Loading...
HomeMy WebLinkAbout1998-158 CONT AMND #5 - Carollo Engineers AMENDMENT NO. 5 TO ENGINEERING SERVICES FOR PHASE 1 OF THE CITY OF ASHLAND WASTEWATER TREATMENT PLANT I MPROVEM ENTS PROJECT The Engineering Services Contract (Agreement) between the City of Ashland (City) and Carollo Engineers (Engineer), dated November 5, 1996 for Phase I of the Wastewater Treatment Plant Upgrade Project is hereby amended as set forth herein. Introduction This amendment is limited to predesign services for the improvement of the Ashland Creek Pump Station. These services are in addition to those services identified in Exhibit 1 to the Engineering Services Contract (Agreement) between the City of Ashland (City) and Carollo Engineers dated November 5, 1996 and Amendments No. 1 through 4. Scope of Services 5.10- Ashland Creek Pump Station Field Inspection Perform a detailed electrical, mechanical and structural inspection of the Ashland Creek Pump Station. The inspection will identify pump station deficiencies and potential modifications to improve the safety, reliability and operation of the pump station. The results of the pump station inspection will be summarized in a short technical memorandum which will present identified deficiencies and recommend remedies. 5.20 - Capacity Evaluation In light of the new 24" gravity sewer to be connected to the wetwell, the capacity of the pump station to handle increased flows will be evaluated. This evaluation will be summarized in a brief technical memorandum and will include: · Hydraulic analysis of the existing pumps to determine the maximum and reliable pumping capacity. · Evaluation of existing and future wet weather flows conveyed to the pump station through the existing 15" gravity sewer and the new 24" gravity sewer. · Identification of capacity improvements required. 5.30 - Workshop Conduct a workshop with City staff to finalize the improvements to the pump station to be included within this design. Milestone Completion Dates A schedule for the services to be performed is as follows: Perform Site Inspection by: November 13, 1998 Develop Flow Projections and Conduct Workshop by: December 11, 1998 G:~,WO~4411E10~AMEND5~ 2.WPO Deliverables The engineer shall prepare and submit to the City the following work products related to the tasks in this Amendment: 1. Inspection Technical Memorandum 2. Capacity and Flow Projections Technical Memorandum 3. Workshop Summary Memorandum Compensation Compensation for completion of these additional services shall be on a basis of direct labor rate times a multiplier of 3.15 for each hour of labor spent undertaking the work plus direct costs. All direct costs shall be invoiced at the actual cost. Total compensation for labor and direct costs fees associated with these Additional Preliminary Design Services shall not exceed $11,680 as identified in the attached spreadsheet. CAROLLO ENGINEERS, P.C. CITY(N= ASHLAND P~VIEWED AS TO CONTENT: By I~ CODING: (For City use only) G:\~I IE10~MEND5~ 2.WPO FEE ESTIMATE - ASHLAND CREEK PUMP STATION PREDESIGN CAROLLO ENGINEERS CITY OF ASHLAHD, OREGON SERVICES FOR EVALUATION AND DESIGN OF IMPROVEMENTS TO ASHLAND CREEK P.S. ESTIMATE OF LEVEL OF EFFORT FOR DESIGN ~;ERVlCES TASKS . . Deelgn TASK DESCRIPTION PIC PM Engineers Electrical Structural Engineer Engineer 5.10 Inspection 8 8 5.20 Capacity Evaluation 2 20 5.30 Workshop 4 8 24 4 8 CAD Totals Total Estimated Hours Fee Schedule Rate ($/hr) Subtotal - Estimated Fee ($) Other Direct ~,osts Mileage and Travel Expenses M~iVFedEx/Telephone Printing Allowance 16 4 10 52 4 16 16 4 10 52 4 16 16 150 125 100 100 100 75 $600 $1,250 $5,200 $400 $1,600 $1,200 TOTAL ESTIMATED FEE WP 12 12 40 TOTAL TASK HOURS COST 16 1,600 26 2,410 72 6,720 114 $10,730 114 $10~30 $10~730 $8OO $5O $1oo $11,680 G~ t I el0~ldENDS.xls 1 11/'~./cJ8 CITY OF ASHLAND CITY HALL ASHLAND, OREGON 97520 NOTICE OF TRANSMITTAL TO: BOB ElMSTAD CAROLLO ENGINEERS 5100 SW MACADAM AVE STE 440 PORTLAND OR 97201 DATE: PROJECT: JOB NO.: SUBJECT: DECEMBER 3, 1998 WW'i'P RENOVATION AMENDMENT 5, PHASE 1 THE FOLLOWING ITEMS ARE BEING SENT TO YOU: Please find enclosed Amendment 5 to the Engineering Services for Phase 1 of the City of Ashland Wastewater Treatment Plant Improvements Project. ENCLOSED UNDEP 'PARATE COVER REMARKS: Thanks. COPIES TO: 'ks .,or / City Engineer (G:dawn\NOT Jim.wpd)