HomeMy WebLinkAbout2026-07-14_Planning PACKET
Planning Commission Meeting Agenda
ASHLAND PLANNING COMMISSION
REGULAR MEETING AGENDA
Tuesday, July 14, 2026
Note: Anyone wishing to speak at any Planning Commission meeting is encouraged to do so. If you
wish to speak, please rise and, after you have been recognized by the Chair, give your name and
complete address for the record. You will then be allowed to speak. Please note the public testimony
may be limited by the Chair.
I.CALL TO ORDER
7:00 p.m., Civic Center Council Chambers, 1175 E. Main Street
II.ANNOUNCEMENTS
1.Staff Announcements
2.Advisory Committee Liaison Reports
III.CONSENT AGENDA
Approval of Minutes
1.June 9, 2026 Regular Meeting Minutes
IV.PUBLIC FORUM
Note: To speak to an agenda item in person you must fill out a speaker request form at the meeting
and will then be recognized by the Chair to provide your public testimony. Written testimony can be
submitted in advance or in person at the meeting. If you wish to discuss an agenda item
electronically, please contact PC-public-testimony@ashland.or.us by 10:00 a.m. on July 14,
2026 to register to participate via Zoom. If you are interested in watching the meeting via Zoom,
please utilize the following link: https://zoom.us/j/94128664134
DISCUSSION ITEMS
Transportation System Plan & Public Engagement Plan Update
Planning Commission ORS Research andResources
OPEN DISCUSSION
Planning Commission Annual Retreat Initial Discussion
ADJOURNMENT
Next Meeting Date: July 28, 2026
If you need special assistance to participate in this meeting, please contact Derek Severson at
planning@ashlandoregon.gov or 541.488.5305 (TTY phone number Notification at least three
business days before the meeting will enable the City to make reasonable arrangements to ensure accessibility
to the meeting in compliance with the Americans with Disabilities Act.
Page 1 of 1
Total Page Number: 1
Total Page Number: 2
Planning CommissionMinutes
Note: Anyone wishing to speak at any PlanningCommission meeting is encouraged to do so. If you wish to speak, please rise and, after you
have been recognized by the Chair, give your name and complete address for the record. You will then be allowed to speak. Please note the
public testimony may be limited by the Chair.
June 9, 2026
REGULAR MEETING
DRAFT Minutes
I.CALL TO ORDER:
Chair Vernercalled the meeting to order at 7:00 p.m.at theCivic Center Council Chambers, 1175 E.
Main Street.
Commissioners Present:Staff Present:
Lisa Verner Brandon Goldman, CommunityDevelopment Director
Jay Lininger Derek Severson, Planning Supervisor
Eric Herron Michael Sullivan, Executive Assistant
Russell Phillips
John Maher
Kerry KenCairn
Susan MacCracken Jain
Absent Members:Council Liaison:
Jeff Dahle
II.ANNOUNCEMENTS
1.Staff Announcements – None
2.Advisory Committee Liaison Reports – None
III.CONSENT AGENDA
Approval of Minutes
1.April 28, 2026 Regular Meeting
2.May 12, 2026 Regular Meeting
3.May 26, 2026 Study Session
Commissioners Phillips/KenCairnm/s to approve the consent agenda as presented.Voice Vote:
Commissioners KenCairn, Maher, Lininger, Phillips,Herron, MacCracken Jain,and Verner: AYE.
Motion Passed 7-0.
Page 1 of 5
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, pleaseemail
planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to
ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1).
Total Page Number: 3
Planning CommissionMinutes
IV.PUBLIC FORUM – None
V.LEGISLATIVE PUBLIC HEARING
PLANNING ACTION: PA-L-2026-00018
APPLICANT: City of Ashland
DESCRIPTION: Legislative amendments to the Ashland Municipal Code to establish a
Manufactured Home Park (MHP) Zone, update development and design standards for
manufactured housing for clear and objective standards, and establish notice of sale, opportunity
to purchase, and tenant protection provisions.
Staff Presentation
Community Development DirectorBrandon Goldman provided an overview of the ordinance
package, noting that it implements a priority action identified in the City's Housing Production
Strategy adopted in 2023, specifically Strategy G — the preservation and modernization of
manufactured home parks. Staff explained that existing manufactured housing development
standards had not been updated in over 30 years, and the project was intended to modernize those
regulations to comply with state law while creating a more effective framework for park preservation
and reinvestment. The work was supported through a grant from the Department of Land
Conservation and Development (DLCD), with technical assistance provided by 3J Consulting.
Mr. Goldmanoutlined three primary components of the ordinance package: (1) amendments to
manufactured housing development standards; (2) establishment of a new Manufactured Home
Park (MHP) zone and corresponding comprehensive plan designation to be applied to existing parks;
and (3) a separate ordinance amending AMC Chapter 10 to establish notice of sale requirements,
opportunity to purchase provisions, and other tenant protections. Mr. Goldmannoted that Assistant
City Attorney Carmel Zahranhad recommended further legal review of the Chapter 10 ordinance,
and that the Planning Commission was not required to make a formal recommendation on that
section, though it could provide comments and recommended modifications for consideration by
legal and the City Council(see attachment #1). This item was scheduled for City Council first
reading on June 16, 2026.
