Loading...
HomeMy WebLinkAbout2010-032 Contract - Carollo Engineers CONTRACT FOR PERSONAL SERVICES CITY OF ASHLAND 20 East Main Street Ashland, Oregon 97520 Telephone: 541/488-6002 Fax: 541/488-5311 CONSULTANT: Carollo Engineers CONTACT: Robert Eimstad TELEPHONE: 4380 SW Macadam Avenue, Suite 350 Portland OR 97239 503-227-1885 ADDRESS: DATE AGREEMENT PREPARED: 12/08109 FAX: 503-227-1747 BEGINNING DATE: January 1,2010 COMPLETION DATE: December 31",2012 COMPENSATION: Time and Materials Not To Exceed $366,996.00 SERVICES TO BE PROVIDED: As outlined in the Exhibits C: Scope or Services, D: Schedule, and E: Bud2et ADDITIONAL TERMS: FINDINGS: Pursuant to AMC 2.52040E and AMC 2.52.060, after reasonable inquiry and evaluation, the undersigned Department Head finds and determines that: (1) the services to be acquired are personal services; (2) the City does not have adequate personnel nor resources to perform the services; (3) the statement of work represents the department's plan for utilization of such personal services; (4) the undersigned consultant has specialized experience, education, training and capability sufficient to perform the quality, quantity and type of work requested in the scope of work within the time and financial constraints prO/ided; (5) the consultant's proposal will best serve the needs of the City; and (6) the compensation negotiated herein is fair and reasonable. NOW THEREFORE, in consideration of the mutual covenants contained herein the CITY AND CONSULT ANT AGREE as follows: 1. Findings / Recitations. The findings and recitations set forth abcNe are true and correct and are incorporated herein by this reference. 2. All Costs by Consultant: Consultant shall, at its own risk and expense, perform the personal services described abO/e and, unless otherwise specified, fumish all labor, equipment and materials required fa- the proper performance of such service. 3. Qualified Work: Consultant has represented, and by entering into this contract now represents, that all personnel assigned to the work required under this contract are fully qualified to perform the service to which they will be assigned in a skilled and worker-like manner and, if required to be registered, licensed or bonded by the State of Oregon, are so registered, licensed and bonded. 4. Completion Date: Consultant shall start performing the service under this contract by the beginning date indicated abcNe and complete the service by the completion date indicated above. 5. Compensation: City shall pay Consultant for service performed, including costs and expenses, the sum specified abcwe. Once work commences. invoices shall be prepared and submitted by the tenth of the month fa- work completed in the prior month. Payments shall be made within 30 days of the date of the invoice. Should the contract be prematurely terminated, payments will be made for work completed and accepted to date of termination. 6. Ownership of Documents: All documents prepared by Consultant pursuant to this contract shall be the property of City. 7. Statutory Requirements: When applicable ORS 279B.220, 279 B.225, 279B.230, 279B.235, ORS Chapter 244, ORS 670.60), 279C.505, 279C.515, 279C.520 and 279C.530 are made part of this contract as though these prO/isions were set forth in full herein. 8. Living Wage Requirements: If the amount of this contract is $18,088 or more, Consultant is required to comply with chapter 3.12 of the Ashland Municipal Code by paying a living wage, as defined in this chapter, to all employees performing work under this contract and to any Subcontractor who performs 50% or more of the service work under this contract: Consultant is also required to post the notice attached hereto as Exhibit B predominantly in areas where it will be seen by all employees. 9. Indemnification: Consultant agrees to defend, indemnify and save City, its officers, employees .and agents harmless from any and all losses, claims, actions, costs, expenses, judgments, subrogations, or other damages resulting from injury to any person (including injury resulting in death), or damage (including loss or destruction) to property, of whatsoever nature arising out of or incident to the perfa-mance of this contract by Consultant (including but not limited to, Consultant's employees, agents, and others designated by Consultant to perform work or services attendant to this contract). Consultant shall not be held responsible for any losses, expenses, claims, subrogations, actions, costs, iudQments, or cther damaQes, directly, solely, and proximately caused by the neQliQence of dty. G:\pul>wrks\eng\08--S4 RightWater Rtght Use\A.dmin\RFP\CC\20Q9..12-09\2009-12-09 Carollo Contract~ Water Master Plan.doc 1 of 32 10. Termination: a. Mutual Consent. This contract may be terminated at any time by mutual consent of both parties. b. City's Convenience. This contract may be terminated at any time by City upon 30 days' notice in writing and delivered by certified mall or in person. c. For Cause. City may terminate or modify this contract, in whole or in part, effective upon deliveiy of written notice to Consultant, or at such later date as may be established by City under any of the following conditions: i. If City funding from federal, state, county or other sources is not obtained and continued at levels sufficient to allow for the purchase of the indicated quantity of services; ii If federal or state regulations or guidelines are modified, changed, or interpreted in such a way that the services are no longer allowable or appropriate for purchase under this contract or are no longer eligible for the funding proposed for payments authorized by this contract; or iii. If any license or certificate required by law or regulation to be held by Consultant to prcwide the services required by this contract is for any reason denied, revoked, suspended, or not renewed. d. For Default or Breach. i Either City or Consultant may terminate this contract in the event of a breach of the contract by the other. Prior to such termination the party seeking termination shall give to the other party written notice of the breach and intent to terminate. If the party committing the breach has not entirely cured the breach within 15 days of the date of the notice, or within such other period as the party giving the notice may authorize or reqUire, then the contract may be terminated at any time thereafter by a written notice of termination by the party giving notice. ii Time is of the essence for Consultant's performance of each and every obligation and duty under thiS contract City by written notice to Consultant of default or breach may at any time terminate the whole or any part of this contract if Consultant fails to prcwide services called for by thiS contract within the time specified herein or In any extension thereof. iii The rights and remedies of City prcwided In this subsection (d) are not exclusive and are in addition to any other rights and remedies provided by law or under this contract. e. ObliqationlLiabilitv of Parties. Termination or modification of this contract pursuant to subsections a, b, or c abcwe shall be without prejudice to any obligations or liabilities of either party already accrued prior to such termination or modification. However, upon receiving a notice of termination (regardless whether such notice is given pursuant to subsections a, b, c or d of this section, Consultant shall immediately cease all activrties under this contract. unless expressly directed otherwise by City in the notice of termination. Further, upon termination, Consultant shall deliver to City all contract documents, information, works-in-progress and other property that are or would be deliverables had the contract been completed. City shall pay Consultant for work performed prior to the termination date if such work was performed in accordance with the Contract 11. Independent Contractor Status: Consultant is an independent contractor and not an employee of the City. Consultant shall have the complete responsibility for tre performance of this contract. Consultant shall prcwide workers' compensation coverage as required in ORS Ch 656 for all persons employed to perform work pursuant to this contract Consultant is a subject employer that will comply with ORS 656.017. 12. Assignment and Subcontracts: Consultant shall not assign this contract or subcontract any portion of the work without the written consent of City. Any attempted assignment or subcontract without written consent of City shall be void. Consultant shall be fully responsible for the acts or crnissions of any assigns or Subcontractors and of all persons employed by them, and the approval by City of any assignment or subcontract shall not create any contractual relation between the assignee or subcontractor and City. 13. Default. The Consultant shall be in default of this agreement if Consultant: commits any material breach or default of any covenant, warranty, certification, or obligation it owes under the Contract; rts ORF status pursuant to tre ORF Rules or loses any license, certificate or certification that is required to perform the SelVices or to qualify as a ORF if consultant has qualified as a ORF for this agreement; institutes an action for relief in bankruptcy or has instituted against it an action for insolvency; makes a general assignment for the benefit of creditors; or ceases doing business on a regular basis of the type identified in its obligations under the Contract; or attempts to assign rights in, or delegate duties under, the Contract 14. Insurance. Consultant shall at its own expense provide the following insurance: a. Worker's Compensation insurance in compliance with ORS 656.017, which requires subject employers to provide Oregon workers' compensation CCNerage for all their subject workers b. Professional Liabilitv insurance with a combined single limit, or the equivalent, of not less than $1.000.000 for each claim, incident or occurrence. This is to cover damages caused by error, omission or negiigent acts related to the professional services to be provided under this contract. c. General Liabilitv insurance with a combined single limit, or the equivalent. of not less than $1.000.000, for each occurrence for Bodily Injury and Property Damage. It shall include contractual liability coverage for the indemnity provided under this contract. d. Automobile Liabilitv insurance with a combined sinole limit, orthe eauivalent, of not less than $1000000, G:'.pub-wrks\eng\08-54 RghtWater Right Use\A.dmin\RFP\CC\2009-12~09\2009-12-09 Carollo Contract- Water Master Plan.doc 2 of 32 EXHIBIT A CERTIFICATIONS/REPRESENTATIONS: Contractor, under penalty of perjury, certifies that (a) the number shown on the attached W-9 form is its correct taxpayer ID (or is waiting for the number to be issued to it and (b) Contractor is not subject to backup withholding because (i) it is exempt from backup withholding or Qi) it has not been notified by the Internal Revenue Service (IRS) that it is subject to backup withholding as a result of a failure to report all interest or dividends, or (iii) the IRS has notified it that it is no longer subject to backup withholding. Contractor further represents and warrants to City that (a) it has the power and authority to enter into and perform the work, (b) the Contract, when executed and delivered, shall be a valid and binding obligation of Contractor enforceable in accordance with its terms, (c) the work under the Contract shall be performed in accordance with the highest professional standards, and (d) Contractor is qualified, professionally competent and duly licensed to perform the work. Contractor also certifies under penalty of perjury that its business is not in violation of any Oregon tax laws, and it is a corporation authorized to act on behalf of the entity designated above and authorized to do business in Oregon or is an independent Contractor as defined in the contract documents, and has checked four or more of the following criteria: /' (1) I carry out the labor or services at a location separate from my residence or is in a . specific portion of my residence, set aside as the location of the business. /' (2) Commercial advertising or business cards or a trade association membership are ~urChased for the business. @)Telephone listing is used for the business separate from the personal residence listing. (4) Labor or services are performed only pursuant to written contracts. (5) Labor or services are performed for two or more different persons within a period of one ---- /year. -L (6) I assume financial responsibility for defective workmanship or for service not provided as evidenced by the ownership of performance bonds, warranties, errors and omission insurance or liabi 'ty in urance relating to the labor or services to be provided. Contractor o " \ . -' ,...:,' .\ ",..-. . . \ ~ ~. . , ..' .. u \ ,".. G:\jlul>-wrksleng\08-54 RighlWaler Right UselAdminIRFPlCC\20Q9.12-09\200!l-12-09 Carollo Conlracl- Water Masler Plan.doc 40132 for each accident for Bodily Injury and Property Damage, including ccwerage for owned, hired or non-owned vehicles, as applicable e. Notice of cancellation or chance. There shall be no cancellation, material change, reduction of limits or intent not to renew the insurance coverage(s) without ~ days' written notice from the Consultant or its insurer(s) to the City. f. Additional Insured/Certificates of Insurance. Consultant shall name The City of Ashland, Oregon, and its elected officials, officers and employees as Additional Insureds on any insurance policies required herein but only with respect to Consultant's services to be provided under this Contract. As evidence of the insurance coverages required by this Contract, the Consultant shall furnish acceptable insurance certificates prior to commencing work under this contract. The certificate will specify all of the parties who are Additional Insureds. Insuring companies or entities are subject to the City's acceptance. If requested, complete copies of insurance policies; trust agreements, etc. shall be prcwided to the City. The Consultant shall be financially responsible for all pertinent deductibles, self-insured retentions and/or self-insurance. 15. Governing Law; Jurisdiction; Venue: This contract shall be gcwerned and construed in accordance with the laws of the State of Oregon without resort to any jurisdiction's conflict of laws, rules or doctrines. Any claim, action, suit or proceeding (collectively, '1he claim") between the City (and/or any other or department of the State of Oregon) and the Consultant that arises from or relates to this contract shall be brought and conducted solely and'exclusively within the Circuit Court of Jackson County for the State of Oregon If, however, the claim must be brought in a federal forum, then it shall be brought and conducted solely and exciusively within the United States District Court for the District of Oregon filed in Jackson County, Oregon. Consultant, by the signature herein of its authorized representative, hereby consents to the in personam Jurisdiction of said courts. In no event shall this section be construed as a waiver by City of any form of defense or immunity, based on the Eleventh Amendment to the United States Constitution, or otherwise, from any claim or from the jurisdiction. 16. THIS CONTRACT AND ATTACHED EXHIBITS CONSTITUTE THE ENTIRE AGREEMENT BETWEEN THE PARTIES. NO WAIVER, CONSENT, MODIFICATION OR CHANGE OFTERMS OFTHIS CONTRACT SHALL BIND EITHER PARTY UNLESS IN WRITING AND SIGNED BY BOTH PARTIES. SUCH WAIVER, CONSENT, MODIFICATION OR CHANGE, IF MADE, SHALL BE EFFECTIVE ONLY IN THE SPECIFIC INSTANCE AND FOR THE SPECIFIC PURPOSE GIVEN. THERE ARE NO UNDERSTANDINGS, AGREEMENTS, OR REPRESENTATIONS, ORAL OR WRITTEN, NOT SPECIFIED HEREIN REGARDING THIS CONTRACT. CONSULTANT, BY SIGNATURE OF ITS AUTHORIZED REPRESENTATIVE, HEREBY ACKNONLEDGES THAT HE/SHE HAS READ THIS CONTRACT, UNDERSTANDS IT, AND AGREES TO BE BOUND BY ITS TERMS AND CONDITIONS. 17. Nonappropriations Clause. Funds Available and Authorized: City has sufficient funds currently available ard authorized for expenditure to finance the costs of this contract within the City's fiscal year budget. Consultant understands and agrees that City's payment of amounts under this contract attributable to work performed after the last day of the current fiscal year is contingent on City appropriations, or other expenditure authority sufficient to allow City in the exercise of its reasonable administrative discretion, to continue to make payments under this contract. In the event City has Insufficient appropriations, limitations or other expenditure authority, City may terminate this contract without penalty or liability to City. effective upon the delivery of written notice to Consultant, with no further liability to Consultant. Certification. Co sui nt shall si n the certification attached hereto as Exhibit A and herein incor reference. CONS TAN CITY OF ASHLAND: BY ~ Sig atu1 Print Name T1TLE~{2./ ,y~&> DATE -V4(lO /2// /.zoID FINANCE DIR CTOR DATE CONTRACT AWARD AND FINDINGS DETERMINED BY' By: FederallD# ~/f) - 08Qq 7-1-2~ ACCOUNT # 'ComPeted W9 fam must be submitted \\ilh contrad PURCHASE ORDER # &1 FO ( G:\pub-wrks\eng\08-54 RightWater Right Use\Admin\RFP\CC\2009-12-09\2009-12-09 Carollo Contract- Water Master Plan.doc 3 of 32 CITY OF ASHLAND WATER CONSERVATION & REUSE STUDY (WCRS) AND COMPREHENSIVE WATER MASTER PLAN (CWMP) EXHIBIT C SCOPE OF-SERVICES 1.0 WATER CONSERVATION AND REUSE STUDY (WCRS) 1.1 Objective To conduct detailed water conservation and re-use study and prepare a report as spelled out in the attached DHS grant application that conforms fully to the attached DHS grant agreement, reporting requirements, and attached prior submittals. 1.2 Consultant Services 1.2.1 Grant ReportinQ Based on the RFP and award of an engineering consultant services contract for the planning study that includes the tasks listed below, administer all applicable grant requirements, including quarterly progress reporting, financial status reporting, requests for release of funds to the City, and final reporting. 1.2.2 ExistinQ Master PlanninQ Gap Analvsis Review, analyze, validate and identify gaps in Ashland's existing water master plans and water sources. (Incorporate results into CWMP). The updated Comprehensive Water Master Plan (CWMP) document to follow the CWRS shall include specific items per OAR Ch. 333, Div. 061 Oregon Department of Human Services, Public Health Systems. The CWMP shall evaluate the needs of the water system for a six and twenty year periods. It shall include but is not limited to the following chapters: 1. Executive Summary that includes: a. Water quality and service goals b. Present and future water system deficiencies identified c. Recommended alternative for achieving goals and correcting deficiencies d. Recommended schedule and financing program for constructing improvements 2. Existing System Description including: a. Service Area. b. Sources of Supply. c. Status of Water Rights. d. Current Drinking Water Quality and Compliance with Regulatory Standards. January 27,2010 pwJICarollciClienVORlAshlandJB406AOOIProjecl ManagemenVConlraclS 6 of 37 e. Maps of System Showing Size and Location of Facilities. f. Estimates of Water Use. g. Operation and Maintenance Requirements. 3. Water Quality & Level of Service Goals Description, considering: a. Existing and Future Regulatory Requirements, including: 1) Preparation of a Disinfection By-product (DBP) Preliminary Evaluation TM that investigates the cause of and prepares recommendations for possible solutions to address high DBP levels in the distribution system. This evaluation may not be necessary; pending the completed lOSE monitoring results, but should be included in the scope so as to reserve funding in the event that it is necessary. 2) Preparation of a Dam Surveillance and Safety Monitoring Plan (DSSMP) for Hosler Dam for inclusion as Chapter 7 of an STI as required by FERC. A $5,000 allowance has been included in the budget for this work. A sub consultant will be selected by the City for this work and will be directly managed by the City. Carollo will not be responsible for the budget, quality or timing of deliverables under this task. b. Non-Regulatory Water Quality Needs of Water Users. 1) Preparation of a Monitoring and Source Water Protection Management' Plan TM for Reeder Reservoir, in particular as it relates to: a). Water Quality to meet current TMDL requirements and treatment objectives. b) Water Quantity to meet storage and operational objectives. c) This work will be conducted by Dr. Jacob Kann and will be directly managed by the City. A $50,000 allowance has been included in the budget for this work. Carollo will not be responsible for the budget, quality or timing of deliverables under this task. c. Flow and Pressure Requirements. 1) Preparation of a TM addressing flow and pressure needs in the Loop Road Zone and preparing an updated budget and scope of services required for the Crowson II Reservoir. d. Capacity Needs Related To Water Use And Fire Flow Needs. (1) Preparation of a TM to address implications of a potential reduction of Reeder Reservoir storage capacity due to structural concems raised by the most recent Part 12 Consultant. The City will provide an assumed reduced water level; Carollo will be responsible for translating the reduced level into the corresponding storage volume. 4. Water Demand: Project growth of water system necessary to meet demand during the 6 year, 20 year, (and 50 year per section B below) periods and impacts on: a. Service area bouhdaries. January 27, 2010 pvrJICarolla'OienVORlAshlandlB406AOO/Prqect Management/Contracls 7 of 37 b. Water supply source(s) and availability. c. Customer water use. 5. Water Supply: An engineering evaluation of existing system's ability to meet the water <Lu~J~ty~_n~~",eJ~~~ElI'V~c:!'lJtO,~Js'.~~~~!!~~~()f~lly_~xistirlg_"",,-~e.L~y~~.r!l__ -c~~~~~deficiencies, anddeficiencies TIkelytodevelop within the master plan periods. The evaluations shall include: a. Water Supply Sources and Water Rights Descriptions. b. Water Treatment Facilities. c. Storage. d. Distribution Facilities including Pumping and Pressure Zone Separation Analysis. e. Operation and Maintenance Requirements. f. Impacts of Present and Probable Future Water Quality Regulations. g. Determination of Additional Water Availability. 6. Alternatives Analysis including identification of: a. The three top alternative engineering solutions that address anticipated deficiencies. b. Environmental impacts of the preferred alternative. c. Associated capital costs, as well as operation and maintenance life cycle costs to correct water system deficiencies and achieve system expansion to meet anticipated growth, including identification of available options for cooperative or coordinated water system improvements with other local water suppliers. 7. Financial Alternatives Analysis, including: a. Local financing: 1) User Fee and Rate Study. 2) System Development Charges Update. b. Financial assistance programs ("One stop"). 8. Capital Improvement Program (CIP) Recommendation, including: a. Engineering alternative and associated costs. b. Maps showing size and location of proposed facilities. c. Financing alternative recommended. d. Schedule for design and construction. 1.2.3 Add 50 Year PlanninQ Horizon Validate the City's future water needs through the year 2058. (Incorporate results in to part of CWMP Chapter 4). January 27,2010 pw-JICardlG'CIientlORlAshlaOO'8406AOOIProjecl ManagemenVConlracts 8 of 37 1.2.4 Alternative Sources Analysis Identify and fully describe all other alternative sources of water that will fully meet the City's needs through the year 2058. (Incorporate results in to CWMP Chapter 5, section g). 1.2.5 RiQht Water. RiQht Use Analysis It is anticipated that each water source will have defined uses and as such, identify options that explore different methods to utilize the right water for the different water uses; potable, irrigation sources and uses. (Incorporate results in to CWMP Chapter 3, section d (1 )). 1.2.6 TID IrriQation Analysis Identify benefits and challenges to using Talent Irrigation District and Bureau of Reclamation water, such as concerns from the Klamath Water basin; Oregon Fish and Wildlife issues, Oregon Water Resources, and oihers (incorporate results in to CWMP Chapter 5, section g). . 1.2.7 TID Environmental Analysis Specifically analyze environmental hann or impacts with the long term use of various irrigation water sources for City irrigation use (incorporate results in to CWMP Chapter 5, section g). 1.2.8 Climate ChanQe Analysis Explicitly address the hydrological benefits and challenges and anticipate the effects of climate change with regard to water needs and water use (incorporate results in to CWMP Chapter 5, section g) 1.2.9 Recycled Water Analysis Identify benefits and challenges to using recycled water, such as the community's perception and realities, restrictions, support from DEQ and State health, fruit growers, and others. (Incorporate results in to CWMP Chapter 5, section g). 1.2.10 Secondary PipinQ System Analysis . . Identify options and cost estimates for piping the irrigation canals, piping for reuse/recycled water uses, ponds, treatment. pumping, and any other relevant costs (incorporate results in to CWMP Chapter 5, section g). 1.3 City Responsibilities 1. Schedule project initiation meeting in Ashland. 2. Review monthly reports, drafts, and requests for infonnation. 1.4 Oeliverables 1. Initiation meetings - agendas, notes, and action items. January 27, 2010 pwJICarollcYaienVORl Ashlandl8406AOO/Projecl Management/Contracts 9 of 37 2. Monthly project reports and invoices (project duration). 3. Draft and Final Copies of the Report as required in the DHS grant agreements. January 27,2010 f1KJ/CardkiClienIlORlAshlandl8406AOOIProjecl ManagementlCoolracts 10 of 37 2.0 WATER SYSTEM DESCRIPTION 2.1 Consultant Services 1. Prepare a summary of data and CWMP reference materials needed from the City. 2. Meet with City staff to tour water system facilities and review system condition and operational issues and concerns. 3. Work with appropriate City staff to create a Water System Description. The following water system components will be described: a: Service Area. b. Sources & Quality of Supply (including coli fonn, contaminants, chemicals, & turbidity). c. Status of Water Rights. d. Current Drinking Water Quality and Compliance with Regulatory Standards. e. Maps of System Showing Location of Facilities. 1) Water Treatment Facilities (process, hydraulic capacity, constituents, & disposal). 2) Transmission System. 3) Pump Stations (including hydraulic capacity). 4) Storage Facilities. 5) Distribution System. 6) System Interties. f. Estimates of Water Use, including historic consumption, production, & capacity g. Operation and Maintenance Requirements. h. Ownership and Management. i. ,Overview - Pressure Zones. 2.2 City Responsibilities 1. Provide copies of requested water system data and reference materials in a timely manner. 2. Host a water system facilities tour for the project team. . 3. Provide Data for the Consultant team to create a Water System Description. 4. Review and comment on draft documents provided by Consultant. 2.3 Assumptions 1. The data collection meeting and facilities tour site visit will be coordinated with project initiation meetings described in Task 1. January 27, 2010 pw-JlCarollciClienVORlAshlancll8406AOO'Projecl ManagemenVConlracls 11 of 37 2. The City will provide the available requested water system data and reference materials. 3. The City will review the draft CWMP System Description chapter and work with the Consultant team to provide necessary information for revising the draft chapter. 4. Detailed system description information and maps judged to be important to system vulnerability will be summarized in a separate confidential memorandum to be provided only to personnel authorized by the Public Works Director. 2.4 Deliverables 1. Data and reference materials request summary. 2. Word document electronic file of draft Plan Chapter 2 containing a description of the existing water system which includes the service area, source(s) of supply, status of water rights, current status of drinking water quality and compliance with regulatory standards, maps or schematics of the water system showing size and location of facilities, estimates of water use, and operation and maintenance requirements 3. Word document electronic file of the final draft Chapter 2 incorporating comments 4. Limited release Technical memorandum of vulnerable system details January 27,2010 pw-JICardlofClienIlOR/AshIan&8406A00IProjecl ManagemenVContracls 12 of 37 3.0 WATER QUALITY & LEVEL OF SERVICE GOALS 3.1 Objective Work with City staff to develop a plan for existing and continued compliance with State and Federal Safe Drinking Water Act requirements. 3.2 Consultant Services 3.2.1 ReQulatorv Requirements and Compliance Pro~ram 1. Describe Safe Drinking Water Act and Oregon DHS drinking water regulations applicable to the City for: a. Existing Regulations. b. Proposed Regulations. c. Anticipated Regulations. 2. Review the City's water quality compliance data from 1999-2007. 3. Create a regulatory compliance monitoring plan for the City. 4. Document compliance status. 5. Prepare recommendations regarding existing monitoring plans and/or treatment practices based on existing or proposed Safe Drinking Water Act regulations. 6. Prepare Comprehensive Regulatory Compliance Plan. 7. Review and document the City's procedures for handling customer inquiries. 8. Document use of certified laboratories. 9. Preparation of a Disinfection By-product (DBP) Preliminary Evaluation TM that investigates the cause of and prepares recommendations for possible solutions to address high DBP levels in the distribution system. This evaluation may not be necessary; pending the completed IDSE monitoring results, but should be included in the scope so as to reserve funding in the event that it is necessary. 3.2.2 Non-Re~ulatorv Needs of Users: Public Involvement Process 1. Technical Review Committee a. The City will establish a Technical Review Committee (TRC) consisting of City management staff and members of the public to provide review and consensus concerning study recommendations and improvement options. b. The Consultant shall schedule milestones throughout the project and submit technical reports to the TRC at these milestones. c. The Consultant shall set the TRC meeting schedule and notify all members. January 27,2010 pwJ/Car~laalenVORlAshlandl8406AOOIProjecl ManagemenVConlracts 13 of 37 2. Public Involvement a. Conduct two (2) open house format hearings during the master planning process to provide an opportunity for the public to comment on the master planning. Consultants may be asked to conduct additional open house meetings to n"." -- snare.tne-Uesigns ana"cost estimateswittftne"pu6lic ana answer questions. b. Inform the City Council of master planning status. Submit a monthly status report to the Public Works Director for Council review. Present a summary and the status of the master planning effort to Council three (3) times during the duration of the project. c. Prepare three separate mailings, to be mailed by the City, which will inform citizens of master planning efforts. d. Assist the City in drafting three (3) news releases informing citizens of the progress of the master planning efforts. e. Provide up to 38 hours of time for Mr. Richard Whitley, a Public Meeting Facilitator, to assist in the public meetings as requested by the City. 3. Preparation of a Monitoring and Source Water Protection Management Plan Technical Memo for Reeder Reservoir in particular it relates Algae and water quality to meet current TMDL requirements and identify future requirements. As noted above, this work will be conducted by Dr. Jacob Kann and will be directly managed by the City. 3.2.3 1. Flow & Pressure Requirements: Proqram Preparation of a Technical Memo addressing storage, pumping, flow and pressure . needs in the Crowson and Loop Road Pressure Zones that includes a detailed budget and scope of services required to address the current deficiencies. 3.2.4 Capacity Needs Related to Water Use: Conservation Proqram 1. Recent Program: Document the City's recent water conservation efforts, including estimated savings if feasible. This will be achieved using information from the City and discussions with City staff. 2. Goal: Assist the City in developing an appropriate quantitative conservation goal. The goal will be developed related to the primary driver of the City's conservation program. Typical conservation drivers include: 1) meeting voluntary water production targets, 2) obtaining additional water supply, 3) deferring capital improvements, 4) decreasing operating costs, or 5) demonstrating responsible use of water resources. 3. Program Next 6 Yrs: Recommend direction of the City's conservation program for the next six years, ensuring that the number of conservation measures involved is reasonable and practical and consistent with past activities as well as the Conservation Plan that is currently being developed. The Consultant should be aware that the City is currently implementing six or more measures (source meters, service meters, January 27,2010 pw-JICarollaclienrJORlAshlandl8406Aro'Projecl ManagemenVConlracts 14 of 37 conservation pricing, bills showing consumption history, education, and landscape management practices on City properties). The City staff will identify the measures for the Consultant to include in the program. Evaluation of the impacts of conservation to the water demand forecast will be addressed. 4. Preparation of a TM to address implications of a potential reduction of Reeder Reservoir storage capaCity due to structural concems raised by the most recent Part 12 Consultant. 3.3 City Responsibilities 1. Provide existing water quality regulatory compliance data from 1999-2007 for review , and summary: 2.. Assist with development of comprehensive regulatory compliance plan elements. 3. Review drafts and provide comments. 3.4 Assumptions 1. No monitoring plans are currently in place. 2. One meeting and one conference call will be held with City staff to develop the draft and final goal setting approach and actual goal(s); 3. The draft and final goals shall be consistent with the City's Water Comprehensive Plan and DHS requirements. 4. The Public Participation Process is very difficult and subject to uncertainty regarding the number of Public Meetings, conference calls and follow-up required. It is therefore proposed to hold five public meetings (2 open houses and 3 council presentation.s) and 5 technical group meetings. 3.5 Oeliverables 1. Word document electronic files of the draft Chapter 3 containing a description of water quality and level of service goals for the water system, considering, as appropriate, existing and future regulatory requirements, non-regulatory water quality needs of water users, flow and pressure requirements, and capacity needs related to water use and fire flow needs. 2. Final draft word electronic file of Chapter 3 with review comments incorporated. 3. Word document electronic files preliminary and final as technical report 4. A Conservation Curtailment Program as required for conservation plans in OAR Ch. 333, Div. 061 January 27,2010 I7KJICarollG"Client/ORJAshlancW406AOOIProject Management/Contracts 15 of 37 4.0 WATER DEMAND EVALUATION 4.1 Consultant Services -~._---'r:==-Create.up tClfourmapsforthistask showing thefollowing:- ...- -...- --- __u.. a. Current City Limits. b. Current Area of urban growth boundary. c. The City's service area for the current, 6 year, 20 year and 50 year time frames. d. Projected City growth areas for the 6, 20, and 50 year periods per the Comprehensive Land Use Plan. e. Current and projected zoning or land use within the City service area. 2. Demographic Projections: Develop demographic projections for the City's service area for three time periods: 6-year, 20-year, and 50-year. These projections will evaluate and include the impacts of climate change and will be based on demographic ~ data from the City Community Development Department, the County Planning Department, the City Public Works Department, and/or the U.S. Census, depending on data availability. Coordination with City's Community Development Department will be important. The ideal demographic data are projections of single family households, multifamily households, and employment through the 50-year time period. If such data is not available, alternative methods of developing demographic projections include: 1) using population data rather than households, 2) using utility connections data rather than households, 3) analyzing historical data to determine historical growth rates and extrapolate growth rates forward as appropriate given input from City staff, and 4) analyzing buildable lands inventory, zoning, and timing of development. A range of demographic projections (such as low, medium and high) can be provided, if desired by City, if the available data support development of such projections. , 3. Analysis: The demographic projections will be matched to the City's existing and projected service area using appropriate analysis with input from the City's Comprehensive Land Use Plan. Please note that GIS data may not be available. The demographic projections should be divided into.sub-areas such as pressures zones, and current versus new service areas, as data allows and as desired by the City. 4. Supply Characteristics: Summarize ten years (or a lesser amount if ten years is not available) of historical supply characteristics such as the number of connections by customer category, production, sales, water balance showing non-revenue water and leaks, peaking factor, and water use factors. (Note: the current Utility Billing System can produce information on water use by customer class. This information can be determined via an extraction of the data from the Utility Billing System and manual development of the customer related details via spread sheet.) This information will be presented on an annual or monthly basis as appropriate. Water use factors, including January 27,2010 pwllCaroll(){:lienVORlAshlandl8406AOOIProjecl Management/Contracts 16 of 37 EDUs, will then be calculated based on this data. Information will be analyzed and presented separately for potable and reclaimed water. 5. Technical Memo: Prepare a Technical Memorandum for City review with summary tables and graphs of the demographic projections and historical supply characteristics. Edits and adjustments of this information shall occur before the data is used to develop the demand forecasts. 6. Demand Forecasts: Generate demand forecasts using the demographic projections and water use factors for the 6-year, 20-year, and 50-year time periods. The forecasts will be presented by billing category (e.g., single family, multifamily, commercial) and additionally will be divided into the same sub-areas as the demographic projections. Information will be presented separately for potable and reclaimed water. For reclaimed water, the Consultant will work with City staff to identify large potable users and determine the feasibility of converting them to reclaimed water based on their location and purpose of water use. The demand forecasts will include adjustments to reflect the conservation program from Task 6. 7. Chapter 4: Prepare the associated chapter for inclusion in the CWMP. 8. Reuse: Describe Ashland's potential for Wastewater Reuse and water rights for Wastewater Treatment Plant effluent and their potential impacts on potable water supply with respect to use of treated effluent in lieu of source water. 9. TlD: Describe Ashland's potential for use of Talent Irrigation District Water and the availability of associated TID water rights for the potential impacts on potable water supply with respect to use of TID water in lieu of source water. 10. TAP: Describe Ashland's potential for use of Talent, Ashland, and Phoenix"(TAP) and " associated 'water rights a~ a drinkin~ water supply. - . - . " . ' Summarize consistency with the ciiY'sland"'~se plan, and "note any differences (e.g. the 50 year scenario will likely go beyond the Elxisting information in the comprehensive land use plan and portions of the service area will be outside the projected City Limits and current Area of City Impact). 4.2' City Respc:msibilitil:is 1. Provide the following source data, per the data and reference materials request 'associated with Task 2: map data layers, City intertie agreements, Related plans, City b~se map/parcel map in ACAD electronic file format, aerial map, utility map, land use maps (current and future), water rights, and Comprehensive Land Use Plan. Facilitate acquisition of data from other sources listed above in Task 4.1, item 2, as needed. 2. Review the draft CWMP chapter. including summarized demographic projections, historical supply characteristics, maps, and provide written comments. January 27, 2010 pw-J/CarollaoientlORlAshlancW406AOO'Projecl Management/Contracts 17 of 37 4.3 Assumptions 1. Limited source data will be available beyond the 20 year planning horizon: Consultant shall collaborate with the Community Development Department and the Engineering Division to determine the 50 year planning horizon data utilizing the Comprehensive ..... [ancfOse Plan' as-~tlie o8seline-f6r'growth-"projections;:---' -,,_.- . ._~-~- 2. These task activities will be completed in conjunction with Task 5. 4.4 DeliverabJes 1. Word document electronic file of draft Plan Chapter 4: containing an estimate of the projected growth of the water system during the master plan period and the impacts on the service area boundaries, water supply source(s) and availability, and customer water use. 2. Word document electronic file of the final draft Chapter 3. January 27,2010 pwJ/Caroll~ienVORJAshlandl8406AOOIPTojecl ManagemenllConlracls 18 of 37 5.0 WATER SUPPLY SYSTEM EVALUATION 5.1 Objective. Perform a water rights and alternate supply options analysis including inventory, comparison with future needs, assessment of interties, and assessment of alternate water supply options to meet IDWR, DEQ and City planning requirements. 5.2 5.2.1 1. 2. 3. . 