CHAPTER IX
PUBLIC SERVICES
CHAPTER IX
PUBLIC SERVICES
The permanence and stability of urban areas
are greatly affected by the quality and ex-
tent of public services, improvements and con-
veniences. Usually a full range of services
is eventually required for an area, even if
the need is not immediately pressing.
Traditional public services are water, sewer,
police, fire, electricity, street lighting,
cable television, and others may also be pro-
vided.
The cost of services has been increasing at
a rate equal to or higher than general infla-
tion figures. Costs are of special concern
when continued growth requires new capital
expenditures, such as enlarging the sewer
treatment plant. Formulas have been devel-
oped which attempt to relate the increase in
population to the expected increase and cost
in services and facilities.
One method of keeping costs down is central-
ized developments, which reduce the amount
of facilities and travel. Where services are
available, but no development occurs (as in
vacant lots), a public investment is being
under-utilized. Another way to lower costs
is to have all services provided simultaneous-
ly, through coordination 'between the agencies
and departments providing these services.
One method of removing some cost burdens
from current City residents is to have new
developments pay for the extension and pro-
IX-1
vision of their services.
Public services, especially those using poles
and above-ground facilities, affect the ap-
pearance of an area. Placement underground
represents a higher initial cost, but usually
lower maintenance costs. Some public ser-
vices will require sites within a neighbor-
hood (e.g., an electrical substation or fire
station).
ASSUMPTIONS:
Residents will continue to demand services
similar to those they receive now, while the
scarcity and cost of materials, labor, and
resources will force re-evaluation of tradi-
tional methods of providing service.
There will be increased secondary costs
(transportation, energy, etc.) in developing
peripheral areas.
Services have a major impact on urban de-
sign and on the effect of urbanization on the
environment.
GOAL:
PROVIDE PUBLIC UTILITIES, SER-
VICES AND FACILITIES IN AN ORDER-
LY, EFFICIENT AND ENVIRONMENTALLY
SENSITIVE WAY AND IN SUFFICIENT
QUANTITY TO MEET CITY NEEDS NOW
AND IN THE FUTURE.
POLICIES:
1) Provide urban areas with the level of
services appropriate to'the density of set-
tlement and resultant service demand.
IX-2
2) Provide services in a timely, coordinated
and orderly manner that minimizes costs
and inconvenience, and prevents prema-
ture, incomplete development.
3)
Prevent urban sprawl and "leap-frogging"
by providing full services in a staged
manner: first to areas within the City
limits, then to the area within the Urban
Growth Boundary.
~)
Encourage the underground placement of
utility lines, with any above-ground
facilities designed to fit the landscape.
5)
Encourage early planning and acquisition
of sites for needed public facilities
(e. g., fire stations, schools, roads,
parks, etc.).
6)
In conjunction with studies of housing,
land use, downtown policies, etc., identi-
fy and implement innovative service tech-
niques in anticipation of major trends,
needs, and economic or environmental
changes, rather than waiting to react
when all options are closed.
7)
Use Capital Improvement Planning to en-
sure that long-term public facility plan-
ning be as cost-effective as possible.
8) Consider system development charges to
fund large capital costs caused by
growth.
SANITARY SEWER SYSTEM
The Ashland sewer system contains approxi-
mately t20,000 lineal feet of concrete and
clay pipe of which the majority is 6 inches
in diameter. The largest size is 18 inches.
Sewers were first constructed in the City in
1906, and, until 19il, they 'were generally
made of clay. After 19tl, concrete pipe was
used. There are no combined storm water
and sanitary sewers in the City system. The
system serves approximately 3200 of the 3800
acres within the present City boundary. Be-
cause of the generally steep slopes and rela-
tively minor infiltration, the system has
capacity for additional flow from areas that
are yet to be developed.
New development is predominantly on the
southeastern side of the City. It can be as-
sumed that the bulk of additional sewage
flow in the near future will be generated
from this area. As more southeastern area
sewers are constructed, the increased flow
will begin to tax the capacity of the mains
on $iskiyou Boulevard, Wightman Street and
Morton Street. These sewers are the main
conduits transporting sewage to the collecting
trunks (i.e., Bear Creek Trunk, Ashland
Creek Trunk, "A" Street Trunk, etc., located
on the northern side of town). The trunks,
in turn, convey the sewage to the treatment
plant. These bottlenecks will have to be
corrected in the future.
