Loading...
HomeMy WebLinkAboutClay_380 (PA-2009-00043) Updated 5121/08 TALENT IRRIGATION DISTRICT LAND USE AGENCY RESPONSE FORM Phone: 541-535~1529 Fax: 541-5354108 Em.ail: tid@talentid.org 104 Vaney View Avenue P.O. Box 467 Talent OR 97540 NAME OF ENTITY REQUESTING RESPONSE: City of Ashland ENTITY REFERENCE NUMBER: 2009-00043 MEETING REVIEW DATE: February 10.2009 MAP DESCRIPTION: 39-1E-IIC TL 2500 PROPERTY ADDRESS:380 Clay Street. AsWancL OR 97520 o NO COMMENT ON LAND USE ISSUE (IF NOT MARKED, CONTINUE BELOW) NO COMMENT o ~ o rg] o r??J D $hnrocl/word/forrns IF CHECKED COMMENTS ARE APPLICAB.LE o A. WATERRIGHTISSUES 1. Water rights need to be sold to someone or transferred back to Talent Irrigation District. Number of Irrigated Acres: ~ Comments: 2. Must have District approval for water rights to remain in place on subject property . Comments: Be aware that the property has 9.7 acres of water rights. Need to notifY District .[this water right will remain. or be removed. B. EASEMENTS DISTRICT EASEl\1ENTS 1. Easement needs to remain clear. No pennanent structures or deep rooted plants will be allowed within the easement limits. Comments: 2. If facility is to be relocated or modified, specifications must meet the District's standards and be agreeable to the DistD.ct. A new written and recorded easement must be conveyed to the District. Comments: 3. If a VvTitten and recorded easement does not exist for an existing facility, then one must be provided in favor oftbe District. Comments: PRIVATE EASEMENTS 1. Property may bave private faciUties (ditch or pipeline) that the District does not manage. Arrangements may need to be made to provide continued service through the subject property for downstream water users_ Comments: Talent Irrigation District Agency Response Form Page 1 of2 Upd~led 5121/08 NO COMMENT IF CHECKED COMMENTS ARE APPLICABLE o o !ZJ D o ~ PRIVATE EASEMENT PROVISIONS FOR MINOR PARTITIONS AND/OR LOT LINE ADJUSTMENTS . 1. If the property currently has water rights and it is being partitioned or a lot line adjustment is being made, easements must be written and recorded which allow access for all of the pieces of property with water rights to continue to have access to the water. Comments: WATER METER REQUlRE:MENT ON TRANSFERRED WATER RIGHTS 1. If the water right on this property is a transferred water right that currently has a water meter requirement, then each of the properties split off of the original parcel all need to have water meters installed prior to the use of irrigation water on the newly formed parcels. Comments: c. FACILITIES (including but not limited to pipelines, ditches~ canals, control checks or boxes) 1. Upgrades to District facilities may be required to support any land use changes or developments, such as pipe installations or encasing existing pipe under roads or concrete. Comments: The District lateral on the Northern nropertv line must be upgraded to PVC viping and a recorded easement for the lateral must be granted in favor of the District. Please supply the District with a plat showing the easement locat.ion. D. DRAINAGE / STORM WATER The District relies on the Bureau of Reel am at jon's Storm Water Policy. No urban storm water or point source flows will be allowed into the District's facilities without going through the Bureau of Reclamation process. (Developments in historically agricultural areas need to be aware of agricultural run off water and take appropriate action to protect the development from upslope water.) Comments: GENERAL COMMENTS: 1. No interruptions to irrigation water deliveries will be allowed. 2. T.T.D. is a Federal Project and some facilities and/or easement issues may need Bureau of Reclamation approvaL 3. The developer/sub-divider will take all appropriate actions to ensure the reliability and protection of the original function of the District's facilities. As required by ORS 92.090(6) the entity must receive a certification form from the District before aP.prOV.IOf~. ~ Date Silll1ed: .!)~ /3-0 L Ii. cndleton nager . sh~l'Cd/worUI[Oft11S Talent Irrigation District Agency Response Form Page 2 of2 February 11, 2009 CITY OF ASHLAND Housing Authority of Jackson County 2251 Table Rock Road Medford, OR 97501 RE: RE: Planning Action #2009-00043 Notice of Decision At its meeting of February 10,2009, based on the record of the public meetings and hearings on this matter, the Ashland Planning Commission approved your request for a Modification and changes to the phasing of previously approved planning actions to allow a land partition creating three lots, Site Review Approval and Tree Removal for the property located at 380 Clay Street -- Assessor's Map # 39 1 E 11 C; Tax Lot 2500. The Ashland Planning Commission approved and signed the Findings, Conclusions and Orders document, on February 10,2009. Approval is valid for a period of one year. Please review the attached findings and conditions of approval. The conditions of approval shall be met prior to project completion. Copies of the Findings, Conclusions and Orders document, the application and all associated documents and evidence submitted, applicable criteria and standards are available for review at the Ashland Community Development Department, located at 51 Winburn Way. This decision may be appealed to the Ashland City Council if a Notice of Appeal is filed within 15 days of the date this notice was mailed and with the required fee ($304), in accordance with Chapter 18.108.110 (A) of the Ashland Municipal Code. The appeal may not be made directly to the Land Use Board of Appeals. The appeal shall be limited to the following criteria: SECTION 18.108.110 Appeal to CounciL A. Appeals of Type I decisions for which a hearing has been held, of Type II decisions or of Type III decisions described in section 18.108. 060.A.I and 2 shall be initiated by a notice of appeal filed with the City Administrator. The standard Appeal Fee shall be required as part of the notice. Failure to pay the Appeal Fee at the time the appeal is filed is a jurisdictional defect. 1. The appeal shall be filed prior to the effective date of the decision of the Commission. 2. The notice shall include the appellant's name, address, a reference to the decision sought to be reviewed, a statement as to how the appellant qualifies as a party. the date of the decision being appealed, and the specific grounds for which the decision should be reversed or modified, based on the applicable criteria or procedural irregularity. 3. The notice of appeal, together with notice of the date. time and place of the hearing on the appeal by the Council shall be mailed to the parties at least 20 days prior to the hearing. 4. The appeal shall be a de novo evidentiary hearing. DEPT. OF COMMUNITY DEVELOPMENT 20 E. Mail Street Ashland, Oregon 97520 www.ashland.or.us Tel: 541-488-5305 Fax: 541-552-2050 TTY: 800-735-2900 rA1 5. The Council may affirm, reverse or modifY the decision and may approve or deny the request, or grant approval with conditions. The Council shall make findings and conclusions, and make a decision based on the record before it as justification for its action. The Council shall cause copies of a final order to be sent to all parties participating in the appeal. B. Appeals may only be filed by parties to the planning action. "Parties" shall be defined as the following: 1. The applicant. 2. Persons who participated in the public hearing, either orally or in writing. Failure to participate in the public hearing, either orally or in writing, precludes the right of appeal to the Council. 3. The Council, by majority vote. 4. Persons who were entitled to receive notice of the action but did not receive notice due to error. If you have any questions regarding this decision, please contact the Community Development Department between the hours of8:00 am and 4:30 pm, Monday through Friday at (541) 488-5305. cc: See attached mailing list DEPT. OF COMMUNITY DEVELOPMENT 20 E. Main Street Ashland, Oregoo 97520 www.ashland.or.us Tel: 541-488-5305 Fax: 541-552-2050 TTY: 800-735-2900 rtl , BEFORE THE PLANNING COMMISSION February 10,2009 ) ) ) ) FINDINGS, ) CONCLUSIONS ) AND ORDERS ) ) ) ) APPLICANTS: Housing Authority of Jackson County & City of Ashland ) ---------------------------------------------------------------------------------------------------------- ) IN THE MA TIER OF PLANNING ACTION #2009-00043, A REQUEST FOR MODI FICA TIONS AND CHANGES TO THE PHASING OF PREVIOUSLY APPROVED PLANNING ACTIONS #2004-00141 AND #2007-00802 FOR THE WILLOWBROOK SUBDIVISION TO ALLOW ALAND PARTITION CREATING THREE LOTS, SITE REVIEW APPROVAL TO CONSTRUCT A 60-UNIT MUL TI-F AMIL Y RESIDENTIAL DEVELOPMENT, AND A TREE REMOVAL PERMIT TO REMOVE 12 TREES SIX-INCHES IN DIAMETER OR GREATER WHERE ONLY 8 TREES WERE PREVIOUSLY APPROVED FOR REMOVAL FOR THE PROPERTY LOCATED AT 380 CLAY STREET. RECIT ALS: 1) Tax lot 2500 of Map 39 IE llC is located at 380 Clay Street and is zoned Low Density Multi-Family Residential (R-2). 2) The applicants are requesting modifications and changes to the phasing of the previously approved Planning Actions #2004-00141 and #2007-00802 for the Willowbrook Subdivision to allow a Land Partition creating three lots and Site Review to construct a 60-unit multi-family residential development for the property located at 380 Clay Street. The application includes a requ~st for a tree removal permit to remove 12 trees six-inches in diameter at breast height (d.b.h.) or greater where only eight trees were previously approved for removal. The site plan and building elevations are on file at the Department of Community Development. 3) The criteria for a Land Partition are as follows: A. The future use for urban purposes of the remainder of the tract will not be impeded. B. The development of the remainder of any adjoining land or access thereto will not be impeded. C. The tract of land has not been partitioned for 12 months. D. The partitioning is not in conflict with any law, ordinance or resolution applicable to the land. E. The partitioning is in accordance with the design and street standards contained in the Chapter 18.88, Performance Standards Options. F. When there exists adequate public facilities, or proof that such facilities can be provided, as determined by the Public Works Director and specified by City documents, for water, sanitary sewers, storm sewer, and electricity. G. When there exists a 20-foot wide access along the entire street frontage of the parcel to the nearest fully improved collector or arterial street, as designated in the Comprehensive Plan. Such access shall be improved with an asphaltic concrete pavement designed for the use of the proposed street. PA 2009-00043 380 Clay Street Page I The minimum width of the street shall be 20-feet with all work done under permit of the Public Works Department. 1. The Public Works Director may allow an unpaved street for access for a minor land partition when all of the following conditions exist: a. The unpaved street is at least 20-feet wide to the nearest fully improved collector or arterial street. b. The centerline grade on any portion of the unpaved street does not exceed ten percent. 2. Should the partition be on an unpaved street and paving is not required, the applicant shall agree to participate in the costs and to waive the rights of the owner of the subject property to remonstrate both with respect to the owners agreeing to participate in the cost of full street improvements and to not remonstrate to the formation of a local improvement district to cover such improvements and costs thereof. Full street improvements shall include paving, curb, gutter, sidewalks and the undergrounding of utilities. This requirement shall be precedent to the signing of the final survey plat, and if the owner declines to so agree, then the application shall be denied. H. Where an alley exists adjacent to the partition, access may be required to be provided from the alley and prohibited from the street. 4) The criteria for Site Review approval are as follows: A. All applicable City ordinances have been met or will be met by the proposed development. B. All requirements of the Site Review Chapter have been met or will be met. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. . D. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88, Performance Standards Options. 5) The criteria for a Tree Removal Permit are as follows: A. Hazard Tree: The Staff Advisor shall issue a tree removal permit for a hazard tree if the applicant demonstrates that a tree is a hazard and warrants removal. 1. A hazard tree is a tree that is physically damaged to the degree that it is clear that it is likely to fall and injure persons or property. A hazard tree may also include a tree that is located within public rights of way and is causing damage to existing public or private facilities or services and such facilities or services cannot be relocated or the damage alleviated. The applicant must demonstrate that the condition or location of the tree presents a clear public safety hazard or a PA 2009-00043 380 Clay Street Page 2 foreseeable danger of property damage to an existing structure and such hazard or danger cannot reasonably be alleviated by treatment or pruning. 2. The City may require the applicant to mitigate for the removal of each hazard tree pursuant to AMC 18.61.084. Such mitigation requirements shall be a condition of approval of the pern1it. B. Tree that is Not a Hazard: The City shall issue a tree removal permit for a tree that is not a hazard if the applicant demonstrates all of the following: 1. The tree is proposed for removal in order to permit the application to be consistent with other applicable Ashland Land Use Ordinance requirements and standards, including but not limited to applicable Site Design and Use Standards and Physical and Environmental Constraints. The Staff Advisor may require the building footprint of the development to be staked to allow for accurate verification of the permit application; and 2. Removal of the tree will not have a significant negative impact on erosion, soil stability, flow of surface waters, protection of adjacent trees, or existing windbreaks; and 3. Removal of the tree will not have a significant negative impact on the tree densities, sizes, canopies, and species diversity within 200 feet of the subject property. The City shall grant an exception to this criterion when alternatives to the tree removal have been considered and no reasonable alternative exists to allow the property to be used as permitted in the zone. Nothing in this section shall require that the residential density be reduced below the permitted density allowed by the zone. In making this determination, the City may consider alternative site plans or placement of structures or alternate landscaping designs that would lessen the impact on trees, so long as the alternatives continue to comply with other provisions of the Ashland Land Use Ordinance. 4. The City shall require the applicant to mitigate for the removal of each tree granted approval pursuant to AMC 18.61.084. Such mitigation requirements shall be a condition of approval of the permi 1. 6) The criteria for an Exception to Street Standards are as follows: A. There is demonstrable difficulty in meeting the specific requirements of this chapter due to a unique or unusual aspect of the site or proposed use of the site. B. The variance will result in equal or superior transportation facilities and connectivity; C. The variance is the minimum necessary to alleviate the difficulty; and D. The variance is consistent with the stated Purpose and Intent of the Performance Standards Options Chapter. 7) The Planning Commission, following proper public notice, held a public hearing on February 10,2009 at which time testimony was received and exhibits were presented. The Planning Commission approved the requested Land Partition, Site Review, and Tree Removal Permits subject to conditions pertaining to the appropriate development of the site. PA 2009-00043 380 Clay Street Page 3 Now, therefore, the Planning Commission of the City of Ashland finds, concludes and recommends as follows: SECTION 1. EXHIBITS F or the purposes of reference to these Findings, the attached index of exhibits, data, and testimony will be used. Staff Exhibits lettered with an "s" Proponent's Exhibits, lettered with a "P" Opponent's Exhibits, lettered with an "0" Hearing Minutes, Notices, Miscellaneous Exhibits lettered with an "M" SECTION 2. CONCLUSORY FINDINGS 2.1 The Planning Commission finds that it has received all information necessary to make a decision based on the Staff Report, public hearing testimony and the exhibits received. 2.2 The Planning Commission finds that the proposed creation of three lots satisfies all applicable criteria for a Land Partition. The Commission finds that the proposal will not impede future development of the remainder of the subject property or of adjacent lands. 47 units ofthe available density approved for the site in the Willowbrook Subdivision have been retained for the development of Lot # 1 in a future phase, while also providing required protection for an existing locally significant wetland on Lot #3. The applicants have proposed to construct street improvements to bring Clay Street to City standards along the property's frontage, to install half-streets to serve the proposed lots within the project, to provide an additional 330-feet of sidewalks, curbs and gutters along the full frontage of the neighboring property to the north to connect to an existing sidewalk, and to reserve a 20-foot strip along the north property line to facilitate a future street connection from Clay Street to Tolman Creek Road. The subject property has not been partition in the last 12 months, and the proposed partitioning here is not in conflict with any applicable laws, ordinances or resolutions. The Planning Commission further finds that adequate capacity ofpublic facilities can and will be provided through the subject property utilizing existing facilities within the adjacent rights-of-way and those additional facilities to be provided with the development. The application includes conceptual utility, grading and drainage plans identifying existing water, sewer, electric and storm drain facilities in the Clay Street and McCall Drive rights-of-way along with proposed extensions to serve the project. 2.3 The Planning Commission finds that multi-family residential units are a permitted use within the Low Density Multi Family Residential (R-2) zoning district. The Commission further finds that the Willowbrook Subdivision was granted final plan approval to construct 107 residential units, which satisfied the requirement that the annexed property ultimately be developed to 90 percent of its base density after unbuildable areas were excluded from the density calculations (8.8 buildable acres x 13.5 residential units PA 2009-00043 380 Clay Street Page 4 per acre x 0.90 = 106.92 units) and that the current proposal to develop Lot #2 with 60 residential units, while reserving the remaining 47 units for the development of Lot #1 in a later phase is consistent with the density regulations of the zoning district and the requirements of the Willowbrook annexation. The Planning Commission further finds that the application as submitted complies with the yard area requirements, maximum building height limitations, and 65 percent lot coverage allowance for the zoning district, and that refuse and recycling containers and required screening will be provided. The Planning Commission finds that the development complies with the adopted Site Design Standards by orienting buildings to the street, providing for access to the buildings from the sidewalk, proposing street trees and landscaping with a variety of locally-adapted trees, shrubs and flowering plants, providing open space, and preserving as many of the existing, healthy trees as possible. The Planning Commission further finds that adequate capacity of public facilities can and will be provided through the subject property utilizing existing facilities within the adjacent Clay Street and McCall Drive rights-of-way and those additional facilities to be provided by the applicants with the development. The application includes conceptual utility, grading and drainage plans identifYing existing water, sewer, electric and storm drain facilities in the Clay Street and McCall Drive rights-of-way along with proposed extensions to serve the project. The Commission finds that Clay Street, a collector street under county jurisdiction in this vicinity, provides paved access to the site. The Commission further finds that the subject property's Clay Street frontage, while paved, lacks curbs, gutters, park row planting strips, street trees or lights, sidewalks or bicycle lanes in this vicinity and that development of the subject property under the Willowbrook annexation and subdivision approvals is subject to conditions requiring a number of improvements which the applicants propose to address here in order both to comply with the conditions already in place and to provide adequate transportation with the development of Lot #2. The improvements required include: I) Improvements to Clay Street to comply with City of Ashland Local Street Standards along the entire approximately 660-foot frontage of the subject property, including 28 feet of pavement overlay to include two travel lanes and an approximately six-foot bike lane, curb, gutter, storm drains, 7-Y2 foot planting strip and a six-foot wide public sidewalk. 2) A connection to the existing sidewalk system to the north with half-street improvements including curbs, gutters, storm drain facilities, planting strip and public sidewalk to be installed along the full 330-foot street frontage of the property immediately to the north (39 IE llCB Lot #1100) of the subject property. 3) Improvement of the two new public streets within the development to half-street standards within a proposed 52-foot right-of-way width with the development of Lot #2, with the remainder of the improvements to be completed with development of Lot #1. The Commission finds that the applicant's installation of 660 feet of new sidewalk, planting strip, curbs, and gutters along the subject property's frontage and 330 additional feet of improvements along the neighboring property to the north's frontage wi II result in a continuous sidewalk system on Clay Street from Dollarhide Way to Ashland Street. In addition, the Commission finds that a right-turn only lane was required to be installed on southbound Clay Street at Ashland Street as a condition of approval of Planning Action #2004-00141, and was to include widening of the pavement width at the intersection; the installation of curb, gutter and storm drainage facilities if applicable; and sidewalks from the Clay Street/Ashland Street intersection to and through the PA 2009-00043 380 Clay Street Page 5 bend (i.e. elbow) in Clay Street to the existing curb and sidewalk on the west side. Given that median installation required by ODOT for development of a nearby property may limit turning movements from Clay Street and eliminate the need for a turn lane, and that the requirements for a right-turn lane were imposed based on a traffic impact analysis of the potential build-out of the site to its maximum allowable density of approximately 130 units while the current application is to build only 60 units with a remaining 47 units (for a total of 107) to be built-out with completion of a second phase, the Commission finds that the applicants proposal to delay installation of the widening improvements for a right-turn only lane until the first certificate of occupancy for the development of Lot #2, with the remaining improvements including curb, gutter, storm drainage, and sidewalks to be deferred until the development of Lot # I, with the understanding that the improvements for the right-turn only lane would not be required if a median were installed prior to this time, provides adequate transportation to serve the proposed development while remaining consistent with the conditions of approval of Planning Action #2004-00141. 2.4 The Planning Commission finds that the application satisfies the applicable criteria for a Tree Removal Permit to remove a total of 12 of the approximately 17 existing trees on the site over six-inches in diameter at breast height (d.b.h.) where the previous Willowbrook Subdivision included the removal of only eight trees. Two of the 12 trees proposed to be removed, an eight-inch d.b.h. almond (prunus dulcis) identified as #24 and a 12-inch d.b.h. black locust (robinia pseudoacacia) identified as #18 are now dead according to the project arborist's assessment. The remaining ten trees - including a significant 40-inch d.b.h. poplar identified as Tree #17 - are proposed for removal due to their locations relative to proposed road and sidewalk construction. Based on the recommendations of the Tree Commission, a condition has been proposed below to require that the sidewalk configuration at the southwest corner of the subject property be slightly modified, and Tree #23 preserved and protected, if the project arborist determines that these modifications would allow the preservation of Tree #23, an eight-inch d.b.h. black oak. The Planning Commission finds that the street and site configurations necessitating the requested tree removals have been proposed in order to permit the application to be consistent with applicable ordinance requirements and standards including preserving a significant wetland, addressing minimum density standards, providing street improvements, and satisfying the Site Design and Use Standards and access management requirements. The Planning Commission further finds that the proposed removals have been requested after consultation with a professional arborist who has assessed the current condition of the trees and concluded the removal of the trees will not have a significant negative impact on tree densities, sizes, canopies, species diversity, erosion, soil stability, or flow of surface waters, and that the impacts to wind protection of the adjacent tree to be preserved can be mitigated through professional pruning given the relatively open canopy structure of the tree to be preserved. The Planning Commission finds that the applicants propose to plant more than twelve new trees with the proposed development of the subject property, more than satisfying the mitigation requirements of the ordinance. 2.6 The Planning Commission finds that the Exception to Street Standards which was approved with Planning Action #2004-00141 and extended with that approval continues to merit approval. In the original approval this Exception was requested in order to permit the installation of a small segment of curbside sidewalk along Clay Street to retain an existing, l8-inch diameter at breast height (d.b.h.) cedar tree. The request was ultimately approved as it was found that the location, size and health of the tree represented clear difficulties in complying with street standards, and that the proposed section of curbside sidewalk did not PA 2009-00043 380 Clay Street Page 6 . compromise the use of the public sidewalk given the relatively small adjustment in sidewalk configuration proposed. The request and the circumstances underlying the previous approval remain unchanged in the current application, and the Planning Commission finds that the request continues to satisfY the applicable criteria. A condition below has been added to require that the area where the sidewalk transitions to curbside in the vicinity of Tree #23 be slightly modified and the tree preserved and protected if the project arborist determines that these modifications would allow the preservation of the tree, an eight-inch d.b.h. black oak. SECTION 3. DECISION 3.1 Based on the record of the Public Hearing on this matter, the Planning Commission concludes that the application for a Land Partition creating three lots, Site Review approval to construct a 60-unit multi- family residential development, and a Tree Removal Permit to remove 12 trees six-inches in diameter at breast height (d.b.h.) or greater where only eight trees were previously approved for removal has satisfied all relative approval criteria and is supported by evidence in the record. Therefore, based on our overall conclusions, and upon the proposal being subject to each of the following conditions, we approve the requested Land Partition, Site Review, and Tree Removal Permits for Planning Action # 2009-00043. Further, if anyone or more of the conditions below are found to be invalid, for any reason whatsoever, then Planning Action #2009-00043 is denied. The following are the conditions and they are attached to the approval: I) That all proposals of the applicant shall be conditions of approval unless otherwise modified herein. . 2) That prior to any disturbance occurring on the site or the issuance of a building, excavation or demolition permit, a Tree Verification Permit shall be obtained. Required tree protection measures detailed in AMC 18.61.200 shall be installed, inspected and approved by the Staff Advisor prior to any development activities, including, but not limited to clearing, grading, excavation or demolition work, or storage of materials, and shall be removed only after completion of all construction activity, including landscaping and irrigation installation. An agreement shall be recorded requiring the remaining poplar situated at the southwest comer of the site to be protected and preserved in accordance with the approved Tree Protection/Tree Removal Plan (Applicant's Exhibit L-l.O). Any modifications or amendments to the plan would be processed through a Tree Removal Permit procedure. The southwest comer of the property as delineated on the Tree Protection/Tree Removal Plan (Applicant's Exhibit L-l) would not be covered by Exempt Tree Removal Activities, Section 18.61.040.C as described in the Land Use Ordinance. 3) That the Housing Authority of Jackson County shall obtain a Demolition/Relocation Review Permit if deemed necessary by the Building Official prior to the removal of any structures necessary to complete the proposed road construction as required in Section 3d of the Clay' Street Intergovernmental Agreement. 4) That prior to signature of the final survey plat: PA 2009-00043 380 Clay Street Page 7 a) A preliminary utility plan for the project be reviewed by the Engineering, Electric, Building and Planning Divisions prior to signature of the final survey plat. The final utility plan for the project shall be reviewed and approved by the Engineering Division and Building Division at the time of building permit submittals. The utility plan shall include the location of connections to all public facilities in and adjacent to the development, including the locations of water lines and meter sizes, sewer mains and services, manholes and clean-outs, storm drainage pipes and catch basins. b) The identification, relocation and piping of existing irrigation facilities shall be addressed at the time of final plat submittal, and shall be finalized with the building permit submittals. The design, relocation and installation of irrigation system shall be reviewed and approved by the Talent Irrigation District prior to the City of Ashland approval of the final engineering construction documents. The irrigation facilities shall be installed as part of the overall public infrastructure requirements. c) The engineering design of all on-site storm water detention systems (i.e. wetland/detention system) shall be reviewed prior to signature of the final plat and approved by the Public Works Department, Building Official and Staff Advisor at the time of Building Permit submittals, the commencement of public infrastructure installation or the issuance of an excavation permit. The design of the wetland/detention shall incorporate required pollution control systems (if applicable), while the discharge shall be designed so as not to significantly increase the volume of runoff beyond pre-development amounts on the property to the north. The permanent maintenance of on-site storm water detention systems must be addressed in a manner approved by the Public Works Department and Building Division, and a preliminary operations and maintenance plan provided for review with the final survey plat. d) The requirements of the Ashland Fire Department, including approved addressing and directional signage; fire fighter access; fire apparatus access including improvements, turn- around, angle of approach, necessary easements and signage; fire flow; and hydrant installation shall be clearly addressed in the preliminary utility plans. Final engineered construction drawings shall be reviewed and approved by the Ashland Fire Department at the time of building permit submittal. 5) That building permit submittals shall include: a) The applicant shall submit an electric distribution plan including load calculations and locations of all primary and secondary services including transformers, cabinets and all other necessary equipment. This plan must be reviewed and approved by the Electric Department prior to building permit submittal. Transformers and cabinets shall be located in areas least visible from streets, while considering the access needs of the Electric Department. b) That the engineering construction drawings for Clay Street comply with City of Ashland Local Street Standards. Clay Street shall be improved along the entire frontage of the property. Improvements to Clay Street shall consistent approximately with the following standards: 28 feet of pavement overlay width (includes two travel lanes and an approximately six-foot bike lane), curb and gutter, storm drains, 7~-foot planting strip and a six-foot wide public sidewalk. The civil plans shall include profiles and cross sections, with erosion PA 2009-00043 380 Clay Street Page 8 control and slope stability methodologies installed consistent with the standards contained in AMC 18.62.080B. c) Engineered designs for a right-turn only lane on southbound Clay Street at Ashland Street shall be provided at the time of building permit submittals. These engineered designs shall include the widening of pavement width at the intersection; installation of curb and gutter, storm drain facilities (if applicable) and sidewalks from the Clay Street! Ashland Street intersection to and through the bend (i.e. elbow) in Clay street to the existing curb and sidewalk on the west installed as part of the overall public infrastructure requirements for the subdivision. Widening improvements for the right-turn only lane may be deferred uI'ltil issuance of a Certificate of Occupancy Permit with all other improvements noted herein to be deferred until Lot # 1 is developed. Widening improvements for the right-turn lane shall not be required to be completed if a median on Ashland Street is installed prohibiting east bound (left) turning movements from Clay Street onto Ashland Street (Highway 66) prior to the issuance of the first Certificate of Occupancy. d) The recommendations of the Ashland Tree Commission noted at their February 5, 2009 meeting, where consistent with Ashland's Site Design and Use Standards and Tree Preservation and Protection Ordinance and with final approval by the Staff Advisor, shall be incorporated into a revised Landscaping, Irrigation and Tree Protection Plans prior to building permit submittal. These plans shall include preservation and protection of Tree #23, a Black Oak (Quercus kelloggi), by modification of the sidewalk where it transitions to curbside between Trees #1 and #23 if the project arborist determines that such modifications will result in the preservation of sufficient critical root zone to preserve the tree. e) That refuse and recycling facilities shall be identified in conjunction with the design of each building and in accordance with the standards described in Section 18.72.115 of the Ashland Land Use Ordinance prior to issuance of a building permit, and shall be installed according to approved plans, inspected and approved by the Staff Advisor prior to the issuance of a Certificate of Occupancy. f) That the color, texture, dimensions, shape and building materials for all exterior components of the project be included at the time of submission of building permit. The information shall be consistent with the colors, texture, dimensions and shape of materials and building materials proposed and approved as part of the land use application. g) That required bicycle parking shall be identified on plans submitted at the time of building permit review. The bicycle parking shall be designed and installed consistent with the standards described in 18.92.040 and shall be inspected and approved by the Staff Advisor prior to the issuance of a Certificate of Occupancy. h) That specifications for all exterior lighting fixtures shall be included at the time of submission of the building permit. Exterior lighting shall be directed on the property and shall not directly illuminate adjacent proprieties. 6) That prior to the issuance of a building permit: a) That the engineered construction drawings for all new public streets within the project shall comply with City of Ashland Local Street Standards. The minimum street width shall be no HA 2009-00043 380 Clay Street Page 9 less than 22 feet in width at intersections (unless permitted by the Ashland Fire Department), and a minimum width of26 to 28 feet when accommodating on-street parking on both sides of the street. Plans to include profiles and cross-sections, with erosion control and slope stability methodologies installed consistent with the standards contained in AMC l8.62.080B. b) The applicants shall submit a wetland delineation and wetland mitigation/enhancement plan that has been reviewed and approved by the Oregon Division of State Lands and the Engineering, Building and Planning Divisions. Such plans shall include civil engineering specifications for any water detention, water treatment and water distribution. c) That prior to issuance of a Building Permit, the Housing Authority of Jackson County shall record deed restrictions in accordance with the City of Ashland's Affordable Housing Standards. 7) That prior to the issuance of a certificate of occupancy, a "half-street" improvement including curb and gutter, storm drain facilities, planting strip and public sidewalk shall be installed along the street frontage of the neighboring property to the north (39 1 E 11 CB, # 1100). The design of these improvements shall be consistent with Ashland's Local Street Standards, allow for a smooth transition to the adjoining sidewalk network and be provided prior to issuance of a Certificate of Occupancy Permit. Such improvements shall be installed as part of the overall public infrastructure requirements for the project. 8) At the time that Lot # 1 is developed, engineered construction drawings for the project addressing the design and installation of public multi-use pathways, fence and gates from the subject property to the City of Ashland Parks/Ashland Family YMCA Soccer Fields shall be provided. The design of any multi-use pathways shall be in accord with City Local Street Standards, reviewed by the Director of the Ashland Parks Department, and approved by the Staff Advisor prior the installation of improvements associated with the development of Lot # 1. That the development and surfacing (i.e. all weather surface) of the multi-use pathway at the south boundary of the project be extended through the existing easement on the adjoining parcel to the south (tax lots #200 and 201). A design for the pathway shall be submitted at the time of any Building Permit approval for Lot #1 and installed as part of the lot's public infrastructure. 9) That the owner of Lot # 1 shall remain responsible for the pruning and continual monitoring of the remaining poplar tree. The owner of Lot #2 shall be responsible for the maintenance of their storm water detention facilities, including for bio-swales to be installed in the Clay Street park row planting strip. 10) That prior to occupancy of Lot 2 a temporary bicycle and pedestrian path and any necessary modifications to the gate and fencing be provided across Lot 1 to the YMCA fields. PA 2009-00043 380 Clay Street Page 10 '%?n -'l?/a (~/ Planning Commission Approval February loth, 2009 Date .. PA 2009-00043 380 Clay Street Page II PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 ABERNATHY CRAIG HUGH BARAQUIN JASON BARKER NORMAN E 321 CLAY ST 1 522 CANON AVE 321 CLAY ST 72 ASHLAND OR 97520 MANITOU SPRINGS CO 80829 ASHLAND OR 97520 P A-2009-00043 391 E 11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 BARNETT JAMES/PRISCILLA BAUSSERMAN SUSAN JOHANNESSEN BEECHAM CHARLES N/NORMA M 321 CLAY ST 115 321 CLAY ST 100 321 CLAYST101 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391E11CC 500 BEY MARK RICHARD/CAROLE ANN BEYER RANNY BLEIWEISS PETER RICHARD TRUSTEE PO BOX 3084 321 CLAY ST 16 ET AL ASHLAND OR 97520 ASHLAND OR 97520 1131 HIGHWOOD DR ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11C 3000 BOOTH STEPHEN TRUSTEE ET AL BOWLES MARCEL YN F BRADLEY DONALD H PO BOX 3592 321 CLAY ST 74 321 CLAY ST 96 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 BRAUN DIVINA BARBARA TRUSTEE ET BRINEGAR SUSAN ELAINE BUDROE WILLETTE JOSEPHINE AL 321 CLAY ST 103 5281 CLEMSON 321 CLAY ST 68 ASHLAND OR 97520 VENTURA CA 93003 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 BURKE JACKIE J CAMPBELL GARY THOMAS CARTER BRUCE JESS 5155 SADDLE BROOK DR POBOX 651 321 CLAY ST A OAKLAND CA 94619 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391E11C 3000 CARVER IRENE CA TRANIDES LISA MARIE CHAMBERLAIN KENT C 321 CLAY ST 27 321 CLAY ST 26 321 CLAY ST 11 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 COFFMAN WANDA W COHEN TRACY ELIZABETH COOK PATRICIA ANN 215 TOLMAN CREEK RD 9 13405 HWY 66 321 CLAY ST 65 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11CB 1100 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CC 1000 COOPER GLEN ALLEN TRUSTEE ET AL COURAUD CHARLES S COWLES JOHN N/JUDITH A PO BOX 5753 321 CLAY ST 83 2125 BIRCHWOOD LN SANTABARBARA CA 93150 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 CROSSLIN BARBARA JEAN CZIRBAN JOEY ELLEN DAVIS INGEBORG 321 CLAY ST 59 215 TOLMAN CREEK RD 7 321 CLAY ST 112 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 P A-2009-00043 391 E 11 C 3000 PA-2009-00043 391 E11 CA 2900 DEMARTINEZ HELENE DISTEFANO SHANI M DIXON RICHARD JAMES 321 CLAY ST 6A 321 CLAY ST 28 215 TOLMAN CR RD 14 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 DIXON TERESA S DONEY JERI M DONOHUE JESSICA 1257 SISKIYOU BLVD 1170 321 CLAY ST 75 321 CLAY ST 70 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CB 4212 PA-2009-00043 391 E11 C 3000 DROSCHER BARBARA ELIZABETH DUNGAN ANDY T ELlNWOOD ELLAE 321 CLAY ST 114 260 MEADOWS DR 321 CLAY ST 90 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 ESCH SHEILA MARY FEELER DOREEN FIUREN CHRISTINA MARIE 321 CLAY ST 5 321 CLAY ST 25 321 CLAY ST 64 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391E11CC 1200 FOLLETT MARY LOU LOVING TRUST ET FREDINBURG SHERI ANN GANGLOFF ROLAND A TRUSTEE ET AL AL 215 TOLMAN CREEK RD 1 18534 WHITE OAK DR 321 CLAY ST 61 ASHLAND OR 97520 SONOMA CA 95476 ASHLAND OR 97520 PA-2009-00043 391 E11 CC 200 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 GARGUS GREGORY B/SUZANNE F GILBERT JILL LOUISE GIORDANO GIROLAMIA 400 CLAY ST 215 TOLMAN CREEK RD 12 321 CLAY ST 106 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 P A-2009-00043 391 E 11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 CA 2900 GOLDEN KATHLEEN MEG GORHAM IRENE WHITNEY TRUSTEE/ GRAHAM SHIRLIE COLLEEN 4211 SPATT WAY 138 215 TOLMAN CRK RD 38 215 TOLMAN CR RD 36 BEA VERTON OR 97007 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391E11C 3000 GRANDON BEVERLEY MAY HAM DOUGLAS C HAMPTON JOSHUA /CHEERI 215 TOLMAN CREEK RD 19 321 CLAY ST 39 321 CLAY ST 2 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 HARDY WARREN D /LUCINDA HAZEL I DEANE LIVING TRUST /HAZEL I HEIDIG HEIDI 321 CLAY ST 39 TRUS 396 IDAHO ST ASHLAND OR 97520 215 TOLMAN CREEK RD 3 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 P A- 2009-00043 391 E 11 C 3000 PA-2009-00043 391 E11 C 3000 HENICK JOHN JOSEPH/PATRICIA ANNE HENTRICH SUZANNE HERNANDEZ TIMOTHY JAY SR 15568 SAINT ANDREWS DR 321 CLAY ST 73 321 CLAY ST 56 PORTLAND OR 97229 ASHLAND OR 97520 ASHLAND OR 97520 PA 2009 00043 391E11C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 HERRER^, DEANNA HILL JUDITH BOWEN HOLZKAMPER JANA RUTH ~e~ IOW,~ ST 631 SOUTH ST 321 CLAY ST 58 ^SHL^.ND OR 97520 REDDING CA 96001 ASHLAND OR 97520 RETURNED PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 INNES JUANITA JACOBSON MARTIN S/FRIED YVONNE S JACOBSON STANTON /CARYN LEE 321 CLAY ST 52 1320 PROSPECT ST 321 CLAY ST 55 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 JAMES ELLEN JOANN JEFFERS BILLY DON JILLSON SHELLY 321 CLAY ST 10 215 TOLMAN CR RD 32 321 CLAY ST E ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391E11CB 1200 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 JOHNSTON ROSS R JR KELLY PAMELA LEE KRUSE DARLENE 301 CLAY ST 321 CLAY ST 76 321 CLAY ST 48 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 KURZ CONSUELO/MILlTELLO LEONARD LANE STEVEN CARROLULlNDA JOYCE LARSON RICHARD 0 T 215 TOLMAN CREEK RD 33 321 CLAY ST 30 321 CLAY ST 24 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CC 600 LAWTON RANDAUDIEZ INES LEIDER HELEN C ET AL LISOWSKI LOTTIE TRUSTEE FBO 775 TOLMAN CREEK RD 321 CLAY ST 34 2149 BIRCHWOOD LN ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 CC 400 LIVESAY LAWRENCE W TRUSTEE ET AL LULL SUMMER ELIZABETH LUNDBLAD ALETHA C 1410 GRIZZLEY CT 215 TOLMAN CREEK RD 8 2165 BIRCHWOOD LN YREKA CA 96097 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CC 900 MAC FARLANE MARY MAC KENZIE DAVID A MAHER MARY Z TRUSTEE ET AL 321 CLAY ST 110 321 CLAY ST 40 2133 BIRCHWOOD LN ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CC 700 MARSH DOUGLAS ROGERS MARTINIE MAXINE MAXWELL RHODA J TRUSTEE ET AL 321 CLAY ST 29 PO BOX 1172 2141 BIRCHWOOD LN ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 MC CARTON DONALD JOHN MC FADDEN JACQUELEINE T MC GUIRE J M MIKE 215 TOLMAN CR RD 37 /CATHERINE J 321 CLAY ST 51 ASHLAND OR 97520 215 TOLMAN CREEK RD 27 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CC 1600 PA-2009-00043 391 E11 C 3000 MC NAUGHT TERRY WAYNE MCLAUGHLIN PAMELA RAE TRUSTEE ET MELLINGER LISA JIDREYER JANET B 321 CLAY ST 105 AL 321 CLAY ST 32 ASHLAND OR 97520 255 SCENIC DR ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 CC 1100 PA-2009-00043 391 E11 C 3000 MENEFEE LEONORA C MESING RUTH MILLER LYNN SYLVIA 215 TOLMAN CR RD 21 2514 CHESTER ST 321 CLAY ST 46 ASHLAND OR 97520 ALAMEDA CA 94501 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 MOLLETT MIKE MORLEY RAYMOND DEAN MOTEN MARIAN BARBARA 321 CLAY ST 95 PO BOX 788 321 CLAY ST 71 ASHLAND OR 97520 Y ACHA TS OR 97498 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 MROZEK DONALD ICA THERINE MURPHY DANIEL C IDEBRA MURPHY RACHEL 321 CLAY ST 98 970 SE RATCLIFF DR 321 CLAY ST 4 ASHLAND OR 97520 SALEM OR 97302 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 MURPHY THOMAS IHUBERTA NEWBOMB LESLEE NICHOLSON E H 215 TOLMAN CR RD 34 PO BOX 3023 321 CLAY ST 7 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 NIMS DELORES OBLAK AMY OCEANA HELEN DIANNE 321 CLAY ST 109 321 CLAY ST 44 321 CLAY ST 85 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CB 1200 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PATTERSON GLEN E PECORARO GREGORY PEPE ALBERT LOUIS/POPE ALBERT T 301 CLAY ST 321 CLAY ST 17 321 CLAY ST 21 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PETERSON DELBERT L PETERSON GLENDA G POGUE JERRY CNALERIE G 215 TOLMAN CREEK RD 13 321 CLAY ST 116 321 CLAY ST 80 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PRINCE LOUANN RABIN MITZI ET AL RACHLES JUNE TRUSTEE I 321 CLAY ST 6 321 CLAY ST 57 215 TOLMAN CREEK RD 6 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 RANGER SUSAN BETH RAZIUK RENEE GLORIA REED SHERRY LYNN 321 CLAY ST 3A 321 CLAY ST 49 321 CLAY ST 86 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 RICHARDS MICHAEL UESTELLE RICHARDSON WILLIAM/DIANA W ROBARTS EVA MARY 321 CLAY ST 79 POBOX 3569 215 TOLMAN CREEK RD 26 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 RODAS DE LEON HILDER MARINEL Y ROSENTHAL EDWARD JAMES or Current SANTURE MARY ANNE 321 CLAY ST 92 Owner 321 CLAY ST 67 ASHLAND OR 97520 321 CLAY ST 69 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CB 1300 PA-2009-00043 391 E11 CB 1300 SA V ARD ROSEMARY P SCAIFE ROY J/LOLA M SCAIFE ROY ULOLA 321 CLAY ST 62 295 E CLAY ST 295 CLAY ST ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 SCHA TTLER DIANNE JEANNE TRE SCHELZ JOAN M SCOTT HARRIET A 321 CLAY ST C 321 CLAY ST 99 321 CLAY ST 82 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 SEMRAU JEAN SEROPIAN BARBARA H SHEPHERD BETTY DORENE 321 CLAY ST 60 215 TOLMAN CR RD 30 321 