HomeMy WebLinkAbout2010-145 CONT Chg Orders 1-10 - Visar Construction
,I ----r--.i'
,
CITY OF ASHLAND
DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE ORDER NO. 1
PROJECT:
LOCATION:
Liberty Street Improvement
Liberty Street
DATE: 8/4/10
PROJECT NO.: 2004-21
CONTRACTOR: Visar Construction Co. Inc.
You are requested to perfonn the following described work upon receipt of an approved copy of this document or as
described by the Engineer: .
Item No. Description Quantity Unit Price Amount
CO I-I Utility conflict resolution L.S. $2,257.00 $2,257.00
.
CO 1-2 Place red slurry in power trench L.S. 613.00 613.00
CO 1-3 Reconnect 4" sewer lateral L.S. 306.00 306.00
CO 1-4 Utility conflict (al sta. 10 + 48 L.S. 294.00 294.00
CO 1-5 Utility conflict (al sta. 10 + 24 L.S. 589.00 589.00
CO 1-6 Utility conflict (al Sta. 9 + 97 L.S. 272.00 272.00
CO 1-7 Utility conflict (al sta. 10 + 23 L.S. 589.00 589.00
CO 1-8 Reconnect 6" sewer lateral L.S. 654.00 654.00
CO 1-9 Install sewer cleanout L.S. 916.00 916.00
CO 1-10 Relocate I ~"water service L.S. 200.00 200.00
Total this Change Order
Previous Change Order
Revised Contract Total
$6,690.00
-0-
$149,488.75
The time provided for completion of this contract is . creased by 10 calendar days. This document shall
become an amendment to th contract and all pro sions of the contract will apply.
i'/~4l:J/p
Date
Recommended By:
Approved By:
Accepted By:
<g Is- / 10
Date
J/411n
ENGINEERING Tel: 541488.5347
20 E. Main Street Fax: 541488-6006
Ashland, O'!'Qon 97520 m: 800.735.2900
WWW.aShland.0r.usG:\pub-WrkS\eng\04.21 Liberty Street\A~dmln\Cons Vendor1\Contract Oocumenis\Change Orders\04-,
~.l'
doc
,
Visar Construction Inc.
General Contractor
PO Box 3101, Central Point, OR 97520
Phone: 541-944.9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works
Ashland, Oregon
Proposal/Change Order
CHANGE ORDER NO. 'J
(
Job Name:
Liberty Street
Line #
Description
1 , 8 " Sanitary Sewer
$2,257
Total Proposed change order
$2,257
Notes:
Due to conflict with other utilities from Sta. 9+88 to 5ta. 10+68, normal sewer line productivity rates were
not attainable. The gas line and Ashland Fiber Network conduit were directly in the proposed sewer trench.
Sheet 4 of the contract drawings clearly shows the gas line clear of the proposed sewer. AFN is not shown
on the drawings. The Differing 5ite Conditions led to an additional day of production.
Approved 8y:
Date:
Disapproved By:
Date:
,
8" Sanitary Sewer Cost Work Sheet
Manhours
labor
8
8
8
Name/Description
Rates
laborer
Ope-ratar
Driver
Hrly Rate
$37AO
$45.21
$39.90
Fringes
Overhead Bare Cost Daily TTL
40.00%
$14:96 , $52.36 $418.88
$18.08 $63.29 $506.35
$15.96 $55.86 $446.88
$0.00 $0.00
$0.00 $0.00
Man hours Per Day
Mise
24
Equip Hrs.
