HomeMy WebLinkAbout2006-0810 Chamber Remodel Presentation
City Council Session on Council Chambers Remodel
August 10,2006
Councilors Present: Mayor Morrison, Amarotico, Chapman, Hartzell, Silbiger
Councilors Absent: Hardesty, Jackson
Staff Present: Bennett
Call to Order
Mayor Morrison called the meeting to order at 12:05 p.m.
Presentation
Eric Gunderson presented the design options and cost estimates for two options for
improving the City Council chambers. The goals of any project would be to increase
seating capacity, improve sound quality, and to improve the general function of the City
Council Chambers for the Council and all other groups that meet. The first option would
be to remodel the existing room. The second option would be to renovate the multi-
purpose room in the Grove.
Gunderson presented the firm's findings. (see attached document)
The meeting adjourned at 12:55 p.m.
Notes taken by Martha Bennett
CITY OF ASHLAND
COUNCIL CHAMBER REMODEL
DESIGN OPTIONS AND COST ESTIMATES
Date: August 10,2006
Owner: Project Manager, Ann Seltzer, Management Analyst
City of Ashland
20 E. Main Street
Ashland, OR 97520
Architect: Eric Gunderson, AlA Principal
Tricia Berg, AlA LEED, Project Manager
PIVOT Architecture,
72 West Broadway
Eugene, OR 97401
Lindsey McGill, Principal
Spectrum Systems
937 SE 14th Street, Suite 101
Portland, OR 97205
Greg Hansen, Lighting Designer
Balzhiser Hubbard Engineers
100 W. 13th Avenue
Eugene, OR 97401
Steve Gunn, Chief Cost Estimator
Construction Focus
PO Box 24705
Eugene, OR 97402
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
Table of Contents
Page
Introduction & Summary
1
Design Drawings
8
Outline Specifications
9
Cost Estimate
21
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
PIVOT Architecture
Introduction & Summary
disruption. Work under this alternative also relocated
the lobby and court clerks' area. The final alternative
examined the Grove building. The 4 alternatives were
presented to the City with direction to pursue 2 final
options for further development and cost estimating.
The two final concepts included Option A, minimal
improvements to the existing building, and Option B,
renovation of the Grove.
The City of Ashland has identified a need for improved
space for City Council Meetings. The present meeting
space is heavily used by a variety of groups including
City Council, Municipal Courts, the School District,
various public commissions, and others. The space is
crowded, acoustics are poor, and visual displays are dif-
ficult to see.
Process & Initial Alternatives
A program of space needs was developed based on
interviews with city staff and others who use the pres-
ent meeting space. The program was completed March
22, 2006. Four design alternatives were developed based
on the program. Three of these focused on the existing
council chamber with varying degrees of expansion
and renovation. AT one extreme, there was a minimal
design which remodeled the existing meeting space,
enlarged rest rooms, new meeting space, and other
improvement. At the other end, a design showed ex-
pansion of the existing meeting space to the north into
the existing lawn. While this option added more space
to the existing room, it did so at great cost and lengthy
City of Ashland
Service Center / Justice Center Area
+
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
1
1 ;
/ ;'
/ / /
/ / ;'
.' /
, ,I /
/' / ;/
/ /1 /
I / .'
/IJ' /
/ //>:~~
-~.d/ //.~:..'/ ~.<">">~ --~
\ -----. '--'._Y' .<<'< .,l-L., Y
\~/-"'-" -~
-/ ] I
I I
Option A: Renovation of the Existing Council Chamber
Option A involves remodeling of the existing city coun-
cil chamber. Key features of Option A include interior
renovation of the existing meeting space, expansion of
rest rooms, added storage space, new conference room,
and improvements to lighting, AV, TV, and council dais.
Seating capacity remains small since the size of the
room in not increased.
The design would require closure of the space for a
minimum period of 4 months while work is completed.
During that time temporary meeting space is needed.
An allowance is needed for the cost of developing
temporary space for that period. Minimum temporary
eguipment needed would include sound amplification,
",~=~ll
==~~-
DPTlDN A - RENDERING FROM AUDIENCE
PERSPECTIVE
sound recording, video recording, digital projection, and
furnishings. Existing council dais, council seating, and
audience seating can be relocated. The City will need
to identify a meeting space and determine the cost of
rental, if any, and set up.
In general, Option A is to be accomplished without
structural change to the existing building_ It is intended
as an interior renovation project. New toilets and
exterior enclosure of an existing roofed area anticipated.
While renovation of the existing room appears modest,
all new systems and finishes are needed within. These
include new lighting, Floor, wall and ceiling finishes, all
new AV eguipment. Expansion of the rest rooms and
creation of the new meeting space is essentially all new
construction.
L ~</,>-;;'-
~/'
.J'f?7// /
~ // "'----~f
, 7/ / ~ ~
,/
~~
..:: _ 'f;
.~- .
~
I
o
o
2
PIVOT Architecture
I
I
16
I
I
5
[]
00000000000
00000000000
00000000000
00000000000
0000 0000
OPTION A - FLOOR PLAN
LEGEND - NOT TO SCALE
1 LOBBY
2 CONFERENCE
lJ . WOMEN'S RESTROOM
. MEN'S RESTROOM
5 COUNCIL CHAMBER
lJ
6 EXTERIOR WORK
. AV-TV
STORAGE
lJ
lJ
lJ
D
(@
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
3
'''>~. "'~-~'. /'
~ ~""
\
\
/\,<
Option B: Renovation of the Grove
Option B is a renovation of an existing multipurpose
space in a building known as the Grove which can be
vacated during construction. The Grove is located on
the same site. Once again, improvements are predomi-
nantly interior renovations. Work at the Grove includes
a new entry canopy and sidewalk. Option B provides
significant gains in audience seating allowing up to
100 spectators. The existing Grove building contains
adequate rest rooms, kitchen, meeting spaces, and lobby
for city council purposes with little renovation required.
Significant design features of the renovation include
added finishes in the council chamber for improved
appearance and better acoustics. In addition, there was
concern that the Grove lacked a clear entry and was not
inviting or clearly identifiable by the public. To this end
a new exterior canopy was added to the west and south
~
~:.
I' ·
($l ~, ~ i\
. US
Q '\' ~ ~\ fi
Q <>
sides of the building. The canopy links the building
with the street and provides a covered point of arrival
for those arriving from the street and parking lot sides.
The canopy design uses glass enclosure as an invitation
to the building. IN the evening, illumination within the
canopy would appear to make the frosted glass glow
forming an inviting marquis to the building. In ad-
dition, we suggest collaboration with a local artist to
design patterns for the etched glass. The patterns could
include the words "AsWand City Council Chamber" in
large letters. The remaining glass surface could include
artistic images of the local countryside, notable features
reflecting the community, or words telling a story related
to the unique historic and contemporary nature of
Ashland.
Room acoustics was a major concern of the interior. In
addition, a design was needed that made the "gymna-
sium like" atmosphere of the existing room more ap-
propriate for civic uses. Acoustical panels are shown on
'~".""". ~ ~-""-
'~~-~~~,
I
.---i--
o
v
v; :1'
4
PIVOT Architecture
LEGEND - NOT TO SCALE
1 LOBBY
2 HALL
. AV-TV
REAR PROJECTION
5 COUNCIL CHAMBER
..6 EXTERIOR WORK
2
~ SJ ~
~
~
~
~
~
~~
.~
(@
II
~
OPTION 8 - FLOOR PLAN
Ashland City Council Chamber Design Options and Cost Estimates
August 10, 2006
5
,- I
the ceiling in a cloudlike pattern. The panels serve the
double purpose of sound absorption and softening the
room. Lghts above and between the panels would give
it an illuminated appearance. Acoustic panels on up-
per walls are shown with spaced wood slats for a more
natural appearance. The council dais is proposed as
wood. The existing clearstory windows remain allowing
abundant natural light within the room. The rear screen
projection surface would be of sufficient brightness to
be clearly visible even with windows uncovered.
