 90.2 145.2 111.4 B20 Exterior Closure 107.5 155.0 129.4 110.3 178.1 141.6 101.3 155.0 126.1 101.2 157.2 127.0 99.5 157.2 126.1 B30 Roofing 125.6 145.5 133.2 108.2 168.5 131.2 125.2 145.5 133.0 107.2 147.9 122.7 107.2 147.9 122.8 C Interior Construction 93.9 136.3 111.4 94.5 197.4 137.1 91.9 136.3 110.3 93.5 150.4 117.0 95.5 150.4 118.2 D10 Services: Conveying 100.0 118.5 105.6 100.0 125.8 107.8 100.0 118.5 105.6 100.0 121.4 106.5 100.0 117.8 105.4 D20 - 40 Mechanical 96.6 126.9 110.0 99.7 170.7 131.1 96.6 123.1 108.3 96.8 141.6 116.6 96.8 141.6 116.6 D50 Electrical 92.1 124.2 109.1 97.5 186.2 144.6 92.1 124.2 109.1 89.1 153.6 123.3 89.1 153.6 123.3 E Equipment & Furnishings 100.0 126.8 101.6 100.0 203.6 106.0 100.0 126.9 101.6 100.0 140.6 102.4 100.0 140.6 102.4 G Site Work 149.1 122.8 131.5 123.7 127.5 126.2 144.4 123.3 130.3 101.6 111.6 108.3 101.8 111.6 108.4 A-G WEIGHTED AVERAGE 100.1 134.2 115.2 101.5 176.5 134.6 98.6 133.4 114.0 95.1 145.1 117.2 95.5 145.0 117.4 DIV.NO.BUILDING SYSTEMS NEW YORK NEW YORK NIAGARA FALLS PLATTSBURGH POUGHKEEPSIE QUEENS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 102.3 179.5 147.9 103.9 117.6 112.0 93.0 103.9 99.4 100.6 154.2 132.3 102.6 178.2 147.3 B10 Shell: Superstructure 99.1 184.4 132.0 95.8 112.9 102.4 95.2 102.0 97.8 98.6 151.0 118.8 99.6 180.7 130.9 B20 Exterior Closure 101.9 181.9 138.8 102.8 129.1 114.9 93.3 103.9 98.2 103.2 152.7 126.0 105.0 178.1 138.7 B30 Roofing 106.3 172.2 131.5 103.9 117.7 109.2 119.3 101.5 112.5 125.5 151.4 135.4 107.8 168.5 131.0 C Interior Construction 100.9 198.6 141.3 95.6 120.4 105.8 97.6 99.7 98.5 93.8 177.7 128.5 93.2 197.4 136.3 D10 Services: Conveying 100.0 135.6 110.8 100.0 109.4 102.9 100.0 100.1 100.0 100.0 116.5 105.0 100.0 125.8 107.8 D20 - 40 Mechanical 100.1 173.2 132.4 96.5 107.0 101.2 96.6 105.6 100.6 96.6 126.6 109.9 99.7 170.7 131.1 D50 Electrical 97.3 186.2 144.5 95.8 104.2 100.2 89.5 95.4 92.6 92.1 131.4 112.9 98.0 186.2 144.8 E Equipment & Furnishings 100.0 204.0 106.1 100.0 117.1 101.0 100.0 94.9 99.7 100.0 190.4 105.3 100.0 203.6 106.0 G Site Work 102.6 112.9 109.5 105.7 96.5 99.6 119.5 103.0 108.4 145.0 123.1 130.3 119.3 127.5 124.8 A-G WEIGHTED AVERAGE 100.3 177.9 134.6 97.9 113.1 104.6 96.7 101.9 99.0 99.3 145.2 119.6 99.9 176.5 133.7 DIV.NO.BUILDING SYSTEMS NEW YORK RIVERHEAD ROCHESTER SCHENECTADY STATEN ISLAND SUFFERN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.5 165.6 139.4 100.3 107.7 104.7 93.2 110.8 103.6 99.2 172.6 142.5 97.1 142.5 123.9 B10 Shell: Superstructure 101.1 170.3 127.8 99.9 116.1 106.2 95.4 121.2 105.3 87.8 179.9 123.3 87.9 143.8 109.5 B20 Exterior Closure 106.8 173.2 137.4 96.8 111.2 103.4 93.6 115.5 103.7 105.5 178.1 139.0 98.3 153.9 123.9 B30 Roofing 108.8 161.1 128.8 103.4 104.6 103.9 103.1 108.9 105.3 106.6 167.2 129.8 107.1 146.9 122.3 C Interior Construction 93.5 170.1 125.2 101.0 105.6 102.9 94.2 106.0 99.1 94.3 189.1 133.6 94.2 156.5 120.0 D10 Services: Conveying 100.0 124.1 107.3 100.0 102.8 100.8 100.0 101.7 100.5 100.0 126.7 108.1 100.0 119.3 105.9 D20 - 40 Mechanical 99.9 161.3 127.1 100.0 92.7 96.8 100.2 106.7 103.1 100.2 170.9 131.5 96.8 130.2 111.6 D50 Electrical 99.7 146.2 124.3 101.3 97.4 99.2 95.2 110.1 103.1 90.8 186.2 141.4 95.5 124.2 110.7 E Equipment & Furnishings 100.0 164.8 103.8 100.0 102.9 100.2 100.0 103.8 100.2 100.0 190.1 105.3 100.0 152.8 103.1 G Site Work 117.4 126.7 123.6 92.4 110.4 104.4 84.6 105.4 98.5 105.8 115.4 112.2 98.8 111.0 107.0 A-G WEIGHTED AVERAGE 100.6 160.9 127.3 99.8 104.5 101.9 96.3 110.8 102.7 96.5 173.9 130.7 95.1 138.8 114.4 DIV. NO.BUILDING SYSTEMS NEW YORK SYRACUSE UTICA WATERTOWN WHITE PLAINS YONKERS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 99.3 104.4 102.4 92.4 102.6 98.4 101.7 105.4 103.9 91.6 141.8 121.3 100.9 146.1 127.6 B10 Shell: Superstructure 96.3 112.9 102.7 93.6 113.4 101.2 94.8 113.7 102.1 88.2 145.3 110.2 96.1 148.7 116.4 B20 Exterior Closure 98.5 111.3 104.4 95.4 106.6 100.5 102.6 111.9 106.9 95.1 157.2 123.7 101.6 157.5 127.4 B30 Roofing 102.9 101.1 102.2 91.2 99.1 94.2 91.5 102.6 95.7 106.9 147.9 122.5 107.2 151.2 124.0 C Interior Construction 93.6 97.4 95.2 95.4 94.6 95.1 94.1 99.2 96.2 94.6 150.4 117.7 98.4 162.2 124.8 D10 Services: Conveying 100.0 102.1 100.6 100.0 97.1 99.1 100.0 101.6 100.5 100.0 121.4 106.5 100.0 130.2 109.2 D20 - 40 Mechanical 100.3 98.3 99.4 100.3 97.5 99.0 100.3 90.7 96.0 100.4 141.6 118.6 100.4 141.8 118.7 D50 Electrical 99.2 105.9 102.7 97.4 105.9 101.9 99.2 95.4 97.2 89.1 153.6 123.3 95.6 169.1 134.6 E Equipment & Furnishings 100.0 93.9 99.6 100.0 90.2 99.4 100.0 97.2 99.8 100.0 140.6 102.4 100.0 155.3 103.2 G Site Work 95.0 104.6 101.4 73.0 103.9 93.7 80.6 104.4 96.5 97.1 111.6 106.9 102.1 111.7 108.5 A-G WEIGHTED AVERAGE 97.8 104.4 100.7 95.9 102.9 99.0 97.5 101.9 99.5 94.8 145.1 117.0 99.0 150.4 121.7 DIV. NO.BUILDING SYSTEMS NORTH CAROLINA ASHEVILLE CHARLOTTE DURHAM ELIZABETH CITY FAYETTEVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 104.7 72.0 85.4 107.4 71.4 86.2 96.7 73.7 83.1 96.0 75.5 83.9 108.7 73.3 87.8 B10 Shell: Superstructure 97.2 81.5 91.1 98.6 80.9 91.7 108.2 81.0 97.7 96.7 83.6 91.6 113.6 80.8 101.0 B20 Exterior Closure 94.9 74.7 85.6 94.7 73.5 84.9 94.1 74.6 85.1 99.9 73.8 87.9 95.1 73.5 85.2 B30 Roofing 103.8 65.5 89.2 98.1 64.8 85.4 104.8 65.5 89.8 104.0 64.6 88.9 103.3 64.8 88.6 C Interior Construction 92.9 67.0 82.2 92.9 66.6 82.0 96.2 66.9 84.1 93.2 67.4 82.5 93.5 66.6 82.4 D10 Services: Conveying 100.0 88.5 96.5 100.0 88.0 96.4 100.0 88.5 96.5 100.0 93.3 98.0 100.0 88.0 96.4 D20 - 40 Mechanical 100.5 62.1 83.5 99.9 62.1 83.2 100.5 62.1 83.5 96.8 61.1 81.0 100.2 61.4 83.0 D50 Electrical 100.9 60.5 79.5 100.0 62.6 80.1 99.0 62.2 79.4 98.7 34.2 64.5 100.2 62.2 80.0 E Equipment & Furnishings 100.0 63.2 97.9 100.0 63.3 97.9 100.0 63.3 97.9 100.0 61.8 97.8 100.0 63.2 97.9 G Site Work 96.5 81.6 86.6 98.1 81.8 87.2 97.3 91.2 93.2 100.5 93.1 95.5 96.2 91.1 92.8 A-G WEIGHTED AVERAGE 98.0 70.3 85.8 98.1 70.2 85.8 100.3 71.1 87.4 97.2 67.8 84.2 101.7 70.7 88.0 DIV.NO.BUILDING SYSTEMS NORTH CAROLINA GASTONIA GREENSBORO HICKORY KINSTON MURPHY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 103.8 71.8 84.9 96.0 73.7 82.8 104.4 73.3 86.0 101.4 72.8 84.5 107.8 71.1 86.2 B10 Shell: Superstructure 97.7 81.0 91.3 102.3 81.0 94.1 97.0 80.9 90.8 95.3 80.5 89.6 96.5 81.1 90.6 B20 Exterior Closure 96.9 74.6 86.6 92.3 74.6 84.2 90.1 74.6 83.0 91.9 73.5 83.4 92.3 73.6 83.7 B30 Roofing 104.1 65.5 89.4 104.6 65.5 89.6 104.2 65.5 89.4 104.1 64.8 89.1 104.1 64.8 89.1 C Interior Construction 96.0 66.9 84.0 96.3 66.9 84.1 93.0 66.9 82.2 92.9 66.6 82.0 93.9 66.7 82.6 D10 Services: Conveying 100.0 88.5 96.5 100.0 87.7 96.3 100.0 88.5 96.5 100.0 88.0 96.4 100.0 88.0 96.4 D20 - 40 Mechanical 100.5 62.1 83.5 100.4 62.1 83.4 96.9 62.1 81.5 96.9 60.9 81.0 96.9 61.4 81.2 D50 Electrical 100.4 62.6 80.3 98.0 60.5 78.1 98.5 62.6 79.4 98.3 60.5 78.2 101.9 60.5 79.9 E Equipment & Furnishings 100.0 63.4 97.9 100.0 63.2 97.9 100.0 63.0 97.8 100.0 62.8 97.8 100.0 62.8 97.8 G Site Work 96.2 81.9 86.6 97.2 91.3 93.2 95.3 89.8 91.6 94.5 89.7 91.3 97.6 80.1 85.9 A-G WEIGHTED AVERAGE 98.8 70.5 86.3 98.7 70.9 86.4 96.4 71.1 85.2 96.0 70.2 84.6 97.2 69.7 85.1 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 14 COA050510 DIV. NO.BUILDING SYSTEMS NORTH CAROLINA NORTH DAKOTA RALEIGH ROCKY MOUNT WILMINGTON WINSTON-SALEM BISMARCK MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 98.4 73.2 83.5 94.7 73.3 82.1 104.7 71.3 85.0 97.6 74.0 83.7 99.6 83.7 90.2 B10 Shell: Superstructure 97.0 80.7 90.7 96.2 80.8 90.2 96.9 80.8 90.7 100.4 81.1 93.0 101.1 86.0 95.3 B20 Exterior Closure 86.9 73.5 80.7 91.4 73.5 83.2 90.3 73.5 82.6 92.4 74.6 84.2 96.4 82.4 89.9 B30 Roofing 99.0 64.8 85.9 104.5 64.8 89.3 103.8 64.8 88.9 104.6 65.5 89.6 109.1 85.0 99.9 C Interior Construction 94.3 66.6 82.8 93.3 66.6 82.3 93.4 66.6 82.3 96.3 66.3 83.9 101.6 69.7 88.4 D10 Services: Conveying 100.0 88.0 96.4 100.0 88.0 96.4 100.0 88.0 96.4 100.0 88.5 96.5 100.0 91.8 97.5 D20 - 40 Mechanical 99.9 61.3 82.9 96.8 61.2 81.1 100.5 61.4 83.2 100.4 62.1 83.4 100.0 77.4 90.0 D50 Electrical 101.0 40.0 68.6 100.9 62.2 80.3 101.2 60.5 79.6 98.0 60.5 78.1 101.6 76.0 88.0 E Equipment & Furnishings 100.0 62.1 97.8 100.0 63.2 97.9 100.0 63.1 97.8 100.0 63.2 97.9 100.0 71.3 98.3 G Site Work 97.1 91.2 93.1 99.3 91.2 93.9 97.8 81.5 86.9 97.6 91.3 93.3 99.1 99.9 99.6 A-G WEIGHTED AVERAGE 96.7 67.6 83.9 96.3 70.6 85.0 97.6 69.7 85.3 98.4 70.8 86.2 100.5 80.5 91.7 DIV.NO.BUILDING SYSTEMS NORTH DAKOTA DEVILS LAKE DICKINSON FARGO GRAND FORKS JAMESTOWN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 112.9 83.5 95.5 105.9 83.4 92.6 98.2 82.2 88.7 105.1 83.4 92.3 111.2 83.7 94.9 B10 Shell: Superstructure 100.7 85.9 95.0 98.4 85.6 93.5 99.4 86.0 94.3 98.6 85.9 93.7 99.9 86.4 94.7 B20 Exterior Closure 102.9 86.8 95.4 108.8 82.4 96.6 99.5 82.2 91.5 102.5 86.8 95.2 108.4 92.4 101.0 B30 Roofing 108.8 83.8 99.3 109.4 84.0 99.7 107.3 79.0 96.5 109.1 83.8 99.4 108.7 84.8 99.5 C Interior Construction 99.3 69.7 87.1 98.1 69.7 86.3 99.2 68.0 86.3 97.5 70.6 86.4 97.8 69.7 86.2 D10 Services: Conveying 100.0 54.8 86.2 100.0 54.8 86.2 100.0 87.0 96.0 100.0 54.8 86.2 100.0 89.0 96.6 D20 - 40 Mechanical 96.7 82.1 90.3 96.7 74.7 87.0 100.0 75.7 89.2 100.3 73.3 88.4 96.7 73.4 86.4 D50 Electrical 97.5 49.3 71.9 106.5 73.5 89.0 101.4 66.8 83.0 101.1 64.6 81.8 97.5 49.3 71.9 E Equipment & Furnishings 100.0 70.0 98.3 100.0 71.2 98.3 100.0 70.2 98.3 100.0 70.7 98.3 100.0 70.0 98.3 G Site Work 105.1 99.9 101.6 111.9 99.8 103.8 97.2 99.0 98.4 108.4 99.8 102.7 104.2 99.9 101.3 A-G WEIGHTED AVERAGE 100.4 77.3 90.2 101.1 78.5 91.1 99.9 78.1 90.3 100.4 77.7 90.4 100.5 77.2 90.2 DIV.NO.BUILDING SYSTEMS NORTH DAKOTA OHIO MINOT WILLISTON AKRON ATHENS CANTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 105.1 85.9 93.8 106.0 82.8 92.3 100.9 91.6 95.4 108.5 88.6 96.7 101.6 85.9 92.3 B10 Shell: Superstructure 98.7 87.3 94.3 99.0 85.6 93.8 99.3 84.2 93.5 103.8 83.1 95.8 99.4 78.1 91.2 B20 Exterior Closure 100.5 85.3 93.5 99.2 85.3 92.8 97.7 89.4 93.9 99.5 83.3 92.0 97.3 79.2 89.0 B30 Roofing 108.8 85.2 99.8 109.0 84.2 99.5 104.7 93.9 100.6 99.6 89.9 95.9 105.8 90.3 99.9 C Interior Construction 97.1 69.7 85.8 98.4 69.7 86.5 104.4 85.5 96.6 96.5 88.6 93.2 100.9 74.6 90.0 D10 Services: Conveying 100.0 91.8 97.5 100.0 54.8 86.2 100.0 95.1 98.5 100.0 90.4 97.1 100.0 93.6 98.1 D20 - 40 Mechanical 100.3 73.4 88.4 96.7 74.7 87.0 100.0 89.9 95.5 96.5 76.8 87.8 100.0 78.3 90.4 D50 Electrical 104.5 77.0 89.9 101.6 74.5 87.2 99.3 87.3 92.9 101.2 93.0 96.9 98.5 87.9 92.9 E Equipment & Furnishings 100.0 71.4 98.3 100.0 70.8 98.3 100.0 85.5 99.2 100.0 92.9 99.6 100.0 76.1 98.6 G Site Work 106.1 99.9 101.9 106.2 97.5 100.4 98.0 100.9 100.0 112.9 89.9 97.5 98.2 100.6 99.8 A-G WEIGHTED AVERAGE 100.4 80.6 91.6 99.5 78.8 90.4 100.4 88.8 95.3 100.2 85.2 93.6 99.8 81.8 91.8 DIV. NO.BUILDING SYSTEMS OHIO CHILLICOTHE CINCINNATI CLEVELAND COLUMBUS DAYTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 98.8 86.7 91.7 94.7 79.4 85.7 99.7 94.5 96.6 94.9 82.6 87.6 90.3 80.5 84.5 B10 Shell: Superstructure 96.1 84.5 91.6 97.2 77.7 89.7 100.2 88.0 95.5 97.2 79.8 90.5 95.7 76.0 88.1 B20 Exterior Closure 95.8 91.3 93.7 94.5 78.3 87.0 98.4 98.5 98.4 95.1 85.1 90.5 94.2 76.7 86.1 B30 Roofing 101.7 87.2 96.2 99.4 80.1 92.1 102.3 98.5 100.9 98.4 85.3 93.4 106.2 78.7 95.7 C Interior Construction 93.7 80.3 88.2 98.0 72.0 87.2 98.5 90.8 95.3 97.6 77.1 89.1 98.2 71.9 87.3 D10 Services: Conveying 100.0 91.9 97.5 100.0 88.8 96.6 100.0 99.5 99.8 100.0 90.6 97.2 100.0 88.7 96.6 D20 - 40 Mechanical 97.1 89.5 93.7 100.0 75.6 89.2 100.0 92.3 96.6 100.0 86.0 93.8 100.9 75.0 89.4 D50 Electrical 101.0 78.5 89.1 99.7 74.8 86.5 98.8 98.2 98.5 98.4 84.3 90.9 98.4 78.4 87.8 E Equipment & Furnishings 100.0 79.8 98.8 100.0 70.2 98.3 100.0 89.3 99.4 100.0 76.6 98.6 100.0 68.0 98.1 G Site Work 101.5 101.0 101.2 97.9 97.3 97.5 97.8 96.2 96.7 100.9 92.0 95.0 96.8 100.5 99.3 A-G WEIGHTED AVERAGE 97.1 86.4 92.4 98.1 77.7 89.1 99.5 93.7 96.9 98.0 83.4 91.5 97.8 77.8 89.0 DIV. NO.BUILDING SYSTEMS OHIO HAMILTON LIMA LORAIN MANSFIELD MARION MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 94.3 80.6 86.2 101.9 84.9 91.9 97.7 89.3 92.7 93.1 84.5 88.0 87.3 83.6 85.1 B10 Shell: Superstructure 96.6 80.5 90.4 102.6 81.7 94.5 99.1 83.0 92.9 97.9 77.8 90.1 94.9 79.5 89.0 B20 Exterior Closure 93.9 79.3 87.1 109.2 78.7 95.1 95.5 93.6 94.7 93.6 89.0 91.5 92.1 87.1 89.8 B30 Roofing 101.8 80.4 93.6 99.1 86.8 94.4 105.7 93.9 101.2 103.9 91.0 99.0 98.0 89.4 94.7 C Interior Construction 96.4 72.2 86.4 96.0 78.4 88.7 100.8 80.5 92.4 100.4 78.4 91.3 94.1 79.3 88.0 D10 Services: Conveying 100.0 89.3 96.7 100.0 89.9 96.9 100.0 97.3 99.2 100.0 94.4 98.3 100.0 90.2 97.0 D20 - 40 Mechanical 100.6 75.9 89.7 96.5 83.5 90.7 100.0 86.5 94.0 96.4 85.9 91.8 96.4 86.0 91.8 D50 Electrical 98.7 78.7 88.1 101.6 78.4 89.3 98.6 83.0 90.3 96.2 72.4 83.6 92.7 72.4 81.9 E Equipment & Furnishings 100.0 70.4 98.3 100.0 78.9 98.8 100.0 74.4 98.5 100.0 73.8 98.5 100.0 76.0 98.6 G Site Work 96.8 100.6 99.3 106.4 89.8 95.3 97.2 101.0 99.7 94.0 100.8 98.5 97.0 96.7 96.8 A-G WEIGHTED AVERAGE 97.7 79.2 89.5 100.6 81.8 92.3 99.3 86.9 93.8 97.4 83.0 91.0 94.8 82.7 89.4 DIV.NO.BUILDING SYSTEMS OHIO SPRINGFIELD STEUBENVILLE TOLEDO YOUNGSTOWN ZANESVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 91.8 82.2 86.1 95.6 89.3 91.9 94.8 91.4 92.8 100.3 88.0 93.0 90.3 85.1 87.2 B10 Shell: Superstructure 96.0 77.4 88.8 93.0 83.1 89.2 97.1 87.9 93.5 99.2 80.8 92.1 96.4 82.6 91.1 B20 Exterior Closure 93.8 76.8 86.0 87.0 89.7 88.3 98.3 92.4 95.6 97.2 85.4 91.7 92.9 79.8 86.8 B30 Roofing 106.0 79.4 95.9 110.1 87.2 101.3 98.2 93.5 96.4 106.0 90.4 100.0 98.1 85.1 93.1 C Interior Construction 97.3 75.4 88.2 103.0 82.9 94.7 95.8 88.0 92.5 100.8 79.7 92.1 93.7 77.7 87.1 D10 Services: Conveying 100.0 88.7 96.6 100.0 88.4 96.5 100.0 95.9 98.8 100.0 93.8 98.1 100.0 85.5 95.6 D20 - 40 Mechanical 100.9 81.3 92.2 96.9 89.7 93.7 100.0 94.4 97.5 100.0 82.2 92.1 96.4 87.7 92.6 D50 Electrical 98.4 84.3 90.9 87.6 104.0 96.3 98.5 109.9 104.6 98.6 87.5 92.7 92.8 75.9 83.9 E Equipment & Furnishings 100.0 73.6 98.5 100.0 81.4 98.9 100.0 89.5 99.4 100.0 78.9 98.8 100.0 76.2 98.6 G Site Work 97.2 100.5 99.4 142.3 105.4 117.6 100.1 97.1 98.1 97.9 100.6 99.7 99.9 96.6 97.7 A-G WEIGHTED AVERAGE 97.7 80.9 90.3 96.7 90.3 93.8 98.0 94.1 96.3 99.6 84.8 93.1 95.3 82.8 89.8 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 15COA050511 DIV. NO.BUILDING SYSTEMS OKLAHOMA ARDMORE CLINTON DURANT ENID GUYMON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 96.6 72.5 82.4 94.6 72.2 81.4 92.5 71.5 80.1 94.9 72.3 81.5 95.8 71.7 81.6 B10 Shell: Superstructure 104.9 62.6 88.6 104.4 62.6 88.3 92.1 62.7 80.7 105.7 62.7 89.1 105.3 61.6 88.4 B20 Exterior Closure 93.9 57.0 76.9 105.3 57.0 83.0 90.0 64.0 78.0 98.1 57.0 79.1 98.8 56.8 79.4 B30 Roofing 106.9 66.2 91.3 107.0 66.2 91.4 100.1 65.5 86.9 107.1 66.2 91.5 107.5 66.2 91.7 C Interior Construction 93.9 57.3 78.7 93.8 57.3 78.7 90.9 56.3 76.6 94.7 59.7 80.2 94.6 58.3 79.6 D10 Services: Conveying 100.0 81.4 94.3 100.0 81.4 94.3 100.0 81.4 94.3 100.0 81.4 94.3 100.0 81.4 94.3 D20 - 40 Mechanical 96.8 66.8 83.5 96.8 66.8 83.5 96.8 66.8 83.5 100.3 66.8 85.5 96.8 65.5 82.9 D50 Electrical 94.4 71.3 82.1 95.4 71.3 82.6 96.7 63.7 79.2 95.4 71.3 82.6 97.1 59.0 76.9 E Equipment & Furnishings 100.0 59.1 97.6 100.0 59.1 97.6 100.0 58.3 97.6 100.0 59.2 97.6 100.0 58.6 97.6 G Site Work 99.4 99.0 99.1 100.8 97.4 98.5 96.3 94.9 95.4 102.5 97.4 99.1 104.8 97.1 99.6 A-G WEIGHTED AVERAGE 98.1 66.7 84.2 99.4 66.6 84.9 94.1 66.1 81.7 99.8 67.0 85.3 99.2 64.5 83.9 DIV.NO.BUILDING SYSTEMS OKLAHOMA LAWTON MCALESTER MIAMI MUSKOGEE OKLAHOMA CITY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 93.0 72.6 81.0 84.1 66.6 73.8 87.5 72.1 78.4 88.7 72.0 78.8 94.5 72.8 81.7 B10 Shell: Superstructure 108.7 62.7 91.0 90.3 58.1 77.9 91.6 71.5 83.8 93.1 70.9 84.6 102.9 62.8 87.4 B20 Exterior Closure 94.5 57.0 77.2 94.0 56.3 76.6 89.7 58.2 75.1 98.1 53.3 77.5 96.0 57.2 78.2 B30 Roofing 106.8 66.2 91.3 99.7 62.5 85.5 100.1 66.1 87.1 100.4 65.5 87.1 97.5 66.7 85.7 C Interior Construction 96.4 59.7 81.2 90.4 45.1 71.7 91.9 56.4 77.2 93.8 53.5 77.1 95.8 59.8 80.9 D10 Services: Conveying 100.0 81.4 94.3 100.0 81.4 94.3 100.0 81.9 94.5 100.0 81.9 94.5 100.0 81.5 94.4 D20 - 40 Mechanical 100.3 66.8 85.5 96.8 62.2 81.5 96.8 62.3 81.5 100.3 62.3 83.5 100.1 67.0 85.5 D50 Electrical 97.2 71.3 83.4 95.1 66.2 79.8 96.5 66.3 80.5 94.6 72.8 83.0 102.5 71.3 85.9 E Equipment & Furnishings 100.0 59.2 97.6 100.0 40.5 96.5 100.0 59.0 97.6 100.0 59.3 97.6 100.0 59.2 97.6 G Site Work 98.1 99.0 98.7 89.7 97.1 94.7 91.3 93.7 92.9 91.5 93.6 92.9 96.2 99.6 98.4 A-G WEIGHTED AVERAGE 100.2 67.1 85.6 93.4 61.6 79.3 93.8 66.2 81.6 96.1 66.0 82.8 99.3 67.3 85.1 DIV.NO.BUILDING SYSTEMS OKLAHOMA PONCA CITY POTEAU SHAWNEE TULSA WOODWARD MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 94.6 72.2 81.4 85.4 70.9 76.9 96.3 71.8 81.8 94.6 71.9 81.1 94.6 67.6 78.6 B10 Shell: Superstructure 92.7 62.6 81.1 91.3 71.2 83.5 92.7 61.9 80.8 96.5 71.4 86.8 104.5 59.1 87.0 B20 Exterior Closure 88.9 57.0 74.2 92.3 58.1 76.5 99.7 56.9 79.9 93.2 58.2 77.0 93.3 56.5 76.3 B30 Roofing 100.3 66.5 87.4 100.3 66.1 87.2 100.3 65.9 87.2 100.5 66.3 87.4 107.1 64.3 90.7 C Interior Construction 91.7 58.1 77.8 90.8 56.4 76.6 91.0 57.1 77.0 94.6 55.8 78.5 93.8 46.4 74.2 D10 Services: Conveying 100.0 81.4 94.3 100.0 81.8 94.5 100.0 81.4 94.3 100.0 81.9 94.5 100.0 81.4 94.3 D20 - 40 Mechanical 96.8 62.3 81.5 96.8 62.3 81.5 96.8 66.8 83.5 100.3 64.1 84.3 96.8 66.8 83.5 D50 Electrical 94.6 69.4 81.2 94.7 66.3 79.7 96.7 71.3 83.2 96.7 66.3 80.6 97.0 71.3 83.3 E Equipment & Furnishings 100.0 59.1 97.6 100.0 58.5 97.6 100.0 59.1 97.6 100.0 58.8 97.6 100.0 43.3 96.7 G Site Work 96.7 97.4 97.1 79.9 89.0 86.0 100.0 97.4 98.2 97.4 92.7 94.3 101.1 97.4 98.6 A-G WEIGHTED AVERAGE 94.2 65.5 81.5 93.3 65.8 81.2 95.7 66.4 82.7 97.0 66.5 83.5 98.1 63.8 82.9 DIV. NO.BUILDING SYSTEMS OREGON BEND EUGENE KLAMATH FALLS MEDFORD PENDLETON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 105.0 99.1 101.5 101.9 99.2 100.3 104.9 99.7 101.8 104.1 99.0 101.1 103.0 98.0 100.0 B10 Shell: Superstructure 99.2 94.7 97.4 99.2 94.8 97.5 98.7 94.8 97.2 98.9 94.5 97.2 104.5 95.2 100.9 B20 Exterior Closure 106.7 96.7 102.1 97.8 96.7 97.3 116.1 96.7 107.2 102.5 96.7 99.8 91.2 96.8 93.8 B30 Roofing 110.7 95.2 104.8 109.9 99.5 105.9 111.0 90.8 103.3 110.6 90.8 103.1 103.2 94.9 100.0 C Interior Construction 100.0 93.1 97.1 99.3 93.1 96.7 100.1 92.7 97.0 101.8 92.7 98.0 84.5 93.4 88.2 D10 Services: Conveying 100.0 99.5 99.8 100.0 99.5 99.8 100.0 99.5 99.8 100.0 99.5 99.8 100.0 102.2 100.7 D20 - 40 Mechanical 96.5 101.9 98.9 100.1 101.9 100.9 96.5 101.9 98.9 100.1 101.9 100.9 98.6 108.5 103.0 D50 Electrical 100.6 95.0 97.6 99.2 95.0 97.0 99.2 78.0 87.9 102.8 78.0 89.6 91.5 96.2 94.0 E Equipment & Furnishings 100.0 94.3 99.7 100.0 94.4 99.7 100.0 93.5 99.6 100.0 93.5 99.6 100.0 94.6 99.7 G Site Work 106.7 103.5 104.5 97.4 103.5 101.5 110.3 103.4 105.7 104.8 103.4 103.9 106.1 96.1 99.4 A-G WEIGHTED AVERAGE 100.6 97.3 99.2 99.7 97.5 98.7 101.6 94.8 98.6 101.3 94.7 98.4 96.5 98.6 97.4 DIV. NO.BUILDING SYSTEMS OREGON PENNSYLVANIA PORTLAND SALEM VALE ALLENTOWN ALTOONA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 104.1 99.2 101.2 98.8 99.1 99.0 87.2 98.2 93.7 93.1 110.0 103.1 99.0 94.4 96.2 B10 Shell: Superstructure 100.6 94.8 98.3 104.1 94.7 100.5 101.6 94.7 98.9 95.1 118.7 104.2 90.9 105.0 96.4 B20 Exterior Closure 98.0 96.7 97.4 99.3 96.7 98.1 86.1 93.8 89.6 95.4 103.7 99.2 88.3 91.2 89.6 B30 Roofing 109.8 95.2 104.2 106.2 95.2 102.0 102.5 91.5 98.3 102.9 117.6 108.5 101.7 94.3 98.9 C Interior Construction 98.0 93.3 96.1 98.6 93.1 96.3 84.7 93.2 88.3 92.6 111.0 100.2 87.7 90.5 88.9 D10 Services: Conveying 100.0 99.5 99.8 100.0 99.5 99.8 100.0 99.8 99.9 100.0 103.7 101.1 100.0 100.2 100.1 D20 - 40 Mechanical 100.1 101.8 100.8 100.1 101.9 100.9 98.6 69.6 85.8 100.3 114.8 106.7 99.7 85.8 93.5 D50 Electrical 99.3 106.2 103.0 106.5 95.0 100.4 91.5 68.7 79.4 98.5 100.6 99.6 89.0 113.5 102.0 E Equipment & Furnishings 100.0 94.9 99.7 100.0 94.3 99.7 100.0 93.2 99.6 100.0 113.9 100.8 100.0 85.0 99.1 G Site Work 100.2 103.5 102.4 92.4 103.5 99.8 93.3 96.1 95.1 93.5 103.6 100.2 95.1 102.8 100.3 A-G WEIGHTED AVERAGE 100.0 98.9 99.5 101.2 97.3 99.5 94.3 85.8 90.5 96.7 110.2 102.6 93.3 96.6 94.8 DIV.NO.BUILDING SYSTEMS PENNSYLVANIA BEDFORD BRADFORD BUTLER CHAMBERSBURG DOYLESTOWN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 109.5 90.8 98.5 95.3 102.0 99.2 90.8 100.6 96.6 94.7 95.1 94.9 88.3 123.9 109.3 B10 Shell: Superstructure 99.9 102.3 100.9 93.5 110.6 100.1 89.2 111.9 98.0 92.4 106.8 98.0 91.5 126.5 105.0 B20 Exterior Closure 104.0 88.3 96.8 95.9 87.7 92.1 86.5 100.2 92.8 101.9 87.1 95.0 96.4 126.1 110.1 B30 Roofing 100.4 89.7 96.3 102.7 94.2 99.5 101.3 96.5 99.5 94.9 87.4 92.0 100.2 130.0 111.6 C Interior Construction 96.6 85.4 92.0 91.7 105.6 97.4 87.7 91.9 89.4 90.2 85.4 88.2 89.9 133.0 107.7 D10 Services: Conveying 100.0 98.7 99.6 100.0 99.7 99.9 100.0 102.0 100.6 100.0 97.0 99.1 100.0 114.6 104.5 D20 - 40 Mechanical 96.4 82.4 90.2 96.7 95.4 96.1 96.2 98.0 97.0 96.7 89.0 93.3 96.2 129.3 110.8 D50 Electrical 95.2 113.5 104.9 92.2 113.5 103.5 89.6 112.0 101.5 88.6 88.6 88.6 91.7 130.3 112.2 E Equipment & Furnishings 100.0 82.6 99.0 100.0 108.6 100.5 100.0 89.4 99.4 100.0 81.4 98.9 100.0 130.4 101.8 G Site Work 106.0 100.2 102.1 93.1 101.7 98.9 86.4 103.6 97.9 89.6 100.1 96.7 108.6 89.8 96.0 A-G WEIGHTED AVERAGE 99.2 93.7 96.8 94.9 102.1 98.1 91.4 102.2 96.2 94.5 92.5 93.6 94.0 126.0 108.2 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 16 COA050512 DIV. NO.BUILDING SYSTEMS PENNSYLVANIA DUBOIS ERIE GREENSBURG HARRISBURG HAZLETON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 107.2 93.8 99.3 99.1 96.4 97.5 103.9 101.7 102.6 96.1 99.3 98.0 87.3 98.9 94.2 B10 Shell: Superstructure 99.3 103.9 101.1 91.8 106.2 97.4 99.0 112.0 104.0 97.9 111.3 103.1 93.0 110.0 99.5 B20 Exterior Closure 108.0 88.6 99.1 82.3 94.8 88.1 107.1 98.4 103.1 93.9 90.9 92.6 97.6 97.0 97.3 B30 Roofing 100.8 92.3 97.5 102.3 94.1 99.1 100.3 97.1 99.1 97.3 108.3 101.5 102.2 104.5 103.1 C Interior Construction 96.7 88.9 93.5 89.3 91.8 90.3 97.0 95.4 96.3 94.2 90.4 92.6 90.9 92.1 91.4 D10 Services: Conveying 100.0 99.2 99.8 100.0 101.8 100.5 100.0 101.8 100.5 100.0 98.5 99.5 100.0 101.4 100.4 D20 - 40 Mechanical 96.4 83.1 90.6 99.7 101.5 100.5 96.4 91.1 94.1 100.0 93.0 96.9 96.7 96.7 96.7 D50 Electrical 95.8 113.5 105.2 90.7 94.8 92.9 95.8 113.5 105.2 95.5 91.1 93.2 93.1 94.1 93.6 E Equipment & Furnishings 100.0 82.7 99.0 100.0 87.4 99.3 100.0 94.9 99.7 100.0 88.7 99.3 100.0 86.5 99.2 G Site Work 110.4 100.3 103.6 92.1 102.8 99.2 102.2 102.2 102.2 89.9 101.4 97.6 86.8 102.3 97.2 A-G WEIGHTED AVERAGE 99.6 95.0 97.6 93.2 98.5 95.5 99.2 101.3 100.1 96.9 96.7 96.8 94.5 98.7 96.3 DIV.NO.BUILDING SYSTEMS PENNSYLVANIA INDIANA JOHNSTOWN KITTANNING LANCASTER LEHIGH VALLEY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.9 99.9 100.7 110.2 95.6 101.6 93.3 102.1 98.5 84.6 99.4 93.4 93.2 117.1 107.4 B10 Shell: Superstructure 98.5 110.6 103.2 100.0 107.4 102.9 89.8 112.9 98.7 90.5 111.4 98.6 94.6 122.2 105.2 B20 Exterior Closure 99.7 96.4 98.2 103.4 91.9 98.1 88.5 98.1 93.0 98.9 91.4 95.4 94.4 113.7 103.3 B30 Roofing 100.2 96.1 98.6 100.5 92.2 97.3 101.4 96.9 99.7 94.3 108.6 99.8 102.6 119.3 109.0 C Interior Construction 96.5 96.6 96.6 96.4 87.9 92.9 87.8 99.7 92.7 90.2 92.0 90.9 92.0 120.9 104.0 D10 Services: Conveying 100.0 101.0 100.3 100.0 100.1 100.0 100.0 101.2 100.4 100.0 98.7 99.6 100.0 102.4 100.7 D20 - 40 Mechanical 96.4 83.0 90.5 96.4 81.8 89.9 96.2 94.2 95.3 96.7 93.2 95.2 96.7 114.2 104.4 D50 Electrical 95.8 113.5 105.2 95.8 113.5 105.2 89.0 113.5 102.0 90.0 97.2 93.8 93.1 140.2 118.1 E Equipment & Furnishings 100.0 92.3 99.5 100.0 85.0 99.1 100.0 97.0 99.8 100.0 89.0 99.4 100.0 134.3 102.0 G Site Work 100.2 101.1 100.8 106.5 101.5 103.1 88.9 103.2 98.5 81.7 101.5 94.9 90.6 103.7 99.4 A-G WEIGHTED AVERAGE 98.0 99.0 98.4 99.2 95.8 97.7 91.9 102.9 96.8 93.2 97.9 95.3 95.0 119.6 105.9 DIV.NO.BUILDING SYSTEMS PENNSYLVANIA MONTROSE NEW CASTLE NORRISTOWN OIL CITY PHILADELPHIA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 91.5 100.0 96.5 91.2 101.4 97.2 87.7 126.4 110.6 89.6 99.0 95.1 97.3 130.0 116.6 B10 Shell: Superstructure 92.6 110.8 99.6 89.3 109.7 97.2 93.3 127.4 106.4 89.0 107.4 96.1 97.8 129.5 110.0 B20 Exterior Closure 93.2 99.5 96.1 86.4 98.8 92.1 100.0 126.5 112.2 85.6 94.0 89.5 101.6 135.2 117.1 B30 Roofing 102.3 92.3 98.5 101.3 109.4 104.4 106.0 130.4 115.3 101.2 95.5 99.0 102.6 137.6 116.0 C Interior Construction 89.8 96.2 92.4 87.7 97.9 91.9 86.2 133.0 105.5 87.6 99.1 92.4 100.8 141.5 117.6 D10 Services: Conveying 100.0 102.9 100.9 100.0 102.0 100.6 100.0 114.6 104.5 100.0 101.2 100.4 100.0 116.8 105.1 D20 - 40 Mechanical 96.7 99.6 98.0 96.2 101.9 98.7 96.4 128.3 110.5 96.2 97.4 96.7 100.2 134.0 115.1 D50 Electrical 92.2 98.7 95.7 89.6 103.4 96.9 93.2 153.9 125.4 91.4 112.0 102.3 97.2 153.9 127.3 E Equipment & Furnishings 100.0 90.3 99.4 100.0 99.3 100.0 100.0 131.5 101.8 100.0 96.7 99.8 100.0 140.3 102.3 G Site Work 90.1 102.9 98.7 86.7 103.7 98.1 96.5 100.9 99.5 85.3 102.0 96.5 102.8 98.0 99.6 A-G WEIGHTED AVERAGE 93.8 101.0 97.0 91.5 102.6 96.4 94.3 130.1 110.1 91.4 101.4 95.8 99.6 134.5 115.0 DIV. NO.BUILDING SYSTEMS PENNSYLVANIA PITTSBURGH POTTSVILLE READING SCRANTON STATE COLLEGE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 107.8 102.7 104.8 87.6 100.0 94.9 84.1 107.1 97.7 95.8 99.8 98.1 90.6 94.1 92.7 B10 Shell: Superstructure 101.3 108.3 104.0 90.9 110.6 98.5 93.4 120.3 103.7 97.2 111.3 102.6 92.6 105.1 97.4 B20 Exterior Closure 99.7 101.7 100.7 97.8 96.8 97.4 98.6 99.7 99.1 95.5 99.9 97.6 100.2 91.7 96.3 B30 Roofing 100.5 98.4 99.7 94.5 107.8 99.6 106.3 111.1 108.1 102.7 97.0 100.5 101.9 105.3 103.2 C Interior Construction 100.3 102.1 101.0 89.4 94.2 91.4 89.2 93.3 90.9 93.6 94.9 94.1 89.9 87.3 88.8 D10 Services: Conveying 100.0 102.1 100.6 100.0 99.4 99.8 100.0 101.7 100.5 100.0 103.0 100.9 100.0 98.3 99.5 D20 - 40 Mechanical 100.0 102.0 100.9 96.7 98.6 97.5 100.1 111.0 105.0 100.3 99.8 100.1 96.7 92.6 94.9 D50 Electrical 98.3 113.5 106.4 88.2 93.4 91.0 99.6 97.2 98.3 98.5 98.7 98.6 91.4 113.5 103.1 E Equipment & Furnishings 100.0 99.8 100.0 100.0 88.3 99.3 100.0 89.3 99.4 100.0 90.3 99.4 100.0 85.0 99.1 G Site Work 106.0 99.9 101.9 84.5 101.3 95.8 100.6 115.1 110.3 94.1 102.9 100.0 85.7 101.4 96.2 A-G WEIGHTED AVERAGE 100.6 104.5 102.3 93.0 99.5 95.9 96.0 106.1 100.5 97.4 101.0 99.0 94.5 97.8 95.9 DIV. NO.BUILDING SYSTEMS PENNSYLVANIA STROUDSBURG SUNBURY UNIONTOWN WASHINGTON WELLSBORO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 90.9 103.9 98.6 96.0 98.5 97.5 101.4 101.6 101.5 102.0 102.5 102.3 95.0 96.6 96.0 B10 Shell: Superstructure 94.0 112.8 101.2 92.4 110.1 99.3 97.9 111.9 103.3 98.3 112.8 103.9 93.2 109.1 99.3 B20 Exterior Closure 92.5 112.2 101.6 96.7 90.3 93.8 106.5 98.3 102.7 99.8 102.4 101.0 101.6 90.7 96.6 B30 Roofing 102.4 101.7 102.2 95.5 99.5 97.0 100.1 97.1 98.9 100.2 98.1 99.4 103.0 90.7 98.3 C Interior Construction 91.4 98.0 94.1 89.8 93.4 91.3 95.6 95.2 95.5 96.4 96.7 96.5 91.4 93.2 92.1 D10 Services: Conveying 100.0 107.5 102.3 100.0 99.4 99.8 100.0 101.8 100.5 100.0 101.8 100.5 100.0 96.7 99.0 D20 - 40 Mechanical 96.7 105.8 100.8 96.7 90.5 93.9 96.4 85.7 91.7 96.4 98.0 97.1 96.7 89.8 93.7 D50 Electrical 93.1 146.7 121.5 88.5 95.6 92.3 92.7 113.5 103.7 95.2 113.5 104.9 92.2 96.0 94.2 E Equipment & Furnishings 100.0 93.3 99.6 100.0 88.0 99.3 100.0 94.9 99.7 100.0 97.1 99.8 100.0 88.1 99.3 G Site Work 88.3 103.6 98.5 95.9 102.3 100.2 100.9 102.2 101.8 101.0 102.3 101.9 96.3 102.2 100.3 A-G WEIGHTED AVERAGE 94.4 111.9 102.1 94.0 96.8 95.2 98.2 100.1 99.0 97.9 103.8 100.5 95.6 96.1 95.8 DIV.NO.BUILDING SYSTEMS PENNSYLVANIA PUERTO RICO WESTCHESTER WILKES-BARRE WILLIAMSPORT YORK SAN JUAN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 94.7 127.0 113.8 88.0 99.5 94.8 85.0 97.4 92.3 88.6 98.5 94.5 116.1 36.0 68.8 B10 Shell: Superstructure 94.9 127.1 107.3 92.2 111.0 99.4 90.2 109.9 97.8 92.3 110.7 99.4 112.7 28.8 80.4 B20 Exterior Closure 101.0 128.3 113.6 96.9 99.6 98.1 88.0 93.5 90.6 98.9 91.3 95.4 99.3 16.9 61.3 B30 Roofing 106.4 126.2 114.0 102.2 96.6 100.1 94.9 92.6 94.0 94.5 108.2 99.8 128.6 22.4 88.1 C Interior Construction 86.9 133.3 106.1 90.3 93.5 91.6 89.7 91.1 90.3 89.5 90.4 89.9 174.9 16.5 109.4 D10 Services: Conveying 100.0 112.5 103.8 100.0 102.9 100.9 100.0 98.4 99.5 100.0 98.7 99.6 100.0 16.4 74.5 D20 - 40 Mechanical 96.4 129.4 111.0 96.7 99.6 98.0 96.7 92.4 94.8 100.2 93.2 97.1 104.2 13.5 64.1 D50 Electrical 93.1 112.3 103.3 93.1 94.1 93.6 89.0 77.9 83.1 90.0 83.4 86.5 124.0 17.7 67.6 E Equipment & Furnishings 100.0 129.8 101.7 100.0 88.5 99.3 100.0 87.3 99.3 100.0 85.9 99.2 100.0 15.6 95.1 G Site Work 102.3 101.8 102.0 87.2 102.8 97.6 87.0 102.8 97.6 85.5 101.5 96.2 132.0 90.8 104.4 A-G WEIGHTED AVERAGE 95.3 124.7 108.3 94.1 100.0 96.7 91.8 94.5 93.0 94.5 95.6 94.9 121.1 24.3 78.3 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 17COA050513 DIV. NO.BUILDING SYSTEMS RHODE ISLAND SOUTH CAROLINA NEWPORT PROVIDENCE AIKEN BEAUFORT CHARLESTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 83.6 115.8 102.6 94.9 115.8 107.2 93.3 71.2 80.3 92.5 57.2 71.7 99.9 71.2 83.0 B10 Shell: Superstructure 91.2 115.0 100.3 97.2 115.0 104.1 95.6 79.7 89.5 95.5 65.2 83.8 98.9 80.0 91.6 B20 Exterior Closure 97.7 117.2 106.7 96.2 117.2 105.9 104.4 67.6 87.4 107.7 65.7 88.4 96.3 67.7 83.1 B30 Roofing 100.1 118.1 107.0 103.2 118.1 108.9 99.8 63.9 86.1 99.5 52.8 81.6 98.6 61.7 84.5 C Interior Construction 95.8 123.5 107.3 95.8 123.5 107.3 94.6 69.3 84.1 95.1 43.4 73.7 96.1 67.5 84.3 D10 Services: Conveying 100.0 105.7 101.7 100.0 105.7 101.7 100.0 72.7 91.7 100.0 83.9 95.1 100.0 72.7 91.7 D20 - 40 Mechanical 100.3 108.6 104.0 100.1 108.6 103.9 97.0 56.1 78.9 97.0 55.9 78.8 100.5 56.8 81.2 D50 Electrical 100.6 99.1 99.8 100.4 99.1 99.7 100.8 63.9 81.2 104.8 33.5 67.0 103.0 59.3 79.8 E Equipment & Furnishings 100.0 121.1 101.2 100.0 121.1 101.2 100.0 66.3 98.0 100.0 34.4 96.2 100.0 66.1 98.0 G Site Work 87.9 103.8 98.5 89.1 103.8 98.9 119.1 89.7 99.4 114.7 89.1 97.6 101.9 89.4 93.5 A-G WEIGHTED AVERAGE 96.2 112.3 103.3 97.9 112.3 104.2 98.2 68.6 85.1 98.9 56.4 80.1 99.1 67.8 85.2 DIV.NO.BUILDING SYSTEMS SOUTH CAROLINA COLUMBIA FLORENCE GREENVILLE ROCK HILL SPARTANBURG MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.0 71.2 83.4 90.4 71.2 79.0 90.8 71.1 79.1 90.5 70.9 78.9 91.1 71.0 79.2 B10 Shell: Superstructure 97.1 80.0 90.5 95.3 79.8 89.3 96.0 79.9 89.8 95.3 79.2 89.1 96.2 79.8 89.9 B20 Exterior Closure 89.6 67.7 79.5 96.6 67.6 83.2 93.2 67.7 81.5 101.4 67.6 85.8 94.3 67.7 82.0 B30 Roofing 94.5 61.7 82.0 98.9 61.7 84.7 98.8 61.7 84.6 98.7 56.6 82.6 98.8 61.7 84.7 C Interior Construction 93.2 67.3 82.5 92.6 67.3 82.1 93.6 67.3 82.7 93.3 67.3 82.5 94.0 67.3 82.9 D10 Services: Conveying 100.0 72.7 91.7 100.0 72.7 91.7 100.0 72.7 91.7 100.0 72.7 91.7 100.0 72.7 91.7 D20 - 40 Mechanical 100.0 56.8 80.9 100.5 56.8 81.2 100.5 56.8 81.2 97.0 56.0 78.9 100.5 56.8 81.2 D50 Electrical 102.8 64.7 82.6 100.7 64.7 81.6 103.1 62.0 81.3 103.1 62.0 81.3 103.1 62.0 81.3 E Equipment & Furnishings 100.0 66.3 98.0 100.0 66.3 98.0 100.0 66.1 98.0 100.0 66.1 98.0 100.0 66.1 98.0 G Site Work 101.6 89.4 93.4 109.9 89.2 96.1 105.4 88.8 94.3 103.4 88.6 93.5 105.2 88.8 94.2 A-G WEIGHTED AVERAGE 97.1 68.5 84.5 97.3 68.5 84.5 97.3 68.1 84.4 97.3 67.6 84.2 97.6 68.1 84.5 DIV.NO.BUILDING SYSTEMS SOUTH DAKOTA ABERDEEN MITCHELL MOBRIDGE PIERRE RAPID CITY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 