8
8
EXdBH
TruCk
Ave $ per Manhour
Hourly Cost
$40.00
$45.00
$57.17
$171.51
$40.00
$45.00
$0.00
$0.00
$0.00
Subs
Mise
Ave $ per Manhour
Houny Cost
$28.33
$85.00
Supplier
Material
$0.00
In Place Quantity
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
CosUUnit
Total
Cost per Man hour = Cost I MH
Daily Output
Bare Unit Cost per unit
Markup 10.00%
Ave $ per Manhour
Quantity
I
L
1
$85.50
1.00
$2,052.11
$2,257.32
n ~J day
Iday
Total # of Days
Total Manhours
Total Labor
Total Equipment
T atal Subs
T atal Materials
Total Bare Cost
Retail Cost
$1,372.11
$320.00
$360.00
$0.00
$0.00
$0.00
$680.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00.
Total Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
1.0000
24
$1,372.11
$680.00
$0.00
$0.00
$2,052.11
$2,257.32
. '
,
,
,,-
, ..",~ """~
..",..~ '?iI'''' , . '00 ;t.
~""~~~;~~~i,-":'''i'-'.~_ ,:"1. " '..~f.'"
~.. "'" ", "'.. :r .. "_'"
. "'''.ut '<"""""',' '.,. ...f"'",,,,,,,,,
~-~~ !i1j~~, ~..l.4.~1p:"':';..r.~ '_;',.: ~
.N... .... t, ; i't'g\ i/l- g"J'V'
,"~.. . ~- l1J i-: '~ _~.-~
' .~. .. -. ..~ "....d;,j. -.'"
.' "~ri:i''''~~''n;,..~.
,', ~'1'"':"t&'~:"" -,:;..
/ i';"," .' '...._.
"', , ,.:~
," .t..-~~~:"~ ""':Ti - """":"~~
// 'i.r, "C.f.. ,.,~ ;;-',~..".,..
.}j< 1> J\ ... i '''.' ~'-l.:~,
~": .. "~.;,~.
"......-,,,-, \ -1 J ~~:~ ~,
.'-.." \ ".. . .~, '! ..
r_~.. ,.' ~rl'l'''' ~."'7 " ~
~. \ tI 'Jf~
' ",j"" ,.-~t:( ~~' \''Ll~}r:!~'"
~~~''''''''
". ~"~t...\,';-1(i('-"";",
~-."'._"",,, .:-)- .,' .:.-~,
_l~ ' . ',' \".
:, ,.
. "...:,i, \)
'f~~~\
I .f..J!;' .~..~,'
~ \ ,..;io." \ .1'"':. "
':','. 7{.. \,~.. "! .-
, .\\."' ... .. ..",.}-.~.: .-
;',
To'
-.~:'
.0:''''-: '-;"~";
.;,,-r
'C'~'-::.':'l-;;"
- ~-\ '. ''''
,
~
Visar Construction Inc.
General Contractor
PO Box 3101, Central Point, OR 97520
Phone: 541-944-9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works
Ashland, Oregon
.<
Proposal/Change Order'
CHA~~OFlOER NO.r2' 'l
I
Job Name:
Liberty Street
Line #
Description
5 Cubic Yards Red Sluny in power trench
$613
Total Proposed change order
$613
Notes: ,
Due to confilct with other utiiities from Sta. 9+95 to Sta. 10+55, the power conduit was laid at or
near 3 feet in depth. Due to the congestion with othr utilities it is recommended that red slurry
be used to cap the power trench to alert any future excavations of the presence of power at
this location.
Approved By:
Date:
Disapproved By:
Date:
SPLIT COST WITH ELECTRIC
ACC. # 690.11.18.00.707100
..
Visar Construction Inc.
General Contractor
PO 80x 3101, Central Point, OR 97520
Phone: 541-944-9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works
Ashland, Oregon
Change Order #3
Job Name:
Liberty Street
Line #
Description
1
4" Sewer Ser.vice Reconnect at Sta. 10+54
306.05
Total Proposed change order
306.05
Notes:
At 5tation 10+54 a Live 4" sewer service was encountered during sewer main construction.
The 5ervice is believed to serve 775 Liberty Street. The service is not noted on the contract .
