Loading...
HomeMy WebLinkAbout2010-030 CONT Chg Order #1 - Reid Middleton Revised CITY OF ASHLAND DEPARTMENT,OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 1 PROJECT: LOCATION: ,tI.UZ.POQ-t"" :rulFOo<.le:l>la-\. ~ .J..O..U4..'lD DATE: Z..(zz..( :U>ID PROJECT NO.: -z.c>'O~ -~L CONTRACTOR: ?=;c- lMico...et"bN You are requested to perform the following described work upon receipt of an approved copy of this document or as described by the Engineer: Item No. Description Quantity Unit Price Amount ~, ~'btt.uc..:nc:...l l I!r IS l$c> ~cS l~ CO 1 e9..)/2>.lE"r . I Total this Chan e OrdeJ"t l'S t e.z:> g . Previous Change Order if. Revised Contract Tota~ "Z-lb, ST-"'f The time provided for cornpletion of this contract is increased by no calendar days. This document shall becorne an amendment to the contract and all provisions of the contract will apply. Approved By: ____ """"i {f~ Recommended By::::; ~ ~gineer .?En~ Reid Middleton ~~ Contractor ~'l"'l:> Date ~/ -z~ ~"lO Date Accepted By: ~~/I? 'Date ENGINEERING Tel: 541-488-5347 20 E. Main Street Fax: 541-488-li006 Ashland, OreQon 97520 m: 800-735-2900 www.aShland.or.USG:lpub-wrkslengIO'ABlank FonnslChange Order.doc rj.1 .' .. ... February 16,2010 File No. 232009.012.001 Mr. Scott Fleury City of Ashland 51 Winburn Way Ashland, OR 97520 Reference: Agreement for Professional Services, dated June 22, 2009 Ashland Municipal Airport Runway 12/30 Rehabilitation and PAPI Installation Subject: Supplement No. I, P API Obstruction Location Survey Dear Mr. Fleury: We are pleased to submit the following proposal for the PAPI Obstruction Location Survey at the Ashland Municipal Airport. This letter serves as a supplement to our referenced agreement. The terms and conditions established by the agreement are unchanged except as noted below. A PROJECT UNDERSTANDING Reid Middleton performed a PAPI obstruction survey on July 22,2009, that was part of the original agreement. At that time it was determined that there were obstacles that penetrated the P API obstacle clearance surface at both ends of Runway 12/30, even using the maximum PAPI glide path of four degrees. Due to the nature of the obstacles, removal was not an option, so based on the FAA guideline that no obstruction could penetrate the obstacle clearance surface, the construction of the PAPl's could not be funded. Under the direction of the City of Ashland (City), Reid Middleton prepared and submitted a Form 7460 requesting the use of baffles to remove the obstructions from the P API's field of view, thus making the construction of the PAPl's eligible for funding. Upon reviewing the Form 7460, the FAA determined the P API system could be funded . with the condition that baffles be used to eliminate that portion of the standard. 20 degree viewing angle that is impacted by obstacle penetrations of the obstacle clearance surface. Reid Middleton will perform a survey to gather design data necessary for properly sizing the baffles that are to be used on the new P API systems. Engineers Planners S/JrveyorJ Reid Middleton, Inr. 728134th StreetSW Suite 100 Everett, WA 98104 Ph: 415741-3800 Fox: 415741-3900 . Mr. Scott Fleury City of Ashland February 16,2010 File No. 232009.012.001 Page 2 B. SCOPE OF SERVICES I.. Form 7460 for PAPI Approval Coordinate, prepare, and submit Form 7460 to the FAA for PAPI approval. This effort includes completion of the form and a narrative of the proposal with design calculations and exhibits. 