Loading...
HomeMy WebLinkAbout2010-199 CONT AMND #1 - Stream Fix ENGINEERING SERVICES CONTRACT AMENDMENT NO.1 Engineering services contract made on the date specified below in Recital A between the City and Engineer as follows: Recitals: A. The following information applies to this contract: CITY: CITY OF ASHLAND ENGINEER: Stream Fix City Hall 19478 S. Starview Ln. 20 E. Main St.. Address: Oregon City, OR 97045 Ashland, Oregon 97520 (541) 488-5347 FAX: (541) 488-6006 Tele: 503/631-8184 Fax: 503/631-8084 Date of this agreement: Oct. 28, 2010 B: RFP Date: February 12, 2010 Proposal Date: March 15,2010 1[2.3 City Contracting Officer: Michael R. Faught, Director of Public Works 1[2.4. Project: Ashland Creek Bank Restoration Project No. 2006-29 1[6.1. Engineer's Representative: Russell A. Lawrence P.E. 1[8.3. Maximum Contract Amount: $75,000.00 B. AMENDMENT NO.1 1. Modification to "Services to be provided" Add services per attached proposal and cost estimate dated September 20, 2010 and made a part of this amendment. 2. Modification to "Compensation" A. Add cost of extra work = $18,320.00 B. Adjusted total contract amount = $93.320.00 CONSULTANT L- BY e4<J# t?, CITY Ii3Y Finance Director Fed. ID # 0/1/ -ht.L . BY REVEIWED AS TO CONTENT ~<:.,~Q-t - City Department Head Date: \ \ \ \0 \ (() Coding: (for City use only) C:\Documents and Settings\Administrator\Local Settings\Temporary Internet Files\OLK4A\06-29 Stream Fix Amendment 1 10 282010.doc ~[!Y2{jRMfL! Septem ber 20, 2010 Jim Olson Engineering Services Manager City of Ashland 51 Winburn Way Ashland, OR 97520 Subject: Change order 1, Water St'; Ashland Cr. Proj 2006-29 Dear Mr. Olson; As a result of the preliminary findings noted in Tech Memo 1, and our site visit Sept 13, 2010, we have determined a change order for additional work is necessary to complete the work presently contracted for under City project 2006-29. The increased work contemplated involves; 1. Additional survey work for the Helman Diversion, above the Water St. bridge, and a strip survey (approximately 40 feet wide) from a point on that diversion North of Central Avenue to the existing irrigation water transportation system from the Million diversion on the easterly side of Ashland Cr. (specific route to be determined by the City). This includes all easement preparation and as-built survey work for the extents of the change order. 2. One Meeting with the active water rights holders for the Helman and Million diversions and irrigation systems to provide technical assistance in support of City efforts to negotiate combining the Million diversion with the Helman diversion. 3. Performing, as a CWRE, necessary diversion transfer paperwork to consolidate the Million and Helman diversions 4. Design of a irrigation water transportation system from the Helman irrigation system to the Million system from a point North of Central Ave. to the exisiting Million irrigation system pipe on the east side of Ashland Cr. This will entail crossing Water St. and the Ashland Cr. Inn property which includes Ashland Creek. 