HomeMy WebLinkAbout2011-016 CONT Chg Order #4 - Visar Construction
>,
CITY OF ASHLAND
DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE ORDER NO. 4
PROJECT:
LOCATION:
Liberty Street Improvement
Liberty Street
DATE: 1/05/2011
PROJECT NO.: 2004-21
CONTRACTOR: Visar Construction Co. Inc.
You are requested to perform the following described work upon receipt of an approved copy of this document or as
described by the Engineer:
Item No. Descrintion Ouantitv Unit Price Amount
CO 4-27 Saw-cut, tear-out extra curb/l!utter NE side tie-in L.S. 336.22 336.22
CO 4-28 Dil! un and exnose com ston for Water Dent. renair L.S. 234.82 234.82
CO 4-29 Retrofit barrel section and adiust sewer manhole L.S. 861.98 861.98
670 Liberty; Poured 4" d-way, Tie in not as per
CO 4-30 olan, lonl!er transition reouired L.S. 1887.15 1887.15
670 Liberty; Driveway removal because of high-
CO 4-31 snot en annroach. Re-Dour drivewav aDDroach L.S. 1909.66 1909.66
676 Liberty; Poured 4" thick driveway. Tie-in not
CO 4-32 as ner nlan, lonl!er transition reouired L.S. 1511.48 1511.48
CO 4-33 684 Libertv; tear out flagstone rock and "rock" bed L.S. 200.13 200.13
681 Liberty; Poured 4" thick driveway. Tie-in not
as per plan, longer transition required, Set of steps
CO 4-34 with landing, meter box adiustment L.S. 3134.12 3134.12
696 LibertY; Create keyway and poured 4" thick
driveway, retaining wall, clean-out. NDS drain
work installation costs reduced by Contractor
CO 4-35 (-$117.40) L.S. 4511.40 4511.40
720 & 730 Liberty: Removed driveway approaches
to lessen grade. Re-graded driveways and landing
CO 4-36 areas with Advanced Al!l!Tel!ate Rock. L.S. 3633.08 3633.08
720 Liberty; Extend segmented block wall to
match new grade on driveway, Built water-meter
CO 4-37 "well" L.S. 2590.93 2590.93
Gravel between segmented wall and edge of
asphalt between Sta. 10+20 and 10+70, raise meter
CO 4-38 boxes L.S. 796.43 796.43
ADJUSTMENT # I; Type D Inlet Box @ Sta.
CO 4-39 10+78: Formed un sidewall and noured bottom L.S. 274.69 274.69
ADJUSTMENT #2; Type D Inlet Box @ Sta.
CO 4-40 10+78 L.S. 825.00 825.00
790 Liberty; Bore under wall and place 3" conduit
into pedestal, backfill with sand - as requested by
CO 4-41 COA Electric Denartment L.S. 497.70 497.70
ENGINEERING
20 E. Main Street
Ashland, Oregon 97520
www.ashland.or.us
G:\pub-wrks\eng\04-21 Liberty StreellA-.AdminlCons Vendor1\Contrect DocumentslChange Orders\02012011 CC Revised Visar Ch,
Tel: 541488-5347
Fax: 541488-0008
TTY: 800-735-2900
~~,
Disposal of stumps and wood debris from common
CO 4-42 area. Contactor adiusted this mice (-$204.80) L.S. 204.81 204.81
Qwest Phone Repair - Invoiced 9/23/2010
CO 4-43 dama"ed durin" main waterline connection L.S. 471.90 471.90
Adjustments to [mal quantities for the following
bid items 15, 16, 18,22,23,24,26,27,28,29,30, (-354.53)
CO 4-44 31,32 & 36 N/A (-354.53)
Original Contract Amount
Total this Change Order
Previous Change Orders
Revised Contract Total
The time provided for completion of this contract is increased by 10 calendar days.
become an amendment to the contract and all prov" s of the contract will apply.
$142,798.75
23,526.97
13,515.09
$179,840.81
(25.9% total increase)
This document shall
Recommended By:
Approved By:
~~o.
Ciry~~
Contrac
2-/1 /;2.:>//
Date
~/ 8)a.n I(
Date
<Q/+ I (t
Date
Accepted By:
ENGINEERING
20 E. Main Street
Ashland, Oregon 97520
www.ashland.or.us
G:\pub-wrks\eng\04-21 Liberty Street\A_Admin\Cons Vendor1\Contract Documents\Change Orders\02012011 CC Revised V~ar Ch,
Tel: 541488-5347
Fax: 541488-6006
TTY: 800-735-2900
r.l1
~
CITY OF
ASHLAND
Council Communication '
Approval of an Amendment to the Contract with Visar Construction Co. Inc. for
. the Liberty Street Improvement Project ~ised~
Meeting Date: February I, 2011 Primary Staff Contact: James H. Olson
Department: Public WorkslEngineer. E-Mail: olsonj@asWand.or.us
Secondary Dept.: Finance Secondary Contact: Morgan Wayman
Approval: Martha Bermett Estimated Time: Consent Agenda
Question: .