A final feature of the design pertains to the existing
lobby space. The Lobby is large enough to display
information about the city and would work as a meeting
space in its own right. Musical events and small perfor-
mances could work well here. To this end new finishes
and lighting are proposed. The wall between the lobby
and council chamber is shown as glass allowing people
in the lobby to see into the chamber while maintaining
acoustical separation.
A side benefit of the Grove is the ability to retain the
existing Council Chamber space as an auxiliary meeting
room. It would still function well for municipal courts
and for Emergency Operation functions (it is served by
emergency power). It was discovered that the existing
room is heavily used so that an added meeting space
would be desirable.
~.
I
OPTION B - GLASS CURTAIN WALL PRECEDENT STUDY;
POOERSOORf PARISH CENTRE, lICHTBLAU WAGNER ARCHITEKTEN, 2002
OPTION B - BARRISOL STRETCH CEILING
APPLICATION
6
PIVOT Architecture
Ashland City Council
Chamber
Preliminary Project Budget
Option A * Existing Option B Grove
Low High Low High
Construction Cost
Demolition $13,508 $13,50E $7,949 $7,94!:
Earthwork & Concrete $12,273 $12,272 $12,758 $12,75E
iSteel $0 $0 $63,85C $63,850
Carpentry $28,854 $28,854 $42,167 $42,167
lCasework $30,58C $30,580 $41 ,42C $41,420
rrhermal & Moisture
Protection $4,71 E $4,715 $4,63!: $4,639
Doors Windows & Glazing $23,66C $23,66C $89,32C $89,320
Finishes $40,732 $40,732 $128,902 $128,902
Light Gauge Framing $62E $625 $( $C
iSpecialties $13,634 $13,634 $8,250 $8,250
'f\v Equipment $369,000 $369,000 $369,000 $369,00C
Mechanical & Electrical $94,02C $94,020 $128,700 $128,70C
iSubtotal $631,601 $631,601 $896,955 $896,95E
Mark up & Contingency $228,12C $347,839 $322,749 $492,765
trotal Building Construction $859,721 $979,440 $1,219,704 $1,389,72C
Public Art 1 % $8,597 $9,794 $12,197 $13,897
Furniture & Equipment $7,500 $7,50C $15,000 $15,000
IChange orders allowance
10% $85,972 $97,944 $121,970 $138,972
rrotal Construction Cost $961,790 $1,094,678 $1,368,871 $1,557,589
Soft Costs (25%) $240,448 $273,67( $342,218 $389,397
(Permits, Design Fees, etc)
otal Project Budget $1,202,238 $1,368,348 $1,711,089 $1,946,987
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
7
PIVOT Architecture
Design Drawings
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
T" I
PIVOT Architecture
'''OJECT NO. CMo1l1,00 It[VIStONS
01.11.0'
00
-em
:::!3:
~O
)>C
'-I
X-
_0
~Z
Z"iJ
C)~
8z
c
Z
n
;=
n
I
)>
3:
OJ
m
;;IC
.NOR~
e
I
I
I
q
,......
II I !II".
I , ......
I "I~ ...~
.... !Z r""
" La.
I .' J;, f" - - - --
, III
- - -\4j"f ..
...
.0
..
~o
8
~
I~
-------
(, ------
: I
I
I
I
I
""1' ..
I
I
I
I
I
~ I
[j
I
I ;
I
I
.1-
I
I
I
I
I
I
I '
.: I
I '
II
II
I,
II
\-------
I
I
I
I
I
I
I
..-. "I
I I
I I
I II~
I I i=
I
I
I
----.--.... - .~.-
I
I~
~
m
r
m
n
:::!
r
o
. ~
~ :;;
~r
I
T
I
I
I
I
I
I
I
I
I
I
~
e ~
1) f
~ ~
I ~ ;;I
~
I ~
I .~
I
I
I
t
I
I
I
I
_, .... ...._.._.._.._nm_
I
I
I
I
I
I
I
,
i
..1...
...8
.-.e
8
...........8
.-8
8
G
.. .... --...-.8
-..-......--------.-..n-.--..--....--.......-...-....-...-----n_..___....._.........._____..____.....___.____._.._._...._..._..___._.__....._....._______..__._____..n__..________....___.____-..-...--...._....._._.._...__..__._.__..._.nn...._..._....___._._._.._..___..._...,...............n............._._,_........_......._........_..._...__._
:I
m
n
:c
8
I
I
,
I
--------
.. --...~,
II
N [:'11
.........
II
~II::-" ..
"11 '\
" : II . \
...~ ot~ ~ -t::::::
I ~
,m
o.
g~
p~
i 1;\ I
'0
8~
~~
II I II r-
II m
II C)
II m
II Z
~ Z en 0
en >< C1
::E (ii m
::E -< Z
(f> Z .
-< ~ m m
G1 . ~
0 r ::E ~
OJ (f> r
en ~ ~ z
;lJ r
en (f> 0
;: -< . -I
0 0 g m
< ;lJ Vl
en en ~
0 ;:
l> Q
Z I
I~
t .
I
I
I
I
I
I
I
-t
I
I
I
- " ' rl2J~~~~:,:,
I ~ is; I
<!e i
~~ i
I
I
I
I
.. 1'-
I
I !
~
I ' ~
! ~
,._.. .--..--- .. ..~
1---' :
'mh ~~~
I. ~
J~ "
I ...
~~~
'1' ~ II
~ Ii
[
i
. ......- ~'-~; j.
I
"'" r=
n.
om
..
n~
~m
,
~
L
I II
II
n I' II
0 II
Z
-n II I~
m ~ I II
;0
m ~ II
Z
n ~ II
m ~ II
~ ...1.1
.---J , ,
,
I
....
SCHEMATIC DESIGN PACKAGE
CITY OF ASHLAND
ASHLAND COUNCIL CHAMBER
PVOT
z
;;:
~ 0
0:: w
>
0 0
~ I- ~
en
V'l ~ ...J 0::
UJ & ...J W
I- ~
0 ~ lD
Z C> ...J 0
e ~ I-
~ Z en
;:: ...J
:.: en s: ...J
0 i:i w ~
z
Z II II II
LU II
l.:J II
LU II
-l II
8- g
~
0 15
~ ~
~ ~
, .
0 8
8------ ~
0
z
~ r
~ I
~\
a::
8 L.U
to
:L
<(
I w
U "
-l 0
G- O t- t-
Z Vl
<( Vl
Z6 L.U
L.U ~
OU
-L:J
I-Z
u-
0--- LUt;;
Vl-
x
l.:J~
Z<(
oz
8- -lQ
-t-
::::>0-
coo
C"'.t
8-
0:::
L.U
8-- to
:L
0 <(
~ J:
~ U
~ ~ -l
2 0
~ " ~
0 ZZ
2 ~I ~~ 0
~ 8 O=>
0 ~~ ~ _0
8 I-U
~ <(l?
>Z
0 LU-
~ ...Jt;;
LU-
0 0;:(;)
2
~
~ 0<
~ o;:Z
~ LUO
I-f=
ZO-
_0
8----. M
~i'
u~
w~
r
G 0::: t:---m
L.U
to
:L ~EE
<(
I J:
U J: t-
-l t- =>
0 a::
0 0
0--------- z z VI
Z6 ~ EB
OU
-L:J ~
I-z
u- i!
LUt;; h. ~
Vl-
8--.-.--- x ~ai E5
l.:J~ ~~~
z<( o'
oz ~H
-lQ ~
::::>6:
cao
0--.-.---
lOAd
'"
o
""Z
1-0
0;::
Zu
>-::J
~~
_Z
LO
au
'"
Q.
