CONTRACT CHANGE ORDER NO. 1
PROJECT:
LOCATION:
,tI.UZ.POQ-t"" :rulFOo<.le:l>la-\. ~
.J..O..U4..'lD
DATE: Z..(zz..( :U>ID
PROJECT NO.: -z.c>'O~ -~L
CONTRACTOR: ?=;c- lMico...et"bN
You are requested to perform the following described work upon receipt of an approved copy of this
document or as described by the Engineer:
Item No. Description Quantity Unit Price Amount
~, ~'btt.uc..:nc:...l l I!r IS l$c> ~cS l~
CO 1 e9..)/2>.lE"r . I
Total this Chan e OrdeJ"t l'S t e.z:>
g .
Previous Change Order if.
Revised Contract Tota~ "Z-lb, ST-"'f
The time provided for cornpletion of this contract is increased by no calendar days. This
document shall becorne an amendment to the contract and all provisions of the contract will
apply.
Approved By:
____ """"i {f~
Recommended By::::; ~
~gineer
.?En~
Reid Middleton
~~
Contractor
~'l"'l:>
Date
~/ -z~ ~"lO
Date
Accepted By:
~~/I?
'Date
ENGINEERING Tel: 541-488-5347
20 E. Main Street Fax: 541-488-li006
Ashland, OreQon 97520 m: 800-735-2900
www.aShland.or.USG:lpub-wrkslengIO'ABlank FonnslChange Order.doc
rj.1
.'
..
...
February 16,2010
File No. 232009.012.001
Mr. Scott Fleury
City of Ashland
51 Winburn Way
Ashland, OR 97520
Reference:
Agreement for Professional Services, dated June 22, 2009
Ashland Municipal Airport Runway 12/30 Rehabilitation and PAPI
Installation
Subject:
Supplement No. I, P API Obstruction Location Survey
Dear Mr. Fleury:
We are pleased to submit the following proposal for the PAPI Obstruction Location
Survey at the Ashland Municipal Airport. This letter serves as a supplement to our
referenced agreement. The terms and conditions established by the agreement are
unchanged except as noted below.
A PROJECT UNDERSTANDING
Reid Middleton performed a PAPI obstruction survey on July 22,2009, that was
part of the original agreement. At that time it was determined that there were
obstacles that penetrated the P API obstacle clearance surface at both ends of
Runway 12/30, even using the maximum PAPI glide path of four degrees. Due
to the nature of the obstacles, removal was not an option, so based on the FAA
guideline that no obstruction could penetrate the obstacle clearance surface, the
construction of the PAPl's could not be funded. Under the direction of the City
of Ashland (City), Reid Middleton prepared and submitted a Form 7460
requesting the use of baffles to remove the obstructions from the P API's field of
view, thus making the construction of the PAPl's eligible for funding. Upon
reviewing the Form 7460, the FAA determined the P API system could be funded
. with the condition that baffles be used to eliminate that portion of the standard.
20 degree viewing angle that is impacted by obstacle penetrations of the obstacle
clearance surface. Reid Middleton will perform a survey to gather design data
necessary for properly sizing the baffles that are to be used on the new P API
systems.
Engineers
Planners
S/JrveyorJ
Reid Middleton, Inr.
728134th StreetSW
Suite 100
Everett, WA 98104
Ph: 415741-3800
Fox: 415741-3900
. Mr. Scott Fleury
City of Ashland
February 16,2010
File No. 232009.012.001
Page 2
B. SCOPE OF SERVICES
I.. Form 7460 for PAPI Approval
Coordinate, prepare, and submit Form 7460 to the FAA for PAPI
approval. This effort includes completion of the form and a narrative of
the proposal with design calculations and exhibits.
2. PAPI Obstruction Location Survey
a. Prepare and coordinate with the City, Airport, FAA, and
subconsultant for the on-site P API obstruction location survey to
be done at the Ashland Municipal Airport. Wicks Surveying will
perform this survey (see attached).
b. . Coordinate the effort and collect and tabulate results on site
during survey.
c. Analyze ahd document the results of the on-site survey to be used
in the design of the baffles for the P API systems. .
C. COMPENSA nON
Reid Middleton shall be paid on a time-plus-expense basis using the rates
indicated in Exhibit "A," Schedule of Charges Effective July 1,2009, attached to
the master agreement. We estimate the fee for this portion of the services to be
$15,180.
We request the budget for the project be increased $15,180 to reflect this revised
scope of services. The amended total for the agreement inclusive of all
supplements is increased from $195,399 to $210,579.
