Loading...
HomeMy WebLinkAbout1992-147 Addendum - DEQDecember 29, 1992 I)I;PARTMk N F NJVII~,ONI M EiN'I A I QUALITY Mr. Steven M. Hall Public Works Director City of Ashland City Hall Ashland, OR 97520 Re: Addendum 2 to Stipulation and Final Order (SFO), No. WQ-SWR-91-202 Dear Mr. Hall: Enclosed for the City's records, please find a fully executed Addendum. S~ncerely, Richard J. Santner Municipal Projects Section Water '~-~-. ' ' ' Qu~ DIV!SlO~ cc: Enforcement Section, DEQ Southwest Region, DEQ Enforcement Section, EPA 811 5W Sixth A\mlue l*ollland, OR 972l)4 1390 (503) 229-~q696 IDD (51)3) 229-6993 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 BEFORE THE ENVIRONMENTAL QUALITY COMMISSION OF THE STATE OF OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY, OF THE STATE OF OREGON, CITY OF ASHLAND, Department, Respondent. ADDENDUM 2 TO STIPULATION AND FINAL ORDER No. WQ-SWR-91-202 JACKSON COUNTY WHEREAS: 1. On March 6, 1992, the Department of Environmental Quality (Department or DEQ) issued National Pollution Discharge Elimination System (NPDES) Waste Discharge Permit Number 100862 (permit) to the City of Ashland (Respondent), pursuant to Oregon Revised Statutes (ORS) 468.740 and the Federal Water Pollution Control Act Amendments of 1972, P.L. 92-500. The permit authorizes the Respondent to construct, install, modify or operate waste water treatment control and disposal facilities (facilities) and discharge adequately treated waste waters into Ashland Creek, waters of the state, in conformance with the requirements, limitations and conditions set forth in the Permit. 2. Paragraph 2.a. of Schedule C of the Permit requires that by no later than September 1, 1992, the permittee shall submit to the Department a final facilities plan report (FPR) for providing upgraded and expanded wastewater treatment facilities as needed to meet TMDL waste load allocations for attaining water quality standards in Bear Creek, to comply with Oregon's water quality 1 - ADDENDUM 2 TO STIPULATION AND FINAL ORDER (WQ-SW!R-91-202) (ASHLAND) (Revised 11-30-92) (MW~WC10~WC10975.5) 1 standard for chlorine residual and ammonia-nitrogen and to comply 2 with state and federal sewage sludge management requirements. 3 3. Stipulation and Final Order No. WQ-SWR-91-202 (Order) was 4 issued by the Environmental Quality Commission (Commission) to 5 Respondent on February 7, 1992. The Order was modified by 6 Addendum 1 issued by the Commission on September 9, 1992. 7 4. Paragraph 10A of the Order as modified requires that by 8 January 1, 1993, the Respondent shall submit a complete facilities 9 plan report for providing upgraded and expanded wastewater control 10 facilities as needed to 11 (a) meet the TMDL for Bear Creek; 12 (b) assure that any toxic impact of the 13 Permittee's discharge of chlorine residual or any 14 other toxic substance complies with OAR 340-41- 15 965(2) (p) for toxic substances and OAR 340-41- 16 965(4) for mixing zones; and, 17 (c) comply with state and federal sewage sludge 18 management requirements. 19 5. By form of a letter received by the Department on 20 November 3, 1992, the Respondent has requested that the schedule 21 for facilities plan report submittal be extended to July 1, 1993. 22 The extension would allow the Respondent to secure consulting 23 services and to evaluate the alternative of incorporating a 24 constructed wetland in the upgraded wastewater treatment 25 facilities. The Respondent has adopted policy objectives which 26 call for replacement in equal volume of effluent not discharged to 2 - ADDENDUM 2 TO STIPULATION AND FINAL ORDER (WQ-SWR-91-202) (ASHLAND) (Revised 11-30-92) (MW~WC10~WC10975.5) 1 Bear Creek during the summer months with water impounded in 2 Emigrant Reservoir, and for elimination of the need for the 3 Respondent to establish and maintain an irrigation system for 4 summer disposal of effluent. The Respondent wishes to determine 5 if use of a constructed wetland would accomplish these policy 6 objectives by producing an effluent that could be delivered to the 7 Talent Irrigation District (TID) in exchange for leaving flows in 8 Bear Creek which during the summer would otherwise be diverted to 9 the TID canal. 10 6. The Department concurs that a complete evaluation of the 11 above described alternative is highly desirable and that extension 12 of the facilities plan submittal date is warranted. 13 7. The Department and Respondent recognize that an extension 14 of the schedule will result in a violation of Paragraph 2.a. of 15 Schedule C of the permit. Therefore, pursuant to ORS 183.415(5), 16 the Department and Respondent wish to limit and resolve the future 17 violation specified herein in advance by this addendum to the 18 Order. 19 NOW THEREFORE, it is stipulated and agreed that the 20 Commission shall amend the Order as follows: 21 1. Change the compliance date in Paragraph 10A(1) of the 22 Order as follows: 23 (1) By July 1, 1993, the Respondent shall submit a complete 24 facilities plan report for providing upgraded and expanded 25 wastewater control facilities as needed to 26 (a) meet the TMDL for Bear Creek; 3 - ADDENDUM 2 TO STIPULATION AND FINAL ORDER (WQ-SWR-91-202) (ASHLAND) (Revised 11-30-92) (MW~WC10~WC10975.5) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 (b) assure that any toxic impact of the Permittee's discharge of chlorine residual or any other toxic substance complies with OAR 340-41- 965(2) (p) for toxic substances and OAR 340-41- 965(4) for mixing zones; and, (c) comply with state and federal sewage sludge management requirements. 2. Add the following subparagraph to Paragraph 10: E. Allowing the Respondent to submit a complete facilities plan report by July 1, 1993, as specified in Paragraph 10A(1) of this Order, Paragraph 2.a. of Schedule C of the Permit notwithstanding. 4 - ADDENDUM 2 TO STIPULATION AND FINAL ORDER (WQ-SWR-91-202) (ASHLAND) (Revised 11-30-92) (MW~WC10kWC10975.5) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 RESPONDENT Date Date/ DEPARTMENT OF ENVIRONMENTAL QUALITY Fr'ed Hansen, Director FINAL ORDER IT IS SO ORDERED: Date ENV~ONME~T~L[ k~QUALITY COMMISSION Fred Hansen, Director Department of Environmental Quality Pursuant to OAR 340-11-136(1) 5 - ADDENDUM 2 TO STIPULATION A/qD FINAL ORDER (WQ-SWR-91-202) (ASHLAND) (Revised 11-30-92) (MWkWC10kWC10975.5)