Loading...
HomeMy WebLinkAbout1995-057 Contract - FowlerCITY OF ASHLAND ~ : CITY HALL ASHLAND, OREGON 97520 telephone (code 503) 482-3211 NOTICE OF TRANSMITTAL TO: Jill Turner Barbara Christensen DATE 06/02/95 PROJECT WTP Sanitary Sewer JOB NO. 95-01A SUBJECT Contract THE FOLLOWING ITEMS ARE BEING SENT TO YOU: Jill: Copy of Contract and requisition for Project No. 95-01A Barbara: Original Contract for filing (bonding requirement has been waived) ENCLOSED X UNDER SEPARATE COVER REMARKS: COPIES TO: (c: \ eng in ecr~no~'ans. frm) Department of Public Wo~ Engineering Division By: James H. Olson Title: Assistant City Engin~r CITY OF ASHLAND CONTRACT FOR PUBLIC WORKS CONSTRUCTION Contract made this day of ("City") and JAMES W. FOWLER 0 ,1995, between the City of Ashland, ("Contractor"). City and Contractor a~ee: Contract Documents: This contract is made as a result of an Advertisement for Bid issued by City for the Water Treatment Plant Sanitary Sewer Construction, Project No. 95-01A. Contract was awarded the bid as the lowest responsible bidder. In the event of any inconsistencies in the terms of this contract, the contract documents der'meal in the Advertisement for Bid and Contractor's bid, this contract shall Lake precedence over the contract documents which shall take precedence over the bid. Scope: Contractor shall begin and complete the project described in the contract documents within the time prescribed in the contract documents. The following exceptions, alterations, or modifications to the contract documents are incorporated into this contract: o Price and Pawnent: City shall pay Contractor amounts earned under the contract. All pa3anents will be made at the times and in the manner provided in the contract documents. Bond: Contractor shall, within[days after execution of the contract and . work uv,~~ontract, furnish bond to the City of Ashland prior to doing any in a form and with a s~k~_a~isfactory to City in the penal sum of $51,591.00 ~1~ conditioned upon the faithful performance of this contract upon the part of the Contractor. Default: A default shall occur under any of the following circumstances: 5.1 5.2 5.3 If the Contractor fails to begin the work under contract within the tinge specified, or fails to perform the work with sufficient workers or equipment or with sufficient materials to insure the prompt completion of the project, or shall neglect or refuse to remove materials or perform anew such work as shall be rejected as defective or unsuitable, or shall discontinue the prosecution of the work. If the Contractor shall become insolvent or declared bankrupt, or commit any act of bankruptcy or insolvency, or allow any final judgment to stand agait~st the Contractor unsatisfied for a period of forty-eight (48) hom~, or shall make an assignment for the benefit of creditors. From any other cause whatsoever, shall not carry on the work in an acceptable manner. 6 Remedies: In addition to the rights and remedies to which the City may be entitled by law for the enforcement of its rights under this contract, City shall have full power and authority, without violating this contract, to take the prosecution of the work from the Contractor, and appropriate or use any or all of the materials and equipment on the ground that may be suitable and acceptable and may cause a contract for the completion of:this contract according to its terms and provisions, or use such methods as required for the completion of the contract, in any acceptable manner. All costs and charges incurred by the City together with the costs of completing the work under the contact, shall be deducted from any money due or which shall become due the Contractor. In case the expense so incurred by the City shall be less than the sum which would have been payable under the contract if it had been completed by the Contractor, then the Contractor shall be entitled to receive the difference less any damages for delay to which the City may be entitled. In case such expense shall exceed the sum which would have been payable under the contract, the Contractor and the surety shall be llabIe and agree to and shall pay the City the amount of the excess with damages for delay of performance, if any. CONTRACTOR CITY OF ASHLAND BY: Its: BY: Its: resmdent 'Brian Almquist City Administrator REVIE~,yED AS TO] CONTENT: uepartment Head Date qg~q~/~ Coding (for City use only) REVIF~VF, D AS TO FORM: City~A~ornqy ~.~ Date .5 ['~,[q5 (c:',cn,ginccrkonlract\&raniLqs.fu~ ) 7 PROPOSAL Mayor and City Council Ashland, Oregon The undersigned bidder declares that the bidder ha~ examine4 the pbns and spec~cations, has vL4texl the sire, and rn~de such investigation as Ls necessary to dctw'qTnine.the character of the mazer~lq and the conditions to be encountered Lu the work and that if this Pzoposal is accepted, the bidder will contract with the City of Ashlands Oregon for .th_e c. onsUmc.~ Qf the prglxt.