HomeMy WebLinkAbout1999-173 Contract - H&R Eng ITY OF ASHLAND PERSONAL SERVICES CONTRACT FOR SERVICES LESS THAN 915,000
CITY OF ASHLAND, (CITY)
Public Works Department
20 E. Main Street, Ashland, OR 97520
(541) 488-5587 FAX: (541) 488-6006
AGREEMENT DATE: April 12,
1999
CONSULTANT: ELWIN A. ROSS, H&R ENGINEERING, INC,
Address: 2340 NW 15TM STREET
REDMOND, OR 97756-1017
Telephone: (541) 923-7639 Fax: (541) 923-7639
¶3. BEGINNING DATE:
April 12, 1999
¶4. COMPENSATION: Not to exceed $3500 ¶3. COMPLETION DATE: ~'Y,~IF30, 1999 /~
¶ 1. SERVICES TO BE PROVIDED: Value Engineering - Biosolids and Effluent Recycling Project (Team Member)
ADDITIONAL TERMS: See Project Description and Scope of Services attached. Errors and omissions insurance not required.
CITY AND CONSULTANT AGREE:
1. All Costs by Consultant: Consultant shall, at its own risk and expense, perform the personal services described above and, unless
otherwise specified, furnish all labor, equipment and materials required for the proper performance of such service.
2. Qualified Work: Consultant has represented, and by entering into this contract now represents, that all personnel assigned to the work
required under this contract are fully qualified to perform the service to which they will be assigned in a skilled and workerlike manner and, if
required to be registered, licensed or bonded by the State of Oregon, are so registered, licensed and bonded. Consultant shall also procure
and maintain a current City of Ashland business license.
3. Completion Date: Consultant shall start performing the service under this contract by the date indicated above and complete the service by
the completion date indicated above.
4. C_o~rnpensation: City shall pay Consultant for service performed, including costs and expenses, the sum of specified above. Once work
commences, invoices shall be prepared and submitted by the tenth of the month for work completed in the prior month. Payments shall be
made within 30 days of the date of the invoice. Should the contract be prematurely terminated payments will be made for work completed and
accepted to date of termination.
5. Ownership of Documents: All documents prepared by Consultant pursuant to this contract shall be the property of City.
6. Statutory Requirements: ORS 279.312,279.314, 279,316 and 279.320 are made part of this contract.
7. Indemnification: Consultant agrees to defend, indemnify and save City, its officers, employees and agents harmless from any and all losses,
claims, actions, costs, expenses, judgments, subrogations, or other damages resulting from injury to any person (including injury resulting in
deathj or damage (including loss or destruction) to property, of whatsoever nature arising out of or incident to the performance of this
contract by Consultant (including but not limited to, Consultant's employees, agents, and others designated by Consultant to perform work or
services attendant to this contract.) Consultant shall not be held responsible for any losses, expenses, claims, subrogations, actions, costs,
judgments, or other damages, directly, solely, and approximately caused by the negligence of City.
8. Termination: This contract may be terminated by City by giving ten days written notice to Consultant and may be terminated by
Consultant should City fail substantially to perform its obligations through no fault of Consultant.
9. Independent Contractor Status: Consultant is an independent contractor and not an employee of the City. Consultant shall have the
complete responsibility for the performance of this contract. Consultant shall provide workers' compensation coverage as required in ORS Ch
656 for all persons employed to perform work pursuant to this contract and prior to commencing any work, Consultant shall provide City with
adequate proof of workers' compensation coverage. Consultant is a subject employer that will comply with ORS 656.017.
10. Insurance: Consultant shall, at its own expense, at all times during the term of this agreement, maintain in force a comprehensive general
liability policy including coverage for contractual liability for obligations assumed under this Contract, blanket contractual liability, professional
errors and omissions, products and completed operations and comprehensive automobile liability including owned and non-owned automobiles.
The hability under each policy shall be a minimum of $500,000 per occurrence (combined single limit for bodily injury and property damage
claims} or $500,000 per occurrence for bodily injury and $100,000 per occurrence for property damage. Liability coverage shall be provided
on an "occurrence" not "claims" basis. The City of Ashland, its officers, employees and agents shall be named as additional insureds.