We appreciate the opportunity to submit this proposed supplemental agreement. The
terms of this agreement will become effective when confirmed by your signature within
30 days. If you wish to pursue this project after that time, this agreement may then be
renegotiated. If the terms are acceptable, please sign your acceptance below and return
one executed copy to Reid Middleton.
...
Mr. Scott Fleury
City of Ashland
February 16,2010
File No. 232009.012.001
Page 3
If you have any questions or comments please call Don Barclay or me.
Sincerely,
ACCEPTED:
. Reid Middleton, Inc.
City of Ashland
;#'~
Kurt M. Addicott, P.E.
Director, Airport Group
By ~r..Q\L~,_
Title '\>,,\:'\,c '\00.['\"'<;' 'S'),-rcc:-\e1L
Date ::l../:;'3/ ~IC:>
Attachments
kab\H:\DOC\2310910l2 Ashland RW 12/30 RehablContrac1s10bstruc SV-Supp 1ILTR-SUPP l.docldeb
...
AIRPORT:
PROJECT'
CLIENT:
JOB NUMBER:
DATE
PROJECT TASK
Ashland Municipal Airport ---
Runway 12f30 Rehabilitation
City of Ashland
232009.913.016
2/01110 i'\DOC\23Ap\09\OI2 _ Ashlaml RW 1230 Rehab\ConlraclslObstruct Surv Supp II[ObslSurvev fee (ashland) xJs]prelim
PROJECT SENIOR PROJECT DESIGN CAD
PRNPAL ENGR ENGR ENGR ENGR OPER. CLER. PA TOTAL PROJECT
$190.00 $180.00 $135.00 $105.00 $85.00 $105.00 $105.00 $85.00 HRS COST
KA RJ DB WBfSV VC OM VF KB
3.75 3.5 29,5 0 0 0 0 0 36.75 $5,325
4 0 8 4 0 0 0 0 16 $2,260
0 0 8 0 0 0 0 0 8 $1,080
0 0 4 0 0 0 0 0 4 $270
4 0 12 8 0 0 0 0 24 $3,220
11.75 3.5 61.5 12 0 0 0 0 88.75 SI2,155
1. FORM 7460 PREPARATION FOR PAPI APPROVAL
a. Coordination und preparation of7460 torm
2. PAPI OBSTRUCTION LOCATION SURVEY
a. Preparalion and coordination for onsite obstruction survey
b .PAPI Obstacle Surface Survey, see Wicks Survey sub below
c. Onsite coordination for P API Obstruction Survey
Site visit Travel (1/2 Rate)
d. PAPI Approach Survey Analysis
Subtotal- Labor
EXPENSES
Travel:
Airfare to City (Round Trip)
Vehicle Rental
Mileage To City (Round Trip)
Mileage To FAA (Round Trip)
Lodging
Per Diem
Processing Fee. Percentage of Expenses
Subtotal- Expenses
SUBCONSUL T ANTS:
Wicks Engineering & Surveying (PAPI Obstacle Clearance Survey)
Handling Fee - Percentage ofSubconsultants
Subtotal- Subconsultants
Cost/Unit Trips Miles Days
$400 I
$120 1 2
$0.55 0 1000
$0.55 0 70
$120.00 1
$30 1
$400
$240
$0
$0
$120
$30
15%
$119
$909
$1,840
15%
$276
TOTAL
$2,116
$15,180
o
(Lump Sum)
Page 1
HB-J2-2010 12: 12 PM
p, 2
VVicks Engineering & Surveying
311 NE "D" Street Grants Pass, Oregon 97526
Tel. (541)-479-3436 Fax (541)-479-1014
ASHLAND AIRPORT PAPI OBSTRUCTION SURVEY
PROPOSAL
Date: February 12,2010
PROPOSAL SUBMITTED TO:
JOB:
Mr. Don Barclay
REID MIDDLETON
728 134th Street, Suite 200
Everett, WA 98204
Ashland Airport .
Tel: (425)-741-3800
Wicks Engineering & Surveying hereby proposes to perform the following survey services:
Stake the location of the two proposed revised P API sites at positions to be determined by Reid
Middleton. Included are three setup points at each P API site to be used as observation points to
determine whether any obstructions exist within a vertical angle also to be determined by Reid
Middleton. This work will be coordinated with Reid Middleton to allow observations by their
personnel.
ESTIMATE' FOR SERVICES: $1840
Payment in full due on completion unless prior arrangements are made in writing. Additional
work required and not listed above shall be done at the rate of $60 per houri one man and $100
per houri two man survey crew. No additional work will be done without prior consent of owner.
