HomeMy WebLinkAbout2007-186 Agrmt RR Grade Crossing
Public Road ImprovemeotI2/041OO
Estimated Costs
Form Approved-A VP Law
,
Improvements to Existing Public Road At Grade Crossing
For E Main Street, DOT 756416E
M.P,428.42 Siskiyou Subdivision
Ashland, OR
TInS AGREEMENT, executed in duplicate this _ day of . 2007, by and between
CENTRAL OREGON AND PACIFIC RAILROAD COMPANY, a Delaware cOlJlOration (hereinafter the
"Railroad'~, and CITY OF ASHLAND, a mmricipal COIpOrntion of the Slate of Oregon (hereinafter the
"Political Body'~, WITNESSETII:
RECITALS:
The Political Body bas requested the Railroad to improve the existing E. Main Street crossing, at
grade, alorig, over and across the Railroad's track and right of way at Mile Post 428.42, Siskiyou
Subdivision. DOT No. 756416E, in City of Ashland, Jackson County, Oregon to which the Railroad is
agreeable, but solely upon terms and conditions hereinafter set forth. .
AGREEMENT:
NOW THEREFORE, in consideration of the premises and of the promises and conditions
h=inafter set forth, the parties hereto agree as follows:
I. The Railroad sball furnish all labor, material, equipment and supervision for, and sball (a)
remove the existing asphalt crossing, (b) install a 80 ft. +- precast concrete crossing, (c) field weld rail.
(d) relay track at crossing with 136## rail, (e) renew the crossties, and (f) surface the track with new
ballast, all at the intersection of the Railroad's mam liDe Siskiyou Subdivision with E. Main Street at
Mile Post 428,42 in Ashland, Jackson County, Oregon, as shown generally on Political Body's print
sheet No.3, marlced Exhibit A,'hereto attached and hereby made a part hereof.
2. The Political Body agrees to reimburSe the Railroad for one hundred perceut (100%) of
Railroad's actua1labor and m~al costs associated with the work and materials described in Section I
above. The Railroad estimates such cost to be One Hundred Fourteen Thousand One Hundred and
Twenty-five Dollars ($114,125.00), as set forth in Estimate dated June 20, 2007 JIIlIrkcd Exhibit B,
hereto attached and hereby made a part hereof. During the pCrformancc of such work the Railroad will
provide progressive billing to Political Body based on Railroad's actual costs. Actual costs to the
Railroad shall include customary additives to materials, services and labor provided by the Rai1road.
Within 120 Days after Railroad bas completed its work, the Railroad will submit a final billing to
Political Body for any ba\ance owed. Political Body shall pay the Railroad within thirty (30) days of its
receipt of all bills submitted by the Railroad.
)
3. The Railroad, at its cost, shall maintain the crossing between the track tie ends. If, in the
future, the Political Body elects to have the surfacing material between the track tie ends replaced with
paving or some surfacing material other than timber planking, the Railroad. at the Political Body's
expense, shall install such replacement swfacing.
4. The Political Body, at its sole cost and expense, sbaIi provide any/all traffic control
including full road closure, barricades, and aU detour signing for the crossing work, provide all labor,
material and equipment to instaU concrete or asphalt street approaches, sawcut roadway, and if required,
will install advanced warning signs, and pavement marlcings in compliance and conformance with the
Manual on Uniform Traffic Control Devices.
c.~_~- e.......d~1IPfII,dgt
I
Public Road Improvement 12104/00
Estimated Costa
Form Approved-A VP Law
5. If Political Body's contractor(s) is/are pcrfmming any WcnK described in Section 4 above,
then the Political Body shall require its contractor(s) to execute the Railroad's standard and current form
of Contraclor's Right of Entry Agreement. Political Body acknowledges receipt of a copy of the
Contractor's Right of Entry Agr=ent and understanding of its tetms, provisions, and requirements, and
will inform its contractor(s) of the need to cxecute the Agreement. Under no circumstances will the
Political Body's, contractor(s) be allowed onto the Railroad's premises without first executing the
Contractor's Right of Entry Agreement
6. Fiber optic cable systems may be buried on the Railroad's property. Protection of the
fiber optic cable systems is of extreme importancc since any break could disrupt service to users resulting
in business intcmJption and loss of revenue and profits. Political Body or its contractor( s) sba11 telephone
the Railroad during normal business hours (7:00 a.m. to 9:00 p.m., Central Tune, Monday through Friday,
except holidays) at 1-800-336-9193 (also a 24-hour number, 7 day number for emergency calls) to
determine if fiber optic cable is 'buried anywhere on the RaiIroad's premises to be used by the Political
Body or its contractor(s). If it is, Political Body or its contactm{s) will telephone the telecommunications
company(ics) involved, aIrange for a cable locator, and. make amingements for relocation or other
protection of the fiber optic cable prior to b€lginning any WOIk on the Railroad's premises,
7. The Political Body, for itself and for its successors and assigns, hereby waives any right
of llSl'~ against the Railroad, as an adjacent property owner, for any and all improvements made
under this agT""""-
8. Covenants herein shall inmc to or bind each party's SUCCesSOIS and assigns; provided, no
right of the Political Body shall be 1ranSfer:red or assigned, either voluntarily or involuntmi1y, excqrt by
'"'iJ'...,$ written agreement acceptable to the Railroad.
