HomeMy WebLinkAbout2026-05-04 Study Session MIN ASHLAND CITY COUNCIL
STUDY SESSION MINUTES
Monday,May 4,2026
Mayor Graham called the meeting to order at 5:30 p.m.
Council Present: Councilors Bloom, DuQuenne, Hansen, Sherrell, Dahle,and Kaplan (via Zoom).
Staff Present:
Sabrina Cotta City Manager
Jordan Rooklyn Deputy City Manager
Scott Fleury Director of Public Works
I. Call to Order
II. Reports and Presentations
a. Facility Planning Study Next Steps
Cotta introduced the topic, noting that the facility planning study was requested and funded in the
previous fiscal biennium and the goal of the study session was to provide staff guidance moving
forward. Fleury presented an overview of two phases:
Phase 1 — McKinstry conducted a full facility condition assessment of all city buildings, producing
itemized cost estimates for maintenance and improvements.
Phase 2 — RW (ORW) developed a space needs and facility plan addressing how the city should use,
manage, or divest its facilities going forward.
City Hall status — Since the January special study session, planning-level cost estimates were
obtained for City Hall repairs, including roof replacement,electrical upgrades, and HVAC replacement.
A cracked rafter had already been repaired by Vitus Construction. Staff noted that cost estimates did
not include permitting, structural calculations, or MEP (Mechanical, Electrical, and Plumbing) analysis.
Staff do not recommend patching the roof, as contractors and in-house facilities staff concur that full
membrane replacement is the appropriate course of action.
Civic campus options — Two potential consolidated campus locations were previously identified:
Briscoe School and 90 North Mountain (the current service center site). A community survey of 159
respondents showed approximately 70% in favor of a civic campus concept.
Divestment properties — Appraisals for the Imperatrice property, B Street Yard, Briscoe School, North
Mountain, City Hall,and the Hardesty property were included in the packet. Proceeds from any
divestment would flow into the newly established Capital Improvement dedicated facilities fund.
Councilors asked for clarification regarding the City Hall roof. Staff confirmed that both contractors
and the city's own facilities personnel do not recommend patching, as it would not prevent continued
moisture intrusion into the substructure,especially given that HVAC rooftop units would also need to
be disturbed. Councilors inquired if some elements—such as minor electrical and pest control—could
be handled in-house to reduce cost. Staff confirmed that minor electrical splicing, hot water heater
City Council Study Session
May 4,2026
Page 1 of 3
replacement,and pest control could be addressed internally. Councilors also discussed a 2014 partial
roof warranty from Bleser Built Roofing and requested that they be contacted.
A broad discussion followed on whether to pursue a consolidated civic campus,and if so,at which
site.Topics discussed included:
w A suggestion was made to table the civic center discussion until the adoption of the next
(2027-29) budget due to economic uncertainties and potential risks of having to fill a general
fund gap.
• Another proposal involved selling some properties to build the facilities fund,with plans to
revisit the civic center question in the next biennium.
w The potential for futureavailability of SOU buildings was mentioned.
• There was emphasis on the need to understand the complete budget picture before making
any decisions,with o strong stance against delaying h]ci|iLV maintenance further.
* The idea was presented to take the civic center entirely off the table, citing the city's structural
deficit and the potential of residents'inability to afford o bond.
w Alternative suggestions included proceeding promptly with the divestment of certain
properties and using the funds to repair existing buildings.
• There was interest expressed in having a financial model and phased plan for the civic center,
which included building o capital fund,divesting certain properties, and tackling ChxHoU �
' �
issues in the short term while still maintaining the civic campus option. �
• Concerns were raised about the financial burden on ratepayers, highlighting that proceeds �
�
�ornd�emt�d �no���ieovvou|dborek/ooverthae�utin� bui|din�u.deferred maintenance
costs.
w There was advocacy for exploring partnerships with other institutions like SOU,the school
district,orOSF,which face similar financial challenges.
w A request was made for a clearer business case analysis to specify which staff roles would �
benefit from co-location versus those requiring dedicated locations.
DahKe moved*o extend the Study Session until 7:15 p,mm.DuQuenne seconded the Motion.All Kn
favor.The motion passed.
Staff noted that URN/o feasibility analysis placed the 20lB Briscoe construction cost atapproximately
$15 million,while o comparable build-out mtQO North Mountain was estimated in the $20 million
range Staff noted that 80 North Mountain would better serve operations by consolidating more staff
at a single location,whereas Briscoe would still leave a bifurcated campus.
The Council reached consensus to remove Briscoe School as a civic campus option,freeing that
property for a future divestment discussion,and provided the following direction to staff:
p Staff are to refine and present information on which departments and functions are highest
priority for co-location,what efficiencies that would create,and which functions must remain
ot specialized locations.
City Council Study Session
woy428c0
Page zof3
• Staff to provide numbers for a civic campus at 90 N Mountain based on the McKinstry report
and current construction costs for discussion at the July Council meeting.
• Staff to remain alert for opportunities to consolidate operations into existing or available
spaces without new construction or reducing current service levels,and to bring those
opportunities forward as they arise.
Additional discussion on safety-related repairs to City Hall including the roof,electrical, HVAC,water
heater,and pest control. Discussion to be continued at a later date.
b. Review of City Council Budget
This agenda item was not reached. The Council agreed to postpone it to a future meeting.
III. Adjournment of Study Session.
The meeting was adjourned at 7:15 pm.
"V_
City Recorder Alissa Kolodzinski Mayor Tonya Graham
City Council Study Session
May 4,2026
Page 3 of 3