Will the Council approve a $@g,r0112~0:6k~p'eI;.centtin:c:r.e:a~J amendment to the existing contract with
Visar Construction Co. Inc. for construction of the Liberty Street improvement project?
Staff Recommendation:
Staff recommends that the council approve a $@:i7!0112~0E. amendment to the existing contract with Visar
Construction Co. Inc. for construction of the Liberty Street improvement project.
Background:
Summary
The Liberty Street Improvement project no. 2004-21 is now complete and all final costs have been
computed and tabulated. The fmal cost includes a number of extra work items that have been
authorized and approved by engineering staff. Many of these extra work items were approved on a
"time and materials" basis so that the actual cost of the work is not exactly known until the work is
completed. Under ordinance no. 3013 the Public Works Director is authorized to approve contract
change orders up to 25 percent of the original bid. Since the final cosl"is !2:s.m percent higher than the
original bid, council approval is required to authorize the final payment to the contractor.
Fiscal Impact
This project proved to be an extremely difficult one to construct and required a total of 43 minor
contract additions and changes which together totaled $@17. 0112.0 . However, since we were able to
secure a very low original bid, the adjusted contract with the 2S.9. percent increase is still very close to
the original construction cost estimate. The engineering for this project also reflected the difficulties
experienced by the contractor in numerous re-4esigns to address utility conflicts. The engineering
contract also experienced cost over runs in excess of 25 percent, which was previously addressed by
the council on May 4,2010. Following is a comparison of the estimated and final costs for the project:
Estimated Costs
Construction: $179,920.00
Engineering: $40.080.00
Total $220,000.00
Final Costs
~~
$46.780.00
~~(jf620'8jll
The actual final project costs are only illir620,8111 or ~!0111 percent higher than the original estimate used
to determine the LID costs. The approved budget for this project was $275,000.
G:lpub-wrkslengI04-21 Liberty StreetlA_Adminl02012011 CC Revised Amend Contract with Visar Construction. doc
CITY OF
ASHLAND
Proiect Complexitv '
Although this project is relatively small in size it provided more construction difficulties, conflicts and
problems than any of the one hundred street improvement projects that proceeded it. The narrow right
of way, small, narrow construction area, and utility conflicts all combined to make this project a most
difficult one to complete. Following are just a few of the problems addressed and solved on this
project:
I. Right of way too narrow: Staff acquired additional easements from three adjacent owners.
2. Telephone cable conflicts: The locations of underground telephone lines were not as
mapped or as indicated by QWEST. QWEST was required to re-Iay 80% of its entire
system, delaying the project nearly 3 weeks.
3. Gas line conflicts: Existing gas lines installed in the 1960's were buried too shallow (1 foot
deep). Three hundred feet of new 2 inch gas line was installed at the proper depth delaying
the project another two weeks.
4. New Facilities conflicts: Few of the non-city owned utilities were as located or as mapped,
causing conflicts in the planned locations of new water, sewer and storm lines, requiring
redesign of the locations and grades of the new lines.
5. Driveway grade issues: Since the street was constructed on a steep side hill, driveways
entered from both above and below the street grade. Widening the street made these
already steep driveways even steeper. A great deal oftime was spent in working with
property owners to build driveways that were acceptable to the owners. In most cases it
was necessary to replace more of the existing driveways than was originally anticipated.
Proiect Completion
Even with the number of problems encountered during the construction of Liberty Street it was
completed on time and under budget. The contractor and project manager did an exceptional job on
this extremely challenging project. The quality of the workmanship on Liberty Street exceeded our
expectations.
L.l.D. Process
This project is one of the last Local Improvement Projects (LIDs) processed under the procedures
outlined under resolution no. 99-09. Under this process the City will fund approximately 50 percent of
the cost of the improvements, with property owners funding the remaining 50 percent. The slight
increase in the overall cost of the project will not change the amount that the property owners will pay,
as all owners will pay a fixed assessment amount of $5,251.00 per assessable unit. The ~1'@0~8l!1 cost
increase will be born entirely by the city.
In the next few months this project will come before the council on two separate occasions. The first
meeting will be to again review the project costs and to set a public hearing date. The public hearing
will be scheduled at least 45 days following the first meeting.
