Loading...
HomeMy WebLinkAbout2001-008 Contract - BurlBrim Excavate" CITY OF ASHLAND CONTRACT FOR PUBLIC WORKS CONSTRUCTION Contract made this '~ldb day of Ashland, ("City") and , between the City of "(Contractor"). City and Contractor agree: 1. Contract Documents: This contract is made as a result of an Advertisement for Bid issued by City for the East Fork Ashland Creek Crossing 2000-03. Contractor was awarded the bid as the lowest responsible bidder. In the event of any inconsistencies in the terms of this contract, the contract documents defined in the Advertisement for Bid and Contractor's bi'd, this contract shall take 2recedence over the contract documents which shall take precedence over the bid. 2. Scope: Contractor shall begin and complete the project described in the contract documents within the time prescribed in the contract documents. The following exceptions, alterations, or modifications to the contract documents are incorporated into this contract: ~]'/¢-/'/1~l~ ]~0,1 l' 3. Price & Payment: City shall pay Contractor amounts earned under the contract. All payments will be made at the times and in the manner provided in the contract documents. 4. Bond: Contractor shall, within five days after execution of the contract and prior to doing any work under the contract, furnish bond to the City of Ashland in a form and with a surety satisfactory to City in the penal sum of ¢.¢7~ conditioned upon the faithful performance of this contract upon the part of the Contractor. 5. Default: A default shall occur under any of the following circumstances: 5.1 If the Contractor fails to begin the work under contract within the time specified, or fails to perform the work with sufficient workers or equipment or with sufficient materials to insure the prompt completion of the project, or shall neglect or refuse to remove materials or perform anew such work as shall be rejected as defective or unsuitable, or shall discontinue the prosecution of the work. 5.2 If the Contractor shall become insolvent or declared bankrupt, or commit any act of bankruptcy or insolvency, or allow any final judgment to stand against the Contractor unsatisfied for a period of forty-eight (48) hours, or shall make an assignment for the benefit of creditors. 5.3From any other cause whatsoever, shall not carry on the work in an acceptable manner. 6. Remedies: In addition to the rights and remedies to which the City may be entitlec by law for the enforcement of its rights under this contract, City shall have full power and authority, without violating this contract, to take prosecution of the work from the Contractor, and appropriate or use any or all of the materials and equipment on the ground that may be suitable and acceptable and may cause a contract for the completion of this O 'C0-03~sn~and PW contract boilerplate doc 1 ! of 29 CITY OF ASHLAND REQUISITION Department: Public Works/Engineering Vendor: Burl Brim Excavation 534 Crowson Road Ashland OR 97520 NO.: PW 32 Date: February 1, 2001 Requested Delivery Date: ASAP Deliver To: Site Via: Account No.: See Below* *(Note: Please allow approximately two (2) weeks for delive~ on items not generally carried or stored, and approximately two (2) months on printed jobs.) Item No. Quantity Unit Description Use of Purchasing Office Only Unit Price Total Price PO No. East Fork Ashland Creek Crossing 36056.42 Above Reeder Reservoi,~ * 670.08.19.00.602~3~ 10,800)670.08.19 .00.602400($10,000)670.08.18.00.602400 ($15,2oo) Job No. 2000-03 Unit No. I hereby eertifythattheabove items areneeessaryforthe operation ofthis dapartmentandare budgeted. ~rize~'ffPerson Pieter Smeenk Issued By February 1, 2001 Date Received By GSpub-wrks\eng\00-00\bid\COl Requisition.doc 1 of 3 MAR-09-2001 09:01 ASHLAND PUBLIC WORKS b4i 4~ bulb P'.Ul PROPOSAL Mayor & City Council Ashland, Oregon The undersigned bidder declares that the bidder has received, read and understood all bid documents; received and understood all addenda; the bidder has taken no exceptions other than these clearly stated in this proposal: the bidder will be liable for increased costs (and attorney fees) for retaining a replacement bidder if the undersigned bidder is awarded the contract but refuses to sign the contract; the bidder has examined the plans and specifications, has visited the site, and made such investigation as is necessary to determine the character of the materials and conditions to be encountered in the work and that if this Proposal is accepted, the bidder will contract with the City of Ashland, Oregon for the construction of the proposed improvement in a form of contract contained in the bid documents, will provide the necessary equipment, materials, tools, apparatus, and labor, in accordance with the plans and specifications on file at the City Engineering Office, Ashland, Oregon, under the following conditions: 1. It is understood that all the work will be performed under a lump sum or unit price basis and that for the