CLAY ST 12 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 SHERMAN FRANK A/KA THLEEN A SHOUP RICHARD L /SALL Y S SHULTS ANDREA LYNN 2237 CAL YOUNG RD 215 TOLMAN CREEK RD 31 321 CLAY ST 88 EUGENE OR 97401 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 CC 201 PA-2009-00043 391 E11 CA 2900 SIMONSEN IVAN OLAF SIPLE KATHLEEN KIM TRUSTEE ET AL SMELCER JOSEPHINE FERN REV TRUST 215 TOLMAN CREEK RD 29 1968 TREEWOOD LN ET AL ASHLAND OR 97520 SAN JOSE CA 95132 215 TOLMAN CREEK RD ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 SMITH SHEILA ANN SMITH SHERRY SMITH STACIA LAUREL c/o SA V AGE 13350 HWY 66 2305 ASHLAND ST 281 STACIA L ASHLAND OR 97520 ASHLAND OR 97520 321 CLAY ST 113 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 SOMERSET CHRISTINE M SON KA TRINA DENISE SPENCER HARRY H 321 CLAY ST 50 321 CLAY ST 8 7322 CHARTER OAK LP ASHLAND OR 97520 ASHLAND OR 97520 TEMPLE TX 76502 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391E11C 3000 PA-2009-00043 391 E11 C 3000 SPENCER L1SA/ENNS GORDON STAMPFLI DEBORAH J STEELE NANCY 321 CLAY ST 111 321 CLAY ST 104 321 CLAY ST 107 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 STEELE SYDNEY MORRIS STITH MARK ANTHONY STONE ARLENE B 321 CLAY ST 77 215 TOLMAN CR RD 15 321 CLAY ST 18 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 STYERS DONNA MAE TAYLOR BILLY P/FEN L THIEL ELISE 321 CLAY ST 23 215 TOLMAN CREEK RD 18 321 CLAY ST 19 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 CA 2900 THIRING DONALD C TOLMAN CREEK PARK LLC TRAVALLEE DANIEL PO BOX 3556 1182 TIMBERLINE TERR 215 TOLMAN CR RD 23 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 CA 2900 TROWBRIDGE BRUCE MELVIN VALINE ROBERT ARTHUR VISAGORSKIS GENEALLE 321 CLAY ST 38 215 TOLMAN CREEK RD 2 215 TOLMAN CREEK RD 5 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CC 1300 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 WAGNER CATHERINE TRUSTEE ET AL WATKINS MONNIE 0 WEBER PATRICK C 2101 BIRCHWOOD LN 215 TOLMAN CR RD 4 321 CLAY ST 66 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 CA 2900 WENDT JACK/SHARON WENNLUND KAREN LOU WIGHT DAVID EDWARD 321 CLAY ST 3 321 CLAYST111 215 TOLMAN CREEK RD 20 ASHLAND OR 97520 ASHLAND OR 97520 ASHLAND OR 97520 PA-2009-00043 391 E11 CC 202 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 WILDMAN ROBERT/WILDMAN ALLISON WILLSON NANCY WINGSPREAD LLC 420 CLAY ST 321 CLAY ST 84 821 JACKSON ST ASHLAND OR 97520 ASHLAND OR 97520 MEDFORD OR 97504 PA-2009-00043 391 E11 CA 2900 PA-2009-00043 391 E11 C 3000 PA-2009-00043 391 E11 C 3000 WINNER MELVIN RAY WITYSHYN MARILYN WRAIGHT CHARLES WALTER/TERRI 215 TOLMAN CR RD 22 321 CLAY ST 108 NEWTON ASHLAND OR 97520 ASHLAND OR 97520 321 CLAY ST 102 ASHLAND OR 97520 P A- 2009-00043 PA-2009-00043 PA-2009-00043 Housing Authority of Jackson County Urban Development Services LLC Laurie Sager & Associates Inc 2251 Table Rock Rd 485 W Nevada St 700 Mistletoe Rd Ste. 201 Medford OR 97501 Ashland, OR 97520 Ashland, OR 97520 PA-2009-00043 PA-2009-00043 PA-2009-00043 Construction Engineering Consultants L.J. Friar & Associates Daniel R. Horton P.O. Box 1724 816 W Eighth St 169 W. Main Street Medford, OR 97501 Medford, OR 97501 Eagle Point, OR 97524 PA-2009-00043 Agate Engineering 1175 East Main Street Medford, OR 97501 PA-2009-00043 Jackson County Roads, Parks & Planning 200 Antelope Road White City, OR 97503 PA-2009-00043 Yehudit Platt 862 Michelle A v Ashland, OR 97520 PA-2009-00043 Cate Hartzell 881 East Main St Ashland, OR 97520 PA-2009-00043 Jody Zonnenschein 75 Brooks Lane Ashland, OR 97520 PA-2009-00043 Bernice Koch 60 Crocker St Ashland, OR 97520 PA-2009-00043 Joyce Woods 2308 Abbott Ashland, OR 97520 PA-2009-00043 Brent Thompson 582 Allison St Ashland, OR 97520 192 380 Clay St 2-11-09 P A-2009-00043 David 1. Pyles & Dan Dorrell % ODOT Region 3/District 8 100 Antelope Road White City, OR 97503 PA-2009-00043 Ruth Alexander & Heidi Parker 2645 Butler Creek Rd Ashland, OR 97520 PA-2009-00043 Stan Druben 125 Brooks Ln Ashland, OR 97520 PA-2009-00043 Aletha Lundblad 2165 Birchwood Ln Ashland, OR 97520 CITY OF ASHLAND ASHLAND PLANNING COMMISSION REGULAR MEETING MINUTES FEBRUARY 10, 2009 CALL TO ORDER Vice Chair Pam Marsh called the meeting to order at 7:05 p.m. in the Civic Center Council Chambers, 1175 East Main Street. Commissioners Present: Pam Marsh Mike Morris Debbie Miller Melanie Mindlin Tom Dimitre Staff Present: Bill Molnar, Community Development Director Brandon Goldman, Senior Planner Derek Severson, Associate Planner Richard Appicello, City Attorney April Lucas, Administrative Assistant Absent Members: Dave Dotterrer Michael Dawkins Council Liaison: Eric Navickas ANNOUNCEMENTS Community Development Director Bill Molnar announced Michael Church has resigned from his position on the Planning Commission. CONSENT AGENDA A. Approval of Minutes 1. January 13, 2009 Planning Commission Meeting 2. January 27, 2009 Planning Commission Study Session Commissioners MorrislDimitre m/s to approve the January 13, 2009 and January 27,2009 meeting minutes. Voice Vote: all AYES. Motion passed. PUBLIC FORUM No one came forward to speak. TYPE II PUBLIC HEARINGS Marsh read aloud the public hearing procedures for land use hearings. A. PLANNING ACTION: 2009.00043 SUBJECT PROPERTY: 380 Clay Street APPLICANT: Housing Authority of Jackson County DESCRIPTION: A request for modification of the previously approved Planning Action #2004-00141 for the Willowbrook Subdivision to allow a Land Partition creating three lots and Site Review to construct a 60-unit multi-family residential affordable housing development for the property located at 380 Clay Street. A previously approved request for an Exception to Street Standards to allow a portion of the sidewalk on Clay Street to be installed at curbside to accommodate a cedar tree on the southwest corner of the site remains unchanged, and the application also includes a request for a tree removal permit to remove 12 trees six-inches in diameter at breast height (d.b.h.) or greater where only eight trees were previously approved for removal. (This property is owned jointly by the City of Ashland and the Housing Authority of Jackson County. The 2004 Annexation and Performance Standards Subdivision approval for Willowbrook Subdivision was for 107 residential units. The required minimum density of the site can be met through future Ashland Planning Commission February 10, 2009 Page 1 of 7 development of the remainder of the property.) COMPREHENSIVE PLAN DESIGNATION: Low Density Multi-Family Residential; ZONING: R-2; ASSESSOR'S MAP #: 391 E 11C; TAX LOT #: 2500 Declaration of Ex Parte Contact Mindlin stated she was contacted by phone by a gentleman named Huelz, who indicated his disappointment that the project did not meet Zero Net Energy standards. Morris stated Huelz left the same message on his answering machine. Dimitre received the same phone call, however he did not listen to the message left by Huelz. Marsh received the same phone call from Huelz. He indicated the same concems outlined by Mindlin and shared his concerns with the site's carbon footprint and urged the Commission to send the project back for modification. Marsh also performed a site visit Miller received the same phone call from Huelz and she also performed a site visit Miller declared that she had recently contacted the Housing Authority to obtain updated subsidized housing figures, and clarified this application was not discussed during that phone call. Staff Report Associate Planner Derek Severson presented the Staff Report and reviewed the size, location, and history of the property. He explained this site was the subject of the Willowbrook Subdivision approval, which occurred in 2006, and he reviewed the previously approved subdivision layout Severson clarified the improvements associated with the Willowbrook approval, and noted the requirement for 17 affordable units and for the property to be developed to 90% of its base density. Severson explained the current application proposes a three-lot land partition. Lot 1 would be approximately 4.32 acres in size and preserved in City ownership for development at a future date. Lot 2 (which is roughly 4 acres in size) would be owned by the Housing Authority and developed into 60 residential units. And Lot 3, which is 1.32 acres, would be preserved in City ownership to protect the wetlands. Additionally, a 20 ft. strip would be preserved to provide a potential future connection between Clay Street and Tolman Creek Road. Severson reviewed the Housing Authority's site plan and explained they are proposing to develop 60 units in 10 buildings. He noted the Applicant's request to remove 12 trees, and clarified the removal of 8 trees was previously approved. Severson reviewed the tree removal plan, planting plan, conceptual utility plan, and proposed street improvements. He clarified the proposed turn lane would not be installed if the median is placed on Ashland Street He also noted the Tree Commission's recommendation to preserve a Black Oak tree on the property and their suggestion to transition the sidewalk in order to preserve the Oak and the larger Cedar tree. Severson clarified the Tree Commission's recommendations have been incorporated into the Findings that are before the Commission. He reviewed the proposed bioswale in the parkrow planting strip and displayed samples of bioswales from a Portland development Severson stated staff believes the application meets all the criteria and they are recommending approval with the noted conditions. Severson was asked to comment on the future development potential for the area where the house is located. Severson stated there has been some discussion of the City's Parks Department purchasing this property for a future parks connection to the YMCA fields. He noted at this point, this not certain and depends on whether the Parks Department can obtain the necessary funding to purchase the property. Council Liaison Navickas arrived at 7:35 p.m. Miller expressed concern with the additional vehicle trips per day that would be created by the 60 new units and asked if staff had considered the traffic impacts. Severson clarified the original subdivision approval included a traffic study and outlined necessary street improvements to accommodate 135 units. He stated these same improvements will occur with the development of this property, even though the number of units has been reduced. Marsh requested additional clarification on the proposed trail system through the property. Severson stated the intention is for the trail connection to the YMCA to go in during the development of Lot 1. Marsh asked about the possibility of an interim connection. Staff noted this lot will be under the ownership of the City and staff could work with the YMCA on this possibility. Ashland Planning Commission FebrualY 10, 2009 Page 2 of 7 Severson briefly commented on the street improvements and clarified the sidewalk would be required even if the right tum lane goes away. Applicant's Presentation A revised planting plan was distributed to the Commission. Mark Knox/485 W Nevada/Project's Representative/Mr. Knox introduced Landscape Architect Laurie Sager, Jason Elzy and Betty McRoberts with the Housing Authority, Civil Engineer Mark Kamarath, Project Architect Dan Horton, and Wetlands Specialist Lee Brennan. Mr. Knox presented a site plan illustrating the street system, parking system, and context of the property in relation to the surrounding neighborhood. He clarified the revised planting plan includes a community garden, which is a concept that came out of the Tree Commission's review of this project. He also clarified they have no issues with adjusting the location of the sidewalk, as requested by the Tree Commission, to protect the Oak tree. Mr. Knox commented on the goals of this project, and stated this application meets all of the requirements that have been imposed. He noted this project is 100% affordable housing and commented on the efforts of the Applicant to go above and beyond the City's requirements in terms of wetland improvements, bioswales, and storm water quality. Mr. Knox noted the common lawn area and playground on the site plan, and stated this is the where they would like to install the garden beds. He commented that the buildings themselves are attractively designed, are oriented to the street, and respect the human scale. He noted almost all of the units have porches, and all of the units have sidewalks that lead from the street to the buildings. Mr. Knox commented on the improvements along Clay Street. He noted the possible future connections and felt the temporary connection suggested by Commissioner Marsh was a great idea. Lori Sager commented on the tree removals, and stated they believe they can reduce the number of removals to 11 and preserve the Black Oak as suggested by the Tree Commission. She clarified 2 of the trees proposed for removal are dead, and stated they have proposed the installation of 130 trees for this project, even though only 76 are required. Ms. Sager also provided a brief overview of the proposed enhancements of wetland area. Jason Elzy commented on the pedestrian connectivity throughout the project and the livability of the building design. He noted the Housing Authority has been working on these types of projects for over 20 years and feels they have a good handle on what works and what doesn't. Public Testimonv Yehudit PlaW862 Michelle Ave/Commented on the number of rental properties currently available in Ashland and questioned whether this project was appropriate at this time. Ms. Platt expressed her concem that the9small pieces of natural area in Ashland are being bought up, paved over, and developed. She stated the nature of Ashland is being transformed and feels it is tuming into a congested town. She felt that more public outreach should have been done and asked if there are other options besides putting in 60 more units. Marsh clarified this project satisfies the R2 zoning requirements for density, and this is not at issue tonight. Greg Gargus/400 Clay Street/Commented on the petition to save the trees that was circulated during the previous subdivision approval. He asked why these trees are not being taken into consideration now, and stated the proposed road could be jogged around the trees without a lot of effort. Mr. Gargus stated he is not opposed to affordable housing but thinks this project could use some modification. Cate Hartzell/881 E Main St/Stated she is a Housing Authority board member and is very proud of this project. She addressed the tree removal issue and noted the previous approval had proposed to remove 8 trees, and this proposal is to remove 11. She stated if anyone has concems with this they should query the age and condition of the tree, and noted the additional landscaping that would be installed. Ms. Hartzell noted the previous traffic study that was completed and noted it was based on a more rapid buildout of the property than is currently proposed. She voiced her support for the proposed enhancement of the wetland. She also indicated the number of rental properties currently available in Ashland reflects what is Ashland Planning Commission February 10, 2009 Page 3 of 7 happening throughout the country and does not believe this will be sustained into the future. She stated this project goes a long way towards sustainability efforts and encouraged the Commission to approve this project. Albert Pepe/321 Clay Street/Stated he likes this proposal better than the previous project, but feels they have an opportunity to create a more sustainable project. Aside from the housing development, he suggested using the remainder of the land for a farm/garden project. Mr. Pepe suggested other concepts be included in the project, including orienting the buildings for a more passive solar design and incorporating a water catchment system. He recommended the Commission rethink the overall scope and design of this project. Ruth Alexander/2645 Butler Creek Road/lndicated she was speaking on behalf of the Ashland School Board and commented on the enrollment problem in Ashland. She stated there is not enough affordable housing in Ashland and families are not moving here. She stated the location of this project is perfect and noted its close proximity to the various surrounding schools. Ms. Alexander noted the results of a demography study completed by the School District and stated there is a good chance the School District could see an increase in enrollment if more affordable housing was available in Ashland. She asked that the Commission approve this project and stated it will help the town and help the schools. [An except of the demographer's report was submitted to the Commission] Heidi Parker/344 Bridge Street/Read aloud a letter from the Ashland School Board. The letter voiced the School Board's support for this project and noted their awareness of Ashland's shortage of housing for working families. It stated Ashland has been experiencing declining enrollment for nearly a decade and the most recent demographic report cites the lack of affordable housing in Ashland as a major contributor to this problem. The letter voiced support for the location of this project and noted its close proximity to local schools. The School Board letter voiced support for the Housing Authority in its endeavor to bring this project to fruition and encouraged Oregon Housing and Community Services to provide the essential funding to make it a reality. Ms. Parker clarified the demography report was completed last year, and the number of available rental properties in Ashland was taken into consideration. Jody Zonnenshein/75 Brooks Lane/Stated her main concern, aside from what has already been said, is about the wetlands. She stated wetland area was destroyed when Abbott Street was put in, and stated protecting the wetlands for the future does not include building right up next to them. Ms. Zonnenshein stated the wetlands will not last if you build all around them and asked the people involved with this project to pay close attention to this issue. Bernice Koch/60 Crocker StreetNoiced her concerns regarding increased traffic. She stated there is already a speeding problem in this area and stated an increase of 100-120 vehicle trips per day will also affect Abbott Street She added Abbott is a very narrow street and should not be used as a major thoroughfare. Ms. Koch also voiced her concerns regarding the protection of the trees and wetlands. Stan Oruben/125 Brooks Lane/Agreed that there needs to be a better demographic mix in Ashland, but stated there are better ways to create affordability than this project Mr. Druben noted the Applicant's request to cut down 3 additional trees and questioned what this projects overall impact on the environment will be. Joyce Woods/2308 Abbott Street/Stated Abbott Street has no posted speed limit, no crosswalks, no stop signs, and is becoming more of a thoroughfare. She stated Abbott is just wide enough for two cars to pass and expressed her concerns with how this project will impact this situation. Ms. Woods asked the Commission to not just consider the traffic impacts of the development itself, but also the movability around the project. She also questioned how the water flow into the existing wetlands would be impacted and voiced her concerns with the tree removals. Brent Thompson/582 Allison Street/Stated the Planning Commission needs to reassure applicants that if they bring in a project that includes structures up to the allowable height limit, it will be approved. He noted this projects two-story building design and felt, in general, structures up to the height limits would allow for more open space and would be a more efficient use of the land. Ashland Planning Commission February 10, 2009 Page 4 of 7 Applicant's Rebuttal Mark Knox/Commented on some of the issues raised in the public hearing. He stated this project should be well known throughout the community and noted the numerous meetings that were held during the annexation hearings. In regards to jogging the location of the street, he stated this option was evaluated and was determined to not be a viable option. He noted they addressed this issue with the Tree Commission and received unanimous approval for the current layout. Mr. Knox clarified a number of the comments made tonight have already been addressed and noted the difficulty in getting to all the details in the time allotted. He encouraged the Commission to support this project and stated it meets all of the criteria. Marsh closed the record and the public hearing at 8:45 p.m. Questions of Staff and Leaal Counsel Staff was asked to comment on whether there is a buffer around the wetlands. Mr. Severson explained the previous subdivision approval had the development right up next to the wetlands, however in this proposal the wetland is on its own lot protected by City ownership. In addition, there is a 30 ft buffer. Mr. Severson clarified all 60 units would be deed restricted affordable rentals. He also commented on the potential traffic impacts and noted this project has a lesser impact than what was originally approved. In addition, the City's Engineering Department reviewed the current proposal and did not indicate any issues. He noted the proposed right turn lane would be installed before occupancy of these units, unless the median on Ashland Street is installed which would negate the need for the turn lane. Mr. Severson commented on the concern raised about increased traffic on Abbott Street, and noted the reserved space on this property that has been set aside for a future east-west connection. He clarified this is not part of this proposal, but is something the Council wanted to see happen. Staff commented on the development potential for Lot 1. Mr. Severson explained this lot could be developed with 47 units, which would bring the entire property to 107 units and be consistent with the previous approval. However, if the Parks Department acquires the land, there would be approximately 1-acre left for housing. And since 47 units is too many for 1-acre, this would likely need to come back for modification at that point. Mr. Molnar noted the questions raised by the Commission in regards to the traffic study and wetlands, and encouraged them in the future to ask these types of questions when the Applicant and their professionals are before them, since it is ultimately the Applicant's burden to satisfy their concerns. Deliberations and Decision Marsh asked each of the commissioners to cite their major and minor issues. Mindlin noted the basic concept of this project has already been approved by the City Council and their decision criteria is fairly slim. She stated she is disappointed that a project of this size does not have solar orientation, and has concerns about the traffic impacts and the overall need for this type of development, but stated this is not under their purview tonight. Morris cited his concerns regarding the amount of asphalt and parking, but agreed that the proposed project satisfies the required criteria. Dimitre shared his concerns with the tree removal and transportation issues and felt this project could have been done differently. Miller stated she does not believe this project meets the criteria for adequate transportation. She indicated the farmland was lost as soon as this property was annexed into the City, and said the only way to reclaim some of that land is to have community gardens. Marsh commented on the difference between macro and micro planning. She stated a number of the speakers talked to the larger "macro" issues, however that is not what is being reviewed tonight. She stated it is clear this project meets the criteria, but recommended an additional condition for the installation of an interim connection to Tolman Creek before the final lot is developed. Ashland Planning Commission February 10, 2009 Page 5 of 7 Commissioners Morris/Marsh m/s to approve Planning Action #2009-00043 with the proposed conditions, and an additional condition for the temporary connection to Tolman Creek before the final lot is developed. DISCUSSION: Mr. Severson clarified the following language would be added as Condition #10: "Prior to the occupancy of Lot 2, a temporary bicycle and pedestrian path and any necessary modifications to the gate and fencing be provided across Lot 1 to the YMCA fields. Jf Roll Call Vote: Commissioners Marsh, Mindlin and Morris, YES. Commissioners Dimitre and Miller, NO. Motion passed 3.2. Marsh asked staff to clarify the issue of community gardens and open space, since this issue has come up several times recently. She also requested staff investigate the issue of height limits and what they are communicating to applicants. Commissioners Morris/Mindlin m/s to approve the Findings for Planning Action #2009.00043. Roll Call Vote: Commissioners Dimitre, Marsh, Mindlin, Morris and Miller, YES. Motion passed 5.0. Commissioners Miller/Dimitre m/s to extend the meeting to 10:00 p.m. Voice Vote: all AYES. Motion passed 5.0. TYPE III PUBLIC HEARINGS A. PLANNING ACTION: 2008.02013 APPLICANT: City of Ashland DESCRIPTION: Public Hearing regarding Ordinance Amendments to the Sign Regulation Chapter (18.96) of the Ashland Land Use Ordinance, relating to changes in the type, size, number and materials of signage allowed within residential and commercial zones. Staff Report Senior Planner Brandon Goldman delivered a presentation on the Sign Code ordinance amendments. He noted the two prior meetings where the Commission has reviewed this item, and provided the following list of key changes and options for consideration: 1) Area Definition: Option 1 calculates the area of a sign as bounded within a rectangle. This is how staff has historically calculated the area. Option 2 creates new opportunities to consider circles, triangles and other geometric shapes in calculating the area. 2) Public Art Definition: Mr. Goldman noted the recommendations from the Public Art and Historic Commissions, and stated Staffs recommendation is to exempt public art from the Sign Code and revise the Site Design Review standards to expand review of exterior changes to historic buildings to include public art. 3) Construction and Real Estate Signs: Option 1 limits the number to one 16 sq. ft. or 32 sq. ft sign (residential/commercial), essentially requiring construction sites to aggregate their signs onto one sheet of plywood. Option 2 permits multiple signs, up to 4, up to the allowable square footage. 4) Wall Graphics Definition: Mr. Goldman clarified currently wall graphics are prohibited, but the proposed ordinance would allow wall graphics as long as they comply with the sign area limits. 5) Buildings with Multiple Frontages: Option 1 provides an additional 30 sq. ft for buildings with 3 or more frontages with a maximum of 60 sq. ft. on any business frontage. Option 2 provides an additional square footage allowance that is half that of the primary entrance for buildings with 3 or more frontages. Mr. Goldman's presentation also addressed the maximum signage allowance, exempt incidental signs and three-dimensional signs. He clarified a 3 cubic ft. three-dimensional (3D) sign would count as one incidental sign, and noted all 3D signs have to be located on private property in the current draft. Mr. Goldman also indicated that after further review of the Downtown Task Force recommendations, the 3 cubic ft. 3D sign limit is applicable to all of the City's historic districts, not just the downtown area, and the current draft of the ordinance reflects this correction. Mr. Goldman cited the Staff Report Addendum that was submitted to the Commission at the beginning of the meeting and clarified in order to have public art on private property, an easement dedicated to the City would need to be provided. He added public art has to be under the City's control, however it has been discussed that easements could be granted for a limited amount of time. Ashland Planning Commission February 10, 2009 Page 6 of 7 Commissioners Miller/Mindlin m/s to extend meeting to 10:30 p.m. Voice Vote: all AYES. Motion passed 5.0. Public Testimonv George Kramer/366 North Laurel/Indicated he was a member of the Downtown Task Force. Mr. Kramer voiced concern with the proposed change to allow wall graphics on historic buildings. He stated these graphics are virtually impossible to remove from brick buildings, but applicants like to do them because they are inexpensive, and asked that the Commission leave the prohibition in place. He commented on the 3D sign options and encouraged the Commission to consider Option 2. He commented on the larger (20 cubic ft.) 3D sign provision and stated the parameters included in the ordinance will alleviate the issues people are afraid of. He added large structures are expensive and he does not believe they will see many businesses take advantage of this provision. Mr. Kramer commented on the public art provision and stated "Alfredo" (the statue outside Wiley's Pasta) is not art and shared his concerns with blending the distinct lines between art and signs. Steve Cole/1323 Mill Pond Rd/Owner of Sound Peace. Mr. Cole commented on the Tibetan prayer flags that were in front of his business for over 10 years. He stated he does not know whether this is a sign or art, but stated these flags are seen all over Ashland and add to the character of this town. He asked the Commission is there was anyway to allow him to keep his flags. Dana BussellNice Chair of the Public Arts Commission and also a member of the Downtown Task Force. Ms. Bussell voiced concern with the 3D object provision and recommended the Commission proceed with caution on this issue. She warned once these types of objects are allowed, they cannot be removed, and recommended they make individuals go through the public art approval process instead. Brent Thompson/582 Allison/Proposed the following option to simplify the wording of the additional frontages provision: "Buildings shall be permitted one square foot of sign area for each linear foot of business frontage; the maximum sign area on any single business frontage shall not exceed 60 sq. ft." Mr. Thompson added that he would differ to staffs expertise and as the petitioner for this provision voiced his support for the proposed ordinance. Marsh closed the record and the public hearing at 10:18 p.rn. Questions of Legal Counsel and Staff Marsh requested each commissioner outline their issues for staff and the following items were listed: 1) request of staff to review possible options that would allow the prayer flags, 2) in regards to the additional frontages provision, request staff consider making a differentiation between multiple businesses in one building and one business that has multiple frontages, 3) request for staff to provide clarification on the 3D object material restrictions and sandwich boards in non-historic zones, and 4) address how this information in going to be presented to the public in a graphic way. Commissioners Miller/Marsh m/s to continue this hearing to the February 24, 2009 Planning Commission meeting. Voice Vote: all AYES. Motion passed. ADJOURNMENT Meeting adjourned at 10:30 p.m. Respectfully submitted, April Lucas, Administrative Assistant Ashland Planning Commission FebrualY 10, 2009 Page 7 of 7 Plan ng Commission S r Request Form lete this form and retum it to the Secretary prior to the discussion of the item you wish to ir, usually 5 minutes. r the record; do not wish to speak. Planni Speaker 1) Complete this form and return it to the Secretary prior to the di speak about. 2) Speak to the Planning Commission from the table podium m 3) State your name and ad s for t cord. 4) Limit y ts 5) If you P 6) u ma 7) Planning Commission Speaker R st Form Planning Commission S eaker Request Form Planning Com . ion Speaker Requ orm 1) Complete this form and return it to the Secretary prior to the discussion of the item you wish to s ut. 2 Planning Commission Speaker Request Form 1) Complete this fonn and return it to the Secretary prior to the discussion of the item you wish to speak: about. 2) Speak: to the Planning Commission from the table podium microphone. 3) State your name.and address for the record. 4) Limit your comments to the amount of time given to you by the Chair, usually 5 minutes. 5) If you present written materials, please give a copy to the Secretary for the record. 6) You may give written comments to the Secretary for the record if you do not wish to speak. 7) Speakers are solely responsible for the content of their public statement. Agenda item number OR IC forum (non agenda item) For: Land Use Public Hearing Against: If yo Chair wi not interrupt. ou may also provide testimony about the challenge when you testify order of proceedings. Written Comments/Challenge: / Planning Commission Speaker Request Form 1) Complete this form and return it to the Secretary prior to the discussion of the item you wish to speak about. 2) Speak to the Planning Commission from the table podium microphone. 3) State your name and address for the record. 4) Limit your comments to the amount of time given to you by the Chair, usually 5 minutes. 5) If you present written materials, please give a copy to the Secretary for the record. 6) You may give written comments to the Secretary for the record if you do not wish to speak. 7) Speakers are solely responsible for the content of their public statement. Agenda item number Regular Meeting OR Land Use PubUc Hearing For: ;;:^'~ ~';;..~~ LAWN 9-HELS MIX "1" 1-MALS 3-ESCF 9-HELS 3-ILEC BUILDING "I" !::i < Z ~ 0.. o Z i= Z ~ 0.. Q v Z V) l- V w !:: :I: V 0:: <( .- o C'l w ~ 0 ~ :J C'l V V) ll") V) '" o 0 0- Z 4: Z ~ 0 0 V) ~ ~ ~ 0 0:: 0:: ~ l:i:i 0 w V .... " 0 Ii; 0 4: V) Z ~~~::i o 0 :I: ZO;:;' 4: "'-...... 0:: :J 4: --' ~ Revision Date: February 10, 2009 Drown By: KAG Scale 1 . ~ 10'-0' l- V w o 0:: 0- e> Z U; :J o ::c lo<: o o Z 0:: ... 0 a::l w c> w w >- ~ 0'" :Vl _ *~ ~ ~U :5 00 :I: Z CO '" (/) (Y) <( January 9, 2009 l-3.4 Birchwood Lane Homeowners Association 2165 Birchwood Lane Ashland OR 97520 City of A4.shIand Planning Exhibit EXHifJIT February 5, 2009 City of Ashland Planning Department 51 Winburn Way Ashland OR 97520 Dear Sir or Madam: I am writing to you in my capacity as President of the Birchwood Lane Homeowners Association. The residents of Birchwood Lane would like to voice their continued concern about the possible opening of two easements in our development to pedestrians. I have attached copies of a 2004 petition directed to Mr. Bill Molnar. Our concerns remain the same as listed in the letter. Please advise us of future meetings regarding Birchwood Lane residents. Sincerely, Aletha Lundblad President ~., . ." i) r -crt Ashland Planning Commission 51 Winburn \Vay Ashland, Oregon 97520 Attn: Bill Molnar Re: Planning Action 2004-116 Dear Mr. Molnar: Per our telephone conversation, the Board of Directors for the Birchwood Homeowners Association and all residents of Birch wood Lane in Ashland, are very concerned regarding the two public easements located on our street. Ultimately, we want these easements removed and it is our understanding that we must present our case to the Ashland City Council for a decision on this matter. Currently, the property located adjacent to the east side boundary of Birch wood Lane is under consideration by the Planning Commission for development of8 four-plexes and an Ace Hardware store with low-income housing above the store (planning action 2004- 116). At a recent public forum regarding this proposed development, the subject of opening this easement for public access was brought up. The Birchwood residents that attended the meeting expressed their concerns and desire ~; not to open this easement for public assess. Our concerns are many. Birchwood Lane is a small cul-de-sac private street. The homes, front landscaping and the street itself is maintained by the Homeowners Association via monthly dues collected from all homeowners. We are constantly having to deal with kids jumping our fences and skateboarding through our property, ruining sections of lawn, breaking plants and leaving trash (drink cups, food containers) all over the property, all of which must be replaced or removed at the homeowners expense. We have had homeless people sleeping in our common area and people high on drugs (who we have since learned live across the street in the mobile home park) running through Birchwood, knocking on doors and screaming obsenities at the residents. We have called the police on several occasions and were told to post "no trespassing" signs which we have done. Ninety percent of our residents are elderly (65 and older) and many live alone. These situations are very annoying and threatening, as well as costly to all of us that live here. We have met with the builder/developer of the proposed development, Mr. Evan Archerd . of Archerd & Dresner, and expressed our concerns over this easement. Mr. Archerd has offered what we all hope will be a solution to this problem by incorporating into the building plans a 10 foot paved path that will run from his property along the southern side of the Birchwood property leading to lower Clay Street. This pathway could be used by all pedestrians, bike riders, joggers, etc. and accomplishes the same results as would opening the easement to public access. t,;) ;' ..:<1 We enclose the signatures of all Birchwood residents opposed to the easement and would ask that it become part of the package to be submitted to the City Council when the project moves forward for their approval. The Board of Directors would also be happy to appear before the City Council to answer any questions they may have. Thank you for your consideration in this matter. Sincerely, Birchwood Homeowners Association j ."'~ BIRCHWOOD RESIDENTS - OPP'OSED TO OPENING THE PUBLIC EASEMENTS LOCATED WITHIN THE BffiCHWOOD DEVELOPMENT: 100/D OF" '] .- < .:t February 10,2009 City of A:J'l!and Planning I~xh1bit City of Ashland Planning Commissioners Ashland, Oregon Comm issioners, Subject: Affordable Housing on Clay Street As the planning for the Clay Street Affordable Housing goes forward, there are several important issues that need to be addressed. They are: 1. Size of the Project. Evidently, there is some consideration being given to reducing the acreage but keeping the number of units the same. This would create a very dense population to the benefit of no one. Commissioners should plan this development as if they were the ones going to live there. Do not cram people into this project just so Ashland can say they have a lot of affordable housing. To reduce green space, parks, walking trails, and increase the density is make this project take on the appearance and feel of a "slum" project. This is something neither the residents nor the City of Ashland wants or needs. 2. Traffic Planning. The Clay Street project will increase the traffic flow by minimum 120 additional vehicles which will travel on surrounding roads twice a day. Clay Street, with it's 25mph speed limit, already has a speeding issue as vehicles go down hill towards East Main. There is a real safety issue since there are no sidewalks. The increase in cars will also increase traffic on Abbott Street, a very, very narrow residential street. Abbott Street primary use was to be for the Chautauqua Trace residents, not as a major thorough fare. Plans need to be made to keep this increase traffic away from Abbott. 3. Future locations. There is a concentration of affordable housing being built in and around the Tolman and Clay Street location on the southeast side of Ashland. It is understandable because there is open land close to public transportation and other services. However, it would behoove the City of Ashland to diversify future affordable housing projects in other areas of the City. Otherwise, this area of the City will be referred to as the 'low income area' or 'projects' or 'ghettos'. ..all names that would do a serious discredit to the residents, the area, and the City. 4. Wetlands. The Clay Street affordable housing location involves some major wetland areas. It is assumed the EPA has given its approval to damage these wetlands. The City of Ashland prides itself on its environmental achievements and attitude. It has been proactive in protecting the environment. One has to really question just because the EPA says it legal to damage these wetlands, the City should do so. In some ways, it reminds one of the recent Wall Street investment bankers developing speculative investment vehicles. They knew it was not right and would fail but did so just because it was profitable and legal. The City of Ashland is much better than the current Wall Street investment bankers. Please review this issue again and give serious consideration of damaging this fragile ares. The citizens of Ashland are relying on your time and expertise to make the correct decisions. Take time to do it right. Thank you. VerY truly yours, r ~~~~ ~~ 60 Crocker Street Ashland, OR 97520 CC Ashland City Council Ashland Traffic Planning Commissioners Ashland City Manager *' i' ('It,\' of Ashland I Pltuming Exhibit I EJ!WJI1..",,___"-_QS2Lt "'!\ .ifVl( ') -,(1.... a small increase in women of child-bearing ages. ,~.EQ!llrihutes-"UlQ4~~.t1trS:~!~Ffti, /' population growth between birth and age five due to the City's eXj2ected success at ,~_~~._~~._.~~.."..~_.-"~".._".._.,..,.....~o-...._._.....=w_..~"~"-,"""",~.,,.,, ... ._.......... "" ........-..........w................". ............ .. .........."...................4..... }nc1uding some affordable family housing in future r~(jjc:l~nti~14E;velonments and a ~__,,~~,=="'~.'~~'W~"._'."="'=--"~".".'...' ,'M. ...~._~~~?' ..=__="...._~-....._.". '.." .... .. .... ....." .. ...=~..,t;~....._~, b.=.........<HP. development climate that favors more multi-family and rentallJ,QJJ.sing, \".w_..""'"',;",.n"~"";'l"?'''''''"'',O~.."..''''~''''O.''''..'''~^..,-,:"''''~"~''''~,.'''''''','-,,r,~,.=;",,__'''<Y_,.''''p-'"c......,-_-,.,:-e'-'''~,.,-,....,~-''''''',.,.~c<-,,"-.._..-..-p..~..-,'-,..,'"_...'...~., ......,. ,-......--. .,,-" <,.;.iN'::~ f--....~".,....,.-.....~.. I j ! .~--""-~--- -.----.~~=.-~...-~-l I Chart 7 Ashland S.D. Birth Cohorts and Kindergarten Enrollment 200 ... ------------------- -------- .. .. - -' .. - - - .. - - - - -I I I - - - --I I 250 -~---"'--=-~~,....-.......--~~~~----~-,.~- ~ 150 "0 c ('Il f/l .c: 1:: iii 100 50 _ .. - ... 1-~reCaStBirth~--- -...- Historic Births ----"11.. - - -I I !__ -S-Forecast~___----~Historic K J o I I 1996- 1998- 2000- 2002- 2004- 2006- 2008- 2010- 2012- 2014- 2016- 2018- I I 97 99 01 03 05 07 09 11 13 15 17 19 I I School Year 1 L______.__~.__.____---._~~~----~----~-..-~.-.~---------~-~-~----j Total K-12 enrollment is forecast to be relatively stable, especially when compared with the loss f1720 students in the last 10 years. ~~2'~l'l9!l!!'~!)U"f9-"'!i~st.!9 growr~~ry;l sloWly1in the next few years as growth from new affordable !WJ,lsiJ:lg ,__--t...:::-~._..-'-~-"..~~~.=._..-_~_.._-m=.--=-=-----...-"-....--~~_.---...-.--._-~~~-~.---.~~..-..-..-. developments in the City of Ashland is tempered by recent small_~r ~.~!!h-.~QhQ!1:~thllt:xYUl (._.--------=,.-.--.-..-%.,."-..-..~_...,,...,,<--..-.-w-..-_.~.__........ .... .. p........ .,......".,...._....co..e,..........p...= ....-.. soon be entering kindergarten and first grade. The pace of elemental)' enrollment growth __._.,._"~__,_..__...,_..."'.~..-._..._.._..~.,.._.,..,,._...".' ......_.....=.'w._.__...,..-.... ------~.~._.--_...._-..._,.....~_......_..-....-....,.... ..........,.-.--,-.,. increases later in the 10 year forecast horizon, but secondary enrollments continue to ____'--~.~,~"'" .,.._,,~~.,>>,,"",.,.,,~.>,,',~,,"'>.,,'...,."".','~A~..-'-.;.,<<;'....." .__<'~'''''_ .,.,....-..=.,- ---- - , ., ,-.' ." '. decline after 2013-14. u_ ___r-'~ ._~~,..-~___~r 36 "- , I ;'_'<;/~', 'I d~ 'v!; ~" '/i-- II 1111'\ /11. ','I lU "!'''~.' 'i!~' ," ~ ')[... I iI-)c '-H I /, ~~~I :.... ~'" .,'~~." '1- ii~ 1 ~ " r!' ~S::"I ,~ ~ I..".."'... ~! ~ .'/, ~m'. '"l.:.<.. .~;. ~~ ~ H~" .,'.:. '':<'' br-:(' '- . ~ . i .~ . ~~ · ': .. \J 'fi .)..... ..t.!l~ ."I!lilll'li :!';i!i !!li1il,q-~ ;~::'!It," 17 """'17 'T, I. :i;!ii:ll'!,! ., ]Ii~iiii~ ::---, ~~. 8" r .., i I ..l; I- '~ .1\ !li'Jil ;'1/1:: it iii! lli" 'l"~: ;""lr~"I"!~~~ - 1~~-"',8 C ,,;. . . .':~~'. II :a / i ~ ' I!;; :;:11 , ;) , . \ . !l:I; ,.. ..., ~~.~.,. ((~S1:~ ~i:l(f. /~..f?I..,I...",.. .,~,... ...., "-=,. '-..:,.lJ .,:,.~ ": ,~ !<!~.~Wn' \ ~!'~l'.. ~iil:"!,,., I~."'dr,!j"':.l . U! "Ill! 1':'1; I. '. i I M~~ . . ..". .." ij A ~ ~..J ;wr.'f.t'i I' -" IJ! , II / " ,I,!;:I I , '" (k1 ~ . PI':"1I'1;+~' ~. '1". ;~ '~~ : CY " .' - ~ ..~. 7 : : rl"',:;~ · : ~~"~ ' .,~ Ir! ~ ._ "iI F/ ~.. e;,. ~;:il J .' 't . ; & 1 ! I '."" Ih~j ,. ~ ( 'IV~ ". /" J~, ~ 1 ~ , t:~~. .. . l1i, b'lI; .,~ ~ I ,.",lJ!tl"l:H\i3 . \. Y , - I I> . . . ,-' "'T"~. J ,. li,;11 ',~ rn t' , :;i'1 ! , ,'11. 'l!.l II J .. .' {z ~. ~ ~ ,;~~' ~. .!. ar~~~~ f\ . ~ ~ .~ ,~ ] ~ . 1':,;':: I:!;~ . rr Rf . ~, "., .lI-J'lIl1r("& II; I-i1 r41,~ ~ ~ i : ~I ,~ :;?" ""'" . ILl H'~l! l i il; !,~, ~ . ..... -. 1.:111". '~ It .. I ~ ;"lH'!'lfc ~ .IILlf !I'I I,,! I J - " ... I ~ ". '. /. <: !. >..,..",~,,"," '. TI;.iTn~IW;ti),~! ilin:ll' liiFI'\.'h;:jllll.I;'.i ;:1 . \ ~' '1 _~ ~ ~; . m~"11f,.. . ~ L.D'J:ll./i'l.<. ?~~':~:::~~ri '4\,~ ~~, f~. '1-7'- _""'C~T"',. , I k\ ~ .: ... ; l}~. tr _~,~ ',~I 1/. ~~~1!tPI!;:: ;~:~;~: ~ I (~.~. ,,~ll : l' ~_-"I'; 'rl__~ ".1' I.... jl 11 ", L. ~ (.' ~ .,,~ 'J, < .x. ~\ D I \ ~ ftP' 0 \ 1M "'1 'I ~ .w;:~ '--t ' ;' Iii \ c<!\~". ~iii . .fl')1~ ~t'o I ~ \ ~. l! EJo' ~:: I t~ t-w :s:~:" ~'i );~: r\ I III I -r- - ~ !' ~_ _ I-~::i.',. "lI:!!".,:;) .';,\'""'~~ ' ~ ........ ~ f3?'.:Joif:~~. i ,.j-~!1. ';1 V J . I:'. ='15- ~ .A",'_. ," .0 /. ~.. '(t: " .14. ' ~1..' !, _ - I!l I I )'KI.1"-''H" .l. > J C -...'1) . ~'; ... . ~~ ~~!...I !:.."'-.: - .... 111. I I '( ;, @;.~....,.~. i'~.' _ ~j j 5; ,) ~L ' 1~'i<;'i;)I:.~. n~ ~~; -S ~.. lf~ ) .. ,: . Ui\ l,""l:F! 'i; , ~ l,'~ ~ ~ )~ ~ ~"~:,~"1 r;: '~ {.;Uir---'D ~d /... ~.~ "..-- 'l>. ~ ~ k' '::!J.' ~ ~- .. '/.1 f;,.~,' k' It ~"\, ~ " -: ,~ i 'il:~'r:~ ~ ~. "~;~J!f' ,.o~. - ~ ~;:1' ~: if \ I .~i "'" ~ '/'~ r.E;::;:i: < -;-;-: ~, ' i .~ b -'ff '~~ II ~~ ','.r .' ',i j' !:~Ip \:\ . .~-:. j! 'i1>; ~ 1':1;. " i i\ .c,,::; \:1 ~ I: ~jf;~ :!. ~T l\. ,~~ .,> i1 \:\ l- J ,. -:-. .. ~ .'. .. !!. "'..:. I T II I T l1'f I I I :~. : ~ ~;. ,! t i; I l' :, ,. ~ !~! ~ I ; I, ~.. T J J// ('() ,,",,(\ 'V ':::.U~I . ~ :::. II.. o ..c 1:.. :2 X 1 '" r.:.l 1 <: . l;(! .... c ::>'= l 2:;: ... .- a: iii it: \.) c: ~ < .~ llla.'" OJ o Ij z ~ a.. 0~ Z~ -I- 1-1- Z~ ::s a.. Q f- W W cr: f- Cf) >- <t: ..J o a ..II ~ ~'.l,,~,,~:~~:~.,.,\; "',. ,,,' i:1.: '.'~I"'f~'P'PJf.;'.llf)~1Iol1j a III J1~~:ttt~;i'~f~ li< ,:W kl, {!. ,.of I' "T ~;1;, .ai.' 0' ,till ',I,' ~"i a a '.! ,~"" '~ o $I,,:i t1 j./ ~ ~ ~ .~ ll"- ,~. :. IIIIV 0; ~ t~t '~''l!l'~ rt' 11,1 ~ & . ~ II. !il III t iI'.c,'ii a a,pE 0 liS en, ... ~ ; !" 'D ~ II U a Ql . Gl tl 0 - CI JE' , 'IfI .q. . '" l:l ,~ II Q a:--.r: ..,._~. <0;, . . ..... CIl ....'E' .;II ~ fIl Cl. III .. It- Gl 0 Ci .'- tJrrJ!l I\, I: UI Q ; u:"~ .fA' e'4 q).}1;1 :i:1"C::] ;.1Il'! EI .; If' ~1II.'fl ~ M E ~~ IV ::: 1:: ILl' .J .i. \it &it ~("O~ ~,,~\. IQ .. c: ,_ jij _....- IV III ",U UI -" 0 .;sr' ' ~~~~~uf~03~~~2~~5~2'~ i ~ ~ c ~ :0 C1 €a~ "& 2 -; e l1li111 . ;"C;;~ _ =~ 0 0 ~ E Ql ~ 0 = ~ - ~ U1~O .E 0 U :E Wrl- 0:: Cl < ~ ~ II .iU a 'IV' 'I.", . . Cl ;E ". ..lJ<aI' jail II ;?' 1111 III IIfl t f' ~T~, '"\ :11.'1"' l't ~ t ::< ,'-~ ~" i' '., I!I..,. . iIIl ,...! ," ,.... .111 I" lEI ." lS ,....~.,.1t,.,...,..,..;'..:'1I1'1I. 'lIll1.~.l .'~ \ \ . w II ".~ 0. .; ".~ . .' f' I ~ .91,' IIQ. ~ i.~. . ~" . ~.. '; VI . s:;I ~ .\O'''~ ,ha .'W 'tfI.t)'fn 'C ~.. "'ltI' \'8..'.', ~~ .~ l..:S ~\.m ..!:. ~'~ :! i., ~ t.I)o r:::.~ 1P[t/ g: l: ~ . ."":; ......, it JC ..._ tll ... :J~ .1 ?!.t1:fl i bf~~,.f G ~1 ./ R ' 1iiii. .< 01111 7n ,.,. ! III !II " ~ III a IIlII Ibllla ~'}:".II all 1II11l1:111 oil,. ~ a Ill" "ad a r:I ~ 1I'Ii'" .. ill W: "- III W 1:1 IIIIl 'ir. a a a 'N' ~3^O1:l ..:J\,,,,,,, ~ .1:1 II I a" II llllll II l.' 1IIr1J III a \'If III III 9 ^ .. Pl! a III l1li a lID III II" III a lOll II a ;~ ., ~ a n ,. /N il!J , . '\ II lD II n II 1::11 l1li a "' G. "Jo:'f ":l .111 .. 'II ~ ~ H 'J.'. a W ,p ~ III II .. II II" .. ~~ ., III II: III. , , III .~, -' ., ,~ ,. .,. . ~,. ~ rll;<' I~., \1\; o jtt"!\It~ {.-"'",.J t (. ; II II III /. " a Ie a a }, alii III !II III III III rl""i, a. ," II " .. If.j a 1:1 III Il d ! II a a II:i Ii:i' Ii.~ a D '" IllI III III II ---- III ~ D 1",.;.' II ., II'.~ fa i;j ~. a +', it' Il II , .. , _01 i'JI III .'M III .. IX {'" :.., "\'i;a .! III " W '1' II' it; 1'/,:. gIll1 III II.. .'.... r" a , ,. , , t. ~. G.;' '-' .:~~,IIr.-'~' .~~-;~' i .. ';r;J.,#lir ''# "\. )~lFft., "l N., '. I, ~i~: I~' ~':&\r"!l III ~\',.,,~ ~ D rJI '"1: !II .. . ,v, adll a I .. '. ~.,' :~_ fl I' ~,;) , '> 'I y, . r, .. ".~ ;) 4 ",. n ,II " '\ III I'JI a Ill' II a iii IP a ri' aU" ~ II l1li II tI II 111l1li .1IlI II l1li a III l1li ill II II .a.r, .. .', III a a II a II l1li II a II' III ."'