Consultant Presentation
Scott Fregonese and Journie Gering of 3J Consulting provided an overview of the project
background, community engagement efforts — including an advisory committee of park residents
that met three times, a joint work session with the Housing and Human Services Advisory Committee,
City Council, and Planning Commission in January 2026, and an online open house and public
survey open from April 27 through May 31, 2026, which received approximately 46 responses. He
reviewed the substantive code changes made between the last Planning Commission meeting and
Page 2 of 5
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, pleaseemail
planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to
ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1).
Total Page Number: 4
Planning CommissionMinutes
the current draft, which included: replacing the term "financial burden" with "proportionate impact" in
the phased compliance provisions; adding childcare and residential facilities to the use table under
AMC 18.2.2.030; increasing the opportunity-to-purchase period from 120 to 180 days; updating
landscaping and lot coverage standards to 65 percent maximum coverage with 35 percent
minimum landscaping; and removing a limitation on increasing the number of units in the phased
compliance section applicable to nonconforming uses.
Mr. Fregonesesummarized the full set of code changes across multiple AMC sections, including
revised manufactured housing development standards, updated density and dimensional
standards supporting higher-density development, removal of minimum lot size requirements in
favor of references to applicable building and fire codes, updated setback and circulation
standards, addition of community-serving building standards, and revised nonconforming use
compliance provisions. The presentation also highlighted the new MHP zone and corresponding map
designations proposed for Wingspread, Tolman Creek, and — upon annexation — Siskiyou Village
and Nauvoo Park. The consultant noted that the Ashland Urban RV Park at 278 Idaho Street and
Upper Pines had been recommended for removal from the proposed zone map(see attachment
#2).
Public Comments
GerryLehrburger:Expressed concerns about flood risk in manufactured home parks near
Bear Creek and called for mitigation measures(see attachment #3).
Rich Rohde:Supported the ordinance package, commending the collaborative process and
urging its unanimous passage.
Deborah Stampfli:Supported the ordinance but worried about large investment groups
outbidding residents.
Peter Hoyt:Advocated for park protection to prevent resident displacement due to
redevelopment.
David Wright (Agent for Wingspread LLC):Objected to extending the opportunity-to-
purchase period to 180 days and sought clarity on nonconforming status implications.
Nancy Willson:Thanked the commission for the proposed protections advocating for
genuine affordable housing.
David Allen:Appreciated thediscussion on zoning recommendations.
Alan Ackroyd:Suggested 180 days might be inadequate for organizing a park purchase and
raised concerns about emergency egress.
Chair Verner closed the Public Hearing at 7:50pm.
Deliberations and Decision
Ordinance 3296 — AMC Title 18 Manufactured Housing Code Amendments
Commissioner Lininger identified inconsistency with terms like "manufactured housing
Page 3 of 5
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, pleaseemail
planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to
ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1).
Total Page Number: 5
Planning CommissionMinutes
development," "manufactured home park," and "manufactured dwelling park" across the code. Staff
concurred, suggesting amending "manufactured dwelling park" to include these as synonyms for
consistency. The "proportionate impact" standard in phased compliance, clarified by consultants,
was also discussed. A minor drafting error on page 51 of the packet was highlighted for correction.
Ordinances 3297 and 3298 — MHP Zone and Comprehensive Plan Map Amendments
Staff and the Commission agreed to amend both zoning map ordinance (3297) and comprehensive
plan map ordinance (3298) to exclude Upper Pines and 278 Idaho Street from the proposed MHP
zone designations, aligning with previous directions. Jackson Wellsprings was confirmed to be
excluded from both maps.
Ordinance 3306 — AMC Chapter 10.116 Notice of Sale, Opportunity to Purchase, and Tenant
Protections
Commissioner Lininger suggested changing "executed" to "tendered" in the notice of sale provisions
for clarity and removing the phrase "following receipt of a notice of sale" from Subsection A to
empower resident organizations to make purchase offers at any time. Extended discussion clarified
no new obligations for park owners would arise, maintaining that residents could express purchase
interest anytime. Commissioner Russell highlighted potential legal challenges with ORS 90.660 and
supported further cityattorney review. Staff noted that theCity Attorney wouldfurtherreviewthe
ordinancebefore Council discussion on June 16.
Commissioners Phillips/Herron m/s to recommend that City Council adopt the proposed
manufactured home park zone ordinance package for PA-L-2026-00018, including Ordinances
3296, 3297, and 3298, together with the supporting findings as recommended by staff and as
amended on the record, specifically: amending Ordinances 3297 and 3298 to remove Upper Pines
and 278 Idaho Street from the proposed MHP zone and comprehensive plan designations,
excluding Jackson Wells Springs from the maps, and amending the definition of "manufactured
dwelling park" to recognize "manufactured home park" and "manufactured housing
development" as synonymous terms; and further recommending that Ordinance 3306 (AMC
Chapter 10.116) be forwarded to City Council with the Planning Commission's comments but
receive additional city attorney review before adoption.
DISCUSSION: Commissioners MacCracken Jain/Maher m/s to amend the motionto withdraw
Ordinance 3306 for further review by the Legal Department and the Planning Commission.
Roll Call Vote: Commissioners Phillips, Herron, Maher, KenCairn, Lininger, and Verner: NAY.
Commissioner MacCracken Jain: AYE. Amendment failed 1-6.
Roll Call Voteon original motion: Commissioners Phillips, Herron, Maher, MacCracken Jain,
KenCairn, Lininger, and Verner: All AYES. Motion passed 7-0.
Page 4 of 5
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, pleaseemail
planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to
ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1).
Total Page Number: 6
Planning CommissionMinutes
VI.OPEN DISCUSSION – None
VII.ADJOURNMENT
Meeting adjourned at 8:47 p.m.