lump sum or unit price all services, materials, labor, equipment, and all work necessary to complete the project in accordance with the plans and specifications shall be furnished for the said lump sum or unit price named. It is understood that the quantities stated in connection with the price schedule for the contract are approximate only and payment shall be made at the unit prices named for the actual quantities incorporated in the completed work. If there shall be an increase in the amount of work covered by the lump sum price, it shall be computed on a basis of "extra work" for which an increase in payment will have been earned and if there be a decrease in the lump sum payment, it shall be made only as a result of negotiation between the undersigned and the Owner. Furthermore, it is understood that any estimate with respect to time, materials, equipment, or service which may appear on the plans or in the specifications is for the sole purpose of assisting the undersigned in checking the undersigned's own independent calculations and that at no time shall the undersigned attempt to hold the Owner, the Engineer, or any other person, firm or corporation responsible for any errors or omissions that may appear in any estimate. 2. The undersigned will furnish the bonds required by the specifications and comply with all the laws of the Federal Government, State of Oregon, and the City of Ashland, which are pertinent to construction contracts of this nature even though such laws or municipal ordinances may not have been quoted or referred to in these specifications. 3, All items for the contract for which forms are provided in the bid documents have been completed in fuji by the showing of a lump sum price or prices for each and every item and by the showing of other information indicated by the proposal form. The undersigned submits the unit prices set forth as those at which the bidder will perform the work involved. The extensions in the column headed "Total" are made up for the sole purpose of facilitating comparison of bids and if there are any discrepancies between the unit prices and the totals shown, the unit prices shall govern. 4. The undersigned agrees that the "Time of Completion" shall be as defined in the specifications and that the bidder will complete the work within the number of consecutive calendar days stated for each schedule after "Notice to Proceed" has been issued by the Owner. Bidder furthermore agrees to pay as liquidated damages, for each calendar day thereafter, the sum of $750 per day for each day the project remains incomplete. 5. The undersigned, as bidder, acknowledges that addenda(s) numbered O through O have been received by the bidder and have been examined as part of the contract documents. 6. The undersigned, as bidder, acknowledges that provisions of Oregon Revised Statute (O.R.S.) 279.350 relating to workers on public works to be paid not less than prevailing rate of wage shall be included in the contract. 7,1 7.2 7.3 Instructions for First-Tier Subcontractors Disclosure. Bidders are required to disclose information about certain first-tier subcontractors (those subcontractors contracting directly with the bidder) when the contract price exceeds $75,000 (see ORS 279,027). Specifically, when the contract amount of a first-tier subcontractor is greater than or equal to: (I) 5% of the project bid, but at least $15,000, or (ii) $500,000 regardless of the percentage, you must disclose the following information about that subcontract.within four hours of bid closing: The subcontractor's name and address; The subcontractor's Construction Contractor Board registration number, if one is required, and; The subcontract dollar value. If you will not be using any subcontractors that are subject to the above disclosure requirements, you are required to indicate "NONE" on the form. THE CITY MAY REJECT A BID IF THE BIDDER FAILS TO SUBMIT THE DISCLOSURE FORM WITH THIS INFORMATION WITHIN FOUR HOURS OF BIB CLOSING. To determine disclosure requirements, the City recommends that you disclose subcontract information for any subcontractor as follows: 1) Determine the lowest possible contract price. That price will be the base bid amount less all alternate deductive bid amounts (exclusive of any options that can only be exercised after contract award). 