The recently remodeled sewage treatment
plant should accommodate additional popula-
tion growth beyond the year 2000. The de-
sign capacity of the plant is 3.1 million gal-
lons per day, or a population equivalent of
40,600, which still leaves an adequate mar-
gin for industrial use. Presently, the
plant's average daily flow is 1.4 mgd.
ASSUMPT IONS:
There will be higher standards for effluents,
eventually requiring tertiary treatment facili-
ties.
Individual treatment facilities will be im-
proved, but still will not be as reliable as
municipal systems.
GOAL:
PROVIDE SANITARY SEWERS THAT MEET
ENVIRONMENTAL STANDARDS FOR ALL
AREAS WITHIN THE CITY LIMITS.
POLICIES:
9) Encourage early planning for new sewage
treatment facilities, outlining site re-
quirements, use of sewage treatment by-
products, costs and financing.
10) Where feasible, require all development
within the City to use Ashland treatment
facilities.
11) Encourage productive use of sewage treat-
ment by-products.
12) Consider the modification of the City's
sewage treatment facility to a tertiary
treatment facility as part of the City's
overall Capital Improvement Plan.
13) Require annexation or contract annexation
in order to receive sewer service in unin-
corporated areas.
IX-3
lg) Size future sanitary sewers to provide for
projected growth within the Urban Growth
Boundary, based upon the City's Compre-
hensive Plan, and for anticipated future
growth for the life of the facility.
WATER SUPPLY AND SERVICE
The City of Ashland owns and operates its
own water supply and distribution system.
The City's domestic water is primarily ob-
tained from Ashland Creek, although in re-
cent years provisions have been made to
treat irrigation water from the Talent Irriga-
tion District (T ID ) for domestic purposes.
The City has acquired rights to 156g acre-
feet per year from the TID.
Reeder Reservoir, the primary storage facility
for the City's untreated water, is formed by
a dam across Ashland Creek. The reservoir
stores excess runoff for use during periods
of low streamflow and has a capacity of ap-
proximately 860 acre-feet. There are two
smaller covered reservoirs below it, Crowson
and Granite Street Reservoirs, which store
treated water.
In 1978, the City's water system supplied
water to 15,193 persons. The average daily
water production for 1978 was 3.0k million
gallons. The City has adequately provided
water for the population in past years, but
instances of conservation measures being im-
posed are becoming more frequent. In the
year 2000, the daily average of water re-
quired is estimated to be 4./~ million gal-
lons.1 For the City to provide adequate
l"City of Ashland Comppehensive Watep Plan," R.W. Beck and
Associates, Seattle, 1980, Table IV-3.
water for the expected population of the year
2000, improvements to the existing water sys-
tem will be necessary.
A detailed study of the Ashland water system
was prepared by R.W. Beck and Associates
and submitted to the City in September, 1980.
'rhe "City of Ashland Comprehensive Water
Plan" thoroughly studies the feasibility and
costs of improvements necessary for the
City's water system to meet the demands of
me year 2000.
According to the Comprehensive Water Plan,
the City will require /+973 acre-feet of water
in the year 2000. In a normal runoff year,
the present Ashland water system would fall
I/+0 acre-feet short of this supply require-
ment. During drought conditions, the system
would fall 13/+0 acre-feet short. Storage defi-
cits of this magnitude can be made up
through the use of TID water, but this would
deplete water available for irrigation pur-
poses within the City and conservation mea-
sures would have to be imposed. This shows
the need for larger water storage facilities.
The Soil Conservation Service concluded in
1959 that a 100-foot high earth-fill dam was
feasible at the Winburn site on the west fork
of Ashland Creek. The dam would form a
reservoir of approximately 5g acres, with a
capacity of about 1600 acre-feet. A dam 80
feet high at the same location would form a
reservoir of approximately 38 acres with a
capacity of about 850 acre-feet. The lower
dam would cost 25% less than the larger dam
but would supply little more than half the
capacity.2
Z Water Resources Management Plan and Facility Study, James
M. Montgomery, Consulting Engineers, Boise, lg77, pp. 7-2
to 7.5.
Increased water supply for the City could al-
so come from acquiring more water from the
Talent Irrigation 'District. The State of Ore-
gon plans to review the water rights associ-
ated with TID reservoirs and to perform a
proof survey of these rights. Once the
rights have been vested, the City can pos-
sibly purchase an additional 1500 acre-feet
per year, according to the TID.