'd39W'v'H::) lDNno::) GN'v'lHS'v'
ONVlHS't,O liD
39'V')D'V'd N91S30 :>1.L'V'W3H:>S
03
OJ)I:liH:)
ON.I.:)JIo.~
oC)
~;;tl
-0
~c
>Z
,:,,0
X"'T1
Vi.
::j0
~O
();;tl
0-0
~):
QZ
r
()
::c
>
3:
OJ
m
;0
.NOR~
II I II .
II m
II C)
II m
II Z
~ z ~ 0
m
:< Vi
:< -<
(f> Z
-< it: Gl
0 r- :E
OJ (f>
m :t>
;0 1=
m (f>
;:: -<
~ 0
m ;0
0 m
;::
:t>
Z
'~Oj(CT NO ll.(VrSrONS
01.11,06
CHfClCEO: EC:
m__ I
, I
II
II
I
I
I
I
....-....--l
I
I
I
I
I
a I
lj
I
I
I
I
.--- " ----t
I
I
I
I
I
I,
I'
mm: I'
I,
: I
I'
(I
1-------
tv
@
I
I
T
8
I
I
co
CD
m....... ..1...
..
.~
~~
--------.
------ 1
I
I
I
I
I
I
.... ....-.-...--...... .. ... -.. --I' .... ...-.. .-...-.
I I
12~ I I
" I I I~
I I F
I I
I I
I I
-1.. .-1 .
I 1
I
1
1
1
I
I
~
I
I
I
I
I
I
I
.1
I
I
I
I~
~
II
m
r-
n
:::!
J:
m
n
J:
o
)>
Vl
)>
.
-t
m
:;:0
Z
)>
..,
m
Vl
m
)>
..,
Z
C)
o
""tl
-t
o
Z
.NOR~
II
SCHEMATIC DESIGN PACKAGE
CITY OF ASHLAND
ASHLAND COUNCIL CHAMBER
........................8
0)
--.8
~d~
8~~
~~~
8~
~~
~~ ..........8
<0
>
~
~
I"
.....----8
8
-- .... .---8
I
: -- ... m_m__-G
I
I
I
I
I
I
I
I
I
I
I
I
I
I
e
.......mm-8
"
~
0r-
O:I
z-
~~
"''''
c-<
0Z
::!o
0-<
z~
o
'"
PVOT
lOA d
I
I
I
J
I
I
I
I
I
I
I
I
0.............1
I
I
I
I
I
I
I
I
0--1
I
I
I
II
I '
I
I
I
0--- -I
I
I
I
I
I
I
I
I
0..........t
t-------
e
c:
o
"-z
>-0
0-
z>-
U
>-::>
"''''
<<:>-
ZCJ)
g
uju
'"
a.
0-.---
e--- --
(
I
~ I
01.....-. J
z I
W
e
tl38V11\fH8 ll8Nn08 ON\flHS\f
ON\f1HS\f ::lO AJ.18
38'i>i:)'id N81S30 811.'il^J3H8S
N\f1d NOI1110ll'J30
e
I
I
D
I
,
----($>
-----.------J -
,I
wa III
>"~
~ gg ',1
aao
I:
~
~~
--. .......~.&.....
.~
I "
~~~
oziil
-" ~f8...~-..
-g---
~
Ii
~ ~~ I 1!1~ !
~ :5 ~~ ~
~ ~8 I a~ a
~ ~ ~ ' I
~ Oce ~
x... .... ..sl..J..... ...._ ......
~ ~ g I
~ ~~I'I~li
5~
.... u u
-
- I
,~ I
:-"=-=-C-=lHIlI-I=-=~-.- n- - ----- - -
I^II'
I .' '..' I r---
I~~ I I
I~ g a ~ ~
I~ ~ ~ ~ : ~ ~
," -
ii!8 ,--.J
I
~~
~~
1;\~
~o
g~
~~
wa
ao
II
I
~I
I'
w
>~
o~
'x
wO
a~
--.J
I
I
I
e
III ..."'"
SNOISl^i~ lOllO ON !:J:lrOl:ld
z
;;'
:. 0
w
'" UJ
>
0 0
>- :.
CJ) w
j '"
<<: w
;: CJ) 1IJ
-' 0
<.!J '" >-
Z ;: ~
;:::
CJ) ;: -'
0 8 w ~
z
Z
UJ II I a
<.9 .
.
UJ .
....J .
~~ON .
0::
w
co
::E
<t:
J:
()
..J
0
Z Z
:::l
~ 0
()
0.. w
Z >
0
0 0::
I- <.9
....J co
0 z
~ 0
j:::
UJ D-
O 0
-r-
~
0 G)
"'0 ::0
-I
<5 0
z C
CD Z
G) 0
::0 ,.,
0 r
< 0
m 0
()
0 ::0
c \J
z
Q s;:
,
() Z
:c
)>
:s::
CD
m
::0
. NOR~
z
~
n
~
~
m
,
n~
c~
~z
mQ
m
m
~
x
o
I
i
\~Ii
~~
8~
~z
~Q
~p
1~
~
==r=======
*~
?t~
~~
..~....~I~
II
II
:1
II
:1
II
-- -------- -t-=-- =--- -- --I--------~r
I I
I
I
-~~~_.~-~..=....=_..~.
I
I
e
II I II r
n m
H G)
A
n m
z
:;: z ~ 0
)> m
r :;: en
r :;: ....
(f) z
.... )> "
0 r
r :;:
'" (f)
m ~
JJ r
m en
;:: ....
0 0
< JJ
m
0 m
;::
)>
Z
P~OJECT NO' 0807 REVISIONS
FLOOR PLAN
SCHEMATIC DESIGN PACKAGE
CITY OF ASHLAND
ASHLAND COUNCIL CHAMBER
07.11,011
TO
E.
I
-0
-----e
-..-e
..---e
.......--e
-me
----me
...--0
I
o
P VOT
IDA d
8
e
8~
8-
0:
o
"-z
SQ
z~
iY~
<~
z(/)
~6
uju
0:
a.
Cl38v-J\fH8 118Nn08 ON\flHS\f
ONIflHSV :00 All::>
38'v'>f8'v'd N81S30 81.L'v'Vl/3H8S
u
~~
~w
~~
:rl~
'=~
'w
n
<~
~n
!Z;~
~t5~
~ w
~
0::
w
Il)
~
<(
J:
..-0
Z.....J
OU
I-Z
0..::::>
00
-.- , 0
zw
0>
-0
1-0::
:;<.9
w,
.....Jo
~~
Oz
0::0
w-
1-1-
><0..
wO
~
..,
SNOIlV^313 ~01~31X3
SNOlSl^i1~ J.0lI0 ON J.:l3rOlfd
~
~
~
il
z
Z
~
~
!Z~
~~
l;ii;j
~
j
~
~
~
~w
~~
~~
z::i
u~
~w
<~
[I]
[I]
~~~
~~~
~i;j~
w ~
~ w
~
~- .------.--.. - ------. - ~--.--. -- ..------.-- _. ."__'___m
0::
w
Il)
~
<(
J:
NO
Z.....J
Ou
i=z
0..::::>
00
,u
Zw
0>
-0
1-0::
:;<.9
w,
.....JO
~~
Oz
0::-
wO
1-1-
><0..
wO
~
8~
en iilg
o lO
C ;;;
--l
I
m
~
.
o
~
~
~
z
o
::0
--l
I
~
'--
~
'--
~
'--
~
'--
~
'--
~
'--
..