Related City Policies:
Ordinance 3013, enacted on May 19, 2010, establishes certain rules and guidelines pertaining to public
contracting and personal service contracts. The ordinance also adopted the Oregon Public Contracting
Code and Attorney General's Model Rules for public contracting.
Council Options:
G:lpub-wrkslengI04-21 Liberty StreetlA_AdminlQ2012011 CC Revised Amend Contract with Visar Construction. doc
CITY OF
ASHLAND
· The Council may approve an amendment to the Visar Construction Co. Inc. contract to increase
the total contract amount by [ill{O]l2~O~. . .
· The Council may decline to approve an amendment to the Visar Construction Co. Inc. contract.
Consequences
All work necessary to complete the Liberty Street improvement project is now complete. The
contractor has performed all work in good faith and under the direction of City engineering staff. If
the contract amendment is not approved it is likely that the contractor will seek legal means to recover
his costs.
Potential Motions:
· Move to approve a m0]l2ro:o: amendment to the Visar Construction Co. Inc. contract for the
construction of the Liberty Street improvements.
· Move to reject a m0112~0:l1 amendment to the Visar Construction Co. Inc. contract for the
construction of the Liberty Street improvements.
Attachments:
Vicinity map
Photos
Change order document
G:\pub-wrks\eng\04-21 Liberty StreetlA_Admin\0201201 I CC Revised Amend Contract with Visar Construction.doc
0 ~
z gz~ ,;
1Io
O<~ ~~
U)~
>-...J ~
~O
~:c ~ E-i~
~~
UrJ)U
~> ~
......
......:l
z~
'".".--:..;
. '.... ~
"f ..l....
J .... i::~;;;f~:":;.. ,~. ~::~ .;
H,:"."
",
!~~~
~~o~
o%~
~~~ffi
l::i~~-
b~ffi~
:';:1:"
! !
. ~ !
~ 0; .. ~
0 ~ t ~
u .
HJI
o
.!!
:E
on
" I'-
.2! 0
0
0
on
N on
" 0
ii
.5
"
c on
0 N
0
0
,'"
o
co=-- ~.
~""" ="00 """'"
?;:~~\ .r, ~
" ~_.'.
......
.
,;'.
.,
. . '.
__""l .< ~
,.
,
r :..
,
,
I
~i
I r-
i
--~." .---- . ~-.,.;,-. -,
"
"
.;i . ~
'0
~ :',~~~~;'~,
" ,
,"".
.'.
o'
,.,-.---
'.
,1..
,: -"0'
".,'b
; ,-~,
.... ~'.
"on.;"p:e
~ .
, '
",
"
"
,
"
..'
.
.....
"
.,:~",,!
".r
: ~
....0.;0.-
'.~ ."
'i;
-.\I:'j;;
~
'.
.'
.~. "
"
,,"ev
tJ ,
~ ,.."'. ::U:."
.,
,,.j'"
-'
'i'~i~~'J'
.. ,
- '<... i:;t~;'~
.....
~~.> i; . ,
.;!<..
.. ~ '..
"J.. C,",
.,;!l ,"
,j' '1:}" ~_.,
,-," ""d)"
". '!J! .:- ,
~" ''<:
":':1. ';;., ,';
. .,
~
.
: .,d'.
"
,..
.,",
'"i
".'
."
CITY OF ASHLAND
DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE ORDER NO. 4
PROJECT:
LOCATION:
Liberty Street Improvement
Liberty Street
DATE: 1/05/2011
PROJECT NO.: 2004-21
CONTRACTOR:. Visar Construction Co. Inc.
You are requested to perfonn the following described work upon receipt of an approved copy of this document or as
described by the Engineer:
Item No. Descriotion Quantitv Unit Price Amount
CO 4-27 Saw-cut, tear-out extra curb/gutter NE side tie-in L.S. ' 336.22 336.22
CO 4-28 Dig uo and expose corn stoo for Water Deot. reoair L.S. 234.82 234.82
CO 4-29 Retrofit barrel section and adiust sewer manhole L.S. 861.98 861.98
670 Liberty; Poured 4" d-way, Tie in not as per
CO 4-30 I plan, longer transition reouired L.S. 1887.15 1887.15
670 Liberty; Driveway removal because of high-
CO 4-31 soot on aooroach. Re-oour drivewav aooroach L.S. 1909.66 1909.66
676 Liberty; Poured 4" thick driveway. Tie-in not
CO 4-32 as per olan, longer transition reouired L.S. 1511.48 1511.48
CO 4-33 . 684 Libertv; tear out flagstone rock and "rock" bed L.S. 200.13 200.13
681 Liberty; Poured 4" thick driveway. Tie-in not
as per plan, longer transition required, Set of steps
CO 4-34 with landing, meter box adiustment L.S. 3134.12 3134.12
696 Liberty; Create keyway and poured 4" thick
driveway, retaining wall, clean-out. NDS drain
work installation costs reduced by Contractor
CO 4-35 (-$117.40) L.S. 4511.40 4511.40
720 & 730 Liberty: Removed driveway approaches
to lessen grade. Re-graded driveways and landing
CO 4-36 areas with Advanced Aggregate Rock. L.S. 3633.08 3633.08
720 Liberty;. Extend segmented block wall to
match new grade on driveway, Built water-meter
CO 4-37 "well" L.S. 2590.93 2590.93
Gravel between segmented wall and edge of
asphalt between Sta. 10+20 and 10+70, raise meter
CO 4-38 boxes L.S. 796.43 796.43
ADmSTMENT #1; Type D Inlet Box@ Sta.
