HomeMy WebLinkAbout1996-49 Orange Ave. LIDRESOLUTION NO. 96-/'/~
A RESOLUTION OF INTENTION TO PROVIDE FOR IMPROVEMENTS
TO ORANGE AVENUE CONSISTING OF CURBS, GUTTERS, STORM
DRAINS, PAVING & SIDEWALKS AND SETTING A PUBLIC HEARING.
THE CITY OF ASHLAND RESOLVES AS FOLLOWS:
SECTION 1. It is the intention of the Council to undertake the improvement described
as follows: Improvements to Orange Avenue consisting of curbs, gutters, storm
drains, paving and sidewalks.
SECTION 2. The description of the boundaries of the local improvement district to be
assessed for this improvement is:
'~1 those lots fronting on Orange Avenue between Laurel Street and He/man
Street as depicted on the map attached to Exhibit A."
SECTION 3. The amount of the estimated cost of the improvement made by the city
engineer and the proposed allocation of the cost among the owners of the properties
to be specially benefitted is:
"Such improvements will be in accordance with costs estimated to be
$87,274.98, of which all will be paid by special assessments on benefited
properties. Costs will be a/located based on a frontage measure of
approximately $76.00 per front foot of each lot."
SECTION 4. The council will hold a public hearing in the Council Chambers, Ashland
Civic Center, 1175 East Main Street on January 21, 1997 at 7:00 p.m., at which time
and place the owners of the benefited properties may appear or submit written
comments prior to or at the hearing as to why the improvement should not be
constructed or why the benefited properties should not be assessed in the manner
proposed.
SECTION 5. The city recorder is directed to serve notice to the property owners by
publishing a notice of the public hearing once in the Daily Tidings, not less than 30
days prior to the hearing, and by mai;ling copies of the notice by first class mail to the
owners of each lot benefited by the proposed improvement as shown on the latest tax
and assessment roll. The notice shall be in the form of Exhibit "A" attached to this
resolution.
PAGE I-IMPROVEMENT RESOLUTION
This resolution was read by title only in accordance with Ashland Municipal Code
§2.04.090 duly PASSED and ADOPTED this
SIGNED and APPROVED this /~Y day of
/7 day o~ ~~ , ~996.
,1996.
Catherine M. Golden, Mayor
Paul Nolte, City Attorney
(p:form~\lidl .res)
PAGE 2-IMPROVEMENT RESOLUTION
EXHIBIT "A"
NOTICE OF PUBLIC HEARING
The City Council of the City of Ashland will meet on January 21, 1997 at 7 p.m. in the
Council Chambers, 1175 East Main Street, to hold a public hearing to consider the
formation of a local improvement district as follows:
NATURE OF THE IMPROVEMENT: "To improve Orange Avenue between Laurel and
Helman Streets with paving, curbs, gutters, storm drains, and sidewalks.'
BENEFITED PROPERTY: '~11 those lots fronting on Orange Avenue between Laurel
Street and Helman Street as depicted on the attached map."
ESTIMATED COST: "The estimated cost of these improvements is $87,274.98, a// of
which will be paid by special assessments on benefited properties. Costs wi// be
a/located based on a frontage measure of approximately $76.00 per front foot of each
lot.' The specific proposed assessment for each lot is contained on the attached
exhibit.
Additional information regarding the proposed improvement or method of assessment
may be obtained at the Engineering Division, 27~/~ North Main, Ashland, OR, phone
number 488-5347, weekdays during the hours of 8:30 am to 5:00 pm.
All affected property owners may appear at the hearing or submit written comments
prior to or at the hearing, as to why the streets should not be improved or why the
benefited properties should not be assessed in the manner proposed. If two-thirds of
the property owners to be benefitted object to the improvement, the improvement will
be suspended for six months.