~n
S~ ~
I\.) ~::! ~
~~ 0 '--
~ ~
0 ii
Z ~
""'0 ~ ~ ~
~ ~
m . '--
0 ;::0 ~
Z 0 ~ ~ I ~I
~ 3
OJ ;::0 z
~
n
m 0
E
G)r i\
;::om 8
0< ~
<)>
m~
()o
OZ ~~
cen O'
~~
z' ~o
()() ~Q
-0 ~~
rc ~
()Z
I()
)>-
~r
OJ()
mI
;::0)>
~
OJ
m
;::0
g
::E
m
en
--l
~
"
..
~8
~~
~~
~
~
eo
BUILDING SECTION
INTERIOR ELEVATIONS
0lI01 "l!!VISIONS
m
}>
en
--l
~~
~r;
m"
e, ~
~z~
~
~
~
~
.
~
/
~
~
S
~
3
Z
~
en
"
;0
0~
0-
z~
(JJz
....>>
;0;0
c-<
0z
::!o
0....
z."
o
;0
m.B
e
mm..e
....m.G
PiVOT
.
OUTLINE SPECIFICATIONS
The Ashland City Council Chamber project includes development of preliminary cost estimates for 2 alternatives.
Preliminary designs have been developed for each alternative. The preliminary designs represent initial concepts
without detailed development of materials and systems. The following outline specifications are assumptions based
on the preliminary designs and provided as a tool for cost estimating. Cost estimates will be used by the City to
determine a preferred alternative and to establish a preliminary budget for construction.
General assumptions include construction by local contractors in the Southern Oregon area including Medford and
Ashland. Start of construction is estimated as one year from this report or July 2007. Construction inflation for
one year should be included. Note that the City of Ashland has a goal of sustainable design. Use FSC certified
wood, "green" products, locally supplied materials, and recycle construction wastes.
Both alternatives are renovations of existing city buildings. Option A is a renovation of the existing City Council
Chamber. The Chamber currently serves as meeting space for a wide variety of groups including municipal court,
emergency operations center, school board, City Commissions, City Committees, and City Council. It is assumed
that construction of Option A would require closure of the space for a minimum period of 4 months. During
that time temporary meeting space is needed. An allowance is needed for the cost of developing temporary space
for that period. Minimum equipment needed would include sound amplification, sound recording, video record-
ing, digital projection, and furnishings. Existing council dais, council seating, and audience seating can be relocated.
The City will need to identify a meeting space and determine the cost of rental, if any, and set up. In general, Op-
tion A is to be accomplished without structural change to the existing building. It is intended as an interior renova-
tion project. New toilets and exterior enclosure of an existing roofed area anticipated.
Option B is a renovation of an existing multipurpose space in a building known as the Grove which can be vacated
during construction. The Grove is located on the same site. Once again, improvements are predominantly interior
renovations. Work at the Grove does include a new entry canopy and sidewalk.
Cautions: Costs are preliminary and are for the purpose of assisting the city in selecting a preferred option. Final
budget limits should not be established until more complete designs ate developed. Issues remaining to be resolved
include Fire Alarm and Sprinklers in the existing Council Chamber and variations in field conditions for the Grove.
Drawings of the Grove appear much different than the actual conditions suggesting the major changes were made
during construction. The estimate assumes the drawings are accurate. Verification is needed before further design
work is done. Relatively high contingencies should be applied pending the development of more detailed designs.
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
9
The specifications are organized using CSI Uniformat. The following is a general outline.
C51 Uniformat Outline
AOO Substructure
A 10 Foundations
BOO Shell
B 10 Superstructure
B20 Exterior Closure
B30 Roofing
COO Interiors
Cl0 Interior construction
C20 Interior Finishes
DOO Services
Dl0 Mechanical
HVAC
Plumbing
D20 Electrical (by BHE)
Lghting
Power
Emergency Power
D30 Audio Visual Systems & Equipment (by Spectrum
Systems)
EOO Equipment & Furnishings
E 10 Equipment
E20 Furnishings
FOO Other Building Construction
F20 Selective demolition
GOO Building Site Work
Gl0 Site Preparation
G30 Pavements & Sidewalks
Responsibility for Cost Estimates
Estimates are being prepared by PIVOT, Construction Focus (CF) with the assistance of Spectrum Systems (SS) and
Balzhiser & Hubbard Engineers (BHE). Assignments are shown below.
SS is to provide costs for AV systems.
BHE is to provide cost estimates for lighting and electrical work with the exception of phone and
data.
PIVOT: Allowance for phone and data systems, furniture costs
CF: It is assumed that work not otherwise assigned is to be estimated by CF.
10
PIVOT Architecture
Option A: Renovation of the Existing Council Chamber
ADO Substructure
AlO Foundations:
Footings: Conventional running footings and stem wall are to be provided at new exterior
walls enclosing the meeting space. Assume 12 inch thick by 18 inch wide footings and 8
inch wide stem walls. Anchor bolts for new exterior wall.
Slabs: New 5 inch thick poured in place concrete slabs with reinforcement are to be
provided at the new meeting room. Similar new slabs are to be poured back at the new
restrooms where plumbing trenches are cut and at the council dais where below floor cable
is needed. Cable and plumbing by BHE.
Provide 6 inches of crushed rock fill and under slab vapor barrier below new slabs
BOO Shell
B 10 Superstructure
Exterior Walls: 2 x 6 wood frame walls at new meeting room, include R19 insulation, vapor
barrier, 5/8 inch plywood or OSB board sheathing, vertical exterior cedar T& G siding with
stain finish.
B20 Exterior Closure
Windows & Glazing: New exterior windows to be Pella or Anderson wood sash windows,
casement style operation with screens. Provide new windows at exterior wall of new
meeting room, at enlarged windows in council chamber, and 2 small new windows high in
wall at new rest rooms (2 ft x 3 ft).
Exterior Door: Provide new exterior door at new meeting room. Wood style and rail door
with full glass. Match style of wood windows.
Ceiling: Ceiling above meeting room and a portion of new rest rooms is currently exterior.
Remove ceiling finish, install new R30 fiberglass insulation and vapor barrier in existing
roof joist space.
Provide wood trim and patch siding at new windows
COO Interiors
CI0 Interior construction
Interior partitions to be 2 x 4 wood frame
Provide blocking and supports where needed for new lights and equipment at walls and
ceilings.
Interior double wood doors to council chamber: Wood style and rail door with full glass.
Provide with panic devices
Interior wood doors, other: Wood, Solid core with wood frame
Interior relites: At new meeting room provide wood frame relites as shown.
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
11
Match appearance of exterior wood windows.
Casework: Casework to be sustainable "green" panel products or certified wood
New council dais, built in wall and counter, all wood
Movable tables for staff and speaker at dais
Lectern, movable
Sink vanity in council chamber, plastic lam finish
Sink vanity in rest rooms, plastic lam finish
C20 Interior Finishes
Interior wall finishes to 5/8 inch gyp board unless otherwise noted. Water resistant board in rest
rooms.
At north wall of council chamber install new wood furring and gyp board over existing CMU.
Ceilings:
Council Chamber: Replace and repair existing gyp board after installing new lights and
equipment.
Council Chamber Dais: Suspended cloud framed with wood, fabric covered acoustical
panel finish.
New Meeting Room: Sloped ceiling at underside of roof framing. Gyp board finish with
parnt.
RVfV: New AC suspended tile system.
Storage: Repair existing suspended ac tile system.
Carpet: New carpet tile system in council chamber, lobby, meeting room, and hall.
Base: Wood base, fir, 1 x 6
Floor coverings, RVfV, storage, rest rooms: Linoleum, Forbo or equal
Acoustic wall panels; Fabric covered acoustical panels as shown on walls of council chamber.
Paneling: Provide clear fir T & G paneling on east wall of council chamber. Recycled
wood. Clear stain finish.
Trim: Provide wood chair rail all around room in council chamber and new meeting room. Provide
wood trim at wood doors and windows.