Drawings. The plan shows 5 proposed service connections on the back side of the manhole at
10+58, one of which was planned for 775 Liberty St. Ail 5 services out the back of the Manhole
were instailed as per plan.
Approved 8y:
Date:
Disapproved By:
Date:
. 'co # 3 ,4" Sewer Service Reconnect at Sta. 10+54
~
Manhours Name/Description Hrly Rate Fringes
labor Rates
8 Laborer $37.40
8 Operator' $45.21
Overhead Bare Cost Daily TTL
40.00%
$14,96 $52.36 $418.86
$18.08 $63.29 ' $506.35
$0,00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
16 Man hours Per Day Ave $ per Manhour 557.83 $115.65 5925.23
Equip Hrs Hourly Cost Mise
8 Excavator $40.00 $40.00 $320.00
8 Loader $45.00 $45.00 5360.00
$0.00 $0.00
50.00 50.00
50.00 $0.00
Subs
Ave $ per Manhour
Hourly Cost
Mise
$42.50
$85.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
CosUUnit
$35.00
$6.20
$6.00
$11.00
Ave S per Manhour 50.00
Supplier Material Quantity In Place Quantity
Wye 1 ea 1 ea
4" feineD 1 ea 1 .ea
45Deg Bend 2 ea 2 ea
Crushed Rock 1 'In 1 tn
Total
Cost per Man hour = Cost I MH
Daily Output
I
~1
5100.33
7.50
Total # of Days
Iday
Iday
Bare Unit Cost per unit
Markup 10.00%
Total Labor
Total Equipment
Total Subs
Total Materials
Total Bare Cost
Retail Cost
$278.23
$306.05
$680.00
$0.00
$0.00
$0.00
50.00
$0.00
$0.00
50.00
Total Cost
$35.00
56.20
$12.00
$11.00
$0.00
50.00
$0.00
$0.00
50.00
$0.00
$64.20
0.1333
$123.36
$90.67
$0.00
$64.20
$278.23
$306.05
c
Visar Construction Inc.
General Contractor
PO 80x 3101, Central Point, OR 97520
Phone: 541-944-9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works
Ashland, Oregon
Change Order #4
Job Name:
Liberty Street
Line #
Description
1
Utility Conflict with Conduit Trenching at Sta. 10+48
$294
Total Proposed change order
$294
Notes:
At Station 10+48 during trenching for conduit out of the vault, existing conduit for
Charter, Power, and Qwest was encountered. These utilities run west and serve the residence
uphill to the west. These utilities are not located on the contract draWings. Additional Man
and equipment hours were required to complete the work.
Approved By:
Date:
Disapproved 8y:
Date:
Overhead Bare Cost Daily TTL
40.00%
$14.!16 $52.36 $418.88
$18.08 $63.29 $506.35
$0.09 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
'CO #4 Conduit Conflict at Vault Sta. 10+48
.
Manhours
Labor
8
8
.
!\lame/Description
Rates
laborer
;Operator
Hrly Rate
Fringes
$37:40
$45,21
16
Equip Hrs.
8
8
Man hours Per Day
Ave $ per Manhour
Hourly Cost
$40.00
$45.00
$57.83
$115.65
Mise
ExC{lvator
Loaoer
$40.00
$45.00
$0.00
$0.00
$0..00
Subs
Ave $ per Manhour
Hourly Cost
Mise
$42.50
$85.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
CosUUnit
Supplier
Ave $ per Manhour
Quantity
$0.00
In Place Quantity
Material
Total
Cost per Man hour = Cost I MH
Daily Output
1
$100.33
6.00
day
Iday
Total # of Days
Bare Unit Cost per unit
Markup 10.00%
Total Labor
Total Equipment
Totai Subs
Total Materials
Total Bare Cost
Retail Cost
$267.54
$294.29
$925.23
$320.00
$360.00
$0.00
$0.00
$0.00
$680.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.1667
$154.21
$113.33
$0.00
$0.00
$267.54
$294.29
.