9. The Political Body shall, when returning this agrecme.nt to the Railroad (signed), cause
same to be accompanied by such Order, Resolution, or Qrmnonr'il of the governing body of the Political
Body, passed and approved as by law prescribed, and duly certified, evitlP.t'lC':ing the authority of the
person executing this agreement on behalf of the Political Body with the power so to do, and which a1so
will certify that funds have been appropriated and are available for the payment of any sums herein
agreed to be paid by Political Body. .
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the date
and year first hereinabove written.. .
CENIRAL OREGON AND PACIFIC RAILROAD
By
Title:
ATTEST:
CITY OF ASHLAND
City Clerk
By
Title:
Pursuant to Resolution/Order
dated
hereto attached.
~.-I~r...,o.-adE.","",.~~
2
<::
..
...
"f
<.>."
" .
"'s
.....
.!!<
ci =..:
Z e=
CI: ....u.=
r:.l Nf-oU)
53 ~O.e
o ~@i
"
i
~ ~ .
1 - i
; ~: i ~i~ ~ i a~} !~ i !
, . !' 8 ~14 8ij a~ "'51 a. I .
~! . t i~Ji ~a~ ~e la IE i:1 J; . ~i
"t 5 _.~4 rd H a4 a. ~.~ -- t .'4
~ ~ ~i ~~.! alJ :$ !g ~t J!' ~! 1 ~~
j J j !~ Jl:~ ~~J l~ l~ l~ i~~ j~ ! !~
0e80 e e 0 e e @ @ @@
M
'"
...
o
'"
<> )
~ i
~
~
.
.,
a~
'II
. II
! l.j
. II,
. ,-
~lh
~lll
~...
~~ I
1.1
Hili
L.
~. ~p
iiii!
!, ~: ~
~ 1 J 11
.. .
,'0
i- 1"\
*
d
_d
d*
u-
.-
--
dd
--
Sd
d
u:
~d
d-
-~
-::
:-
-
~ .~ Ii ~ ~ 9
!
"'U" 3+
: ~ ;
;~
it 1/' s
tj . /
;,0/
T
,
.'
..
. .
. ,
. .
.
I .
1/
i.
I.
,
~ ~
I
.. .
: 1...--!:---L-_ -
l~. I . ~
w'
zl
.:;
,
~
! .
t-
~.
.9UO
~~I'WII;~
...
...
~
,f~
{,
~.
"
STA.""" lffiO.DO
BEG/IIIt}1IS OF PRtJJE.CT'
!
,
?'
--..."
--...,.
~ =r
, I
:l
!
~ ~
~
;;
~
o
o
<t
-r
)-
-D
,
3-
~
- ~
~
g ~
N
"
l
.
~
<:;
.
~
..
,.
-
.
g
,;
.~
. CENTRAL OREGON & PACIFIC RAILROAD, INC.
it
Palrick A. Kerr
Ass!. Ocncml Mm1ager-Engiaeering
333 S.B. Mosher AvCllDC' Roseburg, OR' 97470' Pbonc: 541.9572509' Fax: 541.9573m
June 20, 2007
Paula Brown, PE .
Public Works Director City Engineer
City of A.hl.nil
20 E. Main Street
Ashland, OR 97520
RE: proposed new concn:te crossing surface improvements to E. Main Street,
'MP428.42, DOT 7564l6E, Siskiyou Subdivision, City of Ashland Oregon
Mrs. Brown,.
Per your request the estimated cost for the proposed crossing improvements to E.
Main Street, MP-428.42, DOT 7564l6E, Siskiyou Subdivision, City of .,A.hhmil Oregon
. is below. The proposed improvements include but are not limited to; u:pgnide the existing
main line crossing surface from asphalt to new concrete surfiwe including sidewalk
requirements.