DOO Services
DlO Mechanical
HVAC
New Bathroom exhaust fans
Protection of existing HVAC system during construction
HVAC revisions to meeting room, rest rooms: Extend existing supply and return ducts to
serve meeting room and rest rooms.
Plumbing
Sustainable, low water volume toilets and urinals, motion control flush and water faucets
New drinking fountain, 2 basin type, accessible
Wall mounted toilets and urinals at new restrooms
Lavs at restrooms
Kitchen style sink in council chamber
12
PIVOT Architecture
Fire Protection
Building is not fire sprinklered. Area check indicates we are OK without sprinklers.
No fire alarm system is present. Preliminary code evaluation indicated fire alarms and not
required.
D20 Electrical
Lighting (Cost by BHE)
Demolition of existing lighting and controls
New lighting in council chamber with control system
Lighting in new meeting room and rest rooms
Utility lighting in RVTV and Storage room
Lighting demolition
Lghting controls and switches
Relocate emergency exit signs serving council chamber
Power (Cost by BHE)
Demolition of existing power as needed.
Modify power outlets in council chamber, storage, and RVTV
Provide new power outlets in meeting room and rest rooms
Connect power to AV systems and equipment
Emergency Power (Cost by BHE)
Existing council chamber has emergency power used to support EOC operation.
Connect new lighting to emergency power as required for egress.
Low Voltage (Cost by PIVOT)
Provide phone outlets in new meeting room
Provide phone outlets at dais, for EOC, verify with Lndsey
Conduit for computer network to meeting room
Panic button
Coordinate with AV
D30 Audio Visual Systems & Equipment (Cost by Spectrum Systems)
TV broadcast controls and equipment
TV Cameras for display to audience and council
TV Cameras for broadcast
Sound amplifications and recording systems
Digital projection system
Display monitors
System controls
Connect to power by others
Connect to TV broadcast transmission cable by others
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
13
EOO Equipment & Furnishings
E 10 Equipment
Wash room: standard grab bars, soap dispenser, towel dispenser
Toilet partitions: recycled plastic type
Fire extinguishers: Assume 2 new locations
Coat rod and shelf at new coat area in council chamber
Meeting room equipment: Marker board and flip chart in swing open wood cabinet. Pro
vide in new meeting room.
Signage: new restrooms
Special Sign: Allowance for City of Ashland sign on exterior
E20 Furnishings
Provide window blinds at all new interior and exterior windows and relites (meeting room
and council chamber)
Furniture: Include allowance of $12,600 for new council chamber furniture. Assume exist
ing furniture for meeting room is reused.
E30 Public Art
Provide budget of 1 % for public art.
FOO Other Building Construction
F20 Selective demolition
Recycle construction wastes
Control dust and noise
Sawcut and remove slabs as shown for plumbing and electrical work.
Remove finishes as shown
Remove plumbing fixtures and existing rest room
Sawcut CMU and enlarge council chamber windows as shown.
Other demolition as shown on drawings and as needed
GOO Building Site Work
G30 Pavements & Sidewalks
Repair existing exterior concrete paving at patio outside new meeting room
Remove soil and regrade area outside enlarged council chamber windows.
Currently there is an earth berm against building. Lower about 2 feet.
14 PIVOT Architecture
Option B: Renovation of the Grove Building
AOO Substructure
A 10 Foundations
Footings: New footings for colwnns supporting exterior entry canopy. Slabs: New 4 inch
thick poured in place concrete slabs with reinforcement at exterior walkway. Similar new
slabs are to be poured back at trenches cut at the council dais where below floor cable is
needed. Cable by BHE.
Provide 6 inches of crushed rock fill at new slabs. Provide vapor barrier below new interior
slabs.
Provide poured in place concrete retaining wall and footing where shown on plan at exterior building
corner. Wall height about 3 feet.
BOO Shell
B 10 Superstructure
Exterior Walls: Repair existing 2 x 6 wood frame walls at new window near lobby entry,
outside new RVTV room and outside rear project screen room to replace coiling
door. Include R19 insulation, vapor barrier, 5/8 inch plywood or OSB board sheathing,
Siding: Provide new siding at entry, metal panel product.
Exterior Canopy: Structural steel frame and columns supporting canopy roof.
Roof to be structural metal roofing, about 5 to 6 ft span.
Exterior Canopy: Art glass panels. Frameless glass panels installed with glazing clips.
Glass to be laminated safety glass, 1/2 inch thick. Glass to have custom etched finish with
art work including the words "Ashland City Council Chamber". See exterior elevations.
B20 Exterior Closure
Windows & Glazing: New exterior windows to be Kawneer alwninum storefront windows,
some panels with casement style operation with screens. Provide new windows at exte
rior wall of new entry to lobby and new south door to street.
Exterior Door: Provide new exterior door at council chamber south entry and at main
entry to lobby. Aluminum Storefront. Provide new Hollow steel door at RVTV room.
Paint existing corrugated metal siding, entire building.
COO Interiors
C10 Interior construction
Interior partitions to be 2 x 6 wood frame
Raised council dais to be wood frame, 2 x 6 joists on wood framing with 3/4 inch subfloor
and 1/2 inch underlayment. See design for ramp and steps. Small platform in lobby similar.
Provide blocking and supports where needed for new lights and equipment at walls and
ceilings.
Interior relites and double doors between lobby and council chamber: Frameless
glass, butt glazing. Doors frameless type. Glass to have custom etched finish with
art work similar to exterior canopy.
Casework: Casework to be sustainable "green" panel products or certified wood
New council dais, built in wall and counter, all wood
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
15
Movable tables for staff and speaker at dais
Lectern, movable
Custom wood benches in lobby
Wood display cases in lobby, glass front, secure
C20 Interior Finishes
Interior wall finishes to 5/8 inch gyp board unless otherwise noted. Paint finish.
Ceilings:
Council Chamber and Lobby Upper Ceiling: Replace and repair existing gyp board after installing new
lights and equipment.
Council Chamber suspended Cloud Ceilings: Suspended clouds with proprietary metal frame and
stretched fabric system to form curves as shown on drawings.
Product to be Barrisol (www.barriscom contact Tom Coffee at 206-634-1166 or 206-612-4980.
Product type with fabric surface and Microsorber acoustical backing.
Estimate 23 panels at 6 ft by 13 ft each including frame, acoustical backing, fabric, and suspension sys
tern. Budget $52000, see email from BarrisoL
Lobby finished ceiling: Assume 25% of area with same "cloud" system specified for lobby above.
RVTV: New AC suspended tile system.
Rear projection Room: Exposed structure painted black
Existing Hardwood Floor: Preserve existing hardwood floor in council chamber as shown on drawings.
Carpet: New carpet tile system in council chamber and lobby.
Base: Wood base, hardwood, 1 x 6
Floor coverings, RVTV: Linoleum, Forbo or equal. Rear Projection room, existing floor to remain.
Acoustic wall panels; Fabric covered acoustical panels as shown on walls of council chamber.
Paneling: Provide clear fir T & G paneling on rear wall of council chamber. Recycled wood. Clear stain finish.
DOO Services
D10 Mechanical
HVAC
Protection of existing HVAC system during construction
HVAC revisions to chamber; Provide new ductwork from existing units serving council chamber.
Brief brainstorming meeting with BHE estimates $12,500 for council chamber ducts for supply and
return.
HVAC to RVTV: Extend existing supply and return to new RVTV room.
Plumbing
New drinking fountain, 2 basin type, accessible
Fire Protection
Modify existing fire sprinkler system for new construction.
D20 Electrical (Cost by BHE)
Lighting(Cost by BHE)
Energy efficient lighting
New lighting in council chamber & Lobby
Lighting in rear projection room \
16
PIVOT Architecture
Lighting in RVTV
Lighting demolition
Lighting controls and switches
Relocate emergency exit signs from council chamber
Power (Cost by BHE)
Modify and add power outlets in council chamber, lobby, rear projection, and RVTV
Connect power to AV systems and equipment
Emergency Power (Cost by BHE)
No existing emergency power, EOC (Emergency Operations Center) to remain in present location at
existing council chamber.
