HomeMy WebLinkAbout2006-135 CONT Chg Order #3 - Acres International
Acres International Corporation
6 NickEllSOll Street Ann Building, Suite 101
Seallle, WA 98109 USA
Tel: 206-352-5730' Fax: 206-352-5734
WWW.llcres.com
June 14,2005
14774.01
Ms. Paula C. Brown, PE
City of Ashland
20 East Main Street
Ashland, OR 97520
Subject:
Hosler Dam FERC Part 12 Safety Inspection
Additional Field Investigations - Phase I
Dear Ms. Brown;
At our recent meeting in Portland, the FERC staff summarized their comments on our Finite
Element Analysis & Shear Stability Update Report dated January 13,2005. Based on the
analyses presented therein, their observation as stated to us is that the shear resistant
parameters required to satisfY FERC stability criteria for the Hosler Dam are at the upper
bound of values commonly used in engineering practice. Accordingly, it was their
recommendation that field investigations be performed to confirm the applicability of these
values.
We propose to accomplish the required investigations in two phases. The first phase would
cover our costs for the attendance at the FERC meeting and would include a field
reconnaissance to perform geologic mapping and to defme the scope of a drilling program to
be performed in the subsequent phase. The field reconnaissance would be accomplished by
myself and Rick Donnelly, an Engineering Geologist from our office in Niagara Falls
Ontario. It is our further thinking that the Phase II drilling program itself can be supervised
by Golder Associates, whom we understand is involved with the pending work on the water
supply pipeline / penstock.
Specifically, Phase I would include the following activities:
· Project Management
. FERC Meeting
· Field Reconnaissance
· Investigation Planning
. Drilling Program Specifications
· Drilling Contractor Selection
Our estimate for the completion of the above activities is $15,000 and we would initiate these
activities as soon as possible such that the drilling program can be accomplished in
conjimction with our work that is scheduled at the site this coming summer. As always, we
appreciate the opportunity to work you on this assignment. If you have any questions
regarding this proposal, be sure to give us a call.
Sincerely,
A. Richard Griffith, P.E.
A member of the Hatch Group-
CIT Y Of
AS.HLAND
Council Communication
CONTRACT AMENDMENT FOR THE FERC PART 12 INSPECTION
ENGINEERING SERVICES FOR HOSLER DAM
Meeting Date: June 28, 2006
Department: Public WorKs
Contributing Departments: Finance
Approval: Martha Bennett
.. .
Primary Staff Contact: Paula Brown, Public WorKs
Director I City Engineer, 552-2411
E-mail: Paula@ashland.or.us
Secondary Staff Contact: Pieter Smeenk, Associate
Engineer, 552-2413; E-mail: Pieter@ashland.or.us
Estimated Time: Consent Agenda
Statement:
Approval of a contract amendment for Acres International to complete additional structural analysis, field
investigations and security requirements implemented by the Federal Energy Regulatory Commission (FERC)
Part 12 Safety Inspection Guidelines.
Background:
On January 27,2003, Acres International responded to the City's proposal and was awarded a contract to
complete the Hosler Dam FERC Part 12 Safety Inspection and Associated Security and Seismic Analyses. All
services were scheduled to be completed and submitted to FERC by May 2003. The scope of work included
three primary tasks:
1) Evaluate and report upon the safety condition of Hosler Dam in Accordance with FERC Part 12
Safety Inspection Guidelines
2) Analyze the Dynamic Base Shear at the arch dam, foundation interface for Hosler Dam in accordance
with FERC Engineering Guidelines, Chapter XI - Arch Dams
3) Evaluate and recommend appropriate changes to security procedures for Hosler Dam as provide in
FERC Security Program for Hydropower Projects, June 2002
FERC's review of the initial Safety Inspection and Dynamic Base Shear Analysis submitted by Acres International,
indicated a need for the City to complete a more in-depth structural analyses of Hosler Dam to meet FERC's
revised structural guidelines. These new requirements, while within the scope of work, increased the worK
necessary of Acres International and extended the completion time of the work. Two prior contract amendments
were given to Acres International for the following items:
· Contract Amendment No.1 (August 2003) increased the contract by $13,560.00 to conduct a Failure
Modes Analysis which analyzed the unique ways remotely possible for the dam to fail and also
provided training to staff on the analysis process. This was a new FERC requirement.
· Contract Amendment NO.2 (June 2004) increased the contract by an additional $10,000.00 to
accommodate the structural engineer's time to complete a more in-depth mathematical "Lombardi
Analysisn requirement by FERC to show a different failure mode for base shear.
When the Lombardi Analysis was submitted to FERC, they required additional field investigations to ensure
stability at the face and base of the dam, hence the need for Contract Amendment No.3. Staff negotiated with
G:\pub-wrksladminIPB Council\waler issues\CC Acres Contrad Amend No 3 22Jun06.doc
r61
Acres International and agreed upon an amount of $15,000 to complete this field work when weather permitted
and then re-run the base shear model as required by FERC.
