HomeMy WebLinkAbout1997-075 CONT AMND #1 - OTAK Amendment No. 1 to Engineering Services Contract for Ashland Creek Flood Restoration Project June 24, 1997 Introduction Engineer shall provide the following services related to the Winburn Way crossing design and alternatives analysis. These services are in addition to those services identified in Exhibit 1 to the Engineering Services Contract (Agreement) between the City of Ashland (Oity) and Otak, dated May 22, 1997. Additional Design Services The scope of work for these additional design services shall be based on the descriptions and assumptions outlined in attached Exhibit "A" (letter dated dune 20, 1997). TASK SUMMARY 1. Project Management for the items of work identified in this amendment. 2. Geotechnical Investigation for Winburn Way, Water Street, and flood wall in Lithia Park. 3. Preliminary Engineering Services (bridge alignment, utilities location, etc.) 4. Design of Lithia Park flood wall (provided modeling supports the installation of the wall). Permit processing for flood wall (City, DSL, etc.). Presentation of alternatives/status to City Council. Test of crossing design and channel improvements in HEC-RAS model (2). Prepare final design drawings. Present 95% design drawings to City at technical review meeting. Complete project plans, specifications and bid package. Assist City in sole-source procurement of prefabricated bridge from Con Span. 6. 7. 8. 9. 10. 11. 12. Permit processing for bridge (Corps of Engineers DSL, etc.). 13. Provide bidding services. Compensation Compensation for the completion of these additional services shall be on an hourly, not- to-exceed basis per the table in attached Exhibit A. Otak, Inc. By'~ City of Ash_~l, nd . / '-~'Brian Almquist, Ci~/ministrator Revie~as t o :.nte~..........._ G~eg ~cole:Xssist%~t Ci~ Administrator Reviewed as to By: ~ Paul Nolte, Ci~ AAorney June 20,1997 Mr. Greg Scoles Assistant City Adininistrator City of Ashland City Hall, 20 East Main Street Ashland, Oregon 97520 CI1¥ OF ASHLAN Re' Scope of Work and Fee- Winburn Way Crossing Replacement Design Services ~ Otak Project No. L7844. W03 Dear Greg: 17355 SW Boones Ferry Rd Lake Oswego, OR 97035 Phone (503)6~5 3t~18 Fax (503) 635-5395 620 Kirkland Way, #100 Kirkland, WA 98033 Phone (20~) 822 444~ Fax (20~) $27-9577 Following our public meeting on June 12 relating to the Winburn Way Crossing design alternatives and schedule, you informed me of the City's desire to proceed with design of a replacement for the Winburn Way culvert. Per your request, I have revised our fee estimate for providing preliminary and final design services to the City of Ashland for replacement of the Winburn Way culvert. The enclosed fee estimate includes an hourly breakdown by task of the services that need to be performed. We will not exceed the budget for any individual task without first obtaining your approval. This estimate is based on the following assumptions and understandings: Design work under this contract modification will be limited to the Winburn Way site and proposed adjacent floodwall in Lithia Park only. We will start work on preliminary layout and design for a Con Span type prefabricated bridge at this site as soon as we receive your authorization to proceed. No other bridging option shall be considered because it could not be constructed this year. Design of the floodwall can be accomplished very quickly if results of the computer modeling work now underway indicate that the wall will be beneficial for flood control. A geotechnical investigation is required to determine foundation conditions for the new structure. Geotechnical work will be performed by Squier Associates and will consist of two borings each at the Winburn Way and Water Street sites, plus two test pits to document subsurface soil conditions for the proposed flood wall in Lithia Park. We are drilling two sites now because of significant cost savings associated with a single mobilization of the drill rig and crew ($16,000 for the two sites versus $10,000 per site if accomplished individually). A single report of findings and recommendations will be prepared for both sites. The results and recommendations from the two test pits along the proposed flood wall alignment in the park will be discussed in a separate letter report. Arch+lect$ Englnears Landscape Archrlects Planners Sclentlsls Surveyors Urban Designers P: \ PROJECT \ 7800 \ 7844 \ CONTRACT \ W03 ;"L Mr. Greg Scoles Scope of Work and Fee -- Winburn Way Crossing Replacement Design Services Page 2 June 20, 1997 Before proceeding beyond the preliminary design stage, I will attend a special workshop with the City Council to brief them on the project and get their authorization to proceed with final design and preparation of bidding documents. Our expectation is that this project needs to be accelerated so construction can occur this fall and the bridge can be placed in service before the next rainy season. To that end, it will be necessary for the city to sole-source the procurement of the prefabricated bridge from Con Span. A contractor will be selected on the basis of competitive bids to carry out site demolition and clearing, construct the new bridge foundation, install the bridge, and complete miscellaneous concrete, utilities, and pavement work in accordance with the plans that will be prepared by Otak. A target date for bid opening should be on the agenda for the July 15th council workshop. We anticipate designing the bridge crossing on a slightly different alignment (west) of the existing culvert in order to remove a significant jog in the creek channel that contributes to the hydraulic problems of the existing culvert. This realignment will require additional coordination with the resource agencies during the Section 404 permit application process. This additional work effort is included in Paul Fishman's fee estimate. Please call me if you have any questions or comments about this proposed scope of work and fee. Sincerely, Otak, Incorporated Lawrence M. Magura, PF~ Project Manager LMM:vab enclosure (fee estimate) c. Brian Knight File (Contracts) P: \ PROJECT \ 7800 \ 7844 \ CONTRACT \ W03