Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Copy of Copy of Briscoe 2005 Cost Summary
Recommendations Briscoe can support 275 students 2005 High Priority Replace Windows $489,042 ADA Upgrades $324,981 Add site lighting $28,168 Add parking $318,709 Replace VCT $37,742 Total Cost $1,198,642 Moderate Priority Expand kitchen/ replace equipment $544,059 Expand and remodel administration $237,423 Replace marker boards $16,740 Replace ceiling tile at stage $3,220 Repair roof $295,357 Expand and remodel library $446,677 Total Cost $1,543,476 Lower Priority Replace Cabinets $382,870 Total Cost $382,870 Mechanical, Plumbing, Electrical Replace domestic hot and cold water piping $259,803 Replace boilers $169,012 Install fire sprinkler system $161,354 Upgrade controls to DDC $164,088 Upgrade receptacles and add for tech $109,390 Upgrade lighting throughout $218,784 Add emergency lighting $109,390 Upgrade fire alarm system $0 Upgrade electrical service $246,131 Replace panelboards $109,390 Total Cost $1,547,342 High Priority Structural Seismic retrofit $1,810,029 Total Cost $1,810,029 Total for all recommended improvements 2005 $6,482,359 Low series estimate for const cost increases (60%)$10,371,774 High series estimate for cost increases (100%)$12,964,718 COA050559 National Construction Cost Index: 2016 2021 2005 151.6 668,723.00$ 2016 207.3 444,383.65$ Ratio:1.367414 38,517.32$ 435,807.23$ 51,608.95$ $1,639,040 -$ 324,655.59$ 22,890.51$ 4,403.07$ 403,875.37$ 610,792.49$ 1,366,617.05$ 523,541.89$ $382,870 355,258.32$ 231,109.42$ 220,637.76$ 224,376.27$ 149,581.44$ 299,168.36$ 149,581.44$ -$ 336,563.04$ 149,581.44$ $2,115,857 2,475,059.44$ 2,475,059.44$ $7,979,444 $10,428,814 $7,928,814.36 COA050560