Modify existing fire alarm pull stations and visual alarms.
Low Voltage (Cost by PIVOT)
Provide phone outlets in RVTV, Council Chamber, and Lobby.
Conduit for computer network to RVTV, Council chamber
Panic button
Coordinate with AV
New fiber optic service for RVTV and computer network, By City of Ashland?
D30 Audio Visual Systems & Equipment (Cost by Spectrum Systems)
Rear projection screen including glass and frame
TV broadcast controls and equipment
TV Cameras for display to audience and council
TV Cameras for broadcast
Sound amplifications and recording systems
Digital projection system
Display monitors
System controls
Connect to power by others
Connect to TV broadcast transmission cable by others
EOO Equipment & Furnishings
E 10 Equipment
Fire extinguishers: Assume 3 new locations
Coat rod and shelf at new coat area in council chamber
Signage: restrooms
Special Sign: Allowance for City of Ashland sign on exterior
E20 Furnishings
Provide window blinds at all new interior and exterior windows and relites (meeting room and council
chamber)
Furniture: Furniture: Include allowance of $18,100 for new council chamber furniture. Assume
existing furniture for meeting rooms, lobby, etc is reused.
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
17
E30 Public Art
Provide budget of 1 % for public art.
FOO Other Building Construction
F20 Selective demolition
Recycle construction wastes
Control dust and noise
Sawcut and remove slabs as shown
Remove finishes as shown
Other demolition as shown on drawings and as needed
GOO Building Site Work
G30 Pavements & Sidewalks
New sidewalk from entry to street, 4 inch concrete slab.
Landscape, new landscape plantings along canopy
Revise landscape irrigation for new plantings
18 PIVOT Architecture
I
SPECTRUM
SYSTEMS DESIGN
937 SW. 14TH, SUITE 101
PORTLAND, OR 97205
PHONE: (503) 248-0248
FAX: (503) 274-7684
(800) 288-3492
www.spectrumsd.com
CITY OF ASHLAND
COUNCIL CHAMBER
AUDIO VISUAL
DESIGN DEVELOPMENT BUDGETS
A V PRESENT A TION SYSTEMS
VIDEO COMPUTER DISPLAY
Ceiling projector
Local computer
Lap top connection
DVD player
Video cassette player
Ceiling document camera
Dais view monitors
Audience view monitor(s)
PROGRAM AUDIO SYSTEM
Ceiling speakers
Audio cassette player
Audio from video/computer
CD player
REMOTE CONTROL SYSTEM
Clerk touch screen control panel
Full media control
VOICE REINFORCEMENT SYSTEM
Dais/staff microphones
Wireless microphones
Audio conference
Digital audio recorder
Assisted listening
Front projection in current building
Rear projection in Grove building
Custom Connection Panels
AV PRESENTATION EQUIPMENT & INSTALLATION: $160,000.00 to $190, 000.00
THE GROVE A V BUDGET: $170,000.00 to $202,000.00
CABLE ACCESS BROADCAST SYSTEM
Three cameras w/lens pan/tilt
Production switcher
Character Generator
Video matrix router
Time base corrector
T est generator
Black burst generator
Video cassette recorder
DVD recorder
Audio mixer
Audio amplifier/speakers
Broadcast control console system
View monitors for each camera
Program and pre-view monitors
CG view monitor
CABLE ACCESS BROADCAST EQUIPMENT & INSTALLATION: $165,000.00 to $200,000.00
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
19
PIVOT Architecture
Cost Estimate
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
20
PIVOT Architecture
Exterior
Interior
Restrooms
Interior
Exterior
Exterior
Exterior
Restrooms
Exterior
West
North
West
Interior
West
West
West
NW
Exterior
Interior
North
Council
East Wall
ASHLAND CITY COUNCIL CHAMBER
Option A: Remodel Existing
Statement of Probable Cost
LOC I
I
ITEM
DESCRIPTION
BUILDING REMODEL
I Demolition
Demo slab x_sawcut/demo conc
Demo slab x_sawcut/demo conc
Demo flooring x_carpet
Demo flooring x_cer-tile
Demo casework x_base cabinet
Demo walls x_framinglgypbd
Demo walls x_framing/siding
Demo wall @window x_cut/demo cmu
Demo wall @ patio x_conc walls
Demo wall finishes x_cer-tile
Demo windows x_windows
Demo door x_door/frame
Demo partitions x_toilet partitions
Demo ceilings x---9ypbd/framing
Demo furnishing x_curtain
Demo furnishing x_tackable surface
Demo plumbing x fixtures
I Earthwork, Concrete, Masonrv
Earthwork excavlbackfill/grade
Adjust grade @ windows excav/grade
Slab-on-grade f/s/pl/fin: 5" w/rebar
Slab-on-grade patch @ existing slab
Continuous footings tis/pi 1.5' Wx l' D
Stem wall tis/pi .7' Wx2' HT
Concrete landing f/s/pl/fin: 4" w/rebar
Masonry infill CMU 8x8x16
I Carpentry
Framed walls
Framed walls
Wall backing
Ceiling blocking
Wall paneling
Finish carpentry
Finish carpentry
Finish carpentry
Coat rod & shelf
ICasework
Council Dias
Speaker's table
Lecturn
Garbaae/recv
2x6 framing/shtg
2x4 framing/blocking
wd furring/rigid insul on CMU
2x 12 blocks for lighting
fir_ 4x8Jllywood
wd trim @ drlwindows
wood base
chair rail
allowance
-- furnished by owner --
allowance
allowance
ARCH: Pivot
DWG DATE: 7-11-06
DESIGN LEVEL: SO
CONSTRUCTION FOCUS, INC.
541-686-2031
EUGENE, OREGON
1/3
I QNTY UNIT
2,900 SF
$/UNIT I
TOTAL $
I I 13508
330 SF ~ 6.00t=: .~~()
--16O~~ I ___8.00.t -=-- 1..;!8Q
1 ,500 SF OAO I 600
-- 1~----t... 7.00'-.-882
1 'EA-j-100.00~--- -100
800 "~ ~ ;~ 1_ .. _.1~.680
~336 SF _----.?~-_ _ 840
_. 28 SF. 32.0~+--- ___~~6
56 SF I 15.00 I __ .840
104 SF-r-- ir5.001 _n._. _~
__ 6,E~ .f32.QQ. ~.~O
gyEA 60.00 540
-~ 60.00~ -180
510~ 3.001___ 1,530
600 SF 0.50 300
- .
100 SF 2. OO.~
6 EA 110.00 ~
12273
-. --
9.00 2,970
7J}Q __ _. 868
5.50 1.815
12.00 ~2Q
45.00 1.260
40.00 U40
8.00 ......~
19.00 912
28 854
330 SF
124 SF -r--
330 SF
160 SF
28 LF
~56~=C.
