HomeMy WebLinkAbout1995-105 Contract - North River CITY OF ASHLAND CONTRACT FOR PUBLIC WORKS CONSTRUCTION Contract made this _.~ ' day of July, 1995, between the City of Ashland, ("City") and North River Excavation Pipeline Contractor, Inc. ("Contractor"). City and Contractor agree: {~0ntract Documents: This contract is made as a result of an Advertisement for Bid issued by City for the Oak Street L.I.D., Project No. 93-4}8. Contract was awarded the bid as the lowest responsible bidder. In the event of any inconsistencies in the terms of this contract, the contract documents def'med in the Advertisement for Bid and Contractor's bid, this contract shall take precedence over the contract documents which shall take precedence over the bid. Scone: Contractor shall begin and complete the project described in the contract documents within the time prescribed in the contract documents. The following exceptions, alterations, or modifications to the contract documents are incorporated into this contract: Price and Payment: City shall pay Contractor amounts earned under the contract. AH payments will be made at the times and in the manner provided in the contract doc-meats. Bond.' Contractor shall, within five days after execution of the contract and prior to doing any work under the contract, furnish bond to the City of Ashland in a form and with a surety satisfactory to City in the penal sum of $67,404.~0 conditioned upon the faithful performance of this contract upon the part of the Contractor. Default: A default shall occur under any of the following circumstances: 5.1 5.2 5.3 If the Contractor fails to begin the work under contract within the time specified, or fails to perform the work with sufficient workers or equipment or with sufficient materials to insure the prompt completion of the project, or shall neglect or refuse to remove materials or perform anew such work as shall be rejected as defective or unsuitable, or shall discontinue the prosecution of the work. If the Contractor shall become insolvent or declared bankrupt, or commit any act of bankruptcy or insolvency, or allow any final judgment to stand against the Contractor unsatisfied for a period of forty-eight (48) hours, or shall make an assignment for the benefit of creditors. From any other cause whatsoever, shall not carry on the work in an acceptable manner. Remedies: In addition to the rights and remedies to which the City may be entitled by law for the enforcement of its rights under this contract, City shall have full 19 power and authority, without violating this contract, to take the prosecution of the work from the Contractor, and appropriate or use any or all of the materials and equipment on the ground that may be suitable and acceptable and may cause a contract for the completion of this contract according to its terms and provisions, or use such methods as required for the completion of the contract, in any acceptable manner. AH costs and charges incurred by the City together with the costs of completing the work under the contact, shall be deducted from any money due or which shall become due the Contractor. In case the expense so incurred by the City shah be less than the sum which would have been payable under the contract if it had been completed by the Contractor, then the Contractor shall be entitled to receive the difference less any damages for delay to which the City may be entitled. In case such expense shah exceed the sum which would have been payable under the contract, the Contractor and the surety shall be liable and agree to and shah pay the City the amount of the excess with damages for delay of performance, if any. CONTRACI'OR CITY OF ASFILAND City Admini~tral REVIEWED AS TO CONTENT: DePartment Head Daie ~//~/*-~ Coding (for City use only) REvk v mRM: BY City nt~;0y/~ Date 2O PROPOSAL Mayor and City Council Ashland, Oregon The undersigned bidder declares that the bidder has examined the plans and specifications, has visited the site, and made such investigation as is necessary to determine the character of the materials and the conditions to be encountered in the work and that if this Proposal is accepted, the bidder will contract with the City of Ashland, Oregon for the construction of the proposed improvement in a form of contract contained in the bid documents, will provide the necessary equipment, materials, tools, apparatus, and labor, in accordance with the plans and specifications on file at the City Engineering Office, Ashland, Oregon, under the following conditions: 1. It is understood that all the work will be performed under a lump sum or unit price basis and that for the lump sum or unit price all services, materials, labor, equipment, and all work necessary to complete the project in accordance with the plans and specifications shall be furnished for the sa/d lump sum or unit price named. It is understood that the quantifies stated in connection with the price schedule for the contract are approximate only and payment shall be made at the unit prices named for the actual quantities incorporated in the completed work. If there shall be an increase in the amount of work covered by the lump sum price, it shall be computed on a basis of "extra work" for which an increase in payment will have been earned and if there be a decrease in the lump sum payment, it shall be made only as a result of negotiation between the undersigned and the owner. Furthermore, it is understood that any estimate with respect to time, materials, equipment, or service which may appear on the plans or in the specifications is for the sole purpose of assisting the undersigned in checking the undersigned's own independent calculations and that at no time shall the undersigned attempt to hold the owner, the Engineer, or any other person, firm or corporation responsible for any errors or omissions that may appear in any estimate. 