The Comprehensive Water Plan also studied
the efficiency of the City's water distribution
system. It was found that this system is in
need of upgrading and improvement. At
present, 28% of the water released from the
water treatment plant is lost throughout the
distribution system. A normal system in
good condition can expect 10% system losses.
Overall, the City's water system is in need
of improvement to adequately supply the resi-
dents in the years to come. Improvements
will be costly and large capital expenditures
should be planned for as part of the City's
overall Capital Improvement Program.
ASSUMPTIONS:
The City will continue to utilize Ashland
Creek water, but will need alternative
sources to meet future water demands.
There will be continued pressure for more
residential development above the gravity-
flow system.
GOAL:
PROVIDE SUFFICIENT WATER SUPPLY
FOR ASHLAND RESIDENTS.
POLICIES:
15) The City should continue to acquire pri-
ority water rights on Ashland Creek as
they become available.
16) The City should attempt to purchase addi-
tional Talent Irrigation District water
from confirmed owners.
17)
The City should further study the con-
struction of a new impoundment on Ash-
land Creek at the Winburn site to aug-
ment the City's storage capacity in the
watershed.
18) The City should prioritize and implement
needed water system improvements, as
identified by the City Water Plan, as
part of the City's overall Capital Im-
provement Plan.
19) The City should develop water conserva-
tion measures which can be implemented
in critical water years.
20) The City should exert pressure on the
U.S. Forest Service to manage the water-
shed in ways which are compatible and
not detrimental to Ashland's future use
of the watershed as the City's water sup-
ply. Uses of the watershed which cause
increased sedimentation in Reeder Reser-
voir should be very strongly opposed by
the City.
21) Ensure that the City's efforts to remove
sediment from Reeder Reservoir have as
little harmful environmental impacts on
Ashland and Bear Creeks as possible.
(See Chapter IV, Water Resources.)
IX-5
ELECTRIC SERVICE
The City of Ashland owns and operates a
municipal electric system which served ap-
proximately 6700 customers in 1980. The sys-
tem includes a 12.f+7' kv ' ~witching station
and overhead and underground distribution
facilities. Power is presently bought from
Bonneville Power Administration ( BPA ) and
resold to Ashland residents.
The City's Electric System Study, completed
in 1976 by R.W. Beck & Associates, indicated
that peak demand has been increasing at an
average rate 'of $.6%, with energy consump-
tion increasing at an average rate of 5.3%.
This rate of growth is expected to d~minish
or reverse due to energy conservation. The
system's annual peak typically occurs during
December, January or February, with the mag-
nitude of the peak directly related to clima-
tological conditions. Changes in yearly
weather patterns have resulted in as much
as a 10% difference between successive an-
nual peaks.
The City's service area lies within the City
limits. PP&L service area surrounds the
City; however, in certain areas, due to lack
of PP&L distribution circuits in areas immedi-
ately outside the City limits of Ashland,
PP&L has constructed lines as extensions to
the City's lines to serve its customers. The
system provides excellent service to its cus-
tomers and has a very good operating
record.
(See XI, Energy.)
IX-6
STORM WATER DRAINAGE
The City of Ashland has an underground
storm water drainage system throughout most
of the City. There are no combined sanitary
sewer/storm water drainage facilities in the
City. All new developments which create new
roads are required to install storm water.
drainage facilities in conjunction with the
new roads. The City has no overall Master
Plan for storm water management at present,
so storm water drainage is dealt with on a
case-by-case basis by the City' s Public
Works Department.
GOAL:
TO PROVIDE AN ADEQUATE STORM
WATER DRAINAGE SYSTEM THROUGHOUT
THE ENTIRE CITY OF ASHLAND.
POLICIES:
22) The City should fund and develop an
overall storm water management plan for
the entire City.
23) Ensure that all new developments include
a drainage system which protects adjoin-
ing property as much as possible.
2~) Encourage drainage systems that utilize
natural drainageways and minimize the
amount and rate of surface runoff.
25) Consider necessary improvements to the
City's storm water system as part of the
City's overall Capital Improvement Plan.
26) In all new developments, discourage the
pumping of storm water drainage, includ-
ing the use of sump pumps.
SOLID WASTE
Solid waste disposal is a regional activity
which is regulated by Jackson County (which
has been working on a regional solid waste
plan) and the State of Oregon (which has es-
tablished environmental standards). The Ash-
land site for solid waste disposal meets or
exceeds regional and State guidelines.