4. Water Sources & Water Rights 5. Consultant Services Perfonn a water right inventory and analysis to identify and summarize the status of the City's existing water rights with input from a review of City r~cords and Oregon Department of Water Resources files pertaining to the basic documents of each water right file (permit, certificate, etc.). The depth of this analysis will be sufficient to make a recommendation to the City regarding the sufficiency of existing water rights for current and future demands for each planning horizon. Prepare future supply water rights analysis to determine the adequacy of the City's existing water rights to meet the 6, 20 and 50 year demand forecast developed under Task 5. Service area considerations related to purpose and place of use and service limitations (if any) will be evaluated. The depth of this analysis will be sufficient to define the City's ability to serve the existing and future service area. Identify any additional water rights needed. Document the status of the existing UI interties and agreements and their potential impact on the ability of the City to provide service to current and future service areas with existing and proposed water rights. Describe surface source, groundwater and aquifer storage and recovery (ASR) potential for future source of supply options to meet projected demand and improve system reliability. This summary will include description of the potential facility elements and design criteria, permitting considerations, estimated cost, and other relevant infonnation. Consultant will also describe common implementation issues associated with surface water and ASR projects for City consideration. Describe reuse potential for future source of supply options to meet projected demand and improve system reliability. This summary will include description of the potential water reclamation demands (currently planned and future planned irrigation sites), facility elements and design criteria, pennitting considerations, estimated cost, and other relevant information. Consultant will also describe common implementation issues associated with reuse projects for City consideration. Develop preliminary common cost/yield comparison among the following potential future water supply options: Surface Water Supply and associated water treatment; 6. January 27, 2010 pw-JICarollolOienVORIAshlandl8406AOOIProjecl ManagemenVContracls 19 of 37 Aquifer Storage and Recovery; reuse; conservation savings; and new groundwater supply wells. This effort will rely on the work completed and conservation information available in the City Water Conservation Plan, and information developed as part of the CWMP. 5:2:2 1. City Responsibilities Provide available information regarding existing water rights. 2. Review and comment on CWMP Draft Chapter 6 and Technical Memorandum on potential cost/yield supply options. 5.2.3 Assumptions 1. The City will provide available water rights information. 2. The preliminary cost/yield comparison will rely on existing available capital and O&M cost information for the three different supply options, updating existing cost information to 2009 costs. If O&M costs are not available, a qualitative assessment with ranges associated with high, medium or low costs will be applied to provide for comparison among the alternatives. 5.2.4 DeliverabJes Word document electronic file of draft and final Technical Memorandum titled- Water Rights and Supply Options; and final cost/yield supply options. This memorandum will be formatted to be directly compiled into the CWMP as an appendix. 5.3 Water Treatment 5.3.1 Consultant Services 1. Evaluate the existing Water Treatment Facilities to determine ability to treat water produced to meet the supply requirements for projected demands in all planning horizons. 2. Identify potential solutions to any deficiencies in the Water Treatment Facilities including lack of capacity, location limitations, and distance from proposed supply sources. 3. Develop listing of recommended Treatment Facilities improvements for the Capital Improvements Plan update. 4. Capital Improvements Plan update shall identify locations and types of Treatment Facility additions and upgrades needed for improved use of existing sources and those necessary to serve new sources. 5. Prepare a Technical Memorandum that evaluates the effectiveness and reliability of WTP improvements and operations, including the following process improvements issues: January 27, 2010 pw-JICarolkiOienVORIAshlandf8406AOO'Projecl Management/Contracts 20 of 37 a. Magnetic Meter flow pacing SCADA incompatibilities. b. Hypo-chlorite pump SCADA control inadequacies. c. Soda Ash feed system control issues and remaining work. d. Flocculation Design: how much flocculation is optimal and how much baffling is appropriate. e. Chlorine Diffusion in the clear well to reduce nuisance alarms and reduce secondary DBP. f. Backwash sump pump electrical power supply isolation from the SCADA system, as well as other appropriate transient protection necessary to reduce adverse impacts of lightning and power surges. 5.3.2 Deliverables Word document electronic file of draft and final Technical Memorandum titled- Water 'Treatment Plant Operational and Capital Improvement Options. This memorandum will be directly compiled into the CWMP as an appendix. 5.4 Water Distribution 5.4.1 Consultant Services: 5.4.1.1 Hydraulic Computer Model Development Assist the City in the development of a PC based computer model that can be used for planning, fire flow analysis, sizing of facilities, and extended period simulations. The model will consist of a single input file that includes all the City's pressure zones. This task includes the following: 1. Review the status of the existing hydraulic model. 2. Pr~vide reGOmmendation on purchase of new hydraulic modeling software. 3. Purchase new hydraulic modeling software. 4. Create and calibrate a new hydraulic model utilizing City purchased software, existing hydraulic model data, base maps, and field data. Hydrant tests will be used to collect pressure data to assist in the calibration process. 5. Include distributed system demand and all important facilities (tanks, pumps, sources, interties, and pipelines) to reflect actual system operation including pressure zones. 6. Provide assistance, as needed, for the selection of sites for calibration fire flow tests. 7. Refine the operation of the model so that it will work in steady-state and extended period modes. 8. Provide training, as needed, in the operation of the modeling software. January 27,2010 pw-JICarollo'ClienllORlAshlandl8406Aro'Projecl Management/Contracts 21 of 37 " 9. Utilize model to determine necessary system modifications/additions to meet projected growth and system demand. Findings shall be the basis of recommended Capital Improvement Program update. 5.4.1.2 Model Calibration 1. Data Collection. a. Select sites for fire flow tests and recording. meters. b. Utilizing City provided field data calibrate in accordance with Calibration Guidelines for Water Distribution System Modeling prepared by the Engineering Computer Applications Committee of the AWWA. c. Perform Steady state calibration to Planning Level accuracy. 2. Modeling Scenarios. a. The following simulations will be run to evaluate the ability of the existing system with and without recommended improvements to meet the level of service goals established in Task 3: Description Facilities Mode Demand Purpose Existing Peak Existing Extended 2008 Peak Evaluate existing Hour Period Day with peak hour Diurnal conditions and Curve identify deficiencies Existing Fire Existing Steady 2008 Peak Evaluate existing Flow State Day plus fire flow conditions fire flow and identify deficiencies 2010 CIP 2009 CIP Extended 2010 Peak Develop CIP for Peak Hour Period Day with existing peak hour Diurnal conditions Curve 2010 CIP 2009 CIP Steady 2010 Peak Develop CIP for Fire Flow State Day plus existing fire flow fire flow conditions 2030 Peak 2009 CIP Extended 2030 Peak Evaluate 2030 peak Hour Period Day with hour conditions Diurnal w/2009 CIP Curve improvements and identify deficiencies 2030 Fire 2009 CIP Steady 2030 Peak Evaluate 2030 fire Flow State Day plus flow conditions fire flow w/2009 CIP improvements and identify deficiencies January 27,2010 pw://CarollctCllenrJORI~larnW406AOOIProjecl Management/Contracts 22 of 37 2030 CIP 2030 CIP Extended 2030 Peak Determine CIP for Peak Hour Period Day with 2030 peak hour Diurnal conditions Curve 2030 CIP 2030 CIP Steady 2030 Peak Determine CIP for Fire Flow State Day plus 2030 fire flow fire flow conditions 2015 CIP 2015 CIP Steady 2015 Peak Identify portions of Fire Flow State Day plus 2030 CIP needed to fire flow meet 2015 fire flow conditions b. Develop Table of Capital Improvements for inclusion in final CIP listing. Scheduling of CIP items will take into account the City's street overlay and improvement program as well as other scheduled capital projects. c. Develop drawing that shows the locations of the CIP items included in the final list. 5.4.1.3 System Physical Capacity Analysis 1. Consultant Services. a. Source Capacitv Analvsis 1) Evaluate the existing source (wells, booster pumps, etc.) capacity and compare it to the projected demands for all planning horizons. 2) Provide analysis for each pressure zone in the distribution system. 3) Identify potential solutions to any deficiencies in source. 4) Develop listing of recommended source improvements for the Capital Improvements Plan update. 5) Capital Improvements Plan update shall identify locations and types of piping additions and upgrades needed for improved use of existing sources and those necessary to serve new sources. 5.4.1.4 Energy Consumption Assessment 1. Consultant Services a. . Gather and summarize data on existing water system equipment and facilities energy consumption and efficiency. It is assumed that all required data will be provided by the City in MS Excel format; this task does not include collection or generation of new data. b. Assess existing facilities energy consumption and identify equipment or facilities with potential for energy savings through operational modifications, upgrades, or replacement. January 27, 2010 pwJICaroll<YCIienVORlAshlandlB406AOOIProjecl Management/Conlracts 23 of 37 . 5.5 Storage Capacity Analysis 5.5.1 Consultant Services 1. Eva.luate the existing storage capacity and compare it to the required storage based on - ------projected-demandscusingcthe-following-Griteria-or-those-criteria-that-may,be-required-by DHS: a. Operational Storage. b. Equalizing Storage. c. Fire Flow Storage. d: Standby Storage (use greater of Fire Flow or Standby, if approved by local fire authority). ( e. Dead Storage. 2. Assess by City service level the storage capacity and ability to provide fire flow volumes and rates within each service level. Identify where additional storage is required to meet current and projected demands. 3. Assess operational parameters of Southeast reservoir under high flow demand periods and emergency operations. 4. Provide analysis for each pressure zone in the distribution system. 5. Identify potential solutions to any deficiencies in storage; storage locations will be identified by general area and overflow elevation, and may not include identification of a specific site. 6. Develop listing of recommended storage improvements for the Capital Improvements Plan update. 7. Utilize hydraulic model to assess current storage operations, determine location and size of additional piping needed to improve operations, and determine piping necessary to service new storage f?cilities. 5.5.2 Conveyance Svstem Capacitv Analysis 1. Examine existing conveyance system to determine capacity to deliver water under normal and fire flow scenarios. Identify system deficiencies and improvements necessary to resolve them. Specifically assess ability of system to deliver flow from production and treatment facilities to storage facilities and high flow demand areas. Evaluate methods to fully utilize existing storage capacity. Identify pressure ranges for peak and normal flow conditions. , 2. Reviewability of storage and conveyance systems to meet demands during high flow periods with largest reservoir off line. January 27, 2010 pw'JICafollciOienlfORlAshlard'8406AOOIProjecl ManagemenVContracts 24 of 37 . 5.5.3 1. City Responsibilities , Work with local fire authority to explore possibility and advisability of nesting of fire flow and standby storage. 4. Assumptions Software acquisition shall be made by City during Comprehensive Water System Plan development with recommendations from consultant on available options. Model shall utilize purchased software. Model contains all necessary pipes, pumps, reservoirs, interties, and sources. Calibration of operation in extended period simulation (EPS) by comparing model " behavior (e.g., reservoir levels) to the City's SCADA data is included in this scope of work. Detailed system description information or maps judged to be important to system vulnerability will be summarized in a separate confidential memorandum to be provided only to personnel authorized by the Public Works Director. This information is anticipated to consist of information on required security deficiencies/upgrades. 5.5.4 1. 2. 3. 5.5.5 Oeliverables The following products will be created during this task. Some will be produced by Consultant and others will be produced by the City. 5.5.5.1 Consultant Deliverables 1. Word document electronic file of draft and final Technical Memorandum titled- Water Distribution Hydraulic Modeling to provide Operational and Capital Improvement Options. This memorandum will be directly compiled into the CWMP as an appendix. 2. Source adequacy analysis by pressure zone with recommendations for Capital Improvements, as needed. 3. Conveyance system adequacy analysis by pressure zone with recommendations for Capital Improvements Plan, as needed. 4. Storage adequacy analysis by pressure zone with recommendations for Capital Improvements, as needed. 5. Capital improvement table that contains all improvements recommended for the 20- year planning horizon. 6. Model outputs for use in developing capital improvement program (tables and maps). 7. Summary of Power Consumption Assessment process, findings, and recommendations. 8. Limited release Technical memorandum of vulnerable system details. January 27,2010 pwJ/CardlolOientlORlAshlancW406AOO'Projecl ManagementlContracts 25 of 37 5.5.5.2 City Deliverables 1. Existing hydraulic computer modeling software capable of simulating the Water distribution systems in both steady state and extended period modes. 2. Data regarding equipment and facilities energy consumption and operations. 5.6 Operations and Maintenance 5.6.1 Consultant Services 1. Meet with City staff to review information and create the following sections. a. Organization Structure and Responsibility. b. Operator Certification. c. System Operation, Maintenance and Control. d. Emergency Response Operations. e. Safety. f. Cross Connection Control. g. Supplies and Equipment. h. Record Keeping and Reporting. i. O&M Improvements. 2. Identify any recommended changes to current operations and maintenance program that will require funding through the CIP and evaluate and determine adequate staffing needs. This task will include a detailed evaluation of staffing requirements; other recommendations will be based on City staff input on deficiencies. 3. Identify and recommended changes to current Operations and Maintenance program and subsequent staffing needs that shall be necessary to provide adequate resources to address the expanded infrastructure outlined in the recommended Capital Plan. 5.6.2 City Responsibilities 1. Review available records and provide to the Consultant as requested. 2. Teleconference with Consultant to review available records. 3. Review and comment on draft Chapter 9. 5.6.3 Assumptions 1. Detailed system description information and maintenance information judged to be important to system vulnerability will be summarized in a separate confidential memorandum to be provided only to personnel authorized by the Public Works Director. January 27, 2010 pwJ/CarollolOienVORlAshlandl8406A00IPrc~ecl Mal'l8gemenVContracts 26 of 37 5.6.4 Deliverables 1. Word document electronic file of draft and final Technical Memorandum titled- Water Supply System Operational and Maintenance Improvement Options. This memorandum will be directly compiled into the CWMP as an appendix. 2. Word document electronic files of the draft Chapter 5 containing an engineering evaluation of the ability of the existing water system facilities to meet the water quality and level of service goals, identification of any existing water system deficiencies, and deficiencies likely to develop within the master planning period. The evaluation shall include the water supply source, water treatment, storage, distribution facilities, and operation and maintenance requirements. The evaluation shall also include a description of the water rights with a determination of additional water availability, and the impacts of present and probable future drinking water quality regulations. 3. Final Draft Word electronic file of the Chapter 5 with review comments incorporated. January 27, 2010 pW'J/Cardlo'OienIlORlAshIaro'S406AOO'P~ecl Management/Contracts 27 of 37 6.0 ENGINEERING ALTERNATIVES ANALYSIS 6.1 Consultant Services - T--c---Develop water supply alternatives wtiich adaress tne-planning goals ofthe City. a. Include additional water rights that may need to be purchased. Consider water rights for both surface and well supply. Describe the types and amount of these additional water rights. b. Develop a contingency plan identifying potential emergency water supply options for severe water shortages. c. Assess potential for developing groundwater resources and using ASR. 2. Evaluate each alternative based on the following: a. Feasibility of each source considering preliminary cost estimates and integration with existing transmission and storage facilities. b. Reliability of source for both winter and summer uses. Consider the impact of the university, the school district, the City, and other large water users and factor the impacts of increase and decrease in use. c. Availability of water rights. d. Raw water quality and treatability of the potential sources. Sample collection and testing will be required for each potential source. Jar testing shall be done where necessary or required by the City. e. Compliance of each source with drinking water standards: f. Supply vulnerability and security. 3. Identify three options with the greatest promise to which additional evaluations will be done. 4. Evaluate these three water supply alternatives in greater detail, including present worth of operation and maintenance expenses, updated capital costs, and impact to the annual City budget and user rates. Evaluations shall include identification of specific sites, raw water transmission requirements, and scaled conceptual layouts in displaying the location of major unit processes and structures. All data generated will be at a planning-level of detail; cost estimates will be within a +50/-30 % level of accuracy. 5. Review any environmental impacts of water supply alternatives and identity potential concerns. 6. Receive input on the various water supply improvement alternatives from the staff and the Technical Review Committee. January 27,2010 rwJ/Carolldaient/ORlAshlandl8406AOOIProjecl Management/Contracts 28 of 37 6.2 City Responsibilities 1. Work with Consultant team to evaluate alternatives and select project prioritization criteria. 2. Provide recent City water project bid tabulations to be used in developing the cost estimating tool. 3. Review and comment on draft. 6.3 Assumpticms 1. City will provide available similar project cost information to help set up cost models. 6.4 Oeliverables 1. Draft and final Microsoft Excel spreadsheets. project cost estimating tool, and GIS maps. 2. List of O&M improvements to be included in the CIP and addressed in Operational budgets. 3. Draft and final Chapter 6 titled "Engineering Alternatives Analysis" that contains an identification of alternative engineering solutions, environmental impacts, and associated capital and operation and maintenance costs, to correct water system deficiencies and achieve system expansion to meet anticipated growth, including identification of available options for cooperative or coordinated water system improvements with other local water suppliers. . 4. Draft and final maps of the City distribution system showing locations of projects , identified in the CIP table with attached project number for ease in cross-referencing. / January 27, 2010 pw-JICarollciaienVORlAshtandl8406AOOIProjecl ManagemenVConlracls 29 of 37 7.0 FINANCIAL ALTERNATIVES ANALYSIS 7.1 Consultant Services The financial~program will be included in the Comprehensive Plan document as follows: 1. Past and Present Financial Condition - summarize water utility financial performance for the past six years and document outstanding long-term debt and bonding capacity. 2. Available Revenue Sources - Document available sources of revenue and funding for capital and operational costs and describe historical approaches and/or policies that establish the City's funding methods. 3. Capital Financing Alternatives and Approaches - Identify capital financing. Identify and document Capital Funding Assistance Programs - Available State and Federal grant and loan programs. 4. Life Cycle Costing (By Carollo) - Develop perpetual life replacement program for the distribution system, recommended service life for water lines, pumps, and other .-- .----- - - -- -'...".- - components. a. The program shall include an average, annual revenue requirement needed to fully fund a replacement program. b. The replacement program shall consider an assessment of backlogged needs, recommend a specific program to address the backlog, and shall recommend criteria for use in ranking projects. c. Develop a recommended on going maintenance program, detailing types of maintenance needed to protect investment and frequency of maintenance activities. d. Develop a detailed phasing plan for recommended improvements. Include new water systems in the undeveloped areas within the UGB. Show facilities as closely as possible to final design locations to permit them to be constructed with development projects. e. Prepare system wide maps showing locations and phasing of these improvements. Improvement locations shall be provided to assist staff in ensuring the improvements will be provided with land development. 5. SDC Implementation. a. Provide detailed cost estimates for all recommended water system improvements. 1) Calculate future operation and maintenance costs. 2) Define, in detail, the portion of individual project Costs attributable to existing customers and the portion attributable to growth. Provide documentation for the basis and methodology used to allocate costs. January 27, 2010 pw-JICarollo'OienOORlAshlaOO'8406AOO'Projecl ManagemenlfContracts 30 of 37 ., 3) Review the City's existing system development charges (SDC) and recommend any improvements to the methodology used to allocate costs. Include a list of the recommended improvements that are eligible for SDC funds and the amount each is eligible for. o b. Thoroughly review all possible funding sources for the preferred water system improvements and develop a funding mechanism for the proposed improvements. 1) Review funds available and the status of capital improvements, operation, and maintenance funds for the water system. 2) Identify different funding sources including State, Federal, and private sources. 6. Rate Structure and Conservation - Complete a rate analysis in order to estimate future water rates. Utilize projected annual operation and maintenance costs and any needed capitol improvement bonding to project. Potential rate impacts for the needed improvements. Identify water conservation opportunities that might be addressed through rate structure revisions. Summarize City's approach to utility rate studies, status of rates recommended in 2005 rate study, and anticipated scope of 2010 rate study. 7. Recommended Financial Strategy - Recommend a financial strategy addressing funding sources, basic financial policies, rates and charges. 7.2 City Responsibilities 1. Provide financial, budgeting, rate and customer reports. 2. Review and comment on draft Chapter 7. 7.4 Oeliverables 1. Word document and Excel spreadsheet electronic files of the draft chapter 7 containing a description of alternatives to finance water system improvements that includes local financing (such as user rates and system development charges), long tenn financial alternatives, and financing assistance programs. It also contains a detailed analysis of the financial operational performance of the water fund including detailed financial recommendations to enable the City to implement the preferred engineering solution recommendations chosen in the previous chapter. 2. Final Draft Word electronic file of the chapter 7 with review comments incorporated. ( January 27, 2010 pwJ/Carollo'ClienllORlAshlal'ldl8406AOOIProjecl ManagemenllContracls 31 of 37 3. Word document electronic file of draft and final Technical Memorandum titled-Fees and Rates Study for the Water Supply System. This memorandum will be directly compiled into the CWMP as an appendix. 4. Word document electronic file of draft and final Technical Memorandum titled- SDC - Update for the-Water Supply System.-This memorandum will be directly compiled into the CWMP as an appendix. January 27, 2010 pw-JlCarolkVCIienVORlAshlanG'8406AOOIPrqect Management/Contracts 32 of 37 8.0 CAPITAL IMPROVEMENT PROGRAM (CIP) 8.1 Cons~ltant Services 1. Work with the City during a workshop to discuss and develop project evaluation, screening and prioritization criteria to be used in the selection of and prioritization of projects. The contents of the CIP table and project sheets will also be reviewed and refined at this workshop. 2. Describe the CIP prioritization process, project justification and description. 3. Work with City staff to organize and summarize system pipe age and line break information to help evaluate remaining pipe life throughout the system; it is assumed these data are available in either GIS or MS Excel format. Data provided by the City may be in the form of GASB 34 inventory database. 4. As other project information is made available by the City, water CIP projects will be . scheduled to coordinate with other City sewer and street improvement projects in the same areas to minimize overall infrastructure improvement costs. 5. Provide justification for proposed capital and non-capital improvement projects. 6. Prepare a standard cost estimating methodology that will be used to compare and evaluate project alternatives. Costs will be updated to account for changes in schedule. 7. Apply a standardized cost apportionment methodology to each recommended CIP project which describes the estimated cost of the project in a cost per water service connection. These values will be used for comparison of alternatives and prioritization of projects within the confines of the Plan. 8. Prepare a CIP spreadsheet or database system that can be used to describe and sort projects by date, schedule, priority, or type. Each project in the spreadsheet will be linked to a project sheet that describes the project and project justification. 9. Outline and summarize the schedule of capital improvement projects in a summary table by year for the first 5 years, in 5 year increments for the next 15 years, and projects beyond the 20 year time frame. Develop a system exhibit that identifies projects and timeframe for implementation. 10. Describe long-term strategies for the 50-year system vision. It is expected that details of these strategies will be refined in subsequent CWMP updates. 8.2 City Responsibilities 1. Work with Consultant team to evaluate alternatives and select CIP projects. 2. Help to select project prioritization criteria. January 27, 2010 rmJICarollolOientlORlAshlandl8406AOOIProjecl ManagemenVContracts 33 of 37 3. Provide recent City water project bid tabulations to be used in developing the cost estimating tool. 4. Review and comment on draft CIP. 8.3 Assumptions 1. City will provide available similar project cost information to help set up cost models. 8.4 Deliverables 1. Draft and final Microsoft Excel spreadsheets, project cost estimating tool, and GIS maps. 2. List of O&M improvements to be included in the CIP and addressed in Operational budgets. 3. Draft and final Chapter 8 titled "Capital Improvement Program" that contains a recommended water system improvement program including the recommended engineering alternative and associated costs, maps or schematics showing size and location of proposed facilities, the recommendedfiDancing .aItElrnative,. and a recommended schedule for water system design and construction. 4. Draft and Final Maps of City distribution system showing locations of projects identified in the CIP table with attached project number for ease in cross-referencing. o January 27, 2010 rm-JICaIoIIciOienVOAIAshlandl8406AOO'Project ManagemenVContracts 34 of 37 9.0 ENVIRONMENTAL ASSESSMENT This task is optional and inclusion in study scope will be determined during development of the Comprehensive Water Master Plan. Completion of this task is not included within the current budget. If need for this task arises based on the outcome of the WCRS and CWMP, Carollo will work with the City to develop an appropriate scope and budget for this task. The description herein as provided as an example only. 9.1 Consultant Services 1. Performance of an Environmental Assessment or Environmental Impact Statement as needed to meet State of Oregon and Oregon DEQ regulations for the identification, evaluation, and assessment of potential environment impacts associated with the Comprehensive Water System Master Plan. 2. ENEIS shall meet the requirements set forth in the State Revolving Fund guidelines to allow anticipated Capital Improvement Projects to be eligible for SRF programs. 3. Public participation and review process in accordance with public outreach guidelines. 4. Inclusion of the ENEIS findings in the Comprehensive Water System Plan document 9.2 City Responsibilities 1. Provide floodplain and sensitive areas data as available. 2. Review and comment on draft Chapter 9. 9.3 Assumptions 1. Consultant will participate in public outreach meetings. 9.4 Oeliverables 1. Word document electronic files of the draft Chapter 9. 2. Word document electronic files of final ENEIS Documents and Chapter 9. o January 27, 2010 pw-J/CarollcraientlORlAshIandlB406AOO'Projecl ManagemenVContracts 35 of 37 " :IE :: !:!. c .. 0: ~ " ... .. :IE ~ " ~ " > 'iii c " .c i!! Q. E o o 'D C .. iil '" o ~ ". 'D ~ ill " ~ ~ " '" .. c .!! -g~ .. " :c~ .:2 0 w _0 t: o :;~m b-t::i: C:;~~lil Jt e ~ ~ ~d 001'-: j-Ue: ~ W ~ ffi ~ . u ~ o ~ o ~ u i.~ J5_ .00 . E ~~ ~ ~ 8 .28 ~ , 8~ J ~:s~~~~~1Q! ~~<&~f~~~~~ ........,................. .. N '" g IN 31;) OZI ~_ c. "!.;;;; ~a6 ..- .. co ............. ~~~~! ..;...;......... N ............... .. lP~ - ~ii4~ ~ ~ ~ ~ ~ ri ~ ~;;;~a : ........................... ~8 i~ ~; .; . ............................ ~ ~ g~~~~ II) '" ~..;~M;! ............................ H~iii ~aig~ . 0 ~ :::IJ :;,.. mai<o ~ ~ - ...................., ~~ ~:2~:g~~~~! o 1".5 g !l:l . ~ co ~ <D ~B~ ~M ;:!: 10<0 <D,S I/) lli8 co Ii; !Ill:: .~~ g 1!:: ~ :!l ;! ~ ~ ~ 18 8~~j;; 0.5 . ;:a:i::"ii8 ~;;~g"O~N.OOO~ 5b~J:;; : ~~3:S~ ~ iEa:"o~o~ooo; o crO;; j Jj 00 ~~~~g 0 ~ g ~ e 00 0 ~ U "- 2M '" 8~ ir~g~~g~~~~~! a;; Iii " c :> .. hi ~~~p~ co , co ~ ~ ~ ;! ~ ~"'I u~~ O::.~~~N[;;:"'''''''''NN&1 WM z o ~ ~ ~ W o ~ i I . .!! i i~~lill! g ~ ~ ~iill~ll ~ Il inl~li d I ~ ..J w .s E t: A'l ~p g i ~ E II) a Q Jl ,:fi = 5pn-p s~~~~~~~ ..- N ... '" II> ....... ... ""-..IC..IC.KOII...IC.lI..IC :::::::: ........1-1-................ . ~1~11~1 M M M 3 M M M " ~ : ........... E . ........... @g ~ IOg~ ................ ~ ~ ~ . o . :i: 5 ~ .............. o Q 0 ! M Q <:> 0 :g o 0 0 !i 000 ::: o 0 0 ::: 000 ! o 0 0 ! 00 0 ~ ~ 000 ~ .. ~ 3 i ~ , . ~ g ~ . a .. ~ 3 8 o ~ 1 "5 Jd .n i ~ J j E CL I! r- H~ ~ ~ ~ . l' ~ ~ ~ !! ! o " . ; ~ ~ ~ ~ o .!! ] o , ,Form W-9 Request for Taxpayer Identification Number and Certification Give form to the requester. Do not send to the IRS. Check appropriate box: D IndividuallSoleproprietor Jil ,Corporation 0 Partnership _ _ ",_" _. _ o Umited liability company. Enter the tax classificatjon (D=disregarded entity, C=corporation, P=par1nership) ... _... _ __ o Other (see instructions) .. Address (number, street, and apt. or suite no.) 3033 North 44th Street, Suite 101 (Rev. October 2007) Oepartmerrt of the Treasury Internal Revenue Service Name (as shown on your income tax return) oJ " '" il. Carollo Engineers, P.C. Business name. jf different from above c o &g ~+: " u 02 "lii "i:E o.u '" 'u 8- '" ~ VJ City. state, and ZIP code Phoenix, Arizona 85018 List account number(s} here (optionaQ IN 0" Exempt payee Requester'S name and address (optional) Social security number Enter your TIN in the appropriate box. The TIN provided must match the name given on Line 1 to avoid backup withholding. For individuals, this is your social security number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the Part' instructions on page 3. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN on page 3. Note. If the account is in more than one name, see the chart on page 4 for guidelines on whose number to enter. Certification or Employer Identification number 86: 0899222 Under penalties of perjury, I certify that 1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me). and 2. I am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I.have not been notified by the Internal Revenue Service (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup withholding, and 3. I am a U.S. citizen or other U.S. person (defined below). Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA). and generally, payments other than interest and dividends, you are not required to sign the Certification, but you must provide your correct TIN. See the instructions on page 4. Sign I Signature of Here ,u.s. person ... Date .. Definition of a U.S. person. For federal tax purposes, you are considered a U.S. person if you are: . An individual who is a U.S. citizen or U.S. resident alien, . A partnership, corporation, company, or association created or organized in the United States or under the laws of the United States, . An estate (other than a foreign estate), or . A domestic trust (as defined in Regulations section \ 301.7701-7). \ Special rules for partnerships. Partnerships that conduct a trade or business in the United States are generally required to pay a withholding tax on any foreign partners' share of income from such business. Further, in certain cases where a Form W-9 has not been received, a partnership is required to presume that a partner is a foreign person, and pay the withholding tax. Therefore, if you are a U.S. person that is a partner in a partnership conducting a trade or business in the United States, provide Form W-9 to the partnership to establish your U.S. status and avoid withholding on your share of partnership income. The person who gives Form W-9 to the partnership for purposes of establishing its U.S. status and avoiding withholding on its allocable share of net income from the partnership conducting a trade or business in the United States is in the following cases: . The U.S. owner of a disregarded entity and not the entity. Cat. No. 10231 X Form W -9 (Rev. 10-2007) General Instructions Section references are to the Internal Revenue Code unless otherwise noted. Purpose of Form A person who is required to file an information return with the IRS must obtain your correct taxpayer identification number (TIN) to report, for example, income paid to you, real estate transactions, mortgage interest you paid, acquisition or abandonment of secured property. cancellation of debt, or contributions you made to an IRA. Use Form W-9 only if you are a U.S. person (inCluding a resident alien), to provide your correct TlN to the person requesting it (the requester) and, when applicable, to: 1. Certify that the TIN you are giving is correct (or you are waiting for a number to be issued), 2. Certify that you are not subject to backup withholding, or 3. Claim exemption from backup withholding if you are a U.S, exempt payee. If applicable, you are also certifying that as a U,S. person, your allocable share of any partnership income from a U.S. trade or business is not subject to the withholding tax on foreign partners' share of effectively connected income. Note. If a requester gives you a form other than Form W-9 to request your TIN, you must use the requester's form if it is substantially similar to this Form W-9. ACORD~ CERTIFICATE OF LIABILITY INSURANCE I DATE (MMlDDfYY) 02/01/10 PRODUGER 0564249 1-800-833-7337 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Heffernan Insurance Brokers/ ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Heffernan Professional Practices HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 1808 Embarcadero Road..Suite A ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Palo Alto, CA 94303 INSURERS AFFORDING COVERAGE INSURED INSURER A: OUeBeacon America Insurance Cnmnany Carollo Engineers, A Professional Corporation INSURER B: ACE American Insurance Company 10540 Talbert Avenue. Suite 200 Bast INSURER c: Fountain Valley, CA 92708 INSURER 0: I INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I~~: TYPE OF INSURANCE POUCY NUMBER PQUCY EFFEcnve P2'a1.E',EXPIRATION UMITS A ~NERAL UABIUTY 7180103170000 12/31/09 12/31/10 EACH OCCURRENCE $ 1, ODD, 000 X COMMERCIAL GENERAL LIABILITY FIRE DAMAGE (Anyone fire) S 500,000 I CLAIMS MADE 0 OCCUR MEO EXP (Anyone person) $25,000 r- PERSONAL & ADV INJURY $ 1,000,000 r- GENERAL AGGREGATE S 2,000,000 r-~~i'~ AGG~fillllMIT APrlSIPER: PRODUCTS - COMP/OP AGG S 2,000,000 POLICY X; ~~.9; lOG A ~OMOBllE UABIUTY 7180103170000 12/31/09 12/31/10 COMBINED SINGlE LIMIT $ 1,000,000 X ANY AUTO (Eaaccident) - All OWNED AUTOS BODilY INJURY (Per person) $ - SCHEDULED AUTOS - HIRED AUTOS BODilY INJURY {Per accident) $ - NON.OWNED AUTOS - PROPERTY DAMAGE $ (Pereccidenl) lGE UABIUTY AUTO ONLY. EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ A EXCESS UABIUTY 7180103170000 12/31/09 12/31/10 EACH OCCURRENCE S 1,000,000 ~-OCCUR D CLAIMS MADE AGGREGATE $ 1,000,000 $ =1 ~EOUCT1BLE $ RETENTION $ $ A WORKERS COMPENSAnDN ANO 4060316440000 12/31/09 12/31/10 X I .Vf.'<:?T~n!~ I 10JI;'- EMPLOYERS' UABIUTY $ 1,000,000 E.L EACH ACCIDENT E.L DISEASE. EA EMPLOYE $ 1,000,000 E.L DISEASE - POLlCY LIMIT $ 1,000,000 OTHER B Professional Liability G21656495006 07/04/09 07/04/10 Per Claim. s 1,000,000 Retroactive Date: unlimited Aggregate s 1,000,000 Deductible $400,000 DESCRlPTlON Of OPERAnONSJLOCAnONSNEHICLESJEXCLUSlONS ADDED BY ENDORSEMENTfSPECIAL PROVISIONS All operations of the named insured. Professional Liability is written in aggregate limits of liability not less than the amount shown. Re: Water Conservation' Reuse Study (lfCRS) and Comprehensive Water Plan (CWMP) . Carollo Project #: Not yet assigned. The City of Ashland, Oregon, and its elected officials, officers and employees are included as additional insureds with respects to General & Auto Liability. CERTIFICATE HOLDER I I ADDmONAL INSURED; INSURER LETTER: CANCELLATION *10 DAYS NOTICE POR NON-PAYMBNT OP PREMIUM SHOULD ANY OFTHE ABOVE OESCRlBEO POUCtEB BE CANCELLED BEFORE THE EXPIRAnON I City of Ashland DATE THEREOF, THE ISSUING INSURER WILL ElH~""f MAIL ~ DAYS WRITTEN NonCE TO THE CERTlFlCATE HOLDER NAMED TO THE LEFT, EJf~V'mlIl'''1rftlPr. ............1 20 East Nain Street ~ ~ ~l~~wr~,yyyyyyyyyy~yyyyyyyyyyyyyyyyyyyyyyy Ashland, OR 97520 AUTHORIZED REPRESENTAnvE $- I USA ACORD 25-5 (7/97) drichie 14337393 @ACORD CORPORATION 1988 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. @VANTAGE FOR AUTOMOBILE This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM The following schedule lists the coverage extensions provided by this endorsement. Refer to the individual provi- sions to determine the extent of your coverage. SCHEDULE OF COVERAGE EXTENSIONS 1. Additional Insured By Contract 11. Extra Expense - Broadened Coverage 2. Airbag Discharge 12. Fellow Employee Exclusion 3. Auto Theft Reward 13. Glass Repair - Waiver of Deductible 4. Blanket Waivel of Subrogation 14. Hired Auto Physical Damage Coverage 5. Bodily Injury Redefined - Mental Anguish 15. Hired Auto - Worldwide Coverage Territory 6. Broad Form Named Insured 16. Lease Gap Coverage 7. Communications Equipment 17. Uability Coverage - Supplementary Payments 8. Drive Other Car - Executive Officers 18. Newly Formed or Acquired Organizations 9. Duties In The Event of Accident, Claim, Sull or Loss 19. Physical Damage - Transportation Expenses 10. Emolovees As Insureds 20. Towina - Anv Auto 1. ADDITIONAL INSURED BY CONTRACT The Who Is An Insured provision under SECTION II - LIABILITY COVERAGE is amended to include as iBn additional insured any person or organization wllh whom you agreed in a written contract, written agreement or permit, to provide insurance such as is afforded under this Coverage Form. Such person or organization is an. insured only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part by your maintenance, operation or use of your covered "autos". With respect to the insurance afforded to these additional insureds, this insurance does not apply: a. Unless the written contract or agreement has been executed or the permit has been issued prior to the "bodily injury" or "property damage"; b. To any person or organization included as an insured by endorsement or in the Declarations, or c. To any. lessor of "autos" when their contract or agreement with you for such leased "auto" ends. 2. AIR BAG DISCHARGE If you purchased physical damage coverage for a covered "auto" under this policy, we will pay to reset or re- place an airbag that accidentally discharges without the vehicle being involved in an accident. No deductible applies to this additional coverage. However, this coverage only applies if the airbag is not covered under a manufacturer's warranty and you did not intentionally cause the airbag to discharge. 3. AUTO THEFT REWARD We will pay up to a $2,000 reward in the event of a covered loss, for information leading to the arrest and con- viction of anyone stealing a covered "auto". A reward will not be paid to you, a family member, employee or any public official while performing their duty. 4. BLANKET WAIVER OF SUBROGATION The Transfer Of Rights Of Recovery Against Others To Us condition under SECTION IV - LOSS CONDI- TIONS is replaced by the following: We will waive any right of recovery we may have against any person or organization because of payments we make for injury or damage arising out of the operation of a covered "auto" when you have assumed liability for such "bodily injury" or "property damage" under an "insured contracr, provided the contract is in writing and executed prior to the "bodily injury" or "property damage". 5. BODILY INJURY REDEFINED - MENTAL ANGUISH The definition of "bodily injury" under SECTION V - DEFINITIONS is replaced by the following: "Bodily injury" means bodily injury, sickness, or disease sustained by a person, including mental anguish or death resulting from any of these at any time. veA 201 02 05 Incfudes copyrighted material of Insurance Services Off ace, Inc. Copyright 2004, 1!1!!ll!!!!!!I!!!I!!!!!I!ll!II!! llll!/l!!!!!!!!!!! @@@@@@@@@@@@@@@@@@@@@ Page 1 or 4 6. BROAp FORM NAMED INSURED a. The Who Is An Insured provision under SECTION II - LIABIUTY COVERAGE is amended to include the following: . Any organization which is a legally incorporated entity in which you own a financial interest of more than 50% of the voting stock on the effective date of this Coverage Form will be a Named Insured until the 180th day or the end of the policy period whichever comes first, provided there is no other similar insurance avail- able to that organization. ' b. Paragraph a. of this provision 6. does not apply to "bodily injury" or "property damage" for which an "insured" is also an insured under any other automobile policy or would be an insured under such a policy, DUUorits1ermination~orthlrexhaustion-otits-limit-otinsurance . 