Certificates of insurance acceptable to the City shall be filed with City's Risk Manager prior to the commencement of any services by
Consultant under this agreement. These certificates shall contain provision that coverages afforded under the policies can not be canceled and
restrictive modifications cannot be made until at least 30 days prior written notice has been given to City. A certificate which states merely
that the issuing company "will endeavor to mail" written notice is unacceptable.
11. Assignment and Subcontracts: Consultant shall not assign this contract or subcontract any portion of the work without the written
consent of City. Any attempted assignment or subcontract without written consent of City shall be void. Consultant shall be fully responsible
for the acts or omissions of any assigns or subcontractors and of all persons employed by them, and the approval by City of any assignment
or subcontract shall not create any contractual relation between the assignee or subcontractor and City.
CONSULTANT:
Fed. ID
CITY OF ASHLAND:
CONTENT REVIEW:~~'f2~ (City Dept. Head)
FORM REVIEW.' ~ (City Attorney) Date.'
Coding: ~ 2'~ . ~'1. 7o4,0~
(for City purposes only)
CITY OF ASHLAND PERSONAL SERVICES CONTRACT < ~ 15,000 (p:formsla-shrtps. fk)(rev'd 7/93)
City of Ashland
Biogolids Utilization & Effluent Recycling Project
Value Engineering (VE)
Background
The City of Ashland is designing and constructing improvements to its Wastewater Treatment Facilities. The City is
receiving Department of Environmental Quality (DEQ) funds from the Clean Water State Revolving Fund loan program.
A Value Engineering (VE) review is a required part of the CWSRF program.
The WWTP facilities improvements are being completed in two phases; on-site process improvements, and the off-site
spray irrigation and biosolids reuse program. This VE review is for the off-site reuse program components only. The on-
site process improvements are in construction and not included as a part of this VE.
Scope of Services
The City intends to complete it's VE analysis within an intense three day (maximum) period to be held in a conference
room at the Windmill Inn in Ashland. An additional week is added to the end of the time period to ~nalize the report
and submit it to the City. As the City is moving quickly to completion and would like to finalize this analysis, the date of
the VE analysis has been set for April 19-21, 1999. There are five elements to the VE review:
Review Existing Information
The drawings and specifications, the geotechnical report, the Facilities Plan, the NPDES permit and other documents will
be provided to the Value Engineering (VE) team members at least two days prior to the VE Kickoff. Workshop. (4 hours
each team member prior to the workshop)
VE Workshop Kick-off Meeting
Attend three hour workshop. The City's design engineer (Carollo Engineers) will present the project to the VE team
members. During the workshop the VE team will be given opportunity to ask questions of the design engineer and the
City. (4 hours each team member)
VE Team Work Session
The VE team member' s will meet immediately after the kick-off meeting, in a one and one-half day (maximum) work
session to brainstorm potential cost saving measures for the effluent application and biosolids recycling project, establish
potential cost savings, and establish a list of priority recommendations that the design engineer and the City should
further evaluate for incorporation into the project. (12 hours each team member)
VE Team Evaluation
The VE Team will conclude the work session with an evaluation presented to the City and the design engineer. All
reasonable cost savings measures discussed during the work session will be verbally reported to the City and design
engineer. The issues in the evaluation will become part of the final report. (4 hours each team member)
Prepare and Submit VE Report
Prepare VE Report (up to 16 hours for team leader/preparer, and an additional 2 hours for remaining team members for
review).
The
VE Report will:
document and summarize the VE process,
present a listing of all potential cost saving measures that were considered by the VE team,
provide a listing of cost saving measures in three categories - 1 ) those that were considered and rejected, 2) those
that were considered but would only have a small impact on overall project cost, and 3) those that have potential to
reduce project cost and should be further evaluated by thedesign engineer and the City. The listings should include
potential cost saving and justification or rationale for inclusion of potential cost saving measure in each category.
One copy of the VE Report shall be submitted to the City within one week of the VE Workshop.