Submitted by,
Michael Sullivan, Executive Assistant
Page 5 of 5
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, pleaseemail
planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to
ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1).
Total Page Number: 7
Total Page Number: 8
Manufactured Home
Park Zone (MHPZ)
Planning Commission Public Hearing
Project Overview
Total Page Number: 9
MHPZ Project
Overview
Project Background:The MHPZ is a part of Ashland's Housing Production Strategy
Strategy G: ˝˱˹˾̄˱˹˾ ́̅˱˼˹̄̉ ˱˾˴ ̃̅̀̀˿̂̄ ̀̂˵̃˵̂̆˱̄˹˿˾ ˿˶ ˵̈˹̃̄˹˾˷ ˽˱˾̅˶˱˳̄̅̂˵˴
˸˿˽˵ ̀˱̂˻̃
DLCD Grant:Ashland received a technical assistance grant from the Oregon
Department of Land Conservation and Development (DLCD) to fund the creation of
the MHPZ ordinance.
Design Standards:The project called for set standards for density, lot size,
setbacks, utilities, and more to preserve existing parks and possibly allow higher-
density development and smaller unit sizes.
MHPZ Project
Engagement
¤The MAC met 3 times over the course of the project to give feedback
¤A joint study session between the HHSAC, PC, CC was held on January 27, 2026 to review work products
¤Code changes were reviewed by:
¤MAC on March 11, 2026
¤HHSAC on April 23, 2026
¤PC on April 28, 2026
¤An online open house is available on the city webpage showing work products and materials
¤A survey was published on the webpage
¤it was open from April 27to May 31, 2026
¤Approximately 46 people responded to the survey
Total Page Number: 10
Proposed MHP Zone
Proposed MPH Zone
The Manufactured Home Park Zone (MHPZ) is proposed for 5
existing manufactured housing communities.
3 are located within the Ashland city limits:
¤Wingspread Manufactured Home Park
¤Tolman Creek Manufactured Home Park
¤Ashland Urban RV Park ʸ˂ˇˈ ˙˴˱˸˿ ˣ̄ʽ̂˵˳˿˽˽˵˾˴ ̂˵˽˿̆˱˼ʹ
2 are located within the Ashland Urban Growth Boundary (UGB):
¤Siskiyou Village Manufactured Home Park
¤NavooPark Estates
Total Page Number: 11
New Code Changes
Code changes that have occurred since that last PC
Meeting include:
¤Changed 'financial burden' to 'proportionate impact' and
added definition
¤Added/updated childcare and residential facilities in table in
New
AMC 18.2.2.030
Code
¤Changed 120 days to 180 days for opportunity to purchase per
Planning Commission discussion
Changes
¤Updated landscaping and lot coverage to reflect city staff
Summary
recommendations (65% coverage and 35% landscaped)
¤Updated 'limitations section' under phased compliance and
removed "Limitations. Approval under this subsection shall not:
Allow an increase in the number of manufactured housing
spaces beyond what legally existed at the time the
development became nonconforming;" (AMC 18.2.3.180(G))
Total Page Number: 12
Proposed Code Changes
Add the Manufactured Home Park Zone (MHPZ)
to the Allowed Uses by Zone table.
Code
Update the childcare facilities to be permitted
Changes
on lands zoned for multiunit residential or
institutional uses to comply with HB 3560.
Summary
Update residential treatment facilities and
residential homes to be permitted on lands
zoned for residential, commercial,
AMC
employment, industrial, and public lands
(excluding parks) to comply with HB 2005.
18.2.2.030
Total Page Number: 13
Revise standards for manufactured homes on
individual lots to comply with state-required
Code
clear and objective standards to comply with
Changes
HB 2347 and ORS 197A.400.
Summary
AMC
18.2.3.170
Revise manufactured housing development
standards to implement updated clear and objective
standards.
Update density, dimensional, and design standards
to support higher-density manufactured housing
Code
developments.
Changes
Remove minimum lot size standards and instead
reference applicable building and fire code
Summary
requirements.
Revise maximum lot coverage standards to allow up
to 65 percent lot coverage.
AMC
Update setback standards to reference applicable
18.2.3.180
building and fire code separation requirements and
allow limited encroachments for porches and decks
where compliant with applicable codes.
Update private street and circulation standards,
including turnaround requirements consistent with
applicable fire code standards.
Total Page Number: 14
Add permanent pedestrian walkway and ADA
accessibility requirements.
Update landscaping standards and require
landscaped open areas for a minimum of 35 percent
or lot area.
Code
Update common open space and amenity standards.
Changes
Add standards for community-serving buildings,
Summary
including permitted and conditional accessory uses.
Revise manufactured housing unit standards,
including removal of minimum size, width, and patio
AMC
requirements and allowing smaller units under 500
square feet to count toward density calculations at a
18.2.3.180
reduced ratio.
Revise standards applicable to nonconforming
manufactured housing developments to allow phased
or partial compliance approaches.
Code
Changes
Summary
Revise Performance Standards Option (PSO)
applicability provisions to allow cottage housing and
manufactured housing developments to utilize PSO
procedures.
AMC
18.3.9.020
AMC
Add references to AMC 18.2.3.180 within PSO Overlay
18.3.9.030
applicability standards.
Total Page Number: 15
Code
Changes
Summary
Revise outline plan procedures to exempt
manufactured housing developments and cottage
housing developments from certain outline/final plan
approval submittal requirements.