7. COMMUNICATIONS EQUIPMENT a. The exclusion for electronic equipment under Exclusions of SECTION III - PHYSICAL DAMAGE COVERAGE does not apply to loss of any permanently installed, non-removable communications equipment designed for use as a: 1. Citizen's band radio; 2, Two-way mobile radio or telephone; 3. Scanning monitor receiver, or 4. GPS Navigation System including its antenna and other accessories. b. No Deductible applies to this additional coverage. c. The most we will pay for this coverage is $2,000 per occurrence. 8. DRIVE OTHER CAR - EXECUTIVE OFFICERS a. Tile WfiOlSAn Insure(l prOVISion underSECTION1t=tIABlttlYCOVERAGE'is-amended-to-inelude: If you are designated in the Declarations as: 1. An individual; you and your spouse. 2. A partnership; your partners and their spouses. 3. An organization other than an individual or a partnership; you "executive officers" and their spouses. b. SECTION II - LIABIUTY COVERAGE and SECTION III - PHYSICAL DAMAGE COVERAGE are extended to include "autos" you don't own, hire, lease or borrow while in the care, custody or control of an insured listed in 8.a. This does not include any "auto": 1. Owned by any insured listed in 8.a., or any member of their household, including any such "auto" that is owned but not insured; 2. Used by an insured listed in 8.a. while working in the business of selling servicing, repairing or parking autos; Of1 3. Insured under another policy of insurance. If Medical Payments, UninsuredlUnderinsured Motorist, Personal Injury Protection or other compulsory coverages required by the governing jurisdiction are covered on this policy, then insureds listed in 8.a. above and family members residing in the same households are "insureds" while: 1. Occupying as a passenger, or 2. A pedestrian when struck by any auto you do not own, hire, lease or borrow, except any auto owned by that insured listed. in 8.a, their family members or an auto insured under any other policy. c. The limits and deductibles applicable to this provision will be the largest applicable to any owned "auto" for the specific insurance. d. The following definition is added to SECTION V - DEFINITIONS of the policy: "Executive officer" means a person holding any of the officer positions created by your charter, constitu- tion, by-laws or any similar governing document. e. The Other Insurance Condition, under SECTION IV - BUSINESS AUTO CONDITIONS, does not apply to the provisions of this Drive Other Car endorsement. There is no "other insurance" applicable to this en- dorsement. Page 2 of 4 Includes copyrighted material 01 Insurance SeMces OrrICO, Inc. Copyright 2004. !I!IIII!!!!!!I!!!!!!!!l!!!!I!!!!!!!!!!lll!!l!!!!ll VCA 201 02 05 9. DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS Under SECTION IV - BUSINESS AUTO CONDITIONS - the Duties In The Event Of Accident, Claim, Suit Or Loss Condition is amended as follows: . The requirements that you must a. notify us of an "accidenf' claim, "suit" or "loss" and b. send us documents concerning a claim or "suit" apply only when such "accidenf' claim, "sun" or "loss" is known to: a. You, if you are an individual; b. A partner, rt you are a partnership; c. An executive officer of the corporation or insurance manager, if you are a corporation; or d. A manager, if you are a limned liability company. 10. EMPLOYEES AS INSUREDS The Who Is An Insured provision under SECTION II - LIABILITY COVERAGE is changed by adding the following: Any employee of yours while using a covered "auto" you don't own, hire or borrow in your business or your personal affairs. This coverage is excess over any other collectible insurance. 11. EXTRA EXPENSE - BROADENED COVERAGE Under Paragraph A. of SECTION 111- PHYSICAL DAMAGE COVERAGE, the following Coverage is added: We will pay for the expense of returning a stolen covered "auto" to you subject to Paragraph C. Limit . Of Insurance. 12. FELLOW EMPLOYEE EXCLUSION The Fellow Employee exclusion under SECTION II - LIABILITY COVERAGE does not apply if the "bodily injury" results from the use of a covered "auto" you own or hire. This coverage is excess over any other in- surance. 13. GLASS REPAIR - WAIVER OF DEDUCTIBLE Under Paragraph D. Deductible - of SECTION III - PHYSICAL DAMAGE COVERAGE, the following is added: No deductible applies to glass damage if the glass is repaired rather than replaced. 14. HIRED AUTO - PHYSICAL DAMAGE COVERAGE If hired "autos" are covered "autos" under SECTION II - LIABILITY COVERAGE and if Comprehensive, Specified Causes of Loss, or Collision coverages are provided under this policy for any "auto" you own, then SECTION III - PHYSICAL DAMAGE COVERAGE is extended to "autos" you hire, subject to the fol- lowing limn: The most we will pay for "loss" to any hired "auto" is the lesser of: a. $50,000, b. The actual cash value, or c. The cost of repairing or replacing n with other property of like kind or quality. The deductible will be equal to the largest deductible applicable to any owned "auto" for that coverage. No deductible applies to "loss" caused by fire or lightning. Hired Auto Physical Damage coverage is excess over any other collectible insurance. '. Subject to the above limn, deductible and excess provisions, we will provide coverage equal to the broadest coverage applicable to any covered "auto" you own. We will also cover loss of use of the hired "auto" if the following conditions are met: a. n results from an accident, b. you are legally liable, and c. the lessor incurs an actual financial loss. The most we will pay for this loss of use coverage is $1,000 per "accident". veA 201 02 06 Includes copyrighted material of Insurance Services OffICe, Inc. Copyright 2004. 1!!!!!!lII!1l1!!!!!!!!!!!!!!I!I!lI!!!I!1II!III!!1I Page30f 4 15. HJRED AUTO - WORLDWIDE COVERAGE TERRITORY The definition. of coverage te'mtory in General Conditions.- Policy Period, Coverage Territory - of SEC- TION IV - BUSINESS AUTO CONDITIONS is amended to add: Anywhere in the world for autos hired for 30 days or less, provided that any "suit" is brought in the United States of America Qncluding its territories and possessions), Puerto Rico or Canada. 16. LEASE GAP COVERAGE Under Paragraph C. Limit of Insurance - of SECTION III - PHYSICAL DAMAGE COVERAGE, the follow- ing is added: . We-will-also-pay-the-diffeFen~etween-the-aGlllal-cash-value-of-a-covered.."auto" at the time_oJ"':I.oss:'.Jind the remaining balance. on your lease if the following conditions are met: . a. The "auto" has a long term lease and is covered on this policy. b. The lessor is added as an Additional Insured in a written lease agreement. c. You are legally obligated for the remaining balance. We will. not pay for any amounts representing excess wear and tear charges; additional mileage charges; taxes; overdue payments; penalties, interest or charges resulting from overdue payments; or lease termina- tion fees. H. LIABILITY COVERAGE EXTENSIONS - SUPPLEMENTARY PAYMENTS Under SECTION II - LIABILITY COVERAGE, the Coverage Extension for Supplementary Payments is re- vised as follows: .. . a. The limit for the cost of bail bonds is amended to $3,500. b. The limit for reasonable expenses incurred by the "insured" is amended to $500 a day. 18. NEWLY FORMED OR ACQUIRED ORGANIZATIONS a. The Who Is An Insured provision under SECTION II - LIABILITY COVERAGE is amended to include as an "insured" any organization that is formed or acquired by you and over which you maintain majority ownership. b. Paragraph a. of this provision 18. does not apply to any organization: 1. That is a joint venture or partnership, 2, That is an "insured" under any other policy, 3. That has exhausted its Umit of Insurance under any other policy, or 4. 180 days or more after its acquisition or formation by you, unless you have given us notice of the acquisition or formation. c. Paragraph a. of this provision 18. does not apply to "bodily injury" or "property damage" that results from an "accident" that occurred before you formed or acquired the organization. 19. PHYSICAL DAMAGE - TRANSPORTATION EXPENSES COVERAGE Under SECTION III - PHYSICAL DAMAGE Coverage Extensions, the limit for Transportation Expenses is amended to $75 per day and the maximum is amended to $1,800. 20. TOWING - COVERED AUTOS Under SECTION m - PHYSICAL DAMAGE COVERAGE, Coverage for Towing is amended as follows: a. This coverage applies to any covered "auto" for which a premium charge for towing and labor is shown in the Schedule or in the Declarations. b. The limit is $100. ,. Page 4 of 4 Includes copyrighted material of Insurance Services Office. Inc. Copyright 2004, I! II!! II !l!!!!! I!! II!!!! I!! Ill! I!! !lll! !llll! II! II veA 201 02 06 . , ADDITIONAL INSURED This form modifies insurance provided under the following: GL CONTRACTORS EXTENDER (VCG 206 02 05) WHO IS AN INSURED - (Section II) is deleted and replaced by the following wording: A. Section II - Who Is An Insured is amended to include as an additional insured any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract, agreement or permit that such person or organization be added as an additional insured on your policy. Such person or organization is an additional insured only with respect to liability for "bodily injury: "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing and completed operations for the additional insured. The insurance provided to the additional insured is limited as follows: a) This endorsement shall not increase the limits stated in Section III - LIMITS OF INSURANCE. b) This insurance does not apply to "bodily injury: or "property damage" caused by "your work" included in the "products-completed operations hazard" unless you are required to provide such coverage for the additional insured by a written contract or written agreement in effect during this policy period and signed and executed by you prior to the loss for which coverage is sought. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to: 1. "Bodily injury," "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspections, architectural or engineering activities. Primary & Non-Contributory: Any coverage provided by this endorsement to an additional insured shall be excess over any other valid and collectible insurance available to the additional insured whether primary, excess, contingent or on any other basis unless a written contract or written agreement in effect during this policy period and signed and executed by you prior to the loss for which coverage is sought specifically requires that this insurance apply on a primary or noncontributory basis. Separation of Insureds: Except with respect to the Limits of Insurance, and any rights or duties specifically assigned in this Coverage Part to the first Named Insured, this insurance applies: a. As if each Named Insured were the only Named Insured; and b. Separately to each insured against whom claim is made or "suit" is brought. Per Project Aggregate: Under Section III = Limits of Insurance, the General Aggregate Limit applies separately to each of your projects away from premises owned by or rented to you. Waiver of Subrogation: Section IV - Transfer of Rights of Recovery Against Others to Us Condition is amended to add the following: We will waive any right of recovery we may have against any person or organization because of payments we make for injury or damage arising out of your ongoing operations done under a written contract or agreement with that person or organization and included in "your work" or the "products-completed operations hazard". This waiver applies only to persons or organizations with whom you have a written contract executed prior to the "bodily injury" or "property damage", that requires you to waive your rights of recovery. Narnedlnsuned: Carollo Engineers, A Profeasional Corporation Policy No.: 7180103170000 Additional Insured: Any person or organization with whom you have agreed in written contract, executed prior to 10s8, to Dame as additional insured. fILE COpy CITY OF ASHLAND December 23. 2009 RE: INTENT TO A WARD FOR THE CONSER V AnON AND REUSE STUDY AND COMPREHENSIVE WATER MASTER PLAN PROJECT No. OS-54 The City of Ashland's proposal review committee met on November ISth of 2009 to review the proposals submitted and interviews conducted for the Comprehensive Water Master Plan for the City of Ashland. The review committee consisted of Ashland Public Works staff members, as well as representatives from the Medford Water Commission and Talent Irrigation District. A summary of scoring IS attac. After receiving council approval for the recommended prepesal-e eeember-h)~009.the . -y-is-pleased-te-annellRee-tts--intenHe-award-the-€entFaet to Carollo Eng . All of the proposals received met the intent of the RFP. The proposals varied somewhat in their approach. but all met the requirements of the RFP and all of the proposals offered unique insights into how the City can approach its current engineering challenges. The committee and I appreciate the time you took to research the project and complete your proposal. I would be happy to discuss the results of the committee's selection. Please contact me if you have questions or comments. . Sincerely, 14r ~~~ Pieter Smeenk, P.E. S.E. City of Ashland Public Works Dept. 20 E Main Street Ashland. OR 97520 541-552-2413. TTY SOO-735-2900 54 I -48S-6OO6 FAX CC: Mike Faught Betsy Harshman Engln_lng 20 E, Main Street Ashland. Oregon 97520 www.ashland.oLu5 Tel: 541/488-5347 Fax: 541./488-6006 TTY: 800/735.2900 r~' G:\pub-wrkslengI08-54 Right Waler Right UselAdminIRFPI2oo9-12-24 Intent to Award itr 08-54.doc . vt;na .J Proposers Submittal Interview Total score Carollo Engineers 89.0 +9.3 = 98.3 Keller Associates! B&C 85.8 +9.6 =95.4 HDR 86.8 +8.0 =94:8 West Yost Assoc. 82.6 + 7.0 =89.6 Murray Smith & Assoc. 81.2 = 81.2 Winzer & Kelley 80.0 = 80.0 Natural Systems Int'!. 57.2 =57.2 3 '\1 Engineering 20 E. Main Street Ashland, Oregon 97520 www.ashland.or.us Tel: 541/488-5347 Fax:541"488~06 TTY: BOOI735-2900 ...,. ._~ G:\pub-wrks\eng\08-54 Right Water Right Use\Admin\RFP\2009-12-24 Intent to Award Itr OS-54.doc' - . . - \ REQUEST FOR PROPOSALS for Water Conservation & Reuse Study (WCRS) and Comprehensive Water Master Plan (CWMP) PROJECT NO: 2008-54 PROJECT TYPE: Engineering Services PRE-PROPOSAL CONFERENCE 1:30 PM, August 25, 2009 PROPOSAL OPENING DATE: 1 :30 PM, September 15, 2009 CITY PROJECT MANAGER Pieter Smeenk, PE . PROJECT DURATION 24 month maximum , CITY OF ASHLAND PUBLIC WORKS ENGINEERING 20 E. MAIN STREET ASHLAND OR 97520 541/488-5347 - - .. TABLE OF CONTENTS Table of Contents.. c.......................................................................................... 1 Advertisement............................................................................................. 11 Request for ProDosals 1."1.1 Summary Overview. ...... ........... .... ......... ..... ...... .....:..... ........ ....... Background....................................................................... .. Definitions............................................................................. .. Contract Form...........,............................................................... Contract Duration.. ....... .............. . .... . ....... ....... .. ... ..... ...... . ..... . Contract Payment... .... .. ... . . . ..... . ... ........ . ... . ..... . ... ..... ... . ........... DBE Participation.................................................................. Ashland Living Wage Requirement.... ....... ......... ..... ...... ... ..... ...... 1.1.4 Business License Requirements....................................................... 1.1.5 insurance Requirements................................................................ 1.2 Questions & Clarifications 1.2.1 Proposer Questions................. ....................... ......... ......... ..... ....... "6 1.3 Protests........................................................................... ,.... ..... 6 1.3.1 Award Protest Requirements.... ...... ...... .............. ..................... ......... 6 1.3.2 Costs & Damages.....,.... ..... ............ ........ ...... .......... ....... .............. 6 1.4 "PasslFail" Proposal Submission Requirements..................................... 7 1.4.1 Proposal Submission Deadline......................................................... 7 1.4.2 Terms & Conditions..................................................................... 7 1.5 "Required" Proposal Submission Items 1.5.1 Cover Sheet................................................................................ 7 1.5.2 Page Length Limitation... ............ ...... ........ ..... ......... ..... ... ...... ... ...... 7 1.5.3 Quantity of Proposals...... ........................... ........ ........... ..,....... ....... 8 1.1.2 1.1.3 Evaluation Process & ConsultaDt Selection 2.1 Evaluation Process 2.1.1 Proposal Evaluation.... .............. ............ ......... .................... ..... ..... 9 2.1.2 Interviews I Follow-Up Questions...................................................... 9 2.1.3 "References.. .......... ........... ............. ....... ..... ........... ........ ...... ........ 10 2.1.4 Clarifications...............................................:.............................. 10 2.2 Scoring Criteria............. ..................................... ....:........ ......... ......... ..... ..... 10 SCODe of Services "3.1 General Responsibilities Personnel, Materials and Equipment, Safety Equipment, Professional Duties ...........: II Project Management.......... ................. ............ ...................... .... .... ...... ... II Document Assembly............................................................................. 12 Format.............................................................................................. 13 3.2 Task Specific Responsibilities.. ................. ............... ................. ........... .......13 -39 Appendix A: Appendix B: Contract Form including Exhibit A, Form W-9, City Of Ashland Living Wage 2009 DHS Grant Application, Agreement, and Submittal Documentation G:\pub-wrks\eng\OS-S4 Right Water Right Use\A..dmin\RFP\final\2009-08-11 RFP OS-54.doc I 2 4 4 4 4 5 5 5 5 ADVERTISEMENT CITY OF ASHLAND PUBLIC WORKS REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES The City of Ashland is requesting proposals for professional engineering services to conduct a Water Conservation & Reuse Study (WCRS) and Comprehensive Water System Master Plan (CWMP). The-City\lfi\shtand-was recently awarded-aJrtlreglln-WarerResoilfce DepanmenrWater Conservation, Reuse Grant aimed at conservation of limited potable water supplies and potential utilization of other available water resources including emuent from the City's advanced waster water treatment plant. The findings of the Study will be incorporated into developing the CWMP. The Conservation and Reuse Study will include but is not limited to the following tasks: . Review, analyze, validate and identify gaps in Ashland's existing water master plans resources. . Validate the City's future water needs through the year 2058. . Identify and fully describe all other alternative sources of water. . Identify options that explore the right water for the different water sources and uses available. . Identify benefits and challenges to using irrigation water. . Analyze environmental impacts of long term use of irrigation water sources for City use. . Evaluate hydrological benefits and challenges and anticipate the effects of climate change with regard to water needs and water use. . Identify benefits and challenges to using recycled water. . Identify options and cost estimates. .-Administel'-ancLimplement-all-granl-agreement-requi~ements-and-t'eporting. The Comprehensive Water Master Plan will include but is not limited to the following tasks: . Summarizing and Describing the Water System. . Describing the Water Quality and Service Level Goals for the system. . Projecting Water Demand for the 6 year and 20 year planning horizon. . Evaluating the Water Supply Systeni and identifying deficiencies. . Analyzing available engineering and financial alternatives. . Recommending updates to the capitai improvement program and operational structure of the water supply system. Proposals must be received by 1:30 PM, September 15,2009, in the City of Ashland Engineering Office located at 51 Winburn Way, Ashland OR 97520; Mailing Address: 20 E. Main Street Ashland OR 97520. A non-mandatory pre-proposal conference will be held at 51 Winburn Way at 1:30 PM , August 25, 2009.. For further information, contact City's Project Manager Pieter Smeenk, PE at 541/488-5347. Consultant selection is anticipated to result in City Council approval for the issuance ofa contractJor engineering services in the form provided in this RFP, for a maximum 24 month duration. Proposal documents are available at the above address, as well as the City of Ashland website at www.ashland.or.us. Ifvou received the RFP bv downloading it from the City's website and intend to submit a proposal under this RFP. vou must register as a orospective oroooser. To register, email your contact information including phone numbers, mail and Email addresses to Betsy Harshman at harshmablalashland.or.us. Registration will ensure that your firm will be included on the RFP holders list, and you will therefore receive any addendums that might be issued. The City will not be resoonsible for oroviding addendums to orosoective orooosers that download the RFP from the City website and fail to register as a prosoective' oroposer. Proposals are limited to 10 pages. The proposer must be registered as a Professional Engineer with the State of Oregon. Consultant selection will be based upon weighted criteria as cited in the Request for Proposal document. Standard selection criteria include, but are not limited to: experience, availability, schedule, response time and cost. The City of Ashland reserves the right to reject any and all proposals, to waive formalities or to accept any proposal which appears to serve the best interest of the City of Ashland. Michael R. Faught, Public Works Director ii I' / CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS REQUEST FOR PROPOSAL SECTION 1: SOLICITATION INFORMATION AND REQUIREMENTS 1.1.1 SUMMARY OVERVIEW The City of Ashland is requesting proposals for professional engineering services for a Comprehensive Water System Plan (CWMP) update. This Request for Proposal (RFP) is unique in that the City of Ashland received an Oregon Water Resource Department Water Conservation, Reuse, and Storage Grant that looks at the "Right Water for Right Use". The "Right Water for Right Use" concept evaluates conservation of limited potable water supplies and the potential utilization of other available water resources including the reuse of water from the City's advance waster water treatment plant. One element of this plan will recommend the best use of each water resource (i.e. Talent Irrigation District Water and waste water treatment effluent for irrigation etc.). Another element of the grant will require the consultant to provide a comprehensive report on the impacts climate change will have on the raw water source. The Grant terms specifically require the CWMP update to include the following items: . Review, analyze, validate and identify gaps. in Ashland's existing water master plans and water sources. . Validate the City's future water needs to the year 2058. . Identify and fully describe all alternative water sources. . . Identify options that explore the right water for the different water uses; potable, and irrigation (sources and uses). . . Identify benefits and challenges to using irrigation water. . Analyze environmental harm or impacts with the long term use of various irrigation water sources for City irrigation use. . Evaluate hydrological benefits and challenges and anticipate the effects of climate change with regard to water needs and water use. . Identify benefits and challenges to using recycled water. . Identify options and cost estimates. While this RFP's specific deliverables are designed to meet the grant requirements, it is important for each applicant proposal to clearly demonstrate full compliance with all of the specific OWRD Water Conservation, Reuse and Storage grant requirements and timelines. To that end, a copy of the grant requirements will be included in all application packets. In addition, the scope of work for CWMP update will include requirements for planning, programming, and financing improvements to the community's water systems. The final plan will accurately reflect current water system needs and demands, identify future improvements, include comprehensive and prioritized 20 year Capital Improvement Plan, an evaluation of water system staffing needs, and a specific financial plan to pay for recommended system and staffmg G:lpub-wrks\engI08-54 Right Water Right Uso\AdmlnIRFPlflnal\2009-ll8-11 RFP 08-54.doc -1 . needs that includes a water rate model. The water master plan shall be prepared in accordance with the Oregon Administrative Rules for Public Water Systems OAR 333-061-0090 (5). Background The City of Ashland provides the City's Drinking water source supply, water treatment and water distribution to approximatelTh300 service connections. The City's primary raw water supply source is the Mount Ashland watershed which collects into Ashland Creek. The City . owns and operates Hosler Dam where Ashland's source water is held in Reeder Reservoir. The water treatment plant is located below Hosler Dam next to Ashland Creek and has a peak flow of7.5 million gallons per day in the summer and averages 2 million gallons per day (MOD) in the winter months. The water transmission and distribution system consists of 130 miles of water distribution lines, 6 pump stations, 53 pressure reducing devices, and 1115 fire hydrants. There are four distribution reservoirs with 6.65 million gallons of water storage. In addition, the City owns and maintains 334 separate irrigations meters using potable water and 187 irrigation accounts using Talent Irrigation District (Till). This master plan shall begin by completing this source water study looking at all potential sources as well as storage alternatives to see whether the current approach can be improved. A primary question to answer is whether the community should use water treated to potable drinking water standards to irrigate or whether alternate sources might be more viable. Ashland's winter use of water IS 2 mIllion gallons a day. The sumnier use increases to 7 million gallons a day, primarily because of irrigation use. Finding the best water supply for different uses has previously been known in Ashland as the "Right Water for the Right Use". Alternate sources including the Talent Irrigation District Water, the City's wastewater treatment plant effluent, and other sources and storage alternatives not previously studied; will be investigated in an alternates analysis A 1998 study that looked at water sources was completed before the sewage plant upgrade had been completed. Since completion of the Wastewater treatment plant upgrade, level four effluents now empties into Ashlimd Creek, which then flows into Bear Creek. The City also upgraded the sewage plant to add membranes that remove phosphorus because the Oregon Department of Environmental Quality required Ashland to stop emptying phosphorus-laden wastewater into the creek. The agency also maintains that the City's wastewater effluent is too warm. It must either be cooled, used somewhere else, or exchanged for a colder water source. One possible conclusion of the source water study may be that the best uSe of the wastewater effluent is to use it for irrigation. If the City does use the wastewater for irrigation, it may also need to replace that water that flows into the creek with another source, perhaps by purchasing water rightS from Emigrant Lake. Many Ashlanders already use Talent Irrigation District, or Till, water for their lawns and gardens. The Ashland Parks and Recreation Department is already pioneering expanded use of Till water. The department plans to use Till water to provide fresh water for the upper duck pond in Lithia Park. It will drain water from the pond to irrigate the park. The City has a broad range of water conservation programs in place. However, through this RFP the City is hoping to increase its efficient use of its current water sources. The consultant will verify that increased City use of TID water won't create a strain on the irrigation system and G:lpub-wrkslengIOB-54 Right Water Right UselAdmlnIRFPlflnal\2009.QB-11 RFP OB-54.doc -2- short other users like farmers if the City exchanges another water source for more TID water. For example, the City could use its treated wastewater to irrigate 846 acres of City owned property and replace the in-stream water right with the TID water right tied to the Ashland owned property . The City has spent approximately $2.50 million on its share ofthe Talent-Ashland-Phoenix Water Intertie Pipeline Project (TAP) to bring water from Medford to Ashland. The pipeline now ends in Talent. Finishing the project and connecting Ashland to the Medford water supply would cost approximately $13 million. Of that, about $10 million would be paid for from charges on new development in Ashland, with nearly $3 million paid by water customers. Back in 1998, Carollo Engineering recommended the TAP project as the best supplemental water source based on cost and reliability. But the firm, working with input from a citizen's Water Advisory Group, acknowledged even then that the TAP project was not the most environmentally beneficial option, according to a 1999 memo from the firm to the City. The Water Advisory Group found that maximizing the use of existing water sources, including Talent Irrigation District water, provided environmental benefits. Some members of the group voiced the opinion that finishing the pipeline to connect to Medford's water may not be the best choice. TAP may still have an important role to play in providing a back-up source of water in case of emergency and a means of meeting the needs of a growing population. But this new water study must provide a thorough look at all the water sources, including TAP, irrigation water and sewage wastewater. There is also new data about how climate change may affect the Rogue Valley that will need to be incorporated into the study. . Scientists generally believe that summers will be drier with more intense wildfires and winters will be milder, with less snowpack to supply summer needs. This study will need to provide recommendations to prepare for tha,t possibility. Reference Documents The City has posted a series of studies that need to be incorporated into the CWMP update. Many of those studies can be reviewed on-line at www.ashland.or.us: 2008 Reeder Reservoir Study 2002 Water Distribution Analysis and Capital Improvement Plan 2001 USFS West Fork Stream Study 2000 USFS Ashland Creek Stream Survey 1998 Ashland Creek-Where Living Waters Flow 1991 Comprehensive Water Plan 2006 Water Supply System Master Plan Update Technical Memos 1-4 2009 Independent Part 12 Inspection Report 2008 Preparing for Climate Change in the Rogue River Basin of SW Oregon 2009 City of Ashland Council Goals G:'pub-wrk.'eng'OB~54 Right Water Right U.e\AdmlnIRFPlflnaI\2009-ClB-11 RFP OB-54.doc .3 - 1.1.2 DEFINITIONS For the purposes of this RFP: a) "calendar days" means any day appearing on the calendar, whether a weekday, weekend-tlay,natienal-heliday,-Sta~oliday-or-other-day; b) . "days" means calendar days; and c) "Business days" means calendar days, excluding Saturdays, Sundays and all City recognized holidays. "Agency" or "City" means City of Ashland. "Council" means City of Ashland City Council "Proposers" - All firms submitting Proposals are referred to as Proposers in this document; after negotiations, an awarded Proposer will be designated as "Consultant". "PWD" means Public Works Director "Qualification Based Selection" or "QBS" (for the purposes of this RFP) means evaluations and scoring of proposals based on qualifications, experience and project approach, without considering cost. "RFP" means Request for Proposal. "Scope of Work" means the general character and range of services and supplies needed the work's purpose and objectives, and an overview of the performance outcomes expected by Agency. "Services" means the services to be performed under the Contract. "Statement of Work" means the specific provision in the fmal Contract which sets forth and defines in detail (within the identified Scope of Work) the agreed-upon objectives, expectations, performance standards, services, deliverables, schedule for delivery and other obligations.. ~ I.I.3 CONTRACT FORM The consultant selected by City will be expected to enter into a written contract in the form attached to this RFP in the Appendix. The proposal should indicate acceptance of City's contract provision. Suggested reasonable alternatives that do not substantially impair City's rights under the contract may be submitted as outlined under Section 1.4.2. Unconditional refusal to accept the contract provisions will result in proposal rejection. Contract Duration The maximum duration of the contract is 24 months. Contract Pavment Contingent upon City's need, consultant's performance and the availability of approved funding, City reserves the right to amend the contract (within the scope of the project described in this RFP) for additional tasks, project phases and compensation as necessary to complete a particular project. Proposers are advised that the award and potential dollar amount of the contract under this RFP may be contingent upon approval by the Ashland City Council acting as the Contract Review Board. G:lpub-wrl<slengI08-54 Right Water Right UselAdmlnIRFPlllnaI\2009-G8-11 RFP 08-54.doc -4. Payment will be made for completion of, or acceptable monthly progress on, tasks and deliverables in conformance with contract requirements and all applicable standards. The method of compensation will be determined by the City and may be based upon anyone or combination of the following methods: . Cost plus fixed-fee, up to a maximum NTE amount . Fixed price for all services, Fixed price per deliverable, Fixed price per milestone . Time and materials, up to a maximum NTE amount . Price per unit Disadvantaged Business Enterprise (DBE)Particioation The utilization of federal funds is not anticipated in this contract and no DBE participation goals will be assigned. Ashland Living Wage Requirements Consultant's employees must be paid at least the living wage as established by the City of Ashland on June 30, 2008 ($12.96 per hour): . For all hours worked under a service contract between their employer and the City if the contract exceeds $18,088 or more. . For all hours worked in a month if the employee spends 50% or more of the employee's time in that month working on a project or portion of business of their employer, if the employer has ten or more employees and has received financial assistance for the project or business from the City in excess of$18,088. In calculating the living wage for full time employees, employers may add the value of health care, retirement, 40lK and IRS eligible cafeteria plans, and other benefits to the employee's wages. The City of Ashland Living Wage Statement is appended to the sample contract included in the appendix. 1.1.4. BUSINESS LICENSE REQUIRED The selected consultant must have or acquire a current City of Ashland business license prior to conducting any work under this contract. 1.1.51NSURANCE REQUIREMENTS Contractor shall at its own expense provide the following insurance: a. Worker's Comoensation insurance in compliance with QRS 656.017, which requires subject employers to provide Qregon workers' compensation coverage for all their subject workers. b. Professional Liabilitv insurance with a combined single limit, or the equivalent, of not less than $1,000,000 for each claim, incident or occurrence. This is to cover damages caused by error, omission or negligent acts related to the professional services to be provided under this contract. c. General Liabilitv insurance with a combined single limit, or the equivalent, of not less than $1,000,000 for each occurrence for Bodily Injury and Property Damage. It shall include 'contractualliability coverage for the indemnity provided under this contract. G:lpub-wrkslengI08.54 Right Water Right UselAdmlnIRFPlflnal\200g.Q8-11 RFP 08-54:doc , - 5- d. Automobile Liability insurance with a combined single limit, or the equivalent, of not less than $1,000,000 for each accident for Bodily Injury and Property Damage, including coverage for owned, hired or non-owned vehicles, as applicable. e. Notice of Cancellation or Change. There shall be no cancellation, material change, reduction oflimits or intent not to renew the insurance coverage(s) without 30 days' written notice from the Contractor or its insurer(~) to the Cine. Additional Insured/Certificates of Insurance. Contractor shall name The City of Ashland, Oregon, and its elected officials, officers and employees as Additional Insurers on any insurance policies required herein but only with respect to Contractor's services to be provided under this Contract. As evidence of the insurance coverage required by this Contract, the Contractor shall furnish acceptable insurance certificates prior to commencing work under this contract. The certificate will specifY all of the parties who are Additional Insurers. The consultant's insurance . is primary and non-contributory. Insuring companies or entities are subject to the City's acceptance. If requested, complete copies of insurance policies; trust agreements, etc. shall be provided to the City. The Contractor shall be financially responsible for all pertinent deductibles, self-insured retentions and/or self-insurance. 1.2 OUESTIONS AND CLARIFICATIONS 1.2.1. Proposer Ouestions All inquires, whether relating to the RFP process, administration, deadline or award, or to the intent or technical aspects of the services must be submitted in writing to the City's Project Manager listed in the advertisement for this proposal, , at 20 East Main Street, Ashland Oregon 97520. All questions must be received not later than ten (10) calendar days prior to the proposal submission deadline. Answers to questions received by City, which are deemed by City to be. substantive, will be issued as official addenda to this RFP to ensure that all proposers base their proposals on the same information. When appropriate, asdetennined by City in its sole discretions, revisions, substitutions or clarification of the RFP or attached terms and conditions, an official addendum to this RFP will be issued. Proposer shall indicate receipt of all issued addenda by attaching a copy of the addendum to the proposal. The addendum will not be included in the total maximum page limit. 1.3 PROTESTS 1.3.1 Award Protest Requirements Every proposer who submits a proposal shall be notified of its selection status. Any proposer who claims to have been adversely affected or aggrieved by the selection or any proposer who contends that the provisions of the RFP or any aspect of the procurement process has promoted favoritism in the award of the contract or has substantially diminished competition, must file a written protest to the RFP within seven (7) calendar days after the date of the selection notice. Failure to file a protest will be deemed a waiver of any claim by an offeror that the procurement process violates any provision ofORS Chapter 279, the City of Ashland Local Contract Review Board Rules or the City's procedures for screening and selection of persons to perform personal services. 1.3.2 Costs and Damages G:lpub-wrkslengI08-54 Right Water RIght UselAdmlnlRFPlflnal\2009-08-11 RFP 08-54.doc -6. All costs of a protest shall be the responsibility of the protestor and undertaken at the protestor's expense. City shall not be liable for the proposer's damages or costs for filing the protest or to any participant in the protest, on any basis, express or implied. 1.4 "PASS I FAIL" PROPOSAL SUBMISSION REQUIREMENTS Each proposal must comply with the following Pass I Fail criteria. Proposals not meeting ALL Pass! Fail criteria shall be rejected. 1.4.1 Proposal Submission Deadline (Pass I Fail) Proposals must be received by the submission deadline as indicated in this RFP and at the address specified. City will not accept proposals submitted by facsimile or electronic mail, nor will it accept proposals submitted after the proposal submission deadline. City is not responsible for and will not accept late or mis-delivered proposals. 1.4.2 Terms and Conditions (Pass I Fail) Unless an official addendum has modified or reserved the right to negotiate any terms contained in the contract or exhibits thereto, City will not negotiate any term or condition after the protest deadline, except the statement of work, pricing and calendar with the selected proposer. By proposal submission, the selected proposer agrees to be bound by the terms and conditions as set forth in this RFP and as they may have been modified or reserved by City for negotiation. Any proposal that is received conditioned upon City's acceptance of any other terms and conditions or rights to negotiate will be rejected. I.S "REOUlRED" PROPOSAL SUBMISSION ITEMS AND SCORING DEDUCTIONS Any items in this Section 1.5 marked as REQUIRED that are incomplete or are not submitted with the proposal will receive a three (3) point scoring deduction for each item and must be submitted within two (2) business days of request by City. Failure to deliver properly completed "REQUIRED" items within two (2) business da~s of request by City shall result in proposal rejection. 1.5.1 Cover Sheet (Required) The proposal must include a completed cover sheet signed by a duly authorized representative empowered to bind the proposer (at least one original signature). The cover sheet shall state the project title, the legal name of the proposer, legal status, federal tax ID number, mailing address, primary contact person for this proposal with email address, telephone number, fax number and the name of the person authorized to sign a contract. Include an original signature, printed name . and title and date. 1.5.2 Page Length Limitation (Required) . The proposal must not exceed 10 pages, excluding cover sheet, any tabs or indexes and references, and any issued addendum. Failure to include addendum within the RFP shall result in a three point scoring reduction. If a proposer submits a proposal exceeding this limit, City will consider the pages up to that allowable number and discard all subsequent pages. One page is defmed as: one side of a single 8 y," x II" page. Any page over this size will be counted as two (2) pages. Any page or partial page with substantive text, tables, graphics, charts, etc. will be counted as one page. There is no scoring deduction for exceeding the proposal page limitation; however, extra pagesewill be discarded and will not be considered in the evaluation. G:\pub-wrks\eng\OB...s4 Right Water Right Use\Admln\RFP\flnaf\2009-o8~11 RFP 08.54.doc -7 - 1.5.3 Ouantity of Pro Dosa Is (Required) Proposers must submit six (6) complete copies of the proposal along with six (6) sealed cost proposals. 