HomeMy WebLinkAbout1999-157 Contract - VersatileCITY OF ASHLAND
CONTRACT FOR PUBLIC WORKS CONSTRUCTION
Contract made this ?-7 J,~ day of/::),~YZ , / ~2,¢ , between the City of
Ashland, ("City") and CPf-;,'_-~-/Z/'/,,, 7_7_~,gx'f~ "(Contractor").
City and Contractor agree:
1. Contract Documents: This contract is made as a result of an Advertisement
for Bid issued by City for the Oak Street Traffic Calming & Sidewalk Construction
Project No. 99-11. Contractor was awarded the bid as the lowest responsible bidder.
In the event of any inconsistencies in the terms of this contract, the contract documents
defined in the Advertisement for Bid and Contractor's bid, this contract shall take
precedence over the contract documents which shall take precedence over the bid.
2. Scope: Contractor shall begin and complete the project described in the
contract documents within the time prescribed in the contract documents. The following
exceptions, alterations, or modifications to the contract documents are incorporated into
this contract:
3. Price & Payment: City shall pay Contractor amounts earned under the
contract. All payments will be made at the times and in the manner provided in the
contract documents.
4. Bond: Contractor shall, within five days after execution of the contract and prior
the faithful performance of this contract upon the pa~ of the Cont;actor.
5. Default:
A default shall occur under any of the following circumstances:
5.1 If the Contractor fails to begin the work under contract within the time
specified, or fails to perform the work with sufficient workers or equipment or with
sufficient materials to insure the prompt completion of the project, or shall neglect or
refuse to remove materials or perform anew such work as shall be rejected as
defective or unsuitable, or shall discontinue the prosecution of the work.
5.2 If the Contractor shall become insolvent or declared bankrupt, or commit any act
of bankruptcy or insolvency, or allow any final judgment to stand against the
Contractor unsatisfied for a period of forty-eight (48) hours, or shall make an
assignment for the benefit of creditors.
5.3From any other cause whatsoever, shall not carry on the work in an acceptable
manner.
6. Remedies: In addition to the rights and remedies to which the City may be
entitled by law for the enforcement of its rights under this contract, City shall have full
power and authority, without violating this contract, to take prosecution of the work from
the Contractor, and appropriate or use any or all of the materials and equipment on the
ground that may be suitable and acceptable and may cause a contract for the
completion of this contract according to its terms and provisions, or use such methods
as required for the completion of the contract, in any acceptable manner. All costs and
charges incurred by the City together with the costs of completing the work under the
contract, shall be deducted from any money due or which shall become due the
Contractor. In case the expense so incurred by the City shall be less than the sum
which would have been payable under the contract if it had been completed by the
Contractor, then the Contractor shall be entitled to received the difference less any
damages for delay to which the City may be entitled. In case such expense shall
exceed the sum which would have been payable under the contract, the Contractor and
the surety shall be liable and agree to and shall pay the City the amount of the excess
with damages for delay of performance, if any.
Prevailing Wage Rates: The Contractor shall pay a fee equal to one-
tenth of one percent (0.1 percent) of price of this Contract. The fee shall
be paid on or before the first progress payment or 60 days from the date
work first begins on the Contract, whichever comes first. The fee is
payable to the Bureau of Labor & Industries and shall be mailed or
otherwise delivered to the Bureau at the following address:
Bureau of Labor & Industries
Wage & Hour Division
Prevailing Wage Unit
800 N.E. Oregon Street #32
Portland OR 97232
The Contractor shall fully comply with the provisions of ORS 279.348 through
279.365 pertaining to prevailing wage rates.
CONTRACTOR
CITY OF ASHLAND
Mike Freeman
City Administrator
By:
Its:
BRyE:VIEi~ED~
City Attorney Date:
Coding:
(For City use only)
PERFORMANCE & PAYMENT BOND seND#: Z~E 6 ~ 41001
The undersigned VERSATILE CONCRETE CONSTRUCTION, INC.
, as principal, further referred to in this bond aS' ContraCtor, and GULF INSURANCE CC:X~AN'Z
, as surety, further referred to In this bond as Surety, are jointly and severaiiy
bound unto City of Ashland, as obligee, further referred to in this bond as City, in the
SUITI Of ONE htTNDRgD FIFEY-SgVgN 'I~{OUSAND K)LTR HUI',DRED FIFI~BEN AND 17ORgY-FIVE/100 DOLLARS
($157,415.45)
Contractor and City have entered into a written contract dated , for
the following project: OA~ STREST TRAFFIC CLANING AND SID:EWALK CONSTRUCTION PROJECT
NO. 99-~1ThiS contract is further referred to in this bond as the Contract and is
incorporated into this bond by this reference.