The City of Ashland franchises the Ashland
Sanitary Service for waste collection. Solid
waste is disposed at a 120-acre site located
approximately five miles from the City center
on Valley View Road. The site consists of
clay and sandstone formations which help pro-
vide good surface runoff co.n,ditions. Two di-
version ditches surround the site.
In 1976; the Department of Environmental
quality (DEQ) issued a five-year perrail on
the solid waste site with the following condi-
tions: blowing paper be controlled; was~es
be compacted and covered daily; a caretaker
be on duty; fire prevention equipment be
available; and a suitable access road be pro-
vided. All of th~se conditions are being ful-
filled by the Sanitary Service.
The Sanitary Service attempts some resource
recovery operations, dependent on the market
value of those resources. Some local groups
have attempted resource recovery erierations,
but have been hampered by the geae,:al diffi-
culty of persuading residents to separate
waste and by the economic uncertainty of mar-
ketability.
ASSU~PT ION:
There will be increasing emphasis on recy-
cling and resource recovery as natural re-
sources are depleted, but there will continue
to be a need for landfill sites.
GOAL:
PROVIDE SYSTEMATIC CONTROL OF THE
SOLID WASTE PROCESS FROM COLLEC-
TION TO STORAGE, EMPHASIZING
EFFICIENCY, RESOURCE RECOVERY AND
ENVIRONMENTAL PROTECTION.
POLICIES:
27) Encourage opportunities for recycling and
resource recovery in all solid waste col-
lection programs.
28) Encourage high environmental and aes-
thetic standards in the collection, re-
source recovery and disposal of solid
waste.
29) The City shall coordinate with Jackson
County on the provision of solid waste
disposal sites to meet current and long-
range needs.
SCHOOLS
As in other communities, education programs
and the general educational level are valu-
able resources in Ashland. Educational
facilities such as playgrounds, gymnasiums,
and meeting rooms are important to the
schools, but can be an asset to the whole
community after school hours. Conversely,
the City of Ashland has some resources which
are useful to the School District. Southern
IX-7
Oregon State College, with its special offer-
ings and opportunities, is a very important
asset, as students and faculty contribute
their efforts to solving Ashland's problems.
The number of children in the Ashland School
System has not changed much despite in-
creases in general population. As has been
mentioned before, the demographics of in-mi-
grants may account for this trend. (See
Table IX-i, Ashland Public Schools Enroll-
ment. )
The location of the student population is
shifting toward the areas of newer construc-
tion southeast and northwest of the City cen-
ter. One result of this shift in student popu-
lation is that the schools located in these
areas have almost reached the limit of their
capacity. Table IX-2 indicates that Bellview
and Helman Schools are already at a critical
capacity level. (See Table IX-2, Ashland
Public Schools.)
The ability of the existing school sites to ac-
commodate additional enrollment should be
gauged by present State and local standards
for such educational facilities. For elemen-
tary schools, the, Oregon Stale. Board of Educa-
tion recommends five acres plus one addition-
al acre for each 100 students as a site stan-
dard. The Ashland School District uses a
standard for future elementary schools of a
maximum enrollment of about 500 students,
which indicates a site size of ten acres.
For junior high and high schools, the Oregon
State Board of Education recommends ten
acres plus one additional acre for each 100
students. The Ashland School District uses
a standard of 1000 student limit for junior
IX-8
TABLE IX-l'-~ Ashland Public Schools; Population - School Enrollmentx
General
Sept. Population Elementary
Junior High
Senior High
1970 12,342
1971 13,487
1972 13,980
1973 14,400
1974 14,500
1975 14.400
1976 14,500
1977 14,600
1978 14,700
1979 14,800
1980 14,9922
1,326
1 341
1 375
1 319
1 5011
1 543
1 489
1 550
1,495
1,469
1,494
Total
778 753 2,857
738 797 2,876
740 776 2,891
740 794 2,853
743 745 2.989
776 735 3,054
748 757 3,094
728 721 2,999
737 703 2,935
688 711 2,868
637 681 2812
1The increased enrollment in the elementary schools is due mostly to the addition of'the kindergarten program.
- 21980 U.S. Census preliminary Census counts.
TABLE IX-2 -- Ashland Public Schools - February, 1977.