1.5.4 Minimum ProDosal Contents A. Project Narrative: The narrative should provide a description of the consultant's understandill!rofthe-project-objective~------:--u_- -- -- -- - - - ----- B. Project Schedule and Budget 1. The Consultant shall prepare. a proposed project schedule and budget that anticipates all services required to complete the Master Plan before May, 2011. The Proposal shall include a graphic Gant-chart style schedule of major work tasks with project milestones and estimate of costs for those tasks. C. The Statement of Work (SW) 1. The Statement of Work should outline phases of work and the relationship of the proposed tasks to the objectives of the project. It should include proposed methods of investigation, analysis, and design as appropriate. Key elements shall include: a. An expanded outline of all work tasks b. Detailed work schedule for each major task, including time frames, costs, and estimated staff hours committed to each task. c. List all proposed sub-consultants, including their planned scope of work, estimated cost of services, key project staff and references (contact names, phone numbers, and email addresses). d. Description organized by task of City's anticipated role to assist in the development of the plan. Include specific deliverables needed from the City. e. Detailed description of Consultant's deliverables, including support documents and the technical reports that the Consultant will submit at the set milestones. The consultant should include a description of all computer software (including version) proposed tor the project, including word processing, spreadsheet, mapping, graphics and technical models, display graphics used tor public meetings, and electronic files. f. One copy of similar representative project deliverables recently completed for another similar organization by the consultant. g. Description of the how the consultant will coordinate work with City staff as the plan is developed. Include a discussion of the process used to share . information with the City's project team, anticipated process tor periodic review as the plan is developed, including the type, format, and frequency of meetings. h. The format of the completed master plan shall be recommended by the consultant for the City's consideration, but the City has the option to require changes to the formatting and submittal as it sees fit. D. The proposed work breakdown and associated budget and schedule for services that are submitted together with the Statement of Work shall be attached to the City's standard contract for Engineering Services. Invoices requesting payment shall be prepared assuming payment on a "time and materials not to exceed" (NTE) basis per major task. Payment will be made as a percentage of completion of each task. The City's fiscal year ends on June 30th, and all work completed up to that date must be billed no later than July 5'h. It is of particular importance that work or services rendered are paid out of the budget for the same fiscal year in which the services are budgeted and the . . service is rendered by the City. Therefore, costs associated with contractors' or G:\pub-wrkslengI08-54 Right Water Right U.e\Admln~FP\flnaI\2009-ll8-11 RFP 08-54.doc -8. subcontractors' work or services rendered under the direction or direct or indirect control of the oroDoser are also subiect to the invoicing requirement listed above bv June 30th of each vear. Bv ADril 15!h. the Droooser shall submit an estimate of anticiDated billings uo to June 30lh of that vear. The proposer shall assume that there will be no opportunities to. increase the total cost of the sum of all work tasks, but that costs may be shifted from one task to another after tasks are completed. The City's budgeting process does not provide a means to readily change the total project budget, and proposers must be clear that increases in the project budget will not be available after the Statement of Work has been accepted. Proposers are responsible to ensure that every effort is be made to anticipate potential additional- costs brought about by the project, including but not limited to work or services related to ORS 227.186 (City Planning and Zoning Notice to property owners of hearing on certain zone change; form of notice; exceptions; reimbursement of cost), DHS requirements, and other regulations that increase the City's costs to carry out the master-planning process. SECTION 2.0 EVALUATION PROCESS AND CONSULTANT SELECTION - 2.1 EVALUATION PROCESS 2.1.1 Prooosal Evaluation City will review proposals for conformance with the "Pass / Fail" and "REQUIRED" criteria identified in Sections 1.4 and 1.5. Proposals meeting all Pass / Fail criteria will be forwarded to an evaluation committee that will independently review, score and rank proposals according to the scoring criteria set forth in Section 2.2. The outcome of the evaluation process may, at the City's sole discretion result in: a. Notice to proposers of selection or rejection for contract negotiations and possible award: b. Further steps to gather additional information for evaluation (e.g. checking references, notice of placement on an interview list, requesting clarification); or c. Cancellation of the RFP and either reissuance of the RFP in the same or a revised form or no further action by the City with respect to the RFP. City may reject any or all proposals and may Cancel this RFP at anytime if doing either would be in the public interest as determined by the City. City is not liable for any costs a proposer incurs while preparing or presenting the proposal or during further evaluation stages. All proposals will become part of the public record file without obligation to the City of Ashland. 2.1.2. Interviews / Follow-uo Questions Interviews / follow-up questions may be conducted and scored at the discretion of City. If interviews / follow-up questions are conducted the following will apply: . A minimum of three (3) evaluators shall score the interviews / follow-up questions; . The interviews / follow-up questions will have a maximum score often (10) points; . The number of Proposers selected for interviews / follow-up questions is at the sole discretion of the City; G:\pub-wrks\eng\08~54 Right Water Right Use\Admln\RFP\flnal\2009-08~11 RFP 08..s4.doc .9. . Follow-up questions will typically be sent via email to proposer(s) as an alternative to face-to-face interviews. However, City may conduct face-to-face interviews if determined necessary after conducting written follow-up questions; . Interviews normally require physical attendance at City's offices; however, the City may elect to conduct interviews via teleconference or video conference. Further details will be - -. - - included with notification oftime and date of interviews, if conducted.--- _._. _. ... _. _ 2.1.3 References City does not intend to score references, but may contact references (by phone, email or fax) to verifY information provided in proposals. 2.1.4 Clarifications City may require any clarification it needs to understand the proposer's proposal. Any necessary clarifications or modifications which are in the best interest of City may be made before the proposer is awarded a contract and some or all of the clarifications or modifications may become part of the final contract. Clarifications may not be used to rehabilitate a non-responsive proposal. 2.2 SCORING CRITERIA Scoring will be based upon the following described categories. The proposer must describe how each of the requirements specified in this RFP are met. Responses should be clear and concise. 2.2.1 Understanding of Requested Service Maximum Score 10 Doints Demonstrate a clear and concise understanding of the scope of services being requested in this RFP. 2.2.2 Proposer's CaDabilities Maximum Score 20 points Demonstrate capability to complete the requested services. Response must include: · (10 points) An explanation describing how the proposer can accommodate the varying workload contemplated under an on-call contract, including a description of anticipated response times. · (10 points) An explanation describing proposer's proximity to the project and how the proposer can cost effectively accommodate working on this project. Describe proposer's branch or satellite offices that will provide the requested services, indicate their location(s) and which services they are able to perform. 2.2.3 Proiect Team and Qualification Maximum Score 25 Doints · . (5 points) Describe the extent of principal involvement · (10 points) Include descriptions of similar projects, project outcomes and customer feedback received (if any). · (10 points) Describe the experience and qualifications of proposed project manager(s), (whether they are from the prime or a sub-consultant) with similar interdisciplinary .teams. Include descriptions of similar projects, project outcomes and customer feedback received (if any). Also provide information regarding key staff members (including sub- consultant staff) who are anticipated to perform services. 2.2.4 Resources Maximum Score 15 points G:lpub-wrt<slengIOS-54 Right Water Right UselAdmlnIRFPlflnal\2009-GS-11 RFP OS-54.doc: -10- Demonstrate proposer's resources available to be allocated for the proposed scope of services. Describe any specialties or unique strengths that relate to the services requested in this RFP. Include a brief description of new or innovative equipment or techniques to be used. 2.2.5 Resoonse Time Maximum Score 20. points This criterion relates to how quickly the consultant can respond to City's requests/inquiries. The consultant must demonstrate how time will be managed. 2.2.6 Cost of Services Maximum Score 10. points In an attached sealed envelope, provide a summary of costs including: . Professional, technical, draftsperson, other professional/ sub-professional rate(s); . Direct non-labor costs that might be applicable; r€niena~tTf~;~?r~~:tl;~I~f.~II;diJJJ1~l~;~~i~ ~;Maiimum\'Sc~ore~.\}~$ ~\\Q#~~~\~,*~r.;;Jl~~^~~~{tk:kf;1~1ft1~4J#.tf~rtf~1;.~J;o: t~F:)f.\,jf:;'f';:_'f."X~::-J:?~!ol~1~"t~*~ 2.2.1. Understanding of Requested Services 10. 2.2.2 CONSULTANT Capabilities 20. 2.2.3 CONSULTANT and / or Project Team 25 2.2.4 Resources IS 20. 10 2.2.5 Response Time 2.2.6 Cost of Services .~"'_'V'-""""f''{~'' ",'"'1,.......". ''J2o':l:..'''''''A,l)i': TOiFAlTIr,lIOo.,Pornt " . ~Jd~w.t:~~ t~'t1.~~~ii;U%i"t SECTION 3.0. SCOPE OF SERVICES 3.1 GENERAL REOUIREMENTS 3.1.1 Personnel. Materials & Eauioment: The Consultant shall provide qualified and competent personnel and shall furnish all supplies, equipment, tools and incidentals required to accomplish the work. All materials and supplies shall be of good quality and suitable for the assigned work. 3.1.2 Safety Eauioment: The Consultant shall provide and use all safety equipment including, but not limited to hard hats, safety vests and clothing required by State and Federal regulations and Department policies and procedures. 3.\.3 Professional Resoonsibilities: The Consultant shall perform the work using the standards of care, skill and diligence normally provided by a professional in the performance of such services in respect to similar work and shall comply with all applicable codes and standards. 3.1.4 Proiect Management: The Consultant and the City staff will meet to initiate the Project. The objectives of the meeting will include reviewing the scope, budget, and schedule. The Consultant will be responsible to: I. . Organize and manage Consultant project team and coordinate with City pr~ject manager. G:\pub-wrks\eng\08-54 Right Water Right Use\Admln\RFP\flnal\2009-Ga-11 RFP OB-54.doc . -11- 2. Meet with all Regulatory Agencies impacted (e.g. Oregon Department of Health Services Drinking Water Program to determine expectations and share approach). Develop an acceptable approach for developing the Comprehensive Water System Plan (CWMP), and determine if there are any special concerns or issues DHS believes need to be addressed. 3. Prepare a Statement of Work (SW), that includes scope, schedule and budget; project _ ccontacts.lInd.resPQnsibilities;and update as.needed. TheSW_shaILb.e a coordinated_ document that includes a work breakdown structure (WBS) with an estimate and schedule by work task. 4. Prepare monthly invoices and progress reports including the following: · Work Completed during the Month by work task as a percentage of completion. · Needs for Additional Information, Reviews, or Changes to the SW. . Scope, Schedule, and Budget Issues and Changes. · Project completion status spreadsheet (e.g. standard AlA, EJCDC or approved form). 5. Prepare and submit quarterly and [mal reporting as required to meet any applicable grant reporting requirements. 6. Prepare, assemble, and deliver draft and final documentation as outlined below. 3.1.5 Document Assemblv (Draft and Final): I. For each deliverable, assemble a draft version for City review and a final draft version- for submittal to appropriate agencies and public participation process · Assemble the draft chapters and supporting memoranda into a separate main document and an appendices document. Assemble the two parts into loose-leaf, three-ring binders with dividers, one binder for each study. . Provide data on computer analysis of the distribution system. . Provide the following deliverables to the City: o Three (3) draft bound sets of the document with each set bound in two ihree-ring binders - one with the draft Water Plan and one with Plan appendices. o Five (5) final draft sets of the document for agency review if needed or WRIA 34 Planning Unit if appropriate including plan and appendices. 2. Respond to City and public comments and assemble final plan for City approval. · Prepare an Executive Summary of the plan to be included at the front of the plan document (5 - 10 pages). See required contents in item I of the format requirements below. · Assemble the final chapters and supporting memoranda into the final WCRS &CWMP and appendices document. The document will be assembled into two loose-leaf, three- ring binders with dividers. · Detailed system description information or maps judged to be important to system vulnerability will be summarized in a separate confidential memorandum to be provided only to personnel authorized by the Public Works Director. · Consultant Presentation to City Council for adoption if applicable . Provide the following deliverables to the City: o Copy ready original paper copy of document G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnlRFPlflnal\2009.oS-11 RFP OS-54.doc .12. o Ten (10) bound sets of the document with each set bound in two three-ring binders - one with the Water Plan and one with Plan appendices. o Ten (10) compactdisk PDF file copies of the water plan and appendices. o Three (3) compact disk Word/Excel files copies of the water plan and appendices. 3.2 TASK SPECIFIC REOUIREMENTS: The following pages describe the major tasks and requirements specific to those tasks. G:\pub-wrks\eng\08-54 Right Water Right Use\Admln\RFP\flnal\2009-08-11 RFP 08..s4.doc -13 - 1.0 WATER CONSERVATION AND REUSE STUDY (WCRS) Objective To conduct detailed water conservation and re-use study and prepare a report as spelled out in . the attached DHS grant application that conforms fully to the attached DHSgrant agreement, reporting requirements, and attached prior submittals Consultant Services A. Grant Reporting: Based on the RFP and award of an engineering consultant services contract for the plarming study that includes the tasks listed below, administer all applicable grant requirements, including quarterly progress reporting, financial status reporting, requests for release of funds to the City, and final reporting. B. Existing Master Planning Gap Analysis: Review, analyze, validate and identify gaps in Ashland's existing water master plans and water sources. (Incorporate results into CWMP). The updated Comprehensive Water Master Plan (CWMP) document to follow the CWRS shall include specific items per OAR Ch. 333, Div. 061 Oregon Department of Human Services, Public Health Systems. The CWMP shall evaluate the needs of the water system for a six and twenty year periods. It shall include but is not limited to the following chapters: I. Executive Summary that includes: a. Water quality and service goals b. Present and future water system deficiencies identified c. Recommended alternative for achieving goals and correcting deficiencies d. Recommended schedule and financing program for constructing improvements 2. Existing System Description including: a. Service Area b. Sources of Supply c. Status of Water Rights d. Current Drinking Water Quality and Compliance with Regulatory Standards e. Maps of System Showing Size and Location of Facilities f. Estimates of Water Use g. Operation and Maintenance Requirements 3. Water Quality & Level of Service Goals Description, considering: a. Existing and Future Regulatory Requirements, including: (I) Preparation of an EP A Stage 2 Rule ISDE Evaluation Technical Memo (TM) before December 151 20 I 0 to meet all regulatory requirements for selecting sample sites. (2) Preparation of a Disinfection By-product (DBP) Preliminary Evaluation TM that investigates the cause of and prepares recommendations for possible solutions to address high DBP levels in the distribution system. This evaluation may not be G:lpub-wrkslengIOa-54 Right Water Right UselAdmlnIRFPlflnaI12009-GS-11 RFP OS-54.doc -14- necessary; pending the completed IDSE monitoring results, but should be included in the scope so as to reserve funding in the event that it is necessary. (3) Preparation of a Security Plan, Structural Safety Analysis, and Dam Safety Monitoring Plan for Hosler Dam as required meeting FERC requirements. The most recent Independent Part 12 Inspection Report has spelled out the required reporting in its recommendations. b. Non-Regulatory Water Quality Needs of Water Users. (I) Preparation of a Monitoring and Source Water Protection Management Plan TM for Reeder Reservoir, in particular as it relates to: . -Water Quality to meet current TMDL requirements and treatment objectives -Water Quantity to meet storage and operational objectives c. Flow and Pressure Requirements. (I) Preparation of a TM addressing flow and pressure needs in the Loop Road Zone and preparing an updated budget and scope of services required for the Crowson II Reservoir. d. Capacity Needs Related To Water Use And Fire Flow Needs. (I) Preparation of a TM to address implications of a potential reduction of Reeder Reservoir storage capacity due to structural concerns raised by the most recent Part 12 Consultant. 4. Water Demand: Project growth of water system necessary to meet demand during the 6 year, 20 year, (and 50 year per section B below) periods and impacts on: a. Service area boundaries b. Water supply source( s) and availability . c. Customer water use 5. Water Supply: An engineering.evaluation of existing system's ability to meet the water quality and level of service goals, identification of any existing water system deficiencies, and deficiencies likely to develop within the master plan periods. The evaluations shall include: a. Water Supply Sources and Water Rights Descriptions b. Water Treatment Facilities c. Storage d. Distribution Facilities including Pumping and Pressure Zone Separation Analysis e. Operation and Maintenance Requirements f. Impacts of Present and Probable Future Water Quality Regulations g. Determination of Additional Water Availability 6. Alternatives Analysis including identification of a. The three top alternative engineering solutions that address anticipated deficiencies. b. Environmental impacts of the preferred alternative. c. Associated capital costs, as well as operation and maintenance life cycle costs to ) correct water system deficiencies and achieve system expansion to meet anticipated growth, including identification of available options for cooperative or coordinated water system improvements with other local water suppliers. G:\pub-wrks\eng\08...s4 Right Water Right Use\Admln\RFP\flnal\2009"()8p11 RFP 08-54.doc -15- 7. Financial Alternatives Analysis, including a. Local financing (I) User Fee and Rate Study (2) System Development Charges Update ..1:J. Financial assistance programs ('~One stop") 8. Capital Improvement Program (CIP) Recommendation, including: a. Engineering alternative and associated costs b. Maps showing size and location of proposed facilities c. Financing alternative recommended d. Schedule for design and construction C. Add 50. Year Planning Horizon: Validate the City's future water needs through the year 2058. (Incorporate results in to part ofCWMP Chapter 4). D. Alternative Sources Analysis: Identify and fully describe all other alternative sources of water that will fully meet the City's needs through the year 2058. (Incorporate results in to CWMP Chapter 5, section g) E. Right Water, Right 'Use Analysis: It is anticipated that each water source will have defined uses and as such, identify options that explore different methods to utilize the right water for the different water uses; potable, irrigation sources and uses. (Incorporate results in to CWMP Chapter 3, section d (I)). F. TlD Irrigation Analysis: Iqentify benefits and challenges to using Talent Irrigation District and Bureau of Reclamation water, such as concerns from the Klamath Water basin; Oregon Fish and Wildlife issues, Oregon Water Resources, and others (incorporate results in to CWMP Chapter 5, section g). G. TlD Environmental Analysis: Specifically analyze environmental harm or impacts with the long term use of various irrigation water sources for City irrigation use (incorporate results in to CWMP Chapter 5, section g). H. Climate Change Analysis: Explicitly address the hydrological benefits and challenges and anticipate the effects of climate change with regard to water needs and water use (incorporate results in to CWMP Chapter 5, section g) J. Recycled Water Analysis: Identify benefits and challenges to using recycled water, such as the community's perception and realities, restrictions, support from DEQ and State health, fruit growers, and others. (Incorporate results in to CWMP Chapter 5, section g). K. Secondary Piping System Analysis: Identify options and cost estimates for piping the irrigation canals, piping for reuse/recycled water uses, ponds, treatment, pumping, and any other relevant costs (incorporate results in to CWMP Chapter 5, section g). City Responsibilities G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnIRFPlflnal\2009-GS-11 RFP OS-54.doc -16- I. Schedule projec~ initiation meeting in Ashland 2. Review monthly reports, drafts, and requests for information Deliverables I. Initiation meetings - agendas, notes, and action items 2. Monthly project reports and invoices (project duration) 3. Draft and Final Copies of the Report as required in the DHS grant agreements. G:\pub-wrks\eng\08-54 Right Water Right Use\Admln\RFP\flnal\2009'()8-11 RFP 08-54.doc -17 - 2.0 WATER SYSTEM DESCRIPTION Consultant Services I. Prepare a summary of data and CWMP reference materials needed from the City. 2. Meet with City staff to tour water system facilities and review system condition and operational issues and concerns. 3. Work with appropriate City staff to create a Water System Description. The following water system components will be described: a. Service Area b. Sources & Quality of Supply (including coli form, contaminants, chemicals, & turbidity) c. Status of Water Rights d. Current Drinking Water Quality and Compliance with Regulatory Standards e. Maps of System Showing Size and Location of Facilities -Water Treatment Facilities (process, hydraulic capacity, constituents, &disposal) - Transmission System - Pump Stations (including hydraulic capacity) - Storage Facilities - Distribution System - System Interties f. Estimates of Water Use, including historic consumption, production, & capacity g. Operation and Maintenance Requirements h. Ownership and Management i. Overview - Pressure Zones City Responsibilities I. Provide copies of requested water system data and reference materials in a timely marmer. 2. Host a water system facilities tour for the project team. 3. Provide Data for the Consultant team to create a Water System Description. 4. Review and comment on draft documents provided by Consultant. Assumptions I. The data collection meeting and facilities tour site visit will be coordinated with project initiation meetings described in Task I. 2. The City will provide the available requested water system data and reference materials. 3. The City will review the draft CWMP System Description chapter and work with the Consultant team to provide necessary information for revising the draft chapter. G:lpub-wrksleng\OS-54 Right Water Right UselAdmlnlRFPlflnal\2009.oS-11 RFP OS-54.doc -18 - 4. Detailed system description information and maps judged to be important to system vulnerability will be summarized in a separate confidential memorandum to be provided only to personnel authorized by the Public Works Director. Deliverables I. Data and reference materials request summary. 2. Word document electronic file of draft Plan Chapter 2 containing a description of the existing water system which includes the service area, source(s) of supply, status of water rights, current status of drinking water quality and compliance with regulatory standards, maps or schematics of the water system showing size and location of facilities, estimates of water use, and operation and maintenance requirements 3. Word document electronic file of the final draft Chapter 2 incorporating comments 4. Limited release Technical memorandum of vulnerable system details G:lpub-wrkslengIOB-54 Right Water Right UselAdmlnIRFPlflnaI\2009"'8-11 RFP OB-54.doc -19- 3.0 . WATER QUALITY & LEVEL OF SERVICE GOALS- Objective Work with City staff to develop a plan for existing and continued compliance with State and Federal Safe Drinking Water Act requirements. Consultant Services 3A. Rel!:ulatorv Requirements and Compliance Prol!:ram I. Describe Safe Drinking Water Act and Oregon DHS drinking water regulations applicable to the City for: . Existing Regulations . Proposed Regulations . Anticipated Regulations 2. Review the City's water quality compliance data from .1999-2007 3. Create a regulatory compliance monitoring plan for the City 4. Document compliance status. 5. Prepare recommendations regarding existing monitoring plans and/or treatment practices based on existing or proposed Safe Drinking Water Act regulations 6. Prepare Comprehensive Regulatory Compliance Plan 7. Review and document the City's procedures for handling customer inquiries 8. Document use of certified laboratories 9. Preparation of an EP A Stage 2 Rule ISDE Evaluation Technical Memo (TM) to before December 1st 20 I 0 to meet all regulatory requirements for selecting sample sites. 10. Preparation of a Disinfection By-product (DBP) Preliminary Evaluation TM that investigates the cause of and prepares recommendations for possible solutions to address high DBP levels in the distribution system. This evaluation may not be necessary; pending the completed lDSE monitoring results, but should be included in the scope so as to reserve funding in the event that it is necessary. 38. Nim-Rel!:ulatorv Needs of Users: Public Involvement Process 1. Technical Review Committee a. The City will establish a Technical Review Committee (TRC) consisting of City management staff and members of the public to provide review and consensus concerning study recommendations and improvement options. b. The Consultant shall schedule milestones throughout the project and submit technical reports to the TRC at these milestones. c. The Consultant shall set the TRC meeting schedule and notify all members. 2. Public Involvement a. Conduct two (2) open house format hearings during the master planning process to provide an opportunity for the public to comment on the master plarming. G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnlRFPlflnal\2009.oS-11 RFP OS-54.doc .20 - ." Consultants may be asked to conduct additional open house meetings to share the designs and cost estimates with the public and answer questions. b. Inform the City Council of master planning status. ". Submit a monthly status report to the Public Works Director for Council reView. " Present a summary and the status of the master planning effort to Council three (3) times during the duration of the project. c. Prepare three separate mailings, to be mailed by the City, which will inform citizens of master planning efforts. d. Assist the City in drafting three (3) news releases informing citizens of the progress of the master planning efforts. 3. Preparation of a Monitoring and Source Water Protection Management Plan Technical Memo for Reeder Reservoir in particular it relates Algae and water quality to meet current TMDL requirements and identify future requirements. 3C Flow & Pressure Requirements: Program 1. Preparation of a Technical Memo addressing storage, pumping, flow and pressure needs in the Crowson and Loop Road Pressure Zones that includes a detailed budget and scope of services required to address the current deficiencies. 3D. Capacity Needs Related to Water Use: Conservation Program I. Recent Program: Document the City's recent water conservation efforts, including estimated savings if feasible. This will be achieved using information from the City and discussions with City staff. 2. Goal: Assist the City in developing an appropriate quantitative conservation goal. The goal will be developed related to the primary driver of the City's conservation program. Typical conservation drivers include: I) meeting voluntary water production targets, 2) obtaining additional water supply, 3) deferring capital improvements, 4) decreasing operating costs, or 5) demonstrating responsible use of water resources. 3. Program Next 6 Yrs: Recommend direction of the City's conservation program for the next six years, ensuring that the number of conservation measures involved is reasonable and practical and consistent with past activities as well as the Conservation Plan that is currently being developed. The Consultant should be aware that the City is currently implementing six or more measures (source meters, service meters, conservation pricing, bills showing . consumption history, education, and landscape management practices on City properties). The City staff will identify the measures for the Consultant to include in the program. Evaluation of the impacts of conservation to the water demand forecast will be addressed. 4. Preparation of a TM to address implications of a potential reduction of Reeder Reservoir storage capacity due to structural concerns raised by the most recent Part 12 Consultant. City Responsihilities I. Provide existing water quality regulatory compliance data from 1999-2007 for review and summary . 2. Assist with development of comprehensive regulatory compliance plan elements G:\pub-wr1ts\eng\Oa-54 Right Water Right Use\Admln\RFP\flnal\2009-Ga-11 RFP OB-54.doc -21 - . 3. Review drafts and provide comments Assumptions I. No monitoring plans are currently in place. 2. One meeting and one conference call will be held with City staff to develop the draft and finill goal setting approach and actual goal(s); 3. The draft and final goals shall be consistent with the City's Water Comprehensive Plan and DHS requirements. 4. The Public Participation Process is very difficult and subject to uncertainty regarding the number of Public Meetings, conference calls and follow-up required. It is therefore proposed to hold five public meetings and 12 technical group meetings. Deliverables I. Word document electronic files of the draft Chapter 3 containing a description of water quality and level of service goals for the water system, considering, as appropriate, existing and future regulatory requirements, non-regulatory water quality needs of water users, flow and pressure requirements, and capacity needs related to water use and fire flow needs. 2. Final draft word electronic file of Chapter 3 with review comments incorporated. 3. Word document electronic files preliminary and final as technical report 4. A Conservation Curtailment Program as required for conservation plans in OAR Ch. 333, Div.061 , G:lpub-wrkslengIOa-54 Right Water Right UselAdmlnIRFPlflnal\2009-DS-11 RFP OS-54.doc .22. ..1.- . 4.0 WATER DEMAND EVALUATION Consultant Services I. Create up to four maps for this task showing the following: . Current City Limits . Current Area of urban growth boundary; . The City's service area for the current, 6 year, 20 year and 50 year time frames; . Projected City growth areas for the 6, 20, and 50 year periods per the Comprehensive Land Use Plan; . . Current and projected zoning or land use within the City service area. 2. Demographic Projections: Develop demographic projections for the City's service area for three time periods: 6-year, 20-year, and 50-year. These projections will evaluate and include the impacts of climate change and will be based on demographic data from the City Community Development Department, the County Plarming Department, the City Public Works Department, and/or the U.S. Census, depending on data availability. Coordination with City's Community Development Department will be important. The ideal demographic data are projections of single family households, multifamily households, and employment through the 50-year time period. If such data is not available, alternative methods of developing demographic projections include: I) using population data rather than households, 2) using utility connections data rather than households, 3) analyzing historical data to determine historical growth rates and extrapolate growth rates forward as appropriate given input from City staff, and 4) analyzing buildable lands inventory, zoning, and timing of development. A range of demographic projections (such as low, medium and high) can be provided, if desired by City. . 3. Analysis: The demographic projections will be matched to the City's existing and projected service area using appropriate analysis with input from the City's Comprehensive Land Use Plan. Please note that GIS data may not be available. 'The demographic projections should be divided into sub-areas such as pressures zones, and current versus new service areas, as data allows and as desired by the City. 4. Supply Characteristics: Summarize ten years (or a lesser amount if ten years is not available) of historical supply characteristics such as the number of connections by customer category, production, sales, water balance showing non-revenue water and leaks, peaking factor, and water use factors. (Note: the current Utility Billing System can produce information on water use by customer class. This information can be determined via an extraction of the data from the Utility Billing System and manual development of the customer related details via spread sheet.) This information will be presented on an armual or monthly basis as appropriate. Water use factors, including EDUs, will then be calculated based on this data. Information will be analyzed and presented separately for potable and reclaimed water. 5. Technical Memo: Prepare a Technical Memorandum for City review with summary tables and graphs of the demographic projections and historical supply characteristics. Edits and adjustments of this information shall occur before the data is used to develop the demand forecasts. . G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnIRFPlflnal\2009-DS-11 RFP OS-54.dcx: -23. .. , 6. Demand Forecasts: Generate demand forecasts using the demographic projections and water use factors for the 6-year, 20-year, and 50-year time periods. The forecasts will be presented by billing category (e.g., single family, multifamily, commercial) and additionally will be divided into the same sub-areas as the demographic projections. Information will be presented separately for potable and reclaimed water. For reclaimed water, the Consultant will work with City staff to identify large potable users and determine the feasibility of converting them to reclaimed water based on their location and purpose of water use. The demand forecasts will include adjustments to reflect the conservation program from Task 6. 7. Chapter 4: Prepare the associated chapter for inclusion in the CWMP. 8. Reuse: Describe Ashland's potential for Wastewater Reuse and water rights for Wastewater Treatment Plant effluent and their potential impacts on potable water supply with respect to use of treated effluent in lieu of source water. 9. TID: Describe Ashland's potential for use of Talent Irrigation District Water and the availability of associated nD water rights for the potential impacts on potable water supply with respect to use of nD water in lieu of source water. 10. TAP: Describe Ashland's potential for use of Talent, Ashland, and Phoenix (TAP) and associated water rights as a drinking water supply. Summarize consistency with the City's land use plan, and note any differences (e.g. the 50 year scenario will likely go beyond the existing information in the comprehensive land use plan and portions of the service area will be outside the projected City Limits and current Area of City Impact). City Responsibilities I. Provide the following source data, per the data and reference materials request associated with Task 2: map data layers, City intertie agreements; Related plans, City base map/parcel map in ACAD electronic file format, aerial map, utility map, land use maps (current and future), and water rights. 2. Review the draft CWMP chapter, including summarized demographic projections, historical supply characteristics, maps, and provide written comments. Assumptions I. Limited source data will be available beyond the 20 year planning horizon. Consultant shall collaborate with the Community Development Department and the Engineering Division to determine the 50 year planning horizon data utilizing the Comprehensive Land Use Plan as the baseline for growth projections; 2. These task activities will be completed in conjunction with Task 5. Deliverables I. Word document electronic file of draft Plan Chapter 4: containing an estimate of the projected growth of the water system during the master plan period and the impacts on the service area boundaries, water supply source(s) and availability, and customer water use. 2. Word document electronic file of the final draft Chapter 3. G:lpub-wrkslengIOS.54 Right Water Right UselAdmlnlRFPlflnal\2009-OS.11 RFP OS-54.doc -24- . 5.0 WATER SUPPLY SYSTEM EVALUATION Objective Perform a water rights and alternate supply options analysis including inventory, comparison with future needs, assessment of interties, and assessment of alternate water supply options to meet IDWR, DEQ and City planning requirements. . Sa. Water Sources & Water Rights Consultant Services I. Perform a water right inventory and analysis to identify and summarize the status of the City's existing water rights with input from a review of City records and Oregon Department of Water Resources files pertaining to the basic documents of each water right file (permit, certificate, etc.). The depth of this analysis will be sufficient to make a recommendation to the City regarding the sufficiency of existing water rights for current and future demands for each plarming horizon. 2. Prepare future supply water rights analysis to determine the adequacy of the City's existing ground water rights to meet the 6, 20 and 50 year demand forecast developed under Task 5. Service area considerations related to purpose and place of use and service limitations (if any) will be evaluated. The depth of this analysis will be sufficient to define the City's ability to serve the existing and future service area. Identify any additional water rights needed. 3. Document the status of the existing VI interties and agreements and their potential impact on the ability of the City to provide service to current and future service areas with existing and proposed water rights. 4. Describe surface source and aquifer storage and recovery potential for future source of supply options to meet projected demand and improve system reliability. This summary will include description of the potential facility elements and design criteria, permitting considerations, estimated cost, and other relevant information. Consultant will also describe common implementation issues associated with surface water and ASR projects for City consideration. 5. Describe reuse potential for future source of supply options to meet projected demand and improve system reliability. This summary will include description of the potential water reclamation demands (currently plarmed and future planned irrigation sites), facility elements and design criteria, permitting considerations, estimated cost, and other relevant information. Consultant will also describe common implementation issues associated with reuse projects for City consideration. 6. Develop preliminary common cost/yield comparison among the following potential future water supply options: Surface Water Supply and associated water treatment; Aquifer Storage and Recovery; reuse; conservation savings; and new groundwater supply wells. This effort will rely on the work completed and conservation information available in the City Water Conservation Plan, and information developed as part of the CWMP. City Responsibilities I. Provide available information regarding existing water rights. G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnlRFPlflnall2009.oS-11 RFP OS-54.doc: -25- 2. Review and comment on CWMP Draft Chapter 6 and Technical Memorandum on potential cost/yield supply options. Assumptions I. The City will provide available water rights information. 2. The preliminary cost/yield comparison will rely on existing available capital and O&M cost information for the three different supply options, updating existing cost information to 2009 costs. If O&M costs are not available, a qualitative assessment with ranges associated with high, medium or low costs will be applied to provide for comparison among the alternatives. Deliverables I. Word document electronic file of draft and fmal Technical Memorandum titled- Water Rights and Supply Options; and fmal cost/yield supply options. This memorandum will be formatted to be directly compiled into the CWMP as an appendix. 5b. Water Treatment Consultant Services · Evaluate the existing Water Treatment Facilities to determine ability to treat water produced to meet the supply requirements for projected demands in all planning horizons. , · Identify potential solutions to any deficiencies in the Water Treatment Facilities including lack of capacity, location limitations, and distance from proposed supply sources. · Develop listing of recommended Treatment Facilities improvements for the Capital Improvements Plan update. · Capital Improvements Plan update shall identify locations and types of Treatment Facility additions and upgrades needed for improved use of existing sources and those necessary to serve new sources. · Prepare a Technical Memorandum that evaluates the effectiveness and reliability ofWTP improvements and operations, including the following process improvements issues: (a) Magnetic Meter flow pacing SCADA incompatibilities (b) Hypo-chlorite pump SCADA control inadequacies (c). Soda Ash feed system control issues and remaining work (d) Flocculation Design: how much flocculation is optimal and how much baffling is appropriate (e) Chlorine Diffusion in the clear well to reduce nuisance alarms and reduce secondary DBP (t) Backwash sump pump electrical power supply isolation from the SCADA system, as well as other appropriate transient protection necessary to reduce adverse impacts of lightning and power surges G:lpub-wrkslengI08-54 Right Water Right UselAdmlnlRFPlflnal\2009.oS-11 RFP OS-54.doc -26- Deliverables I. Word document electronic file of draft and fmal Technical Memorandum titled- Water Treatment Plant Operational and Capital Improvement Options. This memorandum will be directly compiled into the CWMP as an appendix. 