CONTRACT CHANGE ORDER NO. 2
MAIN FEEDER/RAWWATER LINE UPGRADE DATE: NOVEMBER 18, 2004
ASHLAND WATERSHED PROJECT NO.: 03-15
CONTRACTOR: BROWN & CALDWELL
You are requested to perform the following described work upon receipt of an approved copy of this
document or as described by the Engineer:
Item No. Description Unit Price Amount
A ..J _"... "I r-. . ~ -~
""" I"\IU III IIUtel!. t;;;.1t9HICCIII 19 """
Item A Increase in design time for additional 8 hours to include utility $1,700.00 $1,700.00
vaults and concrete encased duct banks to plans and
specifications
Item B Altitude Valve Vault $1,800.00 $1,800.00
Item C Flow Control Valve Vault $2,300.00 $2,300.00
Item 0 Flow Metering Vaults: 2 each 24 inch pipeline $2,000.00 $2,000.00
Item E Flow Metering Vaults: 16 Inch pipeline $1,000.00 $1,000.00
Item F Crowson Overflow Structure $1,000.00 $1,000.00
Item G Overflow Outlet $900.0 $900.0
Item H Backwash Pond Drain Piping $1,100.00 $1,100.00
Item I Additional T opo Survey for Backwash Pond $300.00 $300.00
Item J Overflow Drain Pipeline Parallel Pipelines $5,600.00 $5,600.00
Item K Overflow Drain Pipeline Individual Pipeline $1,000.00 $1,000.00
Item L Additional Topo Survey for Overflow Pipeline $1,600.00 $1,600.00
Item M Competitive Bidding Savings; HOPE vs DIP $600.00 $600.00
Item N 6-lnch Sanitary Sewer $2,000.00 $2,000.00
Item 0 Mechanical Details $300.00 $300.00
Item P Electrical Details $400.00 $400.00
Item Q Additional Pipeline Survey for Briggs Easement $1,000.00 $1,000.00
Item R Granite Street Reservoir Area $1,200.00 $1,200.00
Item S WTP Powerhouse Area Topo Survey $700.00 $700.00
Item T Bridge to Clearwell Topo Survey $1,300.00 $1,300.00
ENGINEERING
20 E. Main Street
Ashland, OreQon 97520
WWW.aShland.or.us
G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT\2003\03-15 Ch Od 2.doc
Tel: 541-488-5347
Fax: 541-488-6006
TTY: 800-735-2900
r.,
Item U Additional Topo Survey Slide area at Hosler Dam $700.00 $700.00
Item V Additional Topo Survey for Reservoir Elevations $600.00 $600.00
ItemW Access Road Culverts and Inlets 16 each $1,600.00 $1,600.00
Item X Jackson County Permit Fee $200.00 $200.00
ItemY Arborist for City Permit $400.00 $400.00
Item Z FERC Interface for DIP use 48 hours at $120.00 $4,300.00 $4,300.00
Item AA Hydraulic Analysis Elevation to Remove need for Future $9,400.00 $9,400.00
Facilities
Original Contract Amount
Total this Change Order
Previous Change Order
Revised Contract Total
$279,000.00
$45,000.00
$16,900.00
$340,900.00
Accepted By:
The time provided for completion of this contract is increased by no calendar days. This
document shall become an amendment to the contract and all provisions of the contract will
apply. J
Recommended By: "/flJ~. :;;;"e~
Engineer "
;t:(;tt711--
ar
C ntractor:
CW\ WC\,l-z..
Date
Approved By:
..--
t, J?L~ ()4
Date
" /2 C} /a~
Date '
, PE
Brown & Caldwell
1025 Willamette Street Ste 300
Eugene OR 97520
ENGINEERING
20 E. Main Street
Ashland, Or~on 97520
WWW.aShland.or.us
G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT\2003\03-15 Ch Od 2.doc
Tel: 541-488-5347
Fax: 541-488-6006
TTY: 800-735-2900
r.,
~..
