Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2004-103 Contract - Blackline IncCITY OF ASHLAND
CONTRACT FOR PUBLIC WORKS CONSTRUCTION
Contract made this 6 th day of
between the City of Ashland, ("City") and Blackline, Inc.
May 2004
"(Contractor").
City and Contractor agree:
1. Contract Documents: This contract is made as a result of an
Advertisement for Bid issued by City for the 2004 Slurry Seal Project. Contractor
was awarded the bid as the lowest responsible bidder. In the event of any
inconsistencies in the terms of this contract, the contract documents defi,ned in
the Advertisement for Bid and Contractor's bid, this contract shall take
precedence over the contract documents, which shall take precedence over the
bid.
2. Scope: Contractor shall begin and complete the project described in
the contract documents within the time prescribed in the contract documents.
The following exceptions, alterations, or modifications to the contract documents
are incorporated into this contract:
3. Price & Payment: City shall pay Contractor amounts earned under the
contract. All payments will be made at the times and in the manner provided in
the contract documents.
4. Bond: Contractor shall, within five days after execution of the contract
and prior to doing any work under the contract, furnish bond to the City of
Ashland in a form and with a surety satisfactory to City in the penal sum of Forty-
One Nine Hundred Five Thousand Dollars and Forty-Five Cents, conditioned
upon the faithful performance of this contract upon the part of the Contractor.
5. Default: A default shall occur under any of the following
circumstances:
5.1 If the Contractor fails to begin the work under contract within the, time
specified, or fails to perform the work with sufficient workers or equipment
or with sufficient materials to insure the prompt completion of the project,
or shall neglect or refuse to remove materials or perform anew such work
as shall be rejected as defective or unsuitable, or shall discontinue the
prosecution of the work.
G:\pub-wrks\eng\dept-admin\ENGINEER\PROJEC'l'~004~004 Slurry Seal Blackline Contract 5 04.doc
5.2 If the Contractor shall become insolvent or declared bankrupt, or commit
any act of bankruptcy or insolvency, or allow any final judgment to stand
against the Contractor unsatisfied for a period of forty-eight (48) hours, or
shall make an assignment for the benefit of creditors.
5.3 From any other cause whatsoever, shall not carry on the work in an
acceptable manner.
6. Remedies: In addition to the rights and remedies to which the City
may be entitled by law for the enforcement of its rights under this contract, City
shall have full power and authority, without violating this contract, to take
prosecution of the work from the Contractor, and appropriate or use any or all of
the materials and equipment on the ground that may be suitable and acceptable
and may cause a contract for the completion of this contract according to its
terms and provisions, or use such methods as required for the completion of the
contract, in any acceptable manner. All costs and charges incurred by the City
together with the costs of completing the work under the contract, shall be
deducted from any money due or which shall become due the Contracto~r. In
case the expense so incurred by the City shall be less than the sum which would
have been payable under the contract if it had been completed by the Contractor,
then the Contractor shall be entitled to received the difference less any damages
for delay to which the City may be entitled. In case such expense shall exceed
the sum which would have been payable under the contract, the Contractor and
the surety shall be liable and agree to and shall pay the City the amount of the
excess with damages for delay of performance, if any.
7. Prevailinq Wage Rates: The Contractor shall pay a fee equal to one-tenth
of one percent (0.1 percent) of price of this Contract. The fee shall be paid on or
before the first progress payment or 60 days from the date work first begins on
the Contract, whichever comes first. The fee is payable to the Bureau of' Labor &
Industries and shall be mailed or otherwise delivered to the Bureau at the
following address:
Bureau of Labor & Industries
Wage & Hour Division Prevailing Wage Unit
800 N.E. Oregon Street #32
Portland OR 97232
G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT~2004~004 Slurry Seal Blackline Contract 5 04.doc
8. Living Wage Rates: If the amount of this contract is $15,000 or more,
Consultant is required to comply with chapter 3.12 of the Ashland Municipal
Code by paying a living wage, as defined in this chapter, to all employees
performing work under this contract and to any subcontractor who performs 50%
or more of the service work under this contract. Consultant is also required to
post the attached notice predominantly in areas where it will be seen by all
employees.