5C. Water Distribution Consultant Services: 5C.l Hvdraulic ComDuter Model DeveloDment Assist the City in the development of a PC based computer model that can be used for planning, fire flow analysis, sizing offacilities, and extended period simulations. The model will consist of a single input file that includes all the City's pressure zones. This task includes the following: . . Review the status of the existing hydraulic model . Provide recommendation on purchase of new hydraulic modeling software , . Purchase new hydraulic modeling software . Create and calibrate a new hydraulic model utilizing City purchased software, existing hydraulic model data, base maps, and field data. Hydrant tests will be used"to collect pressure data to assist in the calibration process. . Include distributed system demand and all important facilities (tanks, pumps, sources, interties, and pipelines) to reflect actual system operation including pressure zones. . Provide assistance, as needed, for the selection of sites for calibration fire flow tests. . Refine the operation of the model so that it will work in steady~state and extended period modes. . Provide training, as needed, in the operation of the modeling software. . Utilize model to determine necessary system modifications/additions to meet projected growth and system demand. . Findings shall be the basis of recommended Capital Improvement Program update. 5C.2 Model Calibration Data Collection . Select sites for fire flow tests and recording meters . Utilizing City provided field data calibrate in accordance with Calibration Guidelines for Water Distribution System Modeling prepared by the Engineering Computer Applications Committee of the AWWA. . Perform Steady state calibration to Planning Level accuracy. Modeling Scenarios . . The following base simulations will be run in the same order as listed: Description I Facilities I Mode Demand Purpose G:\pub-wrks\eng\08-54 Right Water Right Use\Admln\RFP\final\2009.QS-11 RFP OB-54.doc .27 - DescriDtion Facilities Mode Demand Purpose Existing Peak Existing Extended 2008 Peak Day Evaluate existing peak Hour Period with Diurnal hour conditions and Curve identify deficiencies Existing Fire Existing Steady State 2008 Peak Day Evaluate existing fire Flow plus fire flow flow conditions and identify deficiencies 2010 ClP Peak 2009 ClP Extended 2010 Peak Day Develop CIP for Hour Period with Diurnal existing peak hour Curve conditions 2010 CIP Fire .2009 CIP Steady State 2010 Peak Day Develop CIP for Flow plus fire flow existing fire flow conditions 2030 Peak Hour 2009 CIP Extended 2030 Peak Day Evaluate 2030 peak Period with Diurnal hour conditions w/2009 Curve CIP improvements and identify deficiencies 2030 Fire Flow 2009 CIP Steady State 2030 Peak Day Evaluate 2030 fire flow plus fire flow conditions w/2009 CIP improvements and identify deficiencies 2030 CIP Peak 2030 CIP Extended 2030 Peak Day Determine CIP for 2030 Hour Period with Diurnal peak hour conditions Curve 2030 ClP Fire 2030 ClP Steady State 2030 Peak Day Determine CIP for 2030. Flow olus fire flow fire flow conditions 2015 CIP Peak 2015 ClP Extended 2015 Peak Day Identify portions of Hour Period with Diurnal 2030 CIP needed to Curve meet 2015 peak hour conditions 2015 CIP Fire 20.15 CIP Steady State 2015 Peak Day Identify portions of Flow plus fire flow 2030 ClP needed to meet 2015 fire flow conditions ,. · Develop Table of Capital Improvements for inclusion in final ClP listing. Scheduling of ClP items will take into account the City's street overlay and improvement program as well as other scheduled capital projects. · Develop drawing that shows the locations of the ClP items included in the fmallist. 5C.3 Svstem Phvsical CaDacitv Analvsis Consultant Services Source Capacity Analysis · Evaluate the existing source (wells, booster pumps, etc.) capacity and compare it to the projected demands for all planning horizons. G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnlRFPlflnal\2009-oS-11 RFP OS-54.doc .28. . Provide analysis for each pressure zone in the distribution system . Identify potential solutions to any deficiencies in source . Develop listing of recommended source improvements for the Capital Improvements Plan update . Capital Improvements Plan update shall identify locations and types of piping additions and upgrades needed for improved use of existing sources and those necessary to serve new sources. 5C.4 Enerl!V Consumption Assessment Consultant Services . Gather and summarize data on existing water system equipment and facilities energy consumption and efficiency. . . Assess existing facilities energy consumption and identify equipment or facilities with potential for energy savings through operational modifications, upgrades, or replacement. 5D. Storal!e Capacity Analvsis Consultant Services . Evaluate the existing storage capacity and compare it to the required storage based on projected demands using the following criteria or those criteria that may be required by DEQ: o Operational Storage' o Equalizing Storage o Fire Flow Storage o Standby Storage (use greater of Fire Flow or Standby, if approved by local fire authority) o Dead Storage . Assess by City quadrant the storage capacity and ability to provide fire flow volumes and rates within each quadrant. Identify where additional storage is required to meet current and projected demands. . Assess operational parameters of Southeast reservoir under high flow demand periods and emergency operations. . Provide analysis for each pressure zone in the distribution system . Identify potential solutions to any deficiencies in storage ) . Develop listing of recommended storage improvement for the Capital Improvements Plan update . Utilize hydraulic model to assess current storage operations, determine location and size of additional piping needed to improve operations, and determine piping necessary to service new storage facilities. Conveyance System Capacity Analysis G:\pub-wrks\eng\08..s4 Right Water Right Use\Admln\RFP\flnal\2009.QS.11 RFP 08.54.doc . -29- · Examine existing conveyance system to determine capacity to deliver water under normal and fire flow scenarios. Identity system deficiencies and improvements necessary to resolve them. Specifically assess ability of system to deliver flow from production and treatment facilities to storage facilities and high flow demand areas. Evaluate methods to fully utilize existing storage capacity. Identity pressure ranges for peak and normal flow conditions. · Reviewability of storage and conveyance systems to meet demands during high flow periods with largest reservoir off line. City Responsibilities · Work with local fire authority to explore possibility and advisability of nesting of fire flow and standby storage Assumptions · Software acquisition shall be made by City during Comprehensive Water System Plan development with recommendations from consultant on available options. Model shall utilize purchased software. · Model contains all necessary pipes, pumps, reservoirs, interties, and sources. · Water quality calibration is included in this scope of work · Detailed system description information or maps judged to be important to system vulnerability will be summarized in a separate confidential memorandum to be provided only to personnel authorized by the Public Works Director. Deliverables The following products will be created during this task. Some will be produced by Consultant and others will be produced by the City. Consultant Deliverables · Word document electronic file of draft and fmal Technical Memorandum titled- Water Distribution Hydraulic Modeling to provide Operational and Capital Improvement Options. This memorandum will be directly compiled into the CWMP as an appendix. . Source adequacy analysis by pressure zone with recommendations for Capital Improvements, as needed. · Conveyance system adequacy analysis by pressure zone with recommendations for Capital Improvements Plan, as needed · Storage adequacy analysis by pressure zone with recommendations for Capital Improvements, as needed. · .Capital improvement table that contains all improvements recommended for the 20-year planning horizon. · Model outputs for use in developing capital improvement program (tables and maps). · Summary of Power Consumption Assessment process, findings, and recommendations. · Limited release Technical memorandum of vulnerable system details. G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnIRFPlflnal\2009-DS-11 RFP OS-54.doc -30. City Oeliverables . Existing hydraulic computer modeling software capable of simulating the Water distribution systems in both steady state and extended period modes. . Data regarding equipment and facilities energy consumption and operations. 50. Operations and Maintenance Consultant Services I. Meet with City staff to review information and create the following sections. . Organization Structure and Responsibility . Operator Certification . System Operation, Maintenance and Control . Emergency Response Operations . Safety . Cross Connection Control . Supplies and Equipment . Record Keeping and Reporting . O&M Improvements 2. Identify any recommended changes to current operations and maintenance program that will require funding through the CIP and evaluate and determine adequate staffing needs. 3. Identify and recommended changes to current Operations and Maintenance program and subsequent staffing needs that shall be necessary to provide adequate resources to address the expanded infrastructure outlined in the recommended Capital Plan City Responsibilities I. Review available records and provide to the Consultant as requested. 2. Teleconference with Consultant to review available records. 3. Review and comment on draft Chapter 9. Assumptions .1. Detailed system description information and maintenance information judged to be important to system vulnerability will be summarized in a separate confidential memorandum to be provided only to personnel authorized by the Public Works Director. Oeliverables I. Word document electronic file of draft and fmal Technical Memorandum titled- Water Supply System' Operational and MaintenanceImprovement Options. ThIs memorandum will be directly compiled into the CWMP as an appendix. 2. Word document electronic files of the draft Chapter 5 containing an engineering evaluation of the ability of the existing water system facilities to meet the water quality and level of service goals, identification of any existing water system deficiencies, and deficiencies G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnIRFPlflnal\2009-llS-11 RFP OS-54.doc - 31 . likely to develop within the master planning period. The evaluation shall include the water supply source, water treatment, storage, distribution facilities, and operation and maintenance requirements. The evaluation shall also include a description of the water rights with a determination of additional water availability, and the impacts of present and probable future drinking water quality regulations. 3. Final Draft Word electronic file of the Chapter 5 with review comments incorporated. G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnlRFPlflnal12009-oS-11 RFP OS-54.doc -32- 6.0 ENGINEERING ALTERNATIVES ANALYSIS Consultant Services I. Develop water supply alternatives which address the plarming goals of the City. I. Include additional water rights that may need to be purchased. Consider water rights for both surface and well supply. Describe the types and amount of these additional water rights. 11. Develop a contingency plan identifying potential emergency water supply options for severe watershortages. 111. Assess potential for developing groundwater resources. 2, Evaluate each alternative based on the following: I. Feasibility of each source considering preliminary cost estimates and integration with existing transmission and storage facilities. 11. Reliability of source for both winter and summer uses. Consider the impact of the university, the school district, the City, and other large water users and factor the impacts of increase and decrease in use. iii. Availability of water rights. IV. Raw water quality and treatability of the potential sources. Sample collection and testing will be required for each potential source. Jar testing shall be done where necessary or required by the City. v. Compliance of each source with drinking water standards. VI. Supply vulnerability and security 3. Identify three options with the greatest promise to which additional evaluations will be done. 4. Evaluate these three water supply alternatives in greater detail, including present worth of operation and maintenance expenses, updated capital costs, and impact to the annual City budget and user rates. Evaluations shall include identification of specific sites, raw water transmission requirements, and scaled conceptual layouts in displaying the location of major unit processes and structures. 5. Review any environmental impacts of water supply alternatives and identity potential concerns. 6. . Receive input on the yarious water supply improvement alternatives from the staff and the Technical Review Committee. . City Responsibilities I. Work with Consultant team to evaluate alternatives and select project prioritization criteria. 2. Provide recent City water project bid tabulations to be used in developing the cost estimating tool. G:\pub-wrks\eng\OB...s4 Right Water Right Use\Admln\RFP\flnal\2009.Q8-11 RFP OB-54.doc .33 - 3. Review and comment on draft. Assumptions I. City will provide available similar project cost information to help set up cost models. Deliverables I. Draft and final Microsoft Excel spreadsheets, project cost estimating tool, and GIS maps. 2. List of O&M improvements to be included in the CIP and addressed in Operational budgets. 3. Draft and final Chapter 6 titled "Engineering Alternatives Analysis" that contains an identification of alternative engineering solutions, environmental impacts, and associated capital and operation and maintenance costs, to correct water system deficiencies and achieve system expansion to meet anticipated growth, including identification of available options for cooperative or coordinated water system improvements with other local water suppliers. 4. Draft and final maps of the City distribution system showing locations of projects identified in the CIP table with attached project number for ease in cross-referencing. G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnlRFPlflnal\2009-oS-11 RFP OS-54.doc -34- . 7.0 FINANCIAL ALTERNATIVES ANALYSIS . Consultant Services The financial program will be included in the Comprehensive Plan document as follows: I. Past and Present Financial Condition - summarize water utility financial performance for the past six years and document outstanding long-term debt and bonding capacity. 2. Available Revenue Sources - Document available sources of revenue and funding for capital and operational costs and describe historical approaches and/or policies that establish the City's funding methods. 3. Capital Financing Alternatives and Approaches - Identify capital fmancing. Identify and document Capital Funding Assistance Programs - Available State and Federal grant and loan programs. 4. Life Cycle Costing - Develop perpetu~llife replacement program for the distribution system, recommended service life for water lines, pumps, and other components. I. The program shall include an average, annual revenue requirement needed to fully fund a replacement program. 11. The replacement program shall consider an assessment of backlogged needs, recommend a specific program to address the backlog, and shall recommend criteria for use in ranking projects. 111. Develop a recommended on going maintenance program, detailing types of maintenance needed to protect investinent and frequency of maintenance activities. IV. Develop a detailed phasing plan for recommended improvements. Include new water systems in the undeveloped areas within the UGB. Show facilities as closely as possible to final design locations to permit.them to be constructed with development projects: 11. Prepare system wide maps showing locations and phasing of these improvements. Improvement locations shall be provided to assist staff in . ensuring the improvements will be provided with land development. 5. SDC Implementation- A. Provide detailed cost estimates for all recommended water system improvements. i. Calculate future operation and maintenance costs. ii. Define, in detail, the portion of individual project Costs attributable to existing customers and the portion attributable to growth. Provide documentation for the basis and methodology used to allocate costs. 111. Review. the City's existing system development charges (SDC) and recommend any improvements to the methodology used to allocate costs. Include a list of the recommended improvements that are eligible for SDC funds and the amount each is eligible for. B. Thoroughly review all possible funding sources for the preferred water system improvements and develop a funding mechanism for the proposed improvements. i. Review all funds available and the status of capital improvements, operation, and maintenance funds for the water system. G:\pub-wrks\eng\08-54 Right Water Right Use\Admln\RF~\flnal\2009-08-11 RFP OB-54.doc .35 - 11. Identify different funding sources including State, Federal, and private sources. 6. Rate Structure and Conservation - Complete a rate analysis in order to estimate future water rates. Utilize projected annual operation and maintenance costs and any needed capitol improvement bonding to project. Potential rate impacts for the needed improvements. IdentifYwater conservation opportunities that might be addressed through rate structure revisions. Summarize City's approach to utility rate studies, status of rates recommended in 2005 rate study, and anticipated scope of201O rate study. 7. Recommended Financial Strategy - Recommend a financial strategy addressing funding sources, basic financial policies, rates and charges. City Responsibilities I. Provide financial, budgeting, rate and customer reports. 2. Review and comment on draft Chapter 7. Assumptions I. The tasks above assume that Consultant will participate in two meetings as part of this effort. 2. The Consultant will create a financial plan for the City. Deliverables I. Word document and Excel spreadsheet electronic files of the draft chapter 7 containing a description of alternatives to finance water system improvements that includes local financing (such as user rates and system development charges), long term financial alternatives, and fmancing assistance programs. It also contains a detailed analysis of the financial operational performance of the water fund including detailed financial recommendations to enable the City to implement the preferred engineering solution recommendations chosen in the previous chapter. 2. Final Draft Word electronic file of the chapter 7 with review comments incorporated. 3. Word document electronic file of draft and final Technical Memorandum titled-Fees and Rates Study for the Water Supply System. This memorandum will be directly compiled into the CWMP as an appendix. 4. Word document electronic file of draft and final Technical Memorandum titled- SDC Update for the Water Supply System. This ineI\lorandum will be directly compiled into the CWMP as an appendix. G:lpub-wrkslengI08-54 Right Water Right UselAdmlnIRFPlflnal\2009-DS-11 RFP OS-54.doc -36- 8.0 CAPITAL IMPROVEMENT PROGRAM (CIP) Consultant Services I. Work with the City during a workshop to discuss and develop project evaluation, screening and prioritization criteria to be used in the selection of and prioritization of projects. The contents of the CIP table and project sheets will also be reviewed and refmed at this workshop. 2. Describe the CIP prioritization process, project justification and description. 3. Work with City staff to organize and summarize system pipe age and line break information to help evaluate remaining pipe life throughout the system. Data may be in the form of OASB 34 inventory database. 4. As other project information is made available by the City, water CIP projects will be scheduled to coordinate with other City sewer and street improvement projects in the same areas to minimize overall infrastructure improvement costs. 5. Provide justification for proposed capital and non-capital improvement projects. 6. Prepare a standard cost estimating methodology that will be used to compare and evaluate project alternatives. Costs will be updated to account for changes in schedule. 7. Apply a standardized cost apportionment methodology to each recommended CIP project which describes the estimated cost of the project in a cost per water service connection. These values will be used for comparison of alternatives ~d prioritization of projects within the confmes cifthe Plan. . 8. Prepare a CIP spreadsheet or database system that can be used to describe and sort proJects by date, schedule, priority, or type. Each project in the spreadsheet will be linked to a project sheet that describes the project and project justification. 9. Outline and summarize the schedule of capital improvement projects in a summary table by year for the first 5 years, in 5 year increments for the next 15 years, and projects beyond the 20 year time frame. Develop a system exhibit that identifies projects and timeframe for implementation. 10. Describe long-term strategies for the 50-year system vision. It is expected that details of these strategies will be refined in subsequent CWMP updates. City Responsibilities 1. Work with Consultant team to evaluate alternatives and select CIP projects. 2. Help to select project prioritization criteria. 3. Provide recent City water project bid tabulations to be used in developing the cost estimating tool. 4. Review and comment on draft CIP. Assumptions I. City will provide available similar project cost information to help set up cost models. G:\pub...wrks\eng\08-54 Right Water Right Use\Admln\RFP\flnal\2009.Qa.11 RFP OB-54.doc -37. Deliverables I. Draft and final Microsoft Excel spreadsheets, project cost estimating tool, and GIS maps. 2. List of O&M improvements to be included in the CIP and addressed in Operational budgets. 3. Draft and final Chapter 8 titled "Capital Improvement Program'.' that contains a recommended water system improvement program including the recommended engineering alternative and associated costs, maps or schematics showing size and location of proposed facilities, the recommended financing alternative, and a recommended schedule for water system design and construction. 4. Draft and Final Maps of City distribution system showing locations of projects identified in the CIP table with attached project number for ease in cross-referencing. G:lpub-wrkslengIOS-54 Right Water Right UselAdmlnIRFPlflnaIl2009-GS-11 RFP OS-54.doc -38- 9.0 ENVIRONMENTAL ASSESSMENT (Note: This task is optional and inclusion in study scope will be determined during development ofthe Comprehensive Water Master Plan) . 9.1 Consultant Services I. Performance of an Environmental Assessment or Environmental Impact Statement as needed to meet State of Oregon and Oregon DEQ regulations for the identification, evaluation, and assessment of potential environment impacts associated with the Comprehensive Water System Master Plan. 2. EAlEIS shall meet the requirements set forth in the State Revolving Fund guidelines to allow anticipated Capital Improvement Projects to be eligible for SRF programs. 3. Public participation and review process in accordance with public outreach puidelines. 4. Inclusion of the EAlEIS findings in the Comprehensive Water System Plan document City Responsibilities I. Provide floodplain and sensitive areas data as available. 2. Review and comment on draft Chapter 9. Assumptions I. Consultant will participate in public outreach meetings. Deliverables I. Word document electronic files of the draft Chapter 9; 2. Word document electronic files offmal ENEIS Documents and Chapter 9. End of Task Specific Requirements G:lpub-wrkslengIOS.54 Right Water Right UselAdmlnlRFPlflnal\2009.oS-11 RFP OS-54.doc -39 - C c;:a""".'#t Engineers... Working Wonders With Waterm ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ~ ) ::) ) J ) ) ) ) ) J ~ ) ) ) ) September 29, 2009 Pieter Smeenk City of Ashland Engineering Omce 20 East Main Street Ashland, OR 97520 Re: Water Conservation and Reuse Study and Comprehensive Water Master Plan Dear Mr. Smeenk, The City of Ashland faces numerous challenges, from long-term water supply reliability to maintaining existing assets. Though much work has been completed previously, the City wishes to integrate the previous work into comprehensive WCRS and CWMP documents. and an integrated llnancial plan. The Carollo team is the best choice for this important project because of our: . Understanding of the Ashland Community. The City's plan for a reliable long-term water supply must be technically sound, llnancial feasible, and - most imponantly - congruent with the values of the Ashland community. Carollo has partnered with the City through numerous critical public decisions, from the previous water supply decision to planning and construction of the wastewater treatmem plant (WWTP). The Carollo team, including myself, has developed a professional and personal relationship with the. City, providing an unparalleled understanding of the City's politics and values. Commitment to Service. As we have demonstrated in our previous work, we are dedicated to providing the highest level of service to the City. This commitment was demonstrated by the support we provided ro the aty in recently reinstating use of the TID raw water supply. Through this period we were in daily contact with City staff, coordinating sampling and analysis, successfully negotiating with DHS staff, and bringing our best technical resources to the table. We will bring this same level of commitment and expenise to the WCRS and CWMP. Minimbation of Staff Impacts. No other team can match our team's knowledge of the City's water supply capabilities and limitations, water distribution system, finance structure, and wastewater treatment and regulatory issues. Our ability to work successfully with City staff has been demonstrated on the nine major projects we have completed for tbe City over the past 12 years. We realize staff resources are limited and our existing knowledge will greatly decrease the number of City staff hours needed for a successful project. f . . . We trust our proposal demonstrates the understanding, experience, and qualificarions needed to successfully complete this project. Please don't hesitate to contact Jack Henderson or myself with questions regarding our team, experience, and scope of services. Project Title: Water ConseNation & Reuse Study afld Comprehensive Water Master Plan Proposel: Carollo Engineers. P.C. Legel St.tus: Professional Corporation Fedel8l TIX 10: 86-0899222 Meiling AddreSB: 4380 SW Macadam Avenue. Suite350. Portland OR 97239 503-227-1885 503-227-1147 beimstad@carollo.com jhenderson@carollo.com Phone: FilII: Emllil: I S;;de;',1ed wo;;;wpply;"~1on "7me;o';;n FlgUM -;1 I I I ,. ',r.! I>, "~'j .'\ \:. .../ a'.". . ...t.:, :. ;'JV . UNDERSTANDING AND SCOPE OF WORK "1' ,.",'~:' . :.~-'" '.' ,\ '"The City is faced with numeraus water system i'l; \::, ' . '. n~eds including develapment af a lang.term water ','.(.,": '''s4pply; maintenance and angaing replacement af ::\!. '/,::..i<,i$tirig infrastructure; new srarage and potential ~ ,~. . \. ':.:4iSiributian upgrades; and improvements to. ~~ ./ ' . ,.-~~dresS' system reliability and safety. Thaugh a ~; , ~~rrilier af individual studies have been completed t'., ,to'.evaIUlite same af these needs independently, {.; ':, '.sta.lfresources to. manage and priaritize these issues . t . ....:.,,'.;. are limited. The City requires camprehensive ' ~ ,~<';;:':p{;llining documents that will integrate past studies ~.\i" .and new infarmatian into. a clear map to. a reliable r"~-::"''-I, l.iloOg.term wate,r supply, and robust treatment and ',.. ,.\." ' . :.~:4';o:..::..diStributiari systems. f..,.... ,.' lIIi~:t:~Qur app~ch inclu~es ~I ite~ spe~ified in the ~.:: ~-"RFP and IS summarized In the SImplified work lIaw ';::<ili~ram shawn in Figure 1. Our approach will , !,:-~~It In a Wati:r Conservatian and Reuse Study ';~:1WCRS) that meets grant requirements, and a ."";.Qomprehensive Water Master Plan (CWMP) that ~ .."" CQvers all specified aspects af the water system. .,~:~.~ .: . , ",-#.1'. We Will Provide a Clear Map to a ';';R8Ualile long-Teim Water Supply System ,,:. ..~ . ,': . . '-The 1998 Long Range Water Supply Plan, "~~)irepafed by Caralla, identified ~he T ^.p Pipeline , :' -,'_;' as the preferred alternative for mcreasmg the ~" ,~:capacity and reliability af Ashland's water supply. , ..:' Corinecting to. TAP to. provide a mare reliable ~:.,.~.~. r".: ~- ~' "_. ....:f'~-:-.~:....::._- . . '1":;;4' , ,k-~-' . .;,~c~ PopuIatlonl "l!'cr Demand , li:Z PmjecUona ~' .' ~,. -. ](::......-z-.. . .-. ...~.. -.' ..: ~ ~~~..;~ ~;~. .. 'f;"-' J...: ~: ) - )". ) J j ) ) .I lOSE Repod Ragulalory Ra""'w water supply was endarsed by the Water Advisary Group and City Council after cansiderable public input. Hawever, significant changes since that study warrant a fresh, unbiased look at haw best to. meet Ashland's water supply needs, as summarized in Figure 2 (an the fallawing page): ~ To. meet TMDL requirements, membrane treatment has been implemented at the wastewater treatment plant (WWTP), greatly reducing the cost to. implement a widespread recycled water program in the City. Water recycling wauld affer benefits to. the City including campliance with the newly develaped temperature TMDL an Bear Creek, and reducing demand an the potable supply by up to. 2 mgd during the summer. Furthermare, an expanded irrigatian water distributian system that cauld deliver both Talent Irrigatian District (TID) water and recycled water far landscape irrigatian cauld dramatically reduce the demands an the potable water system, providing the "right water for the right use" throughaut the City. ~ The 1998 Long Range Water Supply Plan made aggressive assumptians an the City's ability to. canserve water during the summer manths and during droughts. These canservatian assumptians need to. be revisited in light af the City's progress in conserving water and in develaping a \vater conservatian pragram for the City's future. ~ Recent draught conditians have exposed the vulnerability af the Reeder Reservoir supply. The 2008 report "Preparing far Climate Change in the Rogue River Basin af Southwest Oregan" predicts more frequent and severe shortages in the future and ather climate change impacts that will increase the water treatment plant's (WTP) vulnerability to. wild fire and flooding., ' Waler eons.MlIIon and R..... Study Ropod CapItal Improvom.n1. program '.Dr~~~'~:; nCIUdlilif18iio':etrWIUifiig ". "'_.; .', ~-';:O::" ,....,. :.,..... . .. ..'...........M1.=I~..'. -"-.r:r:'!f;~-:;.....,;::~~'.'{\y. t . . ~''''1.;nl>iJ~1t;i~~..-:,;.c''' . . l~~u..~<<tiFg;k Renswol& Replacement Program. ~~~~~J: , M~!ot~lIot:;c. Figure J. Our proposed SCO/l< of wark will ejfiCitnlJ, cmnpk... aU IaSks described in the RFP. ~~-~~ J " . ------------- Regulatory and TMDL Requirements ~ ':"~" ";,,,-,.,;:, ", " ~'~::~~:rjpi~~::~"~-, nolil~l,' I I ,'",;,:''','':~''','7' 'l~.er~~~~ I I ~#~~1~ I I "" ". - " , ~,',~,~",~,vIil'm:~~r;~",~,!,~,; I t~:;"1~7~i.'L;:,;'&~~Pf:it~;r;,;;~~'.Jt;:;~. --~.. . t- I .:}~.~.~~rytmf!~Il1,";t- I I I i: .' , , , , it' , Projected Outdoorl Indoor Use I." I Pa<kagelnro ',: ',NOwWTP.'f,,~ I Th",eMalnAller~atl..s r- :i',' ;~\iO~~ h- (each altemallVe ---._ ~'. ca "-Cih/:(Os~~ I may Indude .. pa ~7'~ .l$J.-;'" multlpte I approaches) I '! t .. .. ", - - . -.j.-- Seleafoo-\' " . th;Mh;~~~ Publlc'P(~~ Conservation Program! Climate Change ,t~~~?:"te~~J{ """""P.!',_~~..!tit{"",." I .r:j::.i;:.~.~~=~~?:..~~{::.f<,-';-~ I I '.i '. , ' .' I I I I I I I level 01 SefYice Goals (public process) d~~;~ni*-~~.~~?~c I ,:~~~~~~#iN:~' ~ " . ,", Evaluation ol'ndl,,'dua' AltffnaUver (life-cyckcostt. quality, quontlty, re'iobility, waler titJht!,. cnmotechclnge envlronmentolfmpacl1. sustofnabJlily) ------------...... Figure 2: Our comprehensive water supply evaluation and in/egTa/ed public />rocess wiU determine the "right water for the right,,,,,", '..' Fortunately, the City has numeraus aptiarui available to. meet lang.term supply and reliability needs, including water recycling. canservatian, TID raw ar treated water, expansian af the Reeder supply, and the TAP pipeline. We will verify tlie reliability and capacity af each af these aptians with a careful assessment af each aptian's cost and benefits. We will then integtare the aptians into. a water supply plan that is technically sound, financially feasible, and meets the public's needs. As Carollo. has been invalved in all af these previaus effarts, from rhe 1998 Long Range Water Supply Plan to. the recent WWfP NPDES Permit Renewal Assistance, we have the knawledge to. integrate the City's water and wastewater needs into. a plan that provides multiple benefits to. the City's residents and the environment. #2 - We Will Guide an Integrated Public Participation Process to Get Public and Council Buy-In We understand that City stakehalders do. nat just want to. "rubberstamp" a salutlan we bring to. them - they want to. be integrally invalved in the decisian making pracess. We recognize this need and plan to include the public technical review cammittee CfRC) in all stages af planning. At project initiation, we will wark with the TRC to. identify Level afService (LOS) Gaals in terms af capacity, reliability, and emergency supply capabilities. Establishing LOS gaals at the beginning af the project has the benefit af sepatating the discussian af averall system capacity and reliability from the evaluatian af specific water supply alternatives, and will help get public and cauncil buy-in in the early phases af the praject. We will then develap three technically.saund supply alternatives that meet the established LOS gaals, with both Iife.cycle costs and nan.financial infarmatian (e.g., enviranmental impacts, water rights issues) to allaw the TRC to. make an infarmed decisian. ....'. 'f , ; D V;\CIieI189.As1'~!JNf\flD.Proposalh1d "\ . .'" ',' '\1.",,- \:._:..- ,', -.-. . .: .'~ . '{t::':' ::Oi1t gaol is to. have an apen and unbiased public '.\~, :" /'.:process. We understand that the City may want to. take ,(I:;', \, t~e,lead in warking with the public an the current : L~' " ': plan; Caralla, will provide all af the structure and ;~;;.1, ::~iI~~r[ needed far a successful public process. On the ,', t- "\ " :\>,:~~aus Water, Sup~ly Plan we successfully wark~d ~.. ' \,~lI\!th,the Water Advlsoty Group (WAG); we pravlded ~/ :. 'ill,e ic;chnkal infarmatian but the decisian was in i:, " 'ih,eir hands. As a result, the final recammendatians ;",. ' h"dthe ~ndarsement af both the WAG and the City t .", ::' c6Jncil. A1; in the previaus plan, aur agenda will be to. ',}!; ;.;' '." :':p,i)jVlac: the needed technical infarmatian to. the public I,;.~\":::::advisory graup to. make a sound decisian - we are nat ~,~'il,tl'~ed,isposed to 'any particular water supply alternative, 2:'~'~kI#3~ We Will Provide a Comprehensive Water ~:J:~1i~em Plan that Integrates Water Supply, Water ~i~Jreatment Plant Performance and Reliability, ;;.:;-;"Stbrage and fire flow Improvements, and :~~alittenance of bistlng Infrastrudure. ~ "" . :"~)lIe understand the City wants a master plan, Clp, and :'1!?.:~nancial plan that integrate all af the water system ", '':ne.eds. In additian to. the water supply evaluatian . ,,:. :,{il$CWised above, we see these needs in five areas: ~;.~::;..: Dis~fection By.product (DBP) Reductian. ':' ',- . ,'.,:' "~ The City's lOSE results are shawing that DBP . ~~~',: 'levels :are near: but prabably nat exceed~ng, the : ' ~_,,:, regulatary limIts. We recommend the City evaluate _..~,:' ciptians to. decrease DBP levels to. provide rhe '. ,...' '" City with an increased margin af safety. As DBP "-<;" ;Jevels are already high when the water reaches the . ,~:distributian system, same adjustments to. treatment, .' ::;: stlch as reducing pre.chlorinatian ar improving total ',_","';-'arganic carbon remaval, will prabably be needed. ." ,~'Vf!e will. also. evaluate impraving system aperatians , ;, ....,;)0 reduce water age, based an aur knawledge af the ';;;;,;;. ,sYstem and our preparatian af the IDSE Plan. . .~fiI'i'.-'. " .. ' '..:fJ.< Water Treatment. The City is in the pracess af '~.,', '" completing a number af interim water treatment ~.:.~., ,'.' ',' plant (WfP) improvements, but has identified ;;:;~('., additianal issues to. be addressed ~ncluding m~nar ,"#;;:~," improvements to. make the WTP s new caustIc ,,; " system functional. In additian to these items and , ) _. . the DBP evaluatian nated above, recent high algae levels in Reeder Reservair and use af the TID r, '," supply warrant evaluation af improved taste and .I': odar contra!. Caralla will wark c1asely with the WTP staff to. identify and implement cost.effective ,.I modificatians to. aptimize the treatment capabilities j' afthis City asset. ~ .- ~ Dlstributian. Piping and Starage. Due to. the City's tapography, the City's distributian system is camplex ) with many pressure zones. As part af the 2003 ) Water Master Plan Review, Carollo. transfarmed the I) ) """"'--- H20Net model develaped by a previaus cansultant inra a usable functianing tool far water system master planning far the firs! time. We further updated the model as part af the 2006 Water Master Plan Update and used the model to. evaluate many afthe issues to. be addressed in the current plan, such as pressures in the Loop Raad Reservair and new Crowsan and Ashland Loop Raad Reservairs. Carolla's warking knawledge af Ashland's distributian system and aur in.depth understanding af the existing model eliminates the substantial amallnt af time that yaur staff will need to. bring any ather modeler up to. speed an yaur distributian system canfiguratian and haw the model works. . Renewal and Replacement. The inclusian af costs far renewal and replacement af existing assets in the City's master plan is critical to. the lang.term financial sustainability af the water system. Carollo. has canducted extensive renewal and replacement evaluatians for a number af clients - we will draw an the knawledge gained in previaus studies to. develap a simplified approach to. quantifying, valuing, and develaping a replacement schedule far the City's existing assets. Recent water master plans campleted by Caralla far both Tualatin Valley Water District and Oak Lodge Water District included renewal and replacement needs. . Operatians and Maintenance. The purpose af the O&M evaluatian is to. summarize the City's current programs, identify majar deftciencies, and recammend improvements. A key camponent will be to. review current staffing levels and certificatians, far both treatment and distributian. O&M evaluatians are a required camponent af Comprehensive Water System Plans in Washingtan State and both Nicki Pozos and Rachellanigan are currently warking an a similar evaluatian far the City af lacey. Their aut.af.state experience will provide great value to. Ashland. Impravements identified through the abave evaluatians will be integrated with prajects identified elsewhere (e.g., stlucturallmprovements to. Hosler dam) into. a camprehensive CIP and financial plan. SCHEDULE The schedule an the fallawing page summarizes allr averall approach to. the project. City participatian will be critical to. successful campletion af the project, hawever, we understand that staff time is limited. As we have dane in the past, we will focus an meeting with City staff at key decisian points and praviding the infarmatian City staff need to. make good decisians. The schedule also. shaws the specified meetings with the public advisary group (TRC), the City COuncil, general public meetings and key deliverables. II .. - -~ CI) - ::::S. 'a CI) .c (J en ~ co c .- E .- Gi ~ D.. il Q) .. .. - a- S B ." .. z . ~ 6 ~ ~ ~ - S 6 .~ . . . ~ ~ (j .. f ~ c ~ ~ ot i ~ ! ~ u "'r- ~ ;a (j ~ ~ " l ~ u. 6 . ~ ~ 12 Y u i!! :< B :!' r--! ~ I l M . ~i l!l I~ .5 ~ ',", '" ;l]j E '-= lii ~ ~~ "C ~e1:lD en f1j.- Q) t: -=>j!:E~ 8~wg.,-t::t: CI'_-c_G.. 0 0 <u-gc:~-:it~ .~_IUQJ~a:a: c='Sl1Cc(I)(I) "'c;{;!j1"a:a: CI) O~'.""", E u u ~'~~!!g-3:3: -::lIlDt;:- Q)--Q)!:4::ra >I!!.!!!.....l'!c; 3ws<(ccu: ~ ~ l ~ ~ ~ !- ill Q N " 6 .... ~ '" i5 E .. l ~ ~ ,;~r-~6 -8' ! g!r- I J j 1 K 1ii ,~ !~h ~ ~~ I :I~~ ~ .' ~ ~ ' u ~ i5 ,I: j ~ 1 , " .. !i' ;-.' ...t. '., ' ;: . - . I j .r. <i c , .3 <> f .3 ~ .j ~- ~.!! !~ Ii . 'li ~ I:- o i! . a. c ~ I . ;,. ._.; .. '1;1 Ii Ii I:J --ace *=000 ... RI'~'+:I'~ c: .. "'c"'",8 . Cl)U'=-aJ II I.:€ Xl~~il ",,"00 .. > ",' c.c: E'" ",w c: 'e.t:::! c: c c: .: !'l;:t!E~,~Q ..... . UI ~ ~~ CD (.J tt a:1C"'0 l!l ii ... ':Q ... .... ~ OJ '-C::G)!JSt::~ l! e "':!l!:l1! '-= Q a- "'::;;:>:><'>0 c; ..!! .g '" '" Q => CJ c ~E c~'i ~ t .0 1U :::J C ~ ~ :Q- - Q) .. IV:::J IV E ~ il ~I' ~ .. l!l .. ~ >a: E rdcOt::t:: w.., t! -QJCoo uc D.EcnQ,a...... (.) <<I CI ~ c: Cb l>> "C CD CD ~ C > .glC;:; ..8 a: i;: c a: a: 1:: .~ ~ 10 c::: co -g ~ CQ a.. a.. g~~=.oil~~~~~ R Gloc::l!l!~>ll!_a:>:> ~ a:UL.W.CIIWS,fI(I)UU ~ll5~l!:li~ll!'il'l!l]~ gc~3:6o~8&!QU:: ~ ~ II Y:\Cncnt89tAsHiWXfII"loposaI~erMP\tmPluposalIrdd' " : ',1<,. \!~, . . ..? , , ", :.j '\ '\' ';(,,': ,PROPOSER'S CAPABILITIES ,tv,'" . : ,Il., : . ,-,' Successful cQmpletian af this project requires diverse I ~''';,V>~ ~ I~~ e~pe[tise in master planning of treatment, transmission, "'f, :::,~: arid storage prajects; strong abilities in develaping , I~W:: I ,',~efeil~ible costestimates and praject schedules; and i', ~" Z .", ;i~e.'ability to. effectively integrate climate change, r.r ',\.~o/.'rt#rVatian and recycled water into. a sustainable ~/" \Y~ter master plan that meets with public approval. ) ~: '..' '1'hraugh aur past and current wark with the City ) f, " ,', afAs.hlaiid we have demanstrated aur abilities in ' .Ii::: ' ",' these areas. We have also campleted numerous ather It. ,;i ;"'~iOjects in the Pacific Narthwest that demanstrate aur l'.u<';",/,;,c:.pabilities to. perfarm the wark described in the RFP. ~~ )f1,.~1l ~rojects des~ribed herein were canducted by ,he ~~S ~~,,~$~lic team members praposed far the WRCS/CWMP. ~(~iClIv ofAshland ,- Multiple Projeds , -::;'lof~t!;;i'oll~ Engineers is proud to. be the City's "cansultant ~:!~tChaice" far nearly all af its significant water and '~:~.;'~tewater prajects far the last 14 years. This successful , '" ...~1'Iistoty with the City includes: -.... .... :'I!.' ;('Wastewater Treatment Plant Upgrade (1996. ,~?..~,-;'2(01). Following extended facilities planning by ~' ;'- :~.nother consultant, Carollo. was selected to finalize ,,:.::' : the' facilities plan, and completepfedesign af the new .;'<":':~P. Based an Carolla's successful campletian, " ','. n the CIty amended the contract and requested that ::,' ;.,:..~-:;-~Caro\la complete design af the new treatment plant ':, _' ,.:, , and provide constructian management services. .......... . ~,:;fong'Range Water Supply Plan (1998). Caralla , ;,. ';warked with rhe City and the Water Advisaty .....