2. PAPI Obstruction Location Survey a. Prepare and coordinate with the City, Airport, FAA, and subconsultant for the on-site P API obstruction location survey to be done at the Ashland Municipal Airport. Wicks Surveying will perform this survey (see attached). b. . Coordinate the effort and collect and tabulate results on site during survey. c. Analyze ahd document the results of the on-site survey to be used in the design of the baffles for the P API systems. . C. COMPENSA nON Reid Middleton shall be paid on a time-plus-expense basis using the rates indicated in Exhibit "A," Schedule of Charges Effective July 1,2009, attached to the master agreement. We estimate the fee for this portion of the services to be $15,180. We request the budget for the project be increased $15,180 to reflect this revised scope of services. The amended total for the agreement inclusive of all supplements is increased from $195,399 to $210,579. We appreciate the opportunity to submit this proposed supplemental agreement. The terms of this agreement will become effective when confirmed by your signature within 30 days. If you wish to pursue this project after that time, this agreement may then be renegotiated. If the terms are acceptable, please sign your acceptance below and return one executed copy to Reid Middleton. ... Mr. Scott Fleury City of Ashland February 16,2010 File No. 232009.012.001 Page 3 If you have any questions or comments please call Don Barclay or me. Sincerely, ACCEPTED: . Reid Middleton, Inc. City of Ashland ;#'~ Kurt M. Addicott, P.E. Director, Airport Group By ~r..Q\L~,_ Title '\>,,\:'\,c '\00.['\"'<;' 'S'),-rcc:-\e1L Date ::l../:;'3/ ~IC:> Attachments kab\H:\DOC\2310910l2 Ashland RW 12/30 RehablContrac1s10bstruc SV-Supp 1ILTR-SUPP l.docldeb ... AIRPORT: PROJECT' CLIENT: JOB NUMBER: DATE PROJECT TASK Ashland Municipal Airport --- Runway 12f30 Rehabilitation City of Ashland 232009.913.016 2/01110 i'\DOC\23Ap\09\OI2 _ Ashlaml RW 1230 Rehab\ConlraclslObstruct Surv Supp II[ObslSurvev fee (ashland) xJs]prelim PROJECT SENIOR PROJECT DESIGN CAD PRNPAL ENGR ENGR ENGR ENGR OPER. CLER. PA TOTAL PROJECT $190.00 $180.00 $135.00 $105.00 $85.00 $105.00 $105.00 $85.00 HRS COST KA RJ DB WBfSV VC OM VF KB 3.75 3.5 29,5 0 0 0 0 0 36.75 $5,325 4 0 8 4 0 0 0 0 16 $2,260 0 0 8 0 0 0 0 0 8 $1,080 0 0 4 0 0 0 0 0 4 $270 4 0 12 8 0 0 0 0 24 $3,220 11.75 3.5 61.5 12 0 0 0 0 88.75 SI2,155 1. FORM 7460 PREPARATION FOR PAPI APPROVAL a. Coordination und preparation of7460 torm 2. PAPI OBSTRUCTION LOCATION SURVEY a. Preparalion and coordination for onsite obstruction survey b .PAPI Obstacle Surface Survey, see Wicks Survey sub below c. Onsite coordination for P API Obstruction Survey Site visit Travel (1/2 Rate) d. PAPI Approach Survey Analysis Subtotal- Labor EXPENSES Travel: Airfare to City (Round Trip) Vehicle Rental Mileage To City (Round Trip) Mileage To FAA (Round Trip) Lodging Per Diem Processing Fee. Percentage of Expenses Subtotal- Expenses SUBCONSUL T ANTS: Wicks Engineering & Surveying (PAPI Obstacle Clearance Survey) Handling Fee - Percentage ofSubconsultants Subtotal- Subconsultants Cost/Unit Trips Miles Days $400 I $120 1 2 $0.55 0 1000 $0.55 0 70 $120.00 1 $30 1 $400 $240 $0 $0 $120 $30 15% $119 $909 $1,840 15% $276 TOTAL $2,116 $15,180 o (Lump Sum) Page 1 HB-J2-2010 12: 12 PM p, 2 VVicks Engineering & Surveying 311 NE "D" Street Grants Pass, Oregon 97526 Tel. (541)-479-3436 Fax (541)-479-1014 ASHLAND AIRPORT PAPI OBSTRUCTION SURVEY PROPOSAL Date: February 12,2010 PROPOSAL SUBMITTED TO: JOB: Mr. Don Barclay REID MIDDLETON 728 134th Street, Suite 200 Everett, WA 98204 Ashland Airport . Tel: (425)-741-3800 Wicks Engineering & Surveying hereby proposes to perform the following survey services: Stake the location of the two proposed revised P API sites at positions to be