Loading...
HomeMy WebLinkAbout1993-087 Addendum-WoodwardClydeOctober 21, 1993 Nan Franklin, City Recorder Contract Amendment, Woodward-Clyde Consultants Attached is the original signed contract amendment for your files. Paul Nolte, City Attorney Jill Turner, Finance Director encl: Contract Amendment Addendum made this ~T~ day of October, 1993, ~etween EIVED City of Ashland ("City") and Woodward-Clyde Consultants ("Engineer") . ~ JJ~ ~ 8 ~ Recitals: A. On January 15, 1993, City and Engineer entered into a "Engineering Services Contract" (further referred to in this addendum as "the agreement"). B. The parties desire to amend the agreement to add tasks to be accomplished by the Engineer. City and Engineer agree to amend the agreement in the following manner: 1. Task 1 as described on Attachment A is added to the agreement. Task 1 is to be billed and paid on a time and materials basis with the maximum to be paid at $8,000. 2. Task 2 as described on Attachment A is added to the agreement. Task 2 is to be billed and paid on a time and materials basis per meeting. 3. Except as modified above the terms of the agreement shall remain in full force and effect. Dated and signed this /[ day of October, 1993. ENGINEER Fed. ~D # CITY REVIEWED AS ~O CONTEN~-' BY _,~ City Dl~r~nt Head Date: BYcl--~tyP'.'I Legal ,Counsel Date: ioI,?;] Coding G~-~ I ~ ~4. (for City use only) Page 1-ADDENDUM TO ENGINEERING SERVICES AGREEMENT ~:~%~-w~.~ A'VFACHMENT A WORK ~[TEM~ Ta~k 1 Conduct research as neeesaary and prepare let~r report analyzing five alternatives including two involving a soil treatmeat vjstem (rapid i~i~nation sysmn). Davis 40 lus. @ $118/hr. $4,720 Schreiber 4 hrs. @ $37/hr. 148 Repp 16 hrs. @ $67far. 1,072 Yamall 8 hrs. @ $68/hr. 560 Geathean 3 days @ $.~00/day 1 Total Task 1 $8,000 Task 2 Attend meetings in Ashlaud and Eugene. Meetings in Eugeae (assuming 4,-hour meeting): Davis $944/raeffdng Yamall $600]me~us Meetings in. Asltland (assuming 441~tr meeiing): Dax4s $1,100/meefing YamaU $~60h~ee~$ Ge~ean $700hmefing