-~.f:~raup ~a develap demand projectians: evaluate ~~. die avaIlable supply and storage capacIty af Reeder , ..... ,Ri:servair, identify supply aptians to. meet identified :".f !Ong,range supply shartfalls, and develap a preferred ,~~ypply alternative. Supply alternatives cansidered ~,~ ':'!,ithin the planning process included canservation, .....~--:":new reservairs, groundwater supply, reuse, TID J;:1Ii. ".,J.t,'\upply, and cannectian to. the TAP pipeline. The ~ .. ~~ ~demand proJectians remain accurate today, aver ten ~-,,,, ':'yearslater. .. ~;~'~;Water Master Plan Review (2003). The previaus -F:-7~-;':"'" Water, Master Plan was develaped by anather , - COllSultant. The City requested that Carollo. review )". .' the plan and the model to. determine whether it met the City's abjectives. Carollo. prepared a review report tbat identified model deficiencies and recommended impravements. )0 Sanitary Sewer Callectian System Master Plan (2003.2004). Carollo. was selected to. develap the City's first collectian system model and identified necessaty impravemenrs to. address capacity problems, replace failing pipe, and pravide capacity for planned growth. ' i '.' .r-~. }, ) ) '1' ) ), ) ) )0 TAP Waterline Extenslan Planning and Predesign (2004). City Cauncil endorsed maving farward with the TAP extensian to provide the City with a redundant water supply to. address emergencies and water supply shartfalls during droughts. Carollo. prepared a predesign report which established potential locatians far the pump statian, pipeline routing, cost estimates, and cannectian aptiallS to the City's distributian system. )0 Capacity Evaluatian far WWTP (2005.2006), Carollo. revised populatian and inlluent lIaw and load projectians far the WWTP far a 20.year planning period. Carollo. then evaluated each treatment process to. detemline if it had adequate capacity to meet prajected lIaws and laads. Althaugh the projected lIaws and laads exceeded the ariginal design loads af the treatment plant, it was determined that the WWTP has capacity thraugh the planning period. The anly concern is the reliable capacity af the membrane treatment system. )0 WWTP Thermal Load Limits (2005.2006). Carollo. was selected to. model the thermal regime af Ashland and Bear Creeks using HeatSource, a campurer model which simulates the thermodynamic and hydrolagic interactians, wark with DEQ to. make sure that the TMDL was develaped an a technically saund basis, and identify the temperature benefits af different temperature management strategies including riparian shading, flaw augmentatian, and WWTP discharge cessatian. )0 Water Dlstributian Madel (2006.2007). The City af Ashland was planning and implementing a number af prajects to. improve the reliability and efficiency af their water system. To. facilitate the evaluatian af further impravements, the City retained Carollo. to. provide an.call services to. update and calibrate the City's hydrauliC model. This included evaluatian ' af law. cost capital and aperatianal improvements to. improve the efficiency of the existing system, evaluatian af two potential new reservairs, training af City staff an use af the hydraulic model, and develapment af an ISDE to meet requirements af the WSEPA Stage 2 Disinfectants and Disinfectian By. Products Rule. )0 NPDES Permit Assistance and Permit Campliance Evaluatian (2008.2009). CaraUa was selected to. assist the City with negariating NPDES permit limits and identifying the implicatian af those permit limits ,an the WWTP and its aperatian. Carollo. met with DEQ staff to. identify potential future permit limits. The planned limitatian with the most impact is the temperature Iimiratian resulting fram the new Bear Creek TMDL. Caralla evaluated aptians far camplying with the limitatian proposed by DEQ. Those aprians include several reuse strategies, discharge to the TID canal with associated water trading, and effluent cooling. 'l\CIenI~-,".~1nckI 11 Relevant Project Experience Tualalln Valley Waler Dlslrltt, OR . Waler Mosler Plan Updale Slewart Davis, Project Manager 503-642-/511 lVWD's master plan identified aver $70 millian in impravemenrs, including 25 MG af new storage capacity. Carollo. converted the District's hydraulic model tram H20Net to. H20Map and lIsed it to evaluate storage, fire /laws, and water supply impacts. Carollo. campleted an evaluatian af the District's lang- term water supply needs, including an ecanamic model camparing three supply alternatives. The evaluatian resulted in the develapment af a decisian framewark that autlined the data needs. decisian points. and key , dates in the path to. a final decisian an a lang-term water supply far the District. As the supply decisian was af great interest to. the public, Caralla presented this wark at several well-attended TVWD Board meetings, and also participated in a public "apen hause". on the water supply decisian. Clry of Lace~ WA . Comprehensive Waler Syslem Plan Updale Brandon McAUisler, Project Manager 360-49/.5600 Carollo. was selected to. provide a Comprehensive Water System Plan for the City af Lacey to. meet a variety af current and lang-term needs. Carollo. is evaluating the major system components and aperatianal aspects af the system utilizing the City's existing hydraulic model. Other project features include a watet rights analysis, wellhead pratectian plan, a financial plan to. address funding and water rates, and an evaluatian af O&M pragrams. Given future supply uncertainty, this praject includes a camplex system analysis with three separate shart- and lang-term. water supply scenarios, including new graundwater resaurces, reclaimed water, and whalesale water purchase. , Oak Lodge Waler Dlslrld, OR - Waler Mosler Plan Updale Dan Bradley, General Manager 50~-654-7765 The goal af this master plan was to integrate improvements needed to meet fire /law requirements, water quality concerns, and renewal and replacement needs into. a prioritized capital improvements program. The master plan included the update and calibratian af the District's hydraulic model, including transferring the model fram H20Net to. Infawater. Renewal and replac~,ment needs were identified thraugh a canditian assessment af the District's abovegraund assets. In additian. recommended projects to. address buried II i I pipelines were identified by using GIS to. map the District's piPe breakage histary and identify vulnerable pipelines. Tualalln Basin Waler Supply Prolect Parlners, OR . Cosl . and Schedule Evaluallon Stewart Davis. Project Manager 503-642-/51/ The gaal af the Casrand Schedule Evaluatian (C&SE) was to. provide an independent verificatial\ af canstructian costs and schedules far majar carnpone~ts af the Tualatin Basin Water Supply Praject, resulting , ' in an integrated implementatian plan. The C&SE ' . included evaluatian af almost $550 rnillian in " , . \.'. improvements, including a 4O.ft raise af Scoggins Dam; a new 6.5-mile, 96-inch diameter raw water pipeline; a new 300 cfs pump statian; and expansian of the Jaint Water Commissian WTP from 75 to. aver /65 mgd. ' Clean Waler Services, OR . Reclaimed Waler Mosler Plan Sieve Kebbe, Project Manager 503-547-8/83 Catalla led the develapment af a Reclaimed Water Master Plan for Clean Water Services in Hillsboro, Oregan. The planning effart was campleted n 2008 and included an evaluatian and priariti,atian af the potential market far reclaimed water in the Tualatin Basin and an assessment af the benefits to. water quality and the District. It was determined that the greatest improvement in Tualatin River water quality wauld result from using reclaimed water to. affset irrigatian withdrawals during critical law flow periods, Surface water rights alang the main stem af the Tualatin and the majar tributaty streams were ptiaritized by size and priarity date and costs were develaped to. assess haw best to. produce and deliver reclaimed water to. replace the surface water withdrawals. :i ',1. " \. ,) " " I" " "1. , :' ! '. i ;, :... ~ " , -..' .... ~' ~ < ~, -.... .-;~ King Counry On-Call Waler Reuse Program John Smyth, Project Manager 206-684-1247 Carollo. campleted five work arders as part af King Caunty's reuse program, including reclaimed water feasibility analyses far the entire County; a study to. evaluate new technalagies far decentralized wastewater treatment far health hazard areas an Vashan Island; a water conservatian white paper to. study the cost implicatians af water canservatian relative to. treatment plant capacity far Carnatian; a predesign far extensian af a reclaimed water line from the Caunty's South Plant to. Tukwila; and a cost model far variaus sizes af generic reclamatian plants, to be used to. evaluate the potential costs af a reclaimed water system. The County recently hired Carollo. to. cantinue services far an additianal3-year period. V:\Cnlf'mr.r~I\WIJ.MP\NlW'I'o~ . .. , . ~ 11 , ", ..-.. '~ . \::. \". .l.....:..,. '.. . ...t,., . . . "i,V )PROJECT TEAM AND QUALIFICATIONS '.. ....... . ';;<i'c' \ ",The Ca.rollo, team has the required expertise, and {\,.i,' the'integrity to deliver both the WCRS and CWMP \V~;,/,':~ha.t will pravide Ashlandwith a clear plan far future ':" 'j....';iiriprovemenrs. Our team has demanstrated aur ability , ,r', \..::"I~;'!illeet yaur needs ~hrough recent and angoing .,~!... ' ' ,:'pI)>J~ts with Ashland. In particular, through aur #i ,. 'Yflrk an the 1998 Water Master Plan and the 2006 ,~,.':' . , M\lSter, Plan Updates, as well as aur lang histary af ~:'~:I: i' wbr~ an yaur wastewater treatment plant we have t ':: ','o:-d,martstrated aur ability to. deliver quality products an :!p.";,;y~~hedule and budget. , f.:J~l~{;~,:.:.i~, ",' '~~' ' ~':i.~:;, ' /, .~~::I......~~ OJ: :'~:' w. 7" ''-,.''.., City of Ashland ~' , ~?;,f,: Peter Smeenk, P.E. .~::; -;:.--, ;,_.; ":"\'. ,:f;,:.' :~,,' .1~': ' ..' ): " ) J -J ) ), ) ) Water Reuse/Public Information - Tracy Clln\Dll, P.E. Hydraulic Modeling -laura Dutt P.E. · Water Rights '. Adam Sussman I ConservallonfOlmate Change - Mary Hansel Climate Change - Alan Hamlet PhD.' Watershed Monitoring Plan - Jacob Kann. Ph.D.' Ho,ler Dam - Dick Grilfllh, P.E.' Rare SludylSDCs - Shaun Plgotl"lSreve Donovan' Environmental Support - Jennifer Mille<' Support Engineer - Rachel lanigan, P,E. 1 Wiler Planning EngIneen 2 GSI Wattf SoIutfons"lrK. ] unJvenfty ofWashlngtORlRe$Nrch Asstshnt ~esM)l' 4 Aquatic Ecosystem Sciences SHot'" Aa<s 6 stMUA PIgon Associates-IrK. 1 Oono'tan Enterpriset,,'nc. 80wkSEwns& Jwodales"lnc. Our team will be led by Bab Eimstad as the partner in charge. As Bob has demanstrated an previous projects for the City, he will be substantively invalved in all aspects af the study. Bob will be supported by Jack Hendersan as project manager and Nicki Pazas as praject engineer. This core team, located in the Portland Office, is committed to. the successful delivery af this project. Brief biagraphies far key team members are pravidcd herein with resumes provided in the appendix. Bab Eimstad, P.E. .. Partner in Charge. Bob has served as PIC far mare than a dazen projects for the city af Ashland aver the past 15 years including the planning and design af the Ashland WWTP, the 2006 Water Supply System Master Plan Updates, and the 1998 Comprehensive Water Supply Plan. Mare recently he was PIC and Praject Manager far the 2008 NPDES Permit Renewal Assistance, which evaluated wastewater recycling alternatives and costs. Bob's wark with Ashland an both water supply and wastewater issues makes him uniquely qualified far this project. As in the past, he will take a direct rate in reviewing all deliverables and cantributing to. the develapment af alternative system improvement cancepts. Jack Hendenan, P.E. .. Project Manager. Jack jained Carollo in February af 2009 as Directarof Wa ter Supply far the Pacific Narthwest. He has aver 25 years af experience in water system facility planning, design, canstructian, aperatians ~nd management and has managed ar been directly invalved in develaping and implementing numerous water supply master plans and capital improvement programs. He has perf armed similar studies for communities similar in size to. Ashland such as Shrewsbuty and Staughtan MA and far majar systems like the Massachusetts Water Resaurces Autharity that provides water to. 2.5 mi\lian customers. Jack has also. been invalved in the evaluatian and design af several major water reuse projects and helped to. develap Water Reuse Policy and Regulatians far the State af Massachusetts. Jack was recently invalved in assisting Ashland with renewed use af the TID raw water supply. Jack has a practical hands-an approach to. project management and maintains direct invalvement in all aspects af the project. Nicki Pazas, Ph.D., P.E. . Project Engineer. Nicki has aver 10 years af experience develaping water supply master plans and canducting water distributian system modeling and analysis. Nicki was the Project Engineer far Ashland's 2006 Water Supply System Master Plan Updates including updating the distributian system model ....--- II and preparing the lOSE Plan. Nicki was also. the project manager for recent and angaing master plans far Tualotin Valley Water District, Oak Lodge Water District, and the City afTIgard. Nicki will be responsible for averseeing future growth, populatian and demand prpjectians, distribulian system modeling and IDSE tasks as well as providing engineering support far most aspects af the project. Tracy Clintan . ReuselPublic Educatian. Tracy specializes in the area af water recycling planning and public invalvement/decisian analysis. She develaped mare rhan 30 water reuse plans far agencies in Oregan, Califarnia, Washingtan, Florida and Nevada ranging in size and camplexity from 1 to. 85 mgd. Tracy brings vast knawledge af issues encauntered when implementing reuse pragrams and considerable experience in develaping public invalvement pragrams, public autreach/educatian plans, public informatian mailers and infarmatianal handauts far stakehalder meetings and facilitating public warkshaps. Tracy will support develapment af materials far the TRC, City Council. and public meetings, Mary Hansel. Sustainability CoOrdinatar. Mary is Carolla's Sustainability Coordinatar and has an extensive background in sustainability principles and strategies as well as water conservation and \Vater use efficiency programs. Mary will be responsible for establishing sllstainability criteria for evaluating alternatives and far assessing achievable goals and strategies (or efficient water use and conservation. Rachel Lanigan, RE. - Staff Engineer. Rachel has warked closely with Nicki aver the past several years an a number af major water supply master plans in ,the Pacific Narthwest, &th Nicki and Rachel war ked an hydraulic evaluations. facility planning, siting, preliminaty design and cost estimating aspects af the TAP Pipeline Project far the City af Ashland, Prior to. jaining Carollo., Rachel was a project engineer providing engineering services to. several Cities in the Rogue Valley. We are partnering with key specialty subcansultants to. provide yau a highly qualified team with direct lIands an knawledge af yaur water supply system as well as the specialized technical expertise required far every aspect afboth the WCRS and the CWMP. The Carollo. Team includes: ~ Laura Dun afWater Planning Engineers who., as a Carollo emplayee, develaped and updated Ashland's water disrributian system model far the 2003 Master Plan Review and 2006 Water Master Plan Update. ~ Adam Sussman af 051 Water Solutians, a recognized regianal expert in Oregan Water Rights who has worked previausly an water rights issues far, " I: the City af Medfard. ~ Dr. Jacob Kann af Aquatic Ecosystem Sciences who. has dane extensive \Vater quality manitaring far Reeder Reservair and the Ashland Creek Watershed. ~ Dick Griffith af Hatch-Acres who. has been invalved in structural and safety inspectians and Part 12 FERC Studies afHosler Dam since the year 2003. ~ Shaun Pigan and Steven Danavan who. as /1nancial experts have teamed with Carollo. previausly an feasibility analysis, SDC and rate analysis studies far ' Ashland and numerou's ather cammunities in Oregon and Washingtan. ' , ~ Jennifer Miller who. is an expert in EAJESAs and will draw an the reSOurces af DENs permitting and environmental expertS as needed. ~, Dr. Alan Hamlet af the Climate Impact Group at the,' , University af Washingtan, is the leading expert an climate change impacts to water resource planning, development and management in the Pacific Narth west. " I -:'j. , i' ", '.; RESOURCES , " Yaur project will be managed and delivered from Caralla's Partland af/1ce and aur 2J lacal emplayees. Additional resources are available in aur Seattle, &ise ' and Walnut Creek af/1ces which can be efficiently accessed using aur wide area netwark and videa . conferencing system that links all af aur 730 regisrered engineers, technical staff and support staff natianally. Our Carollo. staff includ~ aver a dozen individuals with experience in InfaWater, H20NETllll/H20Map@, and GIS and we use the full suite af Microsoft Of/1ce' products far ward processing, spread sheets, praject planning and public presentatians. Far public presentatians and graphics we use the suite af Adabe products, including InDeslgn, Phatoshap and IIlustratar. Our most unique qualification is aur understanding af Ashland and the City's water and wastewater systems. We have campleted nine majar projects far the City aver the past 12 years, tauching all aspects af the City's water and sewer systems. Our team's hands an experience and understanding af Ashland's WWTP, NPDES permit and potential far reuse, alternative sources af supply including TID and TAP. the City's existing water supply and distributian system, and existing hydraulic model, gives us a unique perspective and extensive institutianal knawledge af the apportunities and the probleOlS associated with all af yaur water resaurce planning aptians and yaur distributian and starage needs. a V.\Clert DAstWdl1ropcRlt\W:aIerNP\IOOOJ'IoposaI.~ .:.,\'! , "",',," ....\ \" 'I' ,'It" ,RESPONSE TIME \\~ .' '....~ ")' ';''- \ ". Ar Carollo. Engineers, aur missian statement captures V-r'>: ,'aU! approach to. warking with the City of Ashland ",,~(.-' ''''o~this project as well as allafthe projects we have f- ,\'~~:' ~~j ..~.tde,liveredj we'are 'dedicated to creative, responsive, ':. '. ~., \;, ",'qu~lity solutians to. those we serve." The Carollo. I ~,I, ...." :~~'alri includes members with significant experience in , t' , ' all aspectS af the City's systems, fram the City's past ?..' ,~~ter supply and reuse planning effarts to. the City's ! i; ": . h~lli1lulic model. This understanding will allaw us to. ",., }':', "n;splind mare effectively and mare efficiently than any 'f',~h", ,:': ',dther team. ., '-'," , '., " !I~', };>,:The bestindicatar af the level af responsiveness ':t\~~:>:'yfe ~ilI provide to. the City an this project is aur ' ~",t:;;:;~~rfa~ance an past projects. O~r most r~cent effarts : ;, '~' ,: .)2 '!,:""lSt the Water,Oepartment In restarting the :';",;""/flO water supply demansrrated aur cammllment "7X";;'-'m-a timely response, aur technical understanding af it.; ille hydmulic and water quality impacrs associated ,'7 ~itith using TIO water, as well as aur ability to. '; "k: Workeifectively with the apprapriate regulatars '-:;:~;. :~~uccessfully satisfy regulataty concerns and . ,: ':'''', ':r.,guirements. This praject will be aU! project manager, , " ': 'Ja~k Hendersan's, number ane priarity and aur policy 'f" ,;,,' <,;" -Will'.be to return any phane call (ram the City within : ~ . ,24 haurs. ..e- . '.1";~ _ - '1.:~-::~:BUDGET I.-~., , , "",;.:;." ()oiestlmated level af effart farthe WRCS and ,;:;,~ ~'CMWP is described in the enclased envelape. The ,--,~,Ieyel af effart and budget are based upon aur current .':iinderstanding af City expectatians and aur experience "'~rrfpleriDg similar services for Ashland and ather _ ierits. If Carollo. is selected for this project, we will ''''-''0'& closely with the City to. finalize a detailed scope' ~,4:.~?I';a:budget lailared to (ully address the City's needs far .'t- . ~,!lle.!S services. ' ~.:;1w~' intend to. make the masr af the City's investments --~~,,~_ in 'previous planning efforts, integrat~ng existing and .......:::, ~'--'new infarmatian to. support the pubhc process and );::~' ',' develap the CWMP. Examples include: ,.. - -,1<'0" . i;:~' ',' . Using populatian projectians develaped in the City's recent wastewater master plan as a starring point far 50-year projectians. ' . Utilidng the City's extensive GIS capabilities to. support the demand and reuse system evaluatians and develap required maps. . Including Dick Griffith from Hatch Acres an aur team to. develop a scope and budget for structural improvements to Hosler Dam and a conceptual cost far raising the dam. " ' ,---. J.' I, -t As requested by the City, we have included a $50,000 allatment in the budget far lacab Kann. We assume this amaunt includes the ManitOling and SaU!ce Water Pratection Management Plan under Task IBb(l) afthe scope af wark in the RFP. We have also included an ASR/groundwater evaluatian as an aptianal task anly. Based an cansultatians with Jef( Barry from OSI Water Salutians, ASR/groundwater are very unlikely to. yield sufficient high. quality water to. cantribute to the City's lang-term water supply due to. law well yields (typically <50 gpm) in the Ashland area. ----"" II ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) 1 ) ) ) ) ) ) , ) ) ) ) ) '} ) ) ) ) ) ) ) ) ) ) ,) ) ) ) ) Addenda Received CITY OF ASHLAND ADDENDUM NO.1 TO THE REQUEST FOR PROPOSALS FOR THE Water Conservation & Reuse Study (WCRS) and ,Comprehensive Water Master Plan (CWMP) This addendum issued the 10th day of September, 2009, changes the proposal due date from 1 :30 PM September 151h, 2009 to 1 :30 PM September 30th, 2009. Acknowledge receipt of this addendum by including it with the submitted proposal. This addendum will not be counted among the total number of submitted pages in the proposal. END OF ADDENDUM NO: 1 ) ) ) ) ) ) ) ) ) ,) ) ) ) ) Engln..rlng 20 E, Main Street Ashland, Oregon 97520 www.ashland.or.us TBI: 5411488.5347 Fax: 541./488,6006 TlY: 800/735-2900 r~' G:\pulHYrl<s\eng\08-54 Right Water RighI U'B\AdminIRFP\IIna1\2009.Q9-1 0 AddBndum1,dOC ) ) ) ) ) ) CITY OF ASHLAND ) ) 9 ) ) ) ) ADDENDUM NO.2 TO THE REQUEST FOR PROPOSALS FOR THE Water Conservation & Reuse Study (WCRS) And Comprehensive Water Master Plan (CWMP) This addendum issued this 25'h day 01 September, 2009 affects the solicitation document as distributed on August 11 , 2009 and shall be deemed an integral part 01 the above relerence document.. , A. QUESTIONS AND ANSWERS RECEIVED BY PLAN HOLDERS Q1. Are resumes included in the page limit? Resumes are reference documents and are 1I0t included in the 10 page limit. Q2, Under item 1.5.4, (C)(I)(t), what would you like to. see? An example that represents the level of quality the proposer intends to provide for this study. ) ) ) ) = .J ) ) ) ) ) ) ) ) ) '---J ) ) ) ) Q3. Please clarify how the Statement of Wark (a required propasal element) is scored under section 2.2. ' The connection behveen 2.2.1 and 2.2.6 is important ill order for liS to IInderstand tire level of effort reqllired for the various tasks requested and proposed. A clear relationship between what each task proposed consists of and how ml/ch effort is reql/iredwill be considered important. Q4. Section 2,2,2 refers to an "on-call contract." This project does not appear to be on-call, Please clarify. Please ignore the term "on-call" in that it does nOl apply to this proposal. QS, How shauld the scope of work be dacumented in the proposal and to what level of detail? To the maximum extellt that it can be documented, given the 10 page limit and other requirements. Q6. Please confirm the schedule for deliverables. Engineering 20 E. Main Sltee' Ashland, Oregon 97520 www.8shland.or.us Tel: 541/488-5347 Fax: 541,/488-6006 TrY, 8ll0l735-2900 M- G:Ipub'wf1<s\engl08-54 RIghi Water Right Use\AdminIAFP\addenda\2009:og'25 Addendum2,doc 1 at 4 See page /4 ofr/Ie gram application and extendfonvard the schedule two quarters. This represents the minimum completion schedule. The City would, however, prefer to complete the study as quickly as reasonably practical. Q7. Under Task 3C, are you calling for only a scope of work and budget or the actual tech memo? We are requesting the actual tech nlemo, lIS well as tile budget and scope. Q8. How is the approach being scored? It is nat clear under Section 2.2. No additional illformation is available. Q9. In the Oregan Water Resources Department Grant Application, under Section B (pages 7-8) there would appear to be some additional dacuments that I have not found an the City's website: l. The 1998 Carollo update to the City's Comprehensive Water Supply Study. 2. Documentation of the seven feasible water supply options as developed by the WAG, 3. Documentation of Carolla's evaluation of these water supply options, including their conclusian that the TAP projects was the preferred alternative. Only the /998 Carollo memos are readily available. They will be posed 011 tile City website as an attachmellt to tllis addendum as three separate tech memos. QIO. Under 1.5.4(B) (I), the RFP calls for us to include costs in the proposal. However, under 1.5,3, the RFP states that costs are to be submitted in a separate sealed envelope. Are we to include costs in the main propasal, Le. within the 10 pages or just in the separate sealed envelope or both? Please clarify. Please include the costs in tile separate envelope only. Since the budget and schedule may depend closely on one another, proposers //lay elect to include the schedule together with the costs in the sealed envelope. € QU. Regarding the Part 12 FERC tasks (Task I,O(B)(3)(a)(3)), is it your intent to have the cansultant prepare the Security Plan, Structural Safety Analysis (finite element modeling), and ' Dam Safety Manitoring Plan far Hos!llr Dam as recommended in the Part 12 Ynspectian Report as part af this project. If so, this will be difficult to do. within the City's budget for the averall project. I could not find preparation af these documents listed in any subsequent section. Please clarify. These are ~elatively millOI' tasks that will help tire preparet. of tile study more clearly understand the inter-relationslrip of FERC requiremetlls and the WRD master planning requirement, as well as gaps created by regulation of source water facilities by both state and federal agencies. The stmctural safety alUllysis is a scoping documellf for the finite element modeling that the part /2 Engineering 20 E, MaIn Slree' Ashland, Oregon 97520 www.8shlandof.us Tel: 541/468-5347 Fax: 541,/488.6008 TTY: 8001735-2900 M- L G:\pub,wt1<s\eng\08-54 Righi WalO1 RighI UselAdminIRFPladdenda\2009-09,25 Addendum2,doc 20.14 ) safety inspection recommended. It is 1I0t intended to be the modeling task itself, which is scheduled to OCCIII' after July I" of 20/0, Q12, Is the model available to download from FrP upan request? No, but we are able to upload to an FTP site if requested (and instmctions are provided). Q13. How extensive is your available SCADA informatian? Do you monitor and record all tank: levels and booster stations? ~ ) ) ) ) ) ') ) ) , ) ) = .J J -) ) ) The city's water system is controlled by an indepelwently operated SCADA system built on Wonde/ware software which does not COlUlect directly to the city's Wastewater, or Electrical Power SCADA system. The City has more than /0 years of accwnulatedj1ow, pumping, afld WFP control data that can be accessed by the consultant selected for this project, Data regarding sOllrce water supply fro1ll Ash/mw creek is available for a /lllIclllonger time period from the USGS directly over the internet via the f1ationwide creek and river gaging station system. ' Q14. Please provide contact information for Jacob Kann. See the attached prospective proposers and RFP holder's list Q15. Who would be the best person to visit with the City regarding the water treatment challenges associated with the formation af disinfection byproducts? Daryl McVey or Pieter Smeeflk. Q16. Could we get results from this year's water quality monitoring of the distribution system for THM and HAA? That data is flat yet compiled or available. Q17. Does the CWMP include a rate study? Yes, The Water Master Plan is expected to be a comprehensive financial analysis of all Water Enterprise Fund activities that include an analysis of operations alld maintenance altematives incllwing detailed staffing alld life cycle cost factoring, financing options incltwing connection fees, SDCs, rates, andfinancialforecasting that adeqllately accounts for the cyclical natllre of the economy mid anticipates effects of downtllnts ;'1 tire business environment or revenlles.. ) ) ) ) --:l ) ) ) ) ) The study also shall provide sufficient detail to justify: Base charges Block rates Conservation Rates Engineering 20 E, Main St..el Ashland, Oregon 97520 www ashland.or .us Tel: 5411488,5347 Fax: 541-/488,6008 TTY: 800173!>-2900 1M- G:\pub.wrks\engl08,54 Righi Waler RighI UselAdminIRFPladdenda\2009'09'25 Addendum2,doc 3 at 4 Seasonal rotes Miscellaneous services rates Q18 How do you plan on getting the results of the study to. Council and how do you propose we deal with financing issues during the interim? The study //lay take up to 2 years 10 complete. The cOIISultant will have the responsibility for presenting proposed rates stTllctures to tire Council iucluding rate findings, proposed new ordilUl1lces, and adoption "Colmcil Communications" of the master plan at thefilUll step in the IlUlSter planning process. In the inlerim, we will continue to charge water fees based on the current ordinances. However, tire City reserves Ihe possibility that fees and or rates may need 10 be changed before the conclusion of the study. Q23. What is cities anticipated scope of services regarding the continuation of Reeder Reservoir aquatic modeling and analysis? The City requests that pmposers iuclude in Iheir proposals all allowance for analysis and aquatic modeling of $50,000, which will be more closely scoped and refined at the time of preparation of the Slatement of Work. B. ADDITIONAL ATTACHMENTS FOUND ON CITY WEBSITE The fallowing attachments can be found at htto:/Iwww.ash1and.or.us/SectionIndex.aso?SectionlD=454 and htto:/Iwww.ashland.or.usIPaee.aso?NavID=12141. 1. Sign in sheet for Pre-Pmposal Meeling 2. Current Plan Holder's list 3. 1998 Carollo WalerSupply Tech memos I, 2. and3 ~ Acknowledge receipt of this addendum by including it with the submitted proposal. This addendum will not be counted among the total number 01 submitted pages in the proposal. \ END OF ADDENDUM NO.2 Engineering 20 E. Main Slreet Ashland, Oregon 97520 YIWW.ashland.or.us Tel: 541/488,5347 Fax: 541,/488,6008 TTY: 8001735-2900 M- L G'Ipub-wrk$\eng\08,54 Righi Waler Righi UselMninIRFPladdenda\2009-09,25 Addendum2,doc 4 af 4 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) Resumes Robert B. Eimstad EducatIon IUS Envirollmental Engineering. University of Massochusells, 1986 MS B%ny. Universlfy of J\-fassachllse/ls. J 982 BS Civil Engineer/IIg. University of JWassachusells. 1986 . BS Biology. Ulliversity of Oregon. J 976 Licenses Civil Engineer. Oregon. Washing/on. idaho. California Professional Affiliations Waler E"v;,-onmenl Federalion American Waler Works Association ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ,I Pacific NOr/llwest Cleall Wa'er Association Oregon Association of Clean Woter Agencies ASJocia,;on of Metropolitan Sewerage Agencies Mr, Eimstad, 0 partner with Carollo Engineers, is experienced in . collection system and wastewater lreatment plant facilities planning and design, He has porticular expertise in cambined sewer overflow, wastewater treatment plant, and reclamation planning. Planning . Partncr,in,charge for the review of Capacily Evaluation for the Three Rivel1l Regional Wastewoler Authority, Portland, Oregan, The projcct includes review of available design infonnation, activiated sludge process madels, meeling notcs, and archived information; interview design team members, as necessary; and preparatian ofa technical memorandum summarizing lhe modeling, design and DOE negatialions relating to. the sizing of the aClivated sludge process and its rated capacity, . Parlner,in-charge for the City of Bcnd, Oregon Water Reclamation Facilities Plan, This facilities plan will guide Ihe expansion of the Bend Waler Reclomalian Facility as the city's population continues 10 grow from the current 55,000 to a projected 119,000 by 2030. The project also. includes evaluation of alternatives to increase tbe capacity nf lhe existing disposol ponds to. mcct future fiows, projected ot 12 mgd in year 2030, Expanded opportunities for lense of effinent will be explored, Improvement ofbiosolids treatment to produce a Class A product will be evaluated. Partner,in-charge for the Tualotin Valley Water District Woter Master Plan Update and Woter Monagementond Conservation PIon, Prajecl includes development af population projeclians and water demand forecasls, evaluotion of water supply aplians, distributian syslem analysis and developme/lt af a Capital Impravement Plan. Partner-in,charge for lhe Lake Oswego- Tigard Joinl Waler Supply Plan. Responsible for developmenl and evalualion af system infrastructure, V:'.CIi-en1S91A1hbrMJo~W.ucfMP0909\il.<<antdDIEluu\.Jl1R..!oc: financial, governance, and regulatory requirements for the formation of a new regianal water supply syslem, The projecl includes preparing long-tenn population projeclians and demand farecasts ond evaluating allcmatives for supply infraslructure including surface water intake, raw and finished water llOnsmissian pipelines (including a crossing of lhe Willametle River), lreatment and finished woler storage, Partner-in.charge and regulatory, issues lead for thc Clean Water Services Rock Creek Advanced Wastewater Treatment Facility Plan, The primory objective af this Facility Planning effort is to. provide a fiexible, dynamic planning too.l thaI clearly identifies lriggel1l far implemenling improvements under varying fiaw, load, and rcgulotary scenorios, The project includes a three. phase, workshap based approach thot wos developed to streamline the decision making process ond maximize the use of lhe District's time, Serving as 0 mcmber of ' the Joint Review Team which is rcsalving issues and providing coordination between the development of the Rock Creek Facility Pion and the parallel planning effort althe Durhom facility. Partner-in,chorge and project manager far the Clean Waler Services Reclaimed Water Master'Plan. Carollo was teamed with anotber firm on this ongoing project which is cvaluoling the market for reclaimed waler, the benefits nf a reclomalian program in meeting the District'. water quality objectives, and costs. Porlner-in-charge for Carolla's role in development of Clean Woler Services West Bosin Facililies Pion, The focus af lhe West Basin Facililies Plan was to identify the besl operating slraiegics for the Dislrict's three wesl basin Irealmenl plants, Rack Creek, Hillsboro, and Foresl Grove. Thc plan Ihen develaped improvemenls necessary for continued operalion of lhc 'Hillsboro and Forest Grove treatment plants, c!:'c~"..."J!", EngihMtL..~~ WlJ'lWaW- Robert Bo Eimstad Page 2 Project manager and partner-in,charge for planning and predesign of a 5.5 mgd wastewater reclamation facility at the Medford Regional Wastewater Reel.mation Facility, The planning included pilat testing, regulatary assistance, tcchnology evaluation, and sitc devclopment for the ncw facilities, Treatment Plant DesIgn Partner-in-charge for the Clean Water Services Advanced Treatment Facility East Aemlion Basin Predesign, Final Design, and Bid Period Services, This project includes the design ofa "multipnrpose" aeration basin that has the cnpability to. run in stcp fced canfigumtion to maximize capacity, or in the (A20) mode to provide biological phosphorus removal. Partncr-in,charge for the Clean Water Services Rack Creek Influent Pump S~'tion Final Design, The project includes design of improvement to Ihe Influent Pump Station at the Rock Crcek A WTF which is addressing the following issues: pump clogging and reduction in capacity, inadequate HV AC system, and poor pump removal and maintemmce access, o Partner-in-charge far the City of Medford, Oregon's Regianal Water Reclamation Facility Plant 3 Upgrade, Proejct includes the analysis, preliminary design, final design, and construction services for the Plant 3 Water Upgmde Project. o Partner-in-charge far the design of a new headwarks far the City afBend's Water Reclamation Facility. The 20 mgd headworks includes perforated plate band screens. lime storage and feed, washer/compactors, flow measurement, andscreenings handling facilities in a new building, Project manager for Ute process design of phased implementation 0[$260 million af treatment plant improvements at the City of Salem OR WiIlaw Lake Water Pollution Control Facility and mnre delailed schematic design of the proposed $135 millian Phase I improvements which include a new headwarks, 155 mgd of influent pumping, four new primary clarifiers, new gravity thickeners, a service/utility tuonel, a new outfall and diffuser, cWorine contact expansion, new chemical feed facilities, and new electrical service and distribution. V:'.cli.:Jll~'P~W~~rMP0909"'lkflllnU'.oIEimsl3dR.dIlo: Partner,ill-charge for the City of Medford, Oregon's Regiollal Wostewater Reclamation Facility, (R WRF) Reuse Pilot Irrigation project. The project included the desigll of a 5,5 levellY "unrestricted use" reclaimed water facility for productian af water that will be used for a wide range of agricultural irrigation including irrigutian of food crops. o Project manager for long, range ,vater supply planning for the City of Ashland, OR.. The planning included an evaluation of alternative new sources. storage options, Rnd conservation measures to address future water deficits. Partner-in.charge for the Mcmbrane Pilot Project for lhe City of Ashland, Oregon, Project involved a two.month pilat test ofmembrnne fillers far lhe removal of phosphorus from disinfected secandary emuent. . Partner-in-charge for the preliminary design, fmal design, and construction engineering services for the City of Ashland, Oregon's Tertiary Treatment Planl. Dcsign elements included a secondary effiucnt'pump slation, and immersed membrane filtration system, chemical dosing facilities, an ultmviolet disinfection systcln, and an outfall pipe. o Partner-in,charge for the predesign, permitling assislDllce, design, Dnd conslruction engineering services of the City of Ashland, Oregan wastewater (reatment plant upgrade, The improvements included a new headworks, new aeration basins, 8 new secondary clarifier, rehabilitation af Iwa e.'listing secondary clarifiers, a new RAS/W AS pump stalion, a new aperations building, and UV disinfeclion. Mr, Eimslad led regulatory negotialions and participated in numerous public meetings. o Project mamiger and partner-in-charge far the new lO,mgd Ashland Creek Pump Stalion far the City of Ashland, OR. The pump statian lifts most of the city's wastewater to the wastewater treatment plant and was buill 10 replace an aging existing pump stalion, The new pump station includes three new screw impeller submersible plOnps, o_c~,,~tt.,.. , ~"~ Wondeta Kth www.. John Henderson Education 8S Civil Engineering. Worcester Polytechnic Institute, 1984 BA. Geogrcrphy. Middlebury College, /976 LIcenses Civil Engineer, Massachusells ) ) ) ) ) ) ) ) ProfessIonal Affiliations American Wale," Workf Associallon Disinfection of Facilities Technical Commillee New England Waler ',Varia Association- - FUtral/on COlllllliflee. Vice ChtJ;r Ad Hoc Committee on Slage 2 DBPILT2 Rule Program Comlllillee Oroundwoter Committee ) ) ~ ) ~) ) Ame,.kan Consulling Engineers Council Em-lronment<<1 Affain Commillee Ad Hoc Committee 011 DesalilUllion Po/icy, E.T<cullve Office of Environmental Affairs. MA. ,American SocielY o/Civil Eng'neers Chairman. /998 A.SCE Notional Co,,,,enlion. Local Organizing ConrmUlee ) ) ) .I ) ) ) ) ) ) BasIon Sociery a/Civil Engineers Management Commitlee, Chair NaJlonallYaler lYell Association Wale,. Environment Federat;on Mr, Henderson has more than 25 years of experience in management and delivery af water supply engineering services with specific expertise in WAter quality studies, pilating. process evaluatian and design af drinking water treatment and water reuse systems, facility planning, and design of infrostructure rehabilitation and renewal prajects, He rontinely manages treatment facility plAnning and design, assessment and design of infrastructure improvements, process assessment and evaluation studies and Safe Drinking Water Act compliance studies. Conducted a review of Oregon State procurement requirements for the Tualatin Basin Water Supply Project, to. determine how to implement qualifications based selection methads in a Design-Bid-Build procurement process, The procurement method was developed to ensure lhat the selection process will not be strictly limited to the lowest price bid, but also allows consideration af fiml experience and oyeroll qualifications of the bidders in the selection process. This method, which is in full compliance with all Oregon State regnlations, permits the award of any contract to. be based on the best value to. the owner, cansidering the initial construction cost. the life,cycle, casts and the overall quality of the proposed project. . Project manager and design lead for the 15-mgd lake Whitney Water Treatment Plant for the Sauth Central Cannecticut Regional Water Anthority, Cannecticut. The plant has an innovative treatment process, which includes: dissolved air "olaHoR, ozonation, and 'deep bed granular activated carbon filters with the Ability to add UV disinfection in the future. [n addiiian, the project incorporated sustainable design elements such as a ground source heat pump system and a "green" vegetnted roof system and was named as a 2007 AlNCOTE Top Ten Green Projects in the USA, V:\.clicallW<.UhbnoJI,"",poAb\W:lktM~'02IICttdmoaJ.drx . Project engineerlmanager for the site selection, environmental permitling, piloting, evaluation. process selectioll, conceptual design and final design for the 405-mgd DAF/Ozone/GACfiltrAtian Walnut Hill Water Treatment Plant and 50-MG clearwell far the MaSSAchusetts Water Resources Authority, Massachnsells. The MWRA deferred the construction of the OAF and Ihe filtrntion processes and constructed only the Ozone and the Post-azone Chemical Treatment systems when they snccessfully abtained a waiver to. the filtration requirement of the Safe Drinking Water Act Filtratian Rule, lead process design engineer and project manager afthe 30.mgd upgrade/expansion far the City af Allentown, Pennsylvania, conventional water Ireatment plant that incorporated high-rote. inclined-plate selllers and dual media filtratian, The design received the 1998 Diamand Award for Engineering Excellence from the Cansulting Engineers Council of Pennsylvania far ImlOvation in Water Treatment Plant Design, . Project engineer/manager for piloting and design oca 12-mgd adsorption. clarifier and granular activated filter water treatment plant far the Kennebec Water District, WaterviUe, Maine, The design and construction of one 4-MG and (wo 6- MG pre-stressed concrete" water storage tanks are also a part of this project. . Seniar technical advisar far the Massachusetts Water Resources Autharily Chicopee Valley Aqueduct UV Disinfection Tre.noent Study, which piloted a 6-mgd Trojan Swin medium- pressure UV reactor over a 9-12 month period in order to evaluate operating , characteristics under the rull range af seasonal water quality conditians. . Process design engineer to evaluate, assess and design a 10'mgd brackish water, desalinatian treatment plant and deyelap cost estimates for a firm, fixed price design-build propasal for The Ministry of Water and Irrigatian, Amman, Jordan, Bath high rate conventional and C{'C~"",!r." ~._~~Ml'Iw.w~ John Henderson micro~filtrntion membrane pretreatment systems were evaluated to treat the feed water for reverse osmosis membranes required far desalination, Su'per pulsatars, actinow and up now clarifiers were campared with Narit and Zenon membrane systems for the reverse osmosis pretreatnlcllt process. . Process design engineer to evaluate, Rssess amI design a 5.mgd brackish water desalination J treatment plant and develop cost estimates for an Indefinite Duration IndefUlite Quantity design.build proposal far the $1.1- Billion Iraq Reconstruction Program, The project entailed collecting, analyzing and bench-scale testing of water quality samples from the Euphrates River near AI Ramadi; Iraq, and selecting the most reliable and appropriate process design to meet the project objectives, The selected treatment process included Pall membmnes far pretreatment follawed by reverse osmosis membrnnes, remioernlizati9n and disinfection. . Praject manager for I-year pilot study to investigate process improvements far the Alto Boa Vista Water Treatment Plan!, for the Companhia de Saneamenlo Basica do. Eslado de Slio Paula, Sao Paula, Brazil. The pilot study investigated process modificatians to address recurring and incrcasing problems of taste and odor and to increase the plant capacity from 12 m/s (274 mgd) to 16 mls (365 mgd). A preliminary engineering report prepared as part of the study recammendcd the addition of new potassium oxidation chemical feed systems, conversion of the existing sedimentation basins to inclined plate clarifiers, the additian af intennediate ozonation facilities, and the conversian aflhe existing anthracite/sand filters to. granular activated carbon filters. The report also included a detailed construction-phasing plan to construct the $100- million of recommended capital improvements while maintaining operations althe 30-year-old treatment plant. Project manager for the City of Shrewsbury, Massachusetts, water facilities master plRn and . improvement project. Project included the design of a 4.4-mgd watcr treatment plant designed to remove volatile organic chemicals, control dissalved manganese; and lawcr the corrosiveness oflhe waler fram the largest single groundwatcr production well in Massachusetts. Responsible for the design of two large diameter gravel packed wells to augment the town's water snpply, a V:'C1ielll391hbu,IIJ)Prvpos:al:J\W3IaMP0909\ltc5llm.:s'OUltTldmoal_oo.. Page 2 compute,r analysis aflhe town's distribulian system, the design ofa new L25-MG sleel water storage tank, a 1.25-MG pre-stressed concrete watcr tank and a new I-mgd booster pumping station, ' Project manager for the Town of Stoughton, Massachusetts, Water Supply Masler Plan, The work involved exploralion. testing, design. and developmenl of groundwater supply and treatment facilities including a town-wide hydrogeology study, the testing, pennilling and design of the rcqnired pumping and trealment facilitics far the Cedar Swamp well field, and a fractured bedrock test well investigation program, A distribution study was also completed as part of an evaluation afthe town's overall water supply system. Senior praject engineer for a water supply master plan, hydrogeologic assessmelll and groundwaler management study for the New Jersey Department of Environmental Protection. Camden, New Jersey, which won the 1988 American Consulting Engineering Council National Excellence Award for environmental smdies. Responsibilities included coordinatiall of field investigations and the preliminary design work required to establish a regional groundwater management and water supply plan, as well as the 54-mgd water treatment plant and large diameter distribution facilities required to implement the recommended plan, . Projccl manager responsible for developing water and wastewater infraslrnclure for the redevelapment ofthe South Weymouth Naval Air Station (SoWey NAS) Redevelopment Project, LENNAR, Partners, Weymouth, Massachusetts. With almost 3,000 residential units and 2 million sq, fect af commercial/retail space proposed, this is the largest private development project in MassachuseUs requiring a regianal water supply capable of meeting the average day demand of 1.0 mgd of potable waler, 0.5 mgd of irrigation water and an on~site wastewater treatment planl designed to treat wastewater to reuse standards required for irrigatian water and industrial reuse, C( c~".."1~.,, . EngInoors...