In any action or suit to enforce this agreement the prevailing party shall be entitled to its attorney
fees from the non-prevailing party.
~~,,~:.L
G D. 'cks
Engineer/ Surveyor
reidmid4. v.'pd
Page I of I
~,
r~'
Page 1 11
CITY OF
ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
EII!ili;IID?.'fE~
6/26/2009
m'R.0JNUMBERWB
09003
VENDOR: 014269
REID MIDDLETON
728134TH STREET SW SUITE 200
EVERETT, WA 98204
SHIP TO: Ashland Public Works
(541) 488-5587
51 WINBURN WAY
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date:
Speciallnst:
Req. No.:
Dept.: PUBLIC WORKS
Contact: Michael Faught
Confirming? No
','~~ifW;iff; 1fifumi~ ~~ -'''''''''''"~D..!'scrj;;tion~-lI~A-Jjl\tJ''i ~U~it;R(i~'M2I _E"t~P.riCil'_
Provide engineering services for the 195,399.00
design of the runway 12130
rehabilitation - Project #2008-62,
Approved by Council 06/16/2009.
Contract for Aviation Engineerin!:l
Services - Beginning date: 06/22/2009,
Completion date: 06/30/2011, Insurance
required/On fiie
SUBTOTAL 195 399.00
BILL TO: Account Payable TAX O.OO!
20 EAST MAIN ST FREIGHT 0.00'
541-552-2028 TOTAL 195,399.00
ASHLAND, OR 97520
ljWil>C~P!LIl!]Numb"~lliMlHmJectiN@i~er~ lftl'MiilrAmQ~nnmlrilll ~.Ac-'~9_unt]NumD~ l:R!l19j~_ct!NUiTi~erJ_ fbDgAmQu_mwd
E 200862.100 195 399.00
4/C>. 08,2..4,00, -: ()4/0/J
,
~ ..;;A.~
.6' ~ ~)"
AutHe.iied Signature
VENDOR COPY
Page 1/1
~~,
CITY OF
ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
CITY REC RDER
,',: "DAl:E-'
7/1/2009
1.:;'f'0~N9~~~ER'LI
VENDOR: 014269
REID MIDDLETON, INC.
728 134TH STREET SW SUITE 200
EVERETT, WA 98204
. SHIP TO: Ashland Public Works
(541) 488-5587
51 WINBURN WAY
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date:
Speclallnst:
Req. No.:
Depl: ENGINEERING
Contact: Michael Faught
Confirming? No
~Qua1ltiWEl ;;ll:iniH~"~ ~)S1~PJ.~;~~~;~~T~Y~~&-?~:~{:(rk~.:_~~:'Li;r~'[)estrrotion~~~1-t:. /~:r;~- ~., ,::.::;:;,- ';.:<'-.",, <,', ;'Uni(PrlCf!;,"',:'::.f L: ;,~Exl~R;:i'c-e ':"~'~:':-j
THIS IS A REVISED PURCHASE ORDER
Provide engineering services for the 195,399.00
design of the runway 12130
rehabilitation - Project #2008-62,
Approved by Council 06/16/2009_
Contract for Aviation Engineerin~
Services - Beginning date: 06/22/2009,
Completion date: 06/30/2011, Insurance
required/On file
Processed change order 06/30/2009, PO 191,197.67
closed in error/Payments as of 06/30/09
total $4,201_33, Remaining open balance
is $191,197.67. Also need to change the
account number to 410 08 24 00 704 100.
Processed change order 03/17/2010 15,180_00
Change Order No.1: Perform work
beyond the original stated scope of
services to survey, analyze and
coordinate the approval of baffelin~
for the proposed PAPI systems. Fundin~
for the additional engineering work to
be included in construction budget.
SUBTOTAL 401 776.67
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2028 TOTAL 401,776.67
ASHLAND, OR 97520
JI'1~ccountlNUrii~ ~NUrnber~,;C2~: ~'f:~:~?ArnQuiJf~'1Ii!; ;-:~;f;PACCO'uii~~fumBer':~-(f;,~ :\T:l<YPr6jeci.NtmBer;~~~;1{~ l:fr~E?~n;ountf%S:4
E 260.08.12.00.70420 E 200862.100 195 399.00
E 410.08.24.00.70410 E 200862.100 206 377.67
.~ ~ ~
~ 'L .:?-' ~c'J
Autho ed Signature
VENOOR COPY
CITY OF
ASHLAND
,
I FORM #12 I
lrr..')::r:;;~~'i'~ 'l'1~.t~t'~'i~+J-r:';":-'7- ;C':;::C;;~::';.._\'~:'T.:,;:_.:-:-': ,,:.
