HomeMy WebLinkAbout1983-090 Easment Conditions-CoeDEPARTMENT OF PUBLIC WORKS
Allen A. ,Rising, Director
CITY HALL
503-482-3211
al!lanb
ASHLAND, OREGON
97520
April 13, 1983
Merilyn Coe
1313 Clay St.
Ashland, OR
97520
Dear Ms. Coe:
I would like to thank you for your help in our recent
discussions concerning the proposed pipeline easement through
your property.
The intent of this letter is to set forth the conditions
under which you agreed to give the easement. The conditions
are as follows and are items which the City of Ashland agrees
to do:
The south end of Clay Street between the end of the
pavement and your paved driveway (approximately 420
feet) will be graded and rocked with 3/4" - 1"
crushed rock, and drainage ditches will be cleaned
and or re-established. This work will be done during
the summer of 1983. The present schedule calls for
completion of the south Clay Street portion of the
job about September 1, 1983. We will however,
schedule the street work for within 15 days of the
actual completion date of the pipe work, whenever
that is.
The City will allow you to connect one four-inch
sewer lateral to the City owned sanitary sewer at a
point near the lower end of your driveway as shovm on
the attached plat. There will be no charge for this
connect but you will, of course, be subject to the
regular out-of-City monthly service charge at whatever
rate is in effect for other out-of-City services. This
rate does change from time to time.
A portion of the easement is in the roadway which
serves the Frazier residence and you noted some concern
for his access. The City has discussed this with
Mr. Frazier and he is in agreement with the City's
Merilyn Coe
April 13, 1983
Page Two
proposed rehabilitation plan. Upon compilation of the
project the City will regrade the road and replace any
paved or rocked areas in kind. That is to say, with
pavement or rock to match that which is removed, dis-
turbed or damaged. Prior to any work on that portion
we will meet to come to an agreement as to what is there
now so there will be no disagreement later.
It appears to us that the portion of the pipeline insta-
llation through your pasture, westerly of Clay Street,
should not take any longer than two weeks. We will
place a provision in the specifications whereby if this
installation takes longer than that, the contractor will
be required to erect a temporary fence around the con-
struction area so that you can return your horses to
your pasture. The fence must be satisfactory to you
and I am thinking of metal posts spaced ten feet apart
with the fence being woven wire about 64 inches high.
Please let me know if this is not satisfactory.
I think this covers everything we discussed earlier. If so,
we would appreciate your signing and returning one copy of this
letter and the attached agreement.
We appreciate your help in facilitating this water line pro-
ject.
Very truly yours,
Allen A. Alsing, P.E.
Director of Public Works
AAA: dp
Attachments /
I have reviewed this letter and agree to all of the
provisions outlined.
Merilyn~O~e
Date