105.8 58.9 78.1 103.4 53.0 73.6 103.1 52.8 73.4 103.2 62.1 78.9 102.7 65.7 80.8 B10 Shell: Superstructure 99.5 58.3 83.6 98.2 55.2 81.6 97.8 55.3 81.4 101.6 70.2 89.5 100.4 73.3 89.9 B20 Exterior Closure 102.3 52.4 79.3 96.0 52.0 75.7 100.4 53.5 78.8 99.7 56.1 79.6 100.9 57.0 80.7 B30 Roofing 102.8 48.6 82.1 102.6 46.9 81.3 102.6 48.7 82.1 103.7 48.8 82.7 103.2 50.5 83.1 C Interior Construction 94.7 37.8 71.2 93.6 38.0 70.6 94.3 38.3 71.1 99.2 44.2 76.4 96.6 59.3 81.1 D10 Services: Conveying 100.0 39.0 81.4 100.0 35.8 80.4 100.0 44.1 83.0 100.0 80.4 94.0 100.0 79.7 93.8 D20 - 40 Mechanical 100.2 43.5 75.1 96.6 39.3 71.3 96.6 62.6 81.6 100.0 70.2 86.8 100.2 69.4 86.6 D50 Electrical 104.3 73.8 88.1 102.5 42.2 70.5 104.3 43.0 71.8 108.4 49.7 77.3 100.4 49.7 73.5 E Equipment & Furnishings 100.0 37.0 96.3 100.0 35.9 96.3 100.0 35.7 96.3 100.0 36.7 96.3 100.0 49.9 97.1 G Site Work 103.2 94.9 97.6 99.9 94.9 96.5 99.7 94.9 96.5 102.2 95.2 97.5 101.1 95.1 97.1 A-G WEIGHTED AVERAGE 100.1 54.7 80.1 97.8 48.3 75.9 98.5 53.9 78.8 101.3 62.0 83.9 99.9 65.2 84.6 DIV. NO.BUILDING SYSTEMS SOUTH DAKOTA TENNESSEE SIOUX FALLS WATERTOWN CHATTANOOGA COLUMBIA COOKEVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 91.5 68.7 78.0 101.8 52.8 72.8 98.3 69.7 81.4 88.2 69.8 77.3 96.7 52.2 70.4 B10 Shell: Superstructure 97.2 75.2 88.7 97.4 55.2 81.1 98.5 76.1 89.9 92.9 78.0 87.2 94.7 66.8 83.9 B20 Exterior Closure 91.3 58.9 76.4 111.6 55.3 85.7 101.0 51.3 78.1 108.1 58.2 85.1 110.3 43.2 79.4 B30 Roofing 102.1 53.0 83.3 102.4 48.6 81.9 99.8 61.9 85.3 94.6 64.1 83.0 95.1 51.9 78.6 C Interior Construction 98.1 64.0 84.0 92.2 37.4 69.5 97.1 57.3 80.6 88.7 62.2 77.7 88.9 38.8 68.2 D10 Services: Conveying 100.0 80.4 94.0 100.0 39.0 81.4 100.0 37.3 80.9 100.0 72.2 91.5 100.0 39.2 81.5 D20 - 40 Mechanical 100.0 58.5 81.7 96.6 42.3 72.6 100.2 57.1 81.1 97.7 75.1 87.7 97.7 66.7 84.0 D50 Electrical 103.0 72.6 86.9 101.5 47.3 72.8 103.6 88.9 95.8 93.5 54.8 73.0 95.2 63.4 78.3 E Equipment & Furnishings 100.0 57.7 97.5 100.0 35.7 96.2 100.0 60.0 97.7 100.0 64.0 97.9 100.0 32.6 96.1 G Site Work 92.1 97.0 95.4 99.7 94.9 96.4 101.8 99.0 99.9 88.4 89.2 88.9 93.5 86.2 88.6 A-G WEIGHTED AVERAGE 97.8 67.8 84.6 99.0 50.0 77.4 99.6 67.1 85.3 95.4 68.7 83.6 96.8 57.7 79.5 DIV. NO.BUILDING SYSTEMS TENNESSEE JACKSON JOHNSON CITY KNOXVILLE MCKENZIE MEMPHIS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 96.3 67.1 79.0 85.1 64.9 73.2 92.4 71.1 79.8 95.9 57.1 73.0 92.2 77.3 83.4 B10 Shell: Superstructure 96.5 74.1 87.9 92.8 75.1 86.0 98.0 78.0 90.3 94.8 69.9 85.2 98.5 79.0 91.0 B20 Exterior Closure 105.6 47.4 78.8 126.9 47.4 90.2 90.1 54.3 73.6 111.3 50.0 83.1 96.4 58.8 79.0 B30 Roofing 97.1 58.2 82.3 95.2 56.7 80.5 93.0 66.6 82.9 95.1 46.4 76.5 97.2 69.1 86.4 C Interior Construction 92.6 46.7 73.6 96.8 60.4 81.7 92.4 63.0 80.2 89.5 40.4 69.2 96.6 67.5 84.6 D10 Services: Conveying 100.0 68.6 90.4 100.0 80.9 94.2 100.0 85.0 95.4 100.0 24.4 77.0 100.0 85.1 95.5 D20 - 40 Mechanical 100.1 60.1 82.4 99.9 57.5 81.1 99.9 62.0 83.1 97.7 60.3 81.2 100.0 72.0 87.6 D50 Electrical 99.7 55.8 76.4 94.0 44.2 67.6 100.1 57.9 77.7 95.0 60.0 76.4 101.6 65.7 82.6 E Equipment & Furnishings 100.0 43.1 96.7 100.0 65.3 98.0 100.0 67.0 98.1 100.0 34.8 96.2 100.0 66.7 98.1 G Site Work 96.0 99.7 98.5 108.5 85.4 93.0 89.8 88.3 88.8 93.4 86.2 88.6 90.1 97.3 94.9 A-G WEIGHTED AVERAGE 98.3 61.3 81.9 99.8 60.7 82.5 96.3 66.4 83.1 96.9 57.4 79.5 98.2 72.2 86.7 DIV.NO.BUILDING SYSTEMS TENNESSEE TEXAS NASHVILLE ABILENE AMARILLO AUSTIN BEAUMONT MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 92.9 73.2 81.2 91.4 70.7 79.2 86.8 67.3 75.2 93.9 66.9 77.9 92.2 68.7 78.3 B10 Shell: Superstructure 98.7 76.7 90.2 101.8 68.4 88.9 96.9 65.8 84.9 95.8 65.6 84.2 95.2 69.0 85.1 B20 Exterior Closure 95.2 69.2 83.2 91.2 63.8 78.6 92.9 63.5 79.3 93.9 61.9 79.1 102.6 60.5 83.2 B30 Roofing 94.0 67.2 83.8 99.7 66.8 87.1 95.8 64.8 84.0 97.5 66.0 85.4 103.6 65.8 89.2 C Interior Construction 98.2 67.9 85.7 94.9 64.0 82.1 98.1 55.9 80.6 97.8 55.1 80.1 94.6 58.3 79.5 D10 Services: Conveying 100.0 85.5 95.6 100.0 83.3 94.9 100.0 80.8 94.2 100.0 82.4 94.6 100.0 86.9 96.0 D20 - 40 Mechanical 99.9 78.0 90.2 100.3 50.1 78.1 100.0 54.1 79.7 100.0 59.4 82.0 100.1 65.3 84.7 D50 Electrical 100.6 63.4 80.9 99.7 57.6 77.4 101.9 63.8 81.7 99.0 61.0 78.8 96.9 68.0 81.6 E Equipment & Furnishings 100.0 66.3 98.0 100.0 64.9 98.0 100.0 53.9 97.3 100.0 54.4 97.3 100.0 57.2 97.5 G Site Work 99.0 95.6 96.7 98.2 93.5 95.1 95.6 92.8 93.7 98.1 92.3 94.2 90.1 97.3 94.9 A-G WEIGHTED AVERAGE 98.4 73.6 87.4 98.1 63.7 82.9 97.5 63.2 82.4 97.5 63.6 82.5 97.6 67.3 84.2 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 18 COA050514 DIV. NO.BUILDING SYSTEMS TEXAS BROWNWOOD BRYAN CHILDRESS CORPUS CHRISTI DALLAS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 104.8 68.5 83.4 77.9 69.1 72.7 94.0 68.1 78.7 112.2 66.3 85.1 111.2 72.2 88.2 B10 Shell: Superstructure 97.1 66.7 85.4 91.6 68.0 82.5 100.2 66.6 87.2 96.6 73.8 87.8 101.6 74.7 91.3 B20 Exterior Closure 106.1 55.9 83.0 112.6 56.5 86.7 99.2 55.9 79.2 90.3 54.2 73.6 100.2 64.6 83.8 B30 Roofing 97.0 64.7 84.7 95.3 66.2 84.2 100.4 63.1 86.1 103.6 66.1 89.3 93.1 69.4 84.0 C Interior Construction 90.7 61.7 78.7 89.1 60.7 77.4 92.7 61.7 79.8 102.8 53.5 82.4 98.6 63.5 84.1 D10 Services: Conveying 100.0 80.8 94.2 100.0 82.9 94.8 100.0 80.8 94.2 100.0 86.4 95.9 100.0 84.0 95.1 D20 - 40 Mechanical 96.6 48.1 75.2 96.6 64.8 82.5 96.7 54.1 77.9 100.1 56.9 81.0 100.0 61.5 83.0 D50 Electrical 94.7 50.0 71.0 94.9 68.8 81.1 99.7 60.4 78.9 95.1 57.1 74.9 96.5 63.6 79.0 E Equipment & Furnishings 100.0 64.5 97.9 100.0 63.0 97.8 100.0 64.7 97.9 100.0 54.6 97.4 100.0 65.5 98.0 G Site Work 106.9 93.4 97.8 81.6 98.1 92.7 108.6 91.8 97.3 139.8 88.0 105.1 108.0 95.0 99.3 A-G WEIGHTED AVERAGE 97.5 60.3 81.1 95.0 67.0 82.7 97.9 62.8 82.4 99.7 62.5 83.3 100.3 68.4 86.2 DIV.NO.BUILDING SYSTEMS TEXAS DEL RIO DENTON EASTLAND EL PASO FORT WORTH MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 114.1 64.5 84.8 90.5 66.7 76.4 109.3 68.1 84.9 90.1 66.1 76.0 100.0 69.0 81.7 B10 Shell: Superstructure 97.5 62.6 84.1 94.0 75.4 86.8 97.9 66.9 85.9 97.7 64.6 84.9 97.2 67.0 85.6 B20 Exterior Closure 112.6 54.4 85.8 102.4 54.9 80.5 96.0 62.8 80.7 88.2 54.2 72.5 93.2 55.9 76.0 B30 Roofing 100.1 65.1 86.7 94.8 64.4 83.2 97.4 65.1 85.0 98.0 62.9 84.6 93.2 66.2 82.9 C Interior Construction 96.4 53.7 78.7 100.1 61.0 83.9 75.2 61.7 69.6 93.3 57.8 78.6 95.5 61.7 81.5 D10 Services: Conveying 100.0 82.4 94.6 100.0 79.2 93.7 100.0 78.7 93.5 100.0 80.5 94.1 100.0 83.3 94.9 D20 - 40 Mechanical 96.5 62.2 81.3 96.6 57.7 79.4 96.6 48.1 75.1 99.9 64.7 84.3 99.9 58.6 81.6 D50 Electrical 97.4 64.8 80.1 96.9 63.6 79.2 94.6 63.5 78.1 99.3 54.1 75.3 96.2 63.5 78.9 E Equipment & Furnishings 100.0 54.9 97.4 100.0 64.7 97.9 100.0 64.8 97.9 100.0 59.4 97.6 100.0 65.3 98.0 G Site Work 123.7 91.1 101.9 104.0 84.3 90.8 109.7 91.4 97.5 97.3 91.2 93.2 101.8 94.2 96.7 A-G WEIGHTED AVERAGE 100.5 62.8 83.9 97.5 64.8 83.0 94.1 62.9 80.3 96.3 62.8 81.5 97.3 64.7 82.9 DIV.NO.BUILDING SYSTEMS TEXAS GALVESTON GIDDINGS GREENVILLE HOUSTON HUNTSVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 97.9 69.6 81.2 100.2 64.4 79.0 102.9 67.3 81.9 96.1 68.5 79.8 97.9 68.0 80.2 B10 Shell: Superstructure 96.7 79.3 90.0 94.5 63.9 82.7 97.8 74.3 88.8 98.4 69.9 87.5 95.9 67.4 84.9 B20 Exterior Closure 100.2 58.0 80.7 100.6 53.6 78.9 121.7 56.9 91.8 99.1 60.0 81.1 122.2 56.5 91.9 B30 Roofing 94.3 66.6 83.8 100.7 63.9 86.6 93.1 64.6 82.2 93.9 67.4 83.8 96.4 65.7 84.7 C Interior Construction 96.0 58.3 80.4 95.2 53.4 77.9 95.7 60.1 81.0 101.3 58.1 83.5 90.5 57.6 76.9 D10 Services: Conveying 100.0 87.2 96.1 100.0 77.4 93.1 100.0 81.4 94.3 100.0 87.5 96.2 100.0 77.3 93.1 D20 - 40 Mechanical 96.5 64.9 82.5 96.6 62.3 81.4 96.5 59.9 80.3 100.0 64.8 84.4 96.6 64.7 82.5 D50 Electrical 96.5 64.6 79.6 94.2 60.3 76.2 93.3 63.6 77.5 98.5 68.8 82.8 94.9 64.1 78.5 E Equipment & Furnishings 100.0 58.7 97.6 100.0 54.5 97.3 100.0 62.2 97.8 100.0 59.0 97.6 100.0 58.5 97.6 G Site Work 103.6 96.1 98.6 109.1 91.8 97.5 101.3 87.6 92.1 102.1 96.8 98.5 97.5 98.1 97.9 A-G WEIGHTED AVERAGE 97.3 68.3 84.5 97.0 62.1 81.6 99.9 65.5 84.7 99.3 67.5 85.2 98.6 65.5 84.0 DIV. NO.BUILDING SYSTEMS TEXAS LAREDO LONGVIEW LUBBOCK LUFKIN MCALLEN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 89.1 67.3 76.2 113.0 68.8 86.8 95.6 68.0 79.3 104.2 68.5 83.1 119.5 65.0 87.3 B10 Shell: Superstructure 94.6 65.6 83.4 94.4 66.1 83.5 105.1 75.0 93.5 98.5 66.7 86.2 97.8 72.9 88.2 B20 Exterior Closure 96.7 62.9 81.1 129.0 56.3 95.5 90.7 64.7 78.7 110.1 56.4 85.3 99.8 55.8 79.5 B30 Roofing 99.4 66.7 86.9 94.8 64.0 83.0 88.8 65.9 80.1 94.6 62.6 82.3 103.4 66.2 89.2 C Interior Construction 96.0 55.5 79.2 92.8 61.4 79.8 100.0 56.0 81.8 83.2 58.1 72.8 102.6 53.6 82.3 D10 Services: Conveying 100.0 82.5 94.7 100.0 81.0 94.2 100.0 83.6 95.0 100.0 77.6 93.2 100.0 82.9 94.8 D20 - 40 Mechanical 100.1 62.3 83.4 96.4 58.4 79.6 99.7 50.0 77.7 96.4 61.4 80.9 96.6 58.1 79.5 D50 Electrical 97.5 61.9 78.6 93.8 54.2 72.8 98.4 63.2 79.8 95.1 66.5 79.9 94.9 34.3 62.7 E Equipment & Furnishings 100.0 54.8 97.4 100.0 64.3 97.9 100.0 54.2 97.3 100.0 58.5 97.6 100.0 53.6 97.3 G Site Work 102.5 92.4 95.7 102.2 95.0 97.4 119.5 91.9 101.0 97.3 96.3 96.7 144.1 88.2 106.6 A-G WEIGHTED AVERAGE 97.1 64.7 82.8 100.1 63.1 83.7 99.7 64.1 84.0 96.7 65.0 82.7 100.7 59.5 82.5 DIV. NO.BUILDING SYSTEMS TEXAS MCKINNEY MIDLAND ODESSA PALESTINE SAN ANGELO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 98.0 67.3 79.9 100.1 70.7 82.7 91.5 71.0 79.4 97.4 68.9 80.5 100.4 67.6 81.1 B10 Shell: Superstructure 96.8 74.3 88.1 104.9 77.3 94.2 101.3 68.5 88.7 96.4 66.2 84.7 96.4 65.6 84.5 B20 Exterior Closure 124.8 56.9 93.5 99.4 65.0 83.5 91.2 63.8 78.6 114.5 56.4 87.7 102.9 56.2 81.3 B30 Roofing 92.9 64.6 82.1 89.1 67.4 80.8 99.7 66.3 86.9 95.1 65.3 83.7 96.9 65.8 85.0 C Interior Construction 95.5 60.1 80.8 101.0 63.2 85.4 94.9 63.3 81.8 81.9 61.7 73.6 90.6 54.8 75.8 D10 Services: Conveying 100.0 81.4 94.3 100.0 81.2 94.3 100.0 80.8 94.2 100.0 81.0 94.2 100.0 83.0 94.8 D20 - 40 Mechanical 96.5 59.9 80.3 96.1 50.2 75.8 100.3 56.2 80.8 96.4 58.6 79.7 96.6 50.0 76.0 D50 Electrical 93.3 63.6 77.5 98.4 63.2 79.8 99.8 63.2 80.4 91.3 52.4 70.7 98.8 59.2 77.8 E Equipment & Furnishings 100.0 62.2 97.8 100.0 65.0 98.0 100.0 65.3 98.0 100.0 64.2 97.9 100.0 54.6 97.4 G Site Work 97.7 87.6 90.9 122.5 90.0 100.7 98.2 94.2 95.5 102.3 95.3 97.6 103.0 93.8 96.9 A-G WEIGHTED AVERAGE 99.7 65.5 84.6 100.4 65.8 85.1 98.0 65.7 83.7 96.0 63.0 81.4 97.1 60.8 81.0 DIV.NO.BUILDING