HomeMy WebLinkAbout1994-072 Improvmt Agrmt - ODOTAuGust 1, 1994 Misc. Contracts & Agreement No. 11855 COOPERATIVE IMPROVEMENT AGREEMENT PRELIMINARY ENGINEERING AND CONSTRUCTION FINANCE THIS AGREEMENT is made and entered into by and between THE STATE OF OREGON, acting by and through its Department of Transportation, hereinafter referred to as "State"; and THE CITY OF ASHLAND, acting by and through its Elected Officials, hereinafter referred to as "City". W I T N E S S E T H RECITALS 1. By authority granted in ORS 366.770 and 366.775, State may enter into cooperative agreements with the counties and cities for the performance of work on certain types of improvements projects with the allocation of costs on terms and conditions mutually agreeable to the contracting parties. 2. For the purpose of providing acceptable traffic patterns on public highways, State and City plan and propose to construct a new traffic signal, with fire pre-emption, on the Rogue Valley Highway at Walker Avenue, hereinafter referred to as "project". The location of project is approximately as shown on the sketch map attached hereto, marked Exhibit A, and by this reference made a part hereof. 3. Design and construction of this project will be financed with funds available to State. 4. By the authority granted in ORS 810.210, State is authorized to determine the character or type of traffic control devices to be used, and to place or erect them upon State highways at places where State deems necessary for the safe and expeditious control of traffic. No traffic control devices shall be erected or maintained upon any State highway by any authority other than the State, except with its written approval. Traffic signal work on the project shall conform to the current state standards and specifications. B1394005/05632 -1- Agreement No. 11855 CITY OF ASHLAND NOW, THEREFORE, the premises being in general as stated in the foregoing RECITALS, it is agreed by and between the parties hereto as follows: STATE OBLIGATIONS 1. .State shall acquire all right-of-way, conduct the necessary field surveys, environmental studies, traffic investigations, foundation explorations, and hydraulic studies, identify and obtain all required permits, perform all preliminary engineering and design work required to produce final plans, preliminary/final specifications and cost estimates, arrange for necessary utility relocations, advertise for bid proposals, and award contract. 2. State shall furnish all construction engineering, field testing of materials, technical inspection, project manager services for administration of the contract and "As Constructed" redlined drawings for production of permanent mylar "As Constructed" plans. 3. State shall lay out and paint the necessary lane lines and erect the required directional and traffic control signing for the project. 4. State shall, upon satisfactory signal turn-on and at its own expense, perform all required signal maintenance and retain complete jurisdiction and control of the timing established for operation of the traffic signals. CITY OBLIGATIONS 1. City hereby grants State the right to enter onto and occupy City street right-of-way for the performance of construction and necessary maintenance of the traffic signal equipment, including vehicle detector loops. 2. City shall identify and provide State with any and all city required permits for the project. 3. City shall maintain the pavement surrounding the vehicle detector loops installed in City Street in such a manner as to provide adequate protection for said detector loops, and shall adequately maintain the pavement markings and signing on city street installed in accordance with the plans and specifications. 4. City, by execution of this agreement, does hereby give its consent as required by ORS 373.030(2) to any and all changes of grade within the city limits, if any there be, in connection with or arising out of the project covered by this agreement. 5. City shall, upon completion of the project and at its own expense, provide all power required for operation of the traffic signal. B1394005/05632 -2- Agreement No. 11855 CITY OF ASHLAND 6. City shall enter into and execute this agreement during a duly authorized session of the City Council. GENERAL PROVISIONS 1o State and City agree and understand that a mutual review of the traffic signal plans, specifications, and estimates will be conducted prior to advertisement for construction bid proposals. 2. The Contractor, its subcontractors, if any, and all employers working under this agreement are subject employers under the Oregon Workers' Compensation Law and shall comply with ORS 656.017, which requires them to provide workers' compensation coverage for all their subject workers. IN WITNESS WHEREOF, the parties hereto have set their hands and affixed thier seals as of the day and year hereinafter written. This project was approved by the Oregon Transportation Commission on September 15, 1993 as part of the Six-Year Transportation Improvement Program. The Oregon Transportation Commission, by a duly adopted delegation order, authorized the State Highway Engineer to sign this agreement for and on behalf of the Commission. A C MMENDED :egl on/~ianage r Traffic Engineer Date APPROVED AS TO LEGAL Asst. Attorney General Date APPROVED AS TO LEGAL SUFFICIENGSY City Attorney Date STATE OF OREGON, by a~through its D, epartmgnt of Transportation ~tate Highway Enginee~ CITY OF ASHLAND, by and through its Elected Officials / ~City Admlnl~a~ . 'Recorde / Date ~-/~- f~F(____/ THE CITY OF ASHLAND Billing Address: City of Ashland 20 East Main Ashland, OR 97520 B1394005/05632 -3- ROdUE RIVER HIGHWAY @ WALKER ROGUE VALLEY HIGHWAY JACKSON COUNTY KEY NO. 05632 CPROJECT :~J J J EXHIBIT ASNLAND