AMC
18.3.9.040
AMC
Revise annexation standards to exempt manufactured
18.5.8.050
home parks from residential annexation affordability
requirements and allow manufactured housing
developments up to 18 dwelling units per acre upon
annexation.
Code
Changes
Summary
Add and revise definitions related to manufactured
housing, including Manufactured Dwelling,
Prefabricated Dwelling, Manufactured Dwelling Park,
Recreational Vehicle, and Proportionate Impact.
AMC
18.6.1.030
AMC
Add a new chapter establishing standards related to
manufactured home park sale, closure, conversion,
10.116
and tenant protections, including notice requirements,
opportunity to purchase provisions, relocation
assistance standards, relocation plan review
procedures, anti-harassment provisions, notice
requirements to City housing staff, and enforcement
provisions.
Total Page Number: 16
Updated Zoning Map
Total Page Number: 17
Next Steps
Next Steps:
Adoption Schedule:
¤/źƷǤ /ƚǒƓĭźƌ {ƷǒķǤ {ĻƭƭźƚƓ ΑЏΉЊЎ
¤/źƷǤ /ƚǒƓĭźƌ tǒĬƌźĭ IĻğƩźƓŭ CźƩƭƷ wĻğķźƓŭ ΑЏΉЊЏ
¤City Council Second Reading-7/21
Total Page Number: 18
Questions & Comments
Thank You!
Total Page Number: 19
Total Page Number: 20
Total Page Number: 21
Total Page Number: 22
_________________________________
Total Page Number: 23
Total Page Number: 24
Memo
DATE: July 14, 2026
TO: Planning Commission
FROM: Brandon Goldman, Community Development Director
RE: Transportation System Plan & Public Engagement PlanUpdate
Purpose
This memo provides the Planning Commission with an overview of the City's Transportation System
Plan (TSP), the update process now getting underway, and the Commission's role over the course of
the project. This item is informational and no action is requested at this time. The Commission last
reviewed this project in May 2025, when it approved the Public Engagement Plan. Since that time the
project experienced delays in contracting, but the consultant contract has now been executed and
work is beginning.
What a Transportation System Plan (TSP) Is, and Why It Matters
A Transportation System Plan is the City's long range blueprint for how people and goods move
through Ashland. It identifies the transportation facilities and services needed to support planned
land uses over a twenty year horizon, covering all modes of travel including walking, bicycling,
transit, motor vehicles, and freight. The TSP establishes the projects, programs, and policies that
guide the City's transportation investments and provides the basis for requiring transportation
improvements in conjunction with development.
The TSP is a requirement of Oregon's statewide land use planning program. Statewide Planning Goal
12 (Transportation) and the Transportation Planning Rule adopted by the Land Conservation and
Development Commission direct cities to prepare and adopt transportation system plans that are
coordinated with local comprehensive plans, regional plans, and the Oregon Transportation Plan.
Under this framework, the TSP is adopted as a supporting element of the Comprehensive Plan. This
connection is what gives the plan its legal weight. Once adopted, the TSP shapes future land use
decisions, capital improvement programming, and eligibility for state and federal transportation
funding. Ashland's current TSP was adopted in 2013, and this update will bring the plan into
alignment with current conditions, community priorities, and updated state requirements, including
new provisions of the Transportation Planning Rule adopted under the Climate Friendly and
Equitable Communities program.
Project Structure and Consultant Team
COMMUNITY DEVELOPMENTDEPARTMENT
51 Winburn WayTel: 541.488.5305
Ashland, Oregon 97520Fax: 541.552.2050
ashlandoregon.govTTY: 800.735.2900
Total Page Number: 25
The Oregon Department of Transportation (ODOT) is providing funding and project management
support for the update, and has contracted with Alta Planning + Design to serve as the City's
consultant team. City staff, ODOT, and the consultant team will coordinate through a project
management team over the life of the project, which is anticipated to span approximately two years
from the start of work through adoption.
General Scope of Work
While the detailed schedule remains subject to refinement, the overall arc of the project includes the
following major phases.
•Community engagement foundation. Updating the approved Public Engagement Plan with
the consultant team, launching the project website, and preparing a community profile that
includes an equity analysis to help ensure outreach reaches all segments of the community.
•Policy framework. Review of existing plans, policies, and code provisions, followed by
development of goals, objectives, and evaluation criteria that will guide the plan.
•Existing and future conditions. An inventory of the transportation system and analysis of how
it performs today across all travel modes, along with a forecast of future conditions based on
planned growth.
•Solutions development. Identification and evaluation of potential projects and programs for
each travel mode, leading to prioritized project lists and an assessment of available funding.
•Preferred solutions and draft plan. Selection of a cost constrained set of projects,
preparation of the draft TSP document, and drafting of any implementing ordinances and
findings needed for adoption.
•Adoption. Public hearings before the Planning Commission and City Council, concluding with
adoption of the final TSP and any implementing ordinances.
Public engagement is woven throughout these phases rather than confined to any single step. The
Transportation Advisory Committee and the Planning Commission both reviewed and approved a
Public Engagement Plan for this project in May 2025. That plan is attached to this memo for
reference. The engagement approach it describes will carry forward, although the timeline and
specific dates will need to be updated in consultation with the consultant team now that work is
underway. Rather than forming a temporary advisory body for this effort, the plan relies on the City's
existing standing advisory committees. These include the Transportation Advisory Committee, the
Climate and Environment Policy Advisory Committee, the Housing and Human Services Advisory
Committee, the Wildfire Safety Advisory Committee, and the Social Equity and Racial Justice
Advisory Committee, each engaged at key milestones within its area of focus. Broader community
engagement will include a project website, community surveys, stakeholder interviews, focus groups,
open houses, and coordination with regional partners such as ODOT, the Rogue Valley
Transportation District, Jackson County, the Ashland School District, and Southern Oregon University.
