Loading...
HomeMy WebLinkAbout2009-35 Restoring Electric Rate Schedules RESOLUTION NO. aWe') ~ 3 S A RESOLUTION RESTORING RATE SCHEDULES FOR ELECTRIC SERVICE OMITTED FROM RESOLUTION 2009-26 THE CITY OF ASHLAND RESOLVES AS FOLLOWS: SECTION 1. The electric rate schedules were increased 4% for rates for electric service provided by the City of Ashland effective with usage on or after November 1, 2009 per the Resolution 2009-26. . SECTION 2. The installation and maintenance sections of Schedules 48 & 50 were erroneously omitted from the resolution. Two customers require those schedules for ongoing service. The attached schedules restore the codes with the rates unchanged. These schedules and appropriate adjustments to the rates will be incorporated in future electric rate adjustment resolutions. SECTION 3. Copies of this resolution shall be maintained in the Office of the City Recorder and shall be available for public inspection during regular business hours. SECTION 4. Classification of the fee. The fees specified in Section 1 of this resolution are classified as not subject to the limits of Section 11 b of Article XI of the Oregon Constitution (Ballot Measure 5). SECTION 5. This resolution was PASSED and ADOPTED this / , 2009, and takes effect upon signing by the Mayor. day of \ Barbara Christensen, City Recorder SIGNED and APPROVED this I day of )).c~, 2009. _~O>-~~___ JSRI'I Ctl'6f1'lBefgj, Mayor Kate J(}.d:'s~1 eitair Page 1 of 1 r City of Ashland, Oregon LARGE GENERAL SERVICE - USE OVER 2,000 KILOWATTS SCHEDULE 48 Applicable: This schedule is applicable to electric service loads which have registered over 2,000 kilowatts more than once in any consecutive 18-month period. Deliveries at more than one point, or more than one vOltage and phase classification, will be separately metered and billed. Service for intermittent, partial requirements, or highly fluctuating loads, or where service is seasonally disconnected during anyone-year period will be provided only by special contract for such service. Special Conditions: Customers shall not resell electric service received from the City under provisions of this schedule to any person. Monthly billing: The City will negotiate with a customer a rate structure and rate levels based upon the specific circumstances of the customer. At a minimum, the rates developed for this schedule will be set at a sufficient level to recover all of the costs incurred by the City to serve the customer, including a minimum contribution to fixed assets. Metering & Delivery Voltage Adjustments: The City retains the right to change its line voltage or classifications thereof at any time, and after reasonable advance notice to any customer affected by such change, such customer then has the option to take service through transformers to be supplied by City subject to the VOltage adjustments above. Contract: The City may require the customer to sign a written contract which shall have a term of not less than one (1) year. Effective on Usage as of November 1, 2009 C:\DOCU ME-1 Ishipletd\LOCALS-1 \TempIXPGrpWise\Elec-Sch 48 Large Users 11-1-09.xls 11/24/2009 City of Ashland, Oregon LARGE GENERAL SERVICE - USE OVER 2,000 KILOWATTS SCHEDULE 48 Installation and Maintenance: The City may contract for the installation and maitenance of electric facilities on the customer's premises. The terms of such service shall be set forth in a contract, the form and terms of which shall be approved by the City Council. Monthly charges made by the City shall be approved by the City Council. Monthly charges made by the City as reimbursement for ownership, operation and maintenance costs applicable to facilities installed to furnish service under rules of the Schedule shall be determined in accordance with the following: (1) Operating Charge -- shall be equal to 2/3 of 1 % per month of the installed cost of facilities paid for by the customer. (2) Facilities Charge -- shall be equal to 1 1/2% per month of the installed cost of the facilites as determined by the City for facilities installed at City's expense. (3) Transformer Capacity Charge -- shall be equal to 15 (cents) per nameplate kva. Special Conditions: Customers shall not resell electric service received from the City under provisions of this schedule to any person. City of Ashland, Oregon GENERAL SERVICE - GOVERNMENTAL LARGE SERVICE SCHEDULE 50 Applicable: This schedule is applicable to electric service loads which have registered from 1,000 to 3,000 kilowatts more than once in any consecutive 18-month period. Deliveries at more than one point, or more than one voltage and phase classification, will be separately metered and billed. Service for intermittent, partial requirements, or highly fluctuating loads, or where service is seasonally disconnected during anyone-year period will be provided only by special contract.tor such service. Monthly Billing: The Monthly Billing shall be the sum of the Basic, Demand, Energy, and Reactive Power Charges, plus appropriate Metering and Delivery adjustments. Basic Charge: 2,114.16 Per month Demand Charge: For each kilowatt of Billing Demand. 3.9391 Energy Charge: per kWh 4.621 rates (for usage) shown as cents Minimum Charge: The monthly minimum charge shall be the basic charge. A higher minimum charge may be required by contract. On-Peak Period Billing Demand: The on peak period kilowatts shown by or computed from the readings of City's demand meter for the 3D-minute period of customer's greatest use during the month, determined to the nearest kilowatt. Reactive Power Charge: The maximum 3D-minute reactive demand for the month in kilovolt-amperes in excess of 40% of the measured kilowatt demand for the same month will be billed, in addition to the above charges, at rate shown below, per kvar of such excess reactive demand. 0.9191 The City retains the right to change its line voltage or classifications thereof at any time and after reasonable advance notice to any customer affected by such change, such customer then has the option to take service at the new line voltage or to accept service through transformers to be supplied by City subject to the voltage adjustments above. CONTRACT: The City may require the customer to sign a written contract which shall have a term of not less than one (1) year. Special Conditions: Customers shall not resell electric service received from the City under provisions of this schedule to any person. The City retains the right to change its line voltage or classifications thereof at any time and after reasonable advance notice to any customer affected by such change, such customer then has the option to take service at the new line voitage or to accept service through transformers to be supplied by City subject to the voltage adjustments above. C:IDOCUME-1IshipletdILOCALS-1ITempIXPGrpWiseIElec-Sch 50 Large govt Users 11-1-09.xls 11/24/2009 City of Ashland, Oregon GENERAL SERVICE. GOVERNMENTAL LARGE SERVICE SCHEDULE 50 Page 2 Installation and maintenance: The City may contract for the installation and maintenance of electric facilities on the customer's premisis. The terms of such service shall be set forth in a contract, the form and terms of which shall be approved by the City Council. Monthly charges made by the City shall be approved by the City Council. Monthly charges made by the City as reimbursement for ownership, operation and maintenance costs applicable to facilities installed to furnish service under rules of the Schedule shall be determined in accordance with the following: (1) Operating Charge -- shall be equal to 2/3 of 1 % per month of the installed cost of facilities paid for by the customer. (2) Facilities Charge -- shall be equal to 1 1/2% per month of the installed cost of the facilities as determined by the City for facilities installed at City's expense. (3) Transformer Capacity Charge -- shall be equal 15 (cents) per nameplate kva.