. .
If the City approves of this estim:rt.... cost for this project, please send me a fetter
of concurrence so we can continue to process this project for a fina1 agreement This .
estimate does not include any permits, paving and traffic control by others including full
road closure by others or any real estate requirements.
CfOSIling Surface work $114,125
If you have any questions, please contact me directly at 541-957-2509.
Sine
Patrick Ketr~
Asst General Manager-Engineering
~""
=
~tll
A RailAmerica Company
ZXk~b~-+ E_
_~ Dregon
. :.' , .Tl1e"j"w R. 1(1IIun~"s~L G.w.m."
March 20, 2006
Department of Transportation
Rail Division
555 13th Street NE, Suite 3
Salem. OR 97301-4179
Telephone (503) 986-4321
FAX (503) 986.3183
1TY (503) 986-3416
TO ALL PARTIES
File Code:
RX 1223: In the Matter of the Alteration of Two Railroad-Highway Grade Crossings at East
Main Street and Tolman Creek Road and CENTRAL OREGON & PACIFIC RAILROAD
(CORP), Siskiyou Subdivision, in Ashland, Jackson County, Oregon.
Enclosed is your copy of final Order No. 50367, granting the legal authority to construct, alter or
close a public crossing in the above-cited matter. This Order is a compliance document, the
terms of which are binding upon the affected road authority(s) and railroad(s) and enforceable, if
necessary, in a court of law.
All parties are requested to distribute copies of the Order to all persons in their agency or
company who are involved in the project as supervisors, contractors and quality assurance
inspectors. If the project supervisor should change, please assure that a copy of Order No.
50367, and the importance of its provisions, is provided to the new project manager and
inspectors. Please monitor the construction to ensure ongoing compliance with the Order.
Order No. 50367 requires that all parties provide written notice of completion of the project to
the Rail Division. Upon receipt of this notice, Rail Division Staff will carefully inspect the project
for compliance with the Order. A"y deficiency or non-compliance item(s) found by Staff will be
sent to the party responsible for installation/maintenance of that item. Rail Division does not
consider a project complete until it passes final inspection for full compliance with the Order.
For most projects, the applicant has the major burden of quality control as they are bearing the
costs of construction, installation of traffic control devices, etc. Parties are welcome to invite me
to the pre-construction meeting (advance notice preferred), or call me with questions.
I wish you a successful project completion, in hopes that it will promote the safety of our citizens
at railroad-highway crossings.
'.~mes Senior Crossing Specialist
(503) 986-4095; Fax (503) 986-3183
E-mail myron.l.ameson@odOl.state.or.us
Enclosure:
Copy of Order No. 50367
G:\WG_RAIL\Mt.A\RXSl TRS\RXt223slllt 031006 doc
Form 735-9203 (03-04)
~
ORDER NO. 50367
ENTERED
March 17. 2006
ODOT CROSSING NO. C-426.90
U.S. DOT NO. 756412C
(Tolman Crk Road)
ODOT CROSSING NO. C-428.42
U.S. DOT NO. 756416E
(Main Street)
BEFORE THE OREGON DEPARTMENT
OF TRANSPORTATION
RX 1223
In the Matter of the Alteration of Two )
Railroad-Highway Grade Crossings at East Main )
Street and Tolman Creek Road and CENTRAL )
OREGON & PACIFIC RAILROAD (CORP). )
Siskiyou Subdivision, in Ashland, Jackson County, )
Oregon. )
ORDER
On November 18, 2004, City of Ashland made application under ORS 824.206 seeking
authority to alter the subject grade crossings. On February 22, 2005, applicant amended ns
application. The affected railroad is CORP. The public authority in interest is applicant.
Rail Division staff has investigated the amended application. By letter dated August 1,
2005, staff served the application and Proposed Final Order (PFO) for all parties to review and
acknowledge their agreement. On August 23, 2005, CORP objected to the PFO. On
November 14, 2005, Rail Division received a second amended application from City of Ashland.
By letter dated December 28, 2005 staff served the amended application and RPFO for parties to
review and acknowledge their agreement with ns terms. All parties in this matter have agreed that
the proposed crossing alterations are required by the public safety, necessity, convenience and
general welfare. Therefore, under ORS 824.214, the Department may enter this Order without
hearing.