PAGE 3-IMPROVEMENT RESOLUTION
CITY OF ASHLAND
PUBLIC WORK DEPARTMENT
ENGINEERING DIVISION
Orange Avenue Improvement
Estimated Costs Per Lot
(WITHOUT parking bays)
Revised 11/20/96
Map & Tax Frontage Estimated Cost Credit (1)
Lot Cost/Foot
1 4CB 400 86.470' $76.00 $6,571.72 ($169.48)
2 4CB 500 68.000' $76.00 $5,168.00 ($133.28)
3 4CB 600 75.835' $76.00 $5,763.46 ($148.64)
4 4CB 619 65.580' $76.00 $4,984.08' ($128.54)
5 4CB 620 62.070' $76.00 $4,717.32 ($121.66)
6 4CB 707 72.160' $76.00 $5,484.16 ($141.43)
7 4CB 708 64.050' $76.00 $4,867.80 ($125.54)
8 4CB 709 54.080' $76.00 $4,110.08 ($106.00)
9 4CB 5400 59.000' $76.00 $4,484.00 ($115.64)
10 4CB 5401 91.000 $76.00 $6,916.00 ($178.36)
11 4CB 5500 75.050' $76.00 $5,703.80 ($147. I0)
12 4CB 5501 75.060' $76.00 $5,704.56 ($147.12)
13 4CB 5600 110.000' $76.00 $8,360.00 ($215.60)
14 4CB 5700 90.000' $76.00 $6,840.00 ($176.40)
15 4CB 5800 100.000' $76.00 $7,600.00 ($196.00)
Total
$6,402.24
$5,034.72
$5,614.82
$4,855.54
$4,595.66
$5,342.73
$4,742.26
$4,004.08
$4,368.36
$6,737.64
$5,556.70
$5,557.44
$8,144.40
$6,663.60
$7,404.00
GRAND 1,148.355 $87,274.98 ($2,250.79)
TOTALS
(/)
Credit for Sidewalk Construction: 25%
Sidewalk Cost: $1.96 per frontage foot if approved by council
$85,024.19
PAGE 2-(c:engineer\lid~orange. Es0
ORANGE AVENUE
PROPOSED L.I.D. COMPOSITION
REVISED 11/20/96
No. Map & Tax Frontage Pre-paving
Lot No. Agreement
1 4CB TL 400 86.47' No
2 4CB TL 500 68.00' No
3 4CB TL 600 75.835' Yes
4 4CB TL 619 65.58' Yes
5 4CB TL 620 62.07' Yes
6 4CB TL 707 72.16' Yes
(1)
7 4CB TL 708 64.05' Yes
8 4CB TL 709 54.08 Yes
9 4CB TL 5400 59.00 Yes
10 4CB TL 5401 91.00 Yes
11 4CB TL 5500 75.05 Yes
Name & Address
Tracey W. McCullough
101 Orange Ave.
ASHLAND OR 97520
Richard Katz
125 Orange Ave.
ASHLAND OR 97520
Kathleen Stasny
133 Orange Ave.
ASHLAND OR 97520
Jeff Gossett
359 Keamey St.
ASHLAND OR 97520
Jeff Gossett
359 Kearney St.
ASHLAND OR 97520
Barbara Underwood
408 Laurel St.
ASHLAND OR 97520
Diane Chung
191 Orange Ave.
ASHLAND OR 97520
Fred Cox
918 Morton St.
ASHLAND OR 97520
Jennifer Hall
192 Orange Ave.
ASHLAND OR 97520
Stephen/Ellen Read
398 Laurel St.
ASHLAND OR 97520
Kenneth/Befit Larson
176 Orange
ASHLAND OR 97520
PAGE 1-(c:engineerXlid\orange. Lst)
12 4CB TL 5501 75.06 Yes
Robert/Marjorie McCoy
160 Orange Ave.
ASHLAND OR 97520
13 4CB TL 5600 110.00 No
Kenneth/Pamela Wallace
152 Orange Ave.
ASHLAND OR 97520
14 4CB TL 5700 90.00 No
Kindler Stout, Trustee
130 Orange Ave.
ASHLAND OR 97520
15 4CB TL 5800 100.00 No
James/Helen Dean
395 Helman St.
ASHLAND OR 97520
TOTAL 1,148.355'
Percentage on Agreement:
693.885' (60.42%)
(1) Excludes 62.0feet from frontage due to previous L.I.D. construction.
PAGE 2-~c:engin~r\naXorange.~.s0
o~ I cn
~PA~KSI~
\
\
\
\
\
\