SYSTEMS TEXAS SAN ANTONIO TEMPLE TEXARKANA TYLER VICTORIA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 90.6 68.5 77.6 87.6 65.1 74.3 98.3 71.7 82.6 111.6 68.9 86.4 105.6 66.0 82.2 B10 Shell: Superstructure 97.4 66.8 85.6 93.8 64.1 82.4 91.7 68.0 82.6 99.7 66.2 86.8 97.0 74.8 88.4 B20 Exterior Closure 94.5 63.1 80.0 103.8 55.1 81.3 130.6 63.8 99.8 133.2 56.4 97.8 110.6 57.4 86.1 B30 Roofing 97.3 67.9 86.0 96.4 64.0 84.0 94.3 67.3 84.0 94.9 65.3 83.6 98.2 66.2 86.0 C Interior Construction 99.4 55.6 81.3 72.8 53.7 64.9 94.0 63.4 81.3 83.7 61.7 74.6 94.8 55.1 78.4 D10 Services: Conveying 100.0 83.0 94.8 100.0 80.3 94.0 100.0 83.5 95.0 100.0 83.5 95.0 100.0 77.6 93.2 D20 - 40 Mechanical 100.0 65.0 84.5 96.6 53.9 77.7 96.4 57.6 79.3 96.4 61.5 81.0 96.6 64.6 82.5 D50 Electrical 99.0 61.9 79.3 95.8 56.4 74.9 95.0 59.1 76.0 93.8 58.2 74.9 101.3 54.6 76.6 E Equipment & Furnishings 100.0 55.0 97.4 100.0 54.4 97.3 100.0 65.1 98.0 100.0 64.5 97.9 100.0 54.5 97.3 G Site Work 102.8 95.9 98.2 91.0 94.0 93.0 90.9 97.8 95.5 102.0 95.1 97.4 108.6 93.3 98.4 A-G WEIGHTED AVERAGE 98.1 65.8 83.9 92.4 60.3 78.2 99.1 65.7 84.4 100.1 64.5 84.4 99.5 64.7 84.1 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 19COA050515 DIV. NO.BUILDING SYSTEMS TEXAS UTAH WACO WAXAHACKIE WHARTON WICHITA FALLS LOGAN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 92.7 70.8 79.8 102.0 68.0 81.9 108.4 67.6 84.3 96.8 69.0 80.4 91.4 74.0 81.1 B10 Shell: Superstructure 96.4 68.3 85.6 97.6 74.8 88.8 98.4 75.4 89.6 97.2 67.3 85.7 103.6 76.1 93.0 B20 Exterior Closure 91.7 63.8 78.9 121.4 57.0 91.7 106.2 57.4 83.7 92.0 61.3 77.8 118.0 59.6 91.1 B30 Roofing 97.3 67.7 86.0 93.0 64.9 82.3 94.7 66.5 83.9 97.3 65.0 85.0 98.0 66.3 85.9 C Interior Construction 79.2 63.2 72.6 95.8 61.8 81.7 95.6 58.6 80.3 79.5 63.3 72.8 92.6 59.2 78.8 D10 Services: Conveying 100.0 83.3 94.9 100.0 81.4 94.3 100.0 77.6 93.2 100.0 80.8 94.2 100.0 87.0 96.0 D20 - 40 Mechanical 100.2 60.1 82.5 96.5 53.4 77.4 96.5 62.0 81.3 100.2 53.5 79.6 99.9 66.1 84.9 D50 Electrical 98.9 57.1 76.7 93.3 63.6 77.5 100.3 64.1 81.1 100.6 57.0 77.5 96.7 71.0 83.1 E Equipment & Furnishings 100.0 65.0 98.0 100.0 64.8 97.9 100.0 57.1 97.5 100.0 65.0 98.0 100.0 57.4 97.5 G Site Work 99.5 94.5 96.1 99.3 87.6 91.5 113.4 95.3 101.3 100.5 94.2 96.3 99.0 95.0 96.3 A-G WEIGHTED AVERAGE 94.2 65.7 81.6 99.7 64.5 84.2 99.4 66.4 84.8 94.8 63.6 81.0 100.8 69.5 87.0 DIV.NO.BUILDING SYSTEMS UTAH VERMONT OGDEN PRICE PROVO SALT LAKE CITY BELLOWS FALLS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 90.7 74.0 80.9 92.6 65.7 76.7 92.5 73.7 81.4 96.4 74.0 83.2 88.3 104.4 97.8 B10 Shell: Superstructure 104.2 76.1 93.3 101.9 70.4 89.8 102.6 76.1 92.4 108.2 76.1 95.8 89.9 96.5 92.4 B20 Exterior Closure 103.3 59.6 83.2 121.4 56.4 91.4 119.6 59.6 92.0 126.4 59.6 95.6 97.2 89.2 93.5 B30 Roofing 96.8 66.3 85.1 99.8 60.7 84.8 99.8 66.3 87.0 104.4 66.3 89.9 97.5 89.3 94.4 C Interior Construction 91.7 59.2 78.3 95.1 47.0 75.2 94.9 59.2 80.1 93.8 60.0 79.8 96.5 105.6 100.2 D10 Services: Conveying 100.0 87.0 96.0 100.0 57.7 87.1 100.0 87.0 96.0 100.0 87.0 96.0 100.0 94.4 98.3 D20 - 40 Mechanical 99.9 66.1 84.9 98.1 65.0 83.4 99.9 66.1 84.9 100.1 66.1 85.0 96.7 91.9 94.6 D50 Electrical 97.0 71.0 83.2 102.3 71.0 85.7 97.4 71.0 83.4 99.6 71.0 84.4 102.8 86.2 94.0 E Equipment & Furnishings 100.0 57.4 97.5 100.0 43.2 96.7 100.0 57.4 97.5 100.0 57.4 97.5 100.0 110.5 100.6 G Site Work 87.4 95.0 92.5 96.8 92.9 94.2 95.7 93.3 94.1 87.2 95.0 92.4 90.4 102.3 98.4 A-G WEIGHTED AVERAGE 98.7 69.5 85.8 101.5 64.2 85.0 101.3 69.4 87.2 103.4 69.6 88.5 95.6 95.4 95.5 DIV.NO.BUILDING SYSTEMS VERMONT BENNINGTON BRATTLEBORO BURLINGTON GUILDHALL MONTPELIER MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 88.1 104.3 97.7 90.1 104.4 98.6 103.4 95.7 98.9 86.4 98.1 93.3 103.4 103.6 103.5 B10 Shell: Superstructure 89.7 96.3 92.2 90.2 96.4 92.6 98.9 89.7 95.3 89.4 93.2 90.9 97.4 95.6 96.7 B20 Exterior Closure 102.2 89.2 96.2 102.7 89.2 96.5 102.7 86.1 95.0 101.0 75.3 89.2 101.2 86.9 94.6 B30 Roofing 97.4 84.7 92.6 97.6 84.7 92.6 103.9 82.8 95.8 97.3 76.3 89.3 104.8 86.4 97.8 C Interior Construction 96.3 105.6 100.1 96.6 105.6 100.3 100.9 86.3 94.9 97.3 101.1 98.8 101.0 104.1 102.3 D10 Services: Conveying 100.0 94.4 98.3 100.0 94.4 98.3 100.0 93.9 98.2 100.0 88.5 96.5 100.0 93.9 98.2 D20 - 40 Mechanical 96.7 91.9 94.6 96.7 91.9 94.6 100.0 68.8 86.2 96.7 61.4 81.1 96.4 68.8 84.2 D50 Electrical 102.8 59.0 79.6 102.8 86.2 94.0 102.7 57.0 78.5 102.8 59.0 79.6 101.9 57.0 78.1 E Equipment & Furnishings 100.0 109.2 100.5 100.0 110.5 100.6 100.0 82.0 99.0 100.0 107.6 100.4 100.0 109.0 100.5 G Site Work 89.7 102.3 98.1 91.2 102.3 98.7 95.2 102.2 99.9 89.5 97.6 94.9 93.5 102.2 99.3 A-G WEIGHTED AVERAGE 96.1 91.4 94.0 96.5 95.2 95.9 100.7 80.8 91.9 96.0 80.7 89.3 99.3 85.5 93.2 DIV. NO.BUILDING SYSTEMS VERMONT VIRGINIA RUTLAND ST. JOHNSBURY WHITE RIVER JCT. ALEXANDRIA ARLINGTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 91.8 95.7 94.1 86.0 99.1 93.7 90.2 99.6 95.7 100.9 80.7 89.0 102.2 80.9 89.6 B10 Shell: Superstructure 95.0 89.7 92.9 89.1 93.5 90.8 90.0 93.7 91.4 100.6 89.8 96.4 99.4 90.9 96.1 B20 Exterior Closure 94.7 86.1 90.7 113.6 75.3 95.9 110.9 76.5 95.0 98.8 76.3 88.5 109.9 76.5 94.5 B30 Roofing 97.6 82.8 92.0 97.2 76.3 89.2 97.6 77.0 89.8 102.9 83.2 95.4 105.0 83.0 96.6 C Interior Construction 98.6 86.3 93.5 97.8 101.1 99.2 96.2 101.4 98.3 96.5 72.4 86.5 95.5 72.4 86.0 D10 Services: Conveying 100.0 93.9 98.2 100.0 88.5 96.5 100.0 89.1 96.7 100.0 91.6 97.5 100.0 91.2 97.3 D20 - 40 Mechanical 100.3 68.8 86.4 96.7 61.4 81.1 96.7 62.2 81.4 100.4 85.7 93.9 100.4 85.7 93.9 D50 Electrical 102.8 57.0 78.5 102.8 59.0 79.6 102.8 57.0 78.5 98.0 99.5 98.8 95.6 99.5 97.7 E Equipment & Furnishings 100.0 82.0 99.0 100.0 108.3 100.5 100.0 108.3 100.5 100.0 70.9 98.3 100.0 70.9 98.3 G Site Work 92.9 102.2 99.1 89.6 101.2 97.4 93.7 101.3 98.8 116.0 93.4 100.9 125.3 91.4 102.6 A-G WEIGHTED AVERAGE 97.8 80.8 90.3 97.5 81.1 90.3 97.4 81.3 90.3 99.8 85.2 93.3 100.7 85.3 93.9 DIV. NO.BUILDING SYSTEMS VIRGINIA BRISTOL CHARLOTTESVILLE CULPEPER FAIRFAX FARMVILLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.0 56.9 74.9 103.8 69.0 83.2 101.8 80.4 89.2 101.8 84.0 91.3 102.7 60.0 77.5 B10 Shell: Superstructure 98.1 70.5 87.5 98.8 79.4 91.3 98.6 89.5 95.1 98.5 92.2 96.1 95.6 67.5 84.8 B20 Exterior Closure 102.2 51.0 78.6 111.3 55.7 85.7 103.3 76.1 90.8 109.8 76.2 94.3 100.5 53.7 78.9 B30 Roofing 104.6 58.2 86.9 104.2 67.2 90.1 104.1 82.5 95.9 104.7 77.4 94.3 105.1 53.5 85.4 C Interior Construction 95.4 43.9 74.1 94.3 49.1 75.6 94.8 70.9 84.9 94.8 72.3 85.5 95.1 47.1 75.2 D10 Services: Conveying 100.0 68.1 90.3 100.0 88.9 96.6 100.0 91.1 97.3 100.0 91.1 97.3 100.0 48.0 84.2 D20 - 40 Mechanical 96.9 48.1 75.3 96.9 67.5 83.9 96.9 70.8 85.3 96.9 85.6 91.9 97.0 47.0 74.9 D50 Electrical 97.7 39.4 66.7 97.6 72.4 84.2 100.2 99.5 99.8 98.8 99.5 99.2 93.9 46.3 68.7 E Equipment & Furnishings 100.0 37.0 96.3 100.0 43.1 96.7 100.0 70.8 98.3 100.0 70.9 98.3 100.0 40.7 96.5 G Site Work 108.2 89.9 96.0 112.5 92.6 99.1 113.5 91.0 98.4 123.8 91.3 102.0 107.1 91.9 96.9 A-G WEIGHTED AVERAGE 98.5 54.4 79.0 99.8 68.0 85.7 99.0 81.5 91.3 99.9 85.5 93.6 97.5 55.1 78.8 DIV.NO.BUILDING SYSTEMS VIRGINIA FREDERICKSBURG GRUNDY HARRISONBURG LYNCHBURG NEWPORT NEWS MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.5 79.8 88.7 100.7 51.9 71.9 101.0 58.7 76.0 100.6 67.0 80.8 100.6 75.2 85.6 B10 Shell: Superstructure 98.7 89.7 95.2 98.2 59.8 83.4 98.1 70.0 87.3 98.2 77.3 90.1 96.9 82.8 91.5 B20 Exterior Closure 102.8 74.4 89.7 101.0 45.8 75.6 107.2 51.2 81.4 107.4 54.4 83.0 96.8 57.6 78.7 B30 Roofing 104.1 81.3 95.4 104.6 42.2 80.8 104.5 62.9 88.6 104.4 65.8 89.7 105.1 70.7 91.9 C Interior Construction 94.9 70.3 84.7 95.5 32.6 69.5 95.0 44.0 73.9 94.6 57.1 79.0 95.7 61.7 81.6 D10 Services: Conveying 100.0 85.8 95.7 100.0 42.6 82.5 100.0 67.8 90.2 100.0 69.4 90.7 100.0 90.8 97.2 D20 - 40 Mechanical 96.9 84.1 91.2 96.9 61.1 81.0 96.9 68.8 84.4 96.9 67.2 83.7 100.5 64.6 84.6 D50 Electrical 95.8 99.5 97.7 97.7 42.8 68.6 97.8 93.6 95.6 98.7 50.5 73.2 96.8 65.4 80.1 E Equipment & Furnishings 100.0 70.6 98.3 100.0 32.7 96.1 100.0 38.7 96.4 100.0 57.6 97.5 100.0 61.0 97.7 G Site Work 113.0 91.0 98.2 106.1 88.7 94.5 121.1 89.4 99.9 107.1 90.2 95.8 105.9 93.0 97.3 A-G WEIGHTED AVERAGE 98.6 83.8 92.0 98.4 51.8 77.8 99.4 66.5 84.8 99.1 64.8 83.9 98.3 69.9 85.8 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 20 COA050516 DIV. NO.BUILDING SYSTEMS VIRGINIA NORFOLK PETERSBURG PORTSMOUTH PULASKI RICHMOND MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 102.6 75.4 86.5 104.6 76.4 87.9 99.0 66.0 79.5 100.7 54.6 73.5 100.2 76.4 86.2 B10 Shell: Superstructure 98.7 82.8 92.6 95.7 84.7 91.4 95.4 77.3 88.4 98.2 67.2 86.3 98.4 84.7 93.1 B20 Exterior Closure 93.5 57.6 77.0 105.6 62.7 85.8 99.4 53.4 78.2 98.8 47.7 75.2 94.9 62.7 80.1 B30 Roofing 102.9 70.7 90.6 105.1 72.7 92.7 105.1 65.2 89.9 104.6 48.6 83.2 102.2 72.7 90.9 C Interior Construction 93.5 61.7 80.3 94.1 64.0 81.6 94.2 51.7 76.6 95.5 40.6 72.8 94.5 64.0 81.9 D10 Services: Conveying 100.0 90.8 97.2 100.0 90.8 97.2 100.0 71.3 91.2 100.0 42.6 82.5 100.0 90.8 97.2 D20 - 40 Mechanical 100.1 65.7 84.9 97.0 70.1 85.1 100.5 62.8 83.9 96.9 60.0 80.5 100.0 70.1 86.7 D50 Electrical 99.2 61.6 79.3 96.9 72.4 83.9 95.0 61.6 77.3 97.7 58.1 76.7 101.0 72.4 85.8 E Equipment & Furnishings 100.0 60.8 97.7 100.0 63.4 97.9 100.0 47.6 96.9 100.0 34.9 96.2 100.0 63.4 97.9 G Site Work 105.3 94.1 97.8 109.5 92.9 98.4 104.3 92.3 96.3 105.3 89.1 94.5 101.1 92.9 95.6 A-G WEIGHTED AVERAGE 98.1 69.7 85.5 98.3 73.5 87.4 97.8 64.5 83.1 98.1 56.8 79.9 98.3 73.5 87.3 DIV.NO.BUILDING SYSTEMS VIRGINIA WASHINGTON ROANOKE STAUNTON WINCHESTER CLARKSTON EVERETT MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 110.2 67.2 84.8 103.8 58.0 76.7 100.9 77.0 86.8 95.4 82.4 87.7 101.5 106.5 104.5 B10 Shell: Superstructure 102.4 77.6 92.8 99.0 68.6 87.3 98.3 88.2 94.4 94.3 81.6 89.4 104.6 99.6 102.7 B20 Exterior Closure 98.2 56.7 79.1 104.6 50.1 79.5 105.8 76.3 92.2 105.8 82.2 94.9 98.4 100.3 99.3 B30 Roofing 104.4 69.6 91.1 104.2 49.8 83.4 104.6 80.5 95.4 160.2 83.5 130.9 112.2 105.0 109.5 C Interior Construction 96.0 57.7 80.2 94.7 44.1 73.8 96.1 72.8 86.4 114.7 68.6 95.6 106.1 101.5 104.2 D10 Services: Conveying 100.0 69.4 90.7 100.0 70.2 90.9 100.0 91.1 97.3 100.0 99.8 99.9 100.0 101.9 100.6 D20 - 40 Mechanical 100.4 64.8 84.7 96.9 56.0 78.8 96.9 85.6 91.9 97.2 83.0 90.9 100.2 97.0 98.8 D50 Electrical 97.7 58.2 76.7 96.5 74.1 84.6 96.2 99.5 97.9 87.5 95.0 91.5 104.2 95.9 99.8 E Equipment & Furnishings 100.0 57.9 97.5 100.0 46.8 96.9 100.0 70.8 98.3 100.0 64.6 97.9 100.0 101.9 100.1 G Site Work 106.7 90.2 95.7 109.0 91.2 97.1 119.8 91.0 100.5 107.9 90.2 96.1 93.2 112.1 105.8 A-G WEIGHTED AVERAGE 100.2 65.8 85.0 98.9 60.5 81.9 99.2 84.4 92.7 102.0 82.9 93.5 102.6 100.4 101.6 DIV.NO.BUILDING SYSTEMS WASHINGTON OLYMPIA RICHLAND SEATTLE SPOKANE TACOMA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 92.7 107.0 101.2 94.7 85.5 89.3 105.0 107.0 106.2 97.7 85.2 90.3 102.6 107.0 105.2 B10 Shell: Superstructure 102.3 100.0 101.4 94.4 85.5 91.0 105.1 101.0 103.5 97.2 85.1 92.6 105.9 99.9 103.6 B20 Exterior Closure 96.0 102.7 99.1 107.0 82.8 95.8 103.6 103.9 103.7 107.5 82.1 95.8 99.6 102.7 101.1 B30 Roofing 110.9 104.8 108.6 161.2 83.6 131.6 109.3 105.5 107.9 157.3 85.3 129.8 112.0 104.8 109.2 C Interior Construction 104.1 102.7 103.5 113.7 78.5 99.2 104.8 101.1 103.3 112.8 79.9 99.2 105.7 102.3 104.3 D10 Services: Conveying 100.0 102.6 100.8 100.0 99.9 100.0 100.0 102.4 100.7 100.0 99.9 100.0 100.0 102.6 100.8 D20 - 40 Mechanical 99.9 97.8 99.0 100.9 110.3 105.0 100.1 115.4 106.8 100.8 83.0 92.9 100.2 97.8 99.1 D50 Electrical 102.2 98.4 100.2 85.4 95.0 90.5 103.9 110.6 107.5 83.6 78.7 81.0 104.0 98.4 101.0 E Equipment & Furnishings 100.0 102.1 100.1 100.0 77.8 98.7 100.0 102.7 100.2 100.0 77.0 98.7 100.0 102.1 100.1 G Site Work 90.8 112.2 105.1 110.2 91.1 97.4 98.7 111.9 107.5 109.5 91.0 97.1 96.2 112.2 106.9 A-G WEIGHTED AVERAGE 100.7 101.5 101.1 102.6 91.4 97.6 103.2 107.1 104.9 102.9 83.3 94.3 103.0 101.5 102.4 DIV. NO.BUILDING SYSTEMS WASHINGTON WEST VIRGINIA VANCOUVER WENATCHEE YAKIMA BECKLEY BLUEFIELD MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 111.8 98.4 103.9 105.4 86.4 94.2 107.4 96.3 100.8 100.0 91.3 94.9 98.3 92.5 94.9 B10 Shell: Superstructure 105.6 96.9 102.2 104.3 83.9 96.4 105.3 90.8 99.7 102.0 97.7 100.3 97.9 100.1 98.8 B20 Exterior Closure 104.0 95.5 100.1 107.5 88.0 98.5 97.7 86.4 92.5 95.7 91.3 93.7 96.4 91.7 94.2 B30 Roofing 112.2 96.7 106.2 111.4 89.2 102.9 112.1 86.7 102.4 108.7 88.5 101.0 104.4 88.5 98.3 C Interior Construction 101.5 92.5 97.7 105.8 72.9 92.2 105.1 89.5 98.6 93.5 88.8 91.5 94.9 89.2 92.5 D10 Services: Conveying 100.0 96.2 98.8 100.0 99.1 99.7 100.0 99.0 99.7 100.0 94.6 98.4 100.0 94.6 98.4 D20 - 40 Mechanical 100.3 91.2 96.3 96.7 84.9 91.5 100.2 109.9 104.5 97.0 89.3 93.6 96.9 88.1 93.0 D50 Electrical 109.5 98.4 103.6 104.9 95.9 100.1 107.0 95.0 100.7 94.0 89.3 91.5 96.6 89.3 92.7 E Equipment & Furnishings 100.0 94.2 99.7 100.0 76.0 98.6 100.0 101.4 100.1 100.0 87.0 99.2 100.0 87.0 99.2 G Site Work 105.5 98.5 100.8 105.0 110.6 108.8 98.9 111.4 107.3 99.9 92.4 94.9 100.2 92.4 94.9 A-G WEIGHTED AVERAGE 104.0 95.2 100.1 103.3 86.9 96.0 103.2 96.6 100.2 97.8 91.4 95.0 97.3 91.7 94.8 DIV. NO.BUILDING SYSTEMS WEST VIRGINIA BUCKHANNON CHARLESTON CLARKSBURG GASSAWAY HUNTINGTON MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 98.9 92.5 95.1 100.1 97.4 98.5 104.8 92.1 97.3 101.5 99.6 100.4 107.6 91.6 98.2 B10 Shell: Superstructure 98.0 100.3 98.9 101.5 100.7 101.2 99.2 100.2 99.6 98.6 104.2 100.8 105.9 99.5 103.4 B20 Exterior Closure 105.0 90.7 98.4 92.3 92.3 92.3 106.3 90.8 99.1 104.7 88.5 97.2 95.2 93.9 94.6 B30 Roofing 104.7 89.7 98.9 105.7 89.4 99.5 104.6 89.4 98.8 104.4 90.1 98.9 108.8 89.2 101.3 C Interior Construction 95.3 90.1 93.1 94.7 89.7 92.6 95.0 90.1 92.9 94.2 94.6 94.3 94.7 90.2 92.9 D10 Services: Conveying 100.0 93.6 98.0 100.0 94.9 98.5 100.0 93.6 98.0 100.0 93.6 98.0 100.0 94.8 98.4 D20 - 40 Mechanical 96.9 92.1 94.8 100.2 90.8 96.1 96.9 92.1 94.7 96.9 87.7 92.8 100.6 90.7 96.2 D50 Electrical 98.0 94.3 96.0 99.1 89.3 93.9 98.0 94.3 96.0 98.0 89.3 93.4 97.8 93.4 95.5 E Equipment & Furnishings 100.0 88.0 99.3 100.0 87.3 99.3 100.0 88.0 99.3 100.0 94.7 99.7 100.0 87.7 99.3 G Site Work 106.1 92.3 96.8 99.5 93.4 95.4 107.1 92.3 97.2 103.9 92.3 96.1 104.9 93.4 97.2 A-G WEIGHTED AVERAGE 98.7 93.3 96.3 98.6 93.1 96.2 99.3 93.3 96.7 98.7 93.4 96.3 100.4 93.2 97.2 DIV.NO.BUILDING SYSTEMS WEST VIRGINIA LEWISBURG MARTINSBURG MORGANTOWN PARKERSBURG PETERSBURG MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 100.1 92.3 95.5 103.6 86.0 93.2 98.0 92.9 95.0 100.5 90.6 94.6 98.2 86.1 91.0 B10 Shell: Superstructure 97.9 99.7 98.5 103.0 92.5 99.0 97.9 100.6 98.9 98.9 98.6 98.8 98.1 95.9 97.3 B20 Exterior Closure 108.1 89.2 99.4 98.3 87.9 93.5 111.5 90.8 102.0 96.1 87.9 92.3 99.7 90.4 95.4 B30 Roofing 105.3 88.4 98.8 108.9 85.0 99.8 104.4 89.7 98.8 104.5 89.8 98.9 104.5 85.2 97.1 C Interior Construction 95.5 87.6 92.2 94.7 82.1 89.5 95.4 90.1 93.2 95.1 86.8 91.7 95.8 83.5 90.7 D10 Services: Conveying 100.0 66.8 89.9 100.0 87.7 96.3 100.0 89.4 96.8 100.0 94.3 98.3 100.0 54.1 86.0 D20 - 40 Mechanical 96.9 89.3 93.5 97.0 84.9 91.7 96.9 92.1 94.8 100.3 90.1 95.8 96.9 87.6 92.8 D50 Electrical 93.9 89.3 91.5 100.0 78.0 88.3 98.2 94.3 96.1 98.1 80.4 88.7 101.4 78.0 89.0 E Equipment & Furnishings 100.0 87.0 99.2 100.0 77.4 98.7 100.0 88.1 99.3 100.0 83.0 99.0 100.0 77.4 98.7 G Site Work 114.7 92.3 99.7 103.8 93.1 96.6 101.3 93.2 95.9 109.3 93.3 98.6 100.5 93.1 95.5 A-G WEIGHTED AVERAGE 98.9 90.6 95.3 99.4 85.8 93.4 99.3 93.4 96.7 98.7 89.7 94.7 98.4 86.6 93.2 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 21COA050517 DIV. NO.BUILDING SYSTEMS WEST VIRGINIA WISCONSIN ROMNEY WHEELING BELOIT EAU CLAIRE GREEN BAY MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 101.3 86.3 92.4 100.6 89.7 94.2 102.2 104.3 103.4 98.0 106.3 102.9 101.3 105.8 103.9 B10 Shell: Superstructure 98.6 96.2 97.7 99.1 98.7 98.9 97.3 107.4 101.2 95.6 106.5 99.8 98.6 106.1 101.5 B20 Exterior Closure 99.5 90.4 95.3 107.5 86.7 97.9 95.7 107.5 101.1 91.6 103.2 96.9 106.9 102.7 105.0 B30 Roofing 104.6 86.0 97.5 104.9 88.7 98.7 100.1 94.4 97.9 104.6 99.9 102.8 106.9 86.5 99.1 C Interior Construction 95.4 83.5 90.5 95.7 90.2 93.4 94.2 101.2 97.1 96.8 107.8 101.3 95.6 109.9 101.5 D10 Services: Conveying 100.0 93.6 98.0 100.0 83.9 95.1 100.0 97.6 99.3 100.0 97.8 99.3 100.0 97.7 99.3 D20 - 40 Mechanical 96.9 87.4 92.7 100.4 92.3 96.8 100.1 96.7 98.6 100.1 88.2 94.8 100.4 86.5 94.2 D50 Electrical 100.6 78.0 88.6 95.3 94.3 94.8 99.8 87.4 93.2 104.6 87.1 95.3 98.7 83.4 90.6 E Equipment & Furnishings 100.0 77.4 98.7 100.0 88.2 99.3 100.0 91.7 99.5 100.0 109.8 100.6 100.0 109.7 100.6 G Site Work 103.2 93.1 96.5 110.1 93.2 98.8 97.4 108.3 104.7 97.3 105.5 102.8 99.6 101.1 100.6 A-G WEIGHTED AVERAGE 98.5 87.7 93.7 100.0 92.2 96.5 97.9 100.6 99.1 98.0 99.2 98.5 100.0 97.9 99.1 DIV.NO.BUILDING SYSTEMS WISCONSIN KENOSHA LA CROSSE LANCASTER MADISON MILWAUKEE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 109.5 109.4 109.5 89.7 105.4 99.0 101.6 101.9 101.8 96.2 102.0 99.6 99.9 110.1 105.9 B10 Shell: Superstructure 99.9 107.8 103.0 93.4 104.9 97.8 95.3 100.4 97.3 98.7 100.9 99.5 96.6 103.9 99.4 B20 Exterior Closure 94.6 112.5 102.9 88.1 101.0 94.1 94.6 98.1 96.2 95.1 103.3 98.9 98.6 115.9 106.5 B30 Roofing 100.3 108.5 103.5 104.1 99.6 102.4 99.9 95.3 98.1 98.6 102.4 100.0 99.3 112.6 104.3 C Interior Construction 92.4 113.4 101.1 95.3 108.6 100.8 91.7 100.8 95.5 97.2 101.0 98.8 97.6 116.1 105.2 D10 Services: Conveying 100.0 100.2 100.1 100.0 97.8 99.3 100.0 88.1 96.4 100.0 100.7 100.2 100.0 102.2 100.7 D20 - 40 Mechanical 100.3 97.4 99.0 100.1 88.1 94.8 96.5 88.0 92.8 100.0 97.7 98.9 99.9 106.2 102.7 D50 Electrical 100.2 99.9 100.0 104.9 87.1 95.4 99.5 87.1 92.9 99.6 96.6 98.0 100.7 101.9 101.3 E Equipment & Furnishings 100.0 111.0 100.6 100.0 109.9 100.6 100.0 98.3 99.9 100.0 96.7 99.8 100.0 114.1 100.8 G Site Work 102.7 105.6 104.6 91.2 105.5 100.8 97.3 108.1 104.5 94.9 109.0 104.3 94.2 98.8 97.3 A-G WEIGHTED AVERAGE 98.6 105.8 101.8 96.3 98.7 97.4 96.1 95.8 96.0 98.3 100.5 99.3 98.6 107.9 102.7 DIV.NO.BUILDING SYSTEMS WISCONSIN NEW RICHMOND OSHKOSH PORTAGE RACINE RHINELANDER MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 99.3 96.0 97.3 94.1 96.0 95.3 90.6 100.3 96.3 100.9 110.3 106.4 103.7 96.9 99.7 B10 Shell: Superstructure 95.9 99.7 97.4 95.0 97.7 96.1 93.3 99.4 95.6 98.3 107.8 102.0 96.6 98.1 97.1 B20 Exterior Closure 98.9 97.8 98.4 92.8 98.2 95.3 89.1 100.8 94.5 95.6 112.5 103.4 106.7 96.8 102.1 B30 Roofing 105.7 89.8 99.6 106.0 80.8 96.4 99.3 89.8 95.7 100.2 108.0 103.2 106.8 82.9 97.7 C Interior Construction 85.5 97.9 90.6 91.3 95.8 93.1 90.8 97.9 93.7 94.2 113.4 102.1 91.7 94.3 92.8 D10 Services: Conveying 100.0 91.1 97.3 100.0 88.8 96.6 100.0 89.7 96.9 100.0 100.2 100.1 100.0 90.1 97.0 D20 - 40 Mechanical 95.9 88.3 92.6 96.9 81.8 90.2 96.5 97.5 97.0 100.1 97.5 98.9 96.9 87.3 92.6 D50 Electrical 102.5 87.1 94.3 103.1 78.3 90.0 103.4 96.6 99.8 99.6 103.5 101.7 102.4 79.7 90.4 E Equipment & Furnishings 100.0 94.9 99.7 100.0 91.0 99.5 100.0 92.1 99.5 100.0 111.2 100.7 100.0 91.2 99.5 G Site Work 96.8 105.8 102.8 91.9 100.7 97.8 87.9 107.9 101.3 97.1 109.6 105.5 103.3 100.8 101.6 A-G WEIGHTED AVERAGE 95.9 94.6 95.3 95.9 90.7 93.6 94.6 98.6 96.3 98.1 106.6 101.8 98.6 91.9 95.7 DIV. NO.BUILDING SYSTEMS WISCONSIN WYOMING SUPERIOR WAUSAU CASPER CHEYENNE NEWCASTLE MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 95.0 99.9 97.9 89.5 103.1 97.6 100.6 73.2 84.4 95.8 78.8 85.7 95.6 81.4 87.2 B10 Shell: Superstructure 95.7 100.6 97.6 93.9 103.9 97.7 102.5 73.2 91.2 103.5 77.4 93.5 100.5 79.7 92.5 B20 Exterior Closure 96.3 102.8 99.3 90.9 97.9 94.1 103.1 58.0 82.3 105.9 58.6 84.1 104.4 66.3 86.8 B30 Roofing 105.6 88.4 99.0 105.8 84.7 97.7 106.2 66.8 91.2 100.6 69.4 88.7 102.4 68.5 89.4 C Interior Construction 84.7 98.6 90.5 91.2 107.6 98.0 101.6 56.1 82.8 100.4 68.6 87.3 100.3 70.3 87.9 D10 Services: Conveying 100.0 89.7 96.9 100.0 97.7 99.3 100.0 91.0 97.3 100.0 91.0 97.3 100.0 92.2 97.6 D20 - 40 Mechanical 95.9 92.3 94.3 96.9 87.7 92.8 100.0 71.5 87.4 100.0 71.5 87.4 98.1 71.5 86.3 D50 Electrical 107.7 101.3 104.3 104.3 82.4 92.7 101.2 62.0 80.4 103.5 65.0 83.0 102.2 83.1 92.1 E Equipment & Furnishings 100.0 91.3 99.5 100.0 109.8 100.6 100.0 48.9 97.0 100.0 68.0 98.1 100.0 78.2 98.7 G Site Work 93.3 105.5 101.5 87.8 102.0 97.3 96.6 95.6 95.9 92.7 95.6 94.7 86.7 95.3 92.5 A-G WEIGHTED AVERAGE 95.7 98.5 96.9 95.3 96.4 95.8 101.4 68.3 86.8 101.5 72.0 88.5 100.1 76.4 89.6 DIV. NO.BUILDING SYSTEMS WYOMING RAWLINS RIVERTON ROCK SPRINGS SHERIDAN WHEATLAND MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 97.2 79.9 87.0 96.5 74.2 83.3 96.3 74.5 83.4 99.4 77.5 86.4 98.7 68.8 81.0 B10 Shell: Superstructure 100.8 79.0 92.4 100.6 75.0 90.7 101.7 75.1 91.4 104.3 76.7 93.7 101.2 70.6 89.4 B20 Exterior Closure 118.3 66.3 94.3 112.9 65.8 91.2 132.2 62.1 99.9 111.4 65.8 90.4 107.1 57.9 84.4 B30 