Revised City policy requires any contract amendment totaling 25% or more of the original contract amount to be
approved by City Council acting as the Local Contract Review Board (LCRB). The contract amount with the two
prior amendments was $79,560 (prior to the revised City policy) and with the third amendment, the contract
amount increased to $94,560.
This third contract amendment was accepted by the Public Works Department in July 2005, but the Department
acted in error by not following through to gain LCRB authority to increase the total contracted amount. In addition,
the work has been completed by the consultant, but as there is no authority for the contract amendment, there is
no ability to properly pay the consultant. The requested Council action formalizes the third contract amendment
and allows the consultant to be properly paid.
Related City Policies:
Ordinance 2917, adopted by City Council on March 1,2005, Section 2.52.050, states that if a contract
amendment totals 25% or more of the original contract amount then the contract amendment must be approved
by the Local Contract Review Board.
Council Options:
In this case, there is only one option as staff is regrettably bringing this to Council after the fact. Council must
approve this third contract amendment for Acres International. Council could also formally remind staff to comply
with Ordinance 2917 and bring these items to Council in a timely manner.
Staff Recommendation:
Staff recommends Council approve this third contract amendment for Acres International to complete the contract
for additional structural analysis, field investigations and security requirements implemented by the Federal
Energy Regulatory Commission (FERC) Part 12 Safety Inspection Guidelines.
Potential Motions:
It is motioned that the City Council, acting as the Local Contract Review Board, approve Contract Amendment No.
3 for Acres International to complete the contract for additional structural analysis, field investigations and security
requirements implemented by the Federal Energy Regulatory Commission (FERC) Part 12 Safety Inspection
Guidelines.
Attachments:
1) Contract between the City of Ashland and Acres Intemational for the Hosler Dam FERC Part 12 Safety Inspection
2) Contract Amendment #1
3) Contract Amendment #2
4) Contract Amendment #3 (Proposed)
G:\pub-wrksladminIPB Councillwaler issues\CC Acres Contrad Amend No 3 22Jun06.doc
~4'
H" I
~A'
CiTY RECORDE9'S COpy
Page 1 / 1
CITY OF
ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
7/1/2;06 ]
03995
VENDOR: 006911
ACRES INTERNATIONAL
6 NICKERSON ST STE 101
SEATTLE, WA 98109
SHIP TO: Ashland Public Works
(541) 488-5587
51 WINBURN WAY
ASHLAND, OR 97520
FOB Point:
Tenns: Net
Req. Del. Date: 1/3/2003
Speciallnst:
Req. No.:
Dept.: PUBLIC WORKS
Contact: Paula Brown
Confinning? No
THIS IS A REVISED PURCHASE ORDER
BLANKET PURCHASE ORDER
FERC Part 12 Safety Inspection
56,000.00
RFP
Date of AQreement: January 2, 2003
BeQinninQ Date: January 3, 2003
Completion Date: May 31, 2003
Insurance reQuired/On file
Revised purchase order 03/15/2004
ChanQe Order No. 1
Additon of the Failure Modes Analysis
as part of existinQ contract
Revised purchase order 07/08/2004
ChanQe Order No.2
Lombardi analysis follow-up
Processed ChanQe Order 08/24/2006
ChanQe Order No.3 - Additional Field
InvestiQations, Phase 1 - CO approved
by Council June 28, 2006
13,560.00
10,000.00
15,000.00
*** This is a chanQe order. ***
BILL TO: Account Payable
20 EAST MAIN ST
541-552-2028
ASHLAND, OR 97520
'\
SUBTOTAL
TAX
FREIGHT
TOTAL
E 670.08.15.00.60413
E 690.11.15.00.60413
E 690.11.18.00.60413
47 280.00
34 780.00
12 500.00
VENDOR COpy
A request for a Purchase Order
REQUISTION FORM
CITYOF
ASI-iLAND
Date of ReqUest:_
THIS IS A REQUEST FOR A:
[ X] Change Order (existing PO# 03995 )
Required Date of Delivery/Service:_
Vendor Name:
Address:
City, State, Zip
Phone:
Project Title:
Project Number:
ACRES INTERNATIONAL
150 NICKERSON STREET STE 310
SEATTLE WA 98109
2061352-5730
HOSLER DAM FERC PART 12 INSPECTION
02-28
Services Only
Description
Total Cost
HOSLER DAM FERC PART 12 INSPECTION
CO 1 Addition of the Failure Modes Analysis as part of existin contract
CO 2 - Lombardi anal sis follow-up
CO 3 - Additional Field Investigations Phase I - CO approved by Council
June 28, 2006
Account Number 670.08.15.00.604130 (50%)
'Please Bttach /he Original signed oontract and IIISUIlJ1JCe CettificaI8s.
Account Number
Employee Signature: Supervisorl Depl Head Signature:
NOTE: By signing this requisliion form, I certify tha the above request meets with CIiy of AShland So/icitia/ion Process requir8m Is
G:PubwrksIEng\02-28 Acres CO No 3.x1s
Updated on: 7/15102