Loading...
HomeMy WebLinkAbout1998-071 Memo - Utility FeesMEMORANDUM To: FROM: DATE: SUBJECT: B~a_r. ba_[a Dennis, Greg, Karen, Mac, Mike, Paula, Rosemary, Russ Jill ~ June'19,1998 July 1,1998 Fee Increases Attached are the new fee schedules for water connections and wastewater connections as of July 1, 1998. In addition, the following schedules were reviewed and were not changed at this time. Transportation Utility Fee from July 1997 Storm Drain Utility Fee from July 1997 System Development Charges from January 1998 N:kAcctg\RATES\annual fee transmittal.wpd EXHIBIT "B" CITY OF ASHLAND, OREGON SEWER CONNECTION FEE SCHEDULE RESOLUTION NO. 96-19 EFFECTIVE DATE July 1, 1998 ENR @ 5884.41 ANNOTATED TO SHOW CHANGES. DELETIONS Ar'{E LINED TI II'{OUGIt AND ADDITIONS ARE SHADED. A. Four-inch lateral connection from trunk line to normal curb line. B. Six-inch lateral connection from trunk line to normal curb line. C. Eight-inch lateral connection from trunk line to normal curb line. D. Ten-inch or larger lateral connection from trunk line to normal curb line. E. Manhole maximum depth of five feet. 1. Per additional foot of depth. F. Eight-inch sanitary sewer line with one five- foot manhole per 400 feet of eight-inch line. G. Checking for sewer main blockages without finding a blockage. $1,422.00 $1,428t00 1,488.00 1,494:~00 1,510.00 1,5t::6~00 COST 1,856.00 1864~00 55.00/fi 55.00/ft 27.00/ft 28.O0/ft $ 99.00 $ 99.00 N:\Acctg\RATES\SEWER\exhibit B.98 connections.wpd EXHIBIT "B" CITY OF ASHLAND, OREGON WATER CONNECTION FEE SCHEDULE RESOLUTION NO. 97- EFFECTIVE DATE JULY 1, 1998 EXHIBIT B CITY OF ASHLAND, OREGON INSTALLATION, CONNECTION AND OTHER FEES Effective July 1, 1998 ANNOTATED TO SHOW CHANGES. DELETIONS ARE LINED TI IROUGI I AND ADDITIONS ARE SHADED. A. 3/4 inch service connection from main line including meter 1. If owner/builder/contractor provides trench and backfill B. 1 inch service connection from main line including meter 1. If owner/builder/contractor provides trench and backfill C. 1-1/2 inch service connection from main line including meter 1. If owner/builder/contractor provides trench and backfill D. 2 inch service connection from main line including meter 1. If owner/builder/contractor provide trench and backfill E. 3 inch or larger service connection from main line F. 8 inch and one Fire Hydrant per 335 feet G. First utility locate at an address Additional locates at same address $1,045.00 $1,053.00 ..... 245 00 1,192.00 li:201 ..... 330:00 1,641.00 1;653;00 ..... 6:94:00 1,794.00 1,80&00 ..... 904:00 Cost ........ 49:001ff No Charge ..... 44~00 Other water related fees Water meter re-read Once in 12 months Each additional re-read in 12 months Water Meter Field Test Water Meter Bench Test: 3/4" or 1 "Water Meter 1.5" or 2" Water Meter Larger meters billed Water line pressure check once in 12 months Each additional pressure check in 12 months Install Customer 3/4" hand valve Install Customer 1" hand valve No Charge $ 22.00 $ 22:~00 .... 33:~00 ~ 67:00 ..... 121 00 Actual Cost No Charge .... 26 00 ..... 83.00 $ 93.00 $ 94,00 N ~Acctg~RATE S\WATE R~9807 RATE. RES wpd Effective on or after July 1, 1998