~~.......... Nicki Pozos Education PhD Civil Engineering. Universify of California. Davis. 2002 MS Civil Engineering, Ulliversify ofCalifornia. Dav;,. 1999 BS Bio--Re.source Engineering. Un;veJ"sily of British Columbia, Vancouver, Canada. 1996 Licenses profe.JSional Engineer. Oregon Civil Engineer, California Professional, Affiliations AmericQn Wale,. Works Assoc;alion , lYorlifon:e Strategies Commlllee Member - Pacific Northwest Secl;on, Chair Customer Service Committee - NorlhM'esl Oregon Subseclion. Waler for People and YOllng Professionals Commillee.s ) ) ) ) ) ) ) ) ) ) Dr, Pazos has broad expertise in water treatment) disinfection processes and distributian system water quality. Her experience ranges fram applied research funded by the Water Research Faundatian to. facilities plans far municipal clients, Her work has encompassed advanced treatment technologies including ullravialet (UV), disinfection, ozone, chlorine dioxide, enhanced coagulatian, membrane liItratian, ActiOailll and MIEXiIll. Dr. Pozos' distributian system water quality experience has inciuded water transmission system planning, master plalllling, Water Research Foundation investigations, vulnerability assessments, and chloramine canversion plans. Specific roles have included water age modeling, nitrification monitoring and response. statistical analyses afhislOricaland experimental data, identification of sampling sites, operations planning, evalualion of impacts of trealment changes. and development of inilial distributian system evaluation (lOSE) plans, Her recent experience il.lcludes: Project manager for Ihe Water Master Plan for the City afTigard, OR, A. part of this project, a new, calibrated hydraulic madel in Infowater was deveJaped from the City's GIS system, including calibralion and develapment of a diurnal curve for operation in extended period simulation; The model is being used to evaluate rhe impact oflhe City's planned new joint supply with the City of Lake Oswega and new aquifer storage and recovery (ASR) wells~ as well as to. identify other fire naw, storage and pumping impravements, Project manager far a Financial , Evaluation of Water Supply Alternatives far the City ofHillsbaro, OR. The abjeclive of this project was to develap a SO-year net present value (NPV) madel of three lang- term water supply altemalives for the City, ' cansisting of the Tualalin Basin Water Supply Project, the Willamelle River, and cannection to the Part land Water Bureau system, The model incarporated a Monte Y:'.CIic...I'lJ\.\JbL1Dcl~\WakrMl'0909\Rauma'D]~~..Ioc Carlo analysis to take into. account the level af risk associated with each supply, Project manager for the Cooper Mountain Mini Master Plan for Tualatin Valley Water Distric~ OR, The abjeclive of this study was to use the District's H20Map hydraulic model to. evaluate supply, pumping and starage an Cooper Mountain, The project identified canslnlctian of a new Grabhorn Pump Station (PS) as an alternative to expanding the existing l89th PS thai would improve system reliability and operations. The project also included a financial and nan- financial evaluation afremoving the 189th Reservair, which is located below the hydraulic gradeline af its service area, from service. . Project engineer far Interim Program Management Services far the Tualatin Basin Water Supply Project. The gaal of the IPM services i. to. aid the Partners in ' procuring and defining the role of a long- term program manager. Services include: maintaining an averall program schedule, facilitating on, going planning meetings, supporting discussians with the Bureau of Reclamation, supporting the environmental permitling process, develaping an organizatian and staffing plan, aud furthering design concepts for Ihe intake, pump station, and raw water pipeline. . System analysis Lead for Ihe City af Lacey, WA Camprehensive Water System Plan, The plan includes an evalualion of water supply alternatives, s)'slem analysis using a hydraulic model in H20Net, an integrated capital improvements program, and a rmancial plan. Due 10 several pending water rights applications, the hydraulic model analysis includes cansideration af Iwo different water supply scenarias and three demand scenarios, This plan also. features an interactive source af supply model that can be used to quickly evaluate the supply alternatives, as well as an interactive CIP that will allow City staff to update the CIP based on future conditions. <Ir ca".,..",f,~~ EtlghMta_lftrifng ~ ......www.. NicldPozos Waler quality lead for the City of Auburn, W A Comprehensive Water System Plan, Role included review afhislorical water quality trenos, review and update to the City's water quality monitoring plan, and development of the Water Quality Chapter of the plan, Project engineer far Ihe Seawater Intake Systems lar Desalination Plants Projcct lar the Water Research Faundation. The abjeclive of this project is to develap tools to lacilitate the planning af desalinalion intakes. Deliverables include a State 0.1 the Science Report. an ,interactive Decision Tool programmed in MS Access, and a utility experience survey, Project engineer for the Cast and Schedule Evaluatian for the Tualalin Basin Water Supply Praject Partners, The Partners include seven independent cities and agencies. The project included verification af costs and schedules lor aver $SSO million in capital improvements, inclnding: a raise olScaggins Dam; a new 6-mile long, 96-inch diameter raw water pipeline; a new 300 cIs pump station; imd expansion of the existing Joint Water Commission Waler Treatment Plant from 7S mgd 10 over 160 mgd, The project also included synthesis' of SO-year demand projects lor all Partners and development 01 an integrated implementation plan lor the averall program, Project manager lar the Water Master Plan Update for Oak Lodge Water District. The WMPU includes: development of population and demand projections, update and calibralion olthe DistricI's InloWater madel, idenlification 01 needed distribution system improvements. a condition assessment and evaluation of renewal and replacement needs, review 01 regulatory requirements, development of a capital improvement program, and develapment afrevised system development charges. . Project manager for the Water Master Plan Updale for Tualatin Valley Water District The WMPU included the following: development af populatian and demand projections, calibration of Ihe District's H20Map hydraulic model; development af an Initial Distribution System Evaluatian (lOSE) Plan; identificalian of needed storage, pump slation, and piping improvements; an evalualian of renewal and replacement needs; an V:'.CIicntl9lAsbbDd\PnJ(lOAIs\WaIKMP0909\Rmzmes'DJPtlalIN.doc Page 2 economic evaluation orwnter,supply options; evaluation af supply to Wcst Slope Water District; evaluation of emergency supply to the Portland Water Bureau; and development of a capital impravemenls plan. Majar recommendations include oVer 25 million gallons of addilianal storage capacity and a Iramework for moving forward with identilying a long,term watcr supply for the Dislrict . Waler quality lead for the City 01 Gillden Grove, CA Water Master Plan, Role included reviewing water quality data, evaluating regulatary compliance, and authoring the water quality chapter of the master plan report. . W~ter quality lead for the City 01 Aubum Comprehensive Water Plan, Role included reviewing water quality data, evalnating regulatory compliance, reviewing lhe Cityh's water quality monitoring plan, and autharing the woter quality chapter of the master plan report, . Starr engineer for Phase I Preliminary Engineering afthe Water Supply Improvements Program far Tualatin Valley Water District. The project included idenlification of the diameter and route for a 22-mile long 72-inch diameter water supply pipeline, Rale included preparation oftlte final report, including coonlination af subconsultant contributions. Project engineer for the Water Distribution Model Engineering Services Project far the City of Ashland. Tbe project included develapment of an initial distribution system evaluation (lOSE) plan, identification af system npgrades to maximize use af existing storage and improve available fire flows, In addition, a new spreadsheel was develaped for calculation of chlarine CT delivered at lite Water Treatment Plan. . Project manager far the lOSE Plan and Report for the City afHayward, Developed a standard monitoring phin using water age data from a calibrated hydrlmlic model in H20Net, as well as historical chlorine residuals and temperature data, . . Project engineer lor the lOSE Plan for City of Palo Alto, Develaped a standard mOllitaring plan using water age data from a calibrated hydraulic model in H20Net. as well as historical cblorine residual and temperature data. aca.'f'c'Ol!o ~-,v.bottlg~...w.r"" Tracy A. Clinton Education as Civil Eng'neer;ng. University of Kansas. 1985 Licenses Civil Engineer, Texas.' Arizona, Coliforll;a Professional Affiliations JYaleReuse Associalion Chi Epsilon ) ) } ~ ) ) ) ) ) ) ) ) ) Ms, Clinton is an expert in the areas of water recycling planning and public involvemenVdecision analysis, She has managed or developed more Ihan 3S water reuse plans for agencies across the country. She has also coosnlted on reuse effarls regarding endocrine disrupting compaunds. disinfection alternatives, and filtration methods. Her reuse experience includes recycled \Vater, grey water, and rainwater reuse, The public involvement and decisian analysis specialties have proved useCul when working with large stakeholder groups who are part of a decision process. Her experience includes: Project manager for the Chino Basin Water ConselVation District Strategic Plan, Montclair, CaliComia, PerCormed 10 interviews of service area agencies and devclaped oC a strategic map and plan, Projecl mauager Cor the Sanoma Caunty Water Agency/Sonoma Valley Caunty Sanitation District's Recycled Water Project Ecoaomic/Financial Plan, The project included an analysis oCthe financial and economic benefits of four alternative projccts with multiple agencies priorities. Project manager far the University of CaliComia at Sanla Cruz' Campus Reclaimed Water Sludy. The project included the development oC a decision' matrix to detenniue Ihe best use of recycled, grey, and rain water across the campus for existiug and new Cacilities, . Technical advisor ,to the City aC Vacaville for review and input to their water and recycled water contract pravisions with a power plant. The project included review oC several other agencies' contracts and recammendations Cor their cantract development. " Technical advisor for the City afPunta Gorda, Florida, Reuse Feasibility Study. Reviewed drall report and repart guidelines and provided technical input Project mimager far the City af Daly City/SFPUC design and planning of a recycled water service extension to the Harding Paric Golf Course, The project V:'.clicIll89\Adlbnol'Propos.W.\W~kIM~\R.:iUIUCI'OSCIlDtoDT.lloo ) ) includes design of 4,700 feet oC 18-inch pipe and a 700,OOO,gallon buricd storage tank. . PlOjectmanager Cor the King County, Washington, Reuse Feasibility Report, Ch 4 "Regional Market Analysis." This chapter summarizes the reuse potential, stakeholder program, and reuse scenarios development. and briefly discusses costs and benefits, . Praject manager for the City of Pismo Beach, Califamia, Water Reuse Snldy including conducting a market assessment, developing demand summaries and system concepts with costs. Findings were presented to the council. . Project manager Cor the City oC Modesta, California, Ranch land lease Scudy, Included summarizing existing conditions and ranch management practices, developing rancb allematives and lease options. and presenting recommendations. All recommendations nre planned 10 be implemented, . Project manager serving as reclaimed water advisor Cor the City of Stockton, California, Responsible Cor conducting , plan reviews Cor all new developments incorporating reclaimed water, developing reclaimed water City standards, and coordinating with the local health department. . Technical advisor Car the Carnlel Area \Vastewater District reuse pCnnitting for Ihe Salinity Management Projeet, Cannel, California, Respoosibilitie~ include working with the California Departmenl of Public Health and the Regianal Water , Quality Conlrol Baard on revising the water recycling pennit. . Project manager and author far development of Valume 7 - Reclamatian and Reuse, for the City oCRiverside, California, Integrated Master Plan Cor Wastewater Callectian and Treatment Facilities. This was an updale to. an existing water reuse feasibility study developed in 2003, Volume 7 included a summary of the 2003 plan contents by , c' c~".""1'.,, EngbtGra.p~~Wlll'tWWw'" Tracy A. Clinton Page 2 chapter, lhe planned recycled water pump slation demands, design considemtions. and project and power costs. Projcct manager for the City of Hesperia Water Reuse Masler Plan os part of the overolllnlegrated Watcr District Master Plan~ The reuse master plan consisled of sununarizing the reuse supply, market identification and quantification (including groundwater recharge), developing a recycled waler model using InfaWaler and G1MS baseroap, identifying altematives and regulalary considerotians, and dcveloping an implementation plan for a 2S-year period. . Technicaladvisar far the Beaver Water Dislrict Water Reuse Report as part afthe Regional Growth Study. Thc report summarized the reuse guidelines for Arkansas, Ihe benefits of reuse as well as implementation issues, and identified a systematic planning approach for developing a camprehensive reuse plan. Prajecl Managcr for Ihe Water Reuse Feasibility Study Supplement for Ihe Sewcr Authority Mid- Caastside in Half Moon Bay, California, This study involved updaling a pervious study, conducting bench,scale tesling, and localing/sizing/costing lertiary filtralian and disinfection facilities. Projecl manger for the regional Soulh San FranciscolSan BrullolBrisbane Water Reusc Feasibility Study. Besides SSF, SB, and Brisbane, olher study parlners included the San Prancisca Public Utilities Commission aud Cal- Water Campany. The study included identificalion aud quantification of potential customers, conceptual development and costing af over a dozen alternatives, stakeholder involvemenl workshops, and financial altemalives, . Techuical advisor for Ihe Sweetwater Authority Recyclcd Water Master Plan, Chula Vista, Califomia, Corolla develaped the patential market demand and a series of altematives and costs, The project also included the preparation of a market assessment report and \Valer reuse analysis. Also, conducted the customer interviews and interest summaries. . Principal Investigator for the Reclaimed Water Aquifer Storage and Recovery (ASR) Research Study for Ihe WaleReuse Foundation, which V:'.Cljcnli9\.Ub1md'~IJ\W.1lICrMI'09tW<R.~ll5CliIllDllT,doc consisted of condncting a technical warkshop and litemolre survey, developing a list af conslituents to. be analyzed, conducting sampling at sites in Florida, Arizona, and Austrolia, and writing the report to be published, . Project manager for the Reclaimed Water Master Plan for Clean Water Services in Hillsboro, Oregon, The plan includes develapment af 14 technical memoranda, which define Ilowllaad projections, regulations, reuse market and alternatives, water righlS, costs, modeling, financial alternatives, and recammendatians, . Project manager for Ihe reuse market assessment and public involvement tasks as part afthe King County, Washington, Sammamish Valley Regional Reclaimed Water Conveyance Facility Project. This project includes alllasks from identifying Ihe potential Customers to planning and implementing reuse up to. 10 mgd. This includes developing alternatives, pipeline routings, and customer agreemenls. Project manager for Ihe Sanla Clara V Riley Water Dislricrs (SCVWD) and South County Regional Wastewater Authority's Soulh County Recycled Water Master Plan, SCVWD wishes to maximize rcuse in the County to offset groundwater use. . Project manager for the City ofVacaville California's Recycled Waler MasterPlan, Work included develaping R rRaster plan for recycling tertiary emuent from Vacaville's wastewater Irealmenl facility, The study includes identifying reuse cuslomers in Ihe service area, defining Ute quality and quantity requirements, and evaluating Ihe facility needs (pipelines, pump slations, and starage). The master plan includes a financial analysis, a slakeholder autreach program, and an implementation plan. Work also included eamparing Ihe existing water quality to. irrigalion water quality pammeters, . Project manager for a Reclamation Program Preliminary Economic Feasibility Study for the Caaslside County Water District, Califomia, The Sludy included development of reusc facilities to. canvey recycled water to. Iwo large users: galf courses and a cemetery, <J .c~f'."ff", _.._--""". , LAURA DUTT,P.E. Sol. Proprl.tor WATER PLANNING ENOINEERS EDUCATION B.S, Civil Engineering / Pardand Srate University B,S. Chemistry / Pacific Lutheran University REG,ISTRATION Professianal Engineer / Califarnia / No.. C64627 Professianal Engineer / Oregon / No, 58079PE PROFESSIONAL ORGANIZATIONS American Saciety af Professianal Engineers Water Environment Federntian California Water Environment Association GIS & MODELING SOFTWARE ESRI ArcMap, Spatial Analyst & 3D Analysr, MWHSaft H20Map Sewer, H20M.p Water, Info- Sewer. & InfoWater. Pizer's Hydra Sewer Model. EPA SWMM & XP,S\VMM Starm Water Manage- ment Madel ) ) ) ) ) ) ) '> EXPERIENCE-WATER PLANNING ENGINEERS 2005-2009 CAROLLO ENGINEERS: West Caunty Wastewarer District Cullectian S)'stem Model Update. City of Ashland, Oregon Engineering Services far the Water Distributian Madel, EASTERN MUNICIPAL WATER DISTRICT: Pala Basin Detailed Capacity Analysis. 2006 Wastewater Facilities Master Plan Update, InfaSewer Model Conversian. ' Narth San Jacinta Area Sewer Study, Wastewater Callectian System Engineering Support Services, List af Prajects far 2008: _ 3,day Madel & GIS Training, . Nueva Diversion Alteenative Analysis . Briggs Raad Capacity Analysis, . 2012 Trunk Sewer Capacity Analysis far Peehanga Resart E.xpansion, . Flaw Manitaring Program Recommendation. ) ) ) ) ) ) ) ) ) . Antelape Raad Sewer Capacity Analysis, . Flaw Transfer Study - San Jacinta Valley RWRF to Perris Valley RWRF, Wastewarer Callection System Engineering Support Services - List af Projects far 2005,2007: . Pujal, Warm Springs, and Diaz Lift Statian Basin Flow Projectians, _ Cawston Lift Statian Flaw Projectians. . Sun City & Perris Valley Callectian System Starnge Analysis. . Mareno Valley Flaw Transfer Alteenatives. . Gentian Avenue Sewer Capacity Analysis, . San Jacinto Valley Interceptor Flows and Canneetion Analysis. . Tract 32813 Sewer Capacity Analysis. . Teuacina Tcact Connection Alternatives. . Margan Hills Devclapment Cannectian Alternatives. . Old Tawn Temecula Sewer Study. . Meridian Business Park Sewer Cannectian Alreenative. . Murrieta Creek Crossing Alteenative Study, . Del Ria Sewer Flow Diversian Study, . Harvill Sewer Capacity Analysis, . Wine Country Sewer Capacity Analysis and Connection Alternatives. . Benton Raad Capacity Analysis. . Harvest Landing Capacity Anaiysis. _ Heritage Squarc Capacity Analysis. . Diamand View Meadaws Sewer Stud)'. . Flaw Prajections far Sun City Lift Statian, . Menifee Valley Ranch Sewer Study. . Flow Projectians for Winchester Lift Statian, PROJECT ENGINEER-Eco:LOGIC CONSULTING ENGINEERS 2005 City af Merced. CA - Sauth Merced Sewer System Master Plan. Tualumne City Sanitatian District, III Study, MD Develapment - Oasis Road Pump Statian E valuatian. City af Redding, CA. Washae County, NV ' Warm Springs WWTP Influent Pump Sratian Design , Laura L. Duff, P.E. CITY OF LINCOLN, CA: Sewer System Master Plan, General Plan Update, Collection System Facilities, PROJECT MANAGER/PROJECT ENGINEER-CAROLLO ENGINEERS 1999-2005 EASTERN MUNICIPAL WATER DISTRICT: Callectian System Master Plan Update (2003), Callectian System Master Plan Update (1999), Murricrn, Development Sewer Relief Study, Regianal Water Reelamatian Facility Flaw Projection Study. Rcelaimed Water Madeling Project, WEST COUNTY WASTEWATER DISTRICT: Callectian System Master Plan, Pinale Wastewater Transfer Study, Pipeline Rehabiliration Progrnm, Phase I. CITY OF ASHLAND, OR: Collection System Master Plan Update. TAP (City afTalent, Ashland & Pheani.x) Preliminary Pipeline Engineering & Water Distributian System Analysis, CITY OF PORTLAND, OR: Swan Island Pump Srntian Design, Sullivan, Stark & Halladay Basin Predesign & Sewer Mndeling, OTHER AGENCIES: Wastewater Master PLm - Cil:)' af Pleasanton, C1\, Callectian System Master Plan Update - Oro Loma Sanitary District, CA. Callection System lVIaster Plan Review - Castro Valley Sanitary District, CA. Wastewater Utility Master PI.n - City afRedding, CA, Callectian System Master Plan - City af Chico., CA. Sewer and Starmwater Master Plan - City of Cattage Grove, OR. Templetan Interceptor Cnpacity Analysis - Cil:)' af Paso. Rabies, CA. Page 2 Trunk Sewer Improvements - City ofHilIsbarough, CA, A-Une ReliefInterccptar Project - Central Cantrn Costa Sanitarian District, C1\, HYDRAULIC ENGINEER- US ARMY CORP OF ENGINEERS 1997-1999 Flood Cantral Madel Develapment .WilJamette River, Partland, OR. Flood Frequency Analysis - Willamette IUver, Portland, OR, Tornl Dissolved Oxygen Study- Banneville Dam, The Dalles, OR. , Brownlee Dam - Flaad Control Release Rule Curve, Idaho.. ENVIRONMENTAL CHEMIST _ AMERICAN ENVIRONMENTAL NETWORK 1991-1996 Supervising Chemist. Volatilc Organics Group, Portland, OR Pu B LICA TI ONS/PR ESENT A T ION S Dutt, L., and Dent, S,A. "Effective Methads to. Quantilj' Inftlttatian and Inflow (1&1) for Calleetion System Rehabilitatian." Paper presented at the Water Environment Federatian CollectianSl'sterns 2004 Can ference, Milwaukee, WI, August 8-11, 2004. DUll, 1.. "Creating a Toolbox for Optimizing Basement Flaading Relief Alternatives." Paper presented at the Enviranmental & Water Resaurces Institute/American Society af Civil Engineers Wadd Water and Environmental Resources Cangress 2004, Salt Lake City, UT,June 27'July 1,2004, Dutt, 1.. "Effective Pipeline Rehabilitatian Program for Reducing Inflaw & InfLltration." Proceedings af the Water Environment Federatian 76th Annual Technical Canfercnce & Expasitian, Los Angeles, CA, Octaber 11-15,2003. Dutt, L" Dent, S,1\" Nikaida,].Y. and Taylar, T,F, "Develaping Wet Weather Storm Evcnts from Long, Term Histarical Rainfall Data," Paper presented at the Water Environment Federatian 2003 Collectian Sl'stems Canference, Austin, TX, June 2-5, 2003, tl;;SI W.i..Solullom,lnc. EDUCATION MS, Resource Geography, Oregon,Slale University BS, Geographyl Environmental Studies, University of California al Sanla Barbara DISTINGUISHING QUALIFICATIONS ) ) ) ) ) ) ) ) ) ) . More Ihan 18 years . experience with water rights and lI'alerlmvs . Experience working with water users to identify short-term and long-IeI'm waleI' supply alternatives . Expertise in resolving contentious water resource issues by working with disparate stakeholder groups to develop consensus SO/II/ions . Experience researching and developing water resaurce information Jor stakehalder groups, state agency staffi, and the general public . Excellenl communications skills ) ) ) ) ) ) ) '. Adam Sussman Senior Water Resources Consultant Adam has 18 years afexperience, including 14 years with the Oregan Water Resaurces Department (OWRD), where he develaped expertise in water rights and water laws, including the develapment and implementatian af statewide palicies and programs. As a seniar water resaurces cansultant, Adam warks with water users and providers thraughaut Oregan, assisting them in develaping strategic approaches to. secure and maximize woter rights, and in develaping calUprehensive appraaches to. water rights and water supply management. REPRESENTATIVE PROJECTS Water Rights and Water Supply Services, Confidentlal Client, Ashland, Oregan. Adam evaluated aptians far abtaining water supply through water rights transfers andlar abtaining water supply fram federal water supply projects, Water Rights Consulting Services,' Medford Water Commission, Oregon. While warking at anather cansulting firm, Adam assisted in the develapment af a water management and canservatian plan far the Cammissian, His primary role was develapment af infarmatian abaut the Cammissian's water rights status and reliability. On-Call Water Rights Services, City of Bend, Oregon. Since 2005, Adam has provided an-call cansulting services to. the City. Tasks have included ca,autharing a technical memarandum autlining the implicatians afODFW's 2005 Oregan Native Pish Status Repart an municipal water right permit extensians; providing expert testimany in a water utility candemnatian trial; successfully negatiating the resalutian af pratested graundwater permits with OWRD and WaterWatch afOregan; develaping and implementing a Water Rights Master Plan, which includes campleting permit extensians and water right transfers to. 1 maximize and secure the City's surface water and groundwater rights; and providing angaing cansulting services related to. the Deschutes Basin Mitigalian Program. On-Call Water Rights Services, Avlon Water Campa ny, Bend Oregon. Adam has averseen all water.rights-related activities far Avian Water Campany, the largest private water pravider in Oregan. Overall, the task has been to. secure new water rights and madify and pralect existing water rights for a lang-term, stable water supply. Cansulting services have resulted in the issuance aftwa new groundwater permits; acquisitian af required surfuce water mitigatian; develapment af several claims af beneficial use and water rights certificates; appraval af several permit amendments, water rights transfers, arid permit extensians; and development af a strategic appraach far securing Avian's multiple water rights, Water Supply Strategies, City of Prlnevllle, Oregon. Adam has led an effort to. advise the City's Public Warks Subcammittee regarding near,term and lang-term water supply strategies. In additian, he has helped to. abtain mitigalian assaciated with existing graundwater rights and to. develap and file a new graundwater pennit applicatian that will require mitigation. Adam also provides angaing water rights cansulting. GSI Water Solutions. Inc, lVww.gsiwolersolulions,com ~Sl Adam Sussman Senior Water Resources Consultant W""S.I.U.n~llK. Water Rights Master Plan, City aC Sisters, O,'egon. Adam warked with ather GSI jlersannelta complete a water rights review/audit that includes a campi/atian afwater rigllts awned and cantralled by the City; and a review and evaluatian af all permit 0.1' certificate canditians. Based an tills infannatian, a Water Rights Mastel' Plan will be develaped that provides the City with clear recammendatians and a priaritization af steps to. maintain campliance with its existing water rights, and the develapment af a strategic appraach far securing the City's multiple water rights, Water Supply Needs Assessment, Palk County, Oregon. Warking as a subcansultant to. WHPacific, Adam assisted in the develapment af a' water needs assessment far the 10 largest water praviders in Lincaln Caunty to. help Polk Caunty understand the water praviders' current capacity to supply water and patential supply deficits to. the year 2050, This wark includes evaluating limiting factars assaciated with water supply such as water rights, current infrastructure, strcam flaw, and regulatary canstraints, Watel' Rights nnd RegulatoryCansulllng, Clackamas River Water Pravlders (CRWP), Clackamas, Oregon. Adam is assisting the CRWP in its efIarts to. successftllly camplete tbe water right permit extensian pracess. Current members af the graup are the City aCLake Oswega, Narth Clackamas Caunty Water Cammissian, and Sunrise Water Autbarity, Adam develaped supplemental permit extensian materials, facilitated cammunicatians aballt the permit extensian with OWRD and ODFW, and is now assisting the group in a cantested case hearing with a third-party that bas pratested tbe extensian appravals, Water Management and Conservation Plans (WiVICP), Various Municipalllies and Organizations, Ol'egon. Adam (while warking at anather cansulting finn) was praject manager far develaping WMCPs Car the City of Sandy and tbe City of Lake Oswega, He also participated in tbe develapment afWMCPs far the Kemville-Gleneden Beacb- Lincaln Beach Water District, Part afSt. Helens, Part afUmatilla, City afNewberg, Medfard Water Cammissian, and McMinnville Water & Ligbt. While at GS[, Adam has participated in the develapment af WMCPs far the City af PrineviIle, the Jaint Water Cammissian and City af Flarence. ( Water Rights Consulting Services, City of Calloge G,'ove, Oregon. Adam evaluated the City's water rights and develaped a strategic plan far actians to. secure and maximize water rights, including water rights transfers, water rights permit extensions, and develapment af claims af beneficial use far certificate issuance, Woter Rights Consulting Services, City of Creswell, Oregon. Adam evaluated tbe City's water rights and develaped a strategic plall far actians to. secure and lIUIJ(imize water rights, including water rights pennit extensians and develapment af claims af beneficial use far certificate issuance, Water Rights Consultant of Record; City of CorvaUis, Oregon. GSI is the water rights cansultant afrecard far the City. In this role, Adam has assisted in abtaining approval from OWRD far the City's Water Management and Conservatian Plan, He also. develaped a partial perfectian claim afbeneficial to abtain a water right certificate and is providing Suppart far abtaining a water rights pennit extension to. secure and protect the City's water supply, which is the Willametle River. GS! Waler Solutions, Inc. www.gsiwatersolulions.com Mary L. Hansel Education BS Busine3S Admin;slradon. Major ;" Acco'm/ilJg. University oj Arizona, Tllcson. J 98J Professional Affiliations American Society of Civil Engineers 8iomimicry brs(Uute ) ) ) ) ) ) ) ,} ) } ) ) ) ) ) } ) Ms. Hansel warked far Carollo. from 1990 to. 1997 as the assistant calltraller. She rejained Caralla in 1999 to. wark all special prajects, She was a Certified Public Accauntant from 1985 to. 2003. In addilian to. her finallcialaud infonnation management experience, she has an extensive and varied background ill sustainability principles and strategies, and water use efficiency programs. Ms. Hansel is Ihe ItInllager af a strategic initiative to integrate sustainable practices into. Cnrolla's professianal pmclice and daily apemtians, As pari af Ihe initialive, Ms. Honsel is responsible far develaping gaals and implementing n multi-faceted plan 10. integrate sustainabilily principle., taals, and practices into. the Carollo. workplace. Her resp.ansibililies include the fallawing wark lasks: I) develap and present learning sessions on sustainabitity for Carollo's starr, projectleams, and clients; 2) team leader an the Sustainability Technical Advisol}' Team, which is warkiug 10. illtegrate sustainable design principlesinla Caralla's professianal practice; 3) eansult with engineers and staff on energy efficiency I renewable energy strategies and tecbnolog~es>> funding sources for "green" projects, and environmentally friendly materials and construction practices; and 4) aUlhor articles an sustainability far Carollo. clieul and staff newsletters. Representative proJects include: . Sustainability technical advisar far the San JoseJSanta Clara Water Pollulian Cantrol Plant (WPCP) Master Plan far the City af San Jnse, Califarnia. The plant serves a population af 1.3 mil\ian with a capacity af 167 mgd. In additian to. planning far tmditianal wastewater treatment needs, the projecl includes land use planning far 2,600 acres afbufferlands surrounding the plant, Suslaillllbility is a care gaal. Organized and participated in a "brainstorm workshop," designed to explare a range af canceptual planning , altematives far the future "highest and best use" afWPCP lands, Participants included V;'c.li~nta9\.A"hbnd.~\W;alo:f)'lp09()91Jt""'nUl:'S\I'lbmc\.".doc San Jose staff fram nine departments, representatives from tributary agencies, several Sl.stainability "Ihaughtteadem," and leadiug urban develapers. architects, engineers, and scientists, Authared project memarandum an master plan gaals and abjectives and reviewed severn I ather project mernarandums. Sustainability analyst far Ihe EI Estcro Wastewater Treatment Plant Evalualian farlhe City af Santa Barbam, Califarnia, Respansible far assessing the relative environmental sustainabilily of six alternatives. Prepared a limited life cycle greenhouse gas emission evaluation that included aperatianal energy, as well as the embodied energy in chemicals and filter media and the transportatian to. get operations. maintenance and rep~acement materials to. the lreatment plant. Sustainability lechnicaladvisar far the Sewer System Masler Plan far Ihe Sau ' Francisco Public Utilities Commission, Califarnin, Respansible far orienting Ihe praject team to. sustainabilily cancepts, strategies. and alternatives assessment criteria. Sustainability technical advisar far lhe Water Supply Master Plan Update far Samsala Counly Environmental Services, Flarida. Dcvelaped sustainability criteria used to scare waler supply project alternatives far future supply planning. . Sustaillability strategies technical advisar for planning, predesign, and final design of the Water Recycling Facility far Ihe City afPetaluma. Califarnia, Respansible far initial training af lhe project team an sustainabilily principles and toals. Ca-authared a technical memorandum on sustainable design. which evaluated palenlial sustainable design gaals and strategies far the final design, Suslainable design aptions 'evalualed included green building practice.; vegetated roofs, use af recycled ,building materials, passive-salar techniqucs far building healing and cooling, nod solar~photovoltaic energy, Caardinated the wark af subcansultants ex' C~'r."Jt". ~_~~WlIh~~ Mary L. Hansel Page 2 hired to assist in sustuinability assessment of Irealmenl allernatives, using "The Nalural Step Syslem Conditians" and Ihe "Ecolagical Foalprinl." Water Use Efficiency . Conservation specialist for Ihe Waler Masler Plan Updale for the City afHesperia, California, Responsible for summarizing current water canservalian programs and their effectiveness; proposing additional canservalion programs; and providing recommendations lo help measure the effectiveness af all the conservnlion elements, Conservalian specialist for lhe Waler Supply Masler Plan Update for Sarasota County Environmenlal Services, florida. Worked wilh counly personnel to summarize current water conservation program, and assessed whether there is significanl pOlenlial for further conservatian Ihat would materially affect water demand estimates. . Conservation specialist far the Review and Cost Analysis of Demand Reductian Project for Carnation, \Vashington Wastewater Treatment Facility for King County Deparlment afNalural Resources and Parks, The sludy delennined Ihc cost implicalions of implemenling a mandatory water demand management progmm in conjunction with the design af the lreatment facility, Continuing Education . Behaviar, Energy and Climale Change Conference, American Council for an Energy Efficient Economy, Sacramento, CA, 16 hours, November 2004. Wriling Your Sustainability Plan: Process and Framework. University of Oregan Continuing Education, Part land, OR, 8 hours, Octaber 2007. . Green Infrnstruclure and Sustainable Cammunities, ACEC/CSU, Denver, CO, 32 hours, July 16-19,2007. Revenue Impacts of Conservation Workshop. Oakland, CA, 4 haurs, OClober 22, 2004, Environmental Justice Workshop, U.S. EPA, San Francisco, CA, 8 hours, June 29, 2004, V:'.cutnl89\Ash':IIIl.I\Pt"llf'OAb\W:II,:..MI'0909IRdUrrw1\1II(:ms~i.\l,tIoc . Waler Snstainabilily in Silicon Volley: A Vision far Ihe Future Workshop, San Jase, CA, 8 hours, April 24, 2004, LEED Intermediate Workshap, U.S, Green Building Council, Oakland, CA, 8 haurs, 2003. Systems Thinking for Sustainable Enlerprise. Portland, OR, 8 haurs, 2003, . Energy Perfonnance Conrracting, Web-based, 8 haurs, 2003, . McDanough Braungart Design Chemistry Prolocol. 