Roofing 103.9 80.5 95.0 103.3 65.8 89.0 102.5 70.7 90.3 103.6 69.2 90.5 102.6 61.4 86.9 C Interior Construction 101.2 70.3 88.4 100.5 63.9 85.4 102.0 61.9 85.4 104.1 64.1 87.5 99.9 50.5 79.5 D10 Services: Conveying 100.0 92.2 97.6 100.0 85.5 95.6 100.0 83.3 94.9 100.0 91.0 97.3 100.0 84.2 95.2 D20 - 40 Mechanical 98.1 71.5 86.3 98.1 71.5 86.3 99.9 71.5 87.3 98.1 71.5 86.3 98.1 71.5 86.3 D50 Electrical 102.2 69.3 84.8 102.2 64.1 82.0 100.3 83.1 91.2 104.8 64.1 83.2 102.2 83.1 92.1 E Equipment & Furnishings 100.0 77.5 98.7 100.0 63.2 97.9 100.0 65.4 98.0 100.0 63.3 97.9 100.0 48.2 97.0 G Site Work 100.6 95.3 97.1 93.9 95.3 94.8 91.5 95.3 94.0 94.0 95.6 95.1 91.9 95.3 94.2 A-G WEIGHTED AVERAGE 102.3 74.5 90.0 101.3 71.0 87.9 104.2 73.0 90.4 103.0 71.9 89.2 100.7 69.2 86.8 DIV.NO.BUILDING SYSTEMS WYOMING CANADA WORLAND YELLOWSTONE NAT’L PA BARRIE, ONTARIO BATHURST, NEW BRUNSWICK BRANDON, MANITOBA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 95.9 74.5 83.3 96.3 74.5 83.5 155.0 91.5 117.5 120.4 69.2 90.1 138.1 77.0 102.0 B10 Shell: Superstructure 100.8 75.3 90.9 101.3 75.0 91.2 118.8 91.8 108.4 107.1 69.2 92.5 122.9 76.3 104.9 B20 Exterior Closure 104.5 65.8 86.7 102.8 65.8 85.7 131.3 94.9 114.5 125.4 61.1 95.7 165.4 65.2 119.2 B30 Roofing 102.4 67.6 89.1 101.9 66.2 88.2 114.2 91.9 105.6 109.7 63.0 91.9 137.1 75.4 113.5 C Interior Construction 100.6 61.9 84.6 97.3 61.9 82.6 102.7 89.0 97.0 96.7 57.9 80.6 111.4 68.9 93.8 D10 Services: Conveying 100.0 83.9 95.1 100.0 83.9 95.1 139.2 67.3 117.3 131.1 61.9 110.0 131.1 63.5 110.6 D20 - 40 Mechanical 98.1 71.5 86.3 98.1 71.5 86.3 103.1 98.3 101.0 103.2 68.0 87.6 103.3 82.9 94.2 D50 Electrical 102.2 83.1 92.1 101.1 93.3 97.0 115.9 89.7 102.0 112.4 60.4 84.9 117.7 68.3 91.5 E Equipment & Furnishings 100.0 65.3 98.0 100.0 65.8 98.0 139.2 87.2 136.2 131.1 61.7 127.1 131.1 71.1 127.6 G Site Work 89.1 95.3 93.2 89.1 95.3 93.3 122.2 101.1 108.0 106.7 96.4 99.8 140.1 99.6 113.0 A-G WEIGHTED AVERAGE 100.2 73.4 88.4 99.5 74.8 88.6 117.1 92.7 106.3 109.8 66.2 90.5 123.4 75.1 102.0 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 22 COA050518 DIV. NO.BUILDING SYSTEMS CANADA BRANTFORD, ONTARIO BRIDGEWATER, NOVA SCOTIA CALGARY, ALBERTA CAP-DE-LA-MADELEINE, QUEBEC CHARLESBOURG, QUEBEC MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 141.4 100.0 117.0 135.5 75.5 100.1 147.0 103.8 121.5 117.9 89.8 101.3 117.9 89.8 101.3 B10 Shell: Superstructure 111.3 96.8 105.7 108.7 74.2 95.4 128.2 99.9 117.3 105.8 87.1 98.6 105.8 87.1 98.6 B20 Exterior Closure 128.3 99.4 115.0 127.4 70.1 101.0 144.0 90.0 119.1 127.9 81.2 106.4 127.9 81.2 106.4 B30 Roofing 118.3 98.4 110.7 112.8 73.7 97.9 122.4 101.0 114.2 111.5 92.0 104.1 111.5 92.0 104.1 C Interior Construction 99.9 95.2 98.0 93.9 69.7 83.9 102.7 98.9 101.1 101.5 85.9 95.0 101.5 85.9 95.0 D10 Services: Conveying 131.1 68.7 112.1 131.1 64.1 110.7 131.1 97.2 120.8 131.1 80.5 115.7 131.1 80.5 115.7 D20 - 40 Mechanical 103.2 101.2 102.3 103.2 83.6 94.5 105.2 93.1 99.9 103.5 88.5 96.9 103.5 88.5 96.9 D50 Electrical 111.1 89.2 99.5 116.2 63.5 88.2 109.7 101.8 105.5 110.5 70.6 89.3 110.5 70.6 89.3 E Equipment & Furnishings 131.1 94.4 129.0 131.1 72.1 127.7 131.1 100.4 129.3 131.1 84.4 128.4 131.1 84.4 128.4 G Site Work 120.9 101.4 107.8 105.8 98.3 100.8 123.6 117.2 119.3 100.9 99.8 100.2 100.9 99.8 100.2 A-G WEIGHTED AVERAGE 113.0 96.6 105.8 111.0 74.7 95.0 119.8 98.6 110.4 110.4 85.1 99.2 110.4 85.1 99.2 DIV.NO.BUILDING SYSTEMS CANADA CHARLOTTETOWN,PRINCE EDWARD ISLAND CHICOUTIMI, QUEBEC CORNER BROOK,NEWFOUNDLAND CORNWALL, ONTARIO DALHOUSIE, NEW BRUNSWICK MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 145.8 67.7 99.7 111.3 95.4 101.9 146.6 68.8 100.6 132.0 94.5 109.9 121.9 69.3 90.8 B10 Shell: Superstructure 129.9 69.8 106.7 106.4 93.1 101.3 124.2 68.7 102.8 109.1 93.0 102.9 102.3 69.4 89.6 B20 Exterior Closure 138.7 58.5 101.8 124.0 87.8 107.3 194.9 60.6 133.0 129.1 91.4 111.7 131.2 61.1 98.9 B30 Roofing 130.7 60.2 103.8 110.1 100.1 106.3 142.1 62.6 111.7 118.1 92.6 108.4 114.3 63.0 94.7 C Interior Construction 98.7 55.3 80.8 102.0 93.3 98.4 114.5 57.2 90.8 104.0 89.2 97.9 97.5 61.7 82.7 D10 Services: Conveying 131.1 62.5 110.3 131.1 83.5 116.6 131.1 62.1 110.1 131.1 66.7 111.5 131.1 61.9 110.0 D20 - 40 Mechanical 103.6 61.9 85.2 103.2 80.8 93.3 103.3 68.8 88.0 103.5 99.1 101.5 103.2 68.1 87.7 D50 Electrical 111.5 51.4 79.6 109.3 86.2 97.0 115.3 55.7 83.7 111.7 90.2 100.3 113.1 57.1 83.4 E Equipment & Furnishings 131.1 55.1 126.7 131.1 92.0 128.9 131.1 57.1 126.8 131.1 88.0 128.6 131.1 61.6 127.1 G Site Work 129.8 106.0 113.9 104.3 99.3 101.0 145.6 96.5 112.8 118.6 100.8 106.7 103.7 96.4 98.8 A-G WEIGHTED AVERAGE 119.0 63.4 94.4 109.7 89.3 100.7 128.1 65.4 100.4 113.0 93.0 104.1 109.8 66.4 90.6 DIV.NO.BUILDING SYSTEMS CANADA DARTMOUTH, NOVA SCOTIA EDMONTON, ALBERTA FORT MCMURRAY, ALBERTA FREDERICTON, NEW BRUNSWICK GATINEAU, QUEBEC MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 143.4 75.5 103.3 151.7 103.8 123.4 169.3 96.9 126.5 126.3 72.3 94.4 118.4 89.7 101.5 B10 Shell: Superstructure 123.4 74.2 104.5 129.0 99.9 117.8 136.4 92.6 119.5 123.7 75.3 105.1 105.9 87.0 98.7 B20 Exterior Closure 179.6 70.1 129.2 144.0 90.0 119.1 146.8 86.9 119.1 136.4 62.6 102.4 127.8 79.7 105.6 B30 Roofing 139.0 73.7 114.1 126.3 101.0 116.6 126.9 97.6 115.7 125.2 62.9 101.4 111.5 92.0 104.1 C Interior Construction 105.5 69.7 90.7 98.6 98.9 98.8 101.4 92.3 97.6 101.7 63.7 86.0 99.4 85.9 93.9 D10 Services: Conveying 131.1 64.1 110.7 131.1 97.2 120.8 131.1 95.1 120.2 131.1 62.6 110.3 131.1 80.5 115.7 D20 - 40 Mechanical 103.3 83.6 94.5 105.2 93.1 99.9 103.7 97.8 101.1 103.4 77.4 91.9 103.5 88.5 96.8 D50 Electrical 120.0 63.5 90.0 109.8 101.8 105.6 105.5 83.8 94.0 111.7 75.4 92.4 110.5 70.5 89.3 E Equipment & Furnishings 131.1 72.1 127.7 131.1 100.4 129.3 131.1 92.9 128.9 131.1 62.3 127.1 131.1 84.4 128.4 G Site Work 130.4 98.3 108.9 133.9 117.2 122.7 126.4 102.0 110.1 112.3 107.3 108.9 100.6 99.8 100.1 A-G WEIGHTED AVERAGE 124.5 74.7 102.5 119.8 98.6 110.4 122.1 92.8 109.2 116.4 73.3 97.4 110.1 84.9 98.9 DIV.NO.BUILDING SYSTEMS CANADA GRANBY, QUEBEC HALIFAX, NOVA SCOTIA HAMILTON, ONTARIO HULL, QUEBEC JOLIETTE, QUEBEC MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 120.9 89.7 102.4 119.3 87.4 100.5 121.4 101.8 109.8 118.4 89.7 101.5 120.0 89.8 102.1 B10 Shell: Superstructure 106.6 87.0 99.0 123.3 87.5 109.5 120.7 102.9 113.8 106.1 87.0 98.7 106.4 87.1 99.0 B20 Exterior Closure 128.0 79.7 105.7 137.7 84.3 113.1 129.2 99.3 115.5 127.8 79.7 105.6 128.0 81.2 106.4 B30 Roofing 111.5 90.1 103.3 125.3 84.6 109.8 124.2 102.0 115.7 111.5 92.0 104.0 111.5 92.0 104.0 C Interior Construction 99.4 85.9 93.9 100.8 83.3 93.5 100.3 95.0 98.1 99.4 85.9 93.9 101.5 85.9 95.0 D10 Services: Conveying 131.1 80.5 115.7 131.1 68.1 111.9 131.1 94.8 120.1 131.1 80.5 115.7 131.1 80.5 115.7 D20 - 40 Mechanical 103.2 88.5 96.7 104.8 79.7 93.7 105.4 88.4 97.9 103.2 88.5 96.7 103.2 88.5 96.7 D50 Electrical 111.1 70.5 89.6 110.3 85.0 96.9 105.8 99.7 102.5 112.3 70.5 90.2 111.1 70.6 89.6 E Equipment & Furnishings 131.1 84.4 128.4 131.1 82.6 128.3 131.1 93.3 128.9 131.1 84.4 128.4 131.1 84.4 128.4 G Site Work 101.2 99.8 100.3 108.9 108.8 108.8 111.2 115.7 114.2 100.6 99.8 100.1 101.4 99.8 100.3 A-G WEIGHTED AVERAGE 110.3 84.8 99.0 116.1 85.0 102.4 114.3 98.1 107.1 110.2 84.9 99.0 110.6 85.1 99.3 DIV.NO.BUILDING SYSTEMS CANADA KAMLOOPS, BRITISH COLUMBIA KINGSTON, ONTARIO KITCHENER, ONTARIO LAVAL, QUEBEC LETHBRIDGE, ALBERTA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 106.9 93.6 99.0 132.0 95.4 110.4 110.6 98.4 103.4 120.9 89.7 102.5 138.8 97.1 114.2 B10 Shell: Superstructure 103.4 90.0 98.2 110.2 93.0 103.6 111.9 97.0 106.1 106.5 87.0 99.0 125.8 92.6 113.0 B20 Exterior Closure 150.9 89.8 122.8 134.0 91.3 114.3 108.9 100.7 105.1 127.9 79.7 105.7 135.5 86.9 113.1 B30 Roofing 128.1 88.2 112.8 118.1 94.0 108.9 115.2 100.6 109.6 112.1 92.0 104.4 124.1 97.6 113.9 C Interior Construction 98.1 81.5 91.2 105.4 88.6 98.5 92.9 91.9 92.5 99.5 85.9 93.9 100.2 93.1 97.3 D10 Services: Conveying 131.1 90.9 118.9 131.1 66.7 111.5 131.1 93.8 119.8 131.1 80.5 115.7 131.1 95.1 120.2 D20 - 40 Mechanical 103.2 92.0 98.2 103.5 99.2 101.6 104.4 91.9 98.9 104.5 88.5 97.4 103.5 94.5 99.5 D50 Electrical 114.4 80.2 96.3 111.8 88.9 99.6 109.6 102.7 106.0 109.6 70.5 88.9 106.9 83.8 94.6 E Equipment & Furnishings 131.1 86.8 128.6 131.1 88.0 128.6 131.1 89.9 128.7 131.1 84.4 128.4 131.1 93.0 128.9 G Site Work 120.3 103.7 109.2 118.6 104.9 109.4 99.4 106.3 104.0 101.2 99.8 100.3 117.8 102.6 107.6 A-G WEIGHTED AVERAGE 112.7 88.8 102.2 114.1 93.1 104.8 107.8 97.0 103.0 110.5 84.9 99.2 116.7 92.3 105.9 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 23COA050519 DIV. NO.BUILDING SYSTEMS CANADA LLOYDMINSTER, ALBERTA LONDON, ONTARIO MEDICINE HAT, ALBERTA MONCTON, NEW BRUNSWICK MONTREAL, QUEBEC MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 132.2 92.2 108.6 124.3 101.1 110.6 132.2 92.2 108.6 117.6 75.9 93.0 130.0 98.6 111.4 B10 Shell: Superstructure 109.5 89.5 101.8 121.4 101.6 113.8 109.8 89.5 102.0 106.5 78.3 95.7 125.9 98.9 115.5 B20 Exterior Closure 127.6 81.3 106.2 131.7 102.2 118.1 127.6 81.3 106.2 125.2 63.6 96.8 130.0 89.1 111.1 B30 Roofing 120.5 92.1 109.7 125.5 100.7 116.0 127.3 92.1 113.9 114.2 67.9 96.5 118.4 99.8 111.3 C Interior Construction 99.2 83.6 92.8 97.8 93.3 96.0 99.3 83.6 92.8 96.7 64.7 83.4 100.2 93.9 97.6 D10 Services: Conveying 131.1 92.6 119.4 131.1 94.9 120.1 131.1 92.6 119.4 131.1 63.5 110.6 131.1 84.5 116.9 D20 - 40 Mechanical 103.5 94.4 99.5 105.4 90.3 98.7 103.2 91.1 97.8 103.2 70.4 88.7 105.2 80.9 94.5 D50 Electrical 104.7 83.8 93.6 104.9 102.7 103.7 104.7 83.8 93.6 116.5 62.3 87.8 106.4 86.2 95.7 E Equipment & Furnishings 131.1 83.3 128.4 131.1 90.8 128.8 131.1 83.3 128.4 131.1 63.7 127.2 131.1 92.0 128.9 G Site Work 117.3 102.0 107.0 109.2 112.5 111.4 116.2 102.1 106.7 106.0 96.8 99.8 114.1 110.5 111.7 A-G WEIGHTED AVERAGE 111.5 88.9 101.5 114.3 98.5 107.3 111.7 88.2 101.3 110.1 70.6 92.6 115.7 91.5 105.0 DIV.NO.BUILDING SYSTEMS CANADA MOOSE JAW, SASKATCHEWAN NEW GLASGOW, NOVA SCOTIA NEWCASTLE, NEW BRUNSWICK NORTH BAY, ONTARIO OSHAWA, ONTARIO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 119.7 70.6 90.7 141.1 75.5 102.3 120.4 69.3 90.2 147.9 89.6 113.5 133.9 93.9 110.3 B10 Shell: Superstructure 103.9 70.6 91.1 121.2 74.2 103.1 107.1 69.4 92.6 124.4 90.4 111.3 110.1 94.2 104.0 B20 Exterior Closure 119.7 60.7 92.5 173.1 70.1 125.7 125.4 61.1 95.7 174.3 87.5 134.3 117.5 94.8 107.0 B30 Roofing 110.9 65.2 93.4 139.0 73.7 114.1 114.2 63.0 94.6 146.0 88.4 124.0 