HomeMy WebLinkAbout1983-074 Installation PermitJACKSON COUNTY DEPARTmeNT OF PUBLIC WORKS
200 Antelope Road
White City, Oregon 97503
UTILITY INSTALLATION PERMIT
NAME CITY OF ASHLAND DATE
(Contracting Agency or O~.zner)
ADDRESS City Hall Ashland, OR 97520 PHONE
September 13 , 1983
482-3211 ext. 238
This permit is granted to you subject to the General Conditions stated below and the
Special Conditions attached. Violation of any of said conditions will constitute sufficient
cause for permit cancellation. ANY WORK ON ANY PORTION OF THE INSTALLATION DESCRIBED BELOW
WITHOUT A VALID PERMIT CONSTITUTES A VIOLATION OF O.R.S. 374.305.
Description of installation Emergency water leak repair in center of road.
NOTE: Work done at 3:00 a.m.
Location ~of installation
350 TOLMAN CREEK ROAD
GENERAL CONDITIONS:
1. This permit is granted for use only on roads under the Jurisdiction of the Jackson
County Board of Commissioners and is not valid upon any federal highway, state highway,
city or town street, or any road not on the county road system of Jackson County.
2. The Jackson County Department of'~Public Works is to be notified a minimum of 24 hours ~.
prior to starting work within a qounty road right-of-way (776-7268 or 826-3122).
3. As provided in O.R.S. 758.010 the, Public Works Department, acting on behalf of the
County Board of Commissioners, ma~ designate where utilities may be located within a
County road right-of-way and may prder the location of such facility changed if deemed
expedient. ~
4. Permittee shall be responsible folr all damages caused by any operations associated
with the utility installation. ~11 damaged areas shall be restored to an "as good as,
or betterthan" condition as existed prior to the utility installation.
5. Permittee agrees to hold the County of Jackson harmless and blameless from any damages
that may be caused by the installation, maintenance, or operation of the above-described
utility.
6. Permittee shall be responsible for restoration and maintenance of all areas adversely
affected by the utility installation for a period of two (2) years after completion
of the project.
By acceptance of this permit, permittee agrees to be responsible for all permit conditions,
including the attached Special Conditions, and said responsibility shall survive the
termination of this permit.
ACCEPTED:
September 9 , 19 83 .
By:
/U~/~~i~t at ive)
EXPIRATION DATE: Sept. 30, 1983 sdw
COMPLETION DATE:
APPROVED: September 13 .. , 19 83
· (Ad~ r-iz e~ep resent at ire)
Utility Inspector
For:
(Title)
Robert J. Carstensen
Director of Public Works
Revised 12-04-81 WJG/sdw