~g(] improvement in a form of contract contained in the bid doerinherits, will provide the necessary equipment, materials, tools, apparatus, and labor, in accordance with the plans and specifications on file at the Ci~ En~n~.ring O~ce, Ashland, Oregon, trader the foilowing conditions: 1. It is understood that all the work will be performed under a lump sum or unit price basis and that for the Iump sum or unit price all services, materials, labor, equipment, and all work necessary to complete the project in accordance with the plans and specifications shall be furnL~b~d for the said lump sq~m or unit price named. It is understood that the quantifies smte:d in connection with the price schedule for the contract are al:rproximate only and payment shall be made at the unit price~ framed for the actual quantifies incorporated in the completed work. If there shall be an increase in the amount of work covered by the lamp sum price, it shall be computed on a basks of "extra work" for which an increase in payment will have been earned and if there be a decrease in the lump sum payment, it shall be made only as a result of negotiation between the undersigned and the owner. Furthermorel. it is understood that any estimate with respect to time, materials, equipment, or service which' may appear on the phns.or in the specifications is for the sale purpose of assisting the undersigned in checkSng the undersigned's own independent calculations and that at no time shall the undersigned attempt to hold the owner, the En~,~meer, or any other person, firm or corporation responsible for any errors cr~ omissions that may appear in any estimate.. 2. The undersigned will furnLqh the bonds required by the spec~o~ and comply with all the laws of the federal government, Stat~ of Oregon, and Ci~ of Ashland which are pea--fi.u~t construction contracts of this nature even though such laws or municipal ordinances may not have been quoted or referred to in these specifications. 3. All items for the contract for which forms are provided _in the bid documents have been completed in full by the showing of a lump sum price or prices for. each and every 'item and by the showing of other information indicated by the proposal form. The und .e~_'gned submits the unit prices set forth as those at which the bidder will perform the work involved_ 'The extensions in the column headed ~Total' are made up for the sole pro-pose of facilitating comFaz~n of bids and if there are any discr~=pancies between the unit prices and the totals shown, the unit prices sh~11 4. The undersi~aed a~ees that the "Time of Completion" shall be as defined in the specSficatiorks and that the bidder will complete the work within the number of consecutive calendar days stated for each schedule after "NotSee to Proceed"-ha~ been issued by the owner. ' '- Bidder further agrees to pay as lkluidated d,~mages, for each c.~lencl~r day thereafter, the sum of one hundred ($100.00) for each day the project remains incomplete. 5. The tmdersi~ed, as bidder, acknowledges ~h_~_t addenda numbered NONE through have been received by the bidder and have been examined as part of tile . contract documents. 6. The under~gned, as bidder, acknowledges that provisions of Oregon-~ Statute (O.R_S.) 279.350 relating to workers on public works to be paid not less than prevailing rate of wage shMl be included in the contract. Name of Bidder Address JAMES W. FOWLER CO. 12775 WESTVIEW DR DALLAS OR 97338 Tellhone No. 503-623-5373 BID SCB'EBU!3*- NO. ITEM UNITS PRICE (figures). 1 6" P.v.c. Sanitary sewer, for 4,109 LF dollars 2 Manhole for 1 Ea dollars 3 4" D. I. San.~.tary Sewer, for 94 LF dollars 4 Bridge Crossing, for Lump Sum dollars 5 Clean-out, for 23 Ea 6 ROCK EXCAVATION BID TOTAL DEPARTMENT OF PUBLIC WORKS ENG~G DIVISION $ 10.50 $2,100.00 $ 24.00 $'~';400.00 $ 117.00 CY $ 117.00 $ 43,144.50 $ 2,100.00 $2,256.00' $1,400.00 $2,691.00' .CONTINGENCY- $51,591.50 Proposal 2 ~00[~ }13q,~O-:[ '.P, $:31(¥F ++~ (I.~i3. O}{D}ISd_'<] '0'$ ilg69 9Z8 £0<~,~., Lr1:60 The City resen'es the fight to reject any and all bids, waive formalities, or accept any bid which appears to ~n,e the best interests of the City. The foregoing prices shall include all labor, materials, equipment, overhead, profit, insurance, and all other incidental expenses to cover the finished work of the several ldnds called for. Unit pfices ~re to be shown in both words and figures. In case of discrepancy, the amounts shown in words will govern. Upon receipt of ,~aStten notice of the acceptance of this bid, Bidder shall execute the formal contract attached within ten days and deliver surety bond or bonds as required. The bid security attached in the sum of five percent of the total price for the bid or combination of bids is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth as liquidated damages for the delay and addition-~l expense to the Owner cau.~:l thereby. The bidder is x or is not__ a resident bidder as defined in O.R.S. 279.029. games W. Fowler Co. Firm Name of Bidder SJ~of Bidder President Official Title __ Oregon State of Incorporation, if incorporated 63701 C.C.B. Number Dated this 22nd d,9.y Of May ___ 19 q5 Proposal 3