116.1 92.7 107.2 C Interior Construction 95.5 58.3 80.1 104.6 69.7 90.2 96.7 61.7 82.2 112.8 87.6 102.3 96.1 93.9 95.2 D10 Services: Conveying 131.1 62.0 110.1 131.1 64.1 110.7 131.1 61.9 110.0 131.1 65.5 111.2 131.1 93.4 119.6 D20 - 40 Mechanical 103.5 73.9 90.4 103.3 83.6 94.5 103.2 68.1 87.6 103.3 97.1 100.5 104.4 102.7 103.7 D50 Electrical 113.3 60.9 85.5 115.6 63.5 87.9 111.8 60.4 84.5 115.8 90.1 102.2 110.7 92.5 101.1 E Equipment & Furnishings 131.1 57.1 126.8 131.1 72.1 127.7 131.1 61.7 127.1 131.1 86.4 128.5 131.1 89.9 128.7 G Site Work 118.3 96.0 103.3 125.2 98.3 107.2 106.7 96.4 99.8 140.5 100.4 113.6 110.9 105.1 107.0 A-G WEIGHTED AVERAGE 108.7 67.9 90.7 122.4 74.7 101.4 109.9 66.8 90.9 125.5 90.8 110.2 110.5 96.4 104.2 DIV. NO.BUILDING SYSTEMS CANADA OTTAWA, ONTARIO OWEN SOUND, ONTARIO PETERBOROUGH, ONTARIO PORTAGE LA PRAIRIE, MANITOBA PRINCE ALBERT, SASKATCHEWAN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 128.3 101.7 112.6 155.0 88.3 115.6 141.4 90.6 111.4 132.0 76.7 99.3 112.8 70.5 87.8 B10 Shell: Superstructure 124.4 102.2 115.9 118.8 89.9 107.7 111.3 91.0 103.5 109.8 76.1 96.8 102.5 70.4 90.1 B20 Exterior Closure 129.9 104.3 118.1 131.3 92.4 113.4 128.3 93.7 112.4 122.3 64.4 95.6 119.1 60.7 92.2 B30 Roofing 128.0 102.1 118.1 114.2 88.6 104.4 118.3 94.7 109.3 111.3 74.8 97.4 110.8 63.9 92.8 C Interior Construction 104.0 92.0 99.0 102.7 86.2 95.8 99.9 88.0 95.0 99.3 68.7 86.6 95.0 57.5 79.4 D10 Services: Conveying 131.1 93.5 119.7 139.2 66.4 117.0 131.1 67.3 111.7 131.1 63.1 110.4 131.1 62.0 110.1 D20 - 40 Mechanical 105.5 92.0 99.5 103.1 97.0 100.4 103.2 100.6 102.1 103.2 82.4 94.0 103.5 66.6 87.2 D50 Electrical 107.8 103.5 105.5 117.3 88.9 102.2 111.1 89.7 99.8 113.0 58.9 84.3 113.3 60.9 85.5 E Equipment & Furnishings 131.1 89.8 128.7 139.2 83.5 136.0 131.1 85.5 128.5 131.1 70.6 127.6 131.1 57.1 126.8 G Site Work 108.6 113.1 111.6 122.2 100.9 107.9 120.9 100.8 107.4 119.6 99.5 106.1 113.0 96.1 101.7 A-G WEIGHTED AVERAGE 116.3 99.2 108.8 117.3 90.9 105.6 113.0 92.7 104.1 111.4 73.4 94.6 107.8 66.1 89.4 DIV. NO.BUILDING SYSTEMS CANADA PRINCE GEORGE, BRITISH COLUMBIA QUEBEC, QUEBEC RED DEER, ALBERTA REGINA, SASKATCHEWAN RIMOUSKI, QUEBEC MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 122.8 91.7 104.4 128.8 98.6 110.9 133.4 92.2 109.1 138.2 95.7 113.1 114.2 95.4 103.1 B10 Shell: Superstructure 106.7 88.6 99.8 125.7 99.7 115.7 110.0 89.5 102.1 128.9 96.0 116.3 104.9 93.1 100.3 B20 Exterior Closure 151.8 89.6 123.2 128.1 91.7 111.3 127.6 81.3 106.2 139.6 88.8 116.2 127.6 87.8 109.3 B30 Roofing 121.9 87.3 108.7 118.5 99.9 111.4 137.5 92.1 120.2 127.1 86.8 111.7 111.5 100.1 107.1 C Interior Construction 97.6 79.9 90.3 102.9 93.9 99.2 99.6 83.6 93.0 105.3 89.3 98.7 101.5 93.3 98.1 D10 Services: Conveying 131.1 90.9 118.9 131.1 84.5 116.9 131.1 92.6 119.4 131.1 68.9 112.2 131.1 83.5 116.6 D20 - 40 Mechanical 103.2 92.0 98.2 105.2 81.0 94.5 103.2 91.1 97.8 104.9 82.5 95.0 103.2 80.8 93.3 D50 Electrical 111.3 80.2 94.8 109.7 86.2 97.2 104.7 83.8 93.6 112.9 89.7 100.6 111.1 86.2 97.9 E Equipment & Furnishings 131.1 80.2 128.2 131.1 92.0 128.9 131.1 83.3 128.4 131.1 89.3 128.7 131.1 92.0 128.9 G Site Work 124.4 103.7 110.5 115.2 109.8 111.6 116.2 102.1 106.7 123.2 112.1 115.7 101.4 99.3 100.0 A-G WEIGHTED AVERAGE 113.8 88.1 102.4 116.2 92.0 105.5 112.1 88.2 101.6 119.8 90.2 106.7 110.0 89.3 100.9 DIV.NO.BUILDING SYSTEMS CANADA ROUYN-NORANDA, QUEBEC SAINT HYACINTHE, QUEBEC SAINT JOHN, NEW BRUNSWICK SARNIA, ONTARIO SASKATOON, SASKATCHEWAN MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 118.4 89.7 101.5 120.9 89.7 102.5 121.0 78.0 95.6 125.4 97.2 108.7 120.3 91.8 103.4 B10 Shell: Superstructure 106.1 87.0 98.7 106.6 87.0 99.1 108.0 80.1 97.3 107.8 95.0 102.9 102.4 89.6 97.4 B20 Exterior Closure 127.8 79.7 105.6 127.9 79.7 105.7 134.6 71.1 105.3 135.7 95.9 117.3 124.7 88.0 107.8 B30 Roofing 111.5 92.0 104.0 111.8 92.0 104.2 114.5 73.8 98.9 118.4 98.6 110.8 110.5 86.0 101.1 C Interior Construction 99.4 85.9 93.8 99.4 85.9 93.8 99.7 69.2 87.1 101.9 95.8 99.4 99.0 90.7 95.6 D10 Services: Conveying 131.1 80.5 115.7 131.1 80.5 115.7 131.1 64.5 110.9 131.1 67.8 111.9 131.1 68.3 112.0 D20 - 40 Mechanical 103.2 88.5 96.7 100.3 88.5 95.1 103.2 80.5 93.1 103.2 106.7 104.7 104.6 82.4 94.8 D50 Electrical 111.1 70.5 89.6 111.8 70.5 89.9 119.2 88.9 103.1 113.9 91.9 102.2 112.0 89.7 100.2 E Equipment & Furnishings 131.1 84.4 128.4 131.1 84.4 128.4 131.1 67.2 127.4 131.1 93.4 128.9 131.1 89.2 128.7 G Site Work 100.6 99.8 100.1 101.2 99.8 100.3 106.8 98.2 101.1 119.1 100.9 106.9 114.2 98.2 103.5 A-G WEIGHTED AVERAGE 110.1 84.9 98.9 109.8 84.9 98.8 112.5 78.8 97.6 113.0 97.2 106.0 109.6 88.0 100.1 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 24 COA050520 DIV. NO.BUILDING SYSTEMS CANADA SAULT STE MARIE, ONTARIO SHERBROOKE, QUEBEC SOREL, QUEBEC ST CATHARINES, ONTARIO ST JEROME, QUEBEC MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 112.8 91.3 100.1 120.9 89.7 102.5 120.0 89.8 102.1 106.9 100.5 103.1 118.4 89.7 101.5 B10 Shell: Superstructure 104.3 92.2 99.6 106.5 87.0 99.0 106.4 87.1 99.0 104.3 99.0 102.2 106.1 87.0 98.7 B20 Exterior Closure 119.2 95.6 108.3 128.0 79.7 105.7 128.0 81.2 106.4 108.6 103.0 106.0 127.8 79.7 105.6 B30 Roofing 117.1 91.4 107.3 111.5 92.0 104.1 111.5 92.0 104.0 115.2 106.6 111.9 111.5 92.0 104.0 C Interior Construction 95.2 92.0 93.9 99.4 85.9 93.8 101.4 85.9 95.0 91.5 98.4 94.4 99.4 85.9 93.8 D10 Services: Conveying 131.1 92.1 119.3 131.1 80.5 115.7 131.1 80.5 115.7 131.1 69.3 112.3 131.1 80.5 115.7 D20 - 40 Mechanical 103.2 94.8 99.5 103.5 88.5 96.8 103.2 88.5 96.7 104.4 91.7 98.8 103.2 88.5 96.7 D50 Electrical 112.7 90.1 100.7 111.1 70.5 89.6 111.1 70.6 89.6 111.1 103.5 107.1 111.7 70.5 89.9 E Equipment & Furnishings 131.1 91.0 128.8 131.1 84.4 128.4 131.1 84.4 128.4 131.1 97.5 129.2 131.1 84.4 128.4 G Site Work 109.4 100.4 103.4 101.2 99.8 100.3 101.4 99.8 100.3 100.2 102.5 101.7 100.6 99.8 100.1 A-G WEIGHTED AVERAGE 108.2 93.3 101.6 110.4 84.9 99.1 110.6 85.1 99.3 105.9 98.2 102.5 110.1 84.9 99.0 DIV.NO.BUILDING SYSTEMS CANADA ST JOHNS, NEWFOUNDLAND SUDBURY, ONTARIO SUMMERSIDE,PRINCE EDWARD ISLAND SYDNEY, NOVA SCOTIA THUNDER BAY, ONTARIO MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 142.1 96.1 114.9 107.3 97.5 101.5 136.8 65.0 94.4 120.0 75.5 93.7 113.4 99.5 105.2 B10 Shell: Superstructure 132.7 95.6 118.4 103.8 96.0 100.8 120.2 64.5 98.7 116.8 74.2 100.4 105.9 97.2 102.5 B20 Exterior Closure 139.8 93.4 118.4 108.8 99.0 104.3 188.6 57.9 128.3 172.0 70.1 125.1 111.9 102.7 107.7 B30 Roofing 140.5 101.4 125.6 114.6 99.2 108.7 138.3 62.0 109.1 139.0 73.7 114.1 115.4 102.2 110.4 C Interior Construction 102.8 85.0 95.4 91.2 92.9 91.9 111.0 55.0 87.9 104.6 69.7 90.2 93.3 96.3 94.6 D10 Services: Conveying 131.1 69.2 112.3 131.1 93.6 119.7 131.1 61.8 110.0 131.1 64.1 110.7 131.1 69.8 112.5 D20 - 40 Mechanical 105.0 87.2 97.1 103.1 91.1 97.8 103.3 61.8 84.9 103.3 83.6 94.5 104.4 92.0 98.9 D50 Electrical 115.5 88.2 101.0 111.1 104.0 107.3 114.7 51.3 81.1 115.6 63.5 87.9 109.6 102.1 105.7 E Equipment & Furnishings 131.1 88.1 128.6 131.1 92.1 128.9 131.1 55.2 126.7 131.1 72.1 127.7 131.1 95.0 129.0 G Site Work 124.3 107.9 113.3 100.3 102.1 101.5 135.7 95.5 108.8 120.1 98.3 105.5 105.0 102.4 103.3 A-G WEIGHTED AVERAGE 121.1 91.0 107.8 105.5 96.4 101.5 125.1 61.5 97.0 120.3 74.7 100.2 107.2 97.2 102.8 DIV.NO.BUILDING SYSTEMS CANADA TIMMINS, ONTARIO TORONTO, ONTARIO TROIS RIVIERES, QUEBEC TRURO, NOVA SCOTIA VANCOUVER, BRITISH COLUMBIA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 141.4 89.6 110.8 120.4 109.0 113.6 126.0 89.8 104.6 136.5 75.5 100.5 125.0 101.6 111.2 B10 Shell: Superstructure 111.3 90.4 103.2 121.6 107.5 116.2 119.4 87.1 107.0 108.9 74.3 95.5 124.7 101.6 115.8 B20 Exterior Closure 128.3 87.5 109.5 129.2 109.9 120.3 173.9 81.2 131.2 127.4 70.2 101.0 130.2 96.0 114.5 B30 Roofing 118.3 88.4 106.9 133.9 110.8 125.0 137.3 92.0 120.0 112.8 73.7 97.9 131.9 93.0 117.1 C Interior Construction 99.9 87.6 94.8 97.9 103.4 100.2 114.6 85.9 102.7 93.9 69.7 83.9 100.6 92.4 97.2 D10 Services: Conveying 131.1 65.5 111.2 131.1 97.4 120.9 131.1 80.5 115.7 131.1 64.1 110.7 131.1 96.2 120.5 D20 - 40 Mechanical 103.2 97.1 100.5 105.1 100.0 102.8 103.3 88.5 96.7 103.2 83.6 94.5 105.3 84.6 96.1 D50 Electrical 112.7 90.1 100.7 105.6 105.8 105.7 115.9 70.6 91.8 110.8 63.5 85.7 104.5 81.6 92.3 E Equipment & Furnishings 131.1 86.4 128.5 131.1 101.8 129.4 131.1 84.4 128.4 131.1 72.1 127.7 131.1 90.5 128.8 G Site Work 120.9 100.4 107.1 124.3 113.2 116.9 120.7 99.8 106.7 106.0 98.3 100.9 113.8 122.5 119.6 A-G WEIGHTED AVERAGE 113.2 90.8 103.3 114.5 105.6 110.6 123.0 85.1 106.3 110.6 74.7 94.8 115.6 93.9 106.0 DIV.NO.BUILDING SYSTEMS CANADA VICTORIA, BRITISH COLUMBIA WHITEHORSE, YUKON WINDSOR, ONTARIO WINNIPEG, MANITOBA YARMOUTH, NOVA SCOTIA MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 125.0 97.2 108.6 172.8 77.1 116.2 108.9 99.1 103.1 143.5 78.6 105.2 140.1 75.5 101.9 B10 Shell: Superstructure 104.1 91.5 99.3 140.5 79.5 117.0 105.0 96.9 101.9 132.0 80.0 111.9 121.0 74.2 103.0 B20 Exterior Closure 154.3 93.5 126.3 181.6 63.1 126.9 108.5 101.2 105.1 137.2 68.4 105.5 173.1 70.1 125.6 B30 Roofing 120.4 92.9 109.9 145.9 66.6 115.6 115.2 101.1 109.8 125.6 73.3 105.6 139.0 73.7 114.1 C Interior Construction 99.2 88.8 94.9 124.0 59.3 97.2 92.1 94.4 93.0 100.0 67.2 86.5 104.6 69.7 90.2 D10 Services: Conveying 131.1 67.9 111.9 131.1 64.7 110.9 131.1 69.0 112.2 131.1 66.0 111.3 131.1 64.1 110.7 D20 - 40 Mechanical 103.2 82.6 94.1 104.0 75.2 91.2 104.4 91.3 98.6 105.2 66.0 87.9 103.3 83.6 94.5 D50 Electrical 111.9 81.0 95.5 127.0 61.8 92.4 114.2 105.5 109.6 111.8 66.7 87.9 115.6 63.5 87.9 E Equipment & Furnishings 131.1 90.5 128.8 131.1 58.5 126.9 131.1 93.3 128.9 131.1 67.8 127.5 131.1 72.1 127.7 G Site Work 123.4 108.4 113.4 150.1 113.1 125.3 96.0 102.3 100.2 115.3 109.1 111.2 125.0 98.3 107.1 A-G WEIGHTED AVERAGE 113.9 88.8 102.8 134.4 71.9 106.8 106.4 96.9 102.2 119.2 72.7 98.7 122.3 74.7 101.3 DIV.NO.BUILDING SYSTEMS CANADA YELLOWKNIFE, NWT MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL MAT. INST. TOTAL A Substructure 173.2 90.8 124.5 B10 Shell: Superstructure 138.3 89.0 119.3 B20 Exterior Closure 180.0 73.6 131.0 B30 Roofing 149.8 83.8 124.6 C Interior Construction 117.5 80.8 102.3 D10 Services: Conveying 131.1 65.6 111.2 D20 - 40 Mechanical 103.9 92.9 99.0 D50 Electrical 129.1 83.8 105.0 E Equipment & Furnishings 131.1 82.5 128.3 G Site Work 161.6 117.5 132.0 A-G WEIGHTED AVERAGE 133.2 86.9 112.8 UNIFORMAT II City Cost Indexes (Assemblies) ~ Year 2017 Base 25COA050521