Loading...
HomeMy WebLinkAbout2005-149 CONT Chg Order #1 - R&G Excavating CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 1 PROJECT: LOCATION: MAIN FEEDER/RAW WATER LINE UPGRADE DATE: ..JUNE 30,2005 ASHLAND WATERSHED PROJECT NO.: 03-15 CONTRACTOR: R&G EXCAVATING You are requested to perform the following described work upon receipt of an approved copy of this document or as described by the Engineer: Item No. Description Quantity Unit Price Amount Purchase & InstaIl6!' FLG CLA-VAL CO 1 #210-09BSKC Valve. At City of Lump sum $1,835.00 $1,835.00 Ashland request for alternate valve. Original Contract Amount Total this Change Order Previous Change Order Revised Contract Total $2,018,876.54 $1,835.00 $0.00 $2,020,711.54 The time provided for completion of this contract is increased by 28 calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply. ra~,-GI}()^J 5: ~ ~,,~.. Engineer ~tr ~J) Contractor: 7/J7)C)5 Date Recommended By: Approved By: ~ 7/r7/ D5 ~ Accepted By: 7- 11- Date ,if H&G Excavating Inc. Brett Stark ~39300 Montgomery Drive Scio OR 97374 ENGINEERING 20 E. Main Street Ashland, Or~on 97520 WWW.aShland.or.us G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT\2003\03-15 Ch Cd 1 R G.doc Tel: 541-488-5347 Fax: 541-488-6006 TTY: 800-735-2900 r~' R & G Excavating, Inc. 39300 Montgomery Drive Seio, OR. H7374 503-394-21 ~IO FAX 503-394-2169 CHANGE OR[)ER Number 0502-01 TO: City of Ashland Pieter Smeenk. P.E. DATE PHONE JOB NAME JOB LOCATION JOB NUMBER JOB PHONE 6/28/2005 503-6213-2320 Mainfeeder pipeline Ashland 0502 541-488-5587 ***THIS CHANGE ORDER BECOMES PART OF AND IN CONFORMANCE \NITH THE EXISTING CONTRACT*** Cost associated with using the Clay-Val Altitude Valve. R & G originally submitted on the OCV valve, as the specs allow. However, per the request of the owner, R ~k G will supply and install the 6" FLG CLA-VAL #210-09BSKC Valve. TOTAL $1,835.00 AUTHORIZED SIGNATlJRE(CONTRACTOR) Brett Stark 6/28/2005 ***With acceptance of this Change Order, 4 weeks will be added to the contract time*** ACCEPTED - The above prices and specifications of this Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. Date of acceptance Signature( owner) 1 rA' C I T Y 0 F CITY RECORDER'S COpy ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 Page 1 /1 3/22/2005 05851 VENDOR: 009545 R & G EXCAVATIING INC 39300 MONTGOMERY DRIVE SCIO, OR 97374 SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: 3/19/2005 Speciallnst: Req. No.: Dept.: PUBLIC WORKS Contact: Joe Strahl Confirming? No BILL TO: Account Payable 20 EAST MAIN ST 541-552-2028 ASHLAND, OR 97520 SUBTOTAL TAX FREIGHT TOTAL 2020711.54 0.00 0.00 2,020,711.54 E 670.08.15.00.70420 E 670.08.36.00.70420 ~ .:1.-. .~.. ~'ZfJ- Au ized Si~Jnature VENDOR COpy CITY OF AS 1--1 LAN D REQUISTION FORM Date of Request: THIS IS A REQUEST FOR A: [X] Change Order (existing PO#: 5851) Required Date of Delivery/Service: Vendor Name: Address: City, State, Zip Phone: Project Title: Project Number: R&G EXGAVATING INC. 39300 MONTGOMERY DRIVE SCIO OR 97374 503/626-A!~320 MAIN FEEDER WATERLINE REPLACEMENT PROJECT 03-15 Services Only Solicitation Proces~.: [ ] Exempt [ ] 3 Written Quotes (copies attached) [ ] Sole Source [ X] Invitation to Bid (copies on file) [ ] Less than $5000 [ ] Request for Proposal (copies on file) Description Total Cost Change Order NO.2 Alternate Valve Assembly: 6" FLG CLA-VAL #210-09BSKC Account Number 670.08.15.00.704200 = 75% .Please attach the Original signed contract and Insurance Certificates. lid '\ ~ Account Number 670.08.36.00.704200 = 25% Employee Signature: ;/iA ~ Supervisor! Dept. Head Signature: '-~ tl NOTE: By signing thi requistiion fonTl, I certify tha the above request meets with Ctiy of Ashland Solicitiation Process requi'ft can be' provided when necessary. G:\pub-wrks\eng\dept-admin\ENGINEER\PROJECT\2003\03-15 RG CO 1 Req 7 05.xls Updated on: 7/15/02