2) Pro~;ide the required disclosure information for any first-tier subcontractor whose potential contract so,ices (i.e., subcontractor's base bid amount plus all alternate additive bid amounts, exclusive of any options that can only be exercised after contract award) are greater than or equal to: (I) 5% of the lowest contract price, but at least $15,000, or (ii) $500,000 regardless of the percentage. Total all possible work for each subcontractor in making this determination (e.g., if a subcontractor will provide $15,000 worth of services on the base bid and $40,000 on an additive alternate, than the potential amount of subcontractor's services is $55,000. Assuming that $55,000 exceeds 5% of the lowest contract price, provide the disclosure for both the $15,000 services and the ($40,000 services). The disclosure should be submitted on the appended form titled First-Tier Subcontractor Disclosure Form, The City reserves the right to reject any and all bids, waive formalities, or accept any bid, which appears to serve the best interests of the City. East Fork Ashland Creek Crossing, Project No. 2000-03 CONSTRUCTION PROJECT Additive-Alternate Bid #1 [NO ITEM No UNIT UNIT PRICE AMOUNT (FIGURES) Erosion Con[roi & Stream Protection ...... m A ;~. ii"~A F~'6'}~ ;Tn g ........................................ ~ ~ ~qqO. 59 s 2q~,59 127 Place Precas! Modular Block Substructure 12~ 1,230 Bed Place 24" mi~us Aggre~ate Base Slurry Aggregate Base 4 Place Class 2000 Rip Rap 10 $ $ ALTERNATE #1 BID TOTAL $ East Fork Ashland Creek Crossing, Project No, 2000-03 CONSTRUCTION PROJECT BID SCHEDULE-Base Bid UNIT PRICE AMOUNT ! INO ITEM No UNIT (FIGURES] Install Geotextile Fabric Place Abutment ~urr¥ Bed Place, 24" minus Place Class 200~ Rip Rap · $ :$ BASE BID TOTAL D \o0-03~e, shlend ~ contre~ boilarpiate,doc 7 of 29 City of Ashland, Department of Public Works First-Tier Subcontractor Disclosure Form (As Required by ORS 279,027 and OAR 137.040-0017) East Fork Ashland Creek Crossing, Project Number 2000-03, i"~M~ & A°D"Ess °r susc°"TRAcT°" I CCB REGISTRATION SUBCONTRACT AMOUNT 2 3 4 5 6 7 9 Attach additional pages if needed. The foregoing prices shall include all labor, materials, equipment, overhead, profit, insurance, and all other incidental expenses to cover the finished work of the several kinds called for, Unit prices are to be shown in both words and figures. In case of discrepancy, the amounts shown in words will govern. Upon receipt of written notice of the acceptance of this bid, Bidder shall execute the formal contract attached within ten days and deliver surety bond or bonds as required. The bid security attached in the sum of five percent of the total price for the bid or combination of bids is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth as liquidated damages for the delay and additional expense to the Owner caused thereby. The Bidderis /~ oris not__ a resident/B~der as de, finCh OR.S. 279.029. Firm Name of Bidder S-~nature of Printed N~lme of Bidder O~ciafTitle State of I~¢erperadon CCB Number Dated this J ~,~. Day Address Telephone No. -- ~ ~ O~ ' ~ 0 of ~9 TOTAL P.06 ASHLAND PUBLIC WORKS CITY OF ASHLAND PUBLIC WORKS DEPARTMENT 27 1/2 East Main Street, Upstairs 97520 (541) 488--n347 541 488 ~006 P.01 ENGINEERING DIVISION cna.ashland.or, us (fa~) NOTICE OF TR.4NS3 TT/ L PROJECT: East Fork Creek Crossing JOB SUBJECT: Bid Documents DATE: FROM: Pictor Smeenk PE TO: City of Ashland 20 East Main St Ashland, OR 97520 (541) $S2-2413 (541) 552.2430 (fax) Pie~er~ Ashland,OR. US 2OOO-O3 Januar~ S, 2001 Rachel Medford Builder~ Exchange 305 N Bartlett Med~ord OR 97501 (541) 773-5327 (541) 773-7021 (fax) THE FOLLOWING ITEMS ARE BEING SENT TO YOU HEREWITH VIA MAIL : Dated Description Filename ages Bid Documents PW contract...Do¢ (29) 8.5Xll REMARKS: Please post and call me if you have any questions, CC: . Steve Lawrence ~ Adroit Construction linc. Scott Kcene ~ Burl Brhn Excavation Zach fi~est (~ $1ayden Construetiou LeeRoy Totten (~ Totten/Meza Co~struefioli G:\pub-wr~eng\00-O0\tmnsmittal.doc TOTAL P,01 CITY OF ASHLAND CITY HALL ASHLAND, OREGON 97520 NOTICE OF TRANSMITTAL TO: KARI OLSON SHARLENE STEPHENS DATE: PROJECT: JOB NO.: SUBJECT: FEBRUARY 22, 2001 EAST FORK ASHLAND CREEK BRIDGE 2000-03 CONTRACT DOCUMENTS THE FOLLOWING ITEMS ARE BEING SENT TO YOU: Karl ~ Please find enclosed a fully executed duplicate original copy of the conlxact and a requisition for this project. Please expedite a purchase order number for this project as payment is pending. Sharlene - One copy of the contract for insurance purposes. ENCLOSED UNDER SEPARATE COVER COPIES TO: Department of Public Works Engineering Department By: Dawn C~ Title: Administrative Secretary G:\pub-wrks~eng\dcpt -admin~ENOINEER~PROSECT~2000~2000~03 Distribution NOT.doc PAGE 1 / 1 CITY OF ASHLAND y 20 E MAIN ST, i DATE PONUMBER ASHLAND, OR 97520 l ~ 01879 VENDOR: 002659 BURL BRIM EXCAVATION INC 534 CROWSON ROAD ASHLAND, OR 97520 SHIPTO: City of Ashland-Warehouse (541) 488-5354 90 N MOUNTAIN ASHLAND, OR 97520 FOB Point: Terms; Net Req Del Date: Special Inst: Req, No.: Dept.: PUBLIC WQRKS Contact: HUCKINS, KAREN Confirming? NO THIS IS A REVISED PURCHASE ORDER East ~ork ~sh and Creek Cross n AISove g ;10800100 Reeder Reservoir- ; Per Contra~[ ~l::Pub c:Works GonstructP'~; Contract dated Februaw 2, 2001 East Fork 15,256.42 SUBTOTAL 3~, 056.42 BILLTO; Account Payable TAX 0,00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 36,056.42 ASHLAND, OR 97520 E 670.08.18.00.602400 15,256.42 E 670.08.19.00.602353 10,800.00 E 670.08.19.00.602400 10,000.00 ...... ~A'iJthor~gh~ture ;/, .'/ VENDOR COPY