determined by Reid Middleton. Included are three setup points at each P API site to be used as observation points to determine whether any obstructions exist within a vertical angle also to be determined by Reid Middleton. This work will be coordinated with Reid Middleton to allow observations by their personnel. ESTIMATE' FOR SERVICES: $1840 Payment in full due on completion unless prior arrangements are made in writing. Additional work required and not listed above shall be done at the rate of $60 per houri one man and $100 per houri two man survey crew. No additional work will be done without prior consent of owner. In any action or suit to enforce this agreement the prevailing party shall be entitled to its attorney fees from the non-prevailing party. ~~,,~:.L G D. 'cks Engineer/ Surveyor reidmid4. v.'pd Page I of I ~, r~' Page 1 11 CITY OF ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 EII!ili;IID?.'fE~ 6/26/2009 m'R.0JNUMBERWB 09003 VENDOR: 014269 REID MIDDLETON 728134TH STREET SW SUITE 200 EVERETT, WA 98204 SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: Speciallnst: Req. No.: Dept.: PUBLIC WORKS Contact: Michael Faught Confirming? No ','~~ifW;iff; 1fifumi~ ~~ -'''''''''''"~D..!'scrj;;tion~-lI~A-Jjl\tJ''i ~U~it;R(i~'M2I _E"t~P.riCil'_ Provide engineering services for the 195,399.00 design of the runway 12130 rehabilitation - Project #2008-62, Approved by Council 06/16/2009. Contract for Aviation Engineerin!:l Services - Beginning date: 06/22/2009, Completion date: 06/30/2011, Insurance required/On fiie SUBTOTAL 195 399.00 BILL TO: Account Payable TAX O.OO! 20 EAST MAIN ST FREIGHT 0.00' 541-552-2028 TOTAL 195,399.00 ASHLAND, OR 97520 ljWil>C~P!LIl!]Numb"~lliMlHmJectiN@i~er~ lftl'MiilrAmQ~nnmlrilll ~.Ac-'~9_unt]NumD~ l:R!l19j~_ct!NUiTi~erJ_ fbDgAmQu_mwd E 200862.100 195 399.00 4/C>. 08,2..4,00, -: ()4/0/J , ~ ..;;A.~ .6' ~ ~)" AutHe.iied Signature VENDOR COPY Page 1/1 ~~, CITY OF ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 CITY REC RDER ,',: "DAl:E-' 7/1/2009 1.:;'f'0~N9~~~ER'LI VENDOR: 014269 REID MIDDLETON, INC. 728 134TH STREET SW SUITE 200 EVERETT, WA 98204 . SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: Speclallnst: Req. No.: Depl: ENGINEERING Contact: Michael Faught Confirming? No ~Qua1ltiWEl ;;ll:iniH~"~ ~)S1~PJ.~;~~~;~~T~Y~~&-?~:~{:(rk~.:_~~:'Li;r~'[)estrrotion~~~1-t:. /~:r;~- ~., ,::.::;:;,- ';.:<'-.",, <,', ;'Uni(PrlCf!;,"',:'::.f L: ;,~Exl~R;:i'c-e ':"~'~:':-j THIS IS A REVISED PURCHASE ORDER Provide engineering services for the 195,399.00 design of the runway 12130 rehabilitation - Project #2008-62, Approved by Council 06/16/2009_ Contract for Aviation Engineerin~ Services - Beginning date: 06/22/2009, Completion date: 06/30/2011, Insurance required/On file Processed change order 06/30/2009, PO 191,197.67 closed in error/Payments as of 06/30/09 total $4,201_33, Remaining open balance is $191,197.67. Also need to change the account number to 410 08 24 00 704 100. Processed change order 03/17/2010 15,180_00 Change Order No.1: Perform work beyond the original stated scope of services to survey, analyze and coordinate the approval of baffelin~ for the proposed PAPI systems. Fundin~ for the additional engineering work to be included in construction budget. SUBTOTAL 401 776.67 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2028 TOTAL 401,776.67 ASHLAND, OR 97520 JI'1~ccountlNUrii~ ~NUrnber~,;C2~: ~'f:~:~?ArnQuiJf~'1Ii!; ;-:~;f;PACCO'uii~~fumBer':~-(f;,~ :\T:l<YPr6jeci.NtmBer;~~~;1{~ l:fr~E?~n;ountf%S:4 E 260.08.12.00.70420 E 200862.100 195 399.00 E 410.08.24.00.70410 E 200862.100 206 377.67 .~ ~ ~ ~ 'L .:?