Visar Construction Inc.
General Contractor
PO 80x 3101, Central Point, OR 97520
Phone: 541-944-9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works
Ashland, Oregon
Change Order #5
Job Name:
Liberty Street
Line #
Description
1
Utility Conflict with Conduit and Water Service at Sta. 10+24
$589
Total Proposed change order
$589
Notes:
At Station 10+24 during trenching for Utility Conduit, a water service for 800 & 775 Liberty St.
was encountered. Contract Drawings show the water service line well south of the proposed
utility trench. The diagonal nature of the service relative to the utility trench caused a
reduction in productivity and a resultant increase in labor and equipment cost.
Approved By:
Date:
Disapproved 8y:
Date:
. CO # 5, Confiict with Utility Trench and Water Service
.
.
Manhours Name/Description Hrly Rate Fringes
Labor Rates
~ Laborer $37.40 ,
8 Operator $45.21
Overhead Bare Cost Daily TTL
40.00%
$14,96 $52.36 $418.88
$18.08 $63.29 $506.35
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$85.00 $680.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
CosUUnit Total Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total # of Oays 0.3333
Total Labor $308.41
Total Equipment $226.67
Total Subs $0.00
Total Materials $0.00
Total Bare Cost $535.08
Retail Cost $588.59
16
Equip Hrs.
8
8
Man hours Per Day
Ave S per Manhour
Hourly Cost
$40.00
$45.00
$57.83
$115.65
Mise
Excavator
Loader
$40.00
$45.00
$0.00
$0.00
$0.00
Subs
Ave $ per Manhour
Hourly Cost
Mise
$42.50
,
Supplier
Ave $ per Manhour
Quantity
$0.00
In Place Quantity
Material
Total
Cost per Man hour = Cost I MH
Daily Output
I
1
$100.33
3,00
Iday
Jday
Bare Unit Cost per unit
Markup 10.00%
$535.08
$588.59
$925.23
$320.00
$360.00
$0.00
$0.00
$0.00
.
.>
.
Visar Construction Inc.
General Contractor
PO 80x 3101, Central Point, OR 97S20
Phone: 541-944-9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works.
Ashland, Oregon
Change Order # 6
Job Name:
Liberty Street
Line #
Description
1
Utility Conflict with Conduit and Phone Drops at Sta. 9+97
$272
T otai Proposed change order
$272
Notes:
At Station 9+97 during trenching for Utility Conduit to the Secondary Pedestal, phone drops
were encountered. The drops are not shown on the contract drawings. Additional time was
required to complete this task resulting in additional labor and equipment hours.
Approved By:
Date:
Disapproved 8y:
Date:
CO # 6, Conflict with Utility Trench and Phone drops "
.
..
Manhours Name/Description Hrly Rate Fringes
Labor Rates
8 laborer 'S37.40
'8 Operator S45.21.
Overhead Bare Cost Daily TTL .
40.00%
St4.96 S52.36 $418.88
$18.08 S63.29 $506.35
$o.ob' $0.00 SO.OO
SO.OO $0.00
$0.00 $0.00
16 Man hours Per Day Ave $ per Manhour $57.83
Equip Hrs. Hourly Cost Mise
8 Excavator S40.OO
8 Loader 545.00
$115.65 S925.23
540.00 S320.00
$45.00 $360.00
SO.OO $0.00
" $0.00 SO.OO
SO.OO SO.OO
,
Subs
Ave $ per Manhour
Hourly Cost
S42.50
,
S85.00 S680.00
SO.OO $0.00
SO.OO $0.00
$0.00 SO.OO
$0.00 $0.00
$0.00 SO.OO
$0.00 $0.00
$0.00 $0.00
Cost/Unit Total Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total # of Days 0.1538
Total Labor $142.34
Total Equipment $104.62
Total Subs $0.00
Total Materials $0.00
Total Bare Cost $246.96
Retail Cost $271.65
Mise
Supplier
Material
Ave $ per Manhour
Quantity
$0.00
In Place Quantity
Total
Cost per Man hour = Cost I MH
Daily Output
1
$100.33
6.50 .
day
Iday
Bare Unit Cost per unlt
Markup 10.00%
$246.96
$271.65
~~~~~::"
'Q-'~':~r."'.!.\':';
'. 1:,~'.~._4'
h,.,',. .