Role of the Planning Commission
COMMUNITY DEVELOPMENTDEPARTMENT
51 Winburn WayTel: 541.488.5305
Ashland, Oregon 97520Fax: 541.552.2050
ashlandoregon.govTTY: 800.735.2900
Total Page Number: 26
The Planning Commission will be involved in this process in two distinct capacities.
•Public engagement throughout the process. The Planning Commission is also designated as
the Committee on Citizen Involvement (2.12.070 -
https://ashland.municipal.codes/AMC/2.12.070) and as such assist the City Council in
establishing opportunities for public engagement in long range planning, supporting those
efforts as they take shape, and evaluating how well the public involvement process is
working. Commissioners will take part in the community conversation throughout the life of
the project. Under the approved Public Engagement Plan, this begins with a joint kickoff
meeting of the Planning Commission and Transportation Advisory Committee, followed by
periodic presentations and study sessions at key milestones, joint review of plan concepts
and alternatives, and Commission review of the draft plan. A joint work session with the City
Council is also anticipated as the draft plan comes together.
•
•Legislative review and recommendation. Because the TSP will be adopted as a technical
supporting document to the Comprehensive Plan, its adoption is a legislative land use
decision. The Commission will hold a public hearing on the draft plan and forward a
recommendation to the City Council. In addition, should the process result in proposed
modifications to the City's street standards or other land use standards, the Commission will
likewise review those amendments to Ashland Municipal Code Chapter 18 and provide a
recommendation to the Council on their adoption.
Next Steps
With the contract executed, the consultant team is initiating project management, community
engagement planning, and background policy review tasks. Staff will return to the Commission with
updates as the project advances and will coordinate scheduling of study sessions at the
appropriate milestones. In the meantime, questions about the project may be directed to the
Community Development Department.
Attachments:
1.May 2025 Draft Public Engagement Plan
2.Select Pages from State of Oregon TSP Guidelines
Full 139 pagedownloadavailable here: https://www.oregon.gov/odot/Planning/TSP-
Guidelines/Documents/TSP%20Guidelines.pdf
COMMUNITY DEVELOPMENTDEPARTMENT
51 Winburn WayTel: 541.488.5305
Ashland, Oregon 97520Fax: 541.552.2050
ashlandoregon.govTTY: 800.735.2900
Total Page Number: 27
City of Ashland – Transportation System Plan Update
Draft Public Engagement Plan (PEP)
Prepared: \[Insert Date\] -Incorporating PC and TAC revisions- 5/1/2025
Purpose
This Public Engagement Plan outlines the community outreach, advisory committee
engagement, and public review process to guide the development of Ashland’s updated
Transportation System Plan (TSP). A TSP is a foundational element of the City’s
Comprehensive Plan, serving as a long-range blueprint for how people and goods will move
within and through the city—by foot, bike, transit, and vehicle. It informs future capital
improvements, development decisions, and funding priorities. Because transportation
directly affects daily life and intersects with goals related to climate action, housing
accessibility, and wildfire preparedness, the TSP is best shaped through robust public
engagement. This process is designed to ensure inclusive and transparent community input,
incorporate technical expertise, and reflect the values and priorities of Ashland residents.
Goals of the Public Engagement Process
Transparency: Ensure the public understands the purpose, scope, and progress of the
TSP update.
Inclusivity: Actively engage community members, including underserved
populations.
Integration: Incorporate feedback from standing advisory committees, technical
experts, and advocacy groups.
Education: Provide stakeholders with accessible and relevant information about
transportation planning.
Responsiveness: Demonstrate how public and advisory committee input informs the
TSP.
Key Stakeholders and Advisory Bodies
Public: Residents, business owners, neighborhood groups, students, and regional
users.
City Bodies:
o Planning Commission
o Transportation Advisory Committee
o Climate Policy Advisory Committee
Total Page Number: 28
o Housing and Human Services Advisory Committee
o Wildfire Safety Advisory Committee
City Council
Regional and Agency Partners:
o Rogue Valley Transportation District (RVTD)
o Oregon Department of Transportation (ODOT)
o Jackson County
o Ashland School District
o Southern Oregon University (SOU)
Regional Advocacy Groups:
o Streets for Everyone (Ashland Climate Collaborative)
o Southern Oregon Climate Action Now (SOCAN)
o others
Overview of Decision-Making and Advisory Bodies
Unlike jurisdictions that form temporary advisory bodies for planning initiatives, Ashland will
rely on its existing standing advisory committees to guide the Transportation System Plan
(TSP) update. These committees—established by ordinance and composed of appointed
community members—each focus on specific policy areas such as transportation, climate,
housing, and wildfire safety. Members are selected for their expertise, lived experience, or
stakeholder representation relevant to the committee's scope. Leveraging these established
bodies ensures continuity, subject matter knowledge, and alignment with ongoing city
priorities. Each advisory committee will be engaged at key milestones to provide focused
input, helping shape the TSP in a way that reflects the community’s values and technical
realities.