2. The undersigned will furnish the bonds required by the specifications and comply with all the laws of the federal government, State of Oregon, and City of Ashland which are pertinent to construction contracts of this nature even though such Jaws or municipal ordinances may not have been quoted or referred to in these specifications. 3. All items for the contract for which forms are provided in the bid documents have been completed in full by the showing of a lump sum price or unit price for each and every item and by the showing of other information indicated by the proposal form. The undersigned submits the unit prices set forth as those at which the bidder MI1 perform the work involved. The extensions in the column headed "Total" are made up for the sole purpose of facilitating comparison of bids and if there are any discrepancies between the unit prices and the totals shown, the unit prices shall govern. 4. The undersigned agrees that the "Time of Completion" shall be as defined in the specifications and that the bidder will complete the work within the number of consecutive calendar days stated for each schedule after "Notice to Proceed" has been issued by the owner. 12 Bidder further agrees to pay as liquidated damages, for each calendar day thereafter, the sum of one hundred dollars ($100.00) for each day the project remains incomplete. 5. The undersigned, as bidder, acknowledges that addenda numbered ~ through ,:~ have been received by the bidder and have been examined as part of the contract documents. 6. The undersigned, as bidder, acknowledges that provisions of Oregon Revised Statute (O.R.S.) 279.350 relating to workers on public works to be paid not less than prevailing rate of wage shall be included in the contract. Name o f Bidder ~4 612:1'14 ~13Gra. ~&Oal 0rrt;~0 Address ~l-) ~'(b K.. (.oq Ct> Telephone No. (~.~'~.'~ ~-~[~ Proposal 13 CITY OF ASHLAND BID SCHEDULE ITEM ESTIMATE UNIT ~o. rrm tn, ers ?raCE ^MOtr~ 1 Site work Lump Sum /LS 2 Utility Trench Construction 1,642 LF /Z~,2 ~'~LF 2S.'.~qff, ,.55I 3 Street Light lnstallation 23 E^ %%.00 m^ //./?gOO 4 Tree Planting 12EA 5 Install Irrigation System Lump Sum 6 ~" Minus Crushed Rock 370 CY /o~0 .tOO /CY ~z-/~/0, O0 7 Install Catch Basin 4 EA 8 ]rnstan storm Or'An M=hole 1EA /o)t30,di3/EA 6.900 ,~0 9 LineInstall 12" PVC Storm Drain492 LF /,~, 7,..q-' /LF ~// 7/7, 00 TOTAL SCHEDULE DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION Proposal 14 The City reserves the right to reject any and all bids, waive formalities, or accept any bid which appears to serve the best interests of the City. The foregoing prices shall include all labor, materials, equipment, overhead, profit, insurance, and all other incidental expenses to cover the finished work of the several kinds called for. Unit prices are to be shown in both words and figures. In case of discrepancy, the amounts shown in words will govern. Upon receipt of written notice of the acceptance of this bid, Bidder shall execute the formal contract attached within ten days and deliver surety bond or bonds as required. The bid security attached in the sum of five percent of the total price for the bid or combination of bids is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth as liquidated damages for the delay and additional expense to the Owner caused thereby. The bidder is ~or is not a resident bidder as defined in O.R.S. 279.029. Firm Name of Bidder ~b vd h-txa..3-o~ q'~-"~rt e_ · Signature of Bidder Official Title State of Incorporation, if incorporated Dated this day of C.C.B. Number Proposal 15 IERFORMANCE AND PAYMENT BOND The undersigned N 6LT~c~(~o~ ~-~01~"~ ~l I ~q.' ~, as principal, further referred to in this bond as Contractor, and"/lV~Stt;~0~. ~1-~1~ , as surety, further referred to in this bond as Surety, are jointly and severally,bound unto City of Ashland, as obligee, further..~eferred to in this bond as City, in the sum ofJ/q2~) ~.tmo-'~'/~ .~:b4~R,~//.ff_.~'fbO~'.~gllars (Sb74/oq'..S'2P Contractor and City.have entered into a written contract dated for the following project: Oh-g- ~& K/.2). tOr.e~/e, cj~ 3/e c?~.¢~, ' This contract is further referred to in this bond as the Contract and is incorporated into this bond by this reference. The conditions of this bond are: If Contractor faithfully performs the Contract within the time prescribed by the Contract, and promptly makes payment to all claimants, as defined in ORS 279.526 through 279.542, then this obligation is null and void; otherwise it shall remain in full force and effect. If Contractor is declared by City to be in default under the Contract, the Surety shall promptly remedy the default, perform all of Contractor's obligations under the Contract in accordance with its terms and conditions and pay to City all damages that are due under the Contract. 3. This bond is subject to claims under ORS 279.526 through 279.542. This obligation jointly and severally binds Contractor and Surety and their respective heirs, executors, administrators, successors. Surety waives notice of modification of the Contract or extension of the Contract time. 6. Nonpayment of the bond premium shall not invalidate this bond. The bond number and the name, address, and telephone number of the agent authorized to receive notices c0nceming this bond are as follows: Bond Number Bond Agent Address Telephone Performance and Paymtmt Bond (p:ffp\bond-pay bnd) l'~ SIGNED this ~] day of WITNESS: (Corporate Seal) (Corporate Seal) Title ~fr.;S · ~g~ Address Attest: Surety By. Title Legal Address Attest: Corporate Secretary Corporate Secretary