HomeMy WebLinkAbout1988-062 Water Supply Plan0 o 0 --~ 0 ~D << q ! ! X 0 ,id o~ Scope of Service Ashland Water Supply Study Attachment A October 20, 1988 Page 1 The following work scope has been established for the Ashland Water Supply Study. The scope identifies four tasks which will be completed ini- tially. Task 1 - Water Demands The purpose of this task is to prepare a tabulation of water system demands for the 1989 to 2010 time period. These demands will be based upon population data provided by the City of Ashland. Specific tasks include: 2. 3. 4. 5. Tabulation of population estimates. Analysis of per capita usage. Estimate of delivered water demand. Estimate of treated water demands. Estimate of raw water demands. Task 2 - Annual Raw Water Yield from Existin9 Sources This task will focus on making an updated estimate of the water supply available from the City's existing diversions, Reeder Reservoir and from water purchased from the Talent Irrigation District (TID). The analysis will utilize historical records to determine the probability of the system yielding a firm water supply. Specific tasks include: Tabulation of historical stream flow records and synthesis of miss- ing records. Evaluation of yield from Reeder Reservoir, including allowances for downstream rights, evaporation, and sluicing; yields will be based upon historical flow records using probabilities based upon these past events. The supply from the TID will be evaluated based upon the existing contract and the hydrology of the TID system. The yield of the combined TID and City system will be determined. The above results will be compared with the raw water demands from Task 1 to determine present and future water supply deficiencies. Statistical probabilities of water shortages occurring will be pre- sented. (L4131e) Scope of Services Ashland Water Supply Study (cont'd) Attachment A October 20, 1988 Page 2 Task 3 - Winburn Reservoir Evaluation The proposed Winburn Dam and Reservoir will be evaluated as a source of water to meet expected water shortages. Existing data will be util- ized extensively and no new field data will be developed. Tasks include: Compilation of physical data (area vs. capacity, drainage area, runoff, dam embankment volumes, spillway design data, etc.). Annual system yields will be developed using the same statistical basis used in Task 2. The yield for several reservoir sizes will be compared with the projected water demands. Reservoir capacities will be selected to meet water demands for several drought occur- rence probabilities. e The existing cost estimate for the dam project will be reviewed and updated and extrapolated to cover several reservoir sizes. e The potential for generating supplemental hydropower from the res- ervoir will be briefly evaluated. Task 4 - Implementation Schedule - Report A schedule for completing additional studies, obtaining peri, its, designing, and constructing Winburn Dam will be prepared and included in the study report. A number of scenarios will be presented; this will al low Ash- land to evaluate options based upon the availability of the various water sources and the probability of meeting projected demands. All of the above tasks will be compiled into a draft project report which will be submitted to Ashland for review. The final report will include an Executive Summary suitable for distribution to a non-technical audience. The results of the study will be presented at a meeting of the City Council. In addition, the results of Tasks 1 and 2 will be presented to the City staff when they are completed. A total of ten (10) copies of the draft report and fifty (50) copies of the final report will be provided to the City. (L4131e) Attachment B October 20, 1988 Payment Schedule Ashland Water .Supply St.u.dS Per Part II, the estimated total amount to be paid for services and expenses by the client shall not exceed ~21,150. The following is an itemization of personnel expected to work on the project with hourly salary costs estimated hours and expenses. Individual or Estimated Hourly Task Activity Hours SalarS Cost Total Cost(l) 1 Mike Stansbury 24 36 $ 2,070 Brad Einfeld 8 33 630 Expenses 500 Subtotal $3,200 Mike Stansbury 40 36 $ 3,460 Brad Einfeld 8 33 630 Mike Giseburt 40 21 2,020 Graphics 12 16 460 Typing 8 12 230 Expenses 1,500 Subtotal $ 8,300 Mike Stansbury 30 36 $ 2,590 Graphics 4 16 150 Typing 8 12 230 Expenses 170 Subtotal $ 3,140 o Mike Stansbury 32 36 $ 2,770 Graphics 24' 16 920 Typing 32 12 920 Expenses 400 Printing Costs 1,500 Subtotal $ 6,510 Total Estimated Cost $21,150 (1)Includes 2.4 multiplier on salary costs. (L4131e) R.W. BECK UU-OOOO-BD-AB November 3, 1988 Mr. Steven M. Hall, P.E, Public Works Director City of Ashland City Hall 20 East Main Street Ashland, Oregon 97520 Dear Mr. Hall: Subject: Addendum to Water Supply Study Profe~sionQ.l: Servic)} Agreement As we discussed on the telephone yesterday, three additional tasks are to be added to our Agreement. The tasks are as follows: Task 1 - The impact of water usage due to visitors to Ashland during the tourist season will be evaluated. Task ~ - The impact of maintaining minimum flows in Ashland Creek upon existing and future yields will be evaluated. Task A brief, reconnaissance level appraisal of obtaining water from Medford will be undertaken. The cost of a pipeline and pumping station will be prepared. The additional cost of including these tasks in our work scope is as follows: Task 1 - No additional cost; this information will be developed concur- rent with existing water usage data. Task 2 - Task 3 - Four additional hours for Mike Giseburt at a cost of $200.00. Six additional hours for Mike Stansbury and 2 hours of graphics for a cost increase of $600.00. The increase cost of $800.00 brings the total estimated cost for the contract to $21,950, Mr. Steven M. Hall, P.E. -2- November 3, 1988 If you have any questions or need additional information, give me a call. Very truly yours, R. W. BECK AND ASSOCIATES please MRS/ato (A431 Se) Michael R.-St~ansb'u'Fx [ ....... Executive Engineer Approved on: STEVEN M. HALL, P.E. PUBLIC WORKS DIRECTOR CITY OF ASHLAND