1.0)Supplying a 6"Flange Converter and Filler Flange(Submitted as COR 008): The existing 16"x
6"tee that will be reused has a 150 lbs. 6"flange. The new fittings that are supposed to attach to the
tee have 250 lbs. flanges. A flange converter is needed to make the connection. Additionally,to
compensate for the thickness of the new flange converter,a 2"filler flange is needed on the other side.
Change Order Item Prices: Note: Prices shown in black are additional compensation amounts to the
Contractor. Prices shown in parentheses and red text are the credit amounts to the City.
1.0 Supplying a 6"Flange Converter and Filler Flange.......................................................................$3,773.00
Total Additional Compensation.........................................................................................................$3,773.00
GENERAL INFORMATION
Previous Change Orders:
• Change Order 001: Canceled— Consisted of the relocation of the backup power generator for the
Ashland Booster Pump Station and all associated work required to complete the relocation. This
change order is no longer being pursued and CO 005 supersedes it.
• Change Order 002: Executed — Consists of the replacement of two buried 16" isolation valves
located on the suction and discharge lines leading to and from the Ashland Booster Pump Station.
The existing valves do not seal completely. The change order called for the existing gate valves to
be replaced with 16"plug valves. This change order has been executed but has not been constructed.
• Change Order 003: Executed— Consists of the substitution of the two plug valves from Change
Order 002 with two gate valves at the Ashland Booster Pump Station site.Additionally,this change
order consists of the replacement of domestic water plumbing at the Talent Booster Pump Station.
Finally,this change order also consists of the relocation of electrical equipment at the Talent Booster
Pump Station.
• Change Order 004: Executed—While conducting work to replace the two 16-inch isolation valves
as part of previous change orders, one of the existing 16-inch 45-degree bends was replaced. This
change order only encompassed labor since the City of Ashland provided all the necessary materials.
• Change Order 005: In Progress— Consists of the removal of the Ashland Booster Pump Station
generator and enclosure from the project.
By signing this form,the Owner and the Contractor agree to release all claims to additional work or credit or delays,
occurring prior to the Date of Issuance,which have not been identified in this Change Order form.
03/04/26 4:39 PM J:\Data\COA\23-0037\60 SDC\Change Orders\CO 006-Flange Converter at Ashland BPS\Change Order 006-Flange Converter at Ashland BPS.doex
�cJF'Lli ,
RH2 �l, LA G�°E pR0, t
flSHLAND
CONTRACT PRICE ADJUSTMENT
Original Contract Price:............. ................... ................ ...............................................................$1,861,800.00
Total of Previous Completed Change Orders: ....................................................................................$65,296.00
Total This Change Order:................................ ........................................................................ ............$3,773.00
Total Adjusted Contract Amount: ....................................................................................—...........$1,930,869.00
RECOMMENDED: APPROVED: APPROVED:
BY y — Lv��� By --- By
Engineer Contractor Owner
By signing this form,the Owner and the Contractor agree to release all claims to additional work or credit or delays,
occurring prior to the Date of Issuance,which have not been identified in this Change Order form.
03/04/26 4:39 PM J:\Data\COA\23-0037\60 SDC\Change Orders\CO 006-Flange Converter at Ashland BPS\Change Order 006-Flange Converter at Ashland BPS.docx
4
BUILDERS
195 Pine St. NE, Salem, OR 97301 — Phone 503.363.0202 — Fax 503.371.5337
DATE: 3/4/2026
TO: Derek HuizingaBell
City of Ashland Public Works
51 Winburn, Ashland, OR 97520
SUBJECT: TAP— COR 008 Flange Converter for Ex. Tee at Ashland BPS
Derek,
Please see the attached change order for supplying a 6" flange converter 250#/125#for
the existing 16"x6" tee we are to reuse. The existing tee has a 150#flange and the new
fittings we ordered as called out in the plans have 250# flanges. Because we are
installing the flange converter between the tee and the 90 elbow we will need to add a 2"
filler flange at the 12"x6" tee on the other side to keep them in line.
Respectfully,
Jesse Thrasher
Project Manager
Pagel
§
}
§/
E/
\/
<@
/g
w _ /\
° ] k /0
§ m8CL U) m
E k\/ /\
\ kkk / 0
mmm o
HI
\ \ N
a
�
■
E
E
/
\
/ ^ �
LCD
k § \2 00
2 \ ® 0
■ § u
E< 3
� ® }
0
2 / u
O ) z
■ $ ® i
�) ® C)
/ § Z } k 0
U 0 & / = 7 /
§ E
\ 5 \ } §
= g E = R
q 2 S /
o § 0 � /
o Q _ Q
\ } - \E e) \
§ ]
Oo E- e
Uj LO ]\/ �\ / 0 0
J
�0
O~
C
cr
cr
0)
7
0) 3
W
(6
O
H
O O O 0
Q O O N V
H N N LO U)
0
H
C 0000 COS 0
0 0 r- r p
N
Y m �
>O
> 00 O I�
-O 0) 001-0N
E r r
O
O N 00 O
d
w 3 N N V
O
U
C
J N
U
0
Ln O Ln
O V V 00
000
O CO LO
� N
00
00 O O �p
Q' 0
O
U mMo
0)U (6
(6 O
H
0) Ln O
U (`')LO
d U LO
w N
O j
0)
t t t t t t
(n Q t t t t t C t t
}UU(n
E E E E E E J w U J J J E E E E E° E E N
0)
t O
Y 2-
j N
N 0) >
E U
L
w
c-
0 (6(V
U c LL
a� m 4t
C O O c _ 0
O 7 (6 N LL ~
U rwaU�a �ID
0 �NM V Ln COI-OD 00�NM V Ln C2 r 0000N NN N N NNN
Z
J
-0
O~
U
C
N _
Q
a
W
E
3
J
0
C
N
U
j� C
0 m
—Q'
0
m
Q
N
7
O
t
C
(6
(6
(6
O
N
O
7 _
S C
M�
J
O
C1
M
J
N
N
t
Y
>O
N
(6
.N
W
C
0 p Y O
U0 Q
00 8
N 0 0
� U
O —
U
N
Z �NM VIn CO I�OD OO�NM VIn CO I�OOO ON N NN
Bid No: E622818 Page 1 of 1
H.D. FOWLER
COMPANY
Customer: DSL BUILDERS LLC Estimate: E622818
Estimator: Matt Frodge Bid Date: 3/6/2026
Job Name: TAP-CHANGES
Location: ASHLAND, OREGON
Line Qty UoM Description Unit Price Extended Price
1 1 EA 6" FILLER FLANGE 2"#150 BCL(D) 1,545.00 1,545.00
5 1 EA 6"250#/125#FLANGE CONVERTER W/ACCESSORIES#840-160ACC 643.53 643.53
Approximate Total SAI JL40