. ..l\~ ", Ii i;: t: ~:h ,. 'ID ~ .., III ,,*, ,!,I~:' ,.,~ , I, l:I .".,.11 ,.., ,_~" ~h,., III III II 110 iii flII e lIriI ill l1li II ~D a II U a a ,. III " o , 011 a . ~ '~::J.' ~ ,i-l, I< 741'~~g~~i"~' _~ ." . all ',1-' ' 4r 't.>." Di ~ .~,>/'~...,. ;,; ~...j ", 'If! ~ ac. ",:" ~,;:'~' t ........ ',.. ,t~ III ~ ~,~ Il.l R.. .Ill " '.'q - .;J,. , 'J: - ~~,' · D" /i ~"~] t~ I' 1-/,\\ . ":,.;'3' .,.."1-\ 11 oJ ~ ;,..,; ~ ~~,I.t W-,'" '.'~ ~: t. ';l" 'Ill" ..~ '. ... ~. :-, B IIlI a II " ;.p tJ I:(!,~ -B DR G' ~II ~ II lP!3 ."." 'A 10 " ",IIIB 111111 III1r.i1Ilo ifII '" ... .oj 'lit I(j n II II a ;1.: II L!g tI 0:1 \:.?l Q a 'lI .'trJ \1 o D U';li, tl1 i,U tY. Woo I r ,I) Ll f'l ). Z r~ ~ i (~' .J .J : U J~ 1lJ ,n {(ll~ 'I!:J JI<l ~, N '" a ~t, ltd f._I (\.1 N IJJ I,.. 7.. y ~1 ~ ~~ ~ dXC) ~ l~r).rolCll'i u: ..I II:- '.. IIJ {Y. ~ ~~~G_19 I;l I: (lJ<J) ID 0 II~ ~~n~'i~~'i Ji'~ ~ .15 ~il\ 8~dl' -,'~ ii" ~l :r ~~. ~l ~j \,1 (f) (.) ,... ,/lO, tl'J wtK -;j' !:':I.} a~ltf Z~!1. .~ '1 <t (Y. 1111 ~~IU- 'Jl. ~. ~ "'l ,II) ;S III n ~~ '1 .J ~l II II Q1 II IIlI ~ io. ri -:;i' -~ ti)i~\ 1.1 ....."8 i.. ~,,:E',~: ......: ,# ~~ ~';':4 i;f},! ~ ~.~. .' ~l b~ ,'... ~:f ".- ~I >. ~ - i ~~ lor; !'-ll~, t ~- ,.". ~,~, ,~ R Q i! ,;. ~ ..' .. ..i. ,,' te" .... W.L. . I:l _\'" Jot )'," ..;'~"'~ \. IJ ,II, II II III II III Ie IIlI ill ~ 01 'II a. .. ~. .... ""11- - ~ iii! a!j .11 II III D ~o:fl a II "' a III ~ ~ III III l1li III II D -... ... - ..... ..... - -.... '. - - ... !Ill n. II III '; r"'~ --"" ,I f j ~ \ II a. m.. t-.o Q)&=L _ _ __\ -- -~- ;._-~ \"J,~filV3~ ~~/ II l1li ',W ,t":~ ;'i~ ill" . ",::;t" ,r:I,)f~, ,. :/, .'1 , ., " . {. '::.~.\.~ . . a' ~ e l:t, .> . >'lI a " a '1'\ :~ '.~, {f\. II . ,~ III n R~' " f: ~['P ' iiant , ~~ lit. 1- t!' ~, 'f ..~, i '~,:~'" 4.. . .''''.; 1,.7..~,r .... ~ ~', ". ~., .,'w ';' :f oj i,(I '~ " f ~ ,:... -!,,':i ,',Yd. pi' '1' I \~'1"":~, )I. ; ';~.f Il1o I t I ill " 'l,1 II I I. II .4 '!..'tE.... _ .. , .~,.. -,r~~, .~ 'f:~' >l_' IIlI l. ~' '~t: 1I'11.II~. III a r;/!' a II Q !'jI R bll ,~ ':II !:II III a ~ '" r. nIlI " !1i1ll III .. ti m L' !J11 " III 1ft r'. rf"l ~ .- U II ill " III II a 011 III ~. <'II ..~-t- ~......._ "" .. .," I~ I ~ "~I D ~ . ~', \ ~_; I ,~'" v... I'J a ~ I;'! II!I J \' Ii Q " III III II ". II a a IIIlt II III III III a II .. a II ., IJ !ll {i II a III " II l1lil1li a a ilia II III II a- u . a "" II D ..~ \' -i '1~~ ,.'~._,~ ',"~ ,; ~. ";, .. ._~i,,. ASHLAND TREE COMMISSION PLANNING APPLICATION REVIEW February 5, 2009 PLANNING ACTION: 2009-00043 SUBJECT PROPERTY: 380 Clay Street APPLICANT: Housing Authority of Jackson County DESCRIPTION: A request for modification of the previously approved Planning Action #2004-00141 for the Willowbrook Subdivision to allow a Land Partition creating three lots and Site Review to construct a 60-unit multi-family residential affordable housing development for the property located at 380 Clay Street. A previously approved request for an Exception to Street Standards to allow a portion of the sidewalk on Clay Street to be installed at curbside to accommodate a cedar tree on the southwest comer of the site remains unchanged, and the application also includes a request for a tree removal permit to remove 12 trees six-inches in diameter at breast height (d.b.h.) or greater where only eight trees were previously approved for removal. (This property is owned jointly by the City of Ashland and the Housing Authority of Jackson County. The 2004 Annexation and Performance Standards Subdivision approval for Willowbrook Subdivision was for 107 residential units. The required minimum density of the site can be met throughfuture development of the remainder of the property.) COMPREHENSIVE PLAN DESIGNATION: Low Density Multi-Family Residential; ZONING: R-2; ASSESSOR'S MAP #: 39 IE 11C; TAX LOT #: 2500 Recommendation: 1) Tree Commission recommends preservation of the Black Oak (Quercus kelloggi) #23 and moving the sidewalk meander between the Incense cedar (Calocedrus decurrens) #1 and #23 to achieve critical root zone preservation of both trees. That a revised Tree Protection and Preservation plan shall be submitted showing the modification. 2) Prune Poplar (Populus trichocarpa) #15 and the Blue Atlas Cedar Cedrus atlantica 'Glauca') #11 to a safe manner prior to the street installation. 3) Include electric vault and transformers on the final landscaping plan and be assured of the clearance required by the Public Utility Commission and the City of Ashland Electric Department. 4) Provide a final irrigation plan prior to the submittal of the building permit to be reviewed and approved prior to the issuance of the building permits. 5) Evaluate the use of the Washington Hawthorn in proximity to pedestrian gathering I traffi c areas. Department of Community Development 51 Winburn Way Ashland, Oregon 97520 www.ashland.oLus Tel: 541-488-5350 Fax: 541-552-2050 TTY: 800-735-2900 CITY OF ASHLAND ASHLAND PLANNING DEPARTMENT STAFF REPORT February 10, 2009 PLANNING ACTION: #2009-00043 APPLICANTS: Housing Authority of Jackson County City of Ashland LOCATION: 380 Clay Street ZONE DESIGNATION: R-2 COMPREHENSIVE PLAN DESIGNATION: Low Density Multi-Family Residential APPLICATION DEEMED COMPLETE: February 2,2009 120-DAY TIME LIMIT: June 2,2009 ORDINANCE REFERENCE: 18.61 18.72 18.76 18.88.050 Tree Preservation and Protection Site Design Review Partitions Street Standards REQUEST: A request for modifications and changes to the phasing of the previously approved Planning Actions #2004-00141 and #2007 -00802 for the Willowbrook Subdivision to allow a Land Partition creating three lots and Site Review to construct a 60-unit multi-family residential development for the property located at 380 Clay Street. The application includes a request for a tree removal permit to remove 12 trees six-inches in diameter at breast height (d.b.h.) or greater where only eight trees were previously approved for removal. I. Relevant Facts A. Background. History of Application In December of 2008, the Ashland City Council and the Housing Authority of Jackson County entered into an Intergovernmental Agreement to purchase the property located at 380 Clay Street with the existing land use approvals in place and to jointly make application to divide and develop the property as proposed in the current submittal materials. In July of 2008, a request for a one-year extension of the Final Plan, Site Review, Tree Removal, and Exception to Street Standards approval was granted through Planning Action #2008-0 I 060. In November of2007, a request for Final Plan Approval for a 53 lot, 107-unit multi-family development under the Performance Standards Options chapter was approved administratively as Planning Action #2007-00802. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 1 of 18 In August of 2007, a request for a second one-year extension of the Outline Plan, Site Review, Tree Removal, and Exception to Street Standards approvals was granted through Planning Action #2007-01229. In November of2006, a request for a one-year extension of the Outline Plan, Site Review, Tree Removal, and Exception to Street Standards approvals was granted through Planning Action #2006-02009. In June of2006, the Annexation, Comprehensive Plan Map Amendment and Zone Change associated with the Planning Commission approval of Planning Action #2004-00141 were approved by the City Council. In July of 2005, the Ashland Planning Commission approved the application for Outline Plan, Site Review, Exception to Street Standards, and Tree Removal Permit for a 1 17-unit multi-family development as Planning Action #2004-00141. There are no other planning actions of record for this site. B. Detailed Description of the Site and Proposal The application involves the partitioning and partial development of an approximately ten- acre parcel on the east side of Clay Street, between Ashland Street and East Main Street, located at 380 Clay Street. The subject property was annexed into the city in 2006 with an R- 2 Low Density Multi-Family Residential zoning, and was subsequently granted Final Plan and Site Review approvals for the development of the 107-unit Willowbrook Subdivision. The Housing Authority of Jackson County and The City of Ashland jointly purchased the subject property with the Willowbrook Subdivision approval in place in December of2008, and now propose some modifications to that existing approval, including changes to the project phasing, partitioning to create three lots, and Site Review approval to develop 60 multi-family residential units, with the remainder of the property able to accommodate development to the required minimum density in a later phase. The subject property is rectangular in shape, and slopes gently (approximately 3 Y2 -percent) down to the north. An existing single family home, barn and other accessory structures are situated on the southwest portion of the subject property near Clay Street. Approximately 30 trees six-inches in diameter at breast height (d.b.h.) or greater have been identified on the site, with the vast majority of these located near the southwest comer of the property in the vicinity ofthe existing residence and out buildings. The Tree Protection/Tree Removal Plan included with the application identifies 12 trees scheduled for retention or removal, four more than the eight trees approved to be removed under the Willowbrook Subdivision approval. The City of Ashland's Wetland and Ripatian Conidor Inventory and Assessment identifies the location of a narrow wetland protruding into the northerly portion of the property. The wetland is shown as part of a larger 112-acre wetland (#W13) consisting of a "gentle topographic swale" that runs from south to north through the neighboring semi-rural properties north of the project and extends through the eastern portion of Bud's Dairy Subdivision, a housing development located further down Clay Street to the north. The Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 2 of 18 Willowbrook Subdivision was initially granted Outline Plan approval with 117 units and 1.21 acres of open space including wetlands and play areas, but subsequent wetland delineation found that the actual wetland on the site was larger than originally suspected. The Final Plan approval reduced the development 107 residential units with 1.25 acres of open space, removed 12 parking spaces that had been proposed adjacent to the wetland, and provided for the mitigation, enhancement and expansion of wetland area. 1. Land Partition to Create Three Lots The Willowbrook Final Plan approval was to subdivide the property, creating 53 lots and allowing for the construction of 107 residential units. The current application proposes to modify this approval by opting for a Land Partition which would create only three lots. The proposed Lot #1 would be approximately 4.32-acres in size, "L- shaped", and would retain 47-units of the approved density for development in a future phase. Lot #2 would be approximately four-acres in size, "L-shaped", and would be developed with 60 residential units as the first phase of development ofthe subject property. With the proposed development, Lot #2 would be retained under the ownership of the Housing Authority of Jackson County. Lot #3 would be approximately 1.31-acres in size and would remain as open space, under City- ownership, to protect the existing wetland. The wetland would be enhanced with the first phase of the development of the subject property. As part of the proposed partition, a 20-foot wide strip extending from Clay Street to the rear of the subject property would be retained with Lot #3 to enable future connectivity between Clay Street and Tolman Creek Road along the full northern property line of the subject property. Access to the proposed lots would be from Clay Street, which would be improved to City standards along the full frontage of the subject property as required in the Willowbrook approval. Sidewalks, curbs and gutters would also be extended northward along the east side of Clay Street to provide a continuous sidewalk connection as required through the Willowbrook application. Two new internal streets would be dedicated along the boundary between the second and third lots, and would be improved to "half-street" standards by the Housing Authority of Jackson County to provide access to accommodate their planned development of Lot #2. The applicants also propose to install the widening improvements necessary for a right- turn only lane at the intersection of Clay Street and Ashland Street with occupancy of the first phase of the development, provided that a median restricting left-turn movements at this location is not installed in the Ashland Street right-of-way before then. The second phase of development is to address the remaining 47 -units of available density as well as completing the improvements of the half-streets, providing an alley-connection to McCall Drive, and addressing the sidewalk improvements along the "elbow" on the west side of Clay Street near the Ashland Street overpass. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - 'Snowberry Brook" Staff Report.dds Page 3 of 18 2. Site Review The Housing Authority of Jackson County proposes to retain the "L-shaped" Lot #2 to develop 60 residential units as affordable housing. The proposed development would consist of 12 one-bedroom units, 12 two-bedroom units, 26 two-bedroom townhomes, and ten three-bedroom units spread over ten two-story building groups, ranging from four to six units per group. The proposed buildings would be oriented to the adjacent street frontages or to the nearby wetland, and street-fronting units are to be provided with direct connections to the adjacent sidewalks. The buildings are to be sided in standard siding with shingles at their pediment and base, with 3 Yz -inch window and door trim and standing seam "cool" metal roofing to minimize heat gain and water quality impacts. Each of the individual units is proposed to have its own porch or balcony; the porches are to utilize six-by-six posts with wrapped bases to provide more of a sense of permanence. The building exteriors are proposed to be painted in earth tones. Parking is proposed to be provided in two surface lots located beside and behind the buildings, and the lOS-space automobile parking requirement is proposed to be satisfied through a combination of 88 off-street spaces and 22 on-street credits. Required parking lot landscaping and screened trash enclosures are provided adjacent to the parking lots. 89 required bicycle parking spaces are to be provided in 15 six- space bicycle parking structures near each of the proposed buildings, with an additional four bicycle parking spaces to be provided at the proposed community building. To satisfy the eight-percent recreational space requirement, the application materials submitted indicate that eight- to nine-percent ofthe subject property is to be provided in recreational space, including several lawn areas and a centrally located neo- Craftsman community building with a multi-purpose room, computer room, restrooms, office, covered patios, bike parking and an adjacent children's play area. The wetland on the City-owned Lot #3 is also proposed to be enhanced concurrently with the Housing Authority of Jackson County's development, and while not proposed as part of the required recreational space it represents a significant additional amenity to residents. A wetland planting plan incorporating a viewing platform and pedestrian access has been provided along with preliminary engineering to enhance the wetland, and the subject property's landscape plan incorporates bio- swale areas and plantings that integrate well with the planned enhancements to the wetland. Permits necessary to accommodate these modifications to the approved- plan for the wetlands under the Willowbrook Subdivision will be obtained through the Division of State Lands. 3. Tree Removal Permit As previously approved, the Willowbrook Subdivision proposal included the removal of eight of the subject property's 30 trees. One of the large poplar trees which was previously identified to be retained, previously identified as Tree #3, was removed Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 4of18 with a tree removal permit, when portions of its canopy split and fell endangering adjacent homes. With the modifications proposed, twelve of the site's remaining trees are proposed to be removed. Ofthese, the tree identified as Tree #17, a 40-inch d.b.h. poplar that is proposed for removal to accommodate the placement ofthe new east/west street, is by far the most significant. Ten of the 12 are proposed for removal due to their locations relative to proposed road and sidewalk construction, and the remaining two, an eight-inch d.b.h. almond (prunus dulcis) and a 12-inch d.b.h. black locust (robinia pseudoacacia) which are now dead according to the proj ect arborist' s assessment. 4. Exception to Street Standards An Exception to Street Standards was approved with Planning Action #2004-00141 to allow a portion ofthe sidewalk along Clay Street to meander around a Cedar tree located in the southwest comer ofthe property. The applicants propose to retain this approved Exception to Street Standards unchanged under the current application. II. Project Impact While previously approved as a Performance Standards Subdivision under Chapter 18.88 to create 53 lots and develop 107 residential units, the application now proposes to modify the approval by partitioning the subject property into only three lots: Lot #1 which would accommodate development of the 47-units of the property's approved density in a future phase; Lot #2 which would be developed as a first phase involving the installation of street improvements and the construction of 60 affordable housing units; and Lot #3 which would contain the existing wetland to be enhanced and maintained in City-ownership. In addition to the proposed three-lot Land Partition, the current application also includes a Site Review approval request to construct the 60 multi - family residential units proposed on Lot #2, and a Tree Removal Permit to remove a total of 12 trees over six-inches in diameter at breast height (d.b.h.) where only eight trees were previously to be removed. The City of Ashland and the Housing Authority of Jackson County propose to utilize Community Development Block Grant (CDBG) funds to complete some of the necessary infrastructure improvements associated with the proposed first phase of development. Given federal requirements and deadlines tied to the use of these CD BG funds, the final survey plat will need to be recorded and public right-of-way necessary for proposed street improvements dedicated to the City prior to construction of these improvements. The timing of standard "trigger points" within the conditions of approval - which would typically require infrastructure installation or bonding prior to the City's sign-off of the final survey plat - have been adjusted accordingly, and in staff's view the partnership between the City and the Housing Authority through an intergovernmental agreement, their shared ownership of the subject property, and the City Council's dedication of $345,000 in CDBG funds toward public facility improvements for this 60-unit affordable housing project provides more than adequate security to merit the relatively minor adjustments to the typical timing of the conditions. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 5 of 18 Chapter 18.108 of the Land Use Ordinance would typically allow a three-lot Land Partition and Site Review for two or more residential units on a single lot to be handled through a "Type I" procedure with administrative approval by the Staff Advisor. However, because the Staff Advisor is employed by the City of Ashland (a property owner and co-applicant) the application was scheduled for a hearing as a "Type II" procedure to provide for a decision by the Planning Commission and avoid any conflict of interest. A. Land Partition to create three-lots The approval criteria for a Land Partition include requirements that an application demonstrate that both the ''future use for urban purposes of the remainder of the tract" and the "the development of the remainder of any adjoining land or access thereto will not be impeded." In this instance, the proposal has reserved 47 units of the available density for development ofthe proposed Lot #1 while also providing required protection for an existing wetland on Lot #3. The applicants also have proposed to construct street improvements along the property's frontage, to install half-streets to serve the proposed lots within the project, to provide an additional 330-feet of sidewalks, curbs and gutters along the full frontage of the neighboring property to the north to connect to an existing sidewalk, and to reserve a 20-foot strip along the north property line to facilitate a future street connection fi'om Clay Street to Tolman Creek Road. There has been discussion of the future possibilities presented by City-ownership of Lot #1 to provide additional park land associated with the adjacent YMCA fields and/or to develop an east-west street connection from Clay Street to Tolman Creek Road, either as an extension of the new street proposed by the Housing Authority on the southern portion of the subject property or along the northern boundary ofthe site. While neither of these is included as part of the current proposal, both the lot configuration proposed and the 20-foot strip reserved along the subject propeliy's north boundary provide for future street connectivity and keep these options open. Staff believes that the proposal not only does not impede but in fact assists in the future development of the proposed Lot #1 and of adjoining propeliies by providing access and frontage improvements. In considering the future impacts of the proposed development, it should also be noted here that the Willowbrook project, with the modifications proposed, is specifically identified for its anticipated positive impacts on enrollment numbers in the Ashland School District's recent "Population and Enrollment Forecasts: 2009-2010 to 2018- 2019" prepared by the Portland State University Population Research Center. The subject property has not been partition in the last 12 months, and the proposed partitioning here is not in conflict with any applicable laws, ordinances or resolutions. Other than a narrow portion of upper Clay Street (at the sharp turn), Clay Street's existing paved width in this vicinity is at least 20 feet as required for partition approval. The applicants note that at the time of completion ofthe project's street work, this section will be paved under necessary permits to ensure it satisfies the required minimum 20-foot width. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 6 of 18 The application includes proposed street improvements to bring Clay Street to City standards along the subj ect property's full frontage, as well as providing frontage improvements for the neighboring property to the north in order to provide a continuous connection to the existing sidewalk system, as required in the Willowbrook approval. In addition, the applicants propose to provide half-street improvements for the two street sections interior to the development, with the remaining interior street improvements to be fully completed concurrently with the development of Lot # 1 in a future phase. The application materials submitted include a "Conceptual Plan: Water, Sewer and Utility" and a "Conceptual Plan: Draining, Grading and Sections" prepared by Construction Engineering Consultants, the film that previously prepared the utility plans associated with the Willowbrook Subdivision approval. Water, sewer, electric and storm drain utilities are available in the Clay Street and McCall Drive rights-of-way to serve the project, and the existing facilities along with proposed extension of services to serve the proposal have been identified in conceptual utility and drainage plans provided with the application submittal. In discussions with Engineering Division staff, they have indicated that adequate capacity can and will be provided through the subject property utilizing existing facilities within the rights-of-way and those additional facilities to be provided with the development. B. Site Review Applicable Ordinances The first criterion for Site Review approval is that, "All applicable City ordinances have been met or will be met by the proposed development." The proposed multi-family residential units are a permitted use within the R-2 Low Density Multi Family Residential District. Within this district, the base density is 13.5 dwelling units per acre. The Willowbrook Subdivision approval and associated annexation were based on 8.8 net buildable acres, after unbuildable areas such as the wetlands were excluded from the density calculations, and the base density was 118.8 residential units (8.8 acres x 13.5 residential units per acre). The Subdivision was initially proposed at 117 units, but this was reduced in the Final Plan approval to 107 units to provide a more marketable mix of units while accommodating the delineated wetland which turned out to be larger than had originally been expected. Annexation requirements call for annexed properties to ultimately be developed to 90 percent of their base density, and the 107 residential units approved with the Willowbrook Subdivision Final Plan represented development to 90 percent of the base density that had been considered in the annexation. The current application proposes to develop Lot #2 with 60 residential units, while reserving the remaining 47 units necessary to satisfy the 90 percent minimum density required in the original annexation for the development of Lot #1 in a later phase. Development of the subject property with 107 residential units is consistent both with the allowed density of the zoning district, and with the minimum density required of the annexation approval. Standard yard requirements within the R-2 zoning district call for front yards to be a minimum of 15 feet excluding garages, however unenclosed porches are permitted with a minimum setback often feet from the front property line. Side yards are required to be six feet, except that side yards of a comer lot abutting a public street are required to have a ten foot setback, and rear yards are required to provide a setback of at least ten feet per story. As Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 7of18 proposed, the application complies with all standard setback requirements, and calculations have been provided demonstrating that the proposed buildings near the north property line (buildings "0" and "H") comply with required "Standard A" solar setbacks as well. The maximum allowed lot coverage within the zoning district is 65 percent and the application as proposed requests to cover 63 percent of the site. The maximum building height is limited to 35 feet or 2 Y2 stories, and the buildings here are proposed at 21 feet and two-stories to comply with this requirement. Site Review Chapter Requirements The second Site Review criterion is that, "All requirements of the Site Review Chapter have been met or will be met." The applicants have proposed to provide a four common refuse and recycling containers to provide convenient access for residents of each building, and the plans provided include details of the required screening. Conditions have been recommended below to require that they be installed prior to occupancy, and that compliance with restrictions on the direct illumination of surrounding properties be demonstrated by providing specifications for proposed exterior lighting fixtures with the building pelmit submittals. The application proposes to limit motor vehicle access to the proposed Lot #2 to two consolidated driveway access points from the proposed new streets. The project complies with controlled access standards which require that driveways on residential streets be a minimum of35 feet from intersections and a minimum of 50 feet from the nearest driveway. As proposed, the new driveway on the east/west street is approximately 190 feet east of Clay Street, and the new driveway on the north/south street is more than 300 feet from the intersection to the south. Site Design & Use Standards The third approval criterion is that, "The development complies with the Site Design Standards adopted by the City Councillor implementation of this Chapter." The Site Design Standards address building orientation, streetscape, open space, natural climate control and building materials. In terms of orientation, buildings are to have their primary orientation to the street, are to comply with required setbacks, and are to be accessed from the street and sidewalk. The streets cape is to include street trees and appropriate front yard landscaping, and landscaping is to include a variety oflocally-adapted trees, shrubs and flowering plants with as many of the existing, healthy trees to be preserved as possible. Trees are to be selected to provide natural climate control for the site, and parking areas are to be located behind or beside buildings and shaded by large canopied trees and buffered from adjacent uses. All landscaping is to be irrigated. Building materials and colors are to be compatible with the surroundings and very bright or neon colors are not to be used. The proposed site and building designs respond directly to these requirements, and integrate the site's design, drainage facilities, and landscaping elements with the adjacent wetlands on Lot #3 to a degree that is advantageous to the wetlands, the development, and the neighborhood at large. An area equal to at least eight percent of the subject property's total lot area is required to be dedicated to open space for recreational use by the tenants of the development; to satisfy the requirement, an area is required to be treated in a surface suitable to human recreational use Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 8 of 18 and may not be covered with shmbs, bark mulch, etc. The submittal materials indicate that eight percent of the subject property, or 12,245 square feet is to be provided as recreation space, including a community building, a play area, and several lawn areas located around the development. The application further notes that additional open space areas not included in these calculations are spread throughout the property, including bio-swale areas, areas between the buildings, and individual porches and balconies. In staff's view, the relatively large recreation areas spread around the site, combined with the community building, play area, porches and balconies, and the proximity to the wetlands on Lot #3 will greatly enhance the livability of the proposed development. Adequate Capacity The final criterion for Site Review approval is, "That adequate capacity of City facilitiesfor water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88, Performance Standards Options." Water, sewer, electric and storm drain utilities are available in the Clay Street and McCall Drive rights-of-way to serve the project, and the existing facilities along with proposed extension of services have been identified in conceptual utility and drainage plans provided with the application submittal. In discussions with Engineering Division staff, they have indicated that adequate capacity can and will be provided through the subject property utilizing existing facilities within the rights-of-way and those additional facilities to be provided with the development. Engineering Staffhave noted that the conceptual plans will need to be modified in preparing engineered civil drawings: utility easements will need to be clearly identified, another fire hydrant (in addition to the three hydrants already identified in the plans) will need to be installed near the driveway entrance nearest to Clay Street, electric plans will need to address service stub-outs for future development of adjacent parcels and conduit installation under the sidewalks, street light placement to current standards noted, meter sizes and placement verified, storm drainage within the proposed street addressed and necessary catch basins provided. It was also noted that the sewer line at the project's northern boundary will need to be slightly relocated so that its location is beneath the future street rather than the future sidewalk. In addition, Engineering staff have indicated that the applicant's drainage plans will need to include calculations necessary to demonstrate that proposed on-site detention of stOllliwater restricts post-development peak stormwater flows to levels less than or equal to pre-development levels while providing adequate flows to preserve the hydrology of the wetland on the neighboring property to the north. The applicant has been made aware of these issues, and conditions have been proposed below to require that detailed preliminary civil engineering drawings addressing street improvements, utilities and drainage plans be provided for review with the submittal of the final survey plat, with plans to be finalized and approved prior to the building permit issuance. Clay Street, a collector street under Jackson County's jurisdiction in this vicinity, provides paved access to the site. The subject property's Clay Street frontage is paved, but lacks sidewalks, park row planting strips, street trees, street lights, curbs and gutters. Under the existing Willowbrook Subdivision approval, a number of street improvements were required with development of the subject property in order to provide for adequate transportation: Planning Action PA #2009.00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 9 of 18 Frontage Improvements Clay Street was to be improved to comply with City of Ashland Local Street Standards along the entire frontage of the subject property. These improvements were to include 28 feet of pavement overlay to include two travel lanes and an approximately six-foot bike lane, curb, gutter, storm drains, 7-Y2 foot planting strip and a six-foot wide public sidewalk. The applicants propose to provide these required improvements as part of the first phase of development of the property as well. The conditions of approval proposed below include modifications to allow for submittal ofthe final engineered drawings for review and approval with the building pelmits, and completion prior to the issuance of an occupancy permit. Connection to Existing Sidewalk System to the North Half-street improvements including curbs, gutters, storm drain facilities, planting strip and public sidewalk were required to be installed along the full street frontage of the property immediately to the north (39 IE IICB Lot #1100) of the subject property. These improvements were to be consistent with Ashland's Local Street Standards and allow for a smooth transition to the adjoining sidewalk network. The applicants propose to provide these improvements as part of the first phase of development of the property as well. The conditions of approval proposed below include modifications to allow for submittal of the final engineered drawings for review and approval with the building permits, and completion prior to the issuance of an occupancy permit. Right- Turn Only Lane at Ashland Street Intersection A right-turn only lane on southbound Clay Street at Ashland Street was required to be engineered and installed. The design was to include widening ofthe pavement width at the intersection; the installation of curb, gutter and storm drainage facilities if applicable; and sidewalks from the Clay Street/Ashland Street intersection to and through the bend (i.e. elbow) in Clay Street to the existing curb and sidewalk on the west side. As part of the proposed modifications to the project phasing, the applicants have proposed some revisions to these required improvements. With the recent development approval for 2200 Ashland Street, the Oregon Department of Transportation (ODOT) has indicated that a median is necessary within the Ashland Street right-of-way to limit left turn movements both from the 2200 Ashland Street site and from southbound Clay Street in order to address sight- distance concerns. While the Planning Commission did not require median installation as a condition of the 2200 Ashland Street approval, the Ashland Street right-of-way is an ODOT facility, and the Planning Commission decision recognized that a median might be required through the ODOT permitting process. Because the need for a right-turn only lane would be eliminated by the installation of a median restricting left-turns at this location, the applicants propose to delay installation ofthe widening improvements for a right-turn only lane until the first certificate of occupancy for the development of Lot #2, with the remaining improvements including curb, gutter, storm drainage, and sidewalks to be defelTed until the development of Lot # 1, with the understanding that the improvements for the right- Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 10 of 18 turn only lane would not be required if a median were installed prior to this time. The application explains that these requirements were imposed based on a traffic impact analysis of the potential build-out of the site to its maximum allowable density of approximately 130 units. As proposed, the current application is to build only 60 units with a remaining 47 units (for a total of 107) to be built-out with completion of a second phase. The application explains that the 660-feet of new sidewalk, planting strip, curbs, and gutters along the subject property's frontage and 330 additional feet of improvements along the neighboring property to the north's frontage, a continuous sidewalk system on Clay Street will be provided from Dollarhide Way to Ashland Street. The submittal concludes that the current development represents only 56 percent of the approved density and only 46 percent of that originally considered in the traffic impact analysis, and as such argues that the proposal to defer installation of the remaining approximately 350-feet of improvements until the later phase is more than equitable. Staff concurs with this assessment. Internal Street Improvements All new public streets within the development were required to be improved to Ashland's Local Street Standards, with a minimum street width of 22 feet at intersections and a minimum width of 26-28 feet when accommodating on-street parking on both sides of the street. The application proposes to comply with these standards through the installation of half-street improvements within a proposed 52- foot right-of-way width during the first phase, with the remainder of the improvements to be completed with development of Lot # 1. A connection to McCall Drive was proposed in the Willowbrook application, and while it was not a specifically conditioned requirement of the approval a connection has been identified over Lot #1 to show how this routing could be integrated into the internal street network of the subject property with the development of Lot #1. While not a requirement of the Willowbrook approval or a proposal within the current application, recent applications have recognized the need for an east-west street connection from Clay Street to Tolman Creek Road. As such, the application proposes to preserve a 20- foot wide strip ofland along the subject property's northernmost boundary in City-ownership to partially accommodate a street connection if that were the route chosen and built-out with future development. City ownership of Lot #1 also preserves the future option to provide an east-west street connection by extending the east-west street segment proposed to be installed by the Housing Authority. C. Tree Removal Permit As noted above, the Willowbrook Subdivision proposal included removal of eight of the subject property's 30 trees. One of the large poplar trees which was previously to have been retained, identified as Tree #3 in the Willowbrook submittals, was removed with a tree removal permit after portions of its canopy split and fell endangering adjacent homes. With the modifi cations proposed herein, twelve of the site's remaining trees are proposed for removal. Two of the 12 trees, an eight-inch d.b.h. almond (prunus dulcis) identified as #24 Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 11 of 18 and a 12-inch d.b.h. black locust (robinia pseudoacacia) identified as #18 are now dead according to the proj ect arborist' s assessment. The other ten are proposed for removal due to their locations relative to proposed road and sidewalk construction. Of these, the tree identified as Tree #17, a 40-inch d.b.h. poplar that is proposed for removal to accommodate the placement ofthe new east/west street, is by far the most significant. An even larger 70- inch poplar identified as #15 and located approximately 50-feet south is to be preserved and protected. The application materials provided note that alternative site designs were considered, but that the current proposal was ultimately reached due to the configuration ofthe property, access management standards, and required minimum density. It goes on to explain that while no tree removals are requested on a hazard basis, that it should be noted that poplars are very prone to limb breakage which is a concern here given their size and the significant limb breakage encountered with the tree removed in 2006. Staff would also note that poplars are generally prohibited as City street trees for these reasons. The submittal concludes that based on the project's arborist's assessment, the proposed removals will not have significant negative impacts on erosion, soil stability, flow of surface waters, protection of adjacent trees or windbreaks, and adds that more than 12 trees are to be planted to mitigate the impacts of the proposed removals. D. Exception to Street Standards The original staff report for the Willowbrook Subdivision explained that this was a relatively minor exception to the City Street Standards in order to permit the installation of a small segment of curbside sidewalk along Clay Street to retain an existing, l8-inch diameter at breast height (d.b.h.) cedar tree. At that time, staff expressed support for the requested Exception, noting that the location, size and health of the tree presented a clear difficulty to complying with City street standards and that the proposed Exception would not compromise the use of the public sidewalk given the relatively small adjustment in sidewalk configuration. The Exception was ultimately approved by the Planning Commission, and both the request and the circumstances underlying the previous approval remain unchanged in the current application. III. Procedural - ReQuired Burden of Proof The criteria for preliminary approval of a Land Partition are described in AMC 18.76.050 as follows: A. The future use for urban purposes of the remainder of the tract will not be impeded. B. The development of the remainder of any adjoining land or access thereto will not be impeded. C. The tract of land has not been partitioned for 12 months. D. The partitioning is not in conflict with any law, ordinance or resolution applicable to the land. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 12of18 E. The partitioning is in accordance with the design and street standards contained in the Chapter 18.88, Performance Standards Options. F. When there exists adequate public facilities, or proof that such facilities can be provided, as determined by the Public Works Director and specified by City documents, for water, sanitary sewers, storm sewer, and electricity. G. When there exists a 20-foot wide access along the entire street frontage of the parcel to the nearest fully improved collector or arterial street, as designated in the Comprehensive Plan. Such access shall be improved with an asphaltic concrete pavement designed for the use of the proposed street. The minimum width of the street shall be 20-feet with all work done under permit of the Public Works Department. 1. The Public Works Director may allow an unpaved street for access for a minor land partition when all of the following conditions exist: a. The unpaved street is at least 20-feet wide to the nearest fully improved collector or arterial street. b. The centerline grade on any portion of the unpaved street does not exceed ten percent. 2. Should the partition be on an unpaved street and paving is not required, the applicant shall agree to participate in the costs and to waive the rights of the owner of the subject property to remonstrate both with respect to the owners agreeing to participate in the cost of full street improvements and to not remonstrate to the formation of a local improvement district to cover such improvements and costs thereof Full street improvements shall include paving, curb, gutter, sidewalks and the undergrounding of utilities. This requirement shall be precedent to the signing of the final survey plat, and if the owner declines to so agree, then the application shall be denied. H. Where an alley exists adjacent to the partition, access may be required to be provided from the alley and prohibited from the street. The criteria for Site Review approval are described in AMC 18.72.070 as follows: A. All applicable City ordinances have been met or will be met by the proposed development. B. All requirements of the Site Review Chapter have been met or will be met. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. D. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88, Performance Standards Options. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 13 of 18 The criteria for Tree Removal Permits are described in AMC 18.61.080 as follows: A. Hazard Tree: The Staff Advisor shall issue a tree removal permit for a hazard tree if the applicant demonstrates that a tree is a hazard and warrants removal. 1. A hazard tree is a tree that is physically damaged to the degree that it is clear that it is likely to fall and injure persons or property. A hazard tree may also include a tree that is located within public rights of way and is causing damage to existing public or private facilities or services and such facilities or services cannot be relocated or the damage alleviated. The applicant must demonstrate that the condition or location of the tree presents a clear public safety hazard or a foreseeable danger of property damage to an existing structure and such hazard or danger cannot reasonably be alleviated by treatment or pruning. 2. The City may require the applicant to mitigate for the removal of each hazard tree pursuant to AMC 18.61.084. Such mitigation requirements shall be a condition of approval of the permit. B. Tree that is Not a Hazard: The City shall issue a tree removal permit for a tree that is not a hazard if the applicant demonstrates all of the following: 1. The tree is proposed for removal in order to permit the application to be consistent with other applicable Ashland Land Use Ordinance requirements and standards, including but not limited to applicable Site Design and Use Standards and Physical and Environmental Constraints. The Staff Advisor may require the building footprint of the development to be staked to allow for accurate verification of the permit application; and 2. Removal of the tree will not have a significant negative impact on erosion, soil stability, flow of surface waters, protection of adjacent trees, or existing windbreaks; and 3. Removal of the tree will not have a significant negative impact on the tree densities, sizes, canopies, and species diversity within 200 feet of the subject property. The City shall grant an exception to this criterion when alternatives to the tree removal have been considered and no reasonable alternative exists to allow the property to be used as permitted in the zone. Nothing in this section shall require that the residential density be reduced below the permitted density allowed by the zone. In making this determination, the City may consider alternative site plans or placement of structures or alternate landscaping designs that would lessen the impact on trees, so long as the alternatives continue to comply with other provisions of the Ashland Land Use Ordinance. 4. The City shall require the applicant to mitigate for the removal of each tree granted approval pursuant to AMC 18.61.084. Such mitigation requirements shall be a condition of approval of the permit. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 14of18 IV. Conclusions and Recommendations Overall, staff believe that the proposed modifications and changes to the phasing of the previously approved Planning Actions #2004-00141 and #2007 -00802 for the Willowbrook Subdivision to allow a Land Partition creating three lots and Site Review to construct a 60- unit multi-family residential development, and tree removal permit to remove 12 trees are consistent with the applicable approval criteria and with the original requirements attached to the Willowbrook approval. From staff's perspective, the Housing Authority and their design team merit recognition not only for their willingness to partner with the City to bring this project forward, but also for their willingness to incorporate Ashland's site design standards into the project and to integrate the adjacent wetlands with the open space and landscaping of the project to greatly benefit the livability of the Snowbeny Brook development. The palinership with the Housing Authority and the proposed modifications to the Willowbrook Subdivision's approval represent a true win-win situation for the City in addressing the transportation infrastructure needs and minimum density requirements of the annexation while enhancing and protecting a locally-significant wetland and providing 60-units of much needed affordable housing where only 17 units were previously to have been provided. With this in mind, staff would strongly recommend approval of the application with the following conditions attached: 1) That all proposals of the applicant shall be conditions of approval unless otherwise modified herein. 2) That prior to any disturbance occurring on the site or the issuance of a building, excavation or demolition permit, a Tree Verification Pem1it shall be obtained. Required tree protection measures detailed in AMC 18.61.200 shall be installed, inspected and approved by the Staff Advisor prior to any development activities, including, but not limited to clearing, grading, excavation or demolition work, or storage of materials, and shall be removed only after completion of all construction activity, including landscaping and ilTigation installation. An agreement shall be recorded requiring the remaining poplar situated at the southwest comer of the site to be protected and preserved in accordance with the approved Tree Protection/Tree Removal Plan (Applicant's Exhibit L-1.0). Any modifications or amendments to the plan would be processed through a Tree Removal Permit procedure. The southwest comer of the property as delineated on the Tree Protection/Tree Removal Plan (Applicant's Exhibit L-1) would not be covered by Exempt Tree Removal Activities, Section 18.61.040.C as described in the Land Use Ordinance. 3) That the Housing Authority of Jackson County shall obtain a Demolition/Relocation Review Permit if deemed necessary by the Building Official prior to the removal of any structures necessary to complete the proposed road construction as required in Section 3d of the Clay Street Intergovernmental Agreement. 4) That prior to signature of the final survey plat: a) A preliminary utility plan for the project be reviewed by the Engineering, Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 15of18 Electtic, Building and Planning Divisions prior to signature of the final survey plat. The final utility plan for the project shall be reviewed and approved by the Engineering Division and Building Division at the time of building permit submittals. The utility plan shall include the location of connections to all public facilities in and adjacent to the development, including the locations of water lines and meter sizes, sewer mains and services, manholes and clean-outs, storm drainage pipes and catch basins. b) The identification, relocation and piping of existing irrigation facilities shall be addressed at the time of final plat submittal, and shall be finalized with the building pelmit submittals. The design, relocation and installation of irrigation system shall be reviewed and approved by the Talent Irrigation District prior to the City of Ashland approval of the final engineering construction documents. The irrigation facilities shall be installed as part of the overall public infrastructure requirements. c) The engineering design of all on-site storm water detention systems (i.e. wetland/detention system) shall be reviewed prior to signature of the final plat and approved by the Public Works Department, Building Official and Staff Advisor at the time of Building Permit submittals, the commencement of public infrastructure installation or the issuance of an excavation permit. The design of the wetland/detention shall incorporate required pollution control systems (if applicable), while the discharge shall be designed so as not to significantly increase the volume of runoff beyond pre-development amounts on the property to the north. The pennanent maintenance of on-site storm water detention systems must be addressed in a manner approved by the Public Works Depmiment and Building Division, and a preliminary operations and maintenance plan provided for review with the final survey plat. d) The requirements of the Ashland Fire Department, including approved addressing and directional signage; fire fighter access; fire apparatus access including improvements, turn-around, angle of approach, necessary easements and signage; fire flow; and hydrant installation shall be clearly addressed in the preliminary utility plans. Final engineered construction drawings shall be reviewed and approved by the Ashland Fire Department at the time of building permit submittal. 5) That building permit submittals shall include: a) The applicant shall submit an electric disttibution plan including load calculations and locations of all primary and secondary services including transformers, cabinets and all other necessary equipment. This plan must be reviewed and approved by the Electric Depmiment prior to building permit submittal. Transformers and cabinets shall be located in areas least visible from streets, while considering the access needs ofthe Electric Department. b) That the engineering construction drawings for Clay Street comply with City of Ashland Local Street Standards. Clay Street shall be improved along the entire frontage ofthe property. Improvements to Clay Street shall consistent approximately with the following standards: 28 feet of pavement overlay width (includes two travel lanes and an approximately six-foot bike lane), Planning Action PA #2009-00043 Applicant: Housing Authority 01 Jackson County/City 01 Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 160118 curb and gutter, storm drains, 712-foot planting strip and a six-foot wide public sidewalk. The civil plans shall include profiles and cross sections, with erosion control and slope stability methodologies installed consistent with the standards contained in AMC l8.62.080B. c) Engineered designs for a right-turn only lane on southbound Clay Street at Ashland Street shall be provided at the time of building permit submittals. These engineered designs shall include the widening of pavement width at the intersection; installation of curb and gutter, storm drain facilities (if applicable) and sidewalks from the Clay Street/Ashland Street intersection to and through the bend (i.e. elbow) in Clay street to the existing curb and sidewalk on the west installed as part of the overall public infrastructure requirements for the subdivision. Widening improvements for the right-turn only lane may be deferred until issuance of a Certificate of Occupancy Permit with all other improvements noted herein to be deferred until Lot #1 is developed. Widening improvements for the right-turn lane shall not be required to be completed if a median on Ashland Street is installed prohibiting east bound (left) turning movements from Clay Street onto Ashland Street (Highway 66) prior to the issuance of the first Certificate of Occupancy. d) The recommendations of the Ashland Tree Commission noted at their February 5,2009 meeting, where consistent with Ashland's Site Design and Use Standards and Tree Preservation Ordinance and with final approval by the Staff Advisor, shall be incorporated into a revised Landscaping Plan (if applicable) prior to building permit submittal. The recommendations shall be included on a revised landscaping plan and final irrigation plan at the time of submission of building permit. e) That refuse and recycling facilities shall be identified in conjunction with the design of each building and in accordance with the standards described in Section 18.72.115 of the Ashland Land Use Ordinance prior to issuance of a building permit, and shall be installed according to approved plans, inspected and approved by the Staff Advisor prior to the issuance of a Certificate of Occupancy. f) That the color, texture, dimensions, shape and building materials for all exterior components of the proj ect be included at the time of submission of building permit. The information shall be consistent with the colors, texture, dimensions and shape of materials and building materials proposed and approved as part of the land use application. g) That required bicycle parking shall be identified on plans submitted at the time of building permit review. The bicycle parking shall be designed and installed consistent with the standards described in 18.92.040 and shall be inspected and approved by the Staff Advisor prior to the issuance of a Certificate of Occupancy. ' h) That specifications for all exterior lighting fixtures shall be included at the time of submission ofthe building permit. Exterior lighting shall be directed on the property and shall not directly illuminate adjacent proprieties. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 17 of 18 6) That prior to the issuance of a building permit: a) That the engineered construction drawings for all new public streets within the project shall comply with City of Ashland Local Street Standards. The minimum street width shall be no less than 22 feet in width at intersections (unless permitted by the Ashland Fire Department), and a minimum width of 26 to 28 feet when accommodating on-street parking on both sides of the street. Plans to include profiles and cross-sections, with erosion control and slope stability methodologies installed consistent with the standards contained in AMC l8.62.080B. b) The applicants shall submit a wetland delineation and wetland mitigation/enhancement plan that has been reviewed and approved by the Oregon Division of State Lands and the Engineering, Building and Planning Divisions. Such plans shall include civil engineering specifications for any water detention, water treatment and water distribution. c) That prior to issuance of a Building Pelmit, the Housing Authority of Jackson County shall record deed restrictions in accordance with the City of Ashland's Affordable Housing Standards. 7) That prior to the issuance of a certificate of occupancy, a "half-street" improvement including curb and gutter, storm drain facilities, planting strip and public sidewalk shall be installed along the street frontage of the neighboring property to the north (39 1 E 11 CB, #1100). The design of these improvements shall be consistent with Ashland's Local Street Standards, allow for a smooth transition to the adjoining sidewalk network and be provided prior to issuance of a Certificate of Occupancy Permit. Such improvements shall be installed as part of the overall public infrastructure requirements for the project. 8) At the time that Lot # 1 is developed, engineered construction drawings for the project addressing the design and installation of public multi-use pathways, fence and gates from the subject property to the City of Ashland Parks! Ashland Family YMCA Soccer Fields shall be provided. The design of any multi-use pathways shall be in accord with City Local Street Standards, reviewed by the Director of the Ashland Parks Department, and approved by the Staff Advisor prior the installation of improvements associated with the development of Lot #1. That the development and surfacing (i.e. all weather surface) of the multi-use pathway at the south boundary of the project be extended through the existing easement on the adjoining parcel to the south (tax lots #200 and 201). A design for the pathway shall be submitted at the time of any Building Permit approval for Lot #1 and installed as pati of the lot's public infrastructure. 9) That the owner of Lot #1 shall remain responsible for the pruning and continual monitoring of the remaining poplar tree. The owner of Lot #2 shall be responsible for the maintenance of their storm water detention facilities, including for bio-swales to be installed in the Clay Street park row planting strip. Planning Action PA #2009-00043 Applicant: Housing Authority of Jackson County/City of Ashland Ashland Planning Department - "Snowberry Brook" Staff Report.dds Page 18 of 18 ~I i i I i I i i i i i 1 i 1 I 1 1 i 1 I i ~! ,,1 1 '<, I 1 , , 1 i 1 i 1 i i I 1 , i i I I 1 , i i i 1 i i i i 1 i 1 jg ,> 1~ !fi In ~i~ 1 1 ~I Sil t>j' "31 1 I 1 i i i i i I 1 i I I 1 1 i Pn.l!-'osed Site Layout for 380 Clay Street 24~,~' N8S" i&' 1iZ'"W --\ ! , ! i I (l -4 -{ ~. 0 " ~ l> u> I"J I r l> z \J , I I~ 0 ,~ (l LC ,., J>u> I -I &~". ~4' 4!"UJ (l- ~ -{ 111.iZI;Z!' 71Z , S' I u>G\ I 0 Ol> " -1 , #: zc , l> # -4 (lI ,... u> I t-,) 00 r c;;o l> Z- -4-4 Z -{-{ \J & 0 \l " ~ i I I I I : ~- -------------- -- A2".OO'--Ne,ff~;'4i=E-----------------~ '" ~ ~ ~ ~ E - --- ~ <$ ~2 ~ ~~ m . r I> -j o c -< -n o '" IJl o I> r I> -j (f> -< H:i~ WH ,ii!lf K~. "'!,. ~ .ml! ~ l'I8iH) ~~~;ii 1~ ~i~! i ,,11 ~ J 'iWI '.1: I, 0 . o ~ -. ~~~ ~h;~ \ =:i'"12;, .A, ~~; : ~)( 2 ~;~ l>n u>_ I-4 r-{ l>o z" \J 1/ $ag''s2'5S0( ----- 1'189,7".'12-( 21 \.9~ .;_"u SNOWBERRY BROOK RESIDENTIAL HOUSING An affordable housing development for the Housing Authority of Jackson County for 380 Clay Street 4 r TREE REMOVAL PERMIT ADDENDUM 18.61.080 CRITERIA FOR ISSUANCE OF TREE REMOVAL - STAFF PERMIT: An applicant for a Tree Removal-Staff Permit shall demonstrate that the following criteria are satisfied. The Staff Advisor may require an arborist's report to substantiate the criteria for a permit. As noted, the proposal is to remove 12 trees of the site's 30 trees. All tree protection measures have been designed by a licensed Arborist and Landscape Architect. The Tree Protection Plan notes that all tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042. In addition, during construction the site will be monitored by the project arborist. It should be noted the site's trees, specifically the large Poplar Trees, were evaluated previously by two certified Arborists, John Galbraith and Tom Myers. Each had ditlering opinions as to their ability to survive a development. However, it should be clear each evaluated the trees under different plan configurations with one having housing directly adjacent to the trees and the other no development near the trees (adopted plan). The current plan is somewhat of a hybrid of the previous two plans with only one Poplar Tree being removed. This plan has been evaluated and guided under the direction of a third Arborist, Laurie Sager & Associates. The criteria for a Tree Removal Permit are as follows: A. Hazard Tree: The Staff Advisor shall issue a tree removal permit for a hazard tree if the applicant demonstrates that a tree is a hazard and warrants removal. None of the trees within the proposed project to be removed are being removed because they are falling down, leaning or breaking and none appear to be obviously hazardous even though since the original two Arborist reports were completed in 2005, two of the trees have died and one of the large Poplar Trees' limbs broke off in 2006 and nearly crushed the adjacent house to the south at 400 Clay Street (see attached photos). The rest of the tree was removed by Tom Myers, Upper-Limb-It Tree Service under an Emergency Tree Removal Permit. An attached letter from Mr. Meyers, states that evidence revealed the tree was rotting within. Obviously, during the initial two Arborists' investigations, no exterior evidence was found which is obviously a major consideration, especially when combined with the fact Poplar Tree species are highly "intolerant", subject to wind-throw and trunk failure. In summary, considering the size of Tree #17, it's species limited tolerance level, it's age and the recent collapse of a sister tree, the applicants contend the tree is very likely to be a hazardous tree in the near future. Regardless, all of the trees proposed to be removed, including the Tree #17, are being removed in order to develop the property in accordance with the project's transportation needs, the City's Site Design Standards and the City's minimum density standards as permitted under AMC 18.61.080 B, below. Again, two of the trees proposed to be removed are dead (Trees #18 and #24) and a majority of the trees to be removed are within the Clay Street right-of-way where sidewalks and parkrows are proposed. And, none of these trees are appropriate street trees. B. Tree that is Not a Hazard: The City shall issue a tree removal permit for a tree that is not a hazard if the applicant demonstrates all of the following: 1. The tree is proposed for removal in order to permit the application to be consistent with other applicable Ashland Land Use Ordinance requirements and standards. (e.g. other applicable Site Design and Use Standards). The Staff Advisor may require the building footprint of the development to be staked to allow for accurate verification of the permit application; and All of the trees to be removed are due to their location within a planned street or sidewalk system that is required by the Land Use Ordinance or Site Design and Use Standards. Alternative design configurations were considered in an attempt to minimize tree loss, but the alternatives proved to be inconsistent with applicable land use codes and standards. One of the alternatives showed the road extending through the center of the multi-family portion of the property (Lot #2) with tenant housing "under the tree", This was determined to be not only dangerous but also physically impossible as large limbs (36") would be required to be removed causing trauma and likely killing the tree. Another scenario had the site's open space and common area near the tree, but again the common area's structure and play area would have been directly under the tree causing not only the tree's limb to be removed, but creating a hazardous situation for the tenants (children) under the tree. This scenario also caused the project's required open space to be less than the required 8% and on two parcels. Finally, the alternative design showed an eventual need for additional streets and caused access management issues that are in direct conflict with the City's Transportation standards and policies. 2. Removal of the tree will not have a significant negative impact on erosion, soil stability, flow of surface waters, protection of adjacent trees, or existing windbreaks; and Removal of the trees will not have a significant impact on erosion as the trees to be removed are on minimal sloping lands. According to the project Arborist, the removal of the trees will not have a negative impact on erosion, soil stability and flow of surface waters. However, the removal of Tree #17 may have an impact on the remaining Poplar tree as it appears to provide some level of wind protection. The project Arborist contends this may be minimal due to the tree's open canopy structure, but recommends professional pruning at the time of disturbance in order to mitigate impact. 3. Removal of the tree will not have a significant negative impact on the tree densities, sizes, canopies, and species diversity within 200 feet of the subject prop~~ .. 4 r-..'. - Removal of the tree will not have a significant negative impact on the tree densities, sizes, canopies, and species diversity within 200 feet of the subject property. Again, all of the subject trees have been assessed by the project's arborist who has also chosen the replacement trees. The City shall grant an exception to this criterion when alternatives to the tree removal have been considered and no reasonable alternative exists to allow the property to be used as permitted in the zone. Nothing in this section shall require that the residential density be reduced below the permitted density allowed by the zone. In making this determination, the City may consider alternative site plans or placement of structures or alternate landscaping designs that would lessen the impact on trees, so long as the alternatives continue to comply with other provisions of the Ashland Land Use Ordinance. In regards to the Street Exception request, no exceptions are proposed with this application other than the street exception to meander a sidewalk away from a 24" d.b.h. Cedar tree. Further, the applicants have explored alternative designs, but due to the physical constraints of the property, configuration of the property, access management standards, and the minimum density standards required in the zone, the proposed plan was chosen. Again, all of the trees to be removed are due to their location within a planned street or sidewalk system required by the City's Land Use Ordinance or Site Design and Use Standards. Alternative design configurations were considered in an attempt to minimize tree loss, but the alternatives proved to be inconsistent with applicable land use codes and standards. One of the alternatives showed the road extending through the center of the multi-family portion of the property (Lot #2) with tenant housing "under the tree". This was determined to be not only dangerous but also physically impossible as large 36" diameter limbs 5' from the ground would be required to be removed causing trauma and most likely kill the tree. Another scenario had the site's open space and common area near the tree, but again the common area's structure and play area would have been directly under the tree causing not only the tree's limb to be removed, but creating a hazardous situation for the tenants (children) under the tree. This scenario also caused the project's required open space to be less than the required 8% and on two parcels. Finally, the alternative design showed an eventual need for additional streets and caused access management issues that are in direct conflict with the City's Transportation standards and policies. 4. The City shall require the applicant to mitigate for the removal of each tree granted approval pursuant to AMC 18.61.084. Such mitigation requirements shall be a condition of approval of the permit. The applicants are aware of this provision and are proposing mitigation. 18.61.084 Tree Miti2ation Required An applicant may be required to provide mitigation for any tree approved fQr ~.. J removal. The mitigation requirement shall be satisfied by one or more of the following: A. Replanting on site. The applicant shall plant either a mInImUm 1 ~-inch caliper healthy and well-branched deciduous tree or a 5-6 foot tall evergreen tree for each tree removed. The replanted tree shall be of a species that will eventually equal or exceed the removed tree in size if appropriate for the new location. The tree shall be planted and maintained according to the specifications in the City Tree Planting and Maintenance Guidelines as approved by the City Council. The applicants will mitigate the loss of the 12 trees by planting at least 12 new trees within the project's boundaries. In fact, the landscape plans show significantly more trees that the required minimum. B. Replanting off site. If in the City's determination there is insufficient available space on the subject property, the replanting required in subsection A shall occur on other property in the applicant's ownership or control within the City, in an open space tract that is part of the same subdivision, or in a City owned or dedicated open space or park. Such mitigation planting is subject to the approval of the authorized property owners. If planting on City owned or dedicated property, the City may specify the species and size of the tree. Nothing in this section shall be construed as an obligation of the City to allow trees to be planted on City owned or dedicated property. The applicants are aware of this standard and if determined to be necessary, the applicants will comply. C. Payment in lieu of planting. If in the City's determination no feasible alternative exists to plant the required mitigation, the applicant shall pay into the tree account an amount as established by resolution of the City Council. The applicants are aware of this standard and if determined to be necessary, the applicants will comply. 18.61.200 TREE PROTECTION Tree Protection as required by this section is applicable to any planning action or building permit. A Tree Protection Plan has been submitted as part of the application in order to protect the trees planned to be preserved as well as the site's neighboring trees. All tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042. No development activities, including, but not limited to clearing, grading, excavation or demolition work will occur without the protection measures in place. Protection measures will only be removed after completion of all construction activity, including landscaping and irrigation installation. Furthermore, the project Arborist suggests the remaining Poplar tree be pruned prior to site disturbance and have secure protection fencing (chain-link) around it's perimeter in order to prevent a dangerous situation from occurring. The fencing should remain in perpetuity until the tree is removed or some other form of fencing occurs. ^~f~'nt, ,-,,,,1' 380 Clay Street 2006 Collapse of Poplar Tree (40" D.B.H.) ( ho~?s) lRr....1 18 Looking east (house at 380 Clay Street): The driveway has been engulfed by a "single" limb of the Poplar Tree that has since been removed (photo 10/12/06). ~<. ,.. .0':0 :':' -, .~. ".'7!1t Looking northeast: The photo shows an approximate 36" branch extending approximately 40' from tree's trunk. Looking west towards Clay Street ~..; . ~ " r,. :.u ..-::nt Looking south towards 440 Clay Street NOTE: The pictures herein do not demonstrate the miraculous circumstance that "saved" the house at 440 Clay Street. In reality, there was a secondary limb (not shown) that held-up the limb and kept it from crushing the house. ~:.; . . L) ,-. 1....,. ", :'.:(,nt Upper Limb-it Tree Service PO Box 881 Ashland, OR 97520 Phone: 541-482-3667 Attn: Mark Knox Urban Development Services 320 E. Main Su.202 Ashland, OR 97520 October 13, 2006 Tree Report for 380 Clay 51. The 40-inch DBH Black Cottonwood tree at the entry of 380 clay street (tree #3 in the tree inventory) is in hazardous condition and is presenting a hazard to the public. A major scaffold limb broke and fell on the neighboring property. The damage done to the trunk by the breakage has rendered the trunk structurally unsound. The break of the scaffold limb revealed a rotten point in the trunk where the limb was attached. The resulting wound to the trunk combined with the rot make it certain that the top will break causing further damage to surrounding property unless the tree is removed immediately. There are no remedial measures that can be taken to save this tree. It should be removed immediately. . If you have any questions regarding this report please call me at 482-3667. Tom Myers, Certified Arborist DBA Upper Limb-it .. ) . -,., JAN/30/2009/FRI 14: 12 JACKSON COUNTY ROADS FAX No. 541 774 6295 P.001/001 Roads Engineering -t,~ %::~ ,=~:;:..",.,:_.", , -~...tA_-- ~=;~l , ! m-.1-~''''' .,. ... .' - f:" "",.,- .>-" '., ....<~.._".._J............. JACKSON COUNTY Roads Russ Logue Const/'UctiOIl M(lJlt:lger 200 Antelope Roed White City, OR 97503 Phone: (541) 774-6255 Fax; (541) 774.-6.29$ loguera@jacksoncol.Jf\ly,org January 27,2009 VfflW .jacksoncou nty.org Ashland Planning Department City Hall 51 Winburn Way Ashland, OR 97520 RE: Development off Clay Street - a county-maintained road. Planning File: 2009-00043 Dear Planner: Thank you for the opportunity to comment on the request for modifications and change to the phasing of the previously approved Planning Actions #2004-00141 and 2007-00802 forthe Wilfowbrook Subdivision to allow a Land Partition creating .three lots and Site Review to construct a 60-unit multi-family residential development for the property located at 380 Clay Street. Jackson County Roads has the following comments: 1. The applicant needs to submit construction plans to Jackson County Roads, so we may determine if county permits will be required. Road approaches from Clay Street shall be completed under permits from Jackson County Roads. Additionally, any work within the county's 60-foot right-of-way shall be under a permit from this department. . 2. The development of the property will require access from Clay Street. We recommend that half street road frontage improvements be requir6c:l(road widening, curb, gutter, sidewalk, and bike lane) as a condition for the development. 3. If additional right-of-way is required for the improvements, dedication should be required. City of Ashland standards may be utilized for road improvement if the City agrees, in writing, to future maintenance of the urban improvements. . 4. If county storm drainage facilities are utilized, Jackson County Roads would like a copy of the City approved hydrauHc report including the calculations and drainage plan. Capacity improvements or on site detention, If necessary, shall be installed at the expense of the applicant. Upon completion of the project, the developer's engineer shall certffy that construction of the drainage system was completed per plan and a copy of the certification shall be sent to Jackson County Roads. If you have any questions or need further information feel free to call me at 774-6255. ."'''lJ ;t'e ~ ,;", I ;\Engineering\Oevelopment\CITI ES\ASHl.AND\2009-00043.doc ,'" .;,; e,.... " .:.,;n":~ CITY OF ASHLAND PLANNING APPLICATION SNOWBERRY BROOK RESIDENTIAL HOUSING An affordable housing development for the Housing Authority of Jackson County for 380 Clay Street PROPOSAL: This planning application proposal is for five land use entitlements for the 9.63-acre parcel off Clay Street formally known as the Willowbrook Subdivision: . a 3-10t Land Partition (modified from a 53 lot subdivision); . a Site Review Pennit modification of Planning Action #2004-141 to construct 60 multi- family units (modified from 117 units); . Amendment to certain Conditions of Planning Action #2004-141; and . a Tree Removal Permit modification of Planning Action #2004-141 to remove 12 trees greater than 6" d.b.h. (modified from eight trees) . an exception to the City Street Standards to allow a portion of the sidewalk along Clay Street to meander around a Cedar tree located in the southwest comer of the property (unchanged from Planning Action #2004-141). PROJECT INFORMATION: APPLICANTS: Housing Authority of Jackson County 2251 Table Rock Road Medford, OR 97501 LAND USE PLANNING: Urban Development Services, LLC 485 W. Nevada Street Ashland, OR 97520 Tel: 541-482-3334 LANDSCAPE ARCHITECT: Laurie Sager & Associates, Inc. 700 Mistletoe Road, Suite 201 Ashland, OR 97520 Tel: 541-488-1446 CIVIL ENGINEERING: Construction Engineering Consultants P.O. Box 1724 Medford, Oregon 97501 Tel: 541-779-5268 SURVEYOR: LJ. Friar & Associates 816 W. 8th Street Medford, Oregon 97501 Tel: 541-482-5009 OWNER: City of Ashland 20 E. Main Street Ashland, OR 97520 OWNER: Housing Authority of Jackson County 2251 Table Rock Road Medford, OR 97501 DRAFTING & DESIGN Daniel R. Horton 169 W. Main Street Eagle Point, OR 97524 Tel: 541-830-1014 ARBORIST: Laurie Sager & Associates, Inc. 700 Mistletoe Road, Suite 201 Ashland, OR 97520 Tel: 541-488-1446 WETLAND BIOLOGIST: Agate Engineering 1175 East Main Street Medford, OR 97501 Tel: 541-282-7930 .... .) N 1 r .'-"'nt ADDRESS & TAX LOT: 380 Clay Street Assessor's Map 39lE llC, Tax Lot 2500 ZONING & COMPREHENSIVE PLAN DESIGNATION: R-2; Multi-Residential HISTORY: In June and July of 2005, the Ashland Planning Commission unanimously approved and issued their Findings of Fact for the Subdivision's Outline Plan, Site Review Permit, a Tree Removal Pelmit and Exception to Street Standards. At that time, the Planning Commission also forwarded to the Ashland City Council their recommendation for Annexation, Comprehensive Plan and Zone Map amendments (PA-2004-141). In March and June of 2006, the Ashland City Council approved and issued their Findings of Fact on the Annexation, Comprehensive and Zone Map amendments (PA-2004-141). In October 2006, a request for a one year extension was granted for the subdivision's Outline Plan, Site Review Permit, Tree Removal Permit and Exception to Street Standards (P A-2006- 02009). In July 2007, a request for a one year extension was granted for the subdivision's Outline Plan, Site Review Permit, Tree Removal Pelmit and Exception to Street Standards (P A-2007- 01229). In July 2008, a request for a one year extension was granted for the subdivision's Final Plan, Site Review Permit, Tree Removal Pelmit and Exception to Street Standards (P A-2008- 01060). In November 2008, the Ashland City Council and the Housing Authority of Jackson County agreed to acquire the property for the purpose of affordable housing and park land. INTRODUCTION: The subject property is located at 380 Clay Street, immediately adjacent to the YMCA soccer fields - between Ashland Street and East Main Streets. The property was recently annexed into the City and concurrently received approval for a 53-lot subdivision, 117 (reduced to 107 units with Final Plan application) single and multi-family units, a tree removal permit and an exception to the street standards for a meandering sidewalk adjacent to a tree (Planning Action 2004-141). Of the Oliginal 107 units, 17 units were to be affordable and the remaining market rate. The developer had finalized his financing, completed all of the Home Owner's Association documents, generated all of the civil engineering documents and was preparing to start construction. In November of 2008, the City of Ashland and the Housing Authority of Jackson County agreed to purchase the property in order to develop portions of the property for affordable housing, additional park land or both. As noted, the applicants are proposing five land use entitlements and modifications to the original approval which include: . a 3-lot Land Partition (modified from a 53 lot subdivision); 2 . a Site Review Pennit modification of Planning Action #2004-141 to construct 60 multi- family units (modified from 117 units); . Amendment to certain Conditions of Planning Action #2004-141; and . a Tree Removal Pelmit modification of Planning Action #2004-141 to remove 12 trees greater than 6" d.b.h. (modified from eight trees) . an exception to the City's Street Sandards to allow a portion of the sidewalk along Clay Street to meander around a Cedar tree located in the southwest corner of the property (unchanged from Planning Action #2004-141). PARTITION: Lot #1: Lot #1 is 5.63 acres in area with an average slope of approximately 3%. The parcel includes the property's .83 acres of wetlands, a future road right-of-way along the nOlihern property line, a large portion of land adjacent to the YMCA soccer fields, the existing farm house and accessory buildings and virtually all of the sites trees. The parcel is oddly shaped and will be a remainder parcel (undeveloped) until the property is developed into public park lands, additional housing or a combination thereof. Lot #2: Lot #2 is 4.00 acres in area with an average slope of approximately 3%. The parcel is "L" shaped and incorporates the proposed housing area, off-street parking area, common spaces, play areas and new streets. Lot #2 will be owned and maintained by the Housing Authority of Jackson County. SITE REVIEW PERMIT: Density: The propeliy is zoned R-2 with a base density of 13.5 units an acre. The subject parcel is 4 acres in size allowing up to 54 units with an additional 6 units being added via density bonus provisions. In this case, all of the 60 units are to be affordable rental units allowing for an additional density of25% (18.106.030 G.). As such, 67.5 units are allowed because of the density bonus, but only 60 units are proposed with this application. Note: Due to the annexation provisions of Chapter 18.88.030 F. the 5.63 acre remainder lot (Lot #1), minus areas of natural constraint, parks or right-of-way, will need to provide 90% of the zones base density when developed. Units: The proposal includes 60 affordable rental units to be owned, maintained and managed by the Housing Authority of Jackson County. The housing sizes and types vary as follows: 12 one-bedroom 665 square foot flats 26 - two-bedroom 948 square foot townhomes 12 - two-bedroom 888 square foot flats lO - three-bedroom 1182 square foot flats 60 units total with 9i8 square feet of average living area per unit Vehicle Parking: The parking requirements and obligations per 18.92.020 and 18.88.060 are as follows: Studio units or I-bedroom units less than 500 sq. fl. --1 space/unit. i-bedroom units 500 sq. fl. or larger--I.50 spaces/unit. 2-bedroom units--i. 75 spaces/unit. 3-bedroom or greater units--2. 00 spaces/unit. + Ion-street space per unit 3 Proposed Unit Types: One-bedroom Two-bedroom (TH) Two-bedroom Three-bedroom Total Required Parking: Total Provided Parking: # of Units 12 26 12 10 Vehicle parking spaces required 18 45.5 21 20 104.5 (105) 110 Bike Parking: The bike parking requirements and obligations per 18.92.040 are as follows: One sheltered space per studio and i-bedroom unit i.5 sheltered spaces per 2-bedroom unit 2.0 sheltered spaces per 3-bedroom unit Proposed Unit Types: One-bedroom Two-bedroom (TH) Two-bedroom Three-bedroom Total Required Bike Parking: Total Provided Bike Parking: # of Units 12 26 12 10 Bike parking spaces required 12 39 18 20 89 92 (sheltered) Architectural Design: The proposed buildings are well miiculated and have a variety of building accents, fluctuations and material changes typically not found in traditional multi- family developments. The incorporation of these elements provides a visual opportunity for not only improved aesthetics, but also individualism. Each group of buildings has multiple rooflines, staggered volumes (porches, wall faces, etc.) and heights to help break-up building mass. Each unit has their own porch or balcony depending on the type of unit. The elevations show a variety of materials being used with shingle siding in the pediments and base, standard siding on the walls, standing seam roofing, and 312 trim around the windows and doors. Furthennore, the unit's porch posts are to 6" X 6" with a wrapped base and when combined with the shingled base, give the units a sense of permanence. All of the units will be painted in emih tone exte110r colors. Building Orientation: The plans show ten sets of building groups ranging from four to six units per group. All of the buildings orient towards the street or the site's wetlands. All parking, other than parallel on-street parking, is to the rear or sides of the building in an attempt to minimize its appearance. Each individual unit has its own sidewalk leading directly to the porch and front door helping to not delineate each unit, but also improving their sense of entry. Common Building and Recreation Area: The proposal includes a neo-craftsman "community" building and recreational "play area" within the center of the project. The community building is attractively designed with multiple fi'onts creating an inviting feel. Each front has a large covered patio with three of the fronts having glass entry doors and windows allowing for a "natural" security by the residents. The project's play area or "tot- lot" includes a play structure commonly found at the elementary schools. Both the 4 community building and play area are delineated by sidewalk or short walls. The overall area of the recreational space and play area is 9% of the project. The project's wetlands are not included in the calculations although they clearly are a visual amenity and include a viewing platform and sidewalks on three sides. Conservation Measures: Although not required by code, the proposed development will comply with either the "Enterprise Green Communities Compliance Path" or the "Earth Advantage Certification Path," but most likely the latter. The specific elements of this project will include at minimum the following: . Energy Star lighting throughout . Upgraded attic insulation to R49 . Upgraded window U value to U.35 or better · Energy Star appliances including: refrigerator, dishwasher, & clothes washer · Energy efficiency / low SEER PTHP and forced air units . Water efficient toilets using 1.6 gals. per flush or less . Low flow shower heads and faucet aerators · Use of engineered wood products where possible . Use of recycled contents in finish flooring · Native trees and plants appropriate to the site and climate to be specified. . Interior paints, adhesives, and sealants to be specified as low or no Voc. · Retention of wetlands. . Metal roofs for "clean" storm water runoff routed directly into adjacent wetlands. . Street, parking and sidewalk storm water run off to be retained and treated biologically via on-site bio-swales. In addition, besides the new sidewalk to be added along the project's Clay Street frontage (units, wetlands and City property), the applicants will be constructing a "significant" amount of off-site sidewalk and street improvements in order to improve the areas limited pedestrian facilities. This includes approximately 330' of sidewalk and curbing along the adjacent County property to the north and an additional 100' of sidewalk and curbing to the south connecting the existing sidewalk leading to Ashland Street. These improvements help facilitate pedestrian movement and keep vehicular trips to a minimum. Considering this property is located within y,; mile (5 minute walk) of retail facilities, professional offices, grocery stores and other services, the reduction in vehicular trips should be realized. No other off-site improvements are proposed other than standard utility and storm water improvements as noted herein. Street Designs: All of the project's streets, as well as Clay Street, will be improved to current City Street Standards. The interior streets are to have a 52' right-of-way and a ~ street improvement with two 10' travel lanes, a 7' parking lane, 8' planting strip and 5'-6" sidewalk. The remaining y,; street improvement (along the edges of Lot #1) will occur when that portion of the property is developed. Along the property's Clay Street frontage the plans show additional paving allowing for two travel lanes and a bike path, 6' sidewalk and a 7' -6" planting ship for street trees. However, the plan also shows the planting strip as a "bio- swale" in an attempt to retain heavy metal particulates from the street's storm runoff prior to release into Bear Creek (see Sheet 6, Agate Engineering plans for details). Although this type of improvement isn't common in Ashland, it's very common in Portland and Eugene in an attempt to biologically reduce pollutants prior to entering major stream corridors. The best 5 local example of this type of bio-swale improvement is within the parking lot of North Mountain Park. Transportation: The Oliginal Traffic Impact Analysis for this site was for 130 single family and multi-family residential units. In that analysis, the findings concluded that three of the four intersections impacted by the project will continue to meet applicable mobility standards but for one - Clay and Ashland Street. In that analysis, it concluded the intersection would meet mobility standards if a dedicated right-hand turn lane was added at the intersection. In this scenario, there would be one in-bound lane, one out-bound left lane and one out-bound right lane. This application continues to agree with the analysis. However, considering the recent discussions involving this intersection and the Coming Attractions Theatres project at 2200 Ashland Street (P A02008-0 1318, Approved December 13th, 2008) and the Oregon Department of Transporiation's position on that application's turning movements onto Ashland Street (a State Highway), there is likely to be a raised median at this intersection which would nullify the need for the additional lane. As such, the applicants are proposing to install the lane's pavement without curbing, but would request the improvement be deferred until the proposed units are initially occupied and not complete the lane's paving if the median is installed prior to occupancy. Under this scenario, a significant amount of asphalt, effort and cost could be avoided as there would be no purpose for an '" additional" turn lane if the median was installed first. Wetlands: The subject property has .83 acres (36,499 sq. ft.) of wetlands located within the northwest comer of the property along Clay Street. As with the previous application, the wetlands are to be retained, slightly modified and expanded in order to improve its functionality and aesthetics. In addition, the wetlands will have a "public" viewing platform from the Clay Street sidewalk as illustrated on the project's landscaping plans and wetland plans. In addition, various types of wetland plants will be added in order to increase its ecological and biological benefits. When complete, the wetlands will have a total area of .93 acres (40,490 sq. ft.) - not including the bio-swale areas noted below which will likely increase the appearance of the wetland by an additional 10% to 15%. As noted previously, the application doesn't include the wetland area as part of the project's recreational space even though there is a viewing platform and pedestrian sidewalks on two sides. The wetland boundaries have been officially delineated and accepted by the Division of State Lands (DSL) and were approved as part of the original application along with the proposed wetland plan approved by both DSL and the Corp. of Engineers. The proposed improvement plans have also been review by DSL and the Corp. of Engineers and final approval will occur once all of the applicable engineering documents are complete. All communication to this point with both DSL and the Corp. has been very favorable. Bio-Swales: As noted, the application also includes a number of bio-swales throughout the site in order to biologically improve storm water quality by removing suspended solids to settle out and retain storm water during peak storm events - minimizing downstream capacity issues and erosion problems. The plantings within the bio-swales help filter particulates and their associated pollutants as runoff passes slowly and evenly through the channel. The pollutants are then incorporated into the soil where they may be immobilized and/or decomposed by plants and microbes. 6 Landscape Strategies: The planting plan was completed by a local Landscape Architect, Laurie Sager & Associates, familiar with the area's climate. The Landscaping Plans illustrate the various types of trees, plants, and groundcover proposed for the project based on their relationship from the sun, least active areas and most active areas. In addition, the Landscaping Plans show a heavy emphasis on plants and shrubs, rather than a water consumptive lawn. The parking areas provide shade trees in an attempt to minimize surface heat gain, shade vehicles and sidewalks. There are a number of extended landscape islands within the parking area to help soften the area and break up the linear alignment of parking spaces. Street trees are to be planted 30' on center and planted in accordance with the specified standards noted on the landscape plans. The trees have been chosen from the adopted Street Tree list based upon their setting and amount of hydrology. Utilities: Within the development and along Clay Street the electrical, television and telephone service will be underground within a 10' wide public utility easement. The sanitary sewer and water lines will connect to the existing service lines within the Clay Street right- of-way. Storm water runoff will drain to the existing system along Clay Street and to the planned bio-swales. In addition, an equal portion of storm water that currently drains onto the 5 acre property to the north (Cooper property) has been engineered to continue to drain in order to retain the historic level of hydrology that feeds that property's wetlands. AMENDMENT TO CONDITIONS (PA-2004-141): The proposal is partition the lot into two parcels and developed in two phases. As such, the conditions of approval applied to the original Site Review Permit and Outline Plan Subdivision (PA-2004-141) either no longer apply or more aptly should apply with the correct phase - regardless if the next phase is developed as a park, additional housing or both. The following conditions of approval are include "suggestive" amendments (ddctcd / added) followed by the applicant's explanation. 1) That all proposals of the applicant are conditions of approval unless otherwise modified here. 2) That a consent to annexation form be completed, which is non-revocable for a period of one year from its date. A consent to annexation agreement has been submitted. 