Loading...
HomeMy WebLinkAboutCourts_CivicLINCO L N S T E MAIN ST Build a new City Hall at the location currently occupied by Courts/Civic Center. The new structure would necessarily incorporate the courts and council cham bers. The larg e surface parking lot on site could easily accom m odate a parking structure. The first alternative, term ed “centralized”, would incorporate the functions at the courts building , City Hall, and Com Dev. The second alternative, described as “partitioned”, would result in the City retaining Com Dev and building a sm aller structure at the current courts location. • P arcel Size: N/A - includes m ultiple City facilities• Total P roject Area: 67,351 ft2 o Existing parking lot area: 34,315 ft2 o Existing lawn area, including Courts footprint: 29,465 ft2 • P roposed total area of com pleted project: 17,520 ft2 (partitioned) to 27,470 ft2 (centralized) • Desig nated parking : about 67 stalls, with space for construction of a parking structure• Cost (2 alternatives): o P artitioned: $10 M* o Centralized: $13 M* P roject Area Taxlots 0 30 6015 Feet Courts/Civic Center (2 alternatives) * Costs do not include parking im provem ents. These estim ates were developed by Staff using the cost m odeling assum ptions provided in the architect’s feasibility study. P rofessional estim ate is advised. COA050563