Loading...
HomeMy WebLinkAbout1996-49 Orange Ave. LIDRESOLUTION NO. 96-/'/~ A RESOLUTION OF INTENTION TO PROVIDE FOR IMPROVEMENTS TO ORANGE AVENUE CONSISTING OF CURBS, GUTTERS, STORM DRAINS, PAVING & SIDEWALKS AND SETTING A PUBLIC HEARING. THE CITY OF ASHLAND RESOLVES AS FOLLOWS: SECTION 1. It is the intention of the Council to undertake the improvement described as follows: Improvements to Orange Avenue consisting of curbs, gutters, storm drains, paving and sidewalks. SECTION 2. The description of the boundaries of the local improvement district to be assessed for this improvement is: '~1 those lots fronting on Orange Avenue between Laurel Street and He/man Street as depicted on the map attached to Exhibit A." SECTION 3. The amount of the estimated cost of the improvement made by the city engineer and the proposed allocation of the cost among the owners of the properties to be specially benefitted is: "Such improvements will be in accordance with costs estimated to be $87,274.98, of which all will be paid by special assessments on benefited properties. Costs will be a/located based on a frontage measure of approximately $76.00 per front foot of each lot." SECTION 4. The council will hold a public hearing in the Council Chambers, Ashland Civic Center, 1175 East Main Street on January 21, 1997 at 7:00 p.m., at which time and place the owners of the benefited properties may appear or submit written comments prior to or at the hearing as to why the improvement should not be constructed or why the benefited properties should not be assessed in the manner proposed. SECTION 5. The city recorder is directed to serve notice to the property owners by publishing a notice of the public hearing once in the Daily Tidings, not less than 30 days prior to the hearing, and by mai;ling copies of the notice by first class mail to the owners of each lot benefited by the proposed improvement as shown on the latest tax and assessment roll. The notice shall be in the form of Exhibit "A" attached to this resolution. PAGE I-IMPROVEMENT RESOLUTION This resolution was read by title only in accordance with Ashland Municipal Code §2.04.090 duly PASSED and ADOPTED this SIGNED and APPROVED this /~Y day of /7 day o~ ~~ , ~996. ,1996. Catherine M. Golden, Mayor Paul Nolte, City Attorney (p:form~\lidl .res) PAGE 2-IMPROVEMENT RESOLUTION EXHIBIT "A" NOTICE OF PUBLIC HEARING The City Council of the City of Ashland will meet on January 21, 1997 at 7 p.m. in the Council Chambers, 1175 East Main Street, to hold a public hearing to consider the formation of a local improvement district as follows: NATURE OF THE IMPROVEMENT: "To improve Orange Avenue between Laurel and Helman Streets with paving, curbs, gutters, storm drains, and sidewalks.' BENEFITED PROPERTY: '~11 those lots fronting on Orange Avenue between Laurel Street and Helman Street as depicted on the attached map." ESTIMATED COST: "The estimated cost of these improvements is $87,274.98, a// of which will be paid by special assessments on benefited properties. Costs wi// be a/located based on a frontage measure of approximately $76.00 per front foot of each lot.' The specific proposed assessment for each lot is contained on the attached exhibit. Additional information regarding the proposed improvement