3) That a boundmy description and map be prepared in accordance with ORS 308.225. A registered land surveyor shall prepare the description and map. The boundaries shall be surveyed and monuments established as required by statute subsequent to Council approval of the proposed annexation. A boundary description and map, prepared in accordance with ORS 308.225 by a registered land surveyor (Jim Hibbs, LJ. Friar & Associates) has previously been submitted. 7 4) That the applicant submit an electric distribution plan including loan calculations and locations of all primary and secondary services including transformers, cabinets and all other necessary equipment. This plan must be reviewed and approved by the Electric Department prior to Final Plan at the time of Building Permit submittals. Transformers and cabinets shall be located in areas least visible from streets, while considering the access needs of the Electric Department. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Electric Depmiment at that time for their review and approval. 5) That a preliminUlY utility plan for the project be reviewed by the Engineering Division and Building Division prior to final plat. The final utility plan for the project shall be reviewed and approved by the Engineering Division and Building Division at the time of Final Plan Building Permit submittals. The utility plan shall include the location of connections to all public facilities in and adjacent to the development, including the locations of water lines and meter sizes, sewer mains and services, manholes and clean-outs, storm drainage pipes and catch basins. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Engineering and Building Departments at that time for their review and approval. 6) That the identification, relocation and piping of existing irrigation facilities be addressed at the time of Final Plan final plat and finalized with Building Permit submittals. The design, relocation and installation of irrigation system shall be reviewed and approved by the Talent Irrigation District prior to the City of Ashland approval of the .final engineering construction documents. The irrigation facilities shall be installed as part of the overall public infrastructure requirements. The subject property is no longer being subdivided into multiple lots, but instead pmiitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Talent Irrigation District at that time for their review and approval. 7) That the engineering design of all on-site storm water detention systems (i.e. wetland/detention system) shall be reviewed prior to final plat and approved by the Public Works Department, Building Official and Staff Advisor prio," to Final Plan appro",;al at the time of Building Permit submittals and the commencement of public infrastructure installation and the issuance of an excavation permit. The design of the wetland/detention shall incorporate required pollution control systems (if applicable), while the discharge shall be designed so as not to significantly increase the volume of runoff beyond pre-development amounts on the property to the north. The permanent maintenance of on-site storm water detention systems must be addressed thrObigh thc project's CC&Rs and approved by the Public Works Department and Building Division. 8 The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Engineering, Building and Planning Department at that time for their review and approval. Consideling there no longer will be multiple lot owners, but instead one owner (the City of Ashland), there are no CC&Rs. Nevertheless, it should be clearly understood the project's Civil Engineer completed the engineering documents for the subject storm water detention systems for the previous application which were reviewed and approved by the Ashland Public Works Department as they relate to this condition and specifically the property to the north. 8) That the engineering construction drawings for Clay Street comply with City of Ashland Local Street Standards. Clay Street shall be improved along the entire frontage of the property. Improvements to Clay Street shall consistent approximately with the following standards: 28 feet of pavement overlay width (includes two travel lanes and an approximately six-foot bike lane), curb and gutter, storm drains, 7.5' planting strip and a six-foot wide public sidewalk. The Final Plan civil plans shall include profiles and cross sections, with erosion control and slope stability methodologies installed consistent with the standards contained in AMC 18.62. 080B. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Engineering and Planning Department at that time for their review and approval. 9) That a half street improvement including curb and gutter, storm drain facilities, planting strip and public sidewalk be installed along the street fi'ontage of the neighboring property to the north (39 IE 11CV, #1100). The design of these improvements shall be consistent with Ashland's Local Street Standards, allow for a smooth transition to the adjoining sidewalk network and be provided at the time of Pinal Plan prior to issuance of a Certificate of Occupancy Permit. Such improvements shall be installed as part of the overall public infrastructure requirements for the subdivision project. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. Regardless, a half street improvement including curb and gutter, stOlID drain facilities, planting strip and public sidewalk will be installed along the street frontage of the neighboring property to the north (39 IE 11 CV, #1100). The design of these improvements will be consistent with Ashland's Local Street Standards and will allow for a smooth transition to the adjoining sidewalk network. 10) That an engineering design for a right turn only lane on southbound Clay Street at Ashland Street shall be provided at the time of Final Plan Building Permit submittals. The engineered design shall include the widening of pavement width at the intersection,' installation of curb and gutter, storm drain facilities (if applicable) and sidewalks from the Clay Street/Ashland Street intersec~ion to and through the 9 bend (i.e. elbow) in Clay street to the existing curb and sidewalk on the west installed as part of the overall public infrastructure requirements for the subdivision. Widening improvements for the right turn only lane may be deferred until issuance of a Certificate of Occupancy Permit with all other improvements noted herein be deferred until Lot #1 is developed. Widening improvements for the right turn lane shall not be completed if a median on Ashland Street is installed prohibiting east bound (left) turning movements from Clay Street onto Ashland Street (Highway 66). As noted above, the original Traffic Impact Analysis for this site was for 130 single family and multi-family residential units. In that analysis, the findings concluded that three of the four intersections impacted by the project will continue to meet applicable mobility standards but for one - Clay and Ashland Street. In that analysis, it concluded the intersection would meet mobility standards if a dedicated right-hand turn lane was added at the intersection. In this scenario, there would be one in-bound lane, one out-bound left lane and one out-bound right lane. This application continues to agree with the analysis. However, considering the recent discussions involving this intersection and the Coming Attractions Theatres project at 2200 Ashland Street (PA02008-0l318, Approved December 13th, 2008) and the Oregon Department of Transportation's formidable position on that application's turning movements onto Ashland Street (a State Highway), there is likely to be a raised median at this intersection which would nullify the need for the additional lane. As such, the applicants are proposing to install the lane's pavement without curbing, but would request the improvement be deferred until the proposed units are initially occupied and not complete the lane's paving if th.e median is installed prior to occupancy. Under this scenario, a significant amount of asphalt, effort and cost could be avoided as there would be no purpose for an "'additional" turn lane if the median was installed first. Finally, the applicants propose to defer installation of sidewalks, curbs, gutters, and storm drain facilities (if applicable) from the Ashland Street intersection through the bend (i.e. elbow) on the south side of Clay Street until Lot #1 is developed either as a park or housing development. The improvements to be installed with this development (Lot #2), will include not only 660' of new sidewalk, planting strip, curbs, gutters, etc., along the property's entire Clay Street frontage (including the frontage of Lot #1), but also 330' of the neighboring propeliy to the north (County, Tax Lot 391E11CB 1100). With these improvements, a continuous sidewalk system from Dollarhide Way to Ashland Street will be realized. Considering the original approval was for 107 units and now only 60 units are proposed (44% reduction), the ratio of public street improvements (approximately 1,000') in comparison to the proposed units is significant as it's equitably reasonable to defer the remaining sidewalk improvement, approximately 350', until Lot #1 is developed either as a park or housing development. As such, the existing and proposed sidewalk improvements along Clay Street clearly meet the applicable transportation criteria found in AMC 18.72.070 D. and 18.1 06.030 E. and that the proposal is consistent with the original approval (P A-2004-141).d 10 11) That the engineered construction drawings for all new public streets within the project shall comply with City of Ashland Local Street Standards. The minimum street width shall be no less than 22 feet in width at intersections (unless permitted by the Ashland Fire Department), and a minimum width of 26 to 28 feet when accommodating on-street parking on both sides of the street. Plans to include profiles and cross-sections, with erosion control and slope stability methodologies installed consistent with the standards contained in AMC 18.62. 080B. Application will comply. 12) That a st,veet plug, one foot in vv'idth, be dedicated adjacent to public streets and alleys that adjoin the north property boundary. In addition, a street plug shall be dedicated along the eastern boundary of the project, betH'een the public alley and east property line. This condition is no longer applicable as the entire north side of the property has been incorporated into the whole of Lot #1, owned by the City of Ashland. 13) At the time Lot #1 is developed, either as a park, housing development or both, +hfl1 the engineered construction drawings for the project address the design and installation of public multi-use pathways and fence gates from the project to the City of Ashland Parks/Ashland Family YMCA Soccer Fields. The design of the multi-use pathway shall be in accord with City Local Street Standards, reviewed by the Director of the Ashland Parks Department, and approved by the Staff Advisor prior to signature of the final sun'ey plat or the installation of improvements associated with Lot 1 the subdi'v'ision. That the development and surfacing (i.e. all weather surface) of the multi-use pathway at the south boundary of the project be extended through the existing easement on the adjoining parcel to the south (tax lots #200 and 201). A design for the pathway shall be submitted at the time of any Building Permit Pinal Plan approval for Lot #1 and installed as part of the subdi'v'ision 's lot's public inFastructure. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. Considering Lot #1 abuts the properties to the north, east and south, Condition #13 will be addressed when that lot is developed. 14) That public easements shall be id.cntificd on the final survey plat for all multi use patlr,mys. The project CC&Rs shall note that the path"'v'ays are for public use and shall not be obstructed or through access to the cast restricted unless authorized by the City of Ashland and Ashland Parks Department. The previous subdivision approval incorporated pedestrian connections to the south and east of the property. However, the application has changed and the connections are no longer applicable to Lot #2, but most likely will be when Lot #1 is developed. As that time, public pedestIian easements will be designed into that lot's site plan and recorded. 11 15) That the requirements of the Ashland Fire Department, including but not limited to hydrant placement and flow and apparatus access, shall be clearly identified on the preliminary utility plan prior to final plat. Final engineered construction drawings shall be reviewed and approved by the Ashland Fire Department at the time of Building Permit submittaL Final Plan and appro'v'ed prior to signature of the final survey plat or the inst-&Uation of imp,'-ovements associated ~'v'ith the subdi'v'ision. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. 16) That all recommendations of the Ashland Tree Commission noted at their F eb:-uary 3 and Jln'le 9, 2006 meeting and consistent with Ashland's Site Design and Use Standards and Tree Preservation Ordinance, shall be incorporated into a revised Landscaping Plan (if applicable) prior to Final Plan Building Permit approval. The recommendations shall be included on a revised landscaping plan and final irrigation plan at the time of submission of building permit. The application includes a proposal to modify the Tree Removal and Protection Plan and will have met again with the Tree Commission prior to Planning Commission review of this project. 17) That prior to any disturbance occurring on the site or the issuance of a building permit, a Tree Verification Permit shall be applied for. Required Tree Protection Measure (18.61.200) shall be instituted prior to any development activities, including, but not limited to clearing, grading, excavation or demolition work, and shall be removed only after completion of all construction activity, including landscaping and irrigation installation. Application will comply. 18) That the owner of Lot #1 shall remain responsible That a final copy of the CC&Rs for the Homeo~vner 's Association shall be pro'v'ided at thc ti:ne of Final Plan and appro'v'ed prior to signaturc of the .final suney plat. CC&Rs to dcscribc rcsponsibility for the pruning and continual monitoring of the three poplar trees. :naintcnance of common area landscaping, priw.zte dri'v'eways, multi use pat!m'ays and on site storm ~'v'ater detcntion facilities. Thc Homemvncr's Association is :-esponsible for contracting '/v'ith a utility maintenance company for the The owner of Lot #2 shall be responsible for the maintenance of the storm water wetland/detention facility. All parameters fo:- maintenance of the facility, including time lincs and cnforccment, shall be rC'v'ie~'v'ed and appro'v'cd by the City Public Works Department and described in the CC&Rs. Because the subject property is no longer being subdivided into multiple lots, there will be no Homeowner's Association or CC&Rs. However, if Lot #1 is further subdivided and developed, this condition appears to be appropriate at that time. Nevertheless, the property owner of Lot # 1 is the City of Ashland and will be the responsible entity for maintaining the Polar Trees. 12 19) That the project complies with the Affordable Housing Standards as described in 18.106.030G. Each ajJordable unit shall be ident(fied and the required term of ajJordability agreements (i.e. in perpetuity) signed prior to signature of the final survey plat, with proof of recording submitted to the City of Ashland Housing Program Coordinator prior to issuance of a certificate of occupancy. Application will comply. 20) That the CC&Rs identifj) ~~'hich units arc subject to the City's .AjJo:-dable Housing requirements terms of ajJordability. All of the units identified will meet the City's Affordable Housing requirements. 21) That a Demolition/Move permit be issued for all applicable structures on the property prior to signature of the survey plat. Application will comply. 22) That opportunity-to-recycle facilities shall be identified in conjunction with the design of each building and in accordance with the standards described in Section 18.72.115 of the Ashland Land Use Ordinance prior to issuance of a building permit. Application will comply. 23) That the color, texture, dimensions, shape and building materials for all exterior components of the project be included at the time of submission of building permit. The information shall be consistent with the colors, texture, dimensions and shape of materials and building materials proposed and approved as part of the land use application. Application will comply. 24) That required bicycle parking shall be identified on plans submitted at the time of building permit review. The parking shall be designed and installed consistent with the standards described in 18.92.040. Application will comply. 25) That the applicant agrees to construct the project in accordance 'I"ith the approved plan and City ordinances and ~'/ai'v'es the right to file a claim untie," Oregon State~vide },{easure 37. The signed '(/aiver shall be submitted to the City of Ashland Legal Department for re'v'ic~'/ and appro'v'al prior to signature of the sur/ey plat or adoption of a resolution or ordinance formally annexing the property. This condition no longer applies as it has changed ownership. 26) That prior to Building Permit approval Final Plan submittal, the applicants shall submit a wetland delineation and wetland mitigation/enhancement plan that has been reviewed and approved by the Oregon Division of State Lands and Staff Advisor. 13 Such plans shall include civil engineering specifications for any water detention, water treatment and water distribution. Application will comply. 27) That 50% of the affordable units shall be completed and occupied by qualified households, at or bclm'.' 60% area median income, p:'ior to issuance of a certificate of occupancyfor the last of the first 50% ofthc market rate units. Prior to issuance of a building penn it for thc final market rate unit, the final 50% of the afJo:-dable units shall ha'.}e been issued building permits. All affordable units must be occupied, or a rental agreement or purchase agrecment shall be executed with qualified lm',' income households, prior to the issuance of a ccrtifieate of occupancy for the final ma:'ket rate unit. Purchasers 0," rentcrs of the designated affordable units shall be income qual{fied by the City of Ashland and the City shall be presented ,,','ith copies of all rental or sales agrecments associated ~,,'ith the designated affordable units. That prior to issuance of a Building Permit, the Housing Authority of Jackson County shall record deed restrictions in accordance with the City of Ashland's Affordable Housing Standards. Considering all of the units are to be affordable, the majority of this provision no longer applies. 28) That an agreement be recorded requmng the poplar tree grove situated at the southwest corner of the site to be protected and preserved in accordance with the approved Tree Protection/Tree Removal Plan (Applicant's Exhibit L-1.0). Any modifications or amendments to the plan would be processed through a Tree Removal Permit procedure. The southwest corner of the property as delineated on the Tree Protection/Tree Removal Plan (Applicant's Exhibit L-I) would not be covered by Exempt Tree Removal Activities, Section 18.61.040 C. as described in the Land Use Ordinance. Further, the agrcement )muld stipulate that further dc',,'Clopment of the southwest CO:71Cr that includes an increasc in the number of ,"esidcntial units shall include a pc'''centage of rcsid-cntial units for purchase or rent to households consistcnt with the requirements for anncxation and commensurate with City of Ashland resolution adopting a range of qualifj:ing incomes. First, a Tree Removal Permit was obtained for the Poplar Tree that fell in October of 2006. Second, the submitted Tree Protection/Tree Removal Plan has a new exhibit label. Third, the tree exemption noted (18.61.040 B.) pertains to multi-family zoned properties with a single family house which allows trees to be removed without permits. In this case, the remaining parcel (Lot #1), would fall under this exception without this specific language. Finally, the current proposal exceeds both parcels affordable housing obligations as noted under Chapter 18.106.030 G. TREE REMOVAL PERMIT: Twelve of the sites 30 trees are to be removed with this application in order to provide the project's necessary transportation facilities such as its roads and sidewalks. Generally, the trees proposed to be removed are consistent with the trees approved for removal as part of the original application, but for the few trees within or adjacent to the proposed east/west street light-of-way. Most notably, a 40" d.b.h Poplar tree is to be removed as it sits directly in-line 14 with the new street. According to the project's Arborist, this tree is healthy, but its tolerance to construction is poor as well as it's susceptibility to limbs falling. Regardless, this is the only significant tree on the property proposed to removed. Note: In October of 2006, a large 40" d.b.h. Poplar was removed due to a major limb break causing a hazardous condition. At that time this infOlmation was forwarded to the City and Tree Commission. Also during this time, the remaining Poplar Trees were pruned in accordance with the original tree preservation plans. The revised Tree Removal and Protection plans have been updated to recognize any changes since the original approvals. All tree protection measures have been designed by a licensed Arborist and Landscape Architect. The Tree Protection Plan notes that all tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042. In addition, during construction the site will be monitored by the project arborist. STREET STANDARDS EXCEPTION: The request for a Street Exception's request remains unchanged since the original approval (PA-2004-l4l) as the new sidewalk along Clay Street needs to meander towards the curb and run parallel in order to connect to the existing sidewalk to the south. In doing so, the sidewalk avoids a 24" Cedar tree. Findings of Fact The following information has been provided by the applicants to help the Planning Staff, Planning Commission and neighbors better understand the proposed project. In addition, the required findings of fact have been provided to ensure the proposed project meets the Partition standards as outlined in Chapter 18.76 in the Ashland Municipal Code (AMC), Site Design & Use Standards as outlined in the AMC, Section 18.72.070, Site Design & Use Standards (Design Standards Booklet, adopted August 4th, 1992), the criteria for a Tree Removal and Tree Protection as outlined in the AMC, Section 18.61 and the criteria for a Tree Removal Permit as outline in the AMC, Section 18.61. For clarity reasons, the following documentation has been formatted in "outline" form with the City's approval criteria noted in BOLD font and the applicant's response in regular font. Also, there are a number of responses that are repeated in order to ensure that the findings of fact are complete. CHAPTER 18.76 PARTITIONS: A. The future use for urban purposes of the remainder of the tract will not be impeded. The future use of the remaining parcel (Lot #1) has not been impeded as the remaining parcel will have direct frontage and access from the public streets to be installed as part of this application. B. The development of the remainder of any adjoining land or access thereto will not be impeded. 15 The future development of the remainder land (Lot # 1) will not be impeded by the proposed development as as the remaining parcel will have direct frontage and access from the public streets to be installed as part of this application. C. The tract of land has not been partitioned for 12 months. The parcel has not been partitioned in the previous 12 months. D. The partitioning is not in conflict with any law, ordinance or resolution applicable to the land. The partition appears to meet all laws, ordinances, and resolutions for the proposed partition. E. The partitioning is in accordance with the design and street standards contained in the Chapter 18.88, Performance Standards Options. The proposed partition is in accordance with the design and street standard contained in Chapter 18.88, Performance Standards. Clay Street as well as the proposed streets will be improved to ~ street standards (City Standards) with the remaining 14 street improvement occurring by the other side of the street's adjacent property owner. F. When there exists adequate public facilities, or proof that such facilities can be provided, as determined by the Public Works Director and specified by City documents, for water, sanitary sewers, storm sewer, and electricity. All public facilities serving this parcel are adequate and located within the Clay Street light- of-way. According to the multiple communications with department representatives, all of the services such as water, sewer, storm, and electlicity are available and are not at capacity and can accommodate the proposal. G. When there exists a 20-foot wide access along the entire street frontage of the parcel to the nearest fully improved collector or arterial street, as designated in the Comprehensive Plan. Such access shall be improved with an asphaltic concrete pavement designed for the use of the proposed street. The minimum width of the street shall be 20-feet with all work done under permit of the Public Works Department. Other than a narrow section of upper Clay Street (sharp turn), Clay Street's paved width is at least 20'. At the time the project's street improvements are being completed, the applicants will also pave the upper portion of Clay Street in order to ensure its required 20' minimum width is met with all of the work being done under pelmit from the Ashland Public Works Department. H. Where an alley exists adjacent to the partition, access may be required to be provided from the alley and prohibited from the street. No alleys exist on or adjacent to the subject property CHAPTER 18.72.070 SITE DESIGN & USE STANDARDS: 16 A. All applicable City Ordinances have been met or will be met by the proposed development. It has been the intention of the applicants to meet all City Ordinances without requesting any Variances or Exceptions to the Site Design Standards. To the applicant's knowledge, all applicable City ordinances have been met and will be met unless otherwise noted herein. At the time of the building permit submittal, the application will be substantially consistent with the proposed application and will meet all conditions of approval imposed by the regulating authority. B. All requirements of the Site Review Chapter have been met or will be met. All of the requirements listed in the Site Review Chapter, Section 18.72, have been met without Variances or Exceptions. The Site Review Chapter was designed to ensure that high quality development is maintained throughout the City of Ashland. The proposed application was designed and redesigned in order to best meet this purpose and produce a quality living environment. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. The development complies with the City of Ashland's Site Design Standards, adopted August 4th, 1992. A thorough response as to the project's compliance with the Site Design Standards, Section II-B, Approval Standards and Policies for Multi-Family Residential Developments; Section II-D, Parking Lot Landscaping and Screening Standards; and Section II-E, Street Tree Standards, has been provided below. D. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88, Performance Standards Options. All utilities serving the project are within either the Clay Street right-of-way or from McCall Drive which will be extended via easements. None of the utilities are at capacity to service the development. A pre-application was completed on November 5th, 2008, with City Departments reviewing the application and assessing availability of services. All utility work, including driveway turning standards as required by the Planning and Fire Departments, have been incorporated into the site plans. Three new fire hydrants are to be installed and all of the units are accessible from either the adjacent rights-of-way or the private driveway designed to meet width, height and weight requirements for fire-tmck ingress and egress. SITE DESIGN APPROVAL STANDARDS: Multi-family residential development shall conform to the following design standards: II-B-l) Orientation 17 II-B-la) II-B-lb) II-B-lc) II-B-2) II-B-2a) II-B-2b) Residential buildings shall have their primary orientation toward the street when they are within 20 to 30 feet of the street. The proposed application meets the Site Design Standards, Section II-B-1a. The buildings that are within 20 to 30 feet of the street (right-of-way) and include porches oriented towards the street. The front facades have been designed to have an attractive and pedestrian friendly streetscape environment as each street fronting unit has a 6' deep front porch and a sidewalk extending from the adjacent right-of-way to the porch. Buildings shall be set back from the street according to ordinance requirements, which is usually 20 feet. The proposed application meets the Site Design Standards, Section II-B-1 b. as well as the setback requirements of Chapter 18.24.040. D. which allow porches to be as close as 10' and houses to be 15' from the front property line. Building shall be accessed from the street and the sidewalk. Parking areas shall not be located between buildings and the street. The proposed application meets the Site Design Standards, Section II - B-1 c. Parking is within the center of the project in open parking stalls. All of the parking is generally hidden from the street's view other than a few spaces at the entrances. The units are accessed via a sidewalk from the streets and/or from the parking area. Streets cape One street tree for every 30 feet of frontage, chosen from the street tree list, shall be placed on that portion of the development paralleling the street. Where the size of the project dictates an interior circulation street pattern, a similar streetscape with street trees is required. The proposed application meets the Site Design Standards, Section II-B-2a. New street trees, every 30' of frontage, will be planted in accordance with the City's adopted street tree standards. The new trees have been chosen from the City Street Tree List. Front yard landscaping shall be similar to those found in residential neighborhoods, with appropriate changes to decrease water use. The proposed application meets the Site Design Standards, Section II-B-2b. The applicant's landscape plan has been designed keeping in mind the project is for a multi-family residential building complex and that water usage should be limited. The proposed planting species are similar to what would be found in other multi-family neighborhoods around the community. Other than the lawn area near the play area, only small amounts of turf are proposed in order to decrease water use. 18 II-B-3) II-B-3a) II-B-3b) II-B-3c) II-B-3d) II-B-3e) Landscaping Landscaping shall be designed so that 50% coverage occurs within one year of installation and 90% landscaping coverage occurs within 5 years. The proposed application meets the Site Design Standards, Section II-B-3a. The landscape plan has been designed to meet a 50% "spreading" coverage after the first year and 90% "spreading" coverage prior to the development's 5th year. The landscaping plan was designed by a local landscape professional knowledgeable of the various plant and tree specifications for the Southern Oregon climate. Landscaping design shall include a variety of deciduous and evergreen trees and shrubs and flowering plant species well adapted to the local climate. The proposed application meets the Site Design Standards, Section II-B-3b. The landscaping plan incorporates a variety of deciduous shrubs, flowering plant species and drought tolerant ground cover for Southern Oregon. The landscaping plan was designed by a local landscape professional knowledgeable of the various plant and tree specifications for this area. As many existing healthy trees on the site shall be saved as is reasonably feasible. Please see the attached Tree Protection Plan. As many of the site's existing trees are being saved and protected where reasonably feasible. All tree protection measures have been designed by a licensed Arborist and Landscape Architect with the intent to retain as many existing healthy trees as reasonably feasible and still meet the various other site design and zoning requirements (multi-family housing). The Tree Protection Plan notes that all tree protection measures will be installed prior to any construction and a Tree Velification Permit obtained in accordance with Chapter 18.61.042. In addition, dUling construction the site will be monitored by the project arborist. Buildings adjacent to streets shall be buffered by landscaped areas of at least 10 feet in width. The proposed application meets the Site Design Standards, Section II-B-3d. The buildings will sit proudly along Clay and the new streets with porches and landscaping between the buildings and the public sidewalk as illustrated on the landscaping plan. Parking areas shall be shaded by large canopied deciduous trees and shall be adequately screened and buffered from adjacent uses. 19 II-B-3f) II-B-4) II-B-4a) II-B-4b) II-B-4c) II - B-5) The project's landscaping plan identifies a number of shade trees in order to reduce excessive heat gain. All of the parking is either screened or adequately mitigated from the lights-of-way. Irrigation systems shall be installed to assure landscaping successes. Refer to Parking Lot Landscaping and Screening Standards for more detail. The proposed application will meet the Site Design Standards, Section II-B-3f as an inigation system will be installed at the time the landscaping is installed. The landscaping and the inigation system will be installed by a professional landscape company. Open Space An area equal to at least 8% of the lot area shall be dedicated to open space for recreation for use by the tenants of the development. The proposed application meets the Site Design Standards, Section II-B-4a. The applicant proposes 12,245 square feet (8%) of recreational space to be used by the tenants. In addition, more open space is spread throughout the property including the bio-swale areas, areas between buildings, porches and balconies that have not been considered in this calculation. Areas covered by shrubs, bark mulch and other ground covers which do not provide a suitable surface for human use may not be counted toward this requirement. The above standard is intended to preclude areas that typically do not promote space for outdoor activities or social gatherings. Such activities typically include parking lot landscaping, architectural landscaping or landscaping along pedestrian and vehicular access conidors. As such, the project's Landscape Architect has designed the recreational space so that shrubs, bark and similar ground covers are not included in the calculation. Neveliheless, areas not included in the number that should be appreciated as recreational space include the project's porches, balconies and wetland viewing platform as each provide an opportunity for outdoor recreation and human interaction. Decks, patios, and similar areas are eligible for open space criteria. Play areas for children are required for projects of greater than 20 units that are designed to include families. The proposed application meets the Site Design Standards, Section II-B-4c. and includes a play area, lawn area and a community building. Natural Climate Control: Utilize deciduous trees with early leaf drop and low bare branch densities on the south sides of buildings which are occupied and have glazing for summer shade and warmth. 20 The proposed application mccts thc Sitc Dcsign Standards, Section II-B-5. The landscaping plan was designed by a local landscape professional knowledgeable of the various plant and tree specifications for this area. New plantings include deciduous trees that provide for early leaf drop for full winter solar access and summer shading. II - B-6) Building Materials: Building materials and paint colors should be compatible with the surrounding area. Very bright primary or neon-type paint colors which attract attention to the building or use are unacceptable. No bright or neon-type paint colors will be used on the building. The proposed matelial and colors will be eatth tone colors consistent with building materials and colors often found on residential buildings. 18.61.080 CRITERIA FOR ISSUANCE OF TREE REMOVAL - STAFF PERMIT: An applicant for a Tree Removal-Staff Permit shall demonstrate that the following criteria are satisfied. The Staff Advisor may require an arborist's report to substantiate the criteria for a permit. As noted, the proposal is to remove 12 trees of the site's 30 trees. All tree protection measures have been designed by a licensed Arborist and Landscape Architect. The Tree Protection Plan notes that all tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042. In addition, during construction the site will be monitored by the project arborist. The criteria are as follows: A. Hazard Tree: The Staff Advisor shall issue a tree removal permit for a hazard tree if the applicant demonstrates that a tree is a hazard and warrants removal. None of the trees within the proposed project to be removed are being removed because they are hazardous. Instead, they are being removed in order to develop the property in accordance with the project's transpOltation needs and the City's Site Design Standards. Nevertheless, it should be noted the Polar trees are very prone to limb breaks and considering their size a concern as the Poplar limb that fell in 2006 nearly landed on the adjacent neighbor to the south's house, but miraculously only causing minor damage. B. Tree that is Not a Hazard: The City shall issue a tree removal permit for a tree that is not a hazard if the applicant demonstrates all of the following: 1. The tree is proposed for removal in order to permit the application to be consistent with other applicable Ashland Land Use Ordinance requirements and standards. (e.g. other applicable Site Design and Use Standards). The Staff Advisor may require the building footprint of the development to be staked to allow for accurate verification of the permit application; and All of the trees to be removed are due to their location within a planned street or sidewalk system which is required by the Land Use Ordinance or Site Design and Use Standards. 21 2. Removal of the tree will not have a significant negative impact on erosion, soil stability, flow of surface waters, protection of adjacent trees, or existing windbreaks; and Removal of the trees will not have a significant impact on erosion as the trees to be removed are on minimal sloping lands. According to the project ArbOlist, the removal of the trees will not have a negative impact on erosion, soil stability, flow of surface waters, protection of adjacent trees, or existing windbreaks. 3. Removal of the tree will not have a significant negative impact on the tree densities, sizes, canopies, and species diversity within 200 feet of the subject property. Removal of the tree will not have a significant negative impact on the tree densities, sizes, canopies, and species diversity within 200 feet of the subject propeliy. Again, all of the subject trees have been assessed by the project's arborist who has also chosen the replacement trees. The City shall grant an exception to this criterion when alternatives to the tree removal have been considered and no reasonable alternative exists to allow the property to be used as permitted in the zone. Nothing in this section shall require that the residential density be reduced below the permitted density allowed by the zone. In making this determination, the City may consider alternative site plans or placement of structures or alternate landscaping designs that would lessen the impact on trees, so long as the alternatives continue to comply with other provisions of the Ashland Land Use Ordinance. No exceptions are proposed with this application other than the street exception to meander a sidewalk away from a 24" d.b.h. Cedar tree. The applicants have explored alternative designs, but due to the configuration of the property, access management standards, and the minimum density standards required in the zone, the proposed plan was chosen. 4. The City shall require the applicant to mitigate for the removal of each tree granted approval pursuant to AMC 18.61.084. Such mitigation requirements shall be a condition of approval of the permit. The applicants are aware of this provision and will comply. 18.61.084 Tree Mitigation Required An applicant may be required to provide mitigation for any tree approved for removal. The mitigation requirement shall be satisfied by one or more of the following: A. Replanting on site. The applicant shall plant either a minimum 1 Yz-inch caliper healthy and well-branched deciduous tree or a 5-6 foot tall evergreen tree for each tree removed. The replanted tree shall be of a species that will eventually equal or exceed the removed tree in size if appropriate for the new location. The tree shall be planted and maintained according to the specifications in the City Tree Planting and Maintenance Guidelines as approved by the City Council. 22 The applicants will mitigate the loss of the 12 trees by planting at least 12 new trees within the project's boundaries. In fact, the landscape plans show significantly more trees that the required minimum. B. Replanting off site. If in the City's determination there is insufficient available space on the subject property, the replanting required in subsection A shall occur on other property in the applicant's ownership or control within the City, in an open space tract that is part of the same subdivision, or in a City owned or dedicated open space or park. Such mitigation planting is subject to the approval of the authorized property owners. If planting on City owned or dedicated property, the City may specify the species and size of the tree. Nothing in this section shall be construed as an obligation of the City to allow trees to be planted on City owned or dedicated property. The applicants are aware of this standard and if determined to be necessary, the applicants will comply. C. Payment in lieu of planting. If in the City's determination no feasible alternative exists to plant the required mitigation, the applicant shall pay into the tree account an amount as established by resolution of the City Council. The applicants are aware of this standard and if detelmined to be necessary, the applicants will comply. 18.61.200 TREE PROTECTION Tree Protection as required by this section is applicable to any planning action or building permit. A Tree Protection Plan has been submitted as part of the application in order to protect the trees planned to be preserved as well as the site's neighboring trees. All tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042. No development activities, including, but not limited to clearing, grading, excavation or demolition work will occur without the protection measures in place. Protection measures will only be removed after completion of all construction activity, including landscaping and inigation installation. EXCEPTION TO STREET STANDARDS: 18.88.050.F - Exception to Street Standards - An exception to the Street Standards is not subject to the Variance requirements of section 18.100 and may be granted vvith respect to the Street Standards in 18.88.050 ?f all of the following circumstances are found to exist: A. There is demonstrable difficulty in meeting the specific requirements of this chapter due to a unique or unusual aspect of the site or proposed use of the site. There is a demonstrable difficulty in meeting the aforementioned parkrow and sidewalk standard in the far southwest corner of the property as it would require the removal of an 18" Cedar tree. B. The variance will result in equal or superior transportation facilities and connectivity; 23 The request will result in the preservation of a mature Cedar tree and be at least equal in value as the standard pedestlian transportation facility. C. The variance is the minimum necessary to alleviate the difficulty; and The request is the minimum necessary to alleviate the difficulty. D. The variance is consistent with the stated Purpose and Intent of the Performance Standards Options Chapter. The stated Purpose and Intent of the Performance Standards Options Chapter are found in Chapter 18.88.010 ofthe Ashland Municipal Code and is as follows: 18.88.010 Purpose and Intent - The purpose and intent of this Chapter is to allow an option for more flexible design than is permissible under the conventional zoning codes. The design should stress energy efficiency, architectural creativity and innovation, use the natural features of the landscape to their greatest advantage, provide a quality of l?fe equal to or greater than that provided in developments built under the standard zoning codes, be aesthetically pleasing, providefor more efficient land use, and reduce the impact of development on the natural environment and neighborhood. The request is consistent with the stated purpose and intent of the Performance Standards Options Chapter found in Chapter 18.88.010 as the applicant is proposing to retain a mature Cedar tree that would otherwise be removed. 24 AFFIDAVIT OF MAILING STATE OF OREGON ) County of Jackson ) The undersigned being first duly sworn states that: 1. I am employed by the City of Ashland, 20 East Main Street, Ashland, Oregon 97520, in the Community Development Department. 2. On January 23, 2009 I caused to be mailed, by regular mail, in a sealed envelope with postage fully prepaid, a copy of the attached planning action notice to each person listed on the attached mailing list at such addresses as set forth on this list under each person's name for Planning Action #2009-00043, 380 Clay Street. SIGNED AND SWORN TO before me this 3rd day of February, 2009. JFr;:ICIAL SEAL 80SWEll NOTAf;>V PU8UC-OREGON COMMiSSiON NO. 391525 ; ;::JiF.:ES APR 07, 2009 &.....~...)~.'! ( / "":r'o _..' ' . "'h'" 7 \ ._~. f .' Notary Public for State of O~egoD U My Commission Expires: L/-- 1~' [) 7 Com m -Dev\Planning\ T em plates "illiS. .4.~ Planning Department, ~ .nburn Way, Ashland, Oregon 97520 541-488-5305 Fax: 541-552-2050 www,ashland.or,us TTY: 1-800-735-2900 CITY OF ASHLAND PLANNING ACTION: SUBJECT PROPERTY: APPLICANTS: Housing Authority of Jackson County and The City of Ashland DESCRIPTION: A request for modifications and change to the phasing of the previously approved Planning Actions #2004- 00141 and #2007-00802 for the Willowbrook Subdivision to allow a Land Partition creating three lots and Site Review to construct a 60-unit multi-family residential development for the property located at 380 Clay Street. The application includes a request for a tree removal permit to remove 12 trees six-inches in diameter at breast height (d.b.h.) or greater where only eight trees were previously approved for removal. COMPREHENSIVE PLAN DESIGNATION: Low Density Multi-Family Residential; ZONING: R-2; ASSESSOR'S MAP #: 39 1 E 11C; TAX LOT #: 2500 2009-00043 380 Clay Street NOTE: The Ashland Tree Commission will also review this Planning Action on February 5,2009 at 6:00 p.m. in the Community Development and Engineering Services building (Siskiyou Room) located at 51 Winburn Way. ASHLAND PLANNING COMMISSION MEETING: February 10,2009, 7:00 PM, Ashland Civic Center Notice is hereby given that a PUBLIC HEARING on the following request with respect to the ASHLAND LAND USE ORDINANCE will be held before the ASHLAND PLANNING COMMISSION on meeting date shown above. The meeting will be at the ASHLAND CIVIC CENTER, 1175 East Main Street, Ashland, Oregon. The ordinance criteria applicable to this application are attached to this notice. Oregon law states that failure to raise an objection concerning this application, either in person or by letter, or failure to provide sufficient specificity to afford the decision maker an opportunity to respond to the issue, precludes your right of appeal to the Land Use Board of Appeals (LUBA) on that issue. Failure to specify which ordinance criterion the objection is based on also precludes your right of appeal to LUBA on that criterion. Failure of the applicant to raise constitutional or other issues relating to proposed conditions of approval with sufficient specificity to allow this Commission to respond to the issue precludes an action for damages in circuit court. A copy of the application, all documents and evidence relied upon by the applicant and applicable criteria are available for inspection at no cost and will be provided at reasonable cost, if requested. A copy of the Staff Report will be available for inspection seven days prior to the hearing and will be provided at reasonable cost, if requested. All materials are available at the Ashland Planning Department, Community Development and Engineering Services, 51 Winburn Way, Ashland, Oregon 97520. During the Public Hearing, the Chair shall allow testimony from the applicant and those in attendance concerning this request. The Chair shall have the right to limit the length of testimony and require that comments be restricted to the applicable criteria. Unless there is a continuance, if a participant so requests before the conclusion of the hearing, the record shall remain open for at least seven days after the hearing. In compliance with the American with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Administrator's office at 541-488-6002 (TTY phone number 1-800-735-2900). Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting. (28 CFR 35.1020-350104 ADA Title I). If you have questions or comments concerning this request, please feel free to contact the Ashland Planning Department, 541-488-5305. G:\comm-dev\planning\Notices MailedC2009\2009-00043 .doc MINOR LAND PARTITION CRITERIA Section 18,76,050 Preliminary Approval An application for a preliminary partition shall be approved when the following conditions exist: A The future use for urban purposes of the remainder of the tract will not be impeded. 8, The development of the remainder of any adjoining land or access thereto will not be impeded, C, The tract of land has not been partitioned for 12 months, D. The partitioning is not in conflict with any law, ordinance or resolution applicable to the land, E, The partitioning is in accordance with the design and street standards contained in the Chapter 18,88, Performance Standards Options, (ORD 2836. 1999) F, When there exists adequate public facilities, or proof that such facilities can be provided, as determined by the Public Works Director and specified by City documents, for water, sanitary sewers, storm sewer, and electricity, G, When there exists a 20-foot wide access along the entire street frontage of the parcel to the nearest fully improved collector or arterial street, as designated in the Comprehensive Plan, Such access shall be improved with an asphaltic concrete pavement designed for the use of the proposed street. The minimum width of the street shall be 20-feet with all work done under permit of the Public Works Department. 1, The Public Works Director may allow an unpaved street for access for a minor land partition when all of the following conditions exist: a. The unpaved street is at least 20-feet wide to the nearest fully improved collector or arterial street. b, The centerline grade on any portion of the unpaved street does not exceed ten percent. 2, Should the partition be on an unpaved street and paving is not required, the applicant shall agree to participate in the costs and to waive the rights of the owner of the subject property to remonstrate both with respect to the owners agreeing to participate in the cost of full street improvements and to not remonstrate to the formation of a local improvement district to cover such improvements and costs thereof. Full street improvements shall include paving, curb, gutter, sidewalks and the undergrounding of utilities, This requirement shall be precedent to the signing of the final survey plat, and if the owner declines to so agree, then the application shall be denied. H, Where an alley exists adjacent to the partition, access may be required to be provided from the alley and prohibited from the street. (ORD 2951, 2008) SITE DESIGN AND USE STANDARDS 18,72.070 Criteria for Approval The following criteria shall be used to approve or deny an application: A All applicable City ordinances have been met or will be met by the proposed development. 8, All requirements of the Site Review Chapter have been met or will be met. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter, D, That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property, All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88, Performance Standards Options, (ORD 2655,1991; ORD 2836,1999) TREE REMOVAL 18,61,080 Criteria for Issuance of Tree Removal- Staff Permit An applicant for a Tree Removal Permit shall demonstrate that the following criteria are satisfied, The Staff Advisor may require an arborist's report to substantiate the criteria for a permit. A Hazard Tree: The Staff Advisor shall issue a tree removal permit for a hazard tree if the applicant demonstrates that a tree is a hazard and warrants removal. 1, A hazard tree is a tree that is physically damaged to the degree that it is clear that it is likely to fall and injure persons or property, A hazard tree may also include a tree that is located within public rights of way and is causing damage to existing public or private facilities or services and such facilities or services cannot be relocated or the damage alleviated, The applicant must demonstrate that the condition or location of the tree presents a clear public safety hazard or a foreseeable danger of property damage to an existing structure and such hazard or danger cannot reasonably be alleviated by treatment or pruning, 2, The City may require the applicant to mitigate for the removal of each hazard tree pursuant to AMC 18.61.084, Such mitigation requirements shall be a condition of approval of the permit. 8, Tree that is Not a Hazard: The City shall issue a tree removal permit for a tree that is not a hazard if the applicant demonstrates all of the following: 1, The tree is proposed for removal in order to permit the application to be consistent with other applicable Ashland Land Use Ordinance requirements and standards, including but not limited to applicable Site Design and Use Standards and Physical and Environmental Constraints, The Staff Advisor may require the building footprint of the development to be staked to allow for accurate verification of the permit application; and 2, Removal of the tree will not have a significant negative impact on erosion, soil stability, flow of surface waters, protection of adjacent trees, or existing windbreaks; and 3. Removal of the tree will not have a significant negative impact on the tree densities, sizes, canopies, and species diversity within 200 feet of the subject property. The City shall grant an exception to this criterion when alternatives to the tree removal have been considered and no reasonable alternative exists to allow the property to be used as permitted in the zone, Nothing in this section shall require that the residential density be reduced below the permitted density allowed by the zone. In making this determination, the City may consider alternative site plans or placement of structures or alternate landscaping designs that would lessen the impact on trees, so long as the alternatives continue to comply with other provisions of the Ashland Land Use Ordinance, 4, The City shall require the applicant to mitigate for the removal of each tree granted approval pursuant to AMC 18,61.084. Such mitigation requirements shall be a condition of approval of the permit. (ORD 2951, 2008; ORD 2883, 2002) G :\comm-dev\planning:Notices Mailed:2009:2009-00043 .doc T I I I I PA-2009-00043 391E11C 3000 ABERNATHY CRAIG HUGH 321 CLAY ST 1 ASHLAND OR 97520 ^~3^V-09-008-~ WOO"AAaAe'MMM PA-2009-00043 391E11C 3000 BARNETT JAMES/PRISCILLA 321 CLAY ST 115 . ASHLAND OR 97520 PA-2009-oo043 391E11C 3000 BEY MARK RICHARD/CAROLE ANN PO BOX 3084 ASHLAND OR 97520 PA-2009-00043 391 E11CA 2900 BOOTH STEPHEN TRUSTEE ET AL PO BOX 3592 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 BRAUN DIVINA BARBARA TRUSTEE ET AL 321 CLAY ST 68 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 BURKE JACKIE J 5155 SADDLE BROOK DR OAKLAND CA 94619 PA-2009-00043 391E11C 3000 CARVER IRENE 321 CLAY ST 27 ASHLAND OR 97520 PA-2009-00043 391 E 11 CA 2900 COFFMAN WANDA W 215 TOLMAN CREEK RD 9 ASHLAND OR 97520 PA-2009-00043 391 E11CB 1100 COOPER GLEN ALLEN TRUSTEE ET AL PO BOX 5753 SANTA BARBARA CA 93150 PA-2009-00043 391E11C 3000 CROSSLIN BARBARA JEAN 321 CLAY ST 59 ASHLAND OR 97520 T ClO09~S @A~3^~ ~ , l'udn-dod p.IoqaJ al Jalv^vJ ap Uije eJmpeq el '1 la!Jdeu PA-2009-00043 391 E11C 3000 BARAQUIN JASON 522 CANON AVE MANITOU SPRINGS CO 80829 ~uaWa6Jelp ap suas ... PA-2009-00043 391E11C 3000 BAUSSERMAN SUSAN JOHANNESSEN 321 CLAY ST 100 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 BEYER RAN NY 321 CLAY ST 16 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 BOWLES MARCEL YN F 321 CLAY ST 74 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 BRINEGAR SUSAN ELAINE 321 CLAY ST 103 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 CAMPBELL GARY THOMAS POBOX 651 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 CATRANIDES LISA MARIE 321 CLAY ST 26 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 COHEN TRACY ELIZABETH 13405 HWY 66 ASHLAND OR 97520 PA-2009-oo043 391E11C 3000 COURAUD CHARLES S 321 CLAY ST 83 ASHLAND OR 97520 PA-2009-oo043 391E11CA 2900 CZIRBAN JOEY ELLEN 215 TOLMAN CREEK RD 7 ASHLAND OR 97520 r ...~a6p3 dn-dod asodxa 01 aUII BuOIP nil.... _ Jaded pail:l - ~09~S ~H3^V l!Jeqe6 al zas!I!lO Jalad , salP~ ~nb!l~ PA-2009-00043 391E11C 3000 BARKER NORMAN E 321 CLAY ST 72 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 BEECHAM CHARLES N/NORMA M 321 CLAY ST 101 ASHLAND OR 97520 PA-2009-00043 391E11CC 500 BLEIWEISS PETER RICHARD TRUSTEE ET AL 1131 HIGHWOOD DR ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 BRADLEY DONALD H 321 CLAY ST 96 ASHLAND OR 97520 PA-2009-00043 391 E11CA 2900 BUDROE WILLETTE JOSEPHINE 5281 CLEMSON VENTURA CA 93003 PA-2009-00043 391 E11 C 3000 CARTER BRUCE JESS 321 CLAY ST A ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 CHAMBERLAIN KENT C 321 CLAY ST 11 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 COOK PATRICIA ANN 321 CLAY ST 65 ASHLAND OR 97520 PA-2009-00043 391E11CC 1000 COWLES JOHN N/JUDITH A 2125 BIRCHWOOD LN ASHLAND OR 97520 PA-2009-00043 391E11C 3000 DAVIS INGEBORG 321 CLAY ST 112 ASHLAND OR 97520 r @09~S aleldwal ~a^v asn "'!!U"I"'" '~...I~rn.... f I I I I Alf:J^,d-09-00S- I. LUOO',{aa^e'MMM PA-2009-00043 391E11C 3000 DEMARTINEZ HELENE 321 CLAY ST 6A ASHLAND OR 97520 PA-2009-00043 391E11C 3000 DIXON TERESA S 1257 SISKIYOU BLVD 1170 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 DROSCHER BARBARA ELIZABETH 321 CLAYST114 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 ESCH SHEILA MARY 321 CLAY ST 5 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 FOLLETT MARY LOU LOVING TRUST ET AL 321 CLAY ST 61 ASHLAND OR 97520 PA-2009-00043 391 E11CC 200 GARGUS GREGORY B/SUZANNE F 400 CLAY ST ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 GOLDEN KATHLEEN MEG 4211 SPATT WAY 138 BEAVERTON OR 97007 PA-2009-00043 391 E11CA 2900 GRANDON BEVERLEY MAY 215 TOLMAN CREEK RD 19 ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 HARDY WARREN D /LUCINDA 321 CLAY ST 39 ASHLAND OR 97520 PA-2009-00043 391 E11CA 2900 HENICK JOHN JOSEPH/PATRICIA ANNE 15568 SAINT ANDREWS DR PORTLAND OR 97229 T llD091.S @Al.I3AW ~ , Wldn-dOd p.IoqaJ al Jal~^"" ap UIJB aJnlp8~ el ~ za!ldau ~uawa6Jelp ap sues T PA-2009-00043 391 E11C 3000 DISTEFANO SHANI M 321 CLAY ST 28 ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 DONEY JERI M 321 CLAY ST 75 ASHLAND OR 97520 PA-2009-00043 391 E11CB 4212 DUNGAN ANDY T 260 MEADOWS DR ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 FEELER DOREEN 321 CLAY ST 25 ASHLAND OR 97520 PA-2009-00043 391 E11CA 2900 FREDINBURG SHERI ANN 215 TOLMAN CREEK RD 1 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 GILBERT JILL LOUISE 215 TOLMAN CREEK RD 12 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 GORHAM IRENE WHITNEY TRUSTEE/ 215 TOLMAN CRK RD 38 ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 HAM DOUGLAS C 321 CLAY ST 39 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 HAZEL I DEANE LIVING TRUST /HAZEL I TRUS 215 TOLMAN CREEK RD 3 ASHLAND OR 97520 PA-2009-00043 391 E 11 C 3000 HENTRICH SUZANNE 321 CLAY ST 73 ASHLAND OR 97520 w!a6p3 dn-dod asodxa 01 aUlI 6uoIl'! Duaa _ Jaded paa,j - e091.S eAH3^,v' ~!Jeqe6 at zasmm Jalad Ii! sal!,el sa"anb!~~ P A-2009-00043 391 E 11 CA 2900 DIXON RICHARD JAMES 215 TOLMAN CR RD 14 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 DONOHUE JESSICA 321 CLAY ST 70 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 ELlNWOOD ELLAE 321 CLAY ST 90 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 FIUREN CHRISTINA MARIE 321 CLAY ST 64 ASHLAND OR 97520 PA-2009-00043 391E11CC 1200 GANGLOFF ROLAND A TRUSTEE ET AL 18534 WHITE OAK DR SONOMA CA 95476 PA-2009-00043 391E11C 3000 GIORDANO GIROLAMIA 321 CLAY ST 106 ASHLAND OR 97520 PA-2009-00043 391 E 11 CA 2900 GRAHAM SHIRLIE COLLEEN 215 TOLMAN CR RD 36 ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 HAMPTON JOSHUA /CHEERI 321 CLAY ST 2 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 HEIDIG HEIDI 396 IDAHO ST ASHLAND OR 97520 PA-2009-00043 391E11C 3000 HERNANDEZ TIMOTHY JAY SR 321 CLAY ST 56 ASHLAND OR 97520 , e091.S a~eldwal ~a^'d asn CllWIP"I _1-" ,(CP:I , I I I I AH3^,o'-o9-008-L WOO',(,aAU'MMM PA-2009-00043 391E11C 3000 HERRERA DEANNA 363 IOWA ST ASHLAND OR 97520 PA-2009-00043 391E11C 3000 INNES JUANITA 321 CLAY ST 52 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 JAMES ELLEN JOANN 321 CLAY ST 10 ASHLAND OR 97520 PA-2009-00043 391E11CB 1200 JOHNSTON ROSS R JR 301 CLAY ST ASHLAND OR 97520 PA-2009-00043 391E11C 3000 KURZ CONSUELO/MILlTELLO LEONARD T 321 CLAY ST 24 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 LAWTON RANDAUDIEZ INES 775 TOLMAN CREEK RD ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 LIVESAY LAWRENCE W TRUSTEE ET AL 1410 GRIZZLEY CT YREKA CA 96097 PA-2009-00043 391E11C 3000 MAC FARLANE MARY 321 CLAY ST 110 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 MARSH DOUGLAS ROGERS 321 CLAY ST 29 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 MC CARTON DONALD JOHN 215 TOLMAN CR RD 37 ASHLAND OR 97520 T GD09LS @~aJ\W ~ , IIUdn-dOd p.toqaJ el Je,~^", ep uue e.tnlpUtl 81 ~ zaUdeU luewe6.1e4' ep SUes 'Y PA-2009-00043 391E11C 3000 HILL JUDITH BOWEN 631 SOUTH ST REDDING CA 96001 PA-2oo9-00043 391E11CA 2900 JACOBSON MARTIN S/FRIED YVONNE S 1320 PROSPECT ST ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 JEFFERS BILLY DON 215 TOLMAN CR RD 32 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 KELLY PAMELA LEE 321 CLAY ST 76 ASHLAND OR 97520 PA-2009-00043 391 E 11 CA 2900 LANE STEVEN CARROLULlNDA JOYCE 215 TOLMAN CREEK RD 33 ASHLAND OR 97520 PA-2009-00043 391E11 C 3000 LEIDER HELEN C ET AL 321 CLAY ST 34 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 LULL SUMMER ELIZABETH 215 TOLMAN CREEK RD 8 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 MAC KENZIE DAVID A 321 CLAY ST 40 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 MARTINIE MAXINE PO BOX 1172 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 MC FADDEN JACQUELEINE T /CA THERINE J 215 TOLMAN CREEK RD 27 ASHLAND OR 97520 r lfUe6p3 dn-dOd asodxe : 01 au" 6uotu DUeA _ Jaded ~ - - GD09LS ~H3^" ~!Jeqe6 al zas!l!~n Jalad I? salpel sauanb!l;J PA-2009-00043 391E11C 3000 HOLZKAMPER JANA RUTH 321 CLAY ST 58 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 JACOBSON STANTON /CARYN LEE 321 CLAY ST 55 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 JILLSON SHELLY 321 CLAY ST E ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 KRUSE DARLENE 321 CLAY ST 48 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 LARSON RICHARD D 321 CLAY ST 30 ASHLAND OR 97520 PA-2009-00043 391 E11CC 600 LISOWSKI LOTTIE TRUSTEE FBO 2149 BIRCHWOOD LN ASHLAND OR 97520 PA-2009-00043 391E11CC 400 LUNDBLAD ALETHA C 2165 BIRCHWOOD LN ASHLAND OR 97520 PA-2009-00043 391E11CC 900 MAHER MARY Z TRUSTEE ET AL 2133 BIRCHWOOD LN ASHLAND OR 97520 PA-2009-00043 391E11CC 700 MAXWELL RHODA J TRUSTEE ET AL 2141 BIRCHWOOD LN ASHLAND OR 97520 PA-2009-00043 391E11C 3000 MC GUIRE J M MIKE 321 CLAY ST 51 ASHLAND OR 97520 , @09LS a~eldwel ~a^" asn C;:laClln ~Iaa.f ,(Sl?:J , I I I I ^~B^,v-09.00S- L WO)'A!aAe'MMM , l'udn-dod p.loqaJ al Jal~^~J ep ulPl amtpelf el ~ za!ldilH ~uewa6Je4) ap sues ... PA-2009-00043 391E11C 3000 MC NAUGHT TERRY WAYNE 321 CLAY ST 105 ASHLAND OR 97520 PA-2009-00043 391 E11 CC 1600 MCLAUGHLIN PAMELA RAE TRUSTEE ET AL 255 SCENIC DR ASHLAND OR 97520 PA-2009-oo043 391E11CA 2900 MENEFEE LEONORA C 215 TOLMAN CR RD 21 ASHLAND OR 97520 PA-2009-00043 391E11CC 1100 MESING RUTH 2514 CHESTER ST ALAMEDA CA 94501 PA-2009-00043 391E11C 3000 MOLLETT MIKE 321 CLAY ST 95 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 MORLEY RAYMOND DEAN PO BOX 788 Y ACHA TS OR 97498 PA-2009-00043 391E11C 3000 MROZEK DONALD /CA THERINE 321 CLAY ST 98 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 MURPHY DANIEL C /DEBRA 970 SE RATCLIFF DR SALEM OR 97302 PA-2009-00043 391 E11 CA 2900 MURPHY THOMAS /HUBERTA 215 TOLMAN CR RD 34 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 NEWBOMB LESLEE PO BOX 3023 ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 NIMS DELORES 321 CLAY ST 109 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 OBLAK AMY 321 CLAY ST 44 ASHLAND OR 97520 PA-2009-00043 391 E11CB 1200 PA TTERSON GLEN E 301 CLAY ST ASHLAND OR 97520 PA-2009-00043 391E11C 3000 PECORARO GREGORY 321 CLAY ST 17 ASHLAND OR 97520 PA-2009-00043 391 E11CA 2900 PETERSON DELBERT L 215 TOLMAN CREEK RD 13 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 PETERSON GLENDA G 321 CLAY ST 116 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 PRINCE LOUANN 321 CLAY ST 6 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 RABIN MITZI ET AL 321 CLAY ST 57 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 RANGER SUSAN BETH 321 CLAY ST 3A ASHLAND OR 97520 PA-2009-00043 391E11C 3000 RAZIUK RENEE GLORIA 321 CLAY ST 49 ASHLAND OR 97520 T Gl1091.S <B>...uJaI^" ~ r NJ.a6p3 dn-dOd asodxe _ Jadl?d pa6:I m culn "'IIMD nJl:wl @09I.S ~H3^\1 t!Jeqe6 al zas!I!:a.n Jalad '1 sal!)f!J ~nb!:a.;1 P A- 2009-00043 391 E 11 C 3000 MELLINGER LISA J/DREYER JANET B 321 CLAY ST 32 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 MILLER LYNN SYLVIA 321 CLAY ST 46 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 MOTEN MARIAN BARBARA 321 CLAY ST 71 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 MURPHY RACHEL 321 CLAY ST 4 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 NICHOLSON E H 321 CLAY ST 7 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 OCEANA HELEN DIANNE 321 CLAY ST 85 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 PEPE ALBERT LOUIS/POPE ALBERT T 321 CLAY ST 21 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 POGUE JERRY CNALERIE G 321 CLAY ST 80 ASHLAND OR 97520 PA-2009-00043 391 E 11 CA 2900 RACHLES JUNE TRUSTEE I 215 TOLMAN CREEK RD 6 ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 REED SHERRY LYNN 321 CLAY ST 86 ASHLAND OR 97520 @09LS ateldwal ~a^\1 asn ...,....... I~~. ~r__ ,.... f I I f AH3^,~-09-o08-1. WO)'.(a&l\e'MMM PA-2009-oo043 391E11C 3000 RICHARDS MICHAEL UESTELLE 321 CLAY ST 79 ASHLAND OR 97520 PA-2oo9-00043 391E11C 3000 RODAS DE LEON HILDER MARINEL Y ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SAVARD ROSEMARY P 321 CLAY ST 62 ASHLAND OR 97520 PA-2009-oo043 391E11C 3000 SCHA TTLER DIANNE JEANNE TRE 321 CLAY ST C ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SEMRAU JEAN 321 CLAY ST 60 ASHLAND OR 97520 PA-2009-OO043 391E11C 3000 SHERMAN FRANK A1KA THLEEN A 2237 CAL YOUNG RD EUGENE OR 97401 PA-2009-00043 391E11CA 2900 SIMONSEN IVAN OLAF 215 TOLMAN CREEK RD 29 ASHLAND OR 97520 PA-2oo9-00043 391E11C 3000 SMITH SHEILA ANN 13350 HWY 66 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SOMERSET CHRISTINE M 321 CLAY ST 50 ASHLAND OR 97520 PA-2oo9-00043 391E11C 3000 SPENCER L1SAlENNS GORDON 321 CLAY ST 111 ASHLAND OR 97520 T ellI09l.S (ll)..uIilA" ~ IIlJ.dn-dOcl pJoqal &1 J&"^,,, ep up aampeq 81 9 zeudq ~&w&6Je4) &psues .. PA-2oo9-oo043 391E11C 3000 RICHARDSON WILLlAMIOIANA W POBOX 3569 ASHLAND OR 97520 PA-2oo9-00043 391E11C 3000 ROSENTHAL EDWARD JAMES or Current Owner ASHLAND OR 97520 PA-2oo9-00043 391E11CB 1300 SCAIFE ROY JILOLA M 295 E CLAY ST ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SCHEll JOAN M 321 CLAY ST 99 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 SEROPIAN BARBARA H 215 TOLMAN CR RD 30 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 SHOUP RICHARD L !SALL Y S 215 TOLMAN CREEK RD 31 ASHLAND OR 97520 PA-2oo9-oo043 391E11CC 201 SIPLE KATHLEEN KIM TRUSTEE ET AL 1968 TREEWOOD LN SAN JOSE CA 95132 PA-2009-00043 391E11CA 2900 SMITH SHERRY 2305 ASHLAND ST 281 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SON KA TRINA DENISE 321 CLAY ST 8 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 STAMPFLI DEBORAH J 321 CLAY ST 104 ASHLAND OR 97520 IUe6P3 dn-dOd asodxa _ Jaded pa;l:I ,m AUII RuntR n1.ACI _ .091.5 eAH3^,\i ~!Jeqe6 81 zas!l!~n J81ed , 5eIP"l S8UBnb~ PA-2oo9-00043 391E11CA 2900 ROBARTS EVA MARY 215 TOLMAN CREEK RD 26 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SANTURE MARY ANNE PA.2009-00043 391E11CB 1300 SCAIFE ROY LJLOLA 295 CLAY ST ASHLAND OR 97520 PA-2oo9-00043 391 E11 C 3000 SCOTT HARRIET A 321 CLAY ST 82 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SHEPHERD BETTY DORENE 321 CLAY ST 12 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SHULTS ANDREA LYNN 321 CLAY ST 88 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 SMELCER JOSEPHINE FERN REV TRUST ETAL 215 TOLMAN CREEK RD ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SMITH STACIA LAUREL clo SAVAGE STACIA L 321 CLAY ST 113 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 SPENCER HARRY H 7322 CHARTER OAK LP TEMPLE TX 76502 PA-2009-00043 391E11C 3000 STEELE NANCY 321 CLAY ST 107 ASHLAND OR 97520 .091.5 ~eidw;u ~a^v asn ~......_ _ ._... lc~ ,. I I I I A~3^V-09-008-~ WO:)'AHMe'MMM PA-2009-00043 391E11C 3000 STEELE SYDNEY MORRIS 321 CLAY ST 77 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 STYERS DONNA MAE ~ .. 321 CLAY ST 23 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 THIRING DONALD C PO BOX 3556 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 TROWBRIDGE BRUCE MELVIN 321 CLAY ST 38 ASHLAND OR 97520 PA-2009-00043 391E11CC 1300 WAGNER CATHERINE TRUSTEE ET AL 2101 BIRCHWOOD LN ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 WENDTJACK/SHARON 321 CLAY ST 3 ASHLAND OR 97520 PA-2009-00043 391 E11 CC 202 WILDMAN ROBERT/WILDMAN ALLISON 420 CLAY ST ASHLAND OR 97520 P A-2009-00043 391 E 11 CA 2900 WINNER MELVIN RAY 215 TOLMAN CR RD 22 ASHLAND OR 97520 P A-2009-00043 Housing Authority of Jackson County 2251 Table Rock Rd Medford OR 97501 P A-2009-00043 Construction Engineering Consultants P.O. Box 1724 Medford, OR 97501 T @09~S @AlIElAW ~ , "lldn-dOd p.JoqaJ al Jalv^vJ ap U!le amtpe4 el III za!ldaij PA-2009-00043 391 E11 CA 2900 STITH MARK ANTHONY 215 TOLMAN CR RD 15 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 TAYLOR BILLY P/FEN L _ 215 TOLMAN CREEK RD 18 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 TOLMAN CREEK PARK LLC 1182 TIMBERLINE TERR ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 VALINE ROBERT ARTHUR 215 TOLMAN CREEK RD 2 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 WATKINS MONNIE 0 215 TOLMAN CR RD 4 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 WENNLUND KAREN LOU 321 CLAY ST 111 ASHLAND OR 97520 PA-2009-00043 391E11C 3(0) WILLSON NANCY 321 CLAY ST 84 ASHLAND OR 97520 PA-2009-00043 391E11C 30)0 WITYSHYN MARILYN 321 CLAY ST 108 ASHLAND OR 97520 PA-2009-oo043 Urban Development Services LLC 485 W Nevada St Ashland, OR 97520 PA-2009-00043 L.J. Friar & Associates 816 W Eighth St Medford, OR 97501 , IUa6p3 dn-dOd asodxa 01 aUII 6UOII,. nll.,... luawa.6Je4) ap suaS 'V _ Jadl!d paa~ - @09I.S @AH3^" ~!Jeqe6 al zas!l!~n Jalad ~ salpel sauanb!~~ PA-2009-00043 391 E11C 3000 STONE ARLENE B 321 CLAY ST 18 ASHLAND OR 97520 PA-2009-00043 391E11C 3000 THIEL ELISE 321 CLAY ST 19 ASHLAND OR 97520 PA-2009-00043 391E11CA 2900 TRAVALLEE DANIEL 215 TOLMAN CR RD 23 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 VISAGORSKIS GENEALLE 215 TOLMAN CREEK RD 5 ASHLAND OR 97520 PA-2009-00043 391 E11 C 3000 WEBER PATRICK C 321 CLAY ST 66 ASHLAND OR 97520 PA-2009-00043 391 E11 CA 2900 WIGHT DAVID EDWARD 215 TOLMAN CREEK RD 20 ASHLAND OR 97520 PA-2009-00043 391 E11C 3000 WINGSPREAD LLC 821 JACKSON ST MEDFORD OR 97504 P A-2009-00043 391 E 11 C 3000 WRAIGHT CHARLES WAL TER/TERRI NEWTON 321 CLAY ST 102 ASHLAND OR 97520 PA-2009-00043 Laurie Sager & Associates Inc 700 Mistletoe Rd Ste. 201 Ashland, OR 97520 PA-2009-00043 Daniel R. Horton 169 W. Main Street Eagle Point, OR 97524 @09~5 a~eldwa.L ~a^v asn r.!'!llft..... .~a I ~r".. "' I I I I , l'U dn-dOd p.Ioqal al Jal\'^l1J ap uye eJntpelf BI \I zaudau ~uawa6Jelp ap sues .. AH3^V-O~S-L WC>>'N9f'8'MMM PA-2009-00043 Agate Engineering 1175 East Main Street Medford, OR 97501 PA-2009-00043 Jackson County Roads, Parks & Planning 200 Antelope Road White City, OR 97503 183 380 Clay Sf 2/1012009 T Qj?09LS @JUJaJ\V ~ WJ.a6p3 dn-dOd asodxa 01 aUII 6uo.e Duaa _ Jaded paa,j - Qj?09LS ~H3^V ~!Jeqe6 al zas!l!~n Jalad , sal!~ sawtnb!~;1 P A-2009-00043 David J. Pyles & Dan Dorrell % ODOT Region 3/District 8 100 Antelope Road White City, OR 97503 @09LS a~eldwal fll-JaAV asn CI~D"I _ ''''''''~ leD'" This tnllp is based on a digital_ comp;led by Jackson County From a varialy of sources. Jackson County cannot accept responsibity for errors, omissions. or positional llCClIfllCy. Thata... no _, axpnISS8d or impled. Map ct88I8d on 1l2Ol2OO9 2,.w,45 PM uaR1g wob.jad<soncoonty.Ofl/ 121H 1600 1500 1400 1200 3.600. 3.6(}2 3100 201 3.600 3.001 3.600 3200 4400 _. 2000 a "'.........4300 n iJ'ol'UV I;i ~ ~ 3.500 600 500 1&1 &00 700 '100: OOD 1100 2iOO @ Piease recycJe wilh colored off!ce grade paper Cn>ataclwith MapMakor JACKSON COUNTY INFORMATION n!CHNOlOGY Map Maker Application Front Counter legend Highlighted Feature theBuffer theBufferTarget Tax Lol OuUines Tax Lot Numbers Cily Limits Ashland Butte Falls Central Point Eagle- Point Gold Hi? Jacksonville Medford PhooniX Rogue Rive'r Shady Cove Talent 3~O C lcl.-l...\ Set () JACKSON COUNTY Oregon CITY OF ASHLAND PLANNING APPLICATION SNOWBERRY BROOK RESIDENTIAL HOUSING An affordable housing development for the Housing Authority of Jackson County for 380 Clay Street PROPOSAL: This planning application proposal is for five land use entitlements for the 9.63-acre parcel off Clay Street formally known as the Willowbrook Subdivision: . a 3-lot Land Partition (modified from a 53 lot subdivision); . a Site Review Permit modification of Planning Action #2004-141 to construct 60 multi- family units (modified from 117 units); . Amendment to certain Conditions of Planning Action #2004-141; and . a Tree Removal Permit modification of Planning Action #2004-141 to remove 12 trees greater than 6" d.b.h. (modified from eight trees) . an exception to the City Street Standards to allow a portion of the sidewalk along Clay Street to meander around a Cedar tree located in the southwest corner of the property (unchanged from Planning Action #2004-141). PROJECT INFORMATION: APPLICANTS: Housing Authority of Jackson County 2251 Table Rock Road Medford, OR 97501 LAND USE PLANNING: Urban Development Services, LLC 485 W, Nevada Street Ashland, OR 97520 Tel: 541-482-3334 LANDSCAPE ARCHITECT: Laurie Sager & Associates, Inc, 700 Mistletoe Road, Suite 201 Ashland, OR 97520 Tel: 541-488-1446 CIVIL ENGINEERING: Construction Engineering Consultants P,O, Box 1724 Medford, Oregon 97501 Tel: 541-779-5268 SURVEYOR: L.J, Friar & Associates 816 W, 8th Street Medford, Oregon 97501 Tel: 541-482-5009 OWNER: City of Ashland 20 E, Main Street Ashland, OR 97520 OWNER: Housing Authority of Jackson County 2251 Table Rock Road Medford, OR 97501 DRAFTING & DESIGN Daniel R, Horton 169 W, Main Street Eagle Point, OR 97524 Tel: 541-830-1014 ARBORIST: Laurie Sager & Associates, Inc, 700 Mistletoe Road, Suite 201 Ashland, OR 97520 Tel: 541-488-1446 WETLAND BIOLOGIST: Agate Engineering 1175 East Main Street Medford, OR 97501 Tel: 541-282-7930 1 ADDRESS & TAX LOT: 380 Clay Street Assessor's Map 391E 11 C, Tax Lot 2500 ZONING & COMPREHENSIVE PLAN DESIGNATION: R-2; Multi-Residential HISTORY: In June and July of 2005, the Ashland Planning Commission unanimously approved and issued their Findings of Fact for the Subdivision's Outline Plan, Site Review Permit, a Tree Removal Permit and Exception to Street Standards, At that time, the Planning Commission also forwarded to the Ashland City Council their recommendation for Annexation, Comprehensive Plan and Zone Map amendments (PA-2004-141). In March and June of 2006, the Ashland City Council approved and issued their Findings of Fact on the Annexation, Comprehensive and Zone Map amendments (P A -2004-141). In October 2006, a request for a one year extension was granted for the subdivision's Outline Plan, Site Review Permit, Tree Removal Permit and Exception to Street Standards (P A-2006- 02009), In July 2007, a request for a one year extension was granted for the subdivision's Outline Plan, Site Review Permit, Tree Removal Permit and Exception to Street Standards (P A-2007- 01229). In July 2008, a request for a one year extension was granted for the subdivision's Final Plan, Site Review Permit, Tree Removal Permit and Exception to Street Standards (P A-2008- 01060). In November 2008, the Ashland City Council and the Housing Authority of Jackson County agreed to acquire the property for the purpose of affordable housing and park land. INTRODUCTION: The subject property is located at 380 Clay Street, immediately adjacent to the YMCA soccer fields - between Ashland Street and East Main Streets. The property was recently annexed into the City and concunently received approval for a 53-lot subdivision, 117 (reduced to 107 units with Final Plan application) single and multi-family units, a tree removal permit and an exception to the street standards for a meandering sidewalk adjacent to a tree (Planning Action 2004-141), Of the original 107 units, 17 units were to be affordable and the remaining market rate. The developer had finalized his financing, completed all of the Home Owner's Association documents, generated all of the civil engineering documents and was preparing to start construction. In November of 2008, the City of Ashland and the Housing Authority of Jackson County agreed to purchase the property in order to develop portions of the property for affordable housing, additional park land or both. As noted, the applicants are proposing five land use entitlements and modifications to the original approval which include: . a 3-lot Land Partition (modified from a 53 lot subdivision); 2 · a Site Review Permit modification of Planning Action #2004-141 to construct 60 multi- family units (modified from 117 units); . Amendment to certain Conditions of Planning Action #2004-141; and . a Tree Removal Permit modification of Planning Action #2004-141 to remove 12 trees greater than 6" d,b.h, (modified from eight trees) · an exception to the City's Street Sandards to allow a portion of the sidewalk along Clay Street to meander around a Cedar tree located in the southwest corner of the property (unchanged from Planning Action #2004-141). PARTITION: Lot #1: Lot #1 is 5.63 acres in area with an average slope of approximately 3%. The parcel includes the property's .83 acres of wetlands, a future road right-of-way along the northern property line, a large portion of land adjacent to the YMCA soccer fields, the existing farm house and accessory buildings and virtually all of the sites trees. The parcel is oddly shaped and will be a remainder parcel (undeveloped) until the property is developed into public park lands, additional housing or a combination thereof. Lot #2: Lot #2 is 4,00 acres in area with an average slope of approximately 3%. The parcel is "L" shaped and incorporates the proposed housing area, off-street parking area, common spaces, play areas and new streets. Lot #2 will be owned and maintained by the Housing Authority of Jackson County, SITE REVIEW PERMIT: Density: The property is zoned R-2 with a base density of 13,5 units an acre, The subject parcel is 4 acres in size allowing up to 54 units with an additional 6 units being added via density bonus provisions, In this case, all of the 60 units are to be affordable rental units allowing for an additional density of 25% (18.106,030 G.). As such, 67,5 units are allowed because ofthe density bonus, but only 60 units are proposed with this application. Note: Due to the annexation provisions of Chapter 18.88.030 F. the 5,63 acre remainder lot (Lot #1), minus areas of natural constraint, parks or right-of-way, will need to provide 90% of the zones base density when developed, Units: The proposal includes 60 affordable rental units to be owned, maintained and managed by the Housing Authority of Jackson County, The housing sizes and types vary as follows: 12 - one-bedroom 665 square foot flats 26 - two-bedroom 948 square foot townhomes 12 - two-bedroom 888 square foot flats 10 - three-bedroom 1182 square foot flats 60 units total with 918 square feet of average living area per unit Vehicle Parking: The parking requirements and obligations per 18.92.020 and 18.88.060 are as follows: Studio units or I-bedroom units less than 500 sq. ft. --1 space/unit. I-bedroom units 500 sq. ft. or larger--1.50 spaces/unit. 2-bedroom units--1. 75 spaces/unit. 3-bedroom or greater units--2. 00 spaces/unit. + lon-street space per unit 3 Proposed Unit Types: One-bedroom Two-bedroom (TH) Two-bedroom Three-bedroom Total Required Parking: Total Provided Parking: # of Units 12 26 12 10 Vehicle parking spaces required 18 45,5 21 20 104.5 (105) 110 Bike Parking: The bike parking requirements and obligations per 18,92.040 are as follows: One sheltered space per studio and I-bedroom unit 1.5 sheltered spaces per 2-bedroom unit 2.0 sheltered spaces per 3-bedroom unit Proposed Unit Types: One-bedroom Two-bedroom (TH) Two-bedroom Three-bedroom Total Required Bike Parking: Total Provided Bike Parking: # of Units 12 26 12 10 Bike parking spaces required 12 39 18 20 89 92 (sheltered) Architectural Design: The proposed buildings are well articulated and have a variety of building accents, fluctuations and material changes typically not found in traditional multi- family developments. The incorporation of these elements provides a visual opportunity for not only improved aesthetics, but also individualism, Each group of buildings has multiple rooflines, staggered volumes (porches, wall faces, etc.) and heights to help break-up building mass. Each unit has their own porch or balcony depending on the type of unit. The elevations show a variety of materials being used with shingle siding in the pediments and base, standard siding on the walls, standing seam roofing, and 3~ trim around the windows and doors. Furthermore, the unit's porch posts are to 6" X 6" with a wrapped base and when combined with the shingled base, give the units a sense of permanence. All of the units will be painted in earth tone exterior colors, Building Orientation: The plans show ten sets of building groups ranging from four to six units per group. All of the buildings orient towards the street or the site's wetlands, All parking, other than parallel on-street parking, is to the rear or sides of the building in an attempt to minimize its appearance. Each individual unit has its own sidewalk leading directly to the porch and front door helping to not delineate each unit, but also improving their sense of entry. Common Building and Recreation Area: The proposal includes a neo-craftsman "community" building and recreational "play area" within the center of the project. The community building is attractively designed with multiple fronts creating an inviting feel. Each front has a large covered patio with three of the fronts having glass entry doors and windows allowing for a "natural" security by the residents. The project's play area or "tot- lot" includes a play structure commonly found at the elementary schools. Both the 4 community building and play area are delineated by sidewalk or short walls. The overall area of the recreational space and play area is 9% of the project. The project's wetlands are not included in the calculations although they clearly are a visual amenity and include a viewing platform and sidewalks on three sides, Conservation Measures: Although not required by code, the proposed development will comply with either the "Enterprise Green Communities Compliance Path" or the "Earth Advantage Certification Path," but most likely the latter. The specific elements of this project will include at minimum the following: . Energy Star lighting throughout . Upgraded attic insulation to R49 . Upgraded window U value to U.35 or better . Energy Star appliances including: refrigerator, dishwasher, & clothes washer · Energy efficiency / low SEER PTHP and forced air units . Water efficient toilets using 1.6 gals, per flush or less · Low flow shower heads and faucet aerators . Use of engineered wood products where possible · Use of recycled contents in finish flooring . Native trees and plants appropriate to the site and climate to be specified. · Interior paints, adhesives, and sealants to be specified as low or no VOC. . Retention of wetlands in its natural state · Metal roofs for "clean" storm water runoff routed directly into adjacent wetlands. . Street, parking and sidewalk storm water run off to be retained and treated biologically via on-site bio-swales, In addition, besides the new sidewalk to be added along the project's Clay Street frontage (units, wetlands and City property), the applicants will be constructing a "significant" amount of off-site sidewalk and street improvements in order to improve the areas limited pedestrian facilities. This includes approximately 330' of sidewalk and curbing along the adjacent County property to the north and an additional 100' of sidewalk and curbing to the south connecting the existing sidewalk leading to Ashland Street. These improvements help facilitate pedestrian movement and keep vehicular trips to a minimum, Considering this property is located within \4 mile (5 minute walk) of retail facilities, professional offices, grocery stores and other services, the reduction in vehicular trips should be realized, No other off-site improvements are proposed other than standard utility and storm water improvements as noted herein. Street Designs: All of the project's streets, as well as Clay Street, will be improved to current City Street Standards. The interior streets are to have a 52' right-of-way and a % street improvement with two 10' travel lanes, a 7' parking lane, 8' planting strip and 5'-6" sidewalk. The remaining \4 street improvement (along the edges of Lot #1) will occur when that portion of the property is developed. Along the property's Clay Street frontage the plans show additional paving allowing for two travel lanes and a bike path, 6' sidewalk and a 7' -6" planting strip for street trees. However, the plan also shows the planting strip as a "bio- swale" in an attempt to retain heavy metal particulates from the street's storm runoff prior to release into Bear Creek (see Sheet 6, Agate Engineering plans for details), Although this type of improvement isn't common in Ashland, it's very common in Portland and Eugene in an attempt to biologically reduce pollutants prior to entering major stream corridors, The best 5 local example of this type of bio-swale improvement is within the parking lot of North Mountain Park. Transportation: The original Traffic Impact Analysis for this site was for 130 single family and multi-family residential units. In that analysis, the findings concluded that three of the four intersections impacted by the project will continue to meet applicable mobility standards but for one - Clay and Ashland Street. In that analysis, it concluded the intersection would meet mobility standards if a dedicated right-hand turn lane was added at the intersection. In this scenario, there would be one in-bound lane, one out-bound left lane and one out-bound right lane. This application continues to agree with the analysis, However, considering the recent discussions involving this intersection and the Coming Attractions Theatres project at 2200 Ashland Street (P A02008-01318, Approved December 13th, 2008) and the Oregon Department of Transportation's position on that application's turning movements onto Ashland Street (a State Highway), there is likely to be a raised median at this intersection which would nullify the need for the additional lane. As such, the applicants are proposing to install the lane's pavement without curbing, but would request the improvement be deferred until the proposed units are initially occupied and not complete the lane's paving if the median is installed prior to occupancy. Under this scenario, a significant amount of asphalt, effOli and cost could be avoided as there would be no purpose for an "'additional" turn lane if the median was installed first. Wetlands: The subject property has ,83 acres (36,499 sq. ft,) of wetlands located within the northwest corner of the property along Clay Street. As with the previous application, the wetlands are to be retained, slightly modified and expanded in order to improve its functionality and aesthetics. In addition, the wetlands will have a "public" viewing platform from the Clay Street sidewalk as illustrated on the project's landscaping plans and wetland plans. In addition, various types of wetland plants will be added in order to increase its ecological and biological benefits. When complete, the wetlands will have a total area of .93 acres (40,490 sq, ft.) - not including the bio-swale areas noted below which will likely increase the appearance of the wetland by an additional 10% to 15%. As noted previously, the application doesn't include the wetland area as part of the project's recreational space even though there is a viewing platform and pedestrian sidewalks on three sides. The wetland boundaries have been officially delineated and accepted by the Division of State Lands (DSL) and were approved as part of the original application along with the proposed wetland plan approved by both DSL and the Corp. of Engineers. The proposed improvement plans have also been review by DSL and the Corp. of Engineers and final approval will occur once all of the applicable engineering documents are complete. All communication to this point with both DSL and the Corp. has been very favorable. Bio-Swales: As noted, the application also includes a number of bio-swales throughout the site in order to biologically improve storm water quality by removing suspended solids to settle out and retain storm water during peak storm events - minimizing downstream capacity issues and erosion problems. The plantings within the bio-swales help filter particulates and their associated pollutants as runoff passes slowly and evenly throll~ the channel. The pollutants are then incorporated into the soil where they may be immbbilized and/or decomposed by plants and microbes. 6 Landscape Strategies: The planting plan was completed by a local Landscape Architect, Laurie Sager & Associates, familiar with the area's climate. The Landscaping Plans illustrate the various types of trees, plants, and groundcover proposed for the project based on their relationship from the sun, least active areas and most active areas, In addition, the Landscaping Plans show a heavy emphasis on plants and shrubs, rather than a water consumptive lawn. The parking areas provide shade trees in an attempt to minimize surface heat gain, shade vehicles and sidewalks. There are a number of extended landscape islands within the parking area to help soften the area and break up the linear alignment of parking spaces. Street trees are to be planted 30' on center and planted in accordance with the specified standards noted on the landscape plans. The trees have been chosen from the adopted Street Tree list based upon their setting and amount of hydrology. Utilities: Within the development and along Clay Street the electrical, television and telephone service will be underground within a 10' wide public utility easement. The sanitary sewer and water lines will connect to the existing service lines within the Clay Street right- of-way. Storm water mnoff will drain to the existing system along Clay Street and to the planned bio-swales. In addition, an equal portion of storm water that currently drains onto the 5 acre property to the north (Cooper property) has been engineered to continue to drain in order to retain the historic level of hydrology that feeds that property's wetlands. AMENDMENT TO CONDITIONS (PA-2004-141): The proposal is partition the lot into two parcels and developed in two phases. As such, the conditions of approval applied to the original Site Review Pelmit and Outline Plan Subdivision (PA-2004-141) either no longer apply or more aptly should apply with the conect phase - regardless if the next phase is developed as a park, additional housing or both. The following conditions of approval are include "suggestive" amendments (delctcd / added) followed by the applicant's explanation, 1) That all proposals of the applicant are conditions of approval unless otherwise modified here. 2) That a consent to annexation form be completed, which is non-revocable for a period of one year from its date. A consent to annexation agreement has been submitted. 3) That a boundary description and map be prepared in accordance with ORS 308.225. A registered land surveyor shall prepare the description and map. The boundaries shall be surveyed and monuments established as required by statute subsequent to Council approval of the proposed annexation. A boundary description and map, prepared in accordance with ORS 308.225 by a registered land surveyor (Jim Hibbs, LJ. Friar & Associates) has previously been submitted, 7 4) That the applicant submit an electric distribution plan including loan calculations and locations of all primary and secondary services including transformers, cabinets and all other necessary equipment. This plan must be reviewed and approved by the Electric Department prior to Final Plan at the time of Building Permit submittals. Transformers and cabinets shall be located in areas least visible from streets, while considering the access needs of the Electric Department. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Electric Department at that time for their review and approval. 5) That a final utility plan for the project shall be reviewed and approved by the Engineering Division and Building Division at the time of Final Plan Building Permit submittals. The utility plan shall include the location of connections to all public facilities in and adjacent to the development, including the locations of water lines and meter sizes, sewer mains and services, manholes and clean-outs, storm drainage pipes and catch basins. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Engineering and Building Departments at that time for their review and approval. 6) That the identification, relocation and piping of existing irrigation facilities be addressed at the time of Final Plan Building Permit submittals. The design, relocation and installation of irrigation system shall be reviewed and approved by the Talent Irrigation District prior to the City of Ashland approval of the final engineering construction documents. The irrigation facilities shall be installed as part of the overall public infrastructure requirements. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots, In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Talent Irrigation District at that time for their review and approval. 7) That the engineering design of all on-site storm water detention systems (i. e. wetland/detention system) shall be reviewed and approved by the Public Works Department, Building Official and Staff Advisor prior to Final Plan apprmal at the time of Building Permit submittals and the commencement of public infrastructure installation and the issuance of an excavation permit. The design of the wetland/detention shall incorporate required pollution control systems (if applicable), while the discharge shall be designed so as not to significantly increase the volume of runoff beyond pre-development amounts on the property to the north. The permanent maintenance of on-site storm water detention systems must be addressed through the project's CC&Rs and approved by the Public Works Department and Building Division. 8 The subject property is no 10nger being subdivided into multiple lots, but instead partitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Engineering, Building and Planning Department at that time for their review and approval. Considering there no longer will be multiple lot owners, but instead one owner (the City of Ashland), there are no CC&Rs. Nevertheless, it should be clearly understood the project's Civil Engineer completed the engineering documents for the subject storm water detention systems for the previous application which were reviewed and approved by the Ashland Public Works Department as they relate to this condition and specifically the property to the north, 8) That the engineering construction drawings for Clay Street comply with City of Ashland Local Street Standards. Clay Street shall be improved along the entire frontage of the property. Improvements to Clay Street shall consistent approximately with the following standards: 28 feet of pavement overlay width (includes two travel lanes and an approximately six-foot bike lane), curb and gutter, storm drains, 7.5' planting strip and a six-foot wide public sidewalk. The Pinal Plan civil plans shall include profiles and cross sections, with erosion control and slope stability methodologies installed consistent with the standards contained in AMC 18.62. 