The Contractor shall fully comply with the provisions of ORS 279.348 through
279.365 pertaining to prevailing wage rates.
CONTRACTOR
CITY OF ASHLAND
Gino Grimaldi ~',,,~,~.~_
City Administrator~.~~
REVIEWED AS, TO CONTFNT:
D/e/partment Head [)ate:
Coding:
(For City use only)
G:\pub-wrks\eng\dept-admin\ENGINEER\PROJEC'l'~004~2004 Slurry Seal Blackline Contract 5 04.doc
05×28×2004 14:~4 MOLONEY~O~NEILL~¢ORKERY ~ IONES a 1541~886006 N0.~56 ~01
AC.O. RD. CERTIFICATE OF LIABILITY INSURANCE
PROO~CEn (S09)~2~-~02'4 '~ (S09)~25-1803 ~IS CERTIFICA~ IS ISSUED AS A MA~TER OF INF~RMA~ON
Mo]oney, O'Neill, Corkery ~ 3ones, Inc. ONLYAND CONFERS NO RIGHTS UPON ~E CER~FICATE
HGLDE~ THIS CERTIFICATE DOES NOT'AMEND. ~END OR
~2~6 N L~ncaln, Suite ~ AL~R ~E CO~GE AFFORDED BY THE POLICIES BELOW.
Spokane, HA 9920~
INSURERS AFFORDING COVE~GE NAIC
~,s~;o Blackllne Znc ' ' ~,;u~: ~r~an States Znsurance Co'
Spokane, ~A 9~ZOa ~a~Ea:: "'
,
INSURER D:
IN~U~ E;
, ~1 ~ i =, = , ,,
COVER~iES
THE PO~'CIES OF INSURANCE LIb-'TED BELOW HAVE BE--EN ISSUED TO THE INSURED NAMED AEIOVE FOR THE POUCY PI~'RIOD INDICATED, NO"FWITHSTANOIN
ANY REQUIREMENT, TEI~! OR CONDITION OF ANY CONTRACT OR OTHER CICICUMENT WITH RESPECT TO WHICH THI~ CERT(FIC,~TE MAY BE[ IS,SUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POUCIE$ DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POMGIF.~, AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
OE, URA~.U.~aUTY 0].CG30:14.222i 02/17/~004 02/.1.7/Z0OS F..ALCHOOCuRRF, NCE '$
X COMMERCIAL GENER,'U. LUtEiILITY DAMA~b-RENTF~ $
u~ F, XP (~y me.,a.~) s 10,000
A X Blanket Additional PERSC)NAL&ADVI~qJIJF[¥ $
X Insured CG763S1001' GENeRaL AGGREGATE $
GEN'L AGGREGATE UMIT APPLIES PEl~ PRODuGT~ · ~OMr/OP AGG' S Z p .0~.0,000
pO_
AUTOMOB~LE~L,TY '01CG3014222 02/17/2C~04' 02/17/2b0S COM6,NEE)SINGLtLIMIT $ '
X ~ AUTO ¢~a accord} 1, O00.~ 00(]
ALL OWNED AUTO8
;CI4EOULED AUTO~ (Per
A
X HIRED Au'roB Rte)OILY INJURY
X NON-OWNED AUTOS (Pet ecctdenl) $
, ,
PROPERTY DAMAGF
(Par eo~ide~} $
(~alq~Ge ~ ' , , AUTO ONI.~' · F.,A AOCIOENT $
,,
ANY AUTO OTHER THAN F.,A ACC $ .......
AUTO O61LY: AGG $
-.-. DEDUCTII~.E $
RLe'rENTION ~ $
~X/a:x~ mc(;)~.4:,z:~ oz/z?/:,o04 0;i/z;/:,oos' ~w~s~rx'ru-~ i%~' "
eaeLo~, u,~;u~ tVASHZNG'T~ STOP GAP ;~., ~c. ACC~D~T
A ANY PROI:q~JETORn'ARTNEPJEXECUTIVE
OFFICF. R/MEMBER EXCLUDED9 E.L. O~F-.A.~E - EA EMPLOYEE
~PECIAL PROVISIONS below E,L. DI-~EA~E - POLIC,~ LIMIT $ ].