or method of assessment may be obtained at the Engineering Division, 27~/~ North Main, Ashland, OR, phone number 488-5347, weekdays during the hours of 8:30 am to 5:00 pm. All affected property owners may appear at the hearing or submit written comments prior to or at the hearing, as to why the streets should not be improved or why the benefited properties should not be assessed in the manner proposed. If two-thirds of the property owners to be benefitted object to the improvement, the improvement will be suspended for six months. PAGE 3-IMPROVEMENT RESOLUTION CITY OF ASHLAND PUBLIC WORK DEPARTMENT ENGINEERING DIVISION Orange Avenue Improvement Estimated Costs Per Lot (WITHOUT parking bays) Revised 11/20/96 Map & Tax Frontage Estimated Cost Credit (1) Lot Cost/Foot 1 4CB 400 86.470' $76.00 $6,571.72 ($169.48) 2 4CB 500 68.000' $76.00 $5,168.00 ($133.28) 3 4CB 600 75.835' $76.00 $5,763.46 ($148.64) 4 4CB 619 65.580' $76.00 $4,984.08' ($128.54) 5 4CB 620 62.070' $76.00 $4,717.32 ($121.66) 6 4CB 707 72.160' $76.00 $5,484.16 ($141.43) 7 4CB 708 64.050' $76.00 $4,867.80 ($125.54) 8 4CB 709 54.080' $76.00 $4,110.08 ($106.00) 9 4CB 5400 59.000' $76.00 $4,484.00 ($115.64) 10 4CB 5401 91.000 $76.00 $6,916.00 ($178.36) 11 4CB 5500 75.050' $76.00 $5,703.80 ($147. I0) 12 4CB 5501 75.060' $76.00 $5,704.56 ($147.12) 13 4CB 5600 110.000' $76.00 $8,360.00 ($215.60) 14 4CB 5700 90.000' $76.00 $6,840.00 ($176.40) 15 4CB 5800 100.000' $76.00 $7,600.00 ($196.00) Total $6,402.24 $5,034.72 $5,614.82 $4,855.54 $4,595.66 $5,342.73 $4,742.26 $4,004.08 $4,368.36 $6,737.64 $5,556.70 $5,557.44 $8,144.40 $6,663.60 $7,404.00 GRAND 1,148.355 $87,274.98 ($2,250.79) TOTALS (/) Credit for Sidewalk Construction: 25% Sidewalk Cost: $1.96 per frontage foot if approved by council $85,024.19 PAGE 2-(c:engineer\lid~orange. Es0 ORANGE AVENUE PROPOSED L.I.D. COMPOSITION REVISED 11/20/96 No. Map & Tax Frontage Pre-paving Lot No. Agreement 1 4CB TL 400 86.47' No 2 4CB TL 500 68.00' No 3 4CB TL 600 75.835' Yes 4 4CB TL 619 65.58' Yes 5 4CB TL 620 62.07' Yes 6 4CB TL 707 72.16' Yes (1) 7 4CB TL 708 64.05' Yes 8 4CB TL 709 54.08 Yes 9 4CB TL 5400 59.00 Yes 10 4CB TL 5401 91.00 Yes 11 4CB TL 5500 75.05 Yes Name & Address Tracey W. McCullough 101 Orange Ave. ASHLAND OR 97520 Richard Katz 125 Orange Ave. ASHLAND OR 97520 Kathleen Stasny 133 Orange Ave. ASHLAND OR 97520 Jeff Gossett 359 Keamey St. ASHLAND OR 97520 Jeff Gossett 359 Kearney St. ASHLAND OR 97520 Barbara Underwood 408 Laurel St. ASHLAND OR 97520 Diane Chung 191 Orange Ave. ASHLAND OR 97520 Fred Cox 918 Morton St. ASHLAND OR 97520 Jennifer Hall 192 Orange Ave. ASHLAND OR 97520 Stephen/Ellen Read 398 Laurel St. ASHLAND OR 97520 Kenneth/Befit Larson 176 Orange ASHLAND OR 97520 PAGE 1-(c:engineerXlid\orange. Lst) 12 4CB TL 5501 75.06 Yes Robert/Marjorie McCoy 160 Orange Ave. ASHLAND OR 97520 13 4CB TL 5600 110.00 No Kenneth/Pamela Wallace 152 Orange Ave. ASHLAND OR 97520 14 4CB TL 5700 90.00 No Kindler Stout, Trustee 130 Orange Ave. ASHLAND OR 97520 15 4CB TL 5800 100.00 No James/Helen Dean 395 Helman St. ASHLAND OR 97520 TOTAL 1,148.355' Percentage on Agreement: 693.885' (60.42%) (1) Excludes 62.0feet from frontage due to previous L.I.D. construction. PAGE 2-~c:engin~r\naXorange.~.s0 o~ I cn ~PA~KSI~ \ \ \ \ \ \