Planning Commission
As the City’s designated land use review body, the Planning Commission serves as the
primary reviewing authority for the TSP update. Because the Transportation System
Plan is a required element of Ashland’s Comprehensive Plan, any amendments to the
TSP must undergo a public hearing process before the Planning Commission in
accordance with state law and local ordinance. The Commission will hold formal
public hearings and issue recommendations to the City Council regarding the
adoption of the updated TSP. In addition to its legislative responsibilities, the
Commission will participate in a joint kickoff meeting with the Transportation Advisory
Total Page Number: 29
Committee and will review key milestones, including the draft and final plan, to ensure
alignment with broader land use and policy goals.
Transportation Advisory Committee
This committee provides focused input on transportation policy, planning, and project
prioritization. Composed of members with expertise in transportation, engineering,
and mobility systems, the committee will guide the development of multimodal goals,
review proposed projects, and help rank improvements to ensure the TSP advances a
safe, efficient, and accessible transportation network.
Climate and Environment Policy Advisory Committee
Reviews proposed strategies for alignment with the City’s adopted Climate and
Energy Action Plan, with a focus on greenhouse gas reduction.
Housing and Human Services Advisory Committee
Provides input on transportation equity, accessibility, and how proposed investments
may affect vulnerable populations.
Wildfire Safety Advisory Committee
Reviews evacuation modeling assumptions and provides feedback on proposed
transportation improvements to support community resilience.
Social Equity and Racial Justice Advisory Committee
Provides input to ensure the TSP advances equity, access, and anti-displacement
goals. Reviews how proposed transportation investments may impact underserved
communities and supports strategies that promote transportation justice.
Regional Technical Input
Targeted stakeholder interviews will be conducted to gather issue-specific input and
technical insight from key regional partners and institutional stakeholders. Participants may
include:
Oregon Department of Transportation (ODOT)
Rogue Valley Transportation District (RVTD)
Jackson County
Ashland School District
Southern Oregon University (SOU)
Total Page Number: 30
Local transportation advocacy groups such as Streets for Everyone and Southern
Oregon Climate Action Now (SOCAN)
Engagement Strategies and Activities
• Project Website Dedicated TSP Update page (ashlandoregon.gov/TSP)
• Online Surveys
• Social Media / Email Updates
• Pop-up Events
• Utility Bill Inserts (as needed)
• Public Hearings at the Planning Commission and City Council
Engagement Timeline and Activities
(18-Month Process: May 2025 – October 2026)
Phase 1: Project Initiation (Months 1–3)
Launch project webpage and public communications.
Joint Planning Commission & Transportation Advisory Committee Kickoff Meeting.
Phase 2: Data Gathering & Needs Assessment (Months 4–6)
Conduct stakeholder interviews, including SOU and advocacy groups.
Present to:
o Transportation Advisory Committee (TAC)
o Planning Commission
o Climate and Environment Policy Advisory Committee (CEPAC)
o Housing and Human Services Advisory Committee (HHSAC)
o Wildfire Safety Advisory Committee (WSAC)
Social Equity & Racial Justice Advisory Committee (SERJAC)
Launch Community Survey #1.
Phase 3: Concepts & Alternatives (Months 7–9)
Joint review by Planning Commission and Transportation Advisory Committee.
Focus groups (e.g., students, seniors, underserved populations).
Topic-specific workshops with advisory committees.
Total Page Number: 31
Phase 4: Public Open House #1 – General (Months 10–12)
In-person or online open house on draft needs, alternatives, and equity
considerations.
Phase 5: Draft Plan Development (Months 13–15)
Review draft plan with:
o Transportation Advisory Committee (TAC)
o Planning Commission
o Climate and Environment Policy Advisory Committee (CEPAC)
o Housing and Human Services Advisory Committee (HHSAC)
o Wildfire Safety Advisory Committee (WSAC)
Social Equity & Racial Justice Advisory Committee (SERJAC)
Phase 6: Public Open House #2 – Wildfire Evacuation Focus (Months 16–17)
Present wildfire evacuation modeling and proposed street improvements.
Phase 7: Final Review & Adoption (Month 18-24)
Public hearings with Planning Commission and City Council.
Final engagement summary and TSP adoption.
Documentation and Reporting
All advisory committee feedback (including public meeting minutes), survey responses,
public comments, and stakeholder input will be compiled in a Final Engagement Summary
Report. This standalone report will be presented alongside the draft Transportation System
Plan during the Planning Commission and City Council adoption hearings, providing a clear
record of how public input informed the plan’s development.
General Timeline
Total Page Number: 32
Total Page Number: 33
Transportation System Plan Guidelines
Oregon Department of Transportation
December 2024
Total Page Number: 34
Why update a TSP?
A TSP provides a comprehensive, multimodal picture of how the existing and future transportation system meets the
needs of its users. While the state Transportation Planning Rules (TPR) require most Oregon jurisdictions to adopt a
TSP, there are many other good reasons to employ this critical long-range planning tool.
Plot a clear course for your community
Show how your transportationgoalsmeet the goals and Determine where plannedtransportationimprovements
needs of plannedlandusesshould be located and what right-of-way needs to be
protected
Identify and advocate forprojects,programs,and
Provide rationale for making prudenttransportationservicesthecommunitycanfund(financially
investmentsand land use decisionsconstrainedplan)andwouldliketofund(financially
unconstrainedplan),within the planning horizon
Work toward shared goals
A TSP tells others how transportation policies and investments support broader
community and regional goals. Being able to see where goals overlap with those of
other agencies creates valuable opportunities for collaboration.