Applicant proposes to alter the grade crossings at East Main Street (C-428.42) and Tolman
Creek Road (C-426.90). The propo$al includes the construction of sidewalks and bike lanes at
East Main and replacement of the guardrail in the southeast quadrant with 50 feet of standard curb
at Tolman Creek Road. The Appendix to this Order, pages 1 & 2, depict the scope of the proposed
alterations to the crossings. There is a daily average of two freight trains and two swnching
movements over the crossings at a maximum authorized speed of 20 miles per hour. There have
been no reported train-vehicle collisions at the crossings within the past 10 years.
ORDER NO. 50367
/
From the foregoing, the Department finds that the requested crossing alterations are
required by the public safety, necessity, convenience and general welfare.. The application should
be granted upon the foilowing terms.
IT IS THEREFORE ORDERED that:
1. The authority to alter the crossing is granted. No authority to establish a Quiet Zone is
granted by this Order.
2. Applicant shail:
a.
At the East Main Street crossing, as set forth below, reconstruct and maintain the
sidewalks and that portion of the crossing lying outside lines drawn perpendicular to
the end of ties to accommodate the roadway configuration and sidewalks depicted
in the Appendix to this Order, page 2, and bear ail the costs. The roadway
approaches shail comply with OAR 741-120-0020.
\
b. At the Tolman Creek Road crossing, as set forth below:
(1) Remove previously ordered guardrail in the southeast quadrant of the
crossing.
(2) Fumish, instail and maintain standard curb adjacent to the existing
automatic signals in the southeast quadrant at the crossing, and bear ail the
costs. The curb shall be constructed according to OAR 741-110-0030(7)
and shall commence not less than 10 feet from centerline of nearest track
and extend at fuil height not less than 50 feet in advance of the automatic
signals.
c. Bear all the cost of work items listed in paragraphs 3.a., below.
3. Central Oregon & Pacific Railroad shall:
a. At the East Main Street crossing subject to reimbursement by applicant, construct
that portion of the crossing lying between lines drawn two feet outside each rail to
accommodate the roadway configuration and sidewalks, as depicted in the
App.endix to this Order page 1.
b. Notify the Rail Division of the Department in writing or by facsimile transmission not
less than fIVe working days prior to the date that the ordered automatic signals wiil
be activated and placed in service.
4. Each party shall notify the Rail Division of the Department in writing upon completion of its
portion of the project.
2
ORDER NO. 50367
All previous Orders of the Public Utility Commission or the Department relating to the
subject grade crossing, not in conflict with this Order, remain in full effect
Made, entered, and effective
(53/; JI t!o
~--
K~~
Ral Division Administrator
G:\WG_RAIL\XORDERS\RX 1223APFOAshlandCorridor120105.doc
3
~ M
0 ~
It) ClO
g q
U ~
I 0 =
=
~Z 0
MllII U
.... a =
t. 0
..cI ~ t ~
<:I rn e .. "
... ....Ub';,
,~
-g M....rn-g
~o,~~
..
=- ~@:g<
~
.
-+-
Lf)
c
0-
o
2:
-+-
(f)
o
w
,
,
,
,
,
,
, .
..
,
/~"/
.'
''/
ice
\
,
i
I
i
I
.
,
~
.I
.'
,
\. 'f:-.
~: "'"
~/ ~
'Or
,
.:
.
x
~
,
,
~I
~! I
f ,
if I
f ,/
/ I
Ii
r /
f /
j /
, I
I /
, I
I'l
I /;
/ I
, ~ Ii
I ' ff,
I .' /; 'I--. .
I ~I'/ 0
/, /
. ~ / ()
/ c //
1'/1 '
/ (I' t..C'
, '-1-..0
,
,
.
g
~
~
~
. <>
gE
x .
.
~ 0
,
- u
'.
,
i
,
i
.,
,.
~!
,
i
,
,
i
,
i
.,
,
/
,.
/"7t
.11
/'1
'/ .
I;
$11
<<~ '1
0.{' / '
q.'t .... / "
,.. ')' ~
Q' I .. "
, , v
~ ".' .>::J
(J' , ./ J..Cj
~J' ..... :' ~....
I "l 'J
'.
"
. '
~:.J
~;/
x
~
"
.
I
,
,
i
i
.,
.,
i
\ L-"
,~ .
\ \f) \
\ 0...
. ,
,\ 1.\ '\
\ \J-.I \
\ \
,
~
~
~
~
~
~
;.
..
..;
!
, '^
~
, .
"" ,
, >:
, ~
"
, ~
"
~
.
.
.,.
"
~
, ,
" -''I
'.
",t>-
I,
I
+-
"
.I
.
~.
~,
~
Ii
c
I.
>
.
c
"
8