080B. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. In this case, all civil drawings and documents submittals will be provided at the time the building plans are submitted and delivered to the Engineering and Planning Department at that time for their review and approval. 9) That a half street improvement including curb and gutter, storm drain facilities, planting strip and public sidewalk be installed along the street frontage of the neighboring property to the north (39 IE llCV, #1100). The design of these improvements shall be consistent with Ashland's Local Street Standards, allow for a smooth transition to the adjoining sidewalk network and be provided at the timc of Final Plan prior to issuance of a Certificate of Occupancy Permit. Such improvements shall be installed as part of the overall public infrastructure requirements for the subdi"v'ision project. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. Regardless, a half street improvement including curb and gutter, storm drain facilities, planting strip and public sidewalk will be installed along the street frontage of the neighboring property to the north (39 IE lICV, #1100). The design of these improvements will be consistent with Ashland's Local Street Standards and will allow for a smooth transition to the adjoining sidewalk network. 10) That an engineering design for a right turn only lane on southbound Clay Street at Ashland Street shall be provided at the time of Pinal Plan Building Permit submittals. The engineered design shall include the widening of pavement width -at the intersection; installation of curb and gutter, storm drain facilities (if applicable) and sidewalks from the Clay Street/Ashland Street intersection to and through the bend (i.e. elbow) in Clay street to the existing curb and sidewalk on the west instdlled 9 as part of the overall public irifrastructure requirements for the subdivision. Widening improvements for the right turn only lane may be deferred until issuance of a Certificate of Occupancy Permit with all other improvements noted herein deferred until Lot #1 is developed. Widening improvements for the right turn lane shall not be completed if a median on Ashland Street is installed prohibiting east bound (left) turning movements from Clay Street onto Ashland Street (Highway 66), As noted above, the original Traffic Impact Analysis for this site was for 130 single family and multi-family residential units, In that analysis, the findings concluded that three of the four intersections impacted by the project will continue to meet applicable mobility standards but for one - Clay and Ashland Street. In that analysis, it concluded the intersection would meet mobility standards if a dedicated right-hand turn lane was added at the intersection, In this scenario, there would be one in-bound lane, one out-bound left lane and one out-bound right lane, This application continues to agree with the analysis. However, considering the recent discussions involving this intersection and the Coming Attractions Theatres project at 2200 Ashland Street (P A02008-01318, Approved December 13th, 2008) and the Oregon Department of Transportation's formidable position on that application's turning movements onto Ashland Street (a State Highway), there is likely to be a raised median at this intersection which would nullify the need for the additional lane. As such, the applicants are proposing to install the lane's pavement without curbing, but would request the improvement be defened until the proposed units are initially occupied and not complete the lane's paving if the median is installed prior to occupancy. Under this scenario, a significant amount of asphalt, effort and cost could be avoided as there would be no purpose for an "'additional" turn lane if the median was installed first. 11) That the engineered construction drawings for all new public streets within the project shall comply with City of Ashland Local Street Standards. The minimum street width shall be no less than 22 feet in width at intersections (unless permitted by the Ashland Fire Department), and a minimum width of 26 to 28 feet when accommodating on-street parking on both sides of the street. Plans to include profiles and cross-sections, with erosion control and slope stability methodologies installed consistent with the standards contained in AMC 18.62. 080E. Application will comply. 12) That a strcct plug, onc foot in r',:idth, bc dcdicatcd adjaccnt to public strccts and allcys that adjoin thc north property boundary. In addition, a strcct plug shall bc dedicatcd along thc castcrn boundary of thc projcct, bctwccn thc public allcy and cast property line. This condition is no longer applicable as the entire north side of the property has been incorporated into the whole of Lot #1, owned by the City of Ashland. 13) At the time Lot #1 is developed, either as a park, housing development or both, +htH the engineered construction drawings for the project address the design and 10 installation of public multi-use pathways and fence gates from the project to the City of Ashland Parks/Ashland Family YMCA Soccer Fields. The design of the multi-use pathway shall be in accord with City Local Street Standards, reviewed by the Director of the Ashland Parks Department, and approved by the Staff Advisor prior to signature of the final sun:cy plat or the installation of improvements associated with Lot 1 the subdh:ision. That the development and surfacing (i.e. all weather surface) of the multi-use pathway at the south boundary of the project be extended through the existing easement on the adjoining parcel to the south (tax lots #200 and 201). A design for the pathway shall be submitted at the time of Building Permit Final Plan approval and installed as part of the subdi','ision's lot's public irifYastructure. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots, Considering Lot #1 abuts the propeliies to the north, east and south, Condition #13 will be addressed when that lot is developed. 14) That public casements shall be ident?fzed on the final surv'cy plat for all multi use patln'.'a)'s. The project CC&Rs shall note that the path'rvays arc for public use and shall not be obstructed or through acccss to the cast restricted unless authorized by the City of Ash land and Ashland Parks Departmcnt. The previous subdivision approval incorporated pedestrian connections to the south and east of the property. However, the application has changed and the connections are no longer applicable to Lot #2, but most likely will be when Lot #1 is developed. As that time, public pedestrian easements will be designed into that lot's site plan and recorded. 15) That the requirements of the Ashland Fire Department, including but not limited to hydrant placement and flow and apparatus access, shall be clearly ident?fied on the engineered construction drawings and reviewed and approved by the Ashland Fire Department at the time of Building Permit submittal Final Plan and appro~:ed prior to signature of the final sun:ey plat or the installation of improvements associated with the proposal subdh'ision. The subject property is no longer being subdivided into multiple lots, but instead partitioned into two lots. 16) That all recommendations of the Ashland Tree Commission noted at their February 3 and June 9, 2006 meeting and consistent with Ashland's Site Design and Use Standards and Tree Preservation Ordinance, shall be incorporated into a revised Landscaping Plan (if applicable) prior to Final Plan Building Permit approval. The recommendations shall be included on a revised landscaping plan and final irrigation plan at the time of submission of building permit. The application includes a proposal to modify the Tree Removal and Protection Plan and will have met again with the Tree Commission prior to Planning Commission'. review of this project. 11 17) That prior to any disturbance occurring on the site or the issuance of a building permit, a Tree Verification Permit shall be applied for. Required Tree Protection Measure (18.61.200) shall be instituted prior to any development activities, including, but not limited to clearing, grading, excavation or demolition work, and shall be removed only after completion of all construction activity, including landscaping and irrigation installation. Application will comply, 18) That the owner of Lot #1 shall remain responsible That a final copy of the CC&Rs for the HomeO'rt'ncr's Association shall be prmidcd at thc timc of Final Pkm and appro'v'Cfj prior to signature of the final sun'c)' plat. CC&Rs to describc responsibility for the pruning and continual monitoring of the three poplar trees. maintcnance of common arca landscaping, private dri'v'C'/:ays, multi use path'v':ays and on sitc storm v:atcr dctcntion facilitics. Thc Homc01l'ncr's .Association is responsible for contracting 'vvith a utility maintcnance company for the The owner of Lot #2 shall be responsible for the maintenance of the storm water wetland/detention facility. All paramcters for maintcnancc of the facility, including ti.'nc lincs and cnforcement, shall be rC'v'iewcd and approved by the City Public Works Dcpartment and described in thc CC&Rs. Because the subject property is no longer being subdivided into multiple lots, there will be no Homeowner's Association or CC&Rs. However, if Lot #1 is further subdivided and developed, this condition appears to be appropriate at that time. Nevertheless, the property owner of Lot # 1 is the City of Ashland and will be the responsible entity for maintaining the Polar Trees. 19) That the project complies with the Affordable Housing Standards as described in 18.106.0300. Each affordable unit shall be identified and the required term of affordability agreements (i.e. in perpetuity) signed prior to signature of the final survey plat, with proof of recording submitted to the City of Ashland Housing Program Coordinator prior to issuance of a certificate of occupancy. Application will comply. 20) That the CC&Rs identifj: 'vvhich units arc subject to thc City's Affordablc Housing requirements terms of affordability. All of the units identified will meet the City's Affordable Housing requirements, 21) That a Demolition/Move permit be issued for all applicable structures on the property prior to signature of the survey plat. Application will comply. 22) That opportunity-to-recycle facilities shall be identified in conjunction with the dksrgl1 of each building and in accordance with the standards described in Section 18.72.115 of the Ashland Land Use Ordinance prior to issuance of a building permit. 12 Application will comply. 23) That the color, texture, dimensions, shape and building materials for all exterior components of the project be included at the time of submission of building permit. The information shall be consistent with the colors, texture, dimensions and shape of materials and building materials proposed and approved as part of the land use application. Application will comply. 24) That required bicycle parking shall be identified on plans submitted at the time of building permit review. The parking shall be designed and installed consistent with the standards described in 18.92.040. Application will comply. 25) That the applicant agrecs to construct the project in accordance rvith the appro',:ed plan and City ordinances and ','.'aives the right to filc a claim undcr Oregon Statervid-c },1easure 37. The signcd ',vai'ver shall bc submittcd to the City of Ashland Legal Department for rC",:ie'r'.' and apprO';:al prior to signature of the sur,'C)' plat or adoption of a resolution or ordinanecformally annexing the property. This condition no longer applies as it has changed ownership. 26) That prior to Building Permit Final Plan submittal, the applicants shall submit a wetland delineation and wetland mitigation/enhancement plan that has been reviewed and approved by the Oregon Division of State Lands and Staff Advisor. Such plans shall include civil engineering specifications for any water detention, water treatment and water distribution. Application will comply. 27) That 50% of the affordable units shall be completed and occupied by qualified households, at or below 60% area mcdian income, prior to issuance of a eertificatc of occupancy for the last of thc .first 50% of the market rate units. Prior to issuance of a building permit for the final market rate unit, the final 50% of the affordable units shall ha',:e been issued building permits. All affordable units must be occupied, or a rcntal agreement or purchase agreement shall be executed with qualified low income households, prior to the issuance of a certificate of occupancy for the final market rate unit. Purchasers or renters of the designated affordable units shall be income qualified by the City of Ashland and the City shall be presentcd rvith copies of all rental or sales agrecments associatcd r',:ith the d-csignated affordable units. That prior to issuance of a Building Permit, the Housing Authority of Jackson County shall submit income qualifications and guidelines in accordance with the City of Ashland's Affordable Housing Standards. Considering all of the units are to be affordable, the majority of this provision no longer applies, 13 28) That an agreement be recorded requmng the poplar tree grove situated at the southwest corner of the site to be protected and preserved in accordance with the approved Tree Protection/Tree Removal Plan (Applicant's Exhibit L-1.0). Any modifications or amendments to the plan would be processed through a Tree Removal Permit procedure. The southwest corner of the property as delineated on the Tree Protection/Tree Removal Plan (Applicant's Exhibit L-1) would not be covered by Exempt Tree Removal Activities, Section 18,61.040 C. as described in the Land Use Ordinance. Further, the agreement 'r'v'Ould stipulatc that further development of the southH'est corner that includes an increase in the number of residential units shall include a perccntage of residential units fOr purchase or rent to households consistent 'rvith the rcquircments for annexation and commensurate with City of Ashland rcsolution adopting a range of qualifj:ing incomes. First, a Tree Removal Pennit was obtained for the Poplar Tree that fell in October of 2006. Second, the submitted Tree Protection/Tree Removal Plan has a new exhibit label. Third, the tree exemption noted (18.61.040 8.) pertains to multi-family zoned properties with a single family house which allows trees to be removed without permits. In this case, the remaining parcel (Lot #1), would fall under this exception without this specific language, Finally, the cunent proposal exceeds both parcels affordable housing obligations as noted under Chapter 18.106.030 G. TREE REMOVAL PERMIT: Twelve of the sites 30 trees are to be removed with this application in order to provide the project's necessary transportation facilities such as its roads and sidewalks, Generally, the trees proposed to be removed are consistent with the trees approved for removal as part of the original application, but for the few trees within or adjacent to the proposed east/west street right-of-way. Most notably, a 40" d.b.h Poplar tree is to be removed as it sits directly in-line with the new street. According to the project's Arborist, this tree is healthy, but its tolerance to construction is poor as well as it's susceptibility to limbs falling. Regardless, this is the only significant tree on the property proposed to removed. Note: In October of 2006, a large 40" d.b,h, Poplar was removed due to a major limb break causing a hazardous condition. At that time this information was forwarded to the City and Tree Commission. Also during this time, the remaining Poplar Trees were pruned in accordance with the original tree preservation plans. The revised Tree Removal and Protection plans have been updated to recognize any changes since the original approvals, All tree protection measures have been designed by a licensed Arborist and Landscape Architect. The Tree Protection Plan notes that all tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042. In addition, during construction the site will be monitored by the project arborist. STREET STANDARDS EXCEPTION: The request for a Street Exception's request remains unchanged since the original approval (P A - 2004-141) as the new sidewalk along Clay Street needs to meander towards the curb and run parallel in order to connect to the existing sidewalk to the south. In doing so, the sidewalk avoids a 24" Cedar tree. 14 Findings of Fact The following information has been provided by the applicants to help the Planning Staff, Planning Commission and neighbors better understand the proposed project. In addition, the required findings of fact have been provided to ensure the proposed project meets the Partition standards as outlined in Chapter 18,76 in the Ashland Municipal Code (AMC), Site Design & Use Standards as outlined in the AMC, Section 18.72.070, Site Design & Use Standards (Design Standards Booklet, adopted August 4th, 1992), the criteria for a Tree Removal and Tree Protection as outlined in the AMC, Section 18.61 and the criteria for a Tree Removal Permit as outline in the AMC, Section 18.61. For clarity reasons, the following documentation has been formatted in "outline" form with the City's approval criteria noted in BOLD font and the applicant's response in regular font. Also, there are a number of responses that are repeated in order to ensure that the findings of fact are complete. CHAPTER 18.76 PARTITIONS: A. The future use for urban purposes of the remainder of the tract will not be impeded. The future use of the remaining parcel (Lot #1) has not been impeded as the remaining parcel will have direct frontage and access from the public streets to be installed as part of this application, B. The development of the remainder of any adjoining land or access thereto will not be impeded. The future development of the remainder land (Lot #1) will not be impeded by the proposed development as as the remaining parcel will have direct frontage and access from the public streets to be installed as part of this application. C. The tract of land has not been partitioned for 12 months. The parcel has not been partitioned in the previous 12 months, D. The partitioning is not in conflict with any law, ordinance or resolution applicable to the land. The partition appears to meet all laws, ordinances, and resolutions for the proposed partition. E. The partitioning is in accordance with the design and street standards contained in the Chapter 18.88, Performance Standards Options. The proposed partition is in accordance with the design and street standard contained in Chapter 18.88, Performance Standards. Clay Street as well as the proposed streets will be improved to % street standards (City Standards) with the remaining y.:j street improvement OCCUlTing by the other side of the street's adjacent property owner. 15 F. When there exists adequate public facilities, or proof that such facilities can be provided, as determined by the Public Works Director and specified by City documents, for water, sanitary sewers, storm sewer, and electricity. All public facilities serving this parcel are adequate and located within the Clay Street right- of-way. According to the multiple communications with department representatives, all of the services such as water, sewer, storm, and electricity are available and are not at capacity and can accommodate the proposal. G. When there exists a 20-foot wide access along the entire street frontage of the parcel to the nearest fully improved collector or arterial street, as designated in the Comprehensive Plan. Such access shall be improved with an asphaltic concrete pavement designed for the use of the proposed street, The minimum width of the street shall be 20-feet with all work done under permit ofthe Public Works Department. Other than a nan'ow section of upper Clay Street (sharp turn), Clay Street's paved width is at least 20'. At the time the project's street improvements are being completed, the applicants will also pave the upper pOliion of Clay Street in order to ensure its required 20' minimum width is met with all of the work being done under pennit from the Ashland Public Works Department. H. Where an alley exists adjacent to the partition, access may be required to be provided from the alley and prohibited from the street. No alleys exist on or adjacent to the subject property CHAPTER 18.72.070 SITE DESIGN & USE STANDARDS: A. All applicable City Ordinances have been met or will be met by the proposed development. It has been the intention of the applicants to meet all City Ordinances without requesting any Variances or Exceptions to the Site Design Standards. To the applicant's knowledge, all applicable City ordinances have been met and will be met unless otherwise noted herein. At the time of the building permit submittal, the application will be substantially consistent with the proposed application and will meet all conditions of approval imposed by the regulating authority. B. All requirements of the Site Review Chapter have been met or will be met. All of the requirements listed in the Site Review Chapter, Section 18.72, have been met without Variances or Exceptions. The Site Review Chapter was designed to ensure that high quality development is maintained throughout the City of Ashland. The proposed application was designed and redesigned in order to best meet this purpose and produce a quality living environment. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. 16 The development complies with the City of Ashland's Site Design Standards, adopted August 4th, 1992, A thorough response as to the project's compliance with the Site Design Standards, Section II-B, Approval Standards and Policies for Multi-Family Residential Developments; Section II-D, Parking Lot Landscaping and Screening Standards; and Section II-E, Street Tree Standards, has been provided below, D. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88, Performance Standards Options. All utilities serving the project are within either the Clay Street right-of-way or from McCall Drive which will be extended via easements. None of the utilities are at capacity to service the development. A pre-application was completed on November 5t\ 2008, with City Departments reviewing the application and assessing availability of services, All utility work, including driveway tuming standards as required by the Planning and Fire Departments, have been incorporated into the site plans, Three new fire hydrants are to be installed and all of the units are accessible from either the adjacent rights-of-way or the private driveway designed to meet width, height and weight requirements for fire-truck ingress and egress. SITE DESIGN APPROVAL STANDARDS: Multi-family residential development shall conform to the following design standards: II-B-1) Orientation II-B-1a) Residential buildings shall have their primary orientation toward the street when they are within 20 to 30 feet of the street. The proposed application meets the Site Design Standards, Section II-B-la, The buildings that are within 20 to 30 feet of the street (right-of-way) and include porches oriented towards the street. The front facades have been designed to have an attractive and pedestrian friendly streets cape environment as each street fronting unit has a 6' deep front porch and a sidewalk extending from the adjacent right-of-way to the porch, II-B-1b) Buildings shall be set back from the street according to ordinance requirements, which is usually 20 feet. The proposed application meets the Site Design Standards, Section II-B-l b, as well as the setback requirements of Chapter 18.24.040, D. which allow porches to be as close as 10' and houses to be 15' from the front property line. II-B-1c) Building shall be accessed from the street and the sidewalk. Parking areas shall not be located between buildings and the street. 17 II-B-2) II-B-2a) II-B-2b) II-B-3) II-B-3a) II-B-3b) The proposed application meets the Site Design Standards, Section II - B-1 c. Parking is within the center of the project in open parking stalls, All of the parking is generally hidden from the street's view other than a few spaces at the entrances. The units are accessed via a sidewalk from the streets and/or .from the parking area. Streets cape One street tree for every 30 feet of frontage, chosen from the street tree list, shall be placed on that portion of the development paralleling the street. Where the size of the project dictates an interior circulation street pattern, a similar streetscape with street trees is required, The proposed application meets the Site Design Standards, Section II-B-2a. New street trees, every 30' of frontage, will be planted in accordance with the City's adopted street tree standards, The new trees have been chosen from the City Street Tree List. Front yard landscaping shall be similar to those found in residential neighborhoods, with appropriate changes to decrease water use. The proposed application meets the Site Design Standards, Section II-B-2b. The applicant's landscape plan has been designed keeping in mind the project is for a multi-family residential building complex and that water usage should be limited. The proposed planting species are similar to what would be found in other multi-family neighborhoods around the community. Other than the lawn area near the play area, only small amounts of turf are proposed in order to decrease water use. Landscaping Landscaping shall be designed so that 50% coverage occurs within one year of installation and 90% landscaping coverage occurs within 5 years. The proposed application meets the Site Design Standards, Section II-B-3a. The landscape plan has been designed to meet a 50% "spreading" coverage after the first year and 90% "spreading" coverage prior to the development's 5th year. The landscaping plan was designed by a local landscape professional knowledgeable of the various plant and tree specifications for the Southern Oregon climate. Landscaping design shall include a variety of deciduous and evergreen trees and shrubs and flowering plant species well adapted to the local climate. The proposed application meets the Site Design Standards, Section II-B-3b. The landscaping plan incorporates a variety of deciduous shrubs and flowering plant species for Southern Oregon. The landscaping plan was 18 II-B-3c) II-B-3d) 11- B-3e) II-B-3f) II-B-4) II-B-4a) designed by a locallandscape professional knowledgeable of the various plant and tree specifications for this area. As many existing healthy trees on the site shall be saved as is reasonably feasible. Please see the attached Tree Protection Plan. As many of the site's existing trees are being saved and protected where reasonably feasible. All tree protection measures have been designed by a licensed Arborist and Landscape Architect with the intent to retain as many existing healthy trees as reasonably feasible and still meet the various other site design and zoning requirements (multi-family housing), The Tree Protection Plan notes that all tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042, In addition, during construction the site will be monitored by the project arborist. Buildings adjacent to streets shall be buffered by landscaped areas of at least 10 feet in width. The proposed application meets the Site Design Standards, Section II-B-3d. The buildings will sit proudly along Clay and the new streets with porches and landscaping between the buildings and the public sidewalk as illustrated on the landscaping plan. Parking areas shall be shaded by large canopied deciduous trees and shall be adequately screened and buffered from adjacent uses. The project's landscaping plan identifies a number of shade trees in order to reduce excessive heat gain. All of the parking is either screened or adequately mitigated from the rights-of-way. Irrigation systems shall be installed to assure landscaping successes. Refer to Parking Lot Landscaping and Screening Standards for more detail. The proposed application will meet the Site Design Standards, Section II-B-3f as an irrigation system will be installed at the time the landscaping is installed. The landscaping and the irrigation system will be installed by a professional landscape company, Open Space An area equal to at least 8% of the lot area shall be dedicated to open space for recreation for use by the tenants of the development. The proposed application meets the Site Design Standards, Section II-B-4a, The applicant proposes 12,245 square feet (8%) of recreational space to be used by the tenants, In addition, more open space is spread throughout the 19 II-B-4b) II-B-4c) II - B-5) II - B-6) propeliy including the bio-swale areas, areas between buildings, porches and balconies that have not been considered in this calculation. Areas covered by shrubs, bark mulch and other ground covers which do not provide a suitable surface for human use may not be counted toward this requirement. The above standard is intended to preclude areas that typically do not promote space for outdoor activities or social gatherings. Such activities typically include parking lot landscaping, architectural landscaping or landscaping along pedestrian and vehicular access corridors, As such, the project's Landscape Architect has designed the recreational space so that shrubs, bark and similar ground covers are not included in the calculation, Nevertheless, areas not included in the number that should be appreciated as recreational space include the project's porches, balconies and wetland viewing platform as each provide an opportunity for outdoor recreation and human interaction. Decks, patios, and similar areas are eligible for open space criteria. Play areas for children are required for projects of greater than 20 units that are designed to include families. The proposed application meets the Site Design Standards, Section II-B-4c. and includes a play area, lawn area and a community building. Natural Climate Control: Utilize deciduous trees with early leaf drop and low bare branch densities on the south sides of buildings which are occupied and have glazing for summer shade and warmth. The proposed application meets the Site Design Standards, Section II-B-5. The landscaping plan was designed by a local landscape professional knowledgeable of the various plant and tree specifications for this area. New plantings include deciduous trees that provide for early leaf drop for full winter solar access and summer shading. Building Materials: Building materials and paint colors should be compatible with the surrounding area. Very bright primary or neon-type paint colors which attract attention to the building or use are unacceptable. No bright or neon-type paint colors will be used on the building, The proposed material and colors will be earth tone colors consistent with building materials and colors often found on residential buildings. 18.61.080 CRITERIA FOR ISSUANCE OF TREE REMOVAL - STAFF PERMIT: An applicant for a Tree Removal-Staff Permit shall demonstrate that the following criteria are satisfied. The Staff Advisor may require an arborist's report to substantiate the criteria for a permit, As noted, the proposal is to remove 12 trees of the site's 30 trees, All tree protection measures have been designed by a licensed Arborist and Landscape Architect. The Tree 20 Protection Plan notes that all tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042. In addition, during construction the site will be monitored by the project arborist. The criteria are as follows: A. Hazard Tree: The Staff Advisor shall issue a tree removal permit for a hazard tree if the applicant demonstrates that a tree is a hazard and warrants removal. None of the trees within the proposed project to be removed are being removed because they are hazardous. Instead, they are being removed in order to develop the property in accordance with the project's transportation needs and the City's Site Design Standards. Nevertheless, it should be noted the Polar trees are very prone to limb breaks and considering their size a concern as the Poplar limb that fell in 2006 nearly landed on the adjacent neighbor to the south's house, but miraculously only causing minor damage. B. Tree that is Not a Hazard: The City shall issue a tree removal permit for a tree that is not a hazard if the applicant demonstrates all of the following: 1. The tree is proposed for removal in order to permit the application to be consistent with other applicable Ashland Land Use Ordinance requirements and standards, (e.g. other applicable Site Design and Use Standards). The Staff Advisor may require the building footprint of the development to be staked to allow for accurate verification of the permit application; and All of the trees to be removed are due to their location within a planned street or sidewalk system which is required by the Land Use Ordinance or Site Design and Use Standards. 2. Removal of the tree will not have a significant negative impact on erosion, soil stability, flow of surface waters, protection of adjacent trees, or existing windbreaks; and Removal of the trees will not have a significant impact on erosion as the trees to be removed are on minimal sloping lands, According to the project Arborist, the removal of the trees will not have a negative impact on erosion, soil stability, flow of surface waters, protection of adjacent trees, or existing windbreaks, 3. Removal of the tree will not have a significant negative impact on the tree densities, sizes, canopies, and species diversity within 200 feet of the subject property. Removal of the tree will not have a significant negative impact on the tree densities, sizes, . canopies, and species diversity within 200 feet of the subject property, Again, all of the subject trees have been assessed by the project's arb ori st who has also chosen the replacement trees. The City shall grant an exception to this criterion when alternatives to the tree removal have been considered and no reasonable alternative exists to allow the property to be used as permitted in the zone. Nothing in this section shall require that the residential density be reduced below the permitted density allowed by the zone. In making this determination, the City may consider alternative site plans or placement of structures 21 or alternate landscaping designs that would lessen the impact on trees, so long as the alternatives continue to comply with other provisions of the Ashland Land Use Ordinance. No exceptions are proposed with this application other than the street exception to meander a sidewalk away from a 24" d.b.h. Cedar tree, The applicants have explored alternative designs, but due to the configuration of the property, access management standards, and the minimum density standards required in the zone, the proposed plan was chosen. 4. The City shall require the applicant to mitigate for the removal of each tree granted approval pursuant to AMC 18.61.084. Such mitigation requirements shallbea condition of approval of the permit. The applicants are aware of this provision and will comply, 18.61.084 Tree Mitigation Required An applicant may be required to provide mitigation for any tree approved for removal. The mitigation requirement shall be satisfied by one or more of the following: A. Replanting on site. The applicant shall plant either a minimum 1 Yz-inch caliper healthy and well-branched deciduous tree or a 5-6 foot tall evergreen tree for each tree removed. The replanted tree shall be of a species that will eventually equal or exceed the removed tree in size if appropriate for the new location. The tree shall be planted and maintained according to the specifications in the City Tree Planting and Maintenance Guidelines as approved by the City Council. The applicants will mitigate the loss of the 12 trees by planting at least 12 new trees within the project's boundaries. In fact, the landscape plans show significantly more trees that the required minimum. B. Replanting off site, If in the City's determination there is insufficient available space on the subject property, the replanting required in subsection A shall occur on other property in the applicant's ownership or control within the City, in an open space tract that is part of the same subdivision, or in a City owned or dedicated open space or park. Such mitigation planting is subject to the approval of the authorized property owners. If planting on City owned or dedicated property, the City may specify the species and size of the tree. Nothing in this section shall be construed as an obligation of the City to allow trees to be planted on City owned or dedicated property. The applicants are aware of this standard and if determined to be necessary, the applicants will comply. C. Payment in lieu of planting. If in the City's determination no feasible alternative exists to plant the required mitigation, the applicant shall pay into the tree account an amount as established by resolution of the City Council. The applicants are aware of this standard and if determined to be necessary, the applicants will comply, 22 18.61.200 TREE PROTECTION Tree Protection as required by this section is applicable to any planning action or building permit. A Tree Protection Plan has been submitted as part of the application in order to protect the trees planned to be preserved as well as the site's neighboring trees, All tree protection measures will be installed prior to any construction and a Tree Verification Permit obtained in accordance with Chapter 18.61.042. No development activities, including, but not limited to clearing, grading, excavation or demolition work will occur without the protection measures in place, Protection measures will only be removed after completion of all construction activity, including landscaping and inigation installation. EXCEPTION TO STREET STANDARDS: 18.88.050.F - Exception to Street Standards - An exception to the Street Standards is not subject to the Variance requirements of section 18.100 and may be granted with respect to the Street Standards in 18.88.050 if all of the following circumstances are found to exist: A. There is demonstrable difficulty in meeting the specific requirements of this chapter due to a unique or unusual aspect of the site or proposed use of the site. There is a demonstrable difficulty in meeting the aforementioned parkrow and sidewalk standard in the far southwest corner of the property as it would require the removal of an 18" Cedar tree. B. The variance will result in equal or superior transportation facilities and connectivity; The request will result in the preservation of a mature Cedar tree and be at least equal in value as the standard pedestrian transportation facility, C. The variance is the minimum necessary to alleviate the difficulty; and The request is the minimum necessary to alleviate the difficulty. D. The variance is consistent with the stated Purpose and Intent of the Performance Standards Options Chapter. The stated Purpose and Intent ofthe Performance Standards Options Chapter are found in Chapter 18.88.010 of the Ashland Municipal Code and is as follows: 18.88.010 Purpose and Intent - The purpose and intent of this Chapter is to allow an option for more flexible design than is permissible under the conventional zoning codes. The design should stress energy efficiency, architectural creativity and innovation, use the natural features of the landscape to their greatest advantage, provide a quality of life equal to or greater than that provided in developments built under the standard zoning codes, be aesthetically pleasing, provide for more efficient land use, and reduce the impact of development on the natural environment and neighborhood. 23 The request is consistent with the stated purpose and intent of the Performance Standards Options Chapter found in Chapter 18.88.010 as the applicant is proposing to retain a mature Cedar tree that would otherwise be removed. 24 ~ l .; /~ d J.il1JlUS :J ~ 00 ~'\ iO- ~ I (Il1' tJ I!) ,..~ ,.... '- ~ '- ~ " 0) I~ C\') 1Zh\ vrCINITY MAE V NO 5CALE .ttI n.. ! ~~. it ~~ ! ~ I 1; I: !:....~-'-_!!!!.._-- ...... l' '1' R-2 i!f -~ II _II !5 (:' .1 RR-S -- //' ......-1 ..... ,/ ,. - i ex) I It) tI J.Vl:J · co I 1.C) /' .. '\....:.. ...~ . o. '1L, I OTO$l......~ .... 0 t.... -? >". "'6.. 0 ",' \;'0 6-;:"f /;.;.~ '" ......\ "'1' <1 \.~ "i- t... R-2 .- -- .... - ...... .,,:...... ':"":.n"iiiti'"-_- ..._......... ~ )It ~ ...... .~ .~ "'...., ~~.. \.'i' ..... "1- .$> -$- ..... "" V-t- 0 4- -? ~ " 0 ",'" ,,, 4-..... ,..... 6- ",' ,)- /' 1- "'~"'1' ,iI ~ t... -~".....'"' ~ ~ ,!'Ilfl o 00 ~ 0, " 0'> ~ \ ~" 4- '0 6- ~':"~ $\ . ,rG'''LGI'(~)3dld,~ Ill'll ~ "q, I ~ O ~ 9>0 ~ OJ t>~<',O "" I ,7IrI2lLG!'(NJ3dI.,.l,,[f ANI '6: "b ' ~ -0.. I" V '.' ,G/oH.GI';\313 ,,/~- I ~}., ,,~c> ~'\O 't", '" \' , " j~Xl1"'1> .p ~ HJ.<Q& ~ I "'{ '1:,'9" v,,,, "',Pi,!'\ 'S- ~'" jqn:x,1'~"N '.J~~o I ,ilGi/<X;1 O(m)3dld. 9 ANI \Jj ....-~'t \"'", ?t,"'", 0''',,, ~" '&J.~Xl1.) " ~1 ~;I ,iIG",,~I'(&!3dld,/:IANI :V /~;- ..~ <>..%- V~"" 11 j~aai ,c. ~l"Qi Ii} ,@03'l1'.lBl'(~)3d/d.~ ANI ~'\1 /0 J <>' "id ~'?'1dOc!:~ .-aMd.~ j6Y1~U'S."S.6gS ~ ~,,~. ~~' ,~LH.I'^~131:1.~',....r'Il. il; I S("6I, " ~, [l:Ti<< /." ,C' '", ~ [' il~r: 01' ~ _ ~l ~ .- HI<~, r32r,i~9N ,. ..., ------ 11'59 I I ..< " . - \ ----"" ,,\VL .-"'O',;,r, 1:' ::.,y.' ------ ~O)rOO '.",HiL' a ~)d NI11N3"~ ''''7Pi" ~ ~ .-~ F -~:" ,,/ ~ (, :iS~5:\--- \\",:~m3a,o>1 \ ~ ~ 0'>'''''''''';'' ,~" . ':""2- ;;, ~V' I ""'~,,$7\ -, mmn___", '1__":J 0 I' "'-~I\ "i · '1\ 0 F'\r,.--X" '>-..j i.: ~~ rl--- \ ;:--- --------~;-:p ~ ~}~Q--- -- ./ /2 --~- ~f II : / - ......,...'1 ~_-:' r~ Jli @f~ /2' ~--: ~,_ Ij I! i--n ,.-';-'-I(r;''LI-'' ",111m /"' ',- ~ j I: 1;'::.--.... ~ ,Ii', ~ .~~N ,iZl~rSi: *..::li,;~f+ il 1\,/ I i:( ~ LI'g~r' '~, I I r~-. ~f ~ll i .11 ~1Q4 -~I ~.. H j~ f ~~R~~ ~~ T~~~ ~ b?-t-o ; ~I ~4~ ~~~ ~) :Il O=,aJ ~~ ~r I ~ ~~1'. ,! ~, · ;.------! '--;.- ~ I ~ :. 1ft -+.-l1iWv Q ~ -'- , , . - I N ~ · '-' _ i! : - ~ ~fL p: ~ ~~ ~:f; ~J.~ g; l: I ij I ~ i-\l sl r:r. --.., ---.... If' -,: . \1/ I ,./' II' b{ i I 'L IRl ~ L f1 ~~ i ~ l~ r- ~ ~ ~::rr - ~ / I - n ~ .J, I I I LJ I IH I-L ! l~ l-L rnJl' ir.j,ll III c.L V 1- I~ ~ ! ! ~ unj ~ ~ ~ ,,~.t,~"'~,'I~ "li~\:I' .,+h~~Ol;~;;r~ I ~ l I I' ~ ~ ~ ~ ~--!~h · ~ !~ lIt.!: ~mfZ ~ , " ~ ~ II,)--j" ~H - E! ~:r~ :r. ,"'\ P\lf ~ . 'It 1/ [ I v I [ r--; .~ .' >zy ~ "~~~~I~~ 'I~ [; ~ ~ ~In~! ,,~rr !l a -. p; ,r~~ .~? 1 ! ~ 'II" ~ i - p; fj ; ~ A ~ V I I t I~! W~1' '!!~ I~ I ~'t 11M ~ i 1 I !, i;> 1 J I '~~I ~~ ~4 It ,,~:. ~ · PIt ~ ~ I ~ f I 1- fu N~- i ~ ~ V". ~ ~ } e- "" ~ I ~ f : ~J~. rMi n~'O' :j;~. E ~,1[;l~.- A ~J @ I I-- ! u, ~ I-'- ."\X"i ~ ~ ;0 I\l;;A 1 ~ I 1-;' I_~ I Y 'Z." ~ j ~ d l f3 ~'=a '"_:t l-~ ~ff ~ : a ~ ~ f:I: TI Vl ~ '- (i 1...1 . I I ! -. ~9€ ~ ~u= ~ [l;'14 ,t r'----. _u.\ 1 ~~~ J~~Jil ' ~, : I'~ '~ 19, j;i t r"f~ - \_-L___~~~~ i Pf I - ~ ,.-I .M; ...<"~~.r.l ~ ,. f~f~,:~(2)9 ,~ILI i~ \ j ~ --f--" I ~ ~~l_ ~y~~."< ,!, i1ti ,'",,' ~ , d I ~ a ';, - 1 q \ 1W1~t- jlll i i 11 I I Ir" ' Ir..: o-.! '"I I I,~ I I~ I I I -i n. H~ i'.. If'J'fl.,i ~ ~i / f :, I~~. ~~aHII~_ ___=>!(lll! ~L9i-h~ ~r ~I-~, ~)~~ ,~~/ ~' be- T L" ' ~~!P:.t J-l- \ '51 " I V1 f 1f==1-"~~ I- ~ ~ ~~ ~" II \ -'-,__, ./___ \ '/ ~ I~ - >---- jl~;' - - T. '" I rv li' I / ~ !ij I ,"if!JI / air a II~ ~ '~\~~li tf;. r:i fi LJ ,/ ~ 1>1 : I' ~I II r4:1~rh f' ~ ~1'N"'. ~ ir I V H;a +.. I! ~ I ' ,,,,,_____ ~ : c;J ~ ;L~ ,[gf- : I -+ :: ~It~ ""-k'; ~~' \/ ~ Ii ," " ~... !lr.-.. f 1. I~ ! t1i ! , "I ! !I j I \ .: ~ r& I~ I~ ~ I I ~ I i · i ~ +' i ~" ~ Y j. , ~Il ~ r :), 1 u t I 1 - - ~ tn: p n ~~ 4k- 1'n:Jt1 'N--r ~ 1~ ",,-------- _--1- I I I F! f1B I ~ ~ 1:;I1,J' 'I f ~. ,_' ~ j ~ I ~ x 1tli ~.~.~ f \JI ~i ~I // r' ~ 1 :1 I ~ ~ ~~~:: I L~~'~.\__ -".:~_ ~j /)'/ bj, ~ r ~ ~ J I' - . LlJIJI X ~ ~ --- ~ \ --"'n t\~/. II I 'r- - r- 4- -...-- .... 'I . _" ~ ~I 1,;1"'~ N! \~~tI=lIAYCSJ!, rr ~ " l__. --- I 1\ ___/ I -1", r.'l ~ I' -' \}/ 1 L~ j - - ,," n" ii~. 1 ~ ... ~ ~: ~~ ____ ~ 11 \ S5'9r9 _ Io\"OL,9r.69M a~ I ,~,--- II .. ; j ~ ~ "l .. ~~~~~ ~ ~ Uh~ ~ ~ "....' ~ ~ ~ ~.;~ ~ mm";m ~~ ~it~ 9; ~~~ ~ ~~~ I ~i ~t~ i 1Il2~~ ,a, "Q ~ 1~lx ~ ~ ~i ~~~ ~ IIi! it! liP I flllll r~ ~~~ ~i~ii j~1 !i ~~hl ~I ;~~ ~2~~2 ~~ ~l ~~~9 i"- ~D 61 1"---___________1"1 1 ~ tlt~l ~ '''j N , It: _______. ~951 ~ ri : ~~~~~"~-~! ; " , Ii------ -~ q~ ....0 ~'''"- .." ~"" D \-- II: .. & ~~ I ~~ 9.12 ~! . 5~ p h ~ ~ I ~5 ~ ~1!1!l'1 ~ ~ ~H I ~~ ,.;~ u"" ~~~~ t~~~" ,,,., t~.. Il ~~~I~I~~U ~..~ ~ir~i I~ - i U~J ~i~~~ /=:1 I I;:'"j II ~! illl!illlll jlil! I i,l!1 II II ~,.,.".,.,l ~~~9 ~ ~~!! ~a ~3 jll i~~~~~~~~~~~ t jL o o (ilu [Q~~ l- I- II) , ou-~ (ij.J ill u~ lfl ~ <t: 3'" o Z tl) ~ ii~li i~~~ ~llJl ~~~Q I!!ii} ~ I::: ~~~~ ~~3 ~ '" 11. ~ i~!lljlfl . ~ ~ ~~~~l!i!lf ~ <t ~~~~ rrf~1 ~ ~mf ~ m I ~ ~ ! ~~ ~ ~ ~ ~~ I 9 ~ ((J."~II ~ f =- 9 ; ~ <:l: .. ~,i $ I -------m I I I I I i I I , , : : ~~l~ ,I ____JI --,[-" " I, ~~l : , ! , , : : , ---~~.. ru-- , , , : i : , , "-_.u__ " I I : ! I I : I I I , ~=~ " " ____Jl --1'-"" " " ~~~ I I I I I : : , : i ______..il Y- ~~ -0 ~ plll !GO I- u..>->-- . ...,0::: W W~I-~~ ~ ~~~~ Illf -[Q ~(i ..JW-::J If: :r~ 1-0 ~[O()~() ~ -.Q~ ~" ~ <J) , ~s~o~~ Q ~e !~~lllilll.lo \flOC ~~ 6 ~oc 1:1: ()~:JG~() z I- ..J..J ltw'1 IlllL u -w UI 1:D.~\fl1:0 ~ ' 'b'! I' f N Om ell ~1: ~~~~~~ . oc~~ .fth ~ <{ :::!3 ~o (f\ -0)1", ii1lR IE 11 ell:),"" ~ ~mf z 80 Q) II x ill -l {l "<t , z '1 ...J: Q I o ~'" 0- --l IL tY ill 3 o --l ~ ~ ~ ~ ~ ~ ' I- ~~ ~ ~ . (l , 1:: <j<l!;' <I 'j..J ~ ~ m ~~ t ~ ~ t!~" ~ ~ ~i ~ ~ d) ,,:I;l. oll x W -1 (L "'t I Z 1 -1= (L~ llY o ~Ii\ 0- --l IL it ill [L :J ~ ~ ..J ~ ~ ~ z () t-- 1: ).Q W~ 6 l- 1: ). = (,) ...J~ ill =" I;:"'" l- II o z ~ ~~~~--"1lI I I : i , : i I I I l:''::~ II " _~~_JI Ulr-..I ,I I' "--:.Ji i I I I I I I : I I I I ____._..111 r-~~ , I I : i I I I "'~_._n ~ ------.... I : , i I i , , r:-"~ " " ____JI --..",--' " " ~~~ : : , I I I I I ! I I I f ______....a:I ~ -0 PO "lilt - ro~~ (j I- - >- <J) , cJ)(k':~Q ~1V'11 Z \l....,J-l -WUI 9ro~~ -3<fl ~O Z d) ~o lL }- . lliZI-I-Z~ ..JUJN. Il ~ ~to6~o ~ ~9~O~~ 6 O~:JOZ~O ~ll !i:UJ<[ rolL <{Q~~1@ ~ ~I.'lZO~r It ~tl)<[~ tfl::JJN 00 II x ill -1 't I ~ -1" lL~ (t!" o ~<l 0- -1 1L Il ill 3 () -1 cl 8 ~ ~ ~ 111 ~ ~ :n ~ h ~' <lCI Iilii) .. ~ t ::!...l ~ ~ ~ ~ II- 0: . -15- :!: ~ ~ ~ <I ~ ",:I 10' x ill -1 0- 't I Z <{ -1" lL~ It:'; o :;'01 o -1 u.. U:': ill lL lL :J ~ 1~~lI h;;~hlj~ .. iX~ ' ~{fs ~ :::: 4~ i!~llliill ~ l~ .~ ~~~~~ it5~'f ~ (l\ , rl3~ ,z}!t ~ <t m~~ rill ~ llJIr ~ ! \ _u___-. , , , , , , : , I , , i C"=~ " Ii ~_~~jl - --lr--' I' " ~~~ , , , , : i , : , I , , I ------....11 rnn , I I : I I L : , , "- ---~---. I i I ! I i , I I ~~~ 'I ____Jl --'r-.... " " ~~~ i i , I : I : I I I I I __~___.. JL ~~ 0 ~ 11~J'I 0 I- ~}- }- ~ -It w w:z;1- I- ~[Q ~oc -IW- Z y:1l ! h~~lIIIJ Illt(l ::J ~>- 1-0 <[ 0 0 LlO <l. i~ I f3 2 - <Jl ' ~O:t l) a . I'l ililll, Iii · r ~ll'. ~~ ...JI- ffi~ ~ 91t "1'1 O~:J Z ... ~ i 1,1 !illl !$ ~ ...J-I Jtw<t 0 ...Ju.. 0 \ ,.. U~H i" f ~ "'t -w LlI '1O~ <S) {fio w ~ro <Jl ~ <[w ~ ~3~Ph!l ~ 1: ~<[ :z;~z ~r 3 lfI '1z- Il\ iil ~ fIil1 0 -Ii) <{ N <Jl:::J -, N ~ ilHr z 80 0) :r:r (l Z x ill -J fL 't I ~ -J= €I I (l}. o ~<I\ 0- -J IL (l ill 3 o ~ ~ ~ ... ~ ~ m ~ ! ~ I ~~ ' <f0 II- 1Il;jj ~ .. II- ' :!j ~ ~ ~ ~ t ~ It ~ i- ~ lJj ~ ~ "- ~ ~ ~ ~ x ill -J fL "t I Z <t -J= €I oc::O O~ 0- -J IL rt ill [L :::J n_____~ I I I : I I I ] ~..~ " " ____JI ,r-..J ,I ,I L~~ i , : I : I I I I I I I I ------.... -----~"'IiI , , I , , I , I , , I I I ~.;;~ " " unJl ~,;_... I' " ~.':.~ I I , , ! j i I ____~~--Il r---- , I : I j I I I lu~ ., : , ] , , , , , , , I:'=~ " I, _~_.JL __,;r...nf I' ': ~~~ , i , I , I , , , I , r ~_____j 'y,[ ~t 0 0 Ii >- ~ j;llI I- 1->- @ -[i W Wzl- I- !:l-1O ~~ -lW- Z ! 1ll[1Y :J ~OC .. ~! i~! ,!ll " ~>- 1--0 0 uO , \l)' ~oo t) ~~ ~ :;?;[i Cl ...J:I ~ II~id,~,lli i III 9[i ~~ o~~ z U-lo ~ !1'HIIIII~ 0 -l...J ltU-l1 0 ...JlL I- Sill OJ: [lJ(l tJ ~~ 1:ClI.') Q) ~ . 'llip j' f ~ 111 rlllO ~ "1w ~~~ ~[ ~~~ o~f!1 ., <I 3 ((\ jJ) 0 -11) 1: <'l 1'" ~!lf · \l):J ., N Z 50 (f) :r:I Cl I If iI ~ x ...J [L ~ , z </. .J~ ll~ It! o~ o u.. It w .3 o .J ~ ~ h ~ UJ (Q Iii i: :E tr l I ~ <[<&. ~~ ~ i; ~ - II- [. Cl rl :n- $ a.. I-R ~ ~ R III Il)Y '" J: i;! ~ ~ ~ . Ci ~ ~ oc i ~ ~ i l ~ ~ x c:::::J I~' >Ii;l llJ~ II r :J z o I- <(~ >& ill-" --I" ill~ I- Q) ill .3 'i... ~o ...0 . If: lii 1:'if1)~oc _ t- D \':I \ II) , - r 0 I.I)If:>-Z \':I oc33 ~WU~ QIO~<{ ~3<fl ::l0 illZ tl) ~~ II t-}->--ci wZr- ll: -lwjt ll: ~ ~[OO~D ~ ~3:tu~Q ~ O~~ZLUO g ltW<{O~1l t <{Q\':II.I)<tO .., Z ,I} Z ~ ~ ~ 9 <(Z-UIl) b': ;nill<{N J::lJN 00 :t:t ~ jqi .. t~ ~ ~~~~ ll!z ~(I u"~ ~'~1~~ i = ~ . idll!lIl, ~ l~ '" u~~ I]Jislf ~ ~ Ii;;j~ If!