OTHER
O~GCRIPql°N O~ OPeRA~O~/L~CAllOHS / .VI~HICLES t EXCLUSIONS ~elO BY EI~DOR~.MI~TI ~PECIA~. PROVISIONS
IE: 2004 cz'rY OF ASHLAND SLURRY SEAL PRO:IECT
:I'TY OF ASHLAND TS NAINED AS ADD/T]:ONAL ZNBUREDS N2TH RESPECTS TO THE
%BOVE PRO3ECT AS SHOt~I ABOVE.
CERTIF!¢ATE HOLDER
OF As. O
ATTNT DAI~ LAF1B
20 E MA:EN STREET
ASHLAND, OR 975Z0
ACORD 25 {2-00tl0e) FAX: (541)488-6006
CANGELLA, TION , ..
ANY OF 11~ ABOVE DEaCRII~ED POLICfE~ ~ C,~EL~ BEFORE ~E
~~ DATE TH~E~, ~E ~SUrHG INSURER ~. E~VOR TO ~L
DAY8 ~N NOTICE TO THE CERTIfl~TE ~r~Ea ~MED TO ~ ~.
AUTHORI2ED REPRESl;NTATIVE
T'im_ ~arneP/C:LH
@ACC)RD CORPORATION 1988
~4~4 ~OLONEY,O'NEILL,CORKERY ~ ~ONES + 1~4~4886006
85/28/2884
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. A statemer~t
on this certificate does not c~nfer rights to the certlflcat~ holder In lieu of such endorsement(s).
ff SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights t~ the certificate
holder in lieu of such endorsement{s),
DISCLAIMER
The Cer~flcate of Insurance on the reverse side of this form does not constitute a contract between
the isauing insurer(s), authorized representative or producer, and the ce~ficate holder, nor does It
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed there,)n.
&CORD 25 (200'1i08}
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541 ) 488-5300
VENDOR: 008572
BLACKLINE INC
PMB 196 13023 NE HWY 99 STE 7
VANCOUVER, WA 98686
FOB Point:
Terms: Net
Req. Del. Date:
'Special Inst:
CITY RECORDER'S COPY
Page 1 / 1
5/28/2004 I [i 05108
SHIP TO: Ashland Street Department
(541) 488-5313
90 N. MOUNTAIN
ASHLAND, OR 97520
Req. No.:
Dept.: PUBLIC WORKS
Contact: Paula Brown
Confirming? No
Description
2004 Slurry Seal Project for Street
Department
Bid
Date of Agreement: May 6, 2004
'Start Date: June 1,2004
Completion Date: July 15, 2004
InSurance required/On file
Project No: N/A
Unit Price
Ext. Price
SUBTOTAL
TAX
FREIGHT
TOTAL
41,905.45
41.905.45
0.00
' ~i;i~horized Sfgnafure VENDOR COPY
Account Nomber Amount Account Number , · Amount
260.08.12.00.602400 41,905.45
BILL TO: Account Payable
20 EAST MAIN ST 0.00
541-552-2028 41,905.45
ASHLAND, OR 97520
REQUISITION
No. PW -FY 2004
Department Street Department
Vendor BLACKLINE, INC.
PMB 196 13023 NE HWY 99 STE 7
VANCOUVER WA 98686
Account No. 260.08.12.00.602400
Date May 18, 2004
Requested Delivery Date ASAP
Deliver To JOHN PETERSON
Via
(* Note: Please allow approximately two(2) weeks for delivery on items not
generally caried in stored, and approximately two (2) months on printing jobs.)
Item No. Quantity Unit Description Use of Purchasing Office Only
Unit Price Total Price PO No.
2004 Slurry Seal Project for the Street Department
with Blackline Inc.
TOTAL $41,905.45
for Kari:
BID /RFP / EXEMPT: Bid
Contract Start Date: June 1, 2004
Contract Completion Date: July 15, 2004
Insurance on file: I YES I NO
Project No: NA
Job No. Unit No.
I hereby certify that the above items are necessary for the operation
of this department and are budgeted
De~ment~Head~or= ~orized Person
Issued By
Date
Received By