8 haurs, 2001. . The Nah.ral Step Framework. Part land, Orego., 35 hours, 1999, . The Nallllal Slep Framework. Santa Fe, New Me,ica, 40 hours, Dr. Karl-Henrik Raberl and Paul Hawken, 1997. Committees Program Chair for Practical Sustainability Conference, the first annual PNCW A specialty canferenee on sustainability, Couer d' Alene, ill, May 8.9, 2008. Member, American Society of Civil Engioeers Task Foree on Sustainability in Waler Pollulion Engineering, Treasurer. Biomimicry Institute, a non~profit organization whose purpose is to Unaturalizc biomimicry in the cullum by promoting the lransfer of ideas, designs, and stralegies fram biolagy 10. sustainable human systems design," ~ <J.c~'r."1t.,, Engfnoo,s..,Wlritng-~M'lv.w.r. , ALAN F. HAMLET RESEARCH ASSISTANT PROFESSOR 201 More Hall, Box 352700 University of Washington Seattle, WA 98195-2700 ph 206-616-9361 , hamleafl6lu.washinaton.edu Alan F. Hamlet joined lhe CEE facully as a Research Assistant Professor in Sept, 2007, with joint affiliation with the Inter-disciplinary Center for Science in the Earth System (CSES) Climate Impacts Group. His research over the last 1 0 years has focused on the impacts of climate variability and change on rivers and water resources systems in the western U.S., with a particular emphasis on the Columbia River basin in the Pacific Northwest. EDUCATION Ph.D. in Civil and Environmental Engineering, University of Washington, 2006 MSE in Civil and Environmental Engineering, University of Washington, 1996 BS in Mechanical Engineering, University of Washington, 1992 BA in Mathematics, University of Rochester, 1981 RESEARCH INTERESTS ) ) ) ) Integrated hydrological and water resources modeling Impacts of climate variability and climate change on hydrology and water resources Water resources planning and management Climate change planning and adaptation Sustainable water resources development and management Long-lead climate and streamnow forecasts and related water resources applications Modeling of freshwater and estuarine ecosystems Forest hydrology Paleoclimatic precipitation and streamnow reconstruction Climate impacls on hydropower and energy systems Climate services and outreach programs PUBLICATIONS ) ) ) ) Refereed Journal ArtIcles: Andreadis, K.M., E.A. Clark, A.W. Wood, A.F. Hamiel, and D.P. Lettenmaier, 2005: 20th Century Drought in the Conterminous United Slates, J. Hydrometeor., 6(6): 985-1001. Cohen, S.J., Miller, K., Hamlet, A., Avis, W., 2000: Climate Change and Resource Management in the Columbia River Basin, Water International, 25 (2): 253-272 Hamlet, A.F., Lettenmaier, D.P., 1999: Effects of Climate Change on Hydrology and Water Resources in the Columbia River Basin, J. of the American Waler Resources Association, 35 (6): 1597-1623 ) ) V:\CDenI89\AShtand\Pf'OPOSaIS\WaterMP0909\Resumes\12HamletA.doc 1 Hamiel, AF., Lellenmaier, D.P., 2000: Long-Range Climale Forecasting and its Use for Waler Management in lhe Pacific Northwest Region of North America, J. Hydroinformalics, Volume 02.3: 163- 182 Hamlet, A.F., Huppert, D., Lellenmaler, D.P., 2002: Economic Value of Long-Lead Slreamftow Forecasts for Columbia River Hydropower, ASCE J. of Water Res. Planning and Mgml, 128 (2): 91-101 Hamlet, A.F., Lellenmaiar, D.P., 2005: Producing lemporally consistent daily precipitation and temperature fields for the continental U.S., J. of Hydrometeorology, 6(3): 330-336 Hamlet, AF., Mole, P.W, Clarl<, M.P., Lellenmaier, D.P., 2005: Effects of lemperature and precipitallon variability on snowpack lrends in the western U.S., J. of Climate, 18 (21): 4545-4561 Hamlet A.F., Mote PW, Clark M.P., Lellenmaier D.P., 2007: 20th Century Trends in Runoff, Evapotranspiration, and Soil Moisture in the Western U.S., J. Climate, 20 (8): 1468-1486 Hamiel A.F., Lellenmaier D.P., 2007: Effecls of 20th Century Warming and Climate Variability on Flood Risk in the Western U,S., Waler Resour. Res., 43, W06427, doi:10.1029/2006WR005099 Miles, E.L., Snover, AK, Hamiel, AF., Callahan, B., and Fluharty, D., 2000: Pacific Northwest regional assessment: The impacls of climate variability and climate change on the waler resourcas of lhe Columbia River Basin. J, of lhe American Water Resources Association, 36 (2): 399-420 McGuire, M., Wood, AW., Hamiel, AF., Lellenmaier, D,P., 2006: Use of satellite data for slreamnow and reservoir storage forecasts in the Snake River Basin, /D, ASCE J. Water Res. Planning and Mgt, 132,97- 110. Mote, PW., E.A. Parson, A.F. Hamlet, K.G. Ideker, W.S. Keeton, D, P.,Lellenmaier, N.J, Mantua, E.L. Miles, DW. Peterson, D.L. Peterson, R., Slaughter, and AK. Snover, 2003: Preparing for climatic change: lhe waler, salmon, and forests of the Pacific Northwest, Climatic Change, 61: 45-88 Mole P.W., Hamlet A.F., Clark M.P., Lellenmaler D.P., 2005: DeClining mounlain snowpack in western North America, BAMS, 86 (1): 39-49 . Mote, PW., AF, Hamlet, E.P. Salathe, 2007: Has spring snowpack declined in the Washington Cascades?, Hydrology and Earth System Sciences Discussions, 4, 2073-2110, SRef-ID: 1812- 2116/hessd/2007-4-2073 Nijssen, B., O'Donnell G.M, Hamlet, AF., Lellenmaier, D,P., 2001: Hydrologic Sensitlvily of Global Rivers to Climate Change, Climatic Change, 50: 143-145 Payne, J.T., AW. Wood, AF. Hamlet, R.N. Palmer, and D.P. Lellenmaier, 2004: Mitigating the effects of c1imale change on the waler resources of the Columbia River basin, Climatic Change, 62 (1-3): 233-256 Snover, AK, Hamiel, AF., Lellenmaler, D,P., 2003: Climale Change Scenarios for Water Planning Sludies, BAMS, 84 (11): 1513-151 . Voisin, N., A F. Hamlet, L. P. Graham, D. W. Pierce, T. P. Barnell, and D. P. Lellenmaier, 2006: The role of climate forecasts in western U.S. power planning, Journal of Applied Meteorology 45(5), 653-673, Books: Gamble, J.L., John Furlow, Amy K. Snover, Alan F. Hamiel, Barbara J. Morehouse, Holly Hartmann, and Thomas Pagano, 2002: Assessing the Impact of Climate Variability and Change on Regional Water Resources: The Implications for Stakeholders, in Waler: Science, Policy, and Management, R. Lawford et aI., editors, AGU Press Monograph Hamlet, AF., P.W. Mote, A.K. Snover, and E.L. Miles, Chapter 4, Climate, Waler Cycles, and Water Resources Management in Ihe Pacific Northwest, Rhythms of Change: An Integrated Assessment of Climate Impacts on the Pacific Northwest, E.L. Miles and AK. Snover, editors, On review). Hamlet, A.F., 2003: The Role of Transboundary Agreements In the Columbia River Basin: An Integrated Assessment in the Context of Historic Development, Climate, and Evolving Water Policy, Climate and Water: Transboundary Challenges in lhe Americas, Eds. H. Dial and B. Morehouse, K1uwer Press, DordrechVBostonlLondon Lellenmaier, D.P, Hamiel, AF., 2003: Chapter 7, Improving Water Resources System Performance Through Long-Range Climate Forecasts: (he Pacific Northwest Experience, Waler and Climate in the Weslern United States, William M. Lewis Jr., editor, University Press of Colorado. Boulder f V:\Clienf89\Ashland\Proposals\WatetMP0909\Resumes\ 12HamlelAdoc 2 linn 1~lll A. Richard Griffith ) ) ) ) ) ~ ) ) ) SENIOR PROJECT MANAGER. HATCH ACRES CORPORATION SUMMARY OF EXPERIENCE B.S., Civil Engineering, Oregon State University, 1963 M.S.. Structural Mechanics, California State University at Sacramento, 1970 PROFESSIONAL ASSOCIATIONS Registered Professional Engineer, States of Washington, Alaska, Oregon and Idaho CITIZENSHIP United States FERC PART 12 SAFETY INSPECTIONS 2003 - 2009 Independent Consultant (IC) and PFMA Workshop facilitator for safety inspections for the following projects in accordance with Chapter 14 of the FERC Engineering Guidelines, Dam Safety Performance Monitoring Program. . Swan lake Project, Alaska, FERC Project No. 2911 (Ie) . Beaver Falls Project Project, Alaska, FERC Project No. 1922 (IC) . Ketchikan lakes Project, Alaska, FERC Project No. 420 (IC) . Solomon Gulch, Alaska, FERC Project No. 2742 (I C) . Bradley lake, Alaska, FERC Project No. 8221 (I C) . Terror lake and Shotgun Creek Dams, Alaska, FERCProject No. 2743 (I C) . Wanapum Dam, Washington, FERC Project No. 2114 (I C) . Priest Rapids'Dam, Washington, FERC Project No. 2114 (IC) . Blind Slough Hydroelectric Project, Alaska, FERC Project No. 201 (IC) . Reeder Gulch Project. Oregon, FERC Project No. 1107 (Ie) . Alder and la Grande Dams, Washington, FERC Project No. 1862 (facilitator) 1993 - 2002 Project Manager or Project Engineer for safety inspections for the following projects: . Pinnacles Hydroelectric Project, Virginia, FERC No. 10896 Abbeville Hydroelectric Project, South Carolina, FERC Project No. 11286 . Packwood HydroelectriC Project, Washington, FERC Project No.2244 . Ketchikan lakes Hydroelectric Project, Alaska, FERC Project No. 420 RELEVANT EXPERIENCE ) Hatch Acres Corporat/on-1996 to Present . Project Manager for Allison lake Feasibility Studies for Copper Valley Electric Association. The studies in support of the proposed new hydroelectric project near Valdez Alaska involve consideration of three altemative arrangements including a cross basin transfer to an existing hydroelectric project, a long tunnel to a new powerhouse near tidewater and a surface conduit leading to the same new powerhouse location. Detailed project operations were performed to assess the benefits of each scheme in meeting the isolated load requirements of the CVEA system. In addition, geotechnical and environmental field studies were performed in support of the feasibility review and traditional/hybrid FERC licensing process. . Project Manager for the Beaver Falls and Ketchikan lakes Powerhouse Unit Upgrade Study for Ketchikan Public Utilities. This study included a condition assessment of each .) ) ) ) ) ) ) V:\Cbent8~nd\Proposals\WalsrMP0909\Resurnes\13Gri'mhO.dOC 1 HAJ~H Ulfl powerhouse led to identification of equipment replacements required for reliability and life extension for each project. . . Project Manager for preliminary and final design activities for lhe Whitman Lake Hydroelectric Project for Ketchikan Public Utilities. The preliminary design activities included revision to the design arrangement to facilitate the combined use of project waters with a major fish hatchery. Key to the process was a detailed selllement agreement between KPU, the hatchery and stalelFederal resource agencies. The final design activities included new intake facilities at an existing dam, dual conduit system and a two unit powerhouse for the combined hydrolhatchery operation and an upgrade to the hatchery internal water supply system. . Project Manager for the Mossyrock Powerhouse Unit Upgrade Study for Tacoma Power. This study included an evaluallon of the existing equipment and of various possible unit. upgrade scenarios. including installation of a new, third unit. The firm's proprietary software (Auto Vista) was used to evaluate the power benefils of selected upgrade scenarios and a risk-based asset management (HydroVantage) analysis was utilized to determine optimum lhe timing for replacement of the major equipment items. . Project Manager for the Rock Island Powerhouse No. 1 rehabilitation study for Chelan County PUD to update and expand earlier studies to optimize the complete i.e., bank-to- bank plant. The study includes a condition assessment of the equipment in Powerhouse No.1 and Powerhouse No.2, and considers the potential effects of FERC licensing, fish passage and dissolved gases on Ihe rehabilitation or redevelopment of the project. The firm's proprietary software was used to evaluate the power benefils of selected upgrade scenarios for Powerhouse No.1 (AUTO Vista) and a risk-based asset management (RBAM) analysis of the major equipment items in Powerhouse No. 1 and 2. · Project Manager for review of obselVed cracking in the left abulment of the 380-fl high arch Boundary Dam for the City of Seattle. The review included assessment of instrumentation data, stress analyses and geotechnical analysis. The study concluded that the cracking is associated with normallhermal movements within the dam itself ralher than to movement of the abutment, as was previously assumed. Ongoing work includes upgrading of instrumentation program and data interpretation systems. .. Project Manager for seismic upgrading of the concrete section of the Greater Vancouver Water District's Seymour Falis Dam for the maximum credible earthquake. SelVices for lhe project include execution of a geotechnical investigation program, review of seismic criteria, stabilily and strength analysis using state-of-the-art finite element analyses, ilelailed design of remedial measures and an assessment of potential environmental impacts relating to construction works. The 30-m high dam consists of an earth-fm embankment, and a concrete slab and buttress dam which encompasses a 12-bay spillway, an intake and non- overflow sections. · Project Engineer for. relicensing analyses, project spiltway improvements and FERC Part 12 Independent Consullant for the existing Blind Slough project for Petersburg Municipal Power & Light, Alaska, which develops the power potential of Crystal Lake and Crystal Creek. 1994-1995, LouIs Berger & Associates, Seattle, WashIngton. 1971-1994, R.W. Beck, Seattle, WashIngton. 1969-1971, Chas. T. MaIn, Boston, Massachusetts. 1963-1969, CalifornIa Department of Water Resources.m V:\OlenI89\Ashfand\ProposaIS\WaleI'MP0909\ResumeS\f3GrlffilhO.doc 2 SHAUN P. PIGOTT Principal Shaun Pigott Associates, LLC EDUCATION . M~ters; Public Affairs & Finance, University of Washington . Bachelors; Economics, University of Washington PROFESSlONAL EXPERIENCE Mr. Pigott has 25 years of experience in infrastmcture management and public sector finance. Most significant in tenns of Ashland's needs is Mr. Pigott's experience as Project Manager for the design and implementation of numerous system development charges (SDC) for water, stormwater and sewer rate stUdies in Oregon, Washington, Idaho and Utah. Shaun Pigott has developed water-sewer-stOlmwater rates and impact fees for the following jurisdictions: Clean Water Services (OR), Milwaukie, Newberg, Rogue Valley Sewer Services, Roseburg Urban Sanitary Anthority, Medford, Gresham, Clackamas River Water, Scappoose, Rainier, Gresham, West Linn, Molalla, Silverton, Henniston, Water Environment Services (Clackamas County), Oak Lodge Sanitary District and in Utah Price River Improvement District, Murray City, West Valley City, Draper City, Orem City, Salt Lake City, Centerville City, Magna Water Company. Shaun Pigott has been a featured speaker on the design and implementation of SDCs and utility rates for ASCE, APW A (Oregon and Utah) and ACW A. ) ) ) ) ) . Financial consultant and analyst for numerous Northwest' cities, counties and service districts. Responsible for feasibility analysis, cost of service and rate analysis for municipal utilities and Districts. Jurisdictions include: Lake Oswego, Gresham, Portland, Clackamas County, Oak Lodge, Milwaukie, West Linn, Clean Water Services of Washington County, Tualatin, Tigard, Forest Grove and Hillsboro (OR.). . . Shaun Pigott has worked with the cities of Ashland and Medford in the design and implementation of SDCs and utility rates. Similar services were provided to the Roseburg Urban Sanitary Authority (RUSA) and the Rogue Valley Sewer Services (RVS). In all case the recommended revisions to SDCs and/or rates were adopted by the jurisdictions. ) ) ) ) ) ) ) . Shaun Pigott was project manager for the design and implementation of a large wastewater provider in the Portland, OR metro area - Clean Water Services - revised sanitary sewer rate structure, which converted from a fixed EDU approach to a consumption-based rate. This project required development of the revenue requirements for the revised rate structure and developing the cost allocation methodology for the fixed and variable components of the rate. Also involved was coordination of winter average water consumption data from 6 water jurisdictions within the USA service area and conversion of data processing/billing systems to accommodate the revised approach. . Project manager for the regional snrface water program in Washington County, Oregon. This involved 18 months of negotiation among the cities in Washington County regarding the fOlm and operating structure for this new regional entity. The structure, which evolved, was a . ShaUll Pigol/ Associat.... LLC county service district having specific operating agreements with each of the 13 member cities and required development of an application to the Portland Metropolitan Boundary Commission for review/approval of the program. Operated under the Clean Water Services of Washington County, this regional surface water utility is one of the largest and fastest growing entities in the United States. . Project manager for the Clackamas Water Authority Project which eVllluated the feasibility of fonning a regional supply and treatment program for 6 separate water districts and cities in the Clackamas County region. This project extended over 16 months and evaluated the technical and financial feasibility of linking these water systems. Parallel to this analysis, the new statute regarding Water Authority fOffilation was interpreted and an institutional structure negotiated with the individual members and the group as a whole. While the full authority was not implemented, the framework for future regional actions has been established. The merger of two key districts did result frolllthis project. . Contract utility service negotiator between the Clackamas County Service District No. I and the City of Milwaukie in defining ownership, roles, responsibilities and cost allocation for sewer treatment services. . Prepared analyses of utility operations, management, and financing in the fields of willer, wastewater, solid waste, storm water and streets. Projects involved rate design, institutional structuring, costs allocation; audits, cost of service,' public participation and ordinance preparation. Projects were conducted in Washington, Oregon, California, Nevada, Arizona, Illinois, Oklahoma, Kentucky and Ohio. . Shaun Pigott has prepared SDC ordinances, resolutions and methodologies for a wide variety of Utah, Washington and Oregon cities, districts and county governments. These impact fee development projects have included meetings with the public and affected entities such as the Homebuilders Association. Shaun Pigott has also emphasized the active involvement of City Councils in development of these charges through workshops on the legal and financial implications of impact fees. . . Shaun Pigott assisted with the development of wastewater rates for Murray City, Ut. The analysis addressed an historic underfunding of the' utility and incOJ:porated the revised capital program into the rate analysis. Specific policies were also developed with staff and the City Council, which placed the utility on a solid fiscal foundation for the coming years. . Shaun Pigott assisted with the review Magna Water Company's rate and impact fee st~cture to better align the District's cash flow from these two funding sources with revised capital requirements. The analysis culminated in a series of service charge and impact fee revisions which established a common basis for these funding sources. The District's Board unanimously approved these changes which have been implemented by Magna Water Company. . . . Shaun Pigott worked with the cities of Salt Lake, Orem, West Valley, Draper and Centerville in designing and implementing new utilities for storm and surface water management. These. analyses, conducted between 1990 and 200 I, produced new rate structures and impact fee designs for these cities to establish the dedicated revenue stream for moving forward with their operations, maintenance and capital program needs. Shaun PigOll Associates, LLC ) J ) ) ) ) ) , ~ ) ) ,) .) ) ) ) ) J ) ) 'J ProfessIonal Resume for Steven J. Donovan President, Donovan Enterprises, Inc. ANTICIPATED PROJECT ROLE: Project Manager YEARS OF EXPERIENCE: lO+Years with Firm and 28 Years in Field PROFESSIONAL EXPERIENCE: For the past twenty years, Mr. Donovan has been involved in the financial aspects of infrastructure management. From 1988 to 1992" in his capacity as ECDnomist for the City of Portland's' Bureau of Environmental Services, he had worked exclusively on rates and financial evaluations concerning nnmerous public works projects and prognllns. He is currently working with several Northwest Counties and Municipalities on rate setting projects concerning solid waste, water, stormwater, waste water, and transportatiDn. Mr. Donovan was the 1996 Chair of the Beaverton, Oregon Planning Commission and is active in Washington County, Oregon civic affairs. He is proficient in conununicating complex rate making concepts and implications to citizen advisory committees and elected Dfficials. Donovan Enterprises is a Portland, Oregon based management consulting finn specializing in the financial analysis of solid waste collection and disposal, sewer systems, water systems, and surface water management programs. The firm consists of seasoned professiDnals with extensive backgrounds in municipal government, public accounting, and financial advising. The firm has specific qualifications in the following areas of infrastructure financial management and public policy: , o Waste reduction incentive based ratemaking systems for solid waste collection and recycling, consumption based mtes for wastewater, surface water management, and inverted block rate systems for water. o Franchising contract negotiations o Review and development of system development charges for water, wastewater, and surface water management. o Litigation and administrative law support relating to the financial implications of "change of law" contract provisions for water purveyor contracts, wholesale wastewater treatment contracts, and solid waSte franchise agreements. o Acquisitions and mergers advising specifically related to collectinn companies and landfills o Financial a'nalysis and development of creative funding mechanisms for closure and post closure truSlS required under ResDurce Conservation and Recovery Act, and the Clean Water Act. A listing of recent stormwater clients includes: Role SlIIdies I Rate Modelinl!: Silverton, OR, Spokane County, W A; Snohomish County, W A; City of Mercer Island, WA; Oak Lodge, OR Sanitary District; Fresno County, CA; Clark County, W A Connection Cha/"l!es: Spokane CDunty, W A; Unified Sewerage Agency of Washington County, OR; Clackamas County Department of Water Envirorunent Services, OR Financial Planninl! / Fundiflll Oolions: Spokane County, .w A; City of Centerville, UT; City of Milwaukie, OR; Mercer [sland, W A; City of Mount Vernon, W A; City of Oakland, CA; City of Orem, UT; City of Sandy, UT; City ofWilsonville, OR Cosl or Service/aD/ions Analvsis: Spokane County, W A; Snohomish County, W A; City of Mercer Island, W A; Oak Lodge, OR Sanitary District; Fresno County, CA; Clark County, W A; King County Depl. of Natural Resources, VIA; Snohomish County, W A EDUCATION: o MBA, University of Wisconsin o Bachelor ofScierice, Electrical Engineering, University of Wisconsin " ., ) ) ) \ ) ) Education B.S., Environmenllll Studies, 1989, The Evcrgrcen Sta'e Collcge Plant Identification of GrAsses, Sedges, and Rushes, 1994, Willame'te University Inrerngcnc)' \'qctland Delineation Tllllning, 1994, Federnl . Interngenq' Hydri< Soils for Werland Delineation, 1996, Oregon State University PubUcations "Multi-Species Conse~tion Agreement: Landmark Multi- Species ESA Agreemen, for Thrccmilc Canyon Farms, First- in-Nation," Oregon Insider, Issue #341, April I, 2004 'The Upper Klamath Basin \Vatecshcd Assessment Project, Seeking Common Ground...Using Common Sense," The \Vntcc Report, Ocrobcr 2004 Presentations Certified Toasunaster. 2009 "Upper Klamath Basin Watershed Assessment: Sccking Common Ground, Using Common Sense." co-presented with Dan Hcagerty and Josh Corm, K1amarh \Vatershcd Conference, Oregon Institute ofTecbnology, February 2004 "Summ"uf of the Nauon's First Multi-Species Candidate Conservarion Agreement," Secretary of the Interior, Gayle Norron, April 24, 2004 "Biological Perspectives of thc Boardman Arc. Multi-Species Candidate Conservation Agrccment," Oregon Association of Environmcnral Professionals, September 9, 2004 Years oCExpetience 22 ) ) ) ) ) ) .""'l ) ) ) ..1 ) cj ~ U U .-) ) ) ) ) ) ) ) ) ) ) U) ) Jennifer 0, Miller Ecologist I Projtrll'r[tlllagtr Ms. Miller is a Project Manager and Ecologist with more than 20 years of professional experiencc in ,he em'ironmental field. She has led Endangeted Species Act (ESA), National Environmcntal Policy Act (NEPA), and Clean Watcr Act (CW A) compliance efforts for a wide variety of restoration projects and clients throughout the westetn United States. She has also managed and conducted natucal rcsource assessments, wildlife and ,'egetation analyses, and endangered species surveys in a variety of habitats. She has a comprehensive knowledge of the natural resources regulatory framework. Ms. Miller managed the environmental compliance effoltS for' the Williamson River Delta Restocation Project, a State Lands Board awatd winning restoration project. She is currently the assistant Project Manager for the Tualatin Basin Water Supply Project, one of the largest water supply projects in the northwest. For this project she is managing all NEPA and pennitting activities, including ESA and CW A compliance, water rights strategies and wetland permitting and rcstoration. Her recent relevant experience includes the followjng: Tualatin Basin Water Supply Project, for Clean Water Services and the Tualatin Basin Watet Supply Project Partners, Washington County, Oregon The TBWSP is intended to help meet thc growing watet demands of the greater Washington County community, and is one of the largest water supply projects in the Northwest. Project alternatives include the caising of Scoggins Dam to increase reservoir capacilj', a raw water pipeline and pumpback system from the Tualatin Rivet, and the potential for a pipeline at the existing trearment facility on ,he WiIlamette River. DEA was retained by CWS and the Partners to manage the NEPA and environmental compliance aspeclS of the first phase of the project. Ms. ""liller is the DEA Project Manager and NEPA Task Lead, ovetseeing opecations planning, title transfer, the dcvelopment of a Planning Rcpon/Environmentallmpact Statement and all environmentll permitting and mitigation. As part of the environmental pennitting for this project, Ms. Miller has helped to develop and implement ao innovative Collaborative Environmental Process, focused on eady and constant engagement with the regulatory agencies.' Williamson River Delta Restoration Environmental Assessment, for The Nature Conservancy, Klamath Basin, Oregon The Williamson River Delta restoration projecr has been recognized as a regional priority for conservation andrestorn.tion and was recendy awarded the Oregon State Land Board's 2007 Wetland Award. This project was designed to restore the historic functions of a freshwater delta, which is considered cntical habitat for two endangered fish species endemic ro the Klamath Basin. In coordination wjth The Nature Conservancy and various stare and fcderalagendes, Ms. Miller. prepared the EIS and coordinated the NEPA compliance and permitting efforts for this project. Ms. Miller incorporated the expertise of geomorphologisrs. advanced hydrologic madden, river restoration experts, water quality specialists, toxicologists, fisheries biologislS, and many others into the EA and coordinated with various agency representatives to obtain the necessary pCrmits. Seulement Agreement and ESA Candidate Conservation Agreement, for Threemile Canyon Parms, Morrow County, Oregon DEA provided !echnical, policy, and facilitation services for the landmark setdemen' between TIlreemile Canyon Farms, located near Boardman in eastern Oregon, and se,'eral conservation groups, This historic settlement agreemen' between Threemile Canyon Farms and the conservation groups settled litigation that began in 1995 over ; water withdrawals from the Columbia River, water rights and species conservation. As part of the settlemetlt, Ms,Miller led the effort to prepare the nation's first multiple species Candidate Conservation Agreement with Assurances (MSCCAA) under Section 10 of the ESA. The MSCCAA addressed WashinglOn ground squirrel, loggerhead shrike, ferruginous hawk, and sage sparrow. Ms. Miller managed the preparation of the Agrcement, negotiated the Covered Species and. Covered Activities, and facilitated the communications and efforts of the divetse signatories to the Agreemcnt, which included Threemile Canyon Farms, Portland General Electric, U.S. Fish and Wildlife Service, the Oregon Department of Fish and Wildlife and The Nature Conservancy. In addition, DEA led the ESA consultation proceedings for Columbia River salmon and led the fish screen compliance process. Ms. Miller prepared the Biological Assessment (8A) that addressed listed Columbia River salmon ids. Envitonmental Permilling for LaGrande/Union County Airport Runway Safety Area Improvements, for Union County, Oregon DEA staff worked with Union County and Federal Aviation Administration (FAA) staff to conduct thc state and fcderal environmental permilling for the proposcd improvements 10 the Union County-La Grande Airport. \Vlth FAA as rhe lead federal agency, DEA facilitated compliance with NEPA, coordinated formal consultation under the ESA, and obtained a Joinr Removal Fill-Section 404 pennit under the Clean Water Act. Ms. Millcr was the Project Manager for the project oversceing the NEPA, ESA, Section 106 (historical compliance) and Section 404 efforts, as well as coordin.~ting between Union County, FAA, the U.S. Fish and Wildlife Scrvice, NOAA Fisheries, State Historic Presef\'ation Office, Oregon Department of Fish and Wildlife, and DEA staff biologists. Ms. Miller also coordinated with USDA Wildlife Services to evaluate the potential hazards from the airport modifications in relation to the srate wildlife area located in the vicinity of the project. Ms. Miller facililated discussions between FAA, the airport. ODF\V and Wildlife Services to resolve the wildlife hazard issue. , Upper Klamath Basin Watershed Assessment, Phase I, for the Klamath Basin Ecosystem Foundation, Klamath Falls, Oregon Ms, i\<Iiller managed this effort. to assist the Klamath Basin Ecosystem Foundation with the first phase of the Uppec Klamath Basin \Vatershed Assessment (\VA). This plOject consisted of two distinct msks. The first task was to evaluate the Upper Klamath Basin and divide the 33 fifth-field hydlOlogie units of the basin into Watetshed Assessment Units. This effort was completed by consolidating and organizing existing watershed infonnation fonhe Upper Klamath Basin from a wide divetsity of sources and identifying potential dam gnps and supplementation as required. As parr of this task, Ms. Miller designed and facilitated the public outreach, communication and coordination for the WA process. ,. '. . The second task was to conduct the pilot WA on the Upper Williamson River Subbasin. n,is W A was conducted according to the Oregon Watershed Assessment Manual and covered approximarely 850,000 acres, the largest W A conducted in the state of Oregon, The size of the assessmcnt was a challenge; however, the final document WaS very well received by both the Oregon Watershed Enhancement Board and thc lucal Klamath Basin community. ) ) ) ) ) ) ) ) ) ) ) ) "7 ) ) ) ) ) ) ) ) ) ,,:,) ~ j ',J -) ) ) ) ) ) ) ) ) ) ) ) , ") ) ., . Rachel A. Lanigan EducatIon BS Civil Engineerlllg. Oregon Slate UniversifY. 1001 BA Engineering Physics. Westmant College, 1000 LIcenses Civil Engineer, California Professional Affiliations Engineers WI/houl I Borden Por/land . Professionals Chapter American Wafer,Works ,bsoclollon - Pacific Nor,hwe31 Ms. Lanigan joined Carollo in 2007 and has four years of engineering experience in public works and infrnslructure development. Ms. Lanigan obtained her undergrnduate degrees in Civil Engineering al Oregon Slate University and Engineering Physics from Westmont College. Prior to joining Carollo, Ms. Lanigan provided engineering services to seveml cilies in the Roguc Valley, including development coordination, design ond construction of infrastructure improvements, and capillll improvements planning. Her recenl experience includes: Water Planning and Design o Staff engiueer for the City of Lacey, Washington Comprehensive Water Syslem Plan Update, 2009. The Plan includes an analysis ofprojected system population and demands, establisbing planning standards and crileria, a supply analysis & recommendations, system analysis using an H20Net hydmulic model, an inlegmted capital improvements program, and a financial plan. Ms. Lanigan also assisted wilh an in-depth evaluation of seyeml sources of supply for the City, including reclaimed waler, desalination, shallow and deep wells, wholesale purchase, and purchasing neighboring water systems. o StalTengineer for the Cily ofTigaro, Oregon Waler System Masler Plan, 2009. The project includes crealing an H20NCl hydmulic model based on newly created GIS data, identifying 13 independent pressure zones, model calibmlion, modeling two fulure supply scenarios, and performing a system analysis, capital improvements plan, and financial plan. In anticipation of changing the main source of supply from PortlAnd to Lake Oswego, the City's slorage and pumping requiremenls may require significant adjustmenls. Future demands incorpomte additional service areas not currently served by the City. o Staff engineer for Tualatin Basin Waler Supply Project Partnership (TBWSP) providing Inlerim Program Management V:I;CI~l9\khbndIh:JpoAh\WatuMP0909'Rc:sumes\16LuipnRAloc services. The Carollo team assisted the partllering agencies in collabomtive planning of several projects needed to meet future demand. The projecls include a dAm raise, pump back facility, and rnw water pipeline. Staff engineer for Ibe City of Ashland, Oregon's Talenl-Ashland-Phoeni" (TAP) waterline e"tcnsion planning effort. Carollo staff prepared a hydraulic study to assess the impacts of conneclion to a second water supply for lhe City of Ashland. In addilion to serving the cities of Phoenix and Talent, the TAP walerline, if e"lended, will also provide treated water from the Rogue River 10 lhe residents of Ashland. Ms. Lanigan assisted with preparing lechnical memorandums assessing potential pump station sites, providing preliminary pipe design, and estimating project cosls. Staff engineer for the Medford, Oregon WAsbwaler Lagoons Upgrade Project. The Medford Waler Conunission is adding four equalizalion lagoons to the e.isting treatment planl for Iilter washwatcr. Ms. Lanigan's involvement includes yard piping desilW and layout, site grading and dminage, discharge piping and outfall into an environmenlally sensitive ~rea. Wastewater Planning and Design Staff engineer and technical writing for the City of Gresham, Oregon's Wastewater Pump Station Master Plan. Seven small pump stalions in the City of Gresham were evaluated for overall condition And hydraulic capacity. The . wastewater pump station masler plan includes a detailed eVAluation 0 f each stationj alternatives analysis for upgrades, replacement, or removal; and an interactive Capital Improvements Plan for City use in budgcting. Staff engineer for developing design and construction guidelines for King Counly reclaimed waler systems, As King Counly prepares 10 allow new purveyors and end uselS to connect to reclainled aCa,'f,'f)itttfJ ~..MbdfrIg...,.,.MIt~... Rachel A. Lanigan i' , Page 2 water transmission lines, the County requested assistance in developing user-friendly guidelines for meeting reclaimed water permit requirements. Ms. Lanigan worked closely with County staff to create a design manual and develop lhe process by which applications are made and approved. . Staff engineer for the North Albany Lin Slation and Force Main project for Ihe City of Albany, Oregon. In order to prevent sanitary sewer overflow to the Willamette River, Carollo staff assessed multiple options of diverting now, resulting in . major upgrades to an exisling lin stalion and installation ofan8,Ooo-foot new force main. Ms. Lanigan i. responsible for lbe design oflhe 18-inch force moin, including material selection, design or two horizontal direclional drills and lbree railroad cro.sings, and providing air release wilh odor conlrol, surge protection, and pipe draining and cleaning capabililies. Ms. Lanigan is also responsible for cost estimating for the force main component of this project. Provided technical reviews and ex.ecutive summary for an extensive Masler Plan for the City of Bend Wastewater Reclamation Facility. Previous Experience . Staff engineer for Public Works Management, Inc. located in Talent, Oregon. As staff engineer, Ms. Lanigan assisted with lhe city engineering for the Cities of Talent, Phoenix, and Central Point including Ihe coordination of funding, design, contract documents, contractor selection, and construction engineering for city projects; plan review and construction inspection for local developments; and design of small scale municipal projecls. She w~s involved with the development of a Stonnwaler Protection Ordinance for the City of Talent; a Fivl>- Year Capitallmprovcmenls Plan and oversaw citywide street & utility GIS surveys for the cilies ofTalenl and Phoenix. Her involvement also included the regional coordination ofNPDES Phase II MS4 Requirements, the joint-development of a Slormwaler Quality Design Manual for Rogue Valley MS4 Communities and she represented the cilies of Talent and Central Point at regional Stonnwaler Advisory Team (SW AT) meetings. . S.taff engineer for KenCaim Sager L;mdscape Architects, Inc, in Ashland, Oregon. Her involvement included preparation of construction V:'.aieat~l\lfIOII3Ii\W*tMI'0909\anana\J6LaU~ drawings for jurisdictional review and construction; detailed "hardscape" components including walkways, retaining walls, water fountains, etc.; site grading analyses including grading, cut-fill calculations, & erosion and sediment cODlrol plans; and wetland grading and planting plans. . Slaff engineer for Otak, IDe:, in Corvallis, Oregon. While with Olak, Ms. Lanigan was responsible for the design of street profiles, grading, water, sewer, and stonn utllities for developments in the Corvallis area. Her experience includes performing hydrologic calculations for stormwater design and preparing planning documents and. construction drawing selS for jurisdictional approval and constructlon. Engineering assistant - Indian Health Services Internship, Bremerton, Washington. During her internship, Ms, Lanigan assisted three Professional Engineers with the IHS Sanitation Facilities Construction Program; performed the hydraulic modeling ofa small community using EPANET 3.0; provided Ihe layout and design of a small sewage un station using AutoCAD 2000; and completed research and analysis of appropriate waslewater treatment methods for a coaslal community. €.t:a,rtoft!'f:J ~._~MtndIn...MWw" , .. CITYOF ASHLAND PROJECT ACCOUNTING WORKSHEET PROJECT NUMBER (YEAR XX) PROJECT TITLE PROJECT DESCRIPTION Department Project Manager Department Head BUDGET INFORMATION Identify fiscal year I potential splits Identify Funding Codes and Funding Code names DESIGN .100 Engineer Name PO COST Change Orders 1 2 3 4 CONSTRUCTION .120 contractor name PO budget estimate bid I contract total changes total CONSTRUCTION .120 contractor name PO budget estimate bid I contract total changes total PERMIT COSTS (Building Dept) .170 budget estimate final costs 12008-54 IcomprehenSive Water Master Plan r---.~- Public Works/Engineering Pieter Smeenk Mike Fauqht hl0 IFYll Carollo Engineers $ 366,996.00 Miscellaneous Costs: Daily Tidings Advertising Daily Journal of Commerce ~.l' G:P~wr1IsIerVdelt.admili'englneer/projecW-54 Pl'Oj ACCI Worilsheet.xls 1113/12/20101 Pieter Smeenk - 10-1008 Ashland, OR Target Ship Date Page 1 . From: To: CC: Date: Subject: .Steve Mick" <smick@myersequipment.com> "Chapman, Tom" <tchapman@brwncald.com> "Mike Reilly" <mreilly@whreilly.com>, <d.carroll@triadpdx.com>, <n.doyl... 3/12/2010 2:42 PM . 10-1008 Ashland, OR Target Ship Date All, After further conversations this aftemoon, JMS is committed to shipping the vertical flocculator equipment for the Ashland WTP no later than 4/16/10. Our plan is for the shipment to be a contract haul. flat bed, leaving here on 4/16/10 (Friday) and arriving in Ashland on 4/22/10 (Thursday). We will continue to communicate frequently as we move through this process. Best regards, Steve ~). "A' Page1/1 CITY OF ASHLAND 20 E MAIN ST. ASHLAND, bR 97520 (541) 488-5300 ,. B',Ni!lr;,SER 09501 VENDOR: 000162 CAROLLO ENGINEERS, PC 3033 N. 44TH STREET STE. 101 PHOENIX, AZ. 85018 SHIP TO: Ashland public Works (541)488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Tenn,: Net 30 days Req. Del. Date: Speclalln,t: Req. No.: Dept.: Contact: Mike Faught Conflnnlng? No Water Conservation and Reuse Study and Comprehensive Master Plan of the Water Supply System 366,996.00 Approved by City Council - 12/15/2009 Contract for Personal Services Date a9reement prepared: 12/08/2009 Beginning date: 01/01/2010 Completion date: 12/31/2012 Insurance required/On file BILL TO: Account Payable 20 EAST MAIN ST 541-552-2028 ASHLAND, OR 97520 ..ll. oJ. !:CiJ E 670.08.15.00.70420 E 200854.100 E 670.08.37.00.70420 E 200854.100 SUBTOTAL TAX FREIGHT TOTAL ...<M.. ~- ~ ___ 'tI~/o Autho:ad Signature VENDOR COpy I FORM #10 I __J(Q~ CITY OF ASHLAND Intermediate Procurement GOODS & SERVICES $5.000 to $75.000 D 3 Written Quotes PERSONAL SERVICES $5.000 to $75.000 D (3) Written Proposals Description of GOODS & SERVICES or PERSONAL SERVICES Contractor/consultan)/ //;J ~. ) . ~ ~ tf1.--tA..-t!J ?L Pt- r Ae'...e.r-;S.--/ ~r attached contract --. & PUBLIC CONTRACTING R QUIREMENTS - Solicitation Process D ExemDt from ComDetitive Blddina D Invitation to Bid (Copies on file) D Ememeney Reason for exemption: D Written findings attached D Quote or Proposal attached CooDeratlve Procurement D State of Oregon Contract # D State of Washington Contract # D Other govemment agency contract Agency Contract # D Interegency Contract Agency Contract # Total Amount r-~--~-'- ~~ ,6 . (Ji.,'@1 Lj~~~~~_'_J D Small Procurement & Pelllonal Services less than $5.000 Note: Total contract amount, including any amendments may!lQl exceed $6,000 Reauest for ProDosal (Copies on file) Please check one: D geods & Services []/Personai Services D Sole Source D Wrillen findings attached D Quote or Proposal attached D D D SD..lal Procurement Written findings attached Quote or Proposal attached Have all public contracting requirements been sat~sfied? YES /' NO If 'NO', Council approval is required. Council approval received on \ Have funds been budgeted for the purpose of this contract? YES / (Date) NO If 'NO', Council approval is required. Council approval received on ~ Please provide: Account Number _ _ ':?-C:".:'- ~_ - _ _ _ _ _ _ Is the amount of the contract less than $25,OOO? YES (Date) NO .........- (/ /(J-?fj -.cqDate) If 'NO', Legal review is required. Contract was "Approved as to form" by the Legal Department on Is the amount of the contract less than $75,000 for Goods & Services or $50,000 for Personal Services? YES .~ If 'NO', Council approval is required. Council approval received on Is the contract for a period e=~r less? If 'NO', Council approval is required. Council approval received on Please provide terms: Start date: C/" /"" ~ ;{kc /0 . NO /' .;2-?5 ~ ~/ (Date) YES ~. NO :s2.."f/ ~'3 (Date) Completion date: /02-/8-//.>2-C' t' ~ . Can the contract be terminated for convenience thirty (30) or fewer days following delivery of written notice to the contractor? YES ~. NO Prepared by: If 'NO', Council approval is required. Council approval received on ~~~ cr~.4~-~'~1 '2J~-/?-16 (Date) Department: Please circle: ~ved) ~d Lee Tuneberg ~..3~t7 . Not Approved ~- Date: Date: Fonn #10 -Contract Approval Request Fonn, Page 1 of 1, 4/13/2010 , A request for a Purchase Order REQUISITION FORM CITY OF ASHLAND Date of Request: THIS REQUEST IS A: o Change Order( existing PO # Required Date of Delivery/Service: l'-nAo,!'P t:"Sf\~~~ Vendor Name Address City, State, Zip Telephone Number Fax Number Contact Name ~k~ SOLICITATION PROCESS Small Procurement o Less than $5,000 o Quotes (Optional) Intennedlate Procurement o (3) Written Quotes (Copies attached) o Sole Source o Written findings attached o Quote or Pro attached Cooooratlve Procurement o State of OR/WA contract o Other government agency contract o Copy 01 contract attached o Contract # o Invttatlon to Bid (Copies on file) Reauest for ProDosal (Copies on file) Soeciall ExemDl Written findings attached Quote or Pro al attached Emeraencv Written findings attached Quote or Pro aI attached Description of SERVICES Per attached PROPOSAL "- ~ Item # Quantity Unit ~ ./ Description of MATERIALS Unit Price . Total Cost ~l It>?D.o8,..oo.7()</::J.f.>O ~7t.>.f)~".tJt). '7PY6lPD Account Number -- _ II? . 'Items and services must be charged to the appropriate account numbels for the financials to reffect the actual expenditures accurately. Project Number _ ill!. _ .?1 4/'78.133.//D Ib?,[j63.D{) o Per attached QUOTE and the documentation c Supervisor/Depl Head Signature: ~ c...Q. Q.t... -:::>. Employee Signature: G: Finance\Procedure\AP\Forms\8_Requisition form revised.doc Updated on: 313112010