Loading...
HomeMy WebLinkAbout1990-066 Contract - SynergicSYNERGIC RESOURCES CORPORATION CONTRACT FOR CONSULTING SERVICES Issued by: City of Ashland Conservation Division 20 E. Main Street Ashland, OR 97520 Contact: Dick W~nderscheid (503) 488-5306 Contractor: Synergic Resources Corporation 1511 Third Avenue Suite 1018 Seattle, WA 98101 Contact: Lisa Skumatz (206) 624-8508 This agreement is a contract between the City of Ashland, Oregon and Synergic Resources Corporation (Contractor), under which the Contractor shall provide professional services to conduct a Demand Side Water Resources study for the City of Ashland, in accordance with the City of Ashland's Request for Proposals and the Statement of Work in the Contractor's Proposal #1672. The attached Issuer's Request for Proposals: Engineering/Consulting Services, dated August 1990, and the attached Contractor's Proposal #1672: Demand Side Water Resource Study dated September 27, 1990 are incorporated by reference. (continued) 111 Presidential Boulevard, Suite 127, Bala Cynwyd, PA 19004 · Phone 215-667-2160 · Fax 215-667-5593 Page Two of Three Consulting Services Contract City of Ashland and Synergic Resources In the event an inconsistency arises, it shall be resolved by giving preference in the following order: 1) this contract 2) the Issuer's Statement of Work 3) the Contractor's proposal. This is a firm, fixed-price contract in the amount of $25,000, limited to the above scope of work. Partial payment shall be made to the Contractor by the City of Ashland based on completion and acceptance of the indicated deliverables and receipt of proper invoices as follows: Task 1. Project Initiation Deliverable Meeting with Ashland staff. Draft and Revised Work Plan. 2. Analyze Unaccounted-for Draft of "unaccounted-for" water section $5,639 Water of report. 3. Identify And Screen Water Draft Working paper-identifying screening $2,821 Conservation Options 4. Detailed Analysis 5. Reporting Draft Woricing Paper containing detailed analysi§ of the selected options. Final Report describing the procedures used and the final conservation plan developed. Final Project Briefing for Ashland staff, including training in the use of Water Plan if so desired by the City of Ashland. Amount $3,248 $7,241 $6,051 (continued) Page Three of Three Consulting Services Contract City of Ashland and Synergic Resources This contract is limited to the above named scope of work. Any additions, deletions, or changes, etc. must be acknowledged in writing by both parties. Offered by: NAME, TITLE (503) 488-5306 City of ~hland 20 E. Main Street ~hland, OR 97520 Accepted by: Date Dilip R. Limaye, President Date (215) 667-2160 Synergic Resources Corporation 111 Presidential Boulevard, Suite 127 Bala Cynwyd, PA 19004