I,....
\. "II,
.... ...:~~~l"
';j ,,~.
Phone Drops
, .
..
.
Visar Construction Inc.
General Contractor
PO 80x 3101, Central Point, OR 97520
Phone: 541-944-9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works
Ashland, Oregon
Change Order # 7
Job Name:
. Liberty Street
Line #
Description
1
Wateriine and water service conflict at Sta. 9+97 to Sta 10+23
$589
Total Proposed change order
$589
Notes:
From Station 9+97 to 5ta. 10+23 during trenching for the 6" waterline, a galvanized water
service was encountered. It is believed the service was for. 775 & 800 Liberty Street.
The galvanized 1" line ran diagonal across the new trench for about 20 feet and caused
a reduction in planned productivity. The water service is not as per plan.
Approved 8y:
Date:
Disapproved 8y:
Date:
/
.i
CO # 7, Conflict with waterline and water service
.
Manhours . Name/Description Hrly Rate Fringes
labor Rates
B Laborer '.$37.40
8 Operator $45.21
.
Overhead Bare Cost Doily TTL
40.00%
.$14.96 $52.36 $418.88
$18.08 $63.29 $506.35
$OcOO $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Excavat9f
Loader
Ave S per Manhour
Hourly Cost
$40.00
$45.00
$57.83
. $115.65
$925.23
16
Equip Hrs.
8
8
Man hours Per Day
Mise
$40,00
$45.00
$0.00
$0.00
$0.00
$320.00
$360.00
$0.00
$0.00
$0.00
Subs
Ave $ per Manhour
Hourly Cost
S42.50
$85.00 S680.00
SO.OO $0.00
SO.OO SO.OO
$0.00 SO.OO
$0.00 SO.OO
$0.00 $0.00
SO.OO $0.00
SO.OO SO.OO
CosUUnit Total Cost
SO.OO
$0.00
$0.00
SO.OO
SO.OO
SO.OO
SO.OO
$0.00
$0.00
SO.OO
$0.00
Total # of Days 0.3333
Total Labor $308.41
Total Equipment $226.67
Total Subs $0.00
Total Materials SO.OO
Total Bare Cost S535.08
Retail Cost S588.59
Mise
Supplier
Material
Ave $ per Manhour
Quantity
$0.00
In Place Quantity
Totai
Cost per Man hour = Cost I MH
Daily Output
IH
1
$100.33
3.00
lday
Iday
Bare Unit Cost per unit
Markup 10.00%
S535.08
$588.59
.
..
Note Blue locate line
of Galvanized service
line.
"
#
J
.
Visar Construction Inc.
General Contractor
PO Box 3101, Central Point, OR 97S20
Phone: S41-944-9060 Fax S41-664-3032 CCS # 146009
To: City of Ashland
Public Works
Ashland, Oregon
Change Order # 8
Job Name:
Liberty Street
Line #
Description
1
6" Sanitary Sewer Reconnect
$6S4
Total Proposed change order
$6S4
Notes:
At Station 7+S8 an unmarked 6" Sanitary Sewer lateral was encountered during Sewer
Construction. The lateral is not noted on the contract drawings. The service was reconnected
to the original service.
Approved By:
Date:
Disapproved 8y:
Date:
Overhead Bare Cost Doi Iy TTL
40.00%
$14:96: $52.36 $418.88
$18.08 $63.29 $506.35
$0:00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
. -'
CO # 8, 6" Sanitary Sewer Reconnect
..