36 SF i
48 SF I
---
336 SF 5.50 1,84~
1 ,01 ~* I 4.00 _ __ 4,048
-
648 SF 4.25 2,754
192 LF 3.50 672
340isF 22.00 ____....lA~()
3421IF 12.00 ~J.CM
404 LF 12.00 4848
210 LF 14.00 2,940
4 LF 40.00 160
30 580
--
321LF 800.00 25,@
-~-r--
I .-
-=---~ 1,500.00 I 1,500
2iEA i 1,000.00 2,000
ESTIMATE DATE: Aug. 3,2006
REVISION #: 0
CONST. START: 3 QTR_07
Ashland City Council Charnber Design Options and Cost Estimates
August 10,2006
21
ASHLAND CITY COUNCIL CHAMBER
Option A: Remodel Existing
Statement of Probable Cost
LOC ITEM
Food service: Upper/lower
Vanity top
Seating
jThermal & Moisture
Siding
Exterior Insulation @ walls
Insulation @ ceiling
1000rs & Windows
West Exterior door
Interior door
Interior door
Window, interior
Window, exterior
IFinishes
Council Ceiling cloud
Carpet
Linoleum
Restrooms Ceramic tile
Acoustic wall panels
Restrooms Wainscot
RVTV/Storage Ceiling
Gypsum board
Painting
Lt Gau e Framin
Restrooms Ceiling framing
S ecialties
FEC
Meeting Mise specialties
Toilet accessories
Toilet partitions
Restrooms Signage, interior
Signage, exterior
Window blinds
IAV Equipment
Presentation systems
Rear screen projection
Broadcast TV
Mechanical & Electrical
Plumbing
HVAC
ARCH: Pivot
DWG DATE: 7-11-06
DESIGN LEVEL: SO
DESCRIPTION
allowance
wood frame/p-Iam top
-- furnished by owner --
CedaU&g
R-25 balls
R-30 balls
wd- frm/full-lite-dr/hdwr __ 3x 7
wd-frm/wd-dr/hdwr __3x7
wd-frm/full-Iite-dr/hdwr __ 6x 7
wood frame/single glazing
Anderson_wood sash
It gage frame/gypbd cover
allowance
marmoleum
fabric/acoustic core
ceramic tile
suspended grid, ac tile
5/8" bd & texture
2 cts @ walls/ceilings
6" steel joist
marker bd/flip chart
various types
solid plastic
acrylic
allowance
1" alum horizontal
fixture count
ex-fans/extend ductin
CONSTRUCTION FOCUS, INC.
541-686-2031
EUGENE, OREGON
2/3
QNTY UNIT $/UNIT TOTAL $
4ILF! 250.001 1,000
_=~L~__t--- 80.00 r-- - 480
_____+ t- I
~ I
314,SF I 11.50
_-- 314tSf'_j 1.40
_391E.-J____ 1.7~_
I 23 660
------=--1/\ +__...?,5do.~_~ 2~OO
_ __ 3,E~ 1_ 1,100.00 _ ..1,3lJO
__ 2E:RML 3,500.00_3,500
=- 1~~5:_--i__=-~~:;__ u_ ::~:
I 40 732
484tsF 1---16.00 - 7,744
~,3~ifsF!---- 3.50LI--- 8.190
-- ~---j-- ----
- -- 300 r L___~,50 +----- J-=. 650
260 SF I 14.00 i 3640
=-- j~~ -1 - ;~:~~r~-~:~~
---~i:)TSFT ----3.001- 960
- 4,~ -Tn~- --8,764
- 6~560 I S~------l-_ -. O.?SJ I - 3:280
625
250 SF t~u__2.~ --625
13634
- - ,ft - 2.;E~J - . .-ffl
5@!~S-...'~~.250
_-%E~_L 40.00 [ 80
~-~---L. 5,000.001 ~900
21~~ I __JOOI 8~
" 369 000
~~175'000'00'1 175000
1,LS I 11,000.00 11 000
=_~~ 183,000.00 I 183,000
94 020
9 FIX 2,200.00 I--- 19 800
522 SF! 10.001 5220
4715
3,6 I}
440
665
ESTIMATE DATE: Aug. 3, 2006
REVISION #: 0
CONST. START: 3 QTR_07
22
PIVOT Architecture
ASHLAND CITY COUNCIL CHAMBER
Option A: Remodel Existing
Statement of Probable Cost
3/3
lOC I ITEM I DESCRIPTION I QNTY I UNIT I $/UNIT I TOTAL $
Phone wiring allowance _ ____ 11LS ~1-000.gQJ__~QQ()
Electrical power and lighting 2,90QlSF! 21.721 63 000
~-_.----;---'-'._'--'--'-+--- ~-
HP,RDCOST TOTAL r 63160 !
The above HARDCOST TOTAL does not include typical general contractor markups.
Those plus contingencies are listed below as part of a Low-High Range.
Variables include fluctuations in market conditions, material selections, and design considerations.
The Cost Estimate Range will be consolidated as we move closer to the actual Bid Date.
LOW RANGE HIGH RANGE
Markups:
@3%: 18,948 Inflation (July 2007) @8%: 50,528
@15%: 97,582 Contingency @25%: 170,532
52,369 Gen Requirements @ 7%: 59,686
48,030 Profit & Overhead @ 6%: 54,741
860 BOll Wage Fee: 980
10,330 Perfomance Bond: 11,372
-
228,120 Markup Subtotals: 347,839
859,721 CONSTRUCTION TOTAL 979,440
LOW RANGE HIGH RANGE
PUBLIC ART
11 % allowance for public art 9,794
CONSTRUCTION + PUBLIC ART TOTAL I 989,235
NOTES
For details refer to the Outline Specifications by Pivot Architecture, dated July 11, 2006
This estimate assumes competitive bidding by local contractors
EXCLUSIONS
Design fees, permit fees, system development fees, testing.
Hazardous materials abatement, relocation expenses and temporary office space for relocated staff.
ARCH: Pivot
DWG DATE: 7-11-06
DESIGN LEVEL: SO
CONSTRUCTION FOCUS, INC.
541-686-2031
EUGENE, OREGON
ESTIMATE DATE: Aug. 3. 2006
REVISION #: 0
CON ST. START: 3 QTR_07
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
23
24
PIVOT Architecture
Interior
Lobby/Hall
Corridor
Exterior
Corridor
SW
Canopy
West
West
Canopy
SW
SW
Ext Entry
Interior
Dais
Lobby
Council
Interior
East Wall
Council
Lobby
Lobby
ASHLAND CITY COUNCIL CHAMBER
Option B: Remodel The Grove
Statement of Probable Cost
LOC I
ITEM
BUILDING REMODEL
West
I Demolition
Demo slab
Demo flooring
Demo flooring
Demo casework
Demo casework
Demo walls
Demo siding
Demo sloped ceiling
Demo windows
Demo door
Demo door
I Earthwork & Concrete
Earthwork @ ret wall
Earthwork @ pad footings
Landscaping
Sidewalks
Slab-on-grade
Pad footings
Cont ftgs @ ret wall
Retaining wall
I Steel
Canopy
Canopy
Steel frame for art glass
I Caroentrv
Framed walls infill
Framed walls
Floor framing
Floor framing
Ceiling blocking
Framed sloped ceiling
Wall paneling
Finish carpentry
Finish carpentry
Finish carpentry
I Casework
Council Dias
Speaker's table
Lecturn
Wood benches
Display cases
Seating
ARCH: Pivot
DWG DATE: 7-11-06
DESIGN LEVEL: SO
I
DESCRIPTION
1/3
I QNTY I UNIT
3,674 SF
$/UNIT
TOTAL $
x_sawcut/demo conc
x_carpet
x_wood flooring
x_base cabinet
x_shelving
x_framing/gypbd
x_metal panels
x_framing/gypbd
x_windows
x_door/frame
x roll-up
excav/grade
excav/grade
repair lawn/planters
excav-10"/rock-6"/conc-4"
patch @ existing slab
tis/pi 2.5' Wx l' D
tis/pi 1.5' Wx l' D
tls/pl.7' Wx3' HT
chanel frame/mil roofing
steel columns
tube steel
2x6 framing/shtg
2x6 framinglblocking
2x6 joist/plywdlunderlay
2x6 joist/plywdlunderlay
2x12 blocks for lighting
2x6 framing/blocking
fir_ 4x8---plywood
wd trim @ dr/windows
wd slats @ acoustic panels
wood base
allowance
-- furnished by owner --
allowance
allowance
allowance
-- furnished by owner --
CONSTRUCTION FOCUS, INC.