5. Probably redesign of the fish screen structure presently existing on the Helman Diversion 6. Assisting the City in obtaining ODFW grant assistance in replacing the existing Helman fish screen 7. Design for removal of the Million Diversion dam, diversion structure, irrigation piping and stabilization of the east banks of Ashland Creek in the vicinity of this work. C:\Projects\Ashland\Water St\Change Order la.doc Russ Lawrence Stream Fix February 27, 2009 Page 2 8. Perform permitting necessary for the installation of this work as a part of the presently contracted Bank Restoration Work. 9. Perform on-site inspection for stream crossing related work developed under this change order is installed. Item 1 will be performed by others under the direction of the City. Stream Fix proposes to perform items 2 through 9 (inclusive) on an hourly rate, not to exceed basis. Items 2 and 3; We estimate a total of 20 hours, 500 miles and 1 nights lodging for this work. That breaks down to 10 hours in travel (charged at half rate) and 3 hour in negotiations, and 12 hours Diversion Transfer application and follow-up. Items 4 through 8; We estimate a total of 92 hours to perform that work. Four hours of that time will be spent on additional specifications preparation. Item 9; We are allowing 16 hours for inspection of this work. This work will be performed under the hourly rate schedule that is a part of this contract. Russell Lawrence will be performing all of the proposed change order work, items 2 through 8, @ $145jhr. Mileage will be charged at $0.55jmile and Lodging at $125 per day. Travel will be charged at V2 standard hourly rate for this work. Inspection work shall be charged at $105 per hour. Under these terms, the additional work proposed will not exceed $18,320.00 si ncerely, ~a.~ Russell A. Lawrence, P.E. Fluvial geomorphologist CITY RECORDER Page 1/1 ~~, CITY Of ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 I' 'DATE' -. I PO:NUMBER. ., 09551 7/1/2010 VENDOR: 014147 STREAM FIX 19478 S STARVIEW LANE OREGON CITY, OR 97045 SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: Speclallnst: Req. No.: Dept.: Contact: Michael Faught Confirming? No ,"QJ.i1titV :,:.Uhlt ., ..' ,) ~ :;'l. - . .' ;O-esci'iiJtion ", Unit"Price.;, . Ext. Price:,' - - , .' - THIS IS A REVISED PURCHASE ORDER Engineering services for the design, 75,000.00 permitting and implementation of the Ashland Creek Bank Restoration Project No. 2006-39. Approved by City Council on April 20, 2010. Contract for Personal Services Beginning date: April 20, 2010 \ September date: September 20, 2011 Insurance required/On file Processed change order 11/29/2010 18,320.00 Change Order No. 1 SUBTOTAL 93 320.00 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2028 TOTAL 93,320.00 ASHLAND, OR 97520 :.:~~ 'Acco-unFN~umbe,,' ;~:;':; :;T~;tProject)Jum-ber.li' ;:,;'~ " '::.Amc)Lfnt 'Ac'counfNumber ,,- .. ': ~r6ject:Num.6er:;-:-, , - .,'.A:moun'i~L.'.':' .. ,. , E 260.08.17.00.70420 E 200629.100 46 660.00 E 260.08.34.00.70420 E 200629.100 46 660.00 ~.:L ~,j,j;"fp Aut zed Signature VENDOR COPY CITY OF ASHLAND 'FOR:M #13 CONTRACT AMENDMENT APPROVAL REQUEST FORM Request for a Change Order Description of Contract Amendment resulting from: ,~-......~~. ~ - -'_.~' ~-~...---.. . ,-.....-... :... . .- .. . ..~-...-:- - -- -'- . - ",---.- --', - ~ .. -' _.- . . ," ,":' ..' 1)' Cinn'petitive'Sealed'Bid (ITB), 2) Competitive Sealed .Proposal (RFP) or 3) Sole Source. procure'menti' .. ,. ".,""" ..... ------",.".--" ._.. ....,...... '.-.,.,,--.. . . '.,.,...,. ,.,.. ',,,--" .-- -" -.. -,..,-..-...-?-...--.-......." ---..- -,.,.,.. '.. .-,. ~..__._._-^,- --"' .',,". ....,- -,'" '-,' -., "...--,..,.-, .,......'-..--.....,-"... -,.~ Supplier I Contractor; t:<...;t..--;J.-7"L. r '>C Purchase Order Number; 0 'f' r:;;- ~ / Description: ~ ~ ) c:::::::.-"-~ "-<'~_-Y',., ~ r::".>:::e.Y' I/<!- C-L-~ ~'altaChed contract amendment . ,-" , ',....... - t' . .1' ~ ','" .. CoritractAmentlmenf Original contract amount $ "'7" ~ t' IFCJ d1.'