Number of
School Classrooms Land Area
Building Capacity
Enrollment Capacity Remaining
Bellview 13 9 ac. 328 340 12
Briscoe 12 4 ac. 268 312 44
Helman 12 10 ac. 308 312 4
Lincoln 16 6 ac. 353 390 37
Walker 18 10 ac. 318 400 82
Semi-total 71 39 ac.
Jr. High 30 25 ac.
Sr. High 47 22 ac.
1,575 1,754 179
741 8OO 59
742 950 208
TOTAL 148 86 acres 3,058 3,504 446
I '
ASHLAND
OREGON
1
~
\
\
~-
PAR KS - - - - - II
SCHOOLS- - - - s::x
t::::
~'<
~-"
".,,( '''fill
~::Ll=LL__~
high schools and 1500 student limit' for lii~l&'
schools. This indicates a site size of 20
acres for junior high schools and 25 acres
plus for high schools.
Comparing the above school site standards to
anticipated and projected areas of student
population indicates expansion and possible
acquisition of several school sites will be
needed. In the immediate future, for ex-
ample, Bellview and Helman elementary
schools will need to add more classrooms or
significantly change district boundaries in
order to accommodate anticipated enrollment.
In new areas of development, existing schools
will not be able to absorb additional stu-
dents. Briscoe and Lincoln elementary
schools, for example, are already below the
recommended site standards. Thus, in order
to accommodate even a modest increase in stu-
dents over the next 23 years, expansion of
existing facilities and/or acquisition of new
school sites (especially elementary school
sites) in the urbanizable area may be neces-
sary. (See Map IX-l, Public Parks/Schools.)
ASSUMPTIONS:
There will be an increased demand for the
multiple use of school facilities.
Student population will continue shifting with
future annexations. Such shifting will neces-
sitate school district boundary changes.
Continued population growth will eventually
increase the student population, creating a
demand for additional school facilities in the
future.
IX-9
GOAL:
MAKE MAXIMUM EFFORT TOWARD
UTILIZATION OF PRESENT AND FUTURE
EDUCATIONAL AND RECREATIONAL
FACILITIES AND RESOURCES THROUGH
PUBLIC, PRIVATE AND CITY COOPERA-
TION.
POLICIES:
30) Encourage cooperation between the City
and School District when new school facili-
ties are considered or when City action
affects the School District.
31 ) Encourage early acquisition of school
sites of sufficient size for school/park
facilities.
32) Assess the impact of large-scale proposed
developments and their effect on the
schools which they impact.
POLICE SERVICE
The staff of the Ashland Police Department
consists of the Chief of Police, Lieutenant,
four Sergeants, three Corporals, two detec-
tives, ten Patrol Officers, six Clerk/Dispatch-
ers, and an Executive Secretary.
The Department operates four marked patrol
units and four unmarked units, and is res-
ponsible for the enforcement of Federal, State
and local laws within the incorporated limits
of the City of Ashland. At the request of
the Jackson County Sheriff or the Oregon
State Police, City units will assist their agen-
cies with incidents occurring just outside the
City limits.
IX-10
The City's Dispatch Center is responsible for
dispatching of all police and fire/rescue
calls. The Dispatch Center is in radio con-.
tact with police agencies in Jackson and Jo~e-.
phone Counties through the JO-JAC radio,, '
and, in the new expanded facility, is in
radio contact with other fire and ambulance
services in the Ashland area. The "911"
emergency number was implemented in early
1981 in the g82 and ~88 telephone prefixes to
ring into the Dispatch Center.
FIRE SERVICE
The staff of the Ashland Fire Department con-
sists of a Fire Chief and 21 additional paid
personnel. The Department instituted a volun-
teer program for 15 volunteers in September,
1981. The Department operates five motorized
fire-fighting apparatus with one in reserve.
They consist of one 750 gpm pumper, one 1250
gpm pumper, one 1500 gpm pureper, one 2000-
gallon tanker, and an ambulance. The total
water carried on all apparatus is 5220 ga'l-
Ions. Also, the Department operates two
specialized four-wheel-drive grass and brush
units. The Department has 15 self-contained
breathing apparatus, one breathing air com-
pressor, three portable electric generators,
and three smoke ejectors. The Department
operates out of two fire stations and provides
fire protection service to the Ashland City
limits. The Department has also entered into
mutual aid agreements with the other fire de-
partments in the area. Fire dispatching is
done through the City Dispatch Center.