Loading...
HomeMy WebLinkAbout2006-064 CONT Addendum - Pivot Architecture II May 2, 2006 Ann Seltzer, Management Analyst City of Ashland 20 E. Main Street Ashland, OR 97520 Re: Proposed Amendment for the Ashland Council Chamber Architectural Services. Added Design Option and Cost Estimate Dear Ann, PIVOT Architecture (aka \VBGS Architecture & Planning, PC) has prepared a proposed amendment to our agreement with the City of Ashland. The amendment covers design refinement and cost estimates for one additional design option. The current scope of work includes preparation of design options but assumes that a single option would be selected for development and cost estimates. PIVOT prepared 4 conceptual alternatives. During recent meetings including review by staff, council, and public, Options 1 and 4 were selected for further evaluation. Option 4 is located in the Grove Building. Following refinement and budget work, we have assumed that an additional meeting would be needed to assist Ashland in reviewing the final options and making a final selection. Tasks Administration Task: Prepare amendment proposal, coordinate with subconsultants. Administer work and maintain quality control. Revise schedule and maintain communications with the City. Assignment: PIVOT lead with assistance by Spectrum, BHE, and Construction Focus Deliverable: Amendment, revised schedule. Existing Conditions Task: Obtain existing building drawings for the Grove. Enter floor plans and selected information in digital form for use as a base drawing. Make copies of existing building drawings for subconsultants. Assignment: PIVOT Deliverable: Existing building drawings. Schematic Design Refinement Task: Based on review comments from the City, make refinements to design Option 4. Develop in sufficient detail to allow preparation of a conceptual level cost estimate. II Develop designs and information to a level equivalent to the single option contained in the original proposal. Note it is assumed that review of Option 4 with the city would be part of a review meeting for Option 1 already planned. Assignment: Architectural work and base sheets by PIVOT, lighting design by BHE, and A V systems by Spectrum. Deliverable: Schematic drawings, narrative information, and illustrative drawings for architectural, lighting, and A V systems. Cost Estimate Task: Prepare construction cost estimates for Option 4 in a manner consistent with the single option in the original scope of work. Assignment: A V equipment estimate by Spectrum. Lighting estimate by BHE. Coordination and estimating of all other work by Construction Focus. Support and review by PIVOT. Deliverable: Construction cost estimate. Review and Selection Task: Conduct one meeting each 'with City Staff, Council & Mayor, and Public to review designs and costs for Options 1 and 4. Assist City in evaluating the options and selecting a preferred option. This includes one overnight trip to Ashland. Assignment: PIVOT Deliverable: Meeting minutes. Fees & Expenses The maximum amount for services and expenses is to be increased as follows. A detailed estimate of added services is shown on the attached work sheet. The current contract amount: Fees for services of Amendment 1: Revised total fees: $30,000 $ 9.433 $39,433 Schedule PIVOT will work with the City to complete added work in a timely fashion. It is estimated that the additional option will add about 3 to 4 weeks to the current schedule. Please let us know if you have any questions regarding this proposal. t//J/ Eric L. Gunderson City of Ashland Council Chambers Proposed Fees - Amendment 1 WBGS Architects BHE Spectrun CF Total Phase Prine. Prine Arch. Dsgn 4 Dsgn 2 Subtotal Lighting AV Cost Est by Phase Lead Advise Mgr Admin 2 $238 $238 Existing Conditions 10 $680 $680 Refine Design 3 32 $2,533 $1,275 $3,808 Cost Estimate 1 2 $255 $800 $625 $1,000 $2,680 Review & Report 6 12 $1,530 $1,100 $2,630 Expenses $600 $600 Total Hours 12 0 56 0 0 Rate Per hour $119 $87 $68 $58 $47 Markup 10% $5,836 $0 $800 $3,000 $1,000 $10,636 $80 $300 $100 $480 Total Amendment $11,116 Original Contract Markup 10% Revised Total $18,109 $3,480 $4,950 $0 $348 $495 $850 $27,389 $85 $928 $39,433 Page 1 1 1 ,~, C IT Y 0 F CITY J:)r=~O . . ....v ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 y~~ . 06729 VENDOR: 010820 PIVOT. ARCHITECTURE 72 WEST BROADWAY EUGENE, OR 97401 SHIP TO: City of Ashland (541) 488-6002 20 E MAIN STREET ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: Speciallnst: Req. No.: Dept.: ADMINISTRATIVE SERVICES Contact: Ann Seltzer Confirming? No THIS IS A REVISED PURCHASE ORDER Architectural desiQn services fro the renovations and redesiQn of the City Council Chambers per CIP and Council Qoals. Proposal has option for expanded redesiQn of the Police, Courts, PW IElectric offices. WBGS has chanQed their name to Pivot Architecture. 30,000.00 RFP Contract start date: February 6, 2006 Completion date: July 1, 2006 Processed chanQe order 05/25/2006 DesiQn refinement and cost estimates for one additional desiQn option. 9,433.00 BILL TO: Account Payable 20 EAST MAIN ST 541-552-2028 ASHLAND, OR 97520 SUBTOTAL TAX FREIGHT TOTAL L# c:;l- .~ ~s~ orized Signature VENDOR COpy A request for a Purchase Order REQUISTION FORM C1T YQF ASHLAND Date of Request:_ THIS IS A REQUEST FOR A: (Xl Change Order (existing POI 6729) Required Date of Delivery/Service:_ Vendor Name: Address: City, State, Zip Phone: Project Title: Project Number: PIVOT ARCHITECTURE 72 WEST BROADWAY EUGENE OR 97401 541/342-72913 COUNCIL CHAMBER RENOVATIONS 2005-15ADMIN Services Only Description Total Cost Design refinement and cost estimates for one additional design option. COUNCIL CHAMBER RENOVATION Account Number 410.03.42.00.702100 *Please attach the Original signed contract and Insurance Certificates. Employee Signature: NOTE: By signing Account Number Supervlsorl DepL Head Signature: ~J ....~ a ove request meets with Ctiy of Ashland So/icitiation Process requirements and can be PIO~"1r necessary. sfi Vd , G:PubwrkslEngI05-05Admin Cha1ge Order 1 506.xls Updated on: 7/15102