~ /' ;/ . --.1.QL % of original contract Total amount of previous contract amendments Amount of this contract amendment /.e ~g/ , -? ,,"" .--0 /~, '3 ;Lt'J, '-<!?!J % of original contract ,;2.-r. -'1';2 7 .. . % of ongmal contract /.:2;./. ~~? . % of original contract TOTAL AMOUNT OF CONTRACT $ Is the total amount of the cumulative amendments less than or equal to 25% of the original contract amount or $iSO,ooti - ~-".'~ ..,.._.~-: -'~':' - .._... _..- -...- whichever is less? . H H YES V--' NO* *If "No', a Special Procurement is required for the amount that exceeds authority. Council approved on (Date) In accordance with OAR 137-047-0800, the amendment is; 1) Within the scope of procurement 2) Necessary to comply with a change in law that affects performance 0' the contract. 3) Results from renegotiation of the terms and conditions, including the contract price making it advantageous to the contracting agency a) Provided goods and services are the same as in the unamended contract b) The amended contract does not have a total term greater than allowed in the solicitation document YES NO* *If "No", a Special Procurement is required for the amount that does not meet these criteria. Council approved on (Date) Project Numblr!:e:~_::z1!_h1ccount Numb~~~-~!-~.?- ~-?~t'~CC~fN:~:;!n_' n' n' n - n_n_ ~t7 ~$9<1l tfJ&7&~S!"-CJ .?e!' r4> , Account Numtler ___ - __ - __ - __ - ______ Account Number ___ - __ - __ - __ - ______ 'Expendffu," must be cha ed 10 the approp~at"nl numbers for Ihe financials 10 reflect the actual expenditures accurately Affach extra pages if needed. Prepared by; '~ - Departme~ ? <! 4 ",., <<J/ Date: /'/'" - :3 &' - /' 0 ---7 . (V? PIEJilse drele: Reviewed by; vU,-, /,'CG;!.1!--<<-<4J-<-1'-; "'-ApprolIed I Not Approved Date; Department Hri'd Comments: Funds appropriated 'or current fiscal year: F" NO Comments: #:2 "?-' Finance Director IIOC:Y; " Date Form #13 - Contract Amendment Approval Request Form -ITS, RFP or SOLE SOURCE PROCUREMENT, Page 1 of 1,11/30/2010 CITY OF ASHLAND A request for a Purchase Order REQUISTION FORM I~I Date of Request: ~ ~11I20,1O THIS IS A REQUEST FOR A: [X ] Change Order (existing PO: 9551 Vendor Name: StreamFix Address: 19478 S. Starview Lane City, State. Zip Oregon City, OR 97045 Phone: 503-631-8184 Project Title: Ashland Creek Bank Restoration Project Project Number: 2006-29 Services Only Solicitation Process: (l Exempt [ I 3 Vl!ritten Quotes (copies attached) ( I Sole Source [.1 Invitation to Bid (copies on file) [ J Less than $5000 [ ) ~~quest for Proposal (copies on file) Description Total Cost Change Order NO.1 Account Number Account Number 260.08.17.00.704200 260.08.34.00.704200 50% 50% Employee Signature: NOTE: By signing t .Please attach the Original signed contract and Insurance Certificates Supervlsorl Dept. Head Signature: ~l' ..sLfl-t-- , f certify the the above request meets with Ctly of Ashland Soficitiation Process requirements and can be provfded when necessary. ~ "-.~ ttZ-r-~"'" ;' ,,:z ~ ~:L -"7 "';;. G:PlJbwr1(s\Eng\OO-29 StreamFix Change Order No 1.x1s Updated on: 7/15102 Memo CITY OF ASHLAND Date: From: To: Re: Novembe~9 2010 Jim Olson Lee Tune rg Stream Fix Change Order Due to unforeseen permitting and in-stream work, additional funding will be required to complete the Ashland Creek Bank Restoration Project. To compensate for this increase, the Winburn Way project will be removed from the storm drain budget this fiscal year. ENGINEERING DIVISION 20 E. Main 8traat Ashland OR 97520 www.ashland.or.us Tel: 541/488-5347 Fax: 541/488-W06 TTY: 800/735-2900 er.t. ,