~!-
.
Manhours
Labor
8
8
Name/Description
Rates
. Laborer
Operator
Hrly Rate
Fringes
$37:40
$45.21
16 Man hours Per Day Ave $ per Manhour $57.83 $115.65 $925.23
Equip Hrs. Hourly Cost Mise
I 8 Excavator $40.00 $40.00 $320.00
8 Loader $45.00 $45.00 $360.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subs
Ave $ per Manhour
. Hourly Cost
Mise
$42.50
$85.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
CosUUnit
$35.00
$1.82
$13.27
Ave $ per Manhour $0.00
Supplier Material Quantity In Place Quantity
6"Wye 1 ea 1ea
6" Pipe 6 If 6 If
e". Femco 1 ea 1 ea
Total
Cost per Man hour = Cost I MH
Daily Output
I
1
$100.33
3.00
Total # of Days
Iday
Iday
Bare Unit Cost per unit
Markup 10.00%
Total Labor
Total Equipment
Total Subs
Total Materials
Total Bare Cost
Retail Cost
$594.27
$653.69
$680.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total Cost
$35.00
$10.92
$13.27
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$59.19
0.3333
$308.41
$226.67
$0.00
$59.19
$594.27
$653.69
.. '-0'
".
.... .
.'>> )
"' .
,.
Visar Construction Inc.
General Contractor
PO 80x 3101, Central Point, OR 97520
Phone: 541-944-9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works
Ashland, Oregon
Change Order # 9
Job Name:
Liberty Street
Line #
Description
1
New Sewer Cleanout at Sta 7+58
$916
Total Proposed change order
$916
Notes:
At Station 7+58 the proposed Sanitary Sewer Manhole was eliminated due to conflicts with
phone drops. A c1eanout was installed to replace the manhole.
Approved By:
Date:
Disapproved 8y:
Date:
,..'.
. CO #9, New Clean out
.j
..
,.
Manhours
Labor
'8
8
Name/Description
Rates
Labo(~(
-Operator
Hrly Rate
Fringes
Overhead Bare Cost Daily TTL
40.00%
$14.96 $52.36 $418.88
$18.08 $63.29 $506.35
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$37040
$45.'21
16
Equip Hrs.
8
8
Man hours Per Day
Excavator
Loader
Ave $ per Manhour
Hourly Cost
$40.00
$45.00
S57.83
$115.65
S925.23
Mise
$40.00
$45.00
$0.00
SO.OO
SO.OO
$320.00
S360.00
$0.00
SO.OO
SO.OO
Ave $ per Manhour $42.50 $85.00 S680.00
Subs Hourly Cost Mise
SO.OO SO.OO
$0.00 $0.00
SO.OO $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Ave $ per Manhour $0.00 $0.00 $0.00
Supplier Material Quantity In Place Quantity Cost/Unit Total Cost
Cover 1 ea 1 ea $200.00 $200.00
221/4 1 ea t ea $13.20 $13.20
Pipe 8 If 8 If $2.25 $18.00
Crushed Roc!< 6 tn 6 tn $11.00 $66.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total I 1 . rday $297.20
Cost per Man hour = Cost I MH $100.33
Dally Output 3.00 !day Total # of Days 0.3333
Total Labor $308.41
Total Equipment $226.67
Total Subs $0.00
Total Materials $297.20
Bare Unit Cost per unit $832.28 Total Bare Cost $832.28
Markup 10.00% $915.51 Retail Cost $915.51
4 ,"..;'
'J-
4 ...._..
..>1. ..
.>
Visar Construction Inc.
General Contractor
PO 80x 3101, Central Point, OR 97520
Phone: 541-944-9060 Fax 541-664-3032 CCB # 146009
To: City of Ashland
Public Works
Ashland, Oregon
Change Order # 10
Job Name:
Liberty Street
Line #
Description
Reconnect Existing 1 1/2" Water service at Power Vault
$200
Total Proposed change order
$200
Notes:
At the new power vauit, an existing 11/2 water service was encounterd. The service was rerouted
around the new vault and reconnected.