-' ~c'J Autho ed Signature VENOOR COPY CITY OF ASHLAND , I FORM #12 I lrr..')::r:;;~~'i'~ 'l'1~.t~t'~'i~+J-r:';":-'7- ;C':;::C;;~::';.._\'~:'T.:,;:_.:-:-': ,,:. eERSa,N~~:SERV;I(~ES l::Ck~~""~'-.-.'L1:T;;"~~~~~-~c..;...: CHANGE ORDER/CONTRACT AMENDMENT APPROVAL REQUEST FORM Purchase Order Number: C1tJo.a- ~r attached contract amendment "'':I..~'''r'lc''!i''''''.'..~''fT!'':''''''"'!;'''.;'''''''-:''..''c~'..:C_",,'='"-'--'''~rn:'''.'-'-'~:~.''"'''''T'":".-:'''?""''~~-'''''"'''--.~:c:'~'7'--:~~~' C()nira'ct~Am~ndm~lit,for,PERSONAI::.SERV.jCES Originai contract amount $ /'''1S-3<7'1. e'-<!'> / t9--t!J~ .t;./ Total amount of orevious contract amendments % of original contract /c:-,,""C ~d> --;>?S- (0-' >:;:/ , /' % of original contract $ ,;:? / t::J '5"7 '1. If! iJ /" c7 7. '750/" of original contract / Amount of this contract amendment TOTAL AMOUNT OF CONTRACT Is the total aggregate cost change for the Personal Services contract less than or equal to 2507.1 of the original contract amount? YES / NO _ Not Applicable_ If "No", City Council approval is required. City Council approval was received on (Date) Are there any applicable performance or payment bonds and insurance coverages ~ "'-* A. ,f)-vJ.-<. d--& ~~ ~~ that need to be adjusted to account for the change in the contract amount? YES _ NO _ Not Applicable_ Contract amendments for personal services are subject to the following conditions: The original contract imposes binding obligation on the parties covering the terms and conditions regarding changes in E ~k;-~nded contract does not substantially alter the . scope or nature of the project. Has either of these conditions been m t? v' X ~ ;:;:?L1 ",,-'..uJ -'----. YES_ NO NIA c"~ ~.._~tf , ~~"""""""c. If "NO", Council approval is required. Council approval received on ~ (Date~ d.Y~.L. 'x- ~ <L.~r ~u ( 0 ;S?.....t!...yv~.c;. Was the original contract approved by the City Council, or is it exempt? '" . $t? ~ C;7 NO (Exempt/Not Required) Co -/0 (Date) - ;?-d'.&'/ jl YES (Approved by Council) Comments 1 Additional Information: t'!.?Z./ tk.-,(J'c-L.1(. e;,-~_ /--~?'/'O~~ ..' ~:, ) ,tl9 -$t?-/l(Reason for exemption) ~- L cJ2.-r~ ~.A~"2:.> ~'" j'2<.R r 0:-c n.,. ~ e< C ~ /' tf!.~ s .e'~~ ~ // Prepared by: lease circle: Approved Not Approved (!J ~ ~ (13 - /0 ~~ ~ Lee Tuneberg 3hl// () 1 Department: Date: Date: Form #11 - Contract Amendment Approval Request Form - PERSONAL SERVICES, Page 1 of 1, 3/30/2010 CITY OF ASHLAND A request for a Purchase Order REQUISTION FORM Date of Request:I.~:8)20Ko:1 THIS IS A REQUEST FOR A: [X ] Change Order (existing PO# 9003) Vendor Name: Address: City, State, Zip Phone: Project Title: Project Number: Reid Middleton 728 134th Street SW, Suite 200 Everett,WA 98204 425-741-3800 Runway 12/30 Rehabilitation 2008-62 (FAA No. 3-41-0002-08) Description Solicitation Process: Perform work beyond the original stated scope of services to ( I Exempt [.1 3 Written Quotes (copies . attached). survey, analyze and coordinate the approval of baffeling for the [ I Sole Source [.] 'Invitation 10 Bid (copies on file) proposed PAPI systems. Funding for the additional engineering [ ] Less than $5000 [Xl Request for Proposal (copies 'on file) work to be included in construction budget. Total Cost Change Order NO.1 Account Number 410_08.24.00.704100 *Please attach the Original signed contract and Insurance CertirlC8tes. Supervisor' Oepl Head Signature: ~ r.. <;t.fL-4.- . I certify tha the above request meets with Ctiy of Ashland Solicitiatlon Process requirements and can be provided when necessary. G:\pub-wrks\eng\depl-admin\ENGINEER\PROJECn2CJ08\08..62 Change Order Requisition.xls Updated on: 7/15102