eERSa,N~~:SERV;I(~ES
l::Ck~~""~'-.-.'L1:T;;"~~~~~-~c..;...:
CHANGE ORDER/CONTRACT AMENDMENT
APPROVAL REQUEST FORM
Purchase Order Number:
C1tJo.a-
~r attached contract amendment
"'':I..~'''r'lc''!i''''''.'..~''fT!'':''''''"'!;'''.;'''''''-:''..''c~'..:C_",,'='"-'--'''~rn:'''.'-'-'~:~.''"'''''T'":".-:'''?""''~~-'''''"'''--.~:c:'~'7'--:~~~'
C()nira'ct~Am~ndm~lit,for,PERSONAI::.SERV.jCES
Originai contract amount
$ /'''1S-3<7'1.
e'-<!'>
/ t9--t!J~ .t;./
Total amount of orevious contract amendments
% of original contract
/c:-,,""C ~d> --;>?S-
(0-' >:;:/ , /' % of original contract
$ ,;:? / t::J '5"7 '1. If! iJ /" c7 7. '750/" of original contract
/
Amount of this contract amendment
TOTAL AMOUNT OF CONTRACT
Is the total aggregate cost change for the Personal Services contract
less than or equal to 2507.1 of the original contract amount?
YES / NO _ Not Applicable_
If "No", City Council approval is required. City Council approval was received on (Date)
Are there any applicable performance or payment bonds and insurance coverages ~ "'-* A. ,f)-vJ.-<. d--& ~~ ~~
that need to be adjusted to account for the change in the contract amount? YES _ NO _ Not Applicable_
Contract amendments for personal services are subject to the following conditions: The original contract imposes binding obligation on
the parties covering the terms and conditions regarding changes in E ~k;-~nded contract does not substantially alter the .
scope or nature of the project. Has either of these conditions been m t? v' X ~ ;:;:?L1 ",,-'..uJ
-'----. YES_ NO NIA c"~ ~.._~tf
, ~~"""""""c.
If "NO", Council approval is required. Council approval received on ~ (Date~ d.Y~.L. 'x-
~ <L.~r ~u
( 0 ;S?.....t!...yv~.c;.
Was the original contract approved by the City Council, or is it exempt? '" . $t? ~
C;7
NO (Exempt/Not Required)
Co -/0
(Date)
- ;?-d'.&'/ jl
YES (Approved by Council)
Comments 1 Additional Information: t'!.?Z./
tk.-,(J'c-L.1(. e;,-~_
/--~?'/'O~~
..' ~:, ) ,tl9 -$t?-/l(Reason for exemption)
~- L cJ2.-r~ ~.A~"2:.> ~'"
j'2<.R r 0:-c n.,. ~ e<
C ~
/'
tf!.~ s .e'~~
~ //
Prepared by:
lease circle:
Approved
Not Approved
(!J ~ ~ (13 - /0
~~ ~
Lee Tuneberg
3hl// ()
1
Department:
Date:
Date:
Form #11 - Contract Amendment Approval Request Form - PERSONAL SERVICES, Page 1 of 1, 3/30/2010
CITY OF
ASHLAND
A request for a Purchase Order
REQUISTION FORM
Date of Request:I.~:8)20Ko:1
THIS IS A REQUEST FOR A:
[X ] Change Order (existing PO# 9003)
Vendor Name:
Address:
City, State, Zip
Phone:
Project Title:
Project Number:
Reid Middleton
728 134th Street SW, Suite 200
Everett,WA 98204
425-741-3800
Runway 12/30 Rehabilitation
2008-62 (FAA No. 3-41-0002-08)
Description Solicitation Process:
Perform work beyond the original stated scope of services to ( I Exempt [.1 3 Written Quotes (copies
. attached).
survey, analyze and coordinate the approval of baffeling for the [ I Sole Source [.] 'Invitation 10 Bid (copies on
file)
proposed PAPI systems. Funding for the additional engineering [ ] Less than $5000 [Xl Request for Proposal
(copies 'on file)
work to be included in construction budget.
Total Cost
Change Order NO.1
Account Number
410_08.24.00.704100
*Please attach the Original signed contract and Insurance CertirlC8tes.
Supervisor' Oepl Head Signature: ~ r.. <;t.fL-4.-
. I certify tha the above request meets with Ctiy of Ashland Solicitiatlon Process requirements and can be provided when necessary.
G:\pub-wrks\eng\depl-admin\ENGINEER\PROJECn2CJ08\08..62 Change Order Requisition.xls
Updated on: 7/15102