- ..., A" u:l~~ 'E Ii III 'I, ~ ~Wf \I ~l! - ~ ... E-< ~ d) \':Ix QW ...J-l [fill It(! z' 1> ....1& (L~ (t ~. O~" () IL Ii ill 3 o ...J ~ ~ ~ ~ ~, Q ~~.~~ ; ~~~~' 2 --J2~i~ 1 ~~~~~?~ t~<t'd'~ ! ~<(lii~~~ ~ N:tLUli;\!1ll :I ~ ~ ... Q ~ : oc ~ ~ - 8 ~ -J ...J ~ ~ - ~ ~ =' ... E-1 lL (L :J )l ~~ 0 ~ J;~jl 0 LL )-}-- , -oc t- wtl-~~ W ! ~~~~ tl]! J(Q ~oc -IUl-::J~lZ ~>- t-G WtoauO ~ i!!j l}li'j 5 = <J) , ~3;o~~ .~~l~! ~ " -ll f-~ ~ , ~~!1I1111Ii It 911 :L.J ~~~~~~ t uI ~ ~lIP4jlf! 1 -w <J) ~O~~~lll ~(Q ~"1 <t~;?;O;nr :3 <f\ -d)1.N ~~ qlt 0 <J):JJN Z 00 Q ~ J r lj) IJ: i i ;r ~ 0 -I lOx x ,w '/IJ z-l ~[ 1.l -Ili;l -IQ 1L- 1L- I I ~. ~ " 09 o~ 07. 07. -I " -I" IL ~ u...JI w: ~ ill ill 1L 3 1L 0 :J --l ~ ~ ~ ~ ~~jp: ~ ~ ~oj)~oj)t: ..J r: ~~~~t ~ <t -..J~~~ ~~ ~~ ~ ~ i ~ t ? ~ 9~- t tot ~ j. ~ ~ ~ ~~f-III~>il~ 11)_ " :l: ~ ~ ~ ~ ~ ~ ~ ,!. 0 ~ : ~ ~ 8 ~ j f ~ ~ ':JL ~O 0 0 LL >-, ~ pij I- 1->- -fr: w wzt- ~~ :;r{Q ~~ -lW- :i il!!llth _ IOtOC =:'!~oc ~}- I- Ouo t ill ' ~oO f;fr: }-~ -.J'1 \)0 ' t Iii! il!~ l~ I~ zffi~ 2 9fr: 1:'<1 ()~~ -.J-.J ll:w<:{ o-.Jo t -w UI -<{n~ ~~~ PI ~lD l/l ~ 2'<1 I-W ,;;jlf!ll ~ <( 3 q~:?; 0-[ '" <:{~ 0 -If) ii1liW fi II cQ Il)=:'! 00 )t'< - pi z ~ I lif U) II i ~ ~~ [g ~~ <l;...J :r ~ Il'v"d d,^O ~ ... CD CID r / ....../~ c:J :J lL I I- ~ :J L [jJ ~ III ...J ~ ~ ~ ~ ~ ~ !~ ~ iQ <Il :rill y ~& ~ P'if ~ 0 C) u-)-)- , Q ~ l- illZI-!z~ ~h:t H ill ~ ...J [Q ~~ -J1U-:J~lI::: ;' liiU!lilj i r :J l-Cl ~tOOuO ~ (l) >- <.I) , ~3~o~g ~ ~lillilll!1 ~ ~ 0 >- ~ >-z l- ll': <:[<:[ ~~~~~~ ~ ...J-l , Ul14111 ~ <( Z u:r III :J ill \0 O~~~ill ~ E [Q ~<:[ 1I.'lZO-L 3 '" 6\i)<1~ ~~ fl1t 00 \O:J,N ~ ,! r :JO Oz ~I U) ~ ~ I \ \ " ........,- ,-- //'" I I G,^O 1m [jJ ~ Ij -; ..J :J lOQ , )-7. f- = z.s< :::J f; 0'" 09 I H Z~ <[- ...J~ -l (t o o ...J LL z o f- ~ W ...J ill f- rJ) <1 ill I I- :J o <.I) ~ ~ u E ~o It ).-- ~tft~ 10 ~ It: ::l ~ (l :! 1:n.OOllO .n ~g~O~a' ~ O~::lZUJ~ ~ Itw1:0~1l ti 1:a~Q)<Ia ~ z ~'l Z ~ I- ~ <IZ-Oii) ifjQ)1:.. :J::ljN cO XJ: ill (}': ::J 0) () d{fl Z 1:1~ W-' ill(}':;,~ J: ill 1: fi t- a~ ~i ~H~ ~~j w Ii Ill~ Ii w ::J t- O) -J () ill d(j) . ::r t.O. W'il <J) illQ ZDJ ill D~ ill d) -* ..J (j)$t ::r U d) )- q U ~ (}': [J) oj) I- ~e."',L I!! ~ ct ill ~ Q oj) ~ ~ , in 51 i~ X ~ HH ill ~~ (}': oc ln~ :J ~fi 0) () ..J<{ -JI- ww OZb :r ll. z ()~ ill Q ""t -' ~~ ill fi l< ill Ii 1-;- ~g ::r1L ..J Z U t.l) )- 0 q Ii L'9 II U IL I- m ;. I f! II,..,D~ ill (}': ::J (j) o -l o Z w. 9 ::r'; 0);- 1: Ii l- I Z 1: -J (L +'"' ~.... Il' ,~E-.e: _ ill Ir: I- ~ : I ill ~~: W~I ~ "'. ~ ~~ I III ~ .j ~ ~~ : t f : N ill . l i -!'[ -- J - -l ~ i l.. :"' 0:- I \..-- I, 'r- 51 I - 1l ~ f \ J I. N V 1 10"1- c I [J) I Z 1: -1 -J~ m, 0- n ,g- ~ 13 ~iI i'!!lldl 00 la~~dd;I~! ~ I ~'ill!illlf i~ ~ ~~~U:fihf ~ ~ l!!:iwtt.l' ~i III 'i. ~ dHr !:ou ~:!;!t.;t ~~,.:'"r-= dl~S*~S~~~~~ ~lImilhh ~mmlllll I jmil!liilll m t p:JI ~.~~ lll!~ Ii' n~..~ tdl!~ ~ - j;i:~~~lfPS'.! ~ - t Uii litlll ~ I~ ri3~~~tfh~ -, :::r Hl;~ltr j~ oj ~ ! ~lHr ~ . j--- I - I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , I I I I I I I 1--- --- -------- I --- I I I I I I I I I I I I I I I I I I I I I I I OcSL6 NOO~~O 'ONVlHS'v' LOi::' ;Jllns '{l'v'O~ 301311SIW ooL ::lNI Sl::l311Hjll\f 3d'v'JSONVl S31VIJOSS\f aNY ~3E>VS 3 nt nVl ~ W ...J < IiJ iIi J <. :r: N083~O '(]NVlH!;\f 133~lS h'lll) ost l)3rO~d 8NIsnoH )lOO~ca AlIij311MONS g o N '" ~ g " -", o .... ~ I I l I I I I \ i Ii 1!5 It; liS la It \i \>c 10 \~ I_ I \ I 1 \ I I I \ I I \~_I , I I \ \ \ \ \ I \ \ \ I ---~'~\ i~ \ 1"./ ' 10 \ I~ I :~ \ Ii:! I I 18! I I~.. I it: / lw I~ / 15. I /) If: Iffi Y I~ /'11}; lli' -' 15 I 1:1: I ,g I I I I I I L------------I--- I I -_I ( t\ I I \ I .'\ I I \ I ',,_ I I I Z :5 0.. 0 Z Z 0 W I- " 0 w W -1 I- 0 0 Z rr <( 0.. >- -.... -1zzO::: :;:5:52 00...0.0 2""W WzzQ:; 0:::--0 1-1- llizzzzzzzz 0::::5:5:)5:5:5:5:5 1-0..n.D..1l.n.0.a..11. ~OO(?C)('C)"C> X <(ZZZZZZZZ w w:5:5i=i=i=i=i=t= 0 -1l-l-zzzzzz Z t~~S:5S:):5:5 l- I- 0..0..0..11.0..0.. W OOorOorNC0'<;j"l{) W "-:C\iC\ic0c0('")l"1c.-)C':i I J . I I I l .. ( l if) -1-1-1-1-1-1-1-1-1 !- ill ill 0:: !- (/) !- (/) ~ (/) <C ill ii' '-' I I ~ e ~ t '- S il! 0'1'1 o o.z ~U I I '" ::l o .... i ~ \. \ \ I I i I I / I "~~ I(j~ ,~ 1(' Ii' o ~ I ~ :!' .. w .. .. .. e g :l !II .. .. ::Jfil 0> ....0 ~" ~W '''" wo ml!! go "5 109: I I~ I~ ~ ~ ~ a ~~ wo '"z ",10 1-~ !- (/) WI- ~W I-W (/)e::: <:(1- W(/) n: --- ~ ii ~ ~ w > ~ ~ ~ \ 100 ::J Q wQ 10 W ::J lB '"w ~ ~~ '" .. ~~ g g 0 g ~ l- iill-~ l- ~'" ~ ~ S~ e ~ ;;; ~. 133CllS A Vl~ ! I I I I I I Iw 15 If: Iffi 1:\ Iil' I I I I I I I ~ -0 ~ C'l ~ U .2 . ~ . " e " c: o 1) 2 ~ 8 c: ~ ~ " . J; " ~ ~ ~ ~ ~ c:JB EJ V3C1VlV^OV>l3C1 ONIfNOI1::J31OCld 33C11 1331:11818311'1118\13 (d) f-- W W [( f-- II) I I- ::J ~ 0 II) '> I IY I- W rl: > 0 0 Z t) ~ W -, 0 IY Q () z iil ::J 0 I '" 0 0 rl: al >- [( tl: w ~ 0 Z (J) 0 , :i! i: [( W D- O OC D- O z ::'I I rJ) ..: IL o r:: o w ... -< tJ Ul <0 , ~ ,~ ~ 'H 5 ~~ 2 ~ I ij1i .. 0 0 '$ H & H ~ ~o. ,>; ~.l' II n 3 n ~n 11 U o 0 0 ~ ~~ in ~ B. B..I ~~~~~ ~H~~ ID Il III! 15. ~~ a~ 'n'H! ~H~ . ~835~ i HUh ~ ! r~uH ~ 'tI ."l:l~dStl~ W :i:~~~~~ -J ~~l~;~~~ I ~;~~~~~~ ~gh'~;JlI &&g.~~~.~ ~~~l!l-ill' ~~~.]i~t] ~~{!l!ll l:il'iii"iil-a a "it ~pHH~ hiliU ~.t 1;:I;::I::.9.2.2_S OO.III1~~~ "~.S8~~~ tt~~S-~~2" ... o'J (II i5..li ~ g is.. 1Stitl-l.llOi'I"" tl Z ~,~~.~ B B ~ ~ ~~~~~~~~~~res~~~~~~~ 0 ~~~~~;~!~ S F Z....t-l-I-t-rr-I- ~ ~ i3 .. .. ~ 1; Li: . !i 0. dJ 't _(?...., <) ON 0. _ l:: t: '--'_ ~ QfNm~_~~~~~~_~oo~~~~ OC ~~~~~~~ ::J ::'I -ll.g~h.._~ q; "'... /!;l'l\lolJ!IJ 0 2~~.:S..=:!]~.!o! 0. ~~ f- irrS ~ >- ~'i-g~:~~:~ &: .a~]l]l ~8;~~~~ ~'s. [( ~HHHH o .! ~ 1: C 'l -~ -~ of;.2 -lJ -g :! -g 12' "S ~.~ g iGo lJo 0 C).() [} 0 to\. ~ ~2i~~~i~~~~;l.~;~~ z w n ~ i 10 "" I/l "l'M :J ':l ::>,~.~._ t:.~ ~ 1tII W ~ I HHHnnHHH~ ~ - W ~~Q~~~~~O~~~~~~Oil - c lli ~ ~ ~~IIg~;1~ g: i ~N.::~~!~~~~~~g~~~~ ~ ~T'P1:::~~~~~ t 15 " (-)@'f~~ !s ;H, H p~ F-. l!N [~:: ~ ~!i 2.~l~ & ~;'tlg"'~y~~ :[ ~"''ii-B~~Z'Zi if'; ~ i ~l 5S~~~~~~~~~~~~N~W~ ~ ~ ~ ~ OOl'l il ~2i ~ I'" t;s .~.~.t 1i: .~ .~ ~i~',1: .D I ~In hahi H H H~ ~ H HUH ~; H ~~~ U5 L~~ .~!~~j~ ~i }~ ~~~ o ~ ~ ~ 8 h~, :s i $ ~ g 'iig ~ ~~ ~~;'~~i ~~ ~~ i~.9 Z jii~~~ i; ~~ ;i o ~i ~ib3i~ ~~ ~~ ~~ E 'i~ 'iiB'Oitt: ~~ :~~ 2~ :0 E ~ ~ ~ ~ 'a E: ~ ..tI a ~ ~ rJ..;::: ~ s~ '1~.~a~ISi gi ~~ w !~~~llo;~..~~[ ~".~! o 3~~vi5~~~~B~ ~~ii~ cr: !~ ~~:i~1~r:.!1! "O~~~; o ~~=~_~_E~~l~ B'~~~~ l!- i.~-~~~-g1:~~ i~~ ~~- i~ ~ ~-~~ii]~~~:?.LC(lO '~-l~..e o '.Eii.~~"g:HH~h~~'i t= 62!:8~"[~;~i~~]S.8~~1 ~ ~ l]~j ~~;,: ~ ~ ~1j & ~.~ ~~ iL ~t -~2jii-g:B-;:g:~dii~~~&.2 :0 .a.~~';ati'!.e.j~T.i:jj;nvD.{3~il\(:c ~ ~~i:j~i~~~~~!$~~~~ if) <i. m<..:i CI W ...: u ,~ ~ i II III I ~C:II'I i ~ IJ<I l: I'.:..g . -!-sJ..~ "8 z~ m~~ ,...~ 2.; & ~ i -a f"; ~ ~~ Ill:! ~ ~ ~ li ~~ "I ~ ~~f~IJ .~ ~ ~R ~E- ~ l~~5li~ I~ ~ ~; ~~; ~ g ~2"C~ ~ it !.~ ~~ ..~. .8 ll"~~'C ... , ~~ j~~ _~ ~'~.~I~ S~ rn~ JD ~UE~g ~i~~~'.' ~~ ~) ~; ~.~m~~ ~O$'~~] ~i ~m l! ~~:iE ~~~~;~~ ~;I'~~ ~.& iii.2:f" e.40~~~.!~ .~>-' 0-6 i~ ~;;ii ~~~I~!~ijl 11 "'~ !t-=-giu ~1i:Eais.~1io;;1:'II>J!!I.jg (f) S'l":J; ~.,i e :> 'i _ l: '~ ~ Z III ~ -:i ~ iJ' ',; ,;:a ~ w ".a~ i~~~~i~~~~~~!OE~E~Z t .t. 0 _ '" ....:6 l: 5"E ~ !'l: ..:: "lJ ~ "/'i if! C:l ~.J;; 'tI ~ !;l!jlilli~il~ill!iil~ ~ il!5i!.!ii~!~:~i;:,~~~~~~;::1 D ~l~"wti!c!i=ii'!:,nLS;~~~-8~~~~ ill 3~~~~:~~6~~~!:]~i3~~lS b u--!E!i--&"~ ~...s_ =c- ",oIo{3~15.. OC &~';..iU~"~8j-i~'H~c.1l~ [L ~-~~~~-i5.~-~",~;~~~~!.~~~~:l LU -g i-Z f~~ ~:! e~ ~.5~ ~'[)~""'N~ l::; ~ ~ .9o~.::!;;~&}~~i~~~!~ 8.::~ ~.( ai u d lJOlli z ~ 0 D- -0 Z II 0 "' .... B w ... W -< (; U Ul (} 0.::: D- J ~ 0 ~ LU CI:: W W Ol!: l- I-- e W W [( Z f- (J) -< S I- u W w J: V] UJ ....l I- j:: 1 E " . -~ i .!' 0 " ~ t . ~ ~ Ii ~ 2 ~ .... 1- z o f= ~ W ..J W E 8 . . <IJ " >-.J ol~L6 NOD3l:1Q 'ONVlHSV' LO~ 31lns 'OVO~ 30131lSIW ooL :)NI S!:):UIH:)~V' 3dV:)SON'fl S:UVI;)OSSY ONV lJ30VS 3Il:I nV"] ~ Noono 'ONV1HS\f LBHlS AV1) 08e · !:HfOlld ~NlsnoH )fOOlll(! AlIlI3l1MONS ] c o , > Ji 0- 8 N [}' o . ~.. ..!.. --- -=-::::=-- (\f.1..--- ~If~ ~-'x ~ z ~I ::< I I,: I l~ --- -.... 1 I I I I ~ I I II I) w Z :J >- f- er: w 0.. o er: 0.. --- ----- =1. . ":..'1.._",/<;'8::.1 _ ~,''''..' . 01:-1 .'JNIlH81Vv.J ----- 3NIl A.U:!3dOtld ~;iiiL\!:UJ';;ll\,\l'fiO!-' o ci .-" " -" \ m ~ " ,. '"'' ,"z ,,- ",'" "'? ::;-' '"0. \ ~ ~ " /]~~-----i---~"_ _'. " --~-,- ----,...... r-o "1" r ~ - ,~~ '- --l . 'i> ~~~-~---:..t<~f,-..~'--l ----'.. / ~.', < . / '---..., x........../ .......-....~, .,...... . ~ ,,/ ---...,. ~~,""~~~..., z I , ,I/<t~<::::::j'------.., ------~. '~r-t- :-- I ( . '. -----I ~ -t: ' . ,~~, ___ r--~~~..._ -ir-:"- _~-- ," ~ ~ ------. t-~-~---)f- ,., .. 0 .'____. -L I &, _-- ~ ffi g . ..J~-~-- o.. "'~ ... "'. ~D ~ w ~ .. '" ;ii .. \ I m ~~ ...~ "" "'z ~i= WZ ~~ if:~ \ p~ ~ 0 .. < " 0 '" ~ '''' ~ ~ ~ 1': .. ~ ~ ",., IJJ ~ ~ (j ~ .. ~ " ~ ~~ '" Z ::i " ~ ~ ~ ~ ~ 0 ~ :J I ~- - ~ I 0 U f- ~ <{ :l: :;; ~! H j ~~ ~ o ~~ ~_~_ ~ ~ -! ,. ~ ~~ 8 :;!. ~ ~ - ~ -; 1j ~ ~ ~ ii (..q~ lit:: "a ~ ~ii (I~ .E!"'o ~ ~ ! i ~~ ~~ ~~ .~.~ Iii] ;"50 .~; i] - ~~ i;i~~ -g ~ ~~!~~ .~ ~-5-g",~ i~..~Ej~! .to ",,"~~ ~~"g <l ~;;~~:~}:~€- 5.!:: g ~ ,!;-: 1!i-; ~~~~~~:.~ ~ ~ ~ ~~ ~ :~ ~~ @ ~S~ ~~ ~ ~~~ ~ ~o ~ :;@ ~ ~~ ~ mluJ: I ~Q .-.- ~~~ ~ ~~ ~ <I;:t<.L :.: .0...0 .... g O. ~~ "," "t; 'i> -E ~~ "'- ~ € ~~ ~ ~" Ui\i >- u_ '" ..." Q Oi'i" o Ow Q "0- ;; ...0 . w'" '" "''' w ";;i ~ ~ffio ~ ~i~ ::f ~~~ ~~aJl( ~ &~j % ~~t t- O~I- ~ ~o~ (I) rr.:~-, ~ ~z< o ;lOI: u:: Uzw ~ n N~ llO O~ ~2 00 ~~ ..... W~ "'0 ~~~ ~~~ ~~~ 'LO ~~~ ~ ~ :; z G: '" .. ;:! " ;; z o " z i1 >- . o ~ i w 11 a. ;, -; ;, N ~ OJ ~ ~ - ,. 0 :i @ ~~ Z" .J '=~ ~ ~::; ~" IU z.. 0 ~~ 0 w~ w" z ~ffi F w,_ Z "0. <{ ..:" _J ~~ a. ;1io w b~ w er: zo. f- J..; <:;i J u . o. ci 0 , , 6 [l.jf'.lN ~c....~ @(i!J@ !II@@) . . . . . . ~~~ gag~ ~1i.Q, 1i"li.u. ], ~~" ~ ~ l'l III liE <t z :<: o ;;: :;: o o ~ ~ ~"- ~'" o :. f ~ ., ~g~A,~ fw~;~ .~ ~ ~ 1 ~ Cii (5 ~ c Ji ~ 'Ii _:<l ''''~ " , . tIl~o =i ~ -~ W~.. ] ~ '" r ! o 'Ii 8. ' ] ~ '" -Ii ~ L , . rn~;:; j'il -i ."no. ~ L- ~~ " ~ .';'" w :; <l :z o ii: ;: :z w o '" ~ ~ . ;;: ~ ~ ~:~: "-. ~", 8- O'H ~ . -; II 0 1 ~ 1 i '~ -<( ~ In tIJ v.o t . ~ '" i t~ ~ . ~ ~ ~-~ ~ j~ E ~ . . o . ~H l ~ ~ ~ .! 'S't> ,,~ OJ W"~ " . < . . . oil . ~ ~./l .fg ~~ liD ,)(, -' 0 0:1 ~D T] :E lii~"d lJ Sg ~ ,'. ~h >- " ill ~ ....,. '" U 0 ~ ~ " :!: -.,,> 0 (l " '" W z (()31 6 ~ '" W ~ ~ C) ..J (() (j W 0 (() fj)<{(() 0 ... ,.. .J 0 w "'Z<C z ffi ffi ='za:: f- W w !two =' '" 0 Z f- er: 0 "' ffi <{ <( fj)((O '" f- (( " " .J U Wz d w '" 0.. 11..:: 10 "' II ~n ,IJ1EJ:dO!Id ~ . :., ~ oj ~ ~ ""I " .J ~ ~ f- f- 5 w w ~ w W I I ~ iIJ fj) 0 ~ 0 .J ~ W o C) z ;:: z :'i "- II) =' er: I (() z ~ a.. t? Z I- Z ~ a.. o Z ~ tJ ~ Q N I ol/;L6 NO€l3l1O 'ONVlHSV ~ !? NO$3~O f~ NVl HSV 8 r- lOZ 31lns 'aYo~ 3013llSIW ooL .:': d; .g . ~ r ~ HnlS AVl) ogt: " c D: ~ :lNi Sl:).UIH:nIV 3dYJSCNV"] S:UYI:)OSSV aNY .9. o 0 C .. is 1 D3ro~d ~NlsnoH ~oo~g ^~1l311MONS c ~ ,:! "' i' lI;JE}VS 3 III nV"] c, " ~ !,12 ~~ ~ >. _5 0 ~ ~ >~ N N ~ -" -" ~ 0 f- f- ~ W W '" <i w w < -' -' I I B (f) (f) w ~ z 6 :; ~ ~ " 8~ '" ~ ~ ~ " ~ " G ~ " " ~ w !l. 8~ ~ ro ro " f- " '" <1) ~ <( ~ ~ ~ ,; ,; ~ ~ ~ z 0 / r~----------~~ ;tEr;~ i3N(lff6"~~~' . i;; HI ~) x~ ~ ~,~ w Z ::J I i2 <( ::;; \ "' ~'" ,,"; ..." ,:t, ~,~ ,,~ .~~ w.. \ . .' --f~ l , .,_--- I ..-- ~-'. ~~:'--J::~~=:L -~2=]~ '.%.;.. ...... .-1': - '.--} I _-l,..J.-----;- J~). -~- t~' -l.~c-~-~~_. -c~:~f-=:--=~t=~~t-- _l-- - - I = .1 .'.'..'..... --- : "._c.--" - i .---- :1i --:;i:==- ~_C-I-_.. .--' .~-- .. I -----. \ " ~io Nlo; ..." z." ~~ ~~ w.o. \ < ~:< N~ e-" "" Wz ~i= w:i ~i ( I I ) \ i /-~... .--,-' ~ -.../ /'. . "', / . -'--'" ~ ----~' . . _J "'. ". ~.:- '. '" "-_~ \_.. ". \. . ". ~ ~j :~ ~ .lh ~ 0-0 . ~~ '8 :~ ~ i<J ~ -8 ~ ~ ~~ ' .. 6 0 8 "i i i ~. ~ ~ E H ~l ~] !~ :=li ji t~ l~ '::2 .;; 3: a)$ -1J =-.!: e;'i .a:8 i & <1.-:; 0:- ~ -al ~ liS ~ ~.i~ H "U;:j; "tJ w ~'iJi 1! 1:! :~ ~~-g~i ~h~~H~ =!t-~~1! 3 ~.J:"tl~_~l.ll2 :1~~8;t~ . . ,~.1ii ....Pl l"lV'iIIlUlI: >< ':; '> e- @ ~o ~~ "" " ~ o~ ~ ~~~ iii 8 0 j: "2: o . ".. .Z ". <0 " t~ ~~~ ~~ 0 'H 0 '~ ~ffi~ wO ':; ~~ z'2 ;.- tq ~~~ ~:lli z il:i: "Ie<. .." II ro_ w ~ rJ) !JJ W I- o Z w,.. ~i We- i=" ow ~b ~'" Gffi "'. "'", " . 0 ,,~ ~-' " ::J ~:;I iJg <] " ~ .ffil ~~ "' "'I" " '" ~~ -' :0 "0 ~ ~ .--.l OUl[l ~~ g ~ ~~ . ~ ;&~ ~ "e- ~ w"" .. w" ~~ '" IL. l1.a...l "'0 ~ ~~ g o O-{-I o.~~ h~ .. CLI-,:.:'\{ ,,:>is "'~ ;;. o ~t'I'l- ...D. ~ " 0_ "" w ... w::: ~~~ " e-Z .0 u ~ ~~~ " a oU: NO' => " ;;.;IJ. 1\ ~~~ ... o Dw ~~ m ':'::.:0-1 " ~ ..~ "" "..,J ...0 0 11.1-2''<( ~o.~ " w"' 2 agi!5 Z ~ i/,I..J: "'" " .:.:a~~ " I III ~ ., i] ~&: &1i ~"i "i ~~~~~ 0 ~ " W @~ ~~ -' .~ ~ ,,, ~" w ~~ 0 w> Cl WM Z ~ffi F w~ z "~ '"' <~ -' ~~ <l. ::UO uJ 6~ uJ [( ,.. f- 0 0 " " 0 " " " " @I @I @) @ , ~ m 1< "- "- 1< ;. h ;., " ;., I ~ ~ = '!:i ;':" u ~ ; ~~ :;;il .. ~ 0 (:' ~il P i n~L U) 6 .a: 0 Vi ~ h~ ~~~ i ~'~ """ .. ~ " '" '~ o ii i.i e~~ .on <1)".. z o :0 :E o o . ~ o ~ ~ . ~~ E1: III :: <l z () ii: ;: Z III i3 '" .. . . ~ ~ ~ ~,~ ~ ~l~j~ x:.? ."0- ~~.~:t ~~~~~ ~ i ~ i q~ " . 3 !~. !< ~ . d~ .:> . .. . ~ ~ ci f ~,~ ~ .!!! ::0 0 0~~ "'~W :> i 5" .!:! 0" ~" . ~ " 11 ~ H g ~ ... au ... 0 In ~D "u :;: 00 ~3H! " "'U )- 5~ ~ < "- 0. > ~ "i' ~ ." ., tr.l (rl cJ;IlJI :::t ':' ::: " 0 0' < " z wfi] ~ w w ill ii; 000 ~ Ii Cl . -' (fJ " W 0 rJ)<((fJ wg " ... f:J ~~& ffi z -' Cl 6", ~ f- W W ~WO ::;;~ 0 Z I- [J: 0 " ffi :) c( f- (J)lXo [J: ffi a 0 wz Cl tL <l.<( " '" It w ~ (J) -' ~ W o () z ;:: z :'S lL tJ) ~ IX :I: (fJ z ~ c... ~ Z i= Z ~ Q.. o Z ~ li:i $: Q '" ~ 0l'~'L6 NO~no 'ON'fll-!S'1 LOl' 311nS 'avo~ 30131lSfW ooL :)N I SlJ31[H:)~V 3dV:)SONV] S:llYI:)OSSV aNY 1I3~VS mnVl 'i. " ~ ~ ~ ~ ,I o ~ ;.. Q J.i o u '" NOVHO 'ONVlHS\1 !BUS AVl) 088 l.:J3fOMd ~NlsnoH ~OOijll AlImiMONS 8 " eo-" ~ ~ 1. o . M I ...J Jea, ,'"lie eNlWW;lJeop Will, Pil+OJd 01 aou"'lo aplS1"O S8BJ111" Ol B"IOU., A'.Jodwal aplAilldL "Isnbi> JO ''I''''llijnw >jJep)o ,,8 41!M letJal"U! jlJeld JO U"'lell,,!suI Jaije SealB BUllueld 401n~ '9 " 'II I I'Bj.O Jad sqlll4' pue seaJlll" lueld", ~ liDS 6u~S1'a 1M puOIC1 01 '14BnoJ041ml pue SlJII ,,8"' II0S 11"l'UI'~ "la.\I>J8 pue puoS J"lel8 WOJj puolq lIosdOlAsodwo:) "8 "seale pes Ue "' P""Iq Ilosdomsodwo~ ,,9 .>Bld .;: 0001 Jad 'sqI9'1 "seOlJe O"'jUeld Q"'4s pue aa'lll" "' pualq Il0sdoj/lsodwoo ,n e""ld " S310N l1lf13O 8NIlNVld 9n1:lHS l TlW 100(1 :lOl:l3J.'3:W\tra:.:g-"z "N~i'l: (oS) IlI.UOCI ~ ~08 Lid ^;lI!J~")S SlD(l>J 031\;iO::J183(1 )KI a3:~VW'iO 3NflHd NIW.( H01nw 3a?CleJ a3HSINI:I 01 N:J~lVl3M NI M:;JH~IH ), 1.1..1-Fw1lls ii1'i1lT'tHS S'llfllJHS llli130 ElNI1Nlild 30H1 ~101'Ull'X'iMl SH'G'3.1. Z ~3J,;fv 3^D~37d ~=;;~~;~~~r=;im'jm""'~ "C3l\01'B~ A 1l't10139 lWHS . , ". 1VI;:f31'M 3lffo'(]~~30-oI'8i'JON 'dVl~ml ~o!i; dOl3f',OW~Hj '!r13 3S"JiItmi1W :lOdOl.Lv S3dOB _"I'XIW1IOS a3~d3ad 3srl :t!3=Jil'V-S liDS )INflID WOll.:j J,'t/M"fJ ~ ,~H.1ln~~~N[d33)l -NIW.~ ;HJlnn 3~ HSINl.:l3M9V Z """~~ )OO~ ns ~8S3""'SOOClMZ ~N O'?1f8 l>X ~ U~.8 ',' )I~1'\:l'.:!SDI-I~3l:!BfI'!:I 3:SflS:3:ll")Htb:n~~.s Jo ,IlS eladaN MOl Sla~IBM ,MOl Sla~]eM, ~jad"N D @Slod,,1' ss'"<)\"O(] anlS 5uaJlIIJ"dwas U04"!JjllpllaH ~" " kXln "em 8soH uns '){U!d ~IBSV\,\ whWa41uBljaH ffi1"l .S@IBfi ~ Sol~oll"8 fiul~14M ,sal1jJ8una 5u!IJIIlM. Eme!) .j.,,'liW le5 I !JJoqdSal 5uldeaJ:) snqQlllI~ed snqn(J tz;] ~,3'_1 d''ilrll:l le5 ~ ~"040~ BUld"",:) suada.l 8IU04"l'l i3l .Hvw "0"0 "U@Sj",j iJJ"CiM"~S 402ag sISUa0111f.J ""1lfj",~ ~ "'"' 1_6 ~ ~UBzue~ jadJeJ PI"''''''o ~adJ8J PI"'owo, SOI^4delsOlOJIi ~ ~3^O:)(JNnOl:l!) 1S3XI~ 3ZlS 3~\iN NOi'J~m 3~\iN Jlj11N31:)S r (a) n;-ll~S -,- (0) ~"[>l133HS L I .. - i;1 - - ....ci> 1i~ q,.... - """7;) - err{ 51 m:IPP,. q - ~ ]- - - I I I ( \; :0: I ~ i leB S 12B, 1801 leD 1 le5 1 125 I 120 ) IE5 1 IE5 I leB8 !EDg leB g leB ~ 180\ 180 ) 18B g leD 1 186 I le~ S 1"01 leB ~ IB~S IB6l 18B, I"~ , Slod,,~ Sloe! "~ I"B, leB S IBBI'; I"BS leBg le6 S le51 le6 I IBB S IBB S lED) I"B 9 100g Slod "p leBg I"O.!;H 18o.!iH IBO n%~ 180 "I: 180 "l leo ,,0/,1 1181,S leo ,,0/,1 'llnU! 110\ ,P 100,,%1 I"~ ,. 18551 leo,,!:'.:1 leo ,,2 12~ ,I !"",,;: IIIll,S IBO,,::H Ie, ,,}',r IBO,,%I !lInw II eJ .9 12',:::H 3ZIS I ~-!I . . IIV~I -:')018 I I \ -1 I I ON3931 ONV A~Ol)3~IO 9NIINVld ~ 'Jaqo,oO a,el JO ludli il+2j W uosees '010' 0\ m!Jd pailS wnw"ql^ e"24S wn"Jnql^ PIA"O iJJ8(JMoUS oeJlds uoodlN punoqMOUS eBJlds elu!dlli ""'IdS Wil+,8M .aeJlds 'aJaloM hU041JJ1i MOUWI J",soelw nd )J 2M(] iJBwaSDl:I enl9 ue~shl 850H _)jjOON UDJP""POpO~1:I JOPU81dS 81d1nd IIOJPUapOPD4H "Iqwaz "ADN uillpuapDpo4el "1M"\"8 ellqM I"RlJn8 pael OU!JaMOI:! ~111UOlod POllM510qqli aWd oon~)JBM(] SSeJ8 "!BlUnO~ iJpno~ S5al~ UleIU"O~ "18WeH OIlqwoS ~IUaAe"H "DI"SOd wnld ooeJ8 uOBWQ "!.Ila)l alq noo iJJaq~"1 "''''8Ieo anl8 t?roMSlOj .(JOI!:) 5uudS 81uolleoso SS80"!Jd ~U!d LlleBH "'018 8~4M ~ll"aH 145'N lilAleA a"Ildeo .JaluWI pel~.!JBA '8l,""uolo:) ,""'qJ888 aso~ ~OOl:llesuns a50IJ ~ooH pe~j"lJMOJ8 snLllo"ea8 "!-,oj:l1A 5"410"e8:) 'elS ~'20 a5pes j8al Je412al SSalO pao(J J04leaj s!al"'eo:! AuaqJe9 ~p"n5'n9 I"'OH iJJ"'11"B ese"eder 4sru 9 ojO '0:) Bjl"8me~ UUli'JO~ p,eMOH 8aJl.l.uaqMI!JlS )J"""O auow"lIIf esa""der !JJaqoo!^,as aoue!llll8 uwnl"1i "^O~laz "a8'!:) a62111^ 8^"~laz 8S2A uaaJ8 4sli "1J""no~ lehDel leulp.l"Cl ~OO P9Cl ~20 .Ilns Jeed jO!JoolSIJIi a~ruds enl8 !-,'l~e8 OlddBqBJCl ll!JPMOUS 1'l2eH 4:llJM 8"810 4S\1 i'lUJ€lcI Bl:J AauOj1 s,Hl"d B1:l ~'l~m1 ""'0.18 W04l""H UOIB"'4~"M POCI'VIMDII8,\ Ue,""WIi lnui82"H E!".IoP.I") iJJaq~"~H .IOp"8 aSU"""1 jJ1"lsa4~aSJDH pa~ illOU9 aid2~~ MOlD U!81"nO~ loIoOH eidek'j 'Il"1Jected 81d8~ aUl^ ald8~ pooopo0l9 3~\iN NOi'J~JW (8) n:-l133HS T~ I;J:) o l;!l l~ m 1 r- I [ \L.; suPtdOH 11 sqqOH ~q XOd 90L eWI10Jd pOs pIJal9 a~1:I heM E !:MJ ~ "Z>S-U33H; : ..L...b.. " ~)T~ ~ytQ ." m[r- ~ :r.y,=~ 'lmrIri -rrf 5q~h ell' OJ 1f- ~pG) ~ e.. 8 ~ ~~~~41:~ I ,( ''ill I r (::> I ~ m{~~= I I ,ejSe4S, wnumql^ IIPIA"l' wnwnql^ snqle sodJ"~lJo~dw,S ,punoqMOUS, U e"8Jids ,"!u~r<l, "[ oa".IldS IiSl1IBnOp ea",ids "O.lOieM ~"041UV, "I e~eJlds .EU8N, 'd J::)jBS ,anl8 "8~snl. sn"u"wso~ eue'l\nu BSO(J !OPU"ldS aldJnd, UOJp"apop04~ ,"IqwoZ E^ON, UOJp"apllp04H M1nqlli. ~ uwpuapop04(J wnau!oou'e'S S.3CI!:tJ ,pOOl.'S1Oqqli, 811!IU~IOd Olllwnd ofinw snuld ,iJpnOVl.. "8 wn\aSIUUad ,Ujaw"l1, "e wnl8S1uuad ,UOlosed Wnld.p e"'PUBN UJullop'nb. 81"04.~ .illolp'uafd, 80luodef 8!JIB)! ,"lo.dwO:), t!JqBIB xell sU8J!AJadwes U040!.IJ0l"!leH iJ'10 6uodS, "I" "X ~4j~"'Od ,llsapeJj,8X 2IUOJI8OS~ ,MOlD ajl4M, 20IJj ;W5!N 18NoA, eoUo ."l"woJeW-OaJOIi, 2!OpO aU4deo ,5U!IPW~ s,qlaJIS, 'p 'alseeuolo:) ~asuns, SOl":) sn\"lno"w Jap'""p,,! S"I":J ,EllOlQl^, sn~IOUfil:J ~"lS '!leo, Sfil(lOU...:) lIuo~e~onq Xille:) r18-iSJ3-o:lIJe~1 -2 S!~S-O.J.60ill2Ie:J MU<lQ,1 Su"'lJa8 ,i.w5A,j ~osw!J:J, 1 suaqJe9 ,S~28d u!Ml. "d ,,,240088 ,~U!~Olo'J pl2MOH, "P SqA4dOlSOPJI;I ,epmuJ08, "n STllnqlli ""I "ode! auowa~\I ,a'""'lIuij uwnlrll;l, 'B 'X JaI40u"law\l ,"88J8 all"lll" "S lMo~18Z ,eso^ """-'8, 'S eM~loZ ,p8J401V'1,8 snqJOS BlqnJ ~-n::1I;;:.no edJ"~OJ'ew sn OJan 0 Jl1JOD)S!-'\I, '0 snJ~d ,u8wad WOld JjIJpMOUS, snl.~ ,6IUEU "! 'X s!!awew8H ,ed..JI2'JAXO. "G snup:e..I,:j ,ha"OH s)ajad, "0 $OOI:! ,'a~Jnl UMOJg, '0 snol:! wruAdo"a84d ,noa"\I'j8 .e~nju,~ s!lSl1JP"i8 2"!wOjlle, -~ snliJO:) "I~juappoo SlUe:) s"aJ.Jnoap snJpaool'D ,!!JO!-lH 126UJE':l -x snln:JSEl'\j JPlwuoS,5 Joo\l wnaso~ JO'\I wnl2uIOJI0 J"1i ,pooBpOOI8, 'd Ja'\I 3~\iN JUUN31:)S I (v) ~'~~l133HS ~ "c-l 133HS O"Z-l 133HS ~ I I I ~~-_.~~ X1~ mos NM\ll S91^ 091^ W;;'S SldS ridS OldS lildS NlliS lSOH NSO~ dOHH NOHel :)()HH S81li \fWd dNld ~N3d HN3d dNliN \IH1i~ rH3i1 :J3ll S13H SliO:! ~8S'I Mllio ^I<,o OdliG SlO:J 881:) lSI:) AV3:J 0\13:) 8IJ\f8 )IWJ dH38 :J~39 18li8 H8tJIi S3SSIfl:JCl ON\I Cl81:11;1 r3N1i SllilNN3el3d \f:l~\f 'S8n~HS ^13Z Cl13Z V>I(JOS ~3no ~3no \Il:IM 881d Sll;llo'J Q~liH OlfH:! d:)1i B:)l:! dli~:) )f'{lO OliOO 0l3:) Oll/O 9S31i S3J1i 83:1V :)3:)1i 93:1'1 S33m 1081/'1AS Ael0831 \f8 ON38:JllN\;;'ld l , 11 I I I I . _-~'S ., 13:Jl--m- _ L p f. i J::i:I1=tS' - -_L - I ... -;"M1::J:II:lS-- - - - - - - -- oc;QL6 N0t13:l10 'aNVlHSV lOC; 3UnS 'OVO~ 30HllSIW ooL :IN! SD:J:lll-1::nIV Uv':lSQNYJ S31VI;)OSSV aNY lIH)VS ':JllInlf1 ~. ; ...............'... ."'.', j; o Q c o ~ ~ '" tJJ ~ dfl . "., Q ~). 0 *:;~0 ; ....,1.. "'Iii: < ~ ~ ~ ~4~ ~ i/ 0 "'.>>-01.J j; .J!' ~N::1 >c,'"'" ~>a~ ! " ..' ~ NOO~~O 'dNVlHSV \3 nms AVl) 08t ~. D=IrOlld ~NlsnoH )I001lij AlIlElUNlONS f 2, ..... M ~ NVld 5NIINVld ~ JBa, , J"llB aAow"tI Ji.l8p wOJ) jOa,oJd OJ saaJl Ii" OJ ~ulouaj Iu"JodlUal aplWJdS 'I.nbe '0 '~oOJUJ.4 jO ,,~ 4~M 1.IJ'I~1U 1U~id GUlllelsUI JOYB OUII jo,BM 4JJi4 aAoq" sea,. 6U11U"ld 4OJnI'J S suo!l"tl1jsu! SJampl?jnuew jad Xlw P'O'lIl1)SUIP '~'" [I'ejac ,ad sqn'4s pUB S00411" ,UBldE '1a,wJ8 PU" pups J"l~) UJOJj pual'1llosdolllsoclwo:) .~ 'pualq l!osdOI !Asodwoo i ..~, II"lSW 'S80J8 OIBMS BUlp",~ Jaw 'L suoll80ljlJads sJamjOeg1uau MOllo~ 'JaqlljOQ al81 JO ,ud'o' 81E1 U! uos."s hUJEJ OJ ,opd paas '~S oam Hd Spunod ~'I jO aJ'" 18 IIElSU! S'9L-6fC:{f09!# 'Pll s"!~dOH 11 sqqO'r1 WOJ) alq"I'"^'o' XII'J ,xad ~OL 81JJ1lOJd, XII"1 03]8 31VMSOlfl o S3XIIII 0338 :S31ON 1111130 :JNllN\fId 13n~HS ~ Slod,,1> "011.5 I ;;d8JQ "o5;,JO 6uld"aJ8 su.d8J "lu04~1'J <lHVI'J Sjod,,1> 4s"<I1I08 snsnj)' snJunr 3Nnr UCII~6 I paoMfiO(] '!^"Sle~ JA..1Silil'>l, 's SJlWO:J ~<l0J SlOO,,1> a6p.s a6ueJO WO"I""l xaJe8 11:1'0'0 S3SS\lt!8 ON\! Sl'o'INN3Cl3d 'SSnliHS I~O,,*I ~"O MOII'M SOII'4d sn"Boo d3nO weaqwoH Jeuwnlo:) ,",eIBllsa~,q snu!dJlD ~1:!\f) S331J1 leo ,,~1:1 ~ZIS 3V1ItN NOl'Ji.lJm 3I'JVN )1~liN31~S l081'lAS ,11:108311/:) ON:J8311Nifld 5100!.:l -a::31'it):)lssa ~om~lfWV'a 3!\1mld NlNJ:HJlrJlAlA; 3~ a3HStNI.d ^ll~~~~~~H~I:n:~ ' NI~ (..0) l.UIU05~ ootio!:! lld A;:I!::J'u"'JS :tiW110S'031:)V'dWO:) ..\.1W3$ 11'0'130 8NI1NIfld 33<11 'm~r;&N~A 2'.: l:J"'.l;flt~""ONJ::J ~=~~~r;<c~;;"r'~ a3l\OrmJ ),11''1''1013'9 lWHS 1\I1l:l3.lWl31BvtM:I!J3a-.oIS'NON "d'lfl1:inS3::l0 ~ dOl3J\O~3H 'In:) 3eTr'Hsl1'f8 ,OdOLln,dD~ ."XI\!'IjlIOS Q3lNd3l:ld 3SrI :C!3!')!'lVS 110S" ~Nn(Jl ~lm~::1 "mil ,~HJlni'1~N1d33)l 'NIVI ;z :H::llI1W 3(Mf8 fElNH :II'Ioa~~ ~ """""O!DO~13~ ~S3X~;:~::~: ~.8 .;/ ">IW81\"3S0H !:I3's-gm:l I 3Sns~m ~Nltlm3S "0,, \f3CfIf s: )> )>:Do :::0 JJ-I fll mO )> )>~ o Or- tm ~ ~X; 133'CllS ^ \:fl8 ~ ! ! ~~ig '~; ~: c~~ s: )>~)> )> Tl"., Tl -I "'\""'0 m;1mI )> )>, o 0- ~fll I ,,8.. 1f3(:1V B3tllS W1J :Do ;0 m )> o $.: 2:; o I , Z m $.: )>P :0-1 mO P' )"> I OWe z m ..8" 'd3t!V B::iCllS "iflJ ~~\~\~;'/,~II )> ..If.. V3HV 133C11S A\flJ l 1&t:%f:f~illi~~lli.,'W>> .'PjJ?':%..Qitbv.,%1tmJI~f, olSL6 NOmllO 'ONVlHSV ~ ;; q NW3~O 'ONVlHSY 8 C'4 lO~ ,llIns JGVO~ ]O.L3llS'\AI ooL 8 0 . (j mus AVl) og[; '" 0 ;2 0-" M " ::INI S.L:>31IH::lllV 3dV:lSONVl S31VI:JOSSV oNv ~ . l:):HOlld ~NlsooH ~OOllij AlllEHlMONS c ~ ~ "8 ~ 113~VS 3111nvl '" ..Q, 133~lS lS3M/1SV3 (d) "'''' ~ " ~ "10 IiJ ~t1 ~:i '" [3 '" ?i ~ ~ :5 ~ ~ffi I t ~ ;, -,-,~ ~ j U ~ ~~ ~ > z 01 0.' U t '" " fta ~~ " ii 0 " ~e 1 u )." . i3 W f::"'l I) "' ~ 1 ~ ~ ~ ~ ~~ ~ 9 '! ~ I- ~ " ~~ M N G~ J.JJ., '" ro,.:.;.. 6 '" :::; I '" ~f;J~ ~U~ ~~ ~ u E~ ~ '" 16 ~. 8" :r:o.. 0 iii ",if ~iE g '" 0 ~1~ ~~~~ W<( . X ",o. o. ii' ~ ~::<z 1 1iJ..:- ,;, ".. 0 ~ '" Nt.ONJi. -' I I (J) I"" ~ ~ ~ ro N '" >- I- 0 0 -' ~~~ --' ~ (Cl z ;::'.;(@ ;z ~".~ ;z (( (l' <>: <>: 0. il. "'N e'{i? -,-, liJ Z :::; ~~M~~ ~ :;l 0'" " ~ ~ ~ " ~ ~... "'I w :1~ ~ if ,,22 i 010 i3 .. ~ w0 ~o~.....'-'- o. "' 1~ ~ '" " <( ~~ ~~ ~ .;, ~ .;, N " <:":o.q.J.,:;;:":" ~ ;; '" ~-', ~. ~ '1 8 1\ -' (1 III ~ ~ ~ a> ii' ~ " ~ ~ 2 ~ I,) Q (L ...!: '" ".". ~ .. ~ J_ ~&~%~;;;I.'~~.; [3 2 "' w " 3 u " ;i <( u :1: u " w I z :::; I II I~ <>: ;>: ] m Ol m -' "(J ~ ro i!- S Q ~ is Ol ~ ~ ro iL $ 0 ~ 1ii " ~ "' W ~ 1- oo 0 Z z ::5 a.. o Z I- Z ~ 0.. Q ol.~L6 NOmlfO 'ONVlHSY LOG u1nS 'avo~ 308USI\^( ooL :)NI Sl:)3!IH:))J\f 3<iY:)SONVl S31YI:)OSS\f aNV lfmVS mnVl ~ ',,,, >- a:o ~:l 2 CJ NO!H~O 'ONV18SY 13mS AV1) 013S D3fOlld f>N1SnOH )I001lij AlI1I3BMONS oM 8 . " 0: M f...!J -", N\f1d 9NI1NVld ~ 'pu.BB1 pu. MOPaJ'O BU!lU"ld 10j 0'S-11.84s 8.S " ::nON AlH.t '., '''''i' I 8'31."~ ~r~ 3~IlH~~Vi /"' ;, ,"' A~)~ ~ ;c..t.~ ' 111.3." " . / . "'d,u ~ >Jr"; .: ^ Q ,,]I '::i1ll}J" "Ii, \ "'-- ,\'I;-k-'--- I }-/O./ ../ ~-' \ ,ii IV 1 :~ /L/<;:'(~ - ~ ~1p~ ,~~;yJ! . //, .if ~I Hl<Jd." .....,.. ~ 8 ' , """V, i "'NJf\r. '.-So:: ,.. 8100"5 - tNelt I , N ~U3i'L -i S"3:)V-L ~:2/ \ ffi~ I, Do<,"(-(> TJF ~~\ l-.:;Y \lidS", - :"fN:l-g 1SI~-l oaW.~ "".J V'.!:I~d"~ .'1"'" I, ^'- I,'t ........ 'r.:\ 0 III , .." . -.V I.i....'. 'rf N - . J-- -_' 'ypIJ 0f/\~iJ/;J,...fN ~ ~ 'v't:!' {\1. o 1'-/8\.. <1 _ N --- en .....-. 8::J1:l'~ s'n 3NIlHCl1lfVi 1$10-' \lldS"5 't](IS"€ < ~""-I dHld-l !:IHVnil , ./ ~w"z - fJl:l3-tl dl<Jd1> ~"",,1' 8.tOO', ::n:Bs-$ I 101 DNI)H:llfd """' WAd"1 /' "'\:i I ~)~'~<:,:: \ \~'>,i \ L o VBfin-~ :] m )> (Jj "" ~ '!1v~ ~ I ffi / "'K'0~ SJ0n--F",N ~ Wil I_!~ \,8)~ ~:::~ ~::~ ~.~l~ t\~\ 'f L It ~\-"/,, 0.38'; ~:.";g,..'~8< g!l,; ~ ) d~3ll1' 1:0,. - ~~! ~~ "\"r ;:~':;(:' EiJ~r'~ I ^ -, ____.. ~ \\ lSO." ':1,\ ''''','\ · ';{f:j"~ 80~~..' ~'~ -~ ~i~,,~~'., @~ ~ . \\~. :~~ ::::~~... ~ '.':1 '- ~ s" V ~ ~_:!,-c~. ~L ,,~~\';) I-- MO" SldSZ ~ " /. ...... \_...... -/f'~ ...1' r...... ~? -' __ SSIJ~ SI00.................... . '::>"7' ,\_13 ~ -'-dNld1'-' nOd,,=~ _ ",'--j" -~'_ .1:.l11W ~ --0::: ;..0' so .... L dlJ3g"5 51dS" ~ .Jo..o::;; A d>l38il :>'I )b L'. ~ '--. a""~;: 1113"'- ~J~ ~ d~d;: / ""N018 /' . ~ . -" """- "--c VlOd" MOd:' ... ^ J(, ' '" 9~~d310 ! ",I,.',,,,,V 1"\ \'f..\ ~.'_~ :+:,:: OO'^" C t-t- 4? ~i'"~'W ) y "'"I~~';i:lJ LJ d~381> ""'dl ..,.., --I: V , - {;@(Ij! '" ! ~""i(- -, y,,\i *'~ 813."'"--- .. 7 V ", - ',",;["._ ij) ~ =^,^u:;~:~a ~~; ~~; ~ ::: I Y /,; ~^, ^ \ - ,^\'\~1~"/(~-1Ii >-< r3N\1"~10d1> ) :../...\./>//://~,."t,'~~\ y'." rt ^ \ \\\.\\\ 1- SidS-' ."'d" r- I jno., c.'~ -... ( ,".. ~ "311~ T f,X, ~.,y ,~({:;:. ---.., L_ ~~. r---- ~ ( > ' ~ ~:~:.: '~.^\ \:1\\' '-- .L.~'. -L~:!V~:&H (1jJ , ( - ~ so ~~~:~ ~~:~_ -<€ __A I ~ mH~ ~ ITS, ~~ 3 _~, l ~~:~t: So :'\m..~~::: ;, h 1/ \'~ :~~:,H ~~,," 3 '] ""'o~ tn ~ ,,l],, "80lB \...._ .i \.2 ,) f~ .~ I--SldO" :~: ~ ~;:;~ SS'OL ."~'n '>t' \:'---.... ~ · Y ""eI' v~:~ >- ); c :i:i~ '~~~~\ y ~ V 3c~ \~ ~~~~~~~~;~, ~~~j" ~ ;~~~~ / "~'1~;;~ - ? ~ .~ 16:: ~E~~ \ ~;~~;E.1i%2 ~,' l>1: J>; [71,.'"lt!Y I 'i~ 'I: / "~~ 't"""'>,.[~"\' " ( )P.f ! 6 ~~ it" ~:~~ ~GA c- X w 0: / r \ I~(X ~~i~~ 1'---~~ ./ '(III) HI f'J,:->f, ^~' ) ~ ~ " T+-.\...7.t ~ _-4'2: 17 ~ tI . _ t'xf ')!c'" Y-Z '" I"-~~ r--- I 5-___ ~~':'" \ ). ....~.,'. soIl so tJ-:c- ~,SD '(Ii-; ~';~~~-ft'"" \(~\'W \ / ~ ;~f-~~ )~o ("'~: - f:~l 80 ,", I 1if'l I' 80 ~)~~~ '{il '...... l l. r.. \ I " 'I': 1 ::':: ..;: V - 1l~ V lit \ 1...( 17 i ~'. . '\ I / l/ ~. t>-1J. l / / "L1 ~. -,l....1L \ ~i:::/ -ce;- - ~~"'.~ ~'dNld-.' \.11 8S10'!~ / d>B8t \ I_d'! ~.. . ~;d>B8i: l~ 1\ - "'...... SSI:)>{;'-'~ Jl dl,Se-Z N~~_~~ "-.J'dl:J38-S: Cjf'"" ~ WN3d-B ~ / I ~'t-- WN3dll 81d.'Zt~ dNld1: d'JllO"- ^ I-- . .. \" '- oa.V', R0 d:j,:~ dllld.. - VlOd , smo," - , . H '1&, \ SIl'^-' 1^-:...Y$1 ----===dl:l3H~ :mw.~ ~~-l- SldS.2:~ .,,(' ~ ^ \_~ $IdS~L OOlfl i VlOd'LO--' 0011\1'- ~ '*I::Kli; ,~~Nid< ~ " ! ). l1,I ~o"av1' ,,3,, '0018 fl'[. -'/).......(1 f'...- ~~~:,; ,,- ( ~ - ,r- Sldg;. J:lJV"l L:;i.t-: ,*~. I _ dNld-t 2'- ) I'JO / ~ SII'.'-' ~- 0."" r3m$M ~lDd1: dNid'Z - ~- m.t'. ,". r" ~'O\lW'Z I i.\ ..J1t lrt--:d\IllO" ~'r--vlOd" :'="::i3"'" , .,/;I-- ... ,...:::: X a~""3"'1 "'.....IM'nOd1:~ _ '.3~-L-. ',,' '- II'~ OS,Oi' 1127 "'Vi! ~. ~~~-7 ~~i!~ I\,i~~- 1f...,;'~:] ~ I--:~ ~ II Za~~t1 I 'l ,j",l,\OIO-I- I ~ ....., r:;'S1 (; x::< \ \1~. _ 'U!/~.~.' ^ry" ~^i;. ^~: ,~i~- '~\\ "~~i ~~SO)~'J'r'." f-,,"J. 'f--I',..t>^-<)(?~, .' "~ ~,..'..<.j) "" . ,r-.. ~ ~I \. . "--Iri~ I( 00 , '; ';o~~~ t'" ., .. \ ~ ~ ". R1 a so r ,---1\'. f\.;< ." ") 8 . J _ --' '-'" ~~" ,y., 0 X'. I\. -j 8J 1*;r.;'jJlXc, -, a ~ r~. b ~ "l-V'\-~ ~U'i so",-:: c- .t~ Jl yp '';;j'~J; / Xl \~. / -' r ~~.:r; . ~.. /~~Nt~~;;~ ......~~~~~- \ill l-~~ I <i }',/>,;~ i7?/i/ .':...... .;:;:/..;// .7>:'/ l<//>< /.' '" ~V~ L- ~s~~ ~ ~~~.~ - ~~ 3:)(l'lf1} ':rnf'J-g rr /"1,, - 00\11 '" ~ -j o 1!; Z .- ,~ ~~ w... mB ~J.r:H - - 7/ $// _:,~ ONnO~JOAlfld //////h_/~ ~~ .'If' '\ /..-,; ~3"1> 8'3NOI8 $Nldd318 \ I SlO:J"S 8NI011ng JJ.nNlrli'J08 :)"GZ-~ s.:INO.:..s 'elNlda3LS -..... \ / \ ~~ <~ I :.~ I l _s~ -dM.cH: 101 ONI)I~\fd nOd'; QlW'H-~ ~ ' ci~3a,; (. ( 0::; "'NOiS ~.~. Otlldd318 ~I----- "':fc7iJ{ ~ ~HI.l "J.Dd~ \ \ "-. / / I liW.....:;:-1>' dl881' omL ';;:;CI'-lO.L:? ~N1dd31S' \ f ~m~ /I "- - i'3NV-t/M - WlDd-t J:!l3S't1 WN:3d:l "'"0"--, :J3:J'tf-l \l3n'l'I -0- i- 0100-, - ~~., '\ ' ',fs"o! - /i ( A~'i~ 7 > . \1:. " d.3B'1 '\. '\. ~_":;':" / / ""M .\\ r / ~I ~ \ T , "f\<< ..::.y G1 \-1~' ),'('..\ \@ [ -....! ..Q>/, ~ ~,/~ "'~ , ~~;)/J \:: "i. C .H-l38-t 1;:!3CJJ.S HlnDSIHlIJON (dl to'" o~SL6 NO€l3l!O '<lNVlHSY LOt 31lns 'aYo~ 30BUSIW ooL ON I SlJ31IH::HIY 3dYJsaNVl S31VIJOSSY aNY l/38VS 31110Vl ~ q ~ 2 ~ [j I o ;:;; :- 0" ...9 8 '" Noono 'ONVlHSV mus AY1J 08S l:)3rO~d ~NlsnoH )I00l!~ Ml!3aMONS 8~ "rv"\ 0-' "-J r~ ..9, N'v'ld 9NI1NVld ~ 'pus6Sl pue NOJjaJIO 5U~UBld JOj Of-llS84S .as '( I", ':-'\ ;.;~ 3NIlH~:::" ~V1 (%/tjJ-!;~;~ '" ....-;f; ~; \ ~M~ ) - ,/ . I ",",o+.jj\ d" . ~fti~.z ; V ,N C ,,' OIdS"l- ' ;j N ;, rrir d~N-S \ dS , -..... XIW 0338 dS ~ . -... .J f df 3WMSOl9 \_/ j}t1 ~ . ~\.,....... WN3d"l: ~,~I\.... SIll"" \ -;;.'--.j ",?'-.]_. " _ _ r-'\L:':C l_".~).~~1l MIBdO,tl~~_ . 'iOI! ~ N Gl '\. Ho~. , " V! l l! . '1'\t'I' ~NIIHJ1"~ 1s dS t~-~\~_ " -ffi" ~ ' d.' '4,"- J [j. - '- =,~ ~ f ! ';, . 'Pel '- "" , Ti7. i , \/ to. I! \;z:[i< ;.-~ llT'iOi' 1 * Y dOH"Z \ ( , ,')" _ M '. '\'- '\,..ij~) '\ ',I 10~ ---- \ r ^"'O~,'~ ~;V ;' N$Q~ \ ~ ~ - 'J\~ ~~"..___. -,.~ --r==--~,'~~ ..,0",\ r*'t~?i<' ::;;_. ',00 ao :y \'1 '~o~i'~ XIWo:I3S V ~ Ao ;:0 \"W(I~~.s J Ol~~~ \ / .... 0 .;/~.: 3lvMSOl8 ---u '\ 1 NM\ll LJ. <:>- NMVl \" st./ -~/ .J' i '\~~;~ . ^" v l:;: l/ ..... 1 I ", YI U a30V'~ "I If . ,\ ~~.::'~ /\, \J ~; ..j V ~ '0' . <;i/'~ '\-;H,J ~;l~/: :,'.f" ~,I~~ / 1'0:):: ~,~O;' _ c' '" r--- ~~~, ,,1,,0018 .......... 0-1-- 01'30" "'J~/// 0 ~ ~~z ~ y /' ':::~H ~~~i l!fP~y ~-'~., ~ .k ' . V ~ ~ 30~Yil !lffraal^~ '-= OdS"'; ~ J~~~ ~~g ~ \ dS::; ~'~ f )iX/ / ~ g\!1'~.t r-\ r.::::fo~ ~~~~~ I~\ ?,~~~ -. 11 "s Y j:;, ,os", I \ Sl3H.. -h'\ ,OSH~ I O:)$3-b \ 1 NM\ll ; so IC) "c' f 1/ , J (\ '\\ "'i ' V \ so ~ '/ %~{ 3/ f- ~,1WJ ^ ^J: N N 3 ~~~~ 3 .. N Nf ~ ~ ~~~~Ia"-Z.. :::::-'~'-:~2f'l[><NYN~~=e~n3 ~~ ~)lfA\.^~ ~ II,~~ :~f !;;tJ)r~ ~\'K\ ~ r-.. \( / ao ~.rit~ so '-1)0 ".J ' .v:A dO W ~\ Y,s 0 / ~ ..., '\ 3 /, s; -'sYi: '.. 1_' '.") T- J!~ J f\ Y ~OO~'Jf ~ ,.. lr' % ~ "\ I ~<BJ/ ~!fl@@~~'J.4'I... ~'4CT.. ~;~~ ij~ I :::\ --J. ~ / \ ~~,~~ ;!/i. <~: \ ~ '-, ,\)(\\ ,~, c ~ ~ ~JrI':J; 031'", ~ ij\i'~ S'BH'6 @:~\1. ~ ;l ::l-:G3~ 3 (fl -.- Sl''''-' @ .I.XIW 3 {fj)@ S13H-6 @@@l 1/, --031>"' @Ai, ~~~~~~ A~' 1"1/ 1/;== bn" I ,~. XlVII !SOH-Z V1dS~ 3iON O'(:-l133HS 33S ON\ll13M ONnO~8A\11d () ld NM\:Il 5'310'1: ,,,.,,-, I~VIf(X~: ~:') ~ ~Vi \~o,- ~ ,@ I ~ J ~Jlli V ,,~ IX ) ( () ~ DN IOlln 8 JJ.INnWI'JOJ - z m \-' lOl8Nllltl\id rr l.J~ ~ Vl ~ ~~~ : ~ -d"jlhv' -Fif:jjL...,' ; i:!J 1 'li!-.v / X\i', 'v ".+1. J.ll. .,..' "<\ ,A \. / [/ "'R';), , .- \,rz, sop", ,.;.;,.: 6: iy)<':JZFi/ST( '"", so ) ~ ( I..: '-; NSO/;I"l "~S:) X:.! 'J;' SORc'~" , J)S3" SSlo", d:an~-;;; i14 .z.x,," roO", I I ;C>l;\7~~~i \ \~~\\I: -;?~:, 'l:,;' -J/~;~..,.\~. . , \ \~ L) (II I) \ dNldW:/ ~~ """ \\~!~ ~~~8;~~,J t~j~ '~m~ ~~ ~t~ L..:~~~~--1 "0. ~dN .,lOd'9 Offi!V-~ :J3:JVoL -.-oe.A?t.' ,I---- VlOd1> ,J" 'OOlB r * dNlo"t s.sl~~l ~Nld ~ ~:;~ ~-f >;; p~r;;"l. ~ \ 1'3""/' ,----"Nld', a"^~ =;l a.'A1> ~ ^ . , · I r~::- /F::\l ~~"tlll ro;"'- .~ ^ \~~~~~~ t~ I il~ET 1\ v~I!~~ 1\ c;:~l, ~/~;;-j0~;.'~~.~~... \ r .~ I( ^ ~ ^ ~ \',' ^ .l~ A rx' i'.} \ .~,~ z~ ~[rr:.. ;;':! '::.~; SO':~ lC f-- ,,' '\\': ^ t..., ';..: t> ."cI~ Y/,,;: If:: C ~ ~" ';;" 0 . y I,P sO .:' . Lf:":."..'; O'o'll,., V.' - f-- w . :-"-' ~,*, -" 1<- ,; ;'L1 d k","I!~ r ' c.... - ,~ y.. \: 1 '--:., , II..SO ~;:::: d.n~..z &' ~L-:o.'1' >1 ...~J\_~. '\~ l~o \ ~~ /' -~;>~ ~ ~ ;.<~~~f--1\.2~o 1---: ,<;r::< "0~ OOt'~,) .0 I.....,/"l sO:*>f;1 '. ;.. k'\ S~ S'l.ex .'. J.l $810'1' / "~~~h", \./ ~;;,~ ~~~ ., . ~t;: /'_ it ~ __~, I / '<,/..;':' ~/./;/y, "'/';"~';/:;?'~</'/, ~ '/!;Z';/?I :..'? j:t~?t I i~ ,) '''~.:~;>>'.\I' ;{., ~,;;;t</; ;, l;\..!tI,;;; >I;}:; c- (e/, .'i' \; ,~-~~ ~~~ \\ ~, \; 11~ 30"'" millS lS3MfHltlQN (d) ~ ~,i~~o~;::' ,;Z tt,.t. dl::l3'C..g SlO.'J"5 8:)1ch 101 8NIllCJ\ld ~v ~( ~\.iW it o?;QL6 NO~;JllO 'ONVlHSY tOl' ;J11nS 'ayo~ 301311SIW ooL :>N I $1:>:111 H:lllV 3dV::>SONV'] S31VI:)OSSV aNY 1I3~YS mnVl ~ q ~ 9 ~~ " o '" ~ 5 ~ o J5 NO!)3~O 'ONV1HSV m~lS AV1) ogt 1J3rO~d ONlsnoH ;WOllg All~3aMONS 8":1 N ri:('f') S J, E _ ..2, NVld 8NIlNVld ~ pua5a1 pu~ IJDlJallO OUllUEld JOJ 0"\::-1 \ea~s aes '~ ~lON i I " I I I j III - .-- .~j II I ~ "L I\ ~l"""o",,,r:: :-~, ~ ~ f '" '" ""='"K~ )"'r+- ^" ' ,. .-:':_~ · :3\ (~~ :5Q~i:o') ,~J '.,1 -/1 [) I ~>,~; ~\"..A ^"')' ~,:: @ "~,:," l \\ t ~;il, ~ ~:>~ I------. ~ lo'~< z J ,-":.t 1r< / ^O \ := ~~f ~ ll3OV") i I~ ;>-: N1VS" ~'J~~~ 8E ;::~-,~ ~ ~Id') 'fO Ii"\.. flMS1: .H."00113 !...( 'dS,:t---- "",S'< \ ~~;~,_: -i=" "r~jl\\ ~~~f!, ~~ --J~~ rj-- \ \ Vd.V \) 1l ~ ~g:; / fC!J~~~ ( I /fr~~:; (1 IT~~~~ \, / / (:'0;7 \ \ '\ ":s~:~-i" ~:l ~ '--- rr;~!~i! I (IN / (N "" ~/~" i H N ~ r.r1.~'\N ':\ ("" \\ 1\ 'l *,\ ~f-'~Wl^5'Z ~lJ OO~" ./ yv * .~ NM ~~J . ~J f--"~'l N" l _ N" ~ ~~ N);>-< :Jr~'.H N,y >;" '\. /; "" "7 J) 'If I ij (:17 ~~ "-IX so ~, ~ '\ I tit-- SllIU1l ~~ V<~!-1):.)~", ~> 'fJ. 'f '"' !>I.L J>'T; h(i~ Z>, 11~@f:,; I)~ jf.. i/ ~ L7',,, ''0 -;cf" > r/'~g" s"~ ' 0 7' ~ ~"; '^' ,\?;I", 'r, \;, 7,,/' E;' '" '~\ H " '\ \ ~ / ';C""7 '\ I ~'", I ~ \ f _": " \ ~ =- ~ '", 'j( ~ ITVMH ~ ,~~w~ ~' \ \ I"I}-"""''< :' ~ ~,., - -so X h~' '>:5;4- ol.s~ ~ ~ ///: ~ __<,id "';i_ \<l'IAS ;"'3"-1-" SO ~.~ dS " lJ / I '-../ \ r- i t--- "H<I~-t O'~.l133H8 338 GN\flBM NM\il 01\lE v ~ 101 <JNIl<<I\ld ~ lOl8NIW:Nd SSI~-t A~ oS' ~ am"'; 'I, ~,r;;'" 1"d80'0'0 ~c1;~ lc.O\IH' /n':J ~~ I ,,&L:. \ \ ',!.J"J 1 I,:~",'!I'!: I ' ;Z~~;::.. \i ~~::;:'> - J 0't3:J-~ OjdS-{ tIWS' {JldS-~ "lW> "- S91~"t f- I--- f- ~ \~ '" ~ r- ~~\!,),(.1~ :~~~~ ~ t\ ~ \ \ OOJ-l: j"", ~7, ~, I .I " r-r /,,/., '", \:-; ~---- ~ ~ ! ; '~~~ ~ ~ ..~ .... it t-:l ~ ~ LU ~I j ~ ~ ,D ;:5 '. a: ~ ~. O '[L:t , :: ! Z ~ ~ \:J W COw !;::J::t O~I 0:: I a.. u.. l..' l.'J w 0' Z o::z_ <l:Ooc _w Zf-W ;s:<Z OUi3 IOZ VJ~w Vlol:W ~::l!:: '"'f-Vl I -' U I ~~!:: :J 0; ~ f=OO ::leiw t:lU~ ZWL Lij-O:o; f-t;;>-w O-f-tl; Izr:i U 0 @ i~ ~ ~ ~ '-' ...ct: ~ ~w ~ iS~ \Q I '"~ Cj " ~ ~~ \ ~~ l_n___::-L_ (t: ~ <J ,.. i-mm I I \ 1 ;..I~ I I! ~ tJ a; ~ '" I a. <) >. ., ~ '" ~ '" ~ Ol "- ~ ~ ~ ~ c," Ii: Ci" ~ O:~ e~ ~~~ "<>~ ~h oj. C'l Z o ~ ~ ~ ~~ ~ ~~ i ~~ ~ Z ~ z 8 d' V1 ~ ~ t' !--- ~ '-' " ~ ~ '" w Z \,! w z~~~two~~ "" ootll~...JJ:;2otu~~ f=LLO~~OJ:-'~~ ~C::O:::1i~LL~~ZZ ~eeO:~O~L~OO OV'lVl <l:UVlf-O~ v V woo OOOVlVlU '" =- \:)ww wWW{j\:){j {j (j ~CSoCSoCS~~~~~ -0.0. a..o.o.f-f-f- f- f- ~oo ooo~~~ ~ ~ Qg:g:g:g:~~~r;) ~ ~ '" 'Ii o ~ L" ~~, UJ ...J >. III ;:: ~ m'~' "'-, 'Y I - I --)- ~ ~ . I f7 ! I I I I I / / t I I I / i i / I I I / I (;)I I I ~f- ( I I I / I tio:: I I -0 I I r:]Z 1 \ I I I - ZW I \ I I i -(;) I <(<l; l \ I I I / f-Z I z- \ -<t: , I I <t:o:: \ \ / :EO I I ( \ \ I l \ I I ~ \- \ ''\ +- \ \ \ ) \ \ ~ ~ ~ ~ 8 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ '" '" ~ ~ >: 'i: III III <> ~ ~ ~ '" (~ n ~'" 0" "'~ r-" {~(~~~\~ii fi ~ 4. Q~ ~:J W 1:-'0 15.. ~~!J~: ;! o e" -l- V I :<:;- ~ 0.. "'e 0' ~~ o~ti' Z...J . w~o f-~~ >< LU I'-' Wo 0-1- Vle::: I-C}O ~ZZ ...J- ~I-w ~~I LUXI- OLUO -01- Vlf- 000.: I-Z>- tOIl- e:::wo::i ~tOe::: Uw::> a.....Ju O<t: e:::~ OVl o iii ~g ,~ ~i >- f- :J f= ~ ::l n: ct: ~ Q ct: 0 w Z t;; <l: L :::J in L ...c 0: ~ 0 W u. w '=!Z ~ C) W -'0 ~~::l ~ -' ~ I- ~ ex:!i: ~ ~ ct:ct:" ct: ~C) Z <( o:::WWW W >::J <( LW~~~'3 ~ffioUJ L ",U<l:;:;:O O;:~t VlV)V1 V'I 5> o..wo...Oo:::V'I "'''''''Oct:>OO Oex:Oll.o{O ~ '-' L? ~ ~ t-' ~ ~ ~~ ~ r Cl ~ ~ ~ ~ 0 ct: ~ 0 0 Ov 0 ct: Z 0 ~l-l-o...W~o...o... Q,.:Jo...<Ol1. ~ ~ ~ 0;: ~ 0 0 Oct: 0 ~ U 0 ~ ~ ~ it ~ 1:) it it 8':1;; it it l!j it r i ! I r I I r i w ~ Vl >- OVl ~ffi Z~ g~ Vr.? Wz Z- Zt;.; 0- V~ - ---- - -- - - - - --- -------- - -- - ---- - - - - -- -- - ---- -- - ----- - --- - ------ - - ------ - - - --- -- - - -- ------ - -- - - -\ \ \ o Z w " W ...J t " 1 W ...J JI J 2 ~~ i, I:J w Olw N L:J~ O<I 0 ",Ia. U ! .J.."'~ d .u"'Z "'Z_ <CQffi 'i Zf-w ~ 0 ;:<Z ~ 0 O~\5 I < a: I-,Z B" OJ fl/j 'J'J ...Jw >- Vl<W 0 0:: ~I -":JI- S a: ~f-v; w -'VI Cll >-<t: ~ ~8~ 0 8~ ~~ -ct:O Z :JO~ (I) ~ . '.? V - ~ : ~ ZWL w-ct:ffi f-Ci>-I- OXtw ZwvO '- III ~ ~ UI c:: :J ' ~Z :JO LL.- o::f- O~ LL.Z alZ :JO t;.;V \1 ~ I A -' ,~\i, ,- /, 1 i t, 1\\\~0 //;~1:;/~ '~':0;~~\ \/~ / I' \ \ ' / ~ / / / I / / /' lk~~'.1 / 9~//Q'" / ~/ !. , " V,I / / /0 / ~!11/ / /- \ ' ~ / ,/ '<>'0 r~ \ \ r. J (/0/' ~(~" 'flt, 'i A\'\ \ \ v\ ! I ~ \ ~/ / /~,w/ / \ \ \ \ \ I l \ \ '\\, 0/~~~,/ /~/~ \ \\\'\ ' I \ \ \ / / uV> ~ \ \ \ ! \~, \ \ \ \\~ I I; 0)\ \ ,~,.......," ~ 2 4: II:: o >- I wa.: ,,>- U:~ a ~ ~ ~ 8"W - , I ! ! ~-'--"'--T I i r '" '" ~ '" ~~ ~ I ~ ! ~ , ~ L----~ t I I ~j ~ ~ ~ ,;j ,;j ~ ~ ~ ~ ~ ~ ~'0W~ ~ ~ ~ \l G\\\\\;'" " 3 ~ ~ =< ;; ;; III Q, '" '" ~ ~ f;l ~ G '0'\\'\"" ~ ~ t~",,\..~ 2":2: OZUI --I- ~I-Vl U!:a>- UJxVl ZUl" ZOUl O~~ U ~ II '~_~,L,__~~ ~ __ . _YF- ---, -.. -E,&.~W ' _ ~~ ~ __ ~~~'i ...:=--- -~~_ ~ =-_ __ _ _ ___ ...-Ex._8'~s_~~b6r_:~"(R}~I-__i_ . _ ____ _ _ _... _ _ _ _ _ _ &- __ _ _ _ ______ __ __ _EX..~SS_ _ __-_~___~ -=~~~~o ~\=~=~=~~~=~~~=~.~=-=~~.=-~u,~_=_~.~==:_~'=.~:=.._=.~.~=-=:7=:.~~'=.-=.~.~=='~~ ~ ( -----.. " l o . ~fu zt;;; 0>- -Vl 1-" UUI wf- z<( z~ Or.? Uz ~ Vl X UI 0' ':I: .... ~8 ,~ d A.lN:1OJ NOS)!:)Vf AJJ}IOHlflV 8NISflOH SJ7vJS J5/rr U~ .l.lJHS ;:;,',~.( N[j ~r:)Ni ~Na JON J[ 'JNII1~~(J 1VNl')I?fO NfJ--1!}\" ]N1J :ST 21lit w/X)'Jeeuj6U9@8le6e.jleuJ.;j Ci:6L-i:8<:11Y';;) :xe:! OC6L-i?8?:(!/79) .'}91 frOC;L6 liO 'pJOJPeW \/1 # 'IS UIPW )Se;} [;LII 'OJU/ '6upe8U16u3 3J1JlWf'~r -1fT ~o 'aN'Il~S~ >lOO'tJ8 AtltE38MONS ,i j~a t.IOl,I^Ji aN ~ '^ "J f 1:: () ~ ',i ~ 't ~ ~ IE. ~ a ~ h "'R '< ~':1 10 ~~ >! ~ ~ ~l5 ~" ,"" " '!; '< ~~ ~ ~~ " " I(j ~'< ~ ~ --<:~ \lj oJ ~\.'. ~; ~ <i ~Q '^ i" ~" , ~ ,,<"J ~, <;) ~ ~~ ~~ I(j C) \;. "., l( '^ .. " Ie ~, '" ~ 8 t " \) ~ 'd " ,- " ., '-J ~ 9. ~ X,W; "' 2 ~ ....oJ ~;' " '^ ~ ~a 9 "' h'" >! h ~"1 -..! '" k~ ~ ~ t""l "0.: (),...; he) '-J" "" 0,;- -" ~9 """ ~>! ;:oJ ij ;;~ !tit ~~ c)'" <: --J~U'..'""'~V'_'N'_."":':___~;C:.~::;;:=-_=;.'=--_',,....... ., ~ 0; " " ~ ~ ~I ~I 4', c,,"~,.I_". ~~n~;..,......""'",n_"~____~:_~~,-')~.,I-'-'_'_--=--;_~ t ~ I !1 I,,! ;~~ f~ '\1: ~"!i I~ .~ :,I..:'li,:i; ;N~ l ],11:,[" '\ I~' ',P~:,~., :1 '. ~ :il r ,1, i~,~ " I~ ~" 1'1 I,: 'x'"~._-x~..".., I~ ", '.,,- L - - I" -- I {....~--~"-'- i i ~ I' '1'_ - ---, - -, - - , _ _ -b c i" ",~",m~~.__m_____. __ j: II I .------ - ,---,-- r--i--i--.--n, -"-.-.",.'" " , , r \i I:! I / n, " ',,' r , . , ITT ~,t1 il I ""'1 f' , - J1 , '- . *'- . '- :'c,;, Tn ;, ji ! ' ~,~~ - : 9[, II I' . 1"1 1, ~,) ! ) ~J~'I ,- -=" e-~i iTI / - Ir-n--r-fNI:y( h-',' ~., ~ . I - -',,'~. fJ,~,'rl il, ~-':,~S,'~' I i~' . ',L ir", r- ~ I L .8.' ~. - , ,I F '-,-,If=e-''-LJ:: '-! ..l..1..1.1! 1 I % I- :r!j --....- Ii;' 1 ~ - ~ {pl{~: CL11y~ 11' i 117 \frtl rCi! J: ;:;~~:.l ~ I ,: ~;: ~j I lUll I I ~ (~"=~~m:lllll I\" - ,p:,' CD)"" ~T~dTir"\-~h~f,l' Iii I i < .. ~ w \\ . "I~ H i~ '- rrr:I ( . JJ :,' < ',.,fj ~ I {n ~~il I~ ~I; ", ImT 1, ~ !- - , , ~ ,'r'f h / I! '.: /I[:~ " _ f-''-'U ,lef x, . , ,"~ ~, " , [~ ,/." !!'~ i:. I j" C[ ,I,T[ I.Y ." ~. t:jj l-1rl' , - '7 0,-,. "_ I ' ! ----,,--,-..j IT !::J:f ,~. ~--r---V~ , ,'''-Y., , ,,'-,il' i\!" lQ,lj '~I..j r-l'.....:.', I~ ,~ " .,....., ' " /' " /' ,,.' , 11'!;~1 - +rn1.' , , ah- . ' v:,;. x, ,,' , ' '., '~'<fc--ri " ~,~.:~"',, - ~<"l'~ r ,,"~ '7;1(~ A~\~ /.j,,!l, "It J r6Y II , ~ .,L A, ~ .\y, -. ""~~ --- ',. I I~ k'-=w -- ~ nx: ' ;::: >'/ : f. i (~IJ '['iTI ,~~' ,.~ ./~ ~'1!!~ ~- " ;- '::7 -fj ,HH " ",/ ;,~li,,11 r,~ I {~lJUff' -- --~ii 'l~ I (-llll ,0" '-= cd{," .. ' '. 1 I ~ TTTf " , ; -, IIJ f'" ,~; . \ I ~ . I-- - ~~ (" ,- Ljil, ,,' tr.~:.~~~ ~ \ i ~i ~ 1.- -- ~i r,\ ,?S~: lit~ ~U ,=. ~ "I =- ~, !~,r ><::1:. U I 1l1ii - I I:, .- ~I: .. '..-' ~~'~: -1.'W I~ 'II ~."i,~,.,"~, - '= ',' ;- -h\T~r;r!~, ,', \ / ~ ilt I~ I - -.... , y' . ..) "",, '~I" I@ ! ~I - - "'r.,UY:;:lp ,", ~ ~ y _ -- .:1: ~ !'~ - ~, I^i- M W '~r I,' 1/,/' ~"--:':;"--:J' J I Ii "'"I//'"< ".' ~?h. ,. ] ~ tl"Ji1 ,'r ~~ R=-' -:;:z~ ,> ..- ~ :='i I' , llib {'" " " .. .iW ,~~..,~ ~ '/ I i'~_, Cld --If --:d " -' \"" rr"~:-',' , ' , Jill" Ll.LLlIl.LL' t 'II \llt ..~-~~, _.C,b_ .~,-,--, -~'-~,,~ , , -,~."'_.+-,~-~--~---~ ;i.,j:,i !I' ~II , I ~ ~' M-~~~ ~.. ,-_.". I \ 3SnI]H ,..................., "'..........., Ni1V1i IIWII ~._------------~ " " \\ ~ \ \ ;~ .! I I. ,." f-- l- I- " ._ I- - 8 .,~ " ~, " 0 ~~& -".;;3: ....-g~ r~,r "~'" .....(;:.~ 0' , '=="Q . ~ f~ ~~ ~~ Ij t:; Q"a .s 'J ~I \I ti ~.~ 2 I ~ ~% ~.a ~, 3 :. ,'-' ~ 6 ~I ~ I "e..E:S [: , L:i ~~ I\) 3: I "tl ~". tJ l~I~8~~ r~~a~ ~ ~ ~ ~.;~ [0- .;:~ ~- ~ ~ t i\l\L1OJ NOS)]JVr AlIHmnnV 8NISnOH >I00tl8 Ai:li:l38MONS ~a 'ON\flHS\! 531ftJS is(lrall' )]].45 SlJ..!J NfJ ....,jN[ :JNO J~!:!_:iL '~NJt'1"!<J.(J "!'cfNlrJ'W NO ~.Nr JIWJ 5'1 ,,"va WDJ~IlIlU!1511e@el~fj~ :/I~W-::I !JZ6L-Z9<f(I/7f;) :Xr!d Of:6L"o9Z(IP9) :/91 rogL6I:JO 'pJO/P9W VI # 'IS UWWIS""9L/, (] fi: \C 8 J 101 '" .. "' t; ~ II " .. Q i...,- a.., '-. \( ~ ~~ ~ ") ~~ " g ... "J " ,. "'0 " 0, ,. dl ~~ I, .. [2 <.5 ,,) A " " ~ \j -", ~ '" ,,~ , ':! h ~ Sl "'''' ell " "'" ~" i:' ~~ 2 '" '" ~~ r-.,:,.. Lc S'f ..J 0:, " " OJ '" ~ ;;~ ::: ~ ~" '" ~I:: ~. ~_ IJJ i:: c:'^ Sl '^..J ~s:;: '" B~ ~ lil 8 Cl"i -,----,--_..__... \)""""'J'I.~ ~'~-,~ v, Ai mG "DISj^J~ '0" \, ----;\ ~j _~w . '~Uf;6UU8BU!{jU::J 31flLty,tYl C"=W-- 60/1 f/z I ;31i!1J W,\.!]~]~ ~ ~I ~~ I " 1 :::: 15 ~ f:: If:. " ~ Cl ~ ..j ~ " '^ Cl Q " tQ -( 2 W III _1 :s: ~ ~ >1\ ~ 1 g ((), C) ~ Cl N Cl R \w -I <l,) \J\ \3 ~- k ~ I~ X tel 2 8 :,; t':i '\ iJJ 2: iJJ tC\ 2 '^ ~ '<:' 2 ~ ~ I:: '^ ~ '} '<:C ~ CI) ~ [( () G ~ ~ ~t5 1~, ~. ~~~ 1 t.i (<)W ~ :>. ~ ~ ~ ~~ f <>1 ~2~ ;S~I iillj~ "..Jt:.S:" ~~ .. ~ Il.~ ~l IjJ I.. .g ~ & ~ G; ~.~ S ~ (r)~ , t ~.~ 'S.2 ~~ >~ ~~ ~ E 15 ~ ~ ~ 101:" ~. . h"'(.Ij~"1:l \:J~"''l,ll: :'::''<(O"DfJ ffi t ~ It o ~ ...... ~ ~ "'t: m ~ ~ -J -J "'t: ~ ~ A1NnOJ NOS){JYf ",J,1(10H1nV;]NISnOH STJtI.,s lsnr(]li 133,,'S SJ.I-U N; '~~~t'j~D aN jI '!j,".'Y1'r'?1r1 lVNr9JW ,'lO HJ"JJ 3NfJ ~J oV8" WIX)'JS;J/JrDUB@eWDe :/WW-3 rZ6L-ZgZ(lfrg) :xed OS6L-a8;;(/I'!i) :/el frOIiiL6IJO 'pJOjpefl'l YI# 'IS uMYJS~3 !3LII ~o 'ON'i1HSV )!OO~8 ^~n:E38MONS 8 '" \J ~~ !O: >.1-. ',.j- 2~5 . ....\l " ~~~ " ~\l ~~h '1"", \. -rrr i' "j Q , I >:: "0 h ~.. I \' ,~ Q[ cOr::. 1 ,;':: (j (j Q) II. i" ,. i 1:1)-41 ':: $~ ~'" VII- ," ()" <i<<' ;" ~ v'" :t:!(i""''' 'i' ~Q~)~~~g~ /:~~:;;d~~ :r \)~~lD~~ ~fu"',,1j"'~r. '0~~:::"..JV\~Ci ,.J~~)..~"'li. " \ij~V\3.C) ~V\b ~ ~ " ~ '<CI'.iJ "~8 ~1l11.!J ~~ :j)~ ~/: >; gs n: iJ.J -..J ~ \J ~ "'<: ~ cs ~i IJ, LlJ' 6 6 o It llJ -..J :;!;,lU :>;,~ CIJ j~ oj? .....11- Cl:l~ 2 '-' ~~ B ~o;!G ". 0, "j~ ~ ~~~ 5~ 11...... \.).....;2~ ~-.J.-';!.,J..- '( '^ OO::~~\Jj('\_:k ~:..;::~...J~;O::;: ::; s~~v::t -JQ!:!,,~~~ "'~-~~J:~ ''''tl~G''''J~ I :t1-.'I.!::;~;;'&'l' D~'-:Gt::); ~ ~"'~.J"~~lli -8ah2~~t[ ~"'~h~i5~ ~~~\lJ0~~ " ~"' -" R~~~1~~~~ \'~ ~C)~~ Q6 IJ"",, \..J~ AS J"a NDlSI^l~ !IN " ~ " ~ ~ ~ ~ ;;: " ~ ..j '" h , "I.: '<: 0:," <it -" ~ Ei ~ , L~ ;-, () ;;' ~~:-:J~':: a2~r-,~ ~Cl~ &",' ~~"':">! '.j:;~2(J :...: ~ '"' '1- d~~2 ~~~~ "''' o;,;~CJ ,'"5e:~ 'l 2 II] ~ ~ '" " 1: "J 't 'ti ~I~ CO~ ()e llJ I' CI)!~ ~~:5~~ ~ C') ~ I~:r;, ,,;; '" ":./ ~,~ ~;., J~",;;o:, ;JSa'lQ~ d~~M~ "'~':i~1c I:t::~>.-:C) ~HiS )~~t , , c " ':1ct\ Cl h " '() ~2~ ::Jj..C: ~~~ "'~ ~lf:~ -.,;;~, ..!'\%~ ,," ..j",~ '-' --- ~,,~ ;::~ ~ ~ ~~ ~~~ r-. --It ~ ~ ~ ~Ci" ~~ ~~~ ,;.::I.l.. 1J.l.....~S: ~ \.-" CJ 0:, &' ~ \l ~ lIJ -..J ~~ CI}~ 02 .....' Cl:l2 ~ ~s cJ\j '~~ ~3 ,,~ ~w \- Cl'" (@ Rb "0;; ~'- ti'! h:t _ <1l '1 ~~ 3JJltY'~l -W II~\ W ()", G~ '" lJe LlJI- Cl}2 ! ~I IJ cn' ~ () llJ -..J ~~ CI)~ ale -...::.,I!--- col2 SO/!f/ZI ]1\;'0 ).W,:!~Jti 1-. ~ 1! " '" ~iti V\h " ;: ~~ "", ..., 2,-5 '~~ \) ~H h. \l G!I\l: [(llJlj .~~ ~ ~~ ., 'J~ ~IJCl ~~~ ~l ~ Q: l 8,' to ~: : '}~ "'<:~ @~ CI}:2 Job Address: 380 CLAY ST Contractor: ASHLAND OR 97520 Address: C A Owner's Name: D R R ASSET MANAGEMENT INC 0 Phone: p N State Lic No: Customer #: 05043 p HOUSING AUTHORITY OF JACKSON C T City Lic No: I..; Applicant: 2251 TABLE ROCK RD R I Address: MEDFORD OR 97501 A C C Sub-Contractor: A Phone: (541) 779-5785 T Address: N Applied: 01/09/2009 0 T Issued: 01/09/2009 R Expires: 07/08/2009 Phone: State Lic No: Maplot: 391 E 11 C2500 City Lic No: DESCRIPTION: Land Partition & Site Review $917.00 plus $61.00/unit VALUATION Occupancy Type Construction Units Rate Amt Actual Amt Constuction Description Total for Valuation: ELECTRICAL II I II II I MECHANICAL I I STRUCTURAL PERMIT FEE DETAIL Fee Description Amount Fee Description Amount Type I 5,127.00 CONDITIONS OF APPROVAL II II COMMUNITY DEVELOPMENT 20 East Main St. Ashland, OR 97520 www.ashland.or.us Tel: 541-488-5305 Fax: 541-488-5311 TTY: 800-735-2900 Inspection Request Line: 541-552-2080 CITY Of ASHLAND CITY OF ASHLAND To: City of Ashland Planning Department RE: Planning Application Submittal Authorization 380 Clay Street Application Housing Authority of Jackson County On December 2nd, 2008 the Ashland City Council entered into an intergovernmental agreement (IGA) to jointly purchase and develop a property at 380 Clay Street, in partnership with the Housing Authority of Jackson County To facilitate the partitioning and development of the property, as a co-owner, the City agrees to authorize HAJC to submit an application to the Ashland Planning Department for development on the property. Further as a co-owner of the property, per the terms of the IGA: The City and the HAJC agree to each pay one half of the application fees for: (1) the application to partition the property and (2) the application fees to amend the existing development approvals PA #2007-00802 and PA #2004-00141] to divide the authorized development between the parcels, City is not responsible for paying any portion of application or permit fees specifically associated with the HAJC site review and development. This letter is intended to serve as co-owner authorization for the filing of a Planning Action, Demolition Permit, Building Permits, Excavation Permits or any necessary approvals, including any appeals, to partition the Property so that at least two legal parcels are created and allow for the 60 unit affordable housing development as proposed by HAJC. This letter also serves to authorize the distribution of fees as outlined above per the IGA. Th~rlKYOU,) ~~/1 j A - ~~~/ti\j vi... iT - ~ill Molr;jr Btreetor of Community Development molnarb@ashland.or.us Department of Community Development Tel: 541-488-5305 20 East Main Street Fax: 541-488,5311 Ashland, Oregon 97520 TTY: 800-735-2900 www.ashland.or.us r:., r~' ZONING PERMIT APPLICATION FILE # ,f] /l, .:1 009 - 000 If- 3 Planning Department 51 Winburn Way, Ash]and OR 97520 CITY OF ASHLAND 541-488-5305 Fax 54]-488-6006 DESCRIPTION OF PROJECT DESCRIPTION OF PROPERTY Street Address 3 13 D c/tt,/ I lie 97/Z..h..t<- T. / , ,4/~kj). Ori- t 0; '7 SJ.-O Assessor's Map No, 39 1 E Tax Lot(s) 2- ~-oV Zoning 12----2- I Comp Plan Designation AI Ii / ,j.; - hnvr.' /1 ~ j !~Nr>'rrI APPLICANT Name ~r~ A7t/Yt-'~i Phone E-Mail Address City Zip PROPERTY OWNER Name ~k'fL- ,b,i)zjt-)> Phone E-Mail Address City Zip SURVEYOR, ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OTHER Title Name Phone E-Mail Address City Zip Title Name Phone E-Mail Address City Zip I hereby certify that the statements and information contained in this application, including the enclosed drawings and the required findings of fact, are in all respects, true and correct. I understand that all property pins must be shown on the drawings and visible upon the site inspection. In the event the pins are not shown or their location found to be incorrect, the owner assumes full responsibility. I further understand that if this request is subsequently contested, the burden will be on me to establish: 1) 2) 3) 4) that I produced sufficient factual evidence at the hearing to suppori this request; that the findings of fact furnished justifies the granting of the request; that the findings of fact furnished by me are adequate; and furiher that all structures or improvements are properly located on the ground. Failure in this regard will result most likely in not only the request being set aside, but also possibly in my structures being built in reliance thereon being required to be removed at my expense. If I have any doubts, I am advised to seek competent professional advice and assistance. ~ /lf~/6 W:s Applicant' Signature Date As owner of the property involved in this request, I have read and understood the complete application and its consequences to me as a property own:<& mwehds propert~er'S Signature (required) Date [To be completed by City Staff] Date Received Zoning Permit Type Filing Fee $ Planning Action Type OVER ~~ C \DOCUIv1E~ ]\hanksa\LOCALS~I\Temp\Zonlng Permit ApplIcatIon Form.doc