541-686-2031
EUGENE, OREGON
7949
~~ -8~OO 480
- 2Pit: l __ 040 - _. _ ...9Qll
124 ~-t'- - 4.5~f-- ~
6 LF 14.00 84
. 14'U"- ~ ... 8.00' '-112
-,,298rS' ~ --2\61 _ 2,'if,
__.~~F 3.001 _~.Q
__.l!Qj~ . ~ 651
~-----..:t.+.~- 120.00 I 120
_~~_ ~60.001 360
3IE~A 250.00 750
:_ 12758
80lSF 12.00 960
1~IEAi - 100.00--~200
---~il~=t-- 1,00Q:.0.J2.._ JLCIOO
3921SF. ~50 2,~48
601SF+---- 12.00llQ
-.~EA ".. 280.00 3360
~___~*~_n_ :~:~~ ------ 2 ~
. . +------j--' ___ __n__.__-=-'=
63 850
--
70.00 ___#~
600.00 __. _ _ 7,~l!Q
25.00 9 750
42.167
-aotSF"I ---700 r=='----- ---------s6Q
-1-6081S"F1-' -"=
"~ 6.50 10.452
- 38Q]:~-.__ 11.00 ~Q
60]S' 1- 1400,_ Il4!l
240lLF 3.50 840
310 TSF- 6.50 2015
180lsF + --22.00 3.960
-WLF I 12.00 768
744isF I 20.00 14880
30~~t-- 12.00 ~~
41420
22.400
__..~~SF .-
12jEA
39OTS"F- --
T
281LF 800.00
I --r-----
----1fEA j 1,500.00
-261LF-t 120.00
=---- __ 321L~ _. 450.00 --
L -.t--
1500
3120
14,4QQ
---
ESTIMATE DATE: Aug. 2, 2006
REVISION #: 0
CONST. START: 3 QTR_07
Ashland City Council Chamber Design Options and Cost Estimates
August 10, 2006
25
ASHLAND CITY COUNCIL CHAMBER
Option B: Remodel The Grove
Statement of Probable Cost
LOC ITEM DESCRIPTION
Thermal & Moisture
Entry Siding metal-horizontal
Exterior Insulation @ walls R-25 baits
Corridor Insulation @ ceiling R-30 baits
I Doors, Windows, & Glazing
Exterior door hm-frm/hm-dr/hdwr _ 3x7
Exterior door hm-frm/hm-dr/hdwr _ 6x7
Interior door hm-frm/wd-dr/hdwr _3x7
Exterior Art glass panels 1/2" tk/frameless
Art glass etching n by others --
Projection Window, interior wood frame/single glazing
Lobby Window wall, interior 1/2" tk/frameless
Lobby Window wall, interior frameless glass door/hdwr
Intill drs Window, exterior Kawneer 451- T
West Window, exterior Kawneer 451- T
IFinishes
Council Ceiling cloud Barrisol System
Lobby Ceiling cloud Barrisol System
Carpet allowance
RVTV Linoleum marmoleum
Hardwood floor patch @ infill
Hardwood floor refinish
Acoustic wall panels fabric/acoustic core
RVTV Ceiling suspended grid, ac tile
Gypsum board 5/8" bd & texture
Exterior Painting 2-cts @ metal siding
Painting 2 cts @ walls/ceilings
I Specialties
FEC
Mise specialties marker bd/flip chart
Signage, exterior allowance
Window blinds n not included n
IAV Equipment
Presentation systems
Rear screen projection
Broadcast TV
Mechanical & Electrical
Fire protection relocate heads/drops
Plumbing relocate existing OF
HVAC extend ductin
ARCH: Pivot
DWG DATE: 7-11-06
DESIGN LEVEL: SO
CONSTRUCTION FOCUS, INC.
541-686-2031
EUGENE, OREGON
2/3
UNIT
$/UNIT
TOTAL $
4639
.tl_~~ ~:__ 1~:~~1_~__ 4,~~~
~rc.. j ~ . 1.70 -89:0 527
-- ,i,,;- l ---
1.tA i 900.00 900
=_=--}~~M L .. 1,5jjO.00~~ 1,5!)0
___ _1.+ E~__ j 800.0g__j_.__.~0
__Jli~ -+_ 70.00 +__~,800
I 1 ,
I. I
~32!SFI 35.00 ~-1J20
--1'1-4 iSFI-70.00 7980
=-. -16~~'l --3,0~~:~~ _ 1~,~~~
-- _______1.__ ___..____==
270'SF i 50.00 13500
:~-.- ~~-
1 LS . 52,000.00 52,000
- __~-- 1 .Ls-iJ.3. ,0QO'~j .- - _13000
__~840 ~~-t- __-EO 13,440
270 SF i ~ 1485
=~ ~~~i:-=+:=~t-- -- 1'~~~
=- - 90QlSF-t' +----i2.OOi . 10,800
270jSF 3.00' 810
=-=6,976iSF -1=-- 2.001---- 13,952
----..E>,600.~~ i_ ?:~%t-_...M..850
13,210~=r____ 0.50 __6,605
L 8250
- j~~t 2'~;~:~~ __ 2,~~~
__--1=1IEA_--l- _ 5,000.00 I 5000
I i
~.. .--'1.-----' I
! 369 000
--= lfLs=1175,000.00 1_ ~ 175000
1'LS I 11,000.00 11 000
- --0:s1 183,000.00 183000
. -
128 700
3000
1800
12500
12 EA 250.00
1 FIX-T-1,800.00
1ICS-f--12,500.00
ESTIMATE DATE: Aug. 2, 2006
REVISION #: 0
CONST. START: 30TR_07
26
PIVOT Architecture
ASHLAND CITY COUNCIL CHAMBER
Option B: Remodel The Grove
Statement of Probable Cost
3/3
LOC I ITEM I DESCRIPTION I ONTY 1 UNIT 1 $/UNIT I TOTAL $
Phone wiring allowance _1ILS~L10!OOO'OOI 10.000
Electrical power and lighting .._ 3,6i~-._-J_.27.6()J~ J01,400
HARDCOST TOTAL I &96,955
The above HARDCOST TOTAL does not include typical general contractor markups.
Those plus contingencies are listed below as part of a Low-High Range.
Variables include fluctuations in market conditions, material selections, and design considerations.
The Cost Estimate Range will be consolidated as we move closer to the actual Bid Date.
LOW RANGE HIGH RANGE
Markups:
@3%: 26,909 Inflation (July 2007) @8%: 71,756
@15%: 138,580 Contingency @25%: 242,178
74,371 Gen Requirements @ 7%: 84,762
68,209 Profit & Overhead @ 6%: 77,739
1,220 BOll Wage Fee: 1,390
13,461 Perfomance Bond: 14,940
322,749 Markup Subtotals: 492,766
1,219,704 CONSTRUCTION TOTAL 1,389,720
LOW RANGE HIGH RANGE
PUBLIC ART
11 % allowance for public art 13,897
CONSTRUCTION.,. PUBliC ART TOTAL 1 1,403,618
NOTES
For details refer to the Outline Specifications by Pivot Architecture, dated July 11, 2006
This estimate assumes competitive bidding by local contractors
EXCLUSIONS
Design fees, permit fees, system development fees, testing.
Hazardous materials abatement, relocation expenses and temporary office space for relocated staff.
ARCH: Pivot
DWG DATE: 7.11-06
DESIGN LEVEL: SO
CONSTRUCTION FOCUS, INC.
541.686-2031
EUGENE, OREGON
ESTIMATE DATE: Aug. 2, 2006
REVISION #: 0
CONST. START: 3 OTR_07
Ashland City Council Chamber Design Options and Cost Estimates
August 10,2006
27