Loading...
HomeMy WebLinkAbout2001-18 Electric Rate RevisionCITY Of ASHLAND, OREGON RESOLUT O..O. 200 -/O° A RESOLUTION REVISING RATES FOR ELECTRIC SERVICE PURSUANT TO ASHLAND MUNICIPAL CODE SECTION 14.16.030 AND REPEALING RESOLUTION 98-08. THE CITY OF ASHLAND RESOLVES AS FOLLOWS: SECTION 1. The electric rate schedules are increased 10.0% for rates for electric service provided by the City of Ashland effective with Cycle one billings prepared on or after July 1, 2001. SECTION 2. The City of Ashland adopts a 10.0% surcharge on billings for electric usage in addition to the charges specified in Section 1 to help pay for wholesale rate increases on power supplied to the City of Ashland by the Bonneville Power Administration effective with Cycle one billings prepared on or after July 1, 2001. SECTION 3. The sumharge revenue is not subject to the Electric Utility Tax or included in the franchise fee calculation for General Fund Revenues. SECTION 4. Three copies of this resolution shall be maintained in the Office of the City Recorder. SECTION 5. Classification of the fee. The fees specified in Section I and Section 2 of this resolution is classified as not subject to the limits of Section 11 b of Article XI of the Oregon Constitution (Ballot Measure 5). SECTION 6. Resolution 98-08 is repealed. The foregoing resolution was READ BY TITLE ONLY and DULY ADOPTED at a regular m~of the City Cgu.qcil of the City of Ashland on the Barbara Chdstensen, City Recorder SIGNED and APPROVED this ~ day of June, 2001. __ day of June, 2001. Alan W. DeBoer, Mayor