IF_~
CITY RECORDER'S COpy
Page 1 /1
CITY OF ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541 ) 488-5300
DATe
7/1/2004
04826
VENDOR: 008217
BROWN & CALDWELL
PO BOX 45208
SAN FRANCISCO, CA 94145-0208
SHIP TO: Ashland Public Works
(541 ) 488-5587
51 WINBURN WAY
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date: 1/5/2004
Speciallnst:
Req. No.:
Dept.: PUBLIC WORKS
Contact: Paula Brown
Confirming? No
THIS IS A REVISED PURCHASE ORDER
BLANKET PURCHASE ORDER
Engineering design for the Raw Water
and Main Feeder Line from Reeder
Reservoir to the Water Treatment Plant
279,000.00
RFP
Date of agreement: January 16, 2004
Completion date: September 2004
Insurance required/On file
Revised purchase order 09-14-2004
Service costs for permit application,
Task 5-7 on attached letter 08/13/2004
Revised purchase order 12-13-2004
Change Order NO.2
Items A - 2, AA
16,900.00
45,000.00
*** This is a change order. ***
BILL TO: Account Payable
20 EAST MAIN ST
541-552-2028
ASHLAND, OR 97520
SUBTOTAL
TAX
FREIGHT
TOTAL
340 900.00
0.00
0.00
340,900.00
E 670.08.15.00.704200
E 670.08.36.00.704200
255 675.00
85 225.00
~ 2_ . ~ /zA-pd;
--~~ature 7'
VENDOR COpy
REQUISTION FORM
THIS IS A REQUEST FOR A:
[X] Change Order (existing PO# 4826 )
Cllry OF
ASHLAND
Date of Request:
Required Date of DelivE~ry/Service:
Vendor Name:
Address:
City, State, Zip
Phone:
Project Title:
Project Number:
BROWN & CALDWELL
PO BOX 45208
SAN FRANCISCO CA 94145-0208
541/686-9915
MAIN FEEDER RAW WATER LINE UPGRADE
03-15
Services Only Solicitation Process:
[ ] Exempt [ ] 3 Written Quotes (copies
attached)
[ ] Sole Source [ ] Invitation to Bid (copies on
file)
[ ] Less than $5000 [X] Request for Proposal (copies
on file)
Description
Original Contract Cost for Raw Water Line Upgrade Engineering
Service costs for permit application, Task 5-7 on attached letter 8/13/04
Change Order 2 Itemized Below ($45,000.00)
Additional design time for utility vaults and encased duct banks
Altitude valve vault
Flow control valve vault
Flow metering vaults; two 24 inch pipelines
Flow metering vaults; 16 inch pipeline
Crowson overflow structure
Overflow outlet
Backwash pond drain piping
Additional topo survey for backwash pond
Overflow drain pipeline parallel pipelines
Overflow drain pipeline individual pipeline
Additional topo survey for overflow pipeline
Competitive bidding savings; HDPE vs DIP
6-inch sanitary sewer
Mechanical details
Electrical details
Total Cost
on: 7/15/02
I
Additional pipeline survey for Briggs easement
Hydraulic analysis elevation to remove need for future facilites
Granite Street reservoir area
WTP powerhouse area topo survey
Bridge to clearwell topo survey
Additional topo survey slide area at Hosler Dam
Additional topo survey for reservoir elevations
Access road culverts and inlets; 16 each
Jackson County permit fee
Arborist for City permit
FERC interface for DIP use, 48 hours at $120.00 each
Account Number 670.08.15.00.704200 = 75% ($33,750.00)
.Please attach the Original signed contract and Insurance Certificates.
Account Number 670.08.36.00.704200 = 25% ($11,250.00)
Employee Signature, 1111fl r;,,~ Supervisorf Dept. Head Signature, ,C-
NOTE: By signing this requistiion orm, I certify tha the above request meets with Ctiy of Ashland Solicitiation Process requirem
G:Pubwrks\Eng\03-15 Brown & Caldwell CO No 2.xls
Updated on: 7/15/02