Mayor Morrison called the meeting to order at 6:08 p.m.
Councilors Hardesty, Hartzell, Navickas, Jackson, and S ilbiger were present. Councilor Chapman was absent.
1. Does Council have any questions about the status of the Regional Problem Solving (RPS)
Process or any specific concerns about the draft participant's agreement?
Director of Community Development Bill Molnar provided a general overview of the Participant's
Agreement and its key components. He introduced John Renz, the Southern Oregon Representative of the
DLCD and Michael Quilty, the Chair for the RVMPO.
The overview included:
· Participants' Agreement
· Implementation Techniques
· RPS & Participants' Agreement - Approval Process
· Regional Problem Solving - Next Steps
It was explained that the County will probably not make an exception to increase the standard 50 acres to
100 acres in the Minor Plan Amendment because the 50 acres is a threshold between the Minor and Major
Plan Amendments in the County's Land Use Plan.
City Attorney Richard Appicello explained that the Participants' Agreement is not adopting the plan, only
agreeing to run it through the appropriate Land Use course. It is a perspective Land Use decision that the
County will analyze during their review process.
City Administrator Martha Bennett explained that Council would most likely take the initial action of
resolution and commit to send the agreement through the process. The next step would be to adopt the
Participants' Agreement.
Council discussed and questioned how the population allocation was determined. Mr. Renz eXplained that
the County has complete discretion on population allocation. Mr. Quilty noted that one of the statements
in the Participants' Agreement is that the County will abide by the proportional allocation of population
within the RPS plan and would make corrections with the next updated population element.
Mr. Quilty further explained that the County would adopt the entire regional plan. Cities would have to
comply with the County Comprehensive Plan that would involve the ongoing monitoring process and
mechanisms that are in place for the appeal process. Monitoring and compliance was kept general for
feasibility. Mr. Quilty said that land use and transportation would take place at the Metropolitan
Planning Organization (MPO) level because they meet on a regular basis and update the Regional
Transportation Plan every three years. The technical and policy committees from the RPS will meet as
needed.
2. Does the Council wish to endorse the Ashland Forest Resiliency Project Preferred Alternative?
Fire Chief Keith Woodley provided an overview on the Ashland Forest Resiliency Project explaining the
Federal Environmental Impact Study (FEIS) chapter review was a special government-to-government
review period. He introduced Tony Kerwin, the Chair of the Ashland Forest Lands Commission, Marty
Main, Ashland City Consulting Forester, Darren Borgias, Staff Ecologist for the Nature Conservancy and
Linda Duffy, District Ranger for the Siskiyou Mountains Ranger District.
CITY COUNCIL STUDY SESSION
August 4,2008
Page 2 of3
Mr. Kerwin provided an overview of the Ashland Forest Lands Commission Recommendations for
Modification of the Ashland Forest Resiliency Project Preferred Alternative.
The six recommendations are as follows:
1. Silvicultural Treatments within the Research Natural Area
Explanation on the significant difference of proposed treated acres.
2. Addition of Roadside Treatments Adjacent to US Forest Road 2060
Three options were made available to the City. (I): to endorse the Forest Service Alternative,
(2): endorse the Preferred Alternative with modifications recommended by the Ashland Forest Lands
Commission and (3): endorse the unchanged Community Alternative. A fourth option was proposed
that Council be able to suggest modifications at the August 5, 2008 meeting based on other input that
does not reflect the original compromises.
3. Removal of Diameter Limits in the Roadless Area
It was clarified that the Nature conservancy does not have an official stance on commercial extractions
in roadless areas.
4. Locations and Types of Treatments in Roadless Area
It was explained that fuel breaks on the ridge in roadless areas will not look like regular fuel breaks.
The project allowed the Forest Service to prepare for the maintenance in the original prescription and
to design prescriptions to minimize the amount of maintenance required. There are currently 9.5 miles
of fuel breaks existing above the city. There are approximately 23 miles being treated within the entire
area along the ridgeline.
Concern was voiced regarding the Forest Service's long-term objective in the watershed. It was
explained that the project falls under the Healthy Forest Restoration Act and that the community is
highly prone to large-scale catastrophic wild fire.
5. Addition of Strategic Ridgeline Treatments & Canopy Closure
It was explained the plan was to cut fewer trees on the strategic ridge lines, and employ the Community
treatments on other areas and monitor the effect.
6. Sedimentation Issue and DEQ TMDL Standards
An extensive monitoring plan was developed for the whole forum covering each treatment area. A
detailed implementation strategy and monitoring plan will be developed one the project is approved.
PUBLIC TESTIMONY
Terrence Stenson/172 Alida/Spoke about the toxic effect of large woody debris rotting in the water. That
over time, it will break down into a lethal toxic growth and form bacteria requiring harmful chemicals and
water cannons to correct. He noted the Forest Services concerns regarding catastrophic fire but added they
had not restored water tables in the watershed.
3. Update on status of Reeder Reservoir
Public Works Director Mike Faught and Dr. Jacob Kann from the Aquatic Ecosystem Sciences, LLC.
provided an overview on the current Reeder Reservoir algae bloom.
The overview included:
· Algae type: Blue-green or Cyanobacterial algal species: Anabaena flos-aquae
· Geosmin and 2-methylisoborneiol or MIB
· Chemical Treatment
Staff stated they would provide an update on the algae problem when test results are received.
CITY COUNCIL STUDY SESSION
August 4, 2008
Page 3 of3
4. Review of regular meeting agenda for August 5, 2008
Consent Agenda Item #2 regarding the Intergovernmental Agreement (IGA) with the City of
Medford, Oregon, for the transfer of ownership of surplus mesh (public safety) communications
equipment.
Information Technology Director Joe Franell explained the moving costs would not exceed $5,000.00, and
they could use in-house labor and the staff Electrician with installation occurring as needed without
affecting the current budget.
New and Miscellaneous Business Item #4 regarding the contract for $15,000 between Carollo
Engineers PC and the City of Ashland for design and engineering services required to identify a
location for the Talent Booster Pump Stations.
Public Works Director Mike Faught explained the next steps required in purchasing and setting up a new a
booster station.
5. Look Ahead Review moved to end of agenda
City Administrator Martha Bennett reviewed the items on the Council Look Ahead.
Meeting was adjourned at 9:08 p.m.