HomeMy WebLinkAboutMemo_Briscoe Costs Updated 7.12.17 Memo TO: City Hall Ad-hoc Advisory Committee FROM: Kaylea Kathol DATE: 7/12/2017 RE: Cost Estimates for Improvements at Briscoe School In 2005, Ashland School District commissioned a facilities report and seismic evaluation of Briscoe School to develop a cost estimate for necessary upgrades and repairs. Briscoe has been closed since 2004, so the facilities report naturally evaluated conditions through the lens of school operations. The study evaluated architectural, mechanical and plumbing systems, electrical systems, and structural (seismic) conditions. Total costs to implement all improvements was $6.5 million. It should be noted that costs included the addition of some parking (approximately 18 or 19 spaces). The City has updated the construction costs to 2016 values based on the actual national average Historical Cost Index1 . Most items originally evaluated by the District were included in the City’s updated estimate, with the exception of a line item for expanding the kitchen and replacing its equipment. The total 2016 estimate was approximately $8 million (including $2.5 million in seismic retrofits). The 2016 estimate was then escalated by 5.5 percent per year for five years to provide a cost estimate of $10.6 million in 2021. If the City sells the Community Development building for $2.5 million2, proceeds could be applied toward the project for a total cost of $8.1 million. Costs are broken down by line item and by year in the table that follows. 1 http://info.thegordiangroup.com/RSMeans.html. City used actual 2005 cost index (151.6) and actual 2016 cost index (207.3). 2 Real Market Value in 2016, Jackson County Property Data Online COA050615 Calculations for Memo RE: Cost Estimates for Improvements at Briscoe School Improvement Category Description Cost Estimates* 2005 2016 2021 High Priority Replace Windows 489,042$ 668,800$ 874,100$ ADA Upgrades 324,981$ 444,400$ 580,900$ Add site lighting 28,168$ 38,600$ 50,500$ Add parking 318,709$ 435,900$ 569,800$ Replace VCT 37,742$ 51,700$ 67,600$ Total Cost 1,198,642$ 1,639,400$ 2,142,900$ Moderate Priority Expand kitchen/ replace equipment 544,059$ -$ -$ Expand and remodel administration 237,423$ 324,700$ 424,400$ Replace marker boards 16,740$ 22,900$ 30,000$ Replace ceiling tile at stage 3,220$ 4,500$ 5,900$ Repair roof 295,357$ 403,900$ 527,900$ Expand and remodel library 446,677$ 610,800$ 798,300$ Total Cost 1,543,476$ 1,366,800$ 1,786,500$ Lower Priority Replace Cabinets 382,870$ 523,600$ 684,400$ Total Cost 382,870$ 523,600$ 684,400$ Replace domestic hot and cold water piping 259,803$ 355,300$ 464,400$ Replace boilers 169,012$ 231,200$ 302,200$ Install fire sprinkler system 161,354$ 220,700$ 288,500$ Upgrade controls to DDC 164,088$ 224,400$ 293,300$ Upgrade receptacles and add for tech 109,390$ 149,600$ 195,600$ Upgrade lighting throughout 218,784$ 299,200$ 391,100$ Add emergency lighting 109,390$ 149,600$ 195,600$ Upgrade fire alarm system -$ -$ -$ Upgrade electrical service 246,131$ 336,600$ 440,000$ Replace panelboards 109,390$ 149,600$ 195,600$ Total Cost 1,547,342$ 2,116,200$ 2,766,300$ Seismic retrofit 1,810,029$ 2,475,100$ 3,234,900$ Total Cost 1,810,029$ 2,475,100$ 3,234,900$ Total for all recommended improvements 6,482,359$ 8,121,100$ 10,615,000$ Offset - Sale of Community Development N/A N/A 8,115,000$ Mechanical, Plumbing, Electrical High Priority Structural *Cost Notes 2005 estimates developed for Ashland School District by Dull Olson Weekes Architects, Inc. 2016 estimates developed from the RSMeans® Historical Cost Indexes provided by the Gordian Group, where the national actual cost index was 151.6 in 2005 and 207.3 in 2016 2021 estimates developed by escallation of 2016 costs by 5.5 percent per year, consistant with the excallation value used in the Feasibility Study COA050616