Attract and secure funds
Not only does a TSP provide a necessary linkage to theStatewide Transportation
Improvement Programto secure funding,it also provides the policy foundation and
documentation of needs to support transportation funding decisions and requests.
Getting results
Read how TSP updates have helped communities fund system investments,
coordinate with other jurisdictions and agencies, and deliver projects.
14
Total Page Number: 35
Increase potential funding
The Wilsonville TSP update, funded through the Oregon Transportation and Growth Management (TGM) program,
helped the City of Wilsonville pursue funding for projects on the state system.
Support transportation decisions
As part of its TGM-funded TSP update, the City of Ashland examined a road diet on North Main Street (OR 99) that
would reduce the number of lanes from four to three, providing room for bicycle lanes. Because North Main Street is
an alternative route to I-5, ODOT's Motor Carrier Transportation Division was consulted on the proposal. After
extensive consultations between the city and state and a major community engagement effort, the city proceeded
with a 1-year pilot project to restripe North Main Street. After the 1-year pilot period, the Ashland City Council voted
to make the road diet permanent. It should be noted that a road diet on an ODOT facility would most likely be a
component of a corridor refinement plan that would be incorporated into a TSP, since a more detailed analysis and
community engagement are typically needed for this type of project.
For more information on plan implementation, see the excerpt from TGM Tangibles Volume II.
Make major improvements through small, affordable steps
The City of Newberg was awarded an Oregon TGM grant to prepare a pedestrian and bicycle plan, with an emphasis
on identifying a critical core network of Americans with Disabilities Act (ADA) compliant infrastructure. Rather than
wait until funding is secured to construct improvements along an entire corridor, the plan identifies spot
improvements that could strategically and affordably remove barriers along a route more quickly and for a fraction of
the cost. This plan resulted in an amendment to the city's TSP that updated bicycle and pedestrian elements to
include the critical routes and improvements.
For more information on plan implementation, see the excerpt from TGM Tangibles Volume II.
15
Total Page Number: 36
When to update a TSP
Like all planning documents, a TSP should be updated periodically to reflect a community’s growth and change.
Many circumstances can trigger a TSP update, including state or regional compliance issues, changing community
priorities, and funding availability. Cities located within a metropolitan area must update their TSPs to conform with
the 2022 updates to the state Transportation Planning Rules (TPR), which areintended to reduce greenhouse gas
emissions (see OAR 660-0012-0100). The Oregon Department of Land Conservation and Development (DLCD)
encourages communities to review and update their major plans, including TSPs, on an interval of around seven
years. Communities experiencing rapid change may need to update their TSPs at shorter intervals.
Does my community need tohave a TSP?
The TPR provides exemptions to some jurisdictions.
Outside of a metropolitan area - Outside of a metropolitan area - Outside of a metropolitan area -
fewerthan10,000fewerthan25,000
Cities withCounties withUnincorporated areas of counties
residentsmay not be required to residentsmay not be required to fewerthan
inside the UGB with
10,000residentsmay not be
have a TSPhave a TSP
required to have a TSP
Inside a metropolitan area - Cities
and counties withfewerthan
10,000residentsmay not be
required to have a TSP
16
Total Page Number: 37
DLCD may grant a whole or partial exemption from TPR requirements for these jurisdictions. This includes
jurisdictions that are newly included in a metropolitan area and may be subject to new rules. Exempt jurisdictions
are still eligible for state grant funding to prepare or update a TSP but may not be obligated to fulfill all the
requirements in the TPR. More information about how to apply for an exemption may be found in this document.
Can my community secure funding to complete a TSP
update?
Many communities looking to update their TSP need funding to support the effort. Some funding opportunities, like
the Oregon TGM program, are competitive and could affect when an update takes place. Other communities may be
able to self-fund a TSP update, providing more flexibility for timing.
How long will a TSP update take?
Completing all elements of a TSP typically takes 18 to 36 months. Scope, complexity, staff availability, community
interest, budget, and the number of agency participants can influence the timeline.
What might trigger an update?
Population growth and changes to land use patterns, such as:
Significant actual or anticipated population growth
Urban Growth Boundary (UGB) expansions and annexations
Adoption of a Climate Friendly Area (CFA) for jurisdictions within a metropolitan
area
Zoning changes, particularly those that increase residential density or that mix
uses
Updated planning documents (i.e., Buildable Lands Inventory, Housing Needs
Analysis, Economic Opportunities Assessment)
Changed community priorities, such as:
Planned employment or residential development that requires new
transportation infrastructure
Increased housing diversity and complete neighborhoods policies
Climate Action Plans that call for a reduction in vehicle miles traveled (VMT)
Planning for evacuation and supply routes as part of emergency preparedness
Community interest in enhancing active transportation modes
New funding sources (i.e., state or federal grants that require an adopted plan
for eligibility)
New infrastructure that is needed to comply with an Americans with
Disabilities Act Transition Plan
For metropolitan areas, plans to add new or expanded road facilities as
defined in OAR 660-012-0830
17
Total Page Number: 38
The current TSP document no longer addresses the existing or future transportation
needs/vision/standards of the local jurisdiction, such as:
Need for new transportation projects based on infill redevelopment or UGB
expansions
Need to update a Capital Improvement Program
Plan amendments or zone changes
Specific modal elements that need inclusion or updating (i.e., transit plan)
Roadway functional classifications that are inconsistent between local and
state jurisdictions
Completion of most projects in the TSP
A TSP planning horizon of less than 15 years from the current date
The current TSP is inconsistent with other local plans or policies, such as:
Updated comprehensive plan elements, including a Housing Capacity Analysis
A new or updated transit development plan
Updated system development charges/transportation impact fees
Periodic review (regularly scheduled updates to major planning documents;
see the next section, “When Is a TSP Update Required?” for more on periodic
reviews
An expansion of the UGB
Annexation of land into a jurisdiction
An Urban Reserves designation
Planning for the location or relocation of a major transportation facility
A new or relocated employment center
Transportation refinement plans (adopted by resolution or legislatively
adopted by reference into the TSP)
Planning for major improvements on the state system (e.g., freeway
interchanges or new bypasses)
Plans related to access to and connectivity with other transportation modes
(e.g., air, rail, transit, or freight)
The current TSP is inconsistent with state or regional plans or policies. Examples
include:
For jurisdictions within metropolitan areas or amendments to the area’s
Regional Transportation Plan
For jurisdictions within metropolitan areas, compliance with 2022
amendments to the TPR intended to reduce greenhouse gas emissions,
address equity for historically underserved populations, or conduct an
equitable engagement process
Changes to state policy or requirements in the Oregon Transportation Plan or
the associated mode and topic plans
18
Total Page Number: 39
Proposed major projects that require exceptions to Oregon'sStatewide
Planning Goal (e.g., Goal 3, Agricultural Lands)
When is a TSP update required?