The conditions of this bond are:
!f Contractor faithfully performs the Contract within the time prescribed by
the Contract, and promptly makes payment to all claimants, as defined in
ORS 279.526 through 279.542, then this obligation is null and void;
otherwise it shall remain In full force and effect.
If Contractor is declared by CIty to be in default under the Contract, the
Surety shall promptly remedy the default, perform all of Contractor's
obligations under the contract in accordance with its terms and conditions
and pay to City all damages that are due under the Contract.
This bond is subject to claims under ORS 279.526 through 279.542.
This obligation jointly and severally binds Contractor and Surety and their
respective heirs, executors, administrators, successors.
Surety waives notice of modification of the Contract or extension of the
Contract time. **
Nonpayment of the bond premium shall not invalidate this bond.
**PROVIDED THAT ANY MODIFICATION OR CHANGE
TEN PERCENT (10%) OF THE ORIGINAL CONTRACT
SEEKING THE SURETY'S APPROVAL**
ORDER SHALL NOT EXCEED
PRICE WITHOUT FIRST
O:Dawn*d~nalneefiProjec"~99-11 Oak Street Traffic Calming and Sidewalk Construction,dec 14
The bond number and the name. address, and telephone number of the
agent authorized to receive notices concerning this bond are as follows.
Bond Number: AE 6141001
Bond Agent: SKINNER BONDING OF OREGON, INC....
Address: 0123 S.W. HAMILTON
Telephone:
SIGNED this
WITNESS:
(Corporate Seal)
WITNESS:
(Corporate Seal)
PORTLAND, OR 97201
('503) 226-6444
24TH day of AUGUST ....
Contractor: VERSATILE CONCRETE CONSTRUCTION, INC.
Legal Address: ~lb(~, <j, PbtooL,'~,/'/~-,1
Attest::~~u-z-,~. ~
rpor~ie Secre~ry '
· K R I~H E~ H AN'
Title/TTORNEY..- IN- FACT .......
Legal Address:
0123 S .W. HAMILTON
PORTLAND, OR 97201
Attest:
CorpOrate Secretary
G:Dawn~,Englneer~ProJect,\98-11 Oak Street Traffic Calming and Sidewalk Construction,doe ; 5
GUL,-*: INSURANCE COMPANY
ST'. LOUIS, MISSOURI
)",.VI::R ~)1; :\TTORNI,~'~
61410[)1
NUMBEEF~ AE
':'H',:',~C'~;,:~
VERSATTLE CONCRETE CONSTRUCTION
2106 S. PACZFTC
TALENT, OR 9 ? 540
BOF'JD AMOUN"~
INC.
.... Kristy Sheehan, Mary-Anne Skinner
OF PORTLAND, OREGON
i,ol!d~ Lithi 'littk'l:jk;,l~% ,q tilL't> -jlliI. Ha,J, "j"',i i ,:it' hl,!H:d~' (
_
',%
~ "~ .', , 'i" '
....
,
1996 ~.J).. Jlt'l'm!l'i' flit' t'alll[, ('JlriMmml)hcr I %%;iJ~il!!, klln%~li h, 1111" [xY~m;imajj} '.~hd hi'Illk Ii~ fl,l' dtiJ~ ~,~1'1t. {li~ (J(.[)l,%,, as,l -,
oj' ~%t'MchcMel% Ntatc ill' Nc'~ York: Ih;ll Ill i~ lhc Pm'rsidt'nl
illNtl'tllllt'lll; thai Jli' kll(l~s% ihe ~ea[ 14' ~ai(] cnrpin'ali4nl; thal tht.
lhc B4mard .f I)ircctor~ Ill' ~;li(l c.rpnr;Hion and dI;ll he q~.cd hi,
/
k ' Ll
',.,,.d n 24TH t,,~ .i AUGUST
99
CITY
OF
ASHLAND
LEGON
AS/,f
'..
CITY HALL
ASHLAND, OREGON 97520
NOTICE OF TRANSMITTAL
TO:
BARBARA CHRISTENSEN
KATHY GRIFFIN
KARI OLSON
DATE:
PROJECT:
JOB NO.:
SUBJECT:
9/9/99
OAK STREET TRAFFIC CALMING
99-11
CONTRACT DOCUMENTS
THE FOLLOWING ITEMS ARE BEING SENT TO YOU:
Kathy Griffin- Original insurance certificates, copy of contract and bond.
Barbara Christensen - Original contract and bond.
Kari Olson - Copy of requisition, copy of contract.
ENCLOSED ~/
UNDER SEPARATE COVER
REMARKS:
COPIES TO:
Paula Brown
Department of Public Works
Engineering Department
By: Jim Olson
Title: Engineering Services Manager
G:Dawn\Engineer\Project\99-11 Contract Distribution Memo.doc