Approved 8y:
Date:
Disapproved By:
Date:
of II::....
....
.....J:. .."
~..
._.~
CITY OF
ASHLAND
20 E MAIN ST.
ASHLAND. OR 97520
(541) 488-5300
CITY RECORDER
Page 1/1
:'<<}~;DATE ..::{-;o":;'~
~::I: -~'P.O:NUMBER~" ::<:Q
7/1/2010
09585
VENDOR: 015201
VISAR CONSTRUCTION CO INC
PO BOX 3101
CENTRAL POINT, OR 97502
FOB Point:
Terms: Net
Req. Del. Date:
Speclallnst:
SHIP TO: Ashland Public Works
(541) 488-5587
51 WINBURN WAY
ASHLAND, OR 97520
Req. No.:
Dept.:
Contact: Mike Faught
Confirming? No
':Ji,:auariti~7'~ \~:Unit;:L . ':.[IT,,' . .:';'U;Di;1.'tii~ia-ii;( <;..c.....:' ~ ::" ":''lfnitj~:ricet ~~_~ '>:,,~.. ..N'....~.<;;-.,,-_.---~
_.~,," - c. ExC-P.r1ce>~~....L;
THIS IS A REVISED PURCHASE ORDER
Construct the Liberty Street 142,798.75
Improvement Project #2004-21, Payment
to be made in accordance with the
proposal received on 05/06/10 and
attached to the contract.
Contract for Public Works Construction
Date of contract: June 7, 2010
Insurance &.Bonds required/On file
Approved by City Council May 18, 2010
Insurance & Bonds required/On file
Processed change order 08/18/2010 6,690.00
Change Order No. 1 - Change order is
4.684% of original colitract amount
.
SUBTOTAL 149488.75
BILL TO: Account Payable TAX o.ob
20 EAST MAIN ST FREIGHT 0.00
541-552-2028 TOTAL 149,488.75
ASHLAND, OR 97520
_Account!liIUi'iioe, n IIRIP.rOJo"t;NU;;;DEl'f.f)'!i,'l!! ~"~~ttl 1PitAC'couni1Number:;~1:-:~ .. ':~T~'rojectrNumi)er~f!::~':2 ~~Z~mo_unt~
"
E 260.08.35.00.70420 E 200421.120 26 907.98
E 260.08.41.00.70420 E 200421.120 122 580.77
~.2
A~g~~fa
VENDOR COPY
f
,
CITY OF
ASHLAND
A request for a Purchase Order
REQUISTION FORM
Date of Request 1.8/5/20;1[01
THIS IS A REQUEST FOR A:
[X ] Change Order (existing PO #9585
Required Date of Delivery/Service: I
Vendor Name:
Address:
City, State, Zip
Phone:
Project Title:
Project Number:
Visar Construction Co. Inc.
PO Box 3101
Central Point, OR 97502
541-944-9060
Lib~ IJJlprovement
20~
./'
Services Only ?-p~{J- ;J-( Solicitation Process:
[1 Exempt ( ] 3 W~tten Quotes (copies
attached)
[ ] Sole Source (X I InvltaUon 10 Bid (copies on
file)
[ ] less than $5000 I I ~eciuest for Proposal (copies
on file)
Description
Total Cost
Change Order NO.1
Account Number
Account Number
260.08.35.00.704200 (18%)
260.08.41.00.704200 (82%)
"Please attach the Original signed contract and Insurance Certificates.
Employee Signature:
> ~I(zc
Supervisorl Dept. Head Signature:
~:J..co.o~L
G:F'1.bNr1G\Eng\DeplAdmin\Engineer\Project\99-38 Schedule A Change Qrders\04-21 Change order Req Visar.x1s
Updated on: 10113103