Within metropolitan areas, the TPR outlines two types of TSP updates: major and minor (see OAR 660-012-0105). A
major update is one that changes the horizon year of the plan or adds a project that requires enhanced review under
OAR 660-012-0830 because it adds significant capacity, such as a road widening larger than a three-lane arterial. A
major update triggers a complete review of all parts of the TSP, including compliance with the new CFEC program.
A minor update is any other change to a TSP that does not change the horizon year and can be limited in its
approach, such as a refinement plan.
An update is required under the TPR in the following cases:
Periodic Review
Cities with a population of more than 25,000 in a metropolitan area are encouraged to review and update major
planning documents, including the TSP, every seven years. Cities with a population of more than 10,000 and located
outside a metropolitan area are encouraged to review documents every 10 years. The periodic review process is
based on an evaluation and work program developed with the assistance of DLCD. Periodic review type updates are
typically major updates because they almost always change the horizon year of the plan.
While the process of completing a task on the work program varies based on the needs and practices of the
jurisdictions and the nature of the task, the local process for developing a TSP is essentially the same as it would be
for a plan amendment outside of a periodic review. The notice requirements, however, are different.
Periodic review requirements are established in ORS 197.628 to 197.650 and are interpreted and supplemented by
OAR 660-0025.
Plan and Land Use Regulation Amendment
A plan or land use regulation amendment that would substantially affect one or more transportation facilities may
trigger the need to update a TSP. This includes actions such as rezoning an area to land uses that could increase or
change transportation needs that are inconsistent with the comprehensive plan or adding to the UGB outside of a
periodic review. This may be either a major or minor update, depending on the extent of the change.
The TPR requires local jurisdictions to evaluate proposed plan amendments for consistency with adopted land use
and transportation plans. This part of the TPR, as discussed in OAR 660-012-0060, is designed to address several
important objectives:
Ensure that local governments consider the transportation impacts of changes to land use
Keep land use and transportation plans in balance with one another by ensuring that the planned
transportation system is adequate to support the planned land use
Address how needed transportation improvements will be funded
Accommodate new development in a way that minimizes traffic impacts
19
Total Page Number: 40
OAR 660-012-0060 specifies a category of facilities, improvements, and services that can be assumed to be in
place or committed and available to provide transportation capacity over a 20-year planning horizon. The TPR guides
local jurisdictions in determining what transportation improvements are reasonably likely to be provided by the end
of the planning period when considering amendments to local plans and land use regulations. Multimodal Mixed
Use Areas (MMAs) and CFAs are exempt from the requirements of OAR 660-012-0060 per OAR 660-012-0325
(Transportation Review in Climate Friendly Areas).
Special Rules for Metro
The TPR has a special section for rules that apply only to (see OAR 660-012-0140). Metro must develop a Regional
Transportation Plan (RTP) in coordination with the regional transportation plan required by federal law for
metropolitan areas. Cities and counties within Metro must amend their plans to be consistent with the Metro RTP as
implemented through the Functional Plan and may set their horizon year to match the horizon year of the adopted
RTP. Metro has some flexibility built into the TPR to propose alternative requirements to those in the Rule, as well as
the authority to impose additional requirements for transportation system planning within Metro cities and counties.
Any additional or alternative requirements must be approved by the Oregon Land Conservation and Development
Commission (LCDC).
Transportation Planning Rule Citations
Oregon Statewide Planning Goal 12, Transportation, defines the state’s policies on transportation. OAR 660 Division
12, also known as the Transportation Planning Rules (TPR), implements Goal 12. The TPR requires that:
Most jurisdictions prepare and adopt a regional or local transportation plan that serves as the transportation
element of a comprehensive plan (see OAR 660-012-0015 for non-metropolitan areas and OAR 660-012-
0100 for metropolitan areas).
Local TSPs are consistent with RTPs. Where elements of the RTP have not been adopted, coordination is
needed between the city/county and the regional transportation planning agency when preparing the local
TSP (see OAR 660-012-0015).
20
Total Page Number: 41
Total Page Number: 42
_________________________________
Total Page Number: 43
Total Page Number: 44
Total Page Number: 45
Total Page Number: 46
Total Page Number: 47