HomeMy WebLinkAbout2010-0201 Study Session MIN CITY COUNCIL STUDY SESSION
February 1, 2010
Page I of 3
MINUTES FOR CITY COUNCIL STUDY SESSION
Monday, February 1, 2010
Siskiyou Room, 51 Winburn Way
Mayor Stromberg called the meeting to order at 5:34 p.m.
Councilor Chapman, Silbiger, Navickas, Lemhouse and Jackson were present. Councilor Voisin arrived at
5:37 p.m.
Mayor Stromberg requested 5 minutes at end of the meeting to hear a report from Councilor Lemhouse
regarding the Medford Drug Task Force.
1. Look Ahead Review
City Administrator Martha Bennett reviewed the items on the Council Look Ahead.
2. Discussion regarding proposed 6 -Year Capital Improvement Program (CIP) project list?
Public Works Director Mike Faught provided a presentation that included the following:
FY10 Current Year Highlights
FY11 CIP Proposed Program by Division
FY11 Cl? Proposed Project Lists
FY11 Capital Equipment Purchase Plan
FY11 -16 CIP Plan by Division
Council Actions Requested
CIP Planning What is Involved
o Master Plans
o Maintenance Records
o Revenues
o Balance Capabilities
o Timing
Mr. Faught explained utility conflicts and how staff specifically chose streets to overlay that did not have
foreseeable utility conflicts over the next five years.
Historic Project Delivery Chart Planned vs. Actual
FY10 Current Year Highlights Table
Parks Director Don Robertson confirmed the Parks and Recreation Department did not purchase property
this year.
FY11 CIP Proposed Program by Division Chart
FY11 CIP Proposed Transportation Project List
Staff explained the engineering for the Railroad crossing improvements at Hersey Street and Laurel Street
were complete and approved by the Oregon Department of Transportation (ODOT) and currently waiting
for funding. The project will improve the crossing surfaces for pedestrian and bike use without changing
the intersection metrics.
Vicinity Map Sidewalk Construction Projects
FY11 CIP Proposed Street Improvement LID Project List
FY10 Slurry Seals/FY11 Overlays
CITY COUNCIL STUDY SESSION
February I, 2010
Page 2 of 3
FY11 Fiscal Impacts Street Fund
Staff clarified a City Share error regarding the Sheridan and Schofield Street LID on the CIP.
FY11 CIP Proposed Water Fund Project List
Staff explained how recent Total Maximum Daily Load (TMDL) sediment controls would affect the two
smaller reservoirs used to collect sediment and clarified TID Pump Station Improvement amounts.
Council expressed concern regarding the cost of the Master Plans for Wastewater, Storm Water and
Drinking Water. Staff responded that updates should occur every five years and the City is currently at ten
years. Each plan initially costs $350,000, will include new components on rate impacts, life cycle costs and
staffing and decrease to $100,000 $150,000 each if updated on a regular five -year basis.
FY11 Fiscal Impacts Water Fund
o New "Crowson I1" Reservoir
The second reservoir would resolve the 2million gallons per day shortage the City experiences and address
operational issues during peak season. Accessing the Talent Ashland Phoenix (TAP) waterline would
not require a second reservoir; the water would pump directly into the system.
FY11 CIP Proposed Wastewater Storm Drain Fund Project Lists
o Wastewater Treatment Plant Membrane Replacement
Mr. Faught explained membranes have a seven -ten year life span and if they fail, the City will incur a
severe penalty. The current membranes have one year left and that was not sufficient time to research
longer life membranes or alternatives.
o Wastewater Line Replacement; Ashland Creek Main Line
Staff described the replacement process and that it would extend the life of the pipeline approximately 30
years.
FY11 Fiscal Impacts Wastewater Fund
FY11 CIP Proposed Electric Fund Project List
FY11 CIP Proposed AFN/Telecom/IT Project Lists
Information Technology
Staff will research the $22,000 allocation for the community website.
FY11 CIP Proposed Facilities Parks Project Lists
o Parks Recreation
Staff explained the Parks Department has 2 years to repay $1.3million borrowed from the City for the Clay
Street purchase. The money will go back to the Equipment Fund, address downtown parking and leave
approximately $175,000 for the Council to determine how to spend.
FY11 Capital Equipment Purchase Plan
Council and staff discussed the process used for replacing vehicles, why larger trucks are more efficient
than smaller trucks and the benefits of purchasing a used Gradall to clean sediment out of reservoirs and
ponds.
Councilor Jackson left the meeting at 7:10 pm.
CITY COUNCIL STUDY SESSION
February 1, 2010
Page3of3
Councilor Lemhouse introduced the City of Medford's new task force, Medford Area Drug Gang
Enforcement (MADGE) and listed the agencies that make up the 28- member team. He explained that
Medford is a high drug traffic area and that Mexican drug cartel are setting up franchises locally and noted
the escalation in gang violence.
Meeting adjourned at 7:23 p.m.
Respectfully submitted,
Dana Smith
Assistant to the City Recorder