CO 4-39 10+78: Fonned up sidewall and poured bottom L.S. 274.69 274.69
ADmSTMENT #2; Type D Inlet Box @ Sta.
CO 4-40 10+78 L.S. 825.00 825.00
790 Liberty; Bore under wall and place 3" conduit
into pedestal, backfill with sand - as requested by
CO 4-41 COA Electric Department L.S. 497.70 497.70
ENGINEERING
20 E. Main Street
Ashland, Oregon 97520
www.ashland.or.us
G:\pub-wrkslengI04-21 Liberty StreetlA...AdminlCons Vendor1IContract DocumentslChange Orclersl02012011 CC Revised Visar Ch,
Tel: 541-488-5347
Fax: 541-488-0006
TTY: 800-735-2900
rj.1
CO 4-42
L.S.
204.81
204.81
Original Contract Amount
Total this Change Order
Previous Change Orders
Revised Contract Total
The time provided for completion of this contract is increased by 10 calendar days.
become an amendment to the contract and all provisions ofthe contract will apply.
$142,798.75
~52:O~flL'n
13,515.09
$'b7,9.18~0!81!
(2.s~9...Y.J total increase)
This document shall
Recommended By:
City of Ashland
Date
Approved By:
City of AsWand
Date
Accepted By:
Contractor
Date
ENGINEERING
20 E. Main Street
Ashland, Oregon 97520
www.ashland.or.us
G:lpub-wrkslengl04-21 Liberty StreetlA..AdmlnlCons Vendor1\Contract DocumenlslChange Orders\02012011 CC Revised Vlsar Ch,
Tel: 541-488-5347
Fax: 541-488-6006
TTY: 800-735-2900
r.l1
CITY RECORDER
Page 1/1
~~.
._~
CITY OF
ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
h\.<" :;"~:l'}DATE~};:k,a:0f'j !:Dn~01NOrv'-BE~
7/1/2010 09585
VENDOR: 015201
VISAR CONSTRUCTION CO INC
PO BOX 3101
CENTRAL POINT, OR 97502
SHIP TO: Ashland Public Works
(541) 488-5587
51 WINBURN WAY
ASHLAND, OR 97520
FOB Point:
Terms: Net
Req. Del. Date:
Speciallnst:
Req. No.:
Dept.:
Contact: Jim Olson
Confirming? No
:~;:':Quantif{~~ !!iJirmm, ~{j1~:;:~,;~Jr; L:;~~GJ.:i~'~: ';.. '~';;'~""<:,'3n:Yoescrr:;tJ'OhF13t;,:;:~::W\f~:~.~::.~ ',@'C''''El.ITf./::t: i!fi~IUnirp.rige11~ P.W!!IlEX~P.rlc.;':l~H:!:
THIS IS A REVISED PURCHASE ORDER
Construct the Liberty Street 142,798.75
Improvement Project #2004-21, Payment
to be made in accordance with the
proposal received on 05/06/10 and
attached to the contract.
Contract for Public Works Construction
Date of contract: June 7, 2010
Insurance & Bonds requiredlOn file
Approved by City Council May 18, 2010
Insurance & Bonds requiredlOn file
Processed change order 08/18/2010 6,690.00
Change Order No. 1
Processed change order 09/23/2010 2,683.00
Change Order No.2"
Change Order NO.2 - Cumlllative change
Processed change order 11/17/2010 4,142.09
Change Order NO.3
Processed change order 02/08/2011 23,526.97
Change Order NO.4
Approved by Council February 1, 2011
SUBTOTAL 179 840.81
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2028 TOTAL 179,840.81
ASHLAND, OR 97520
_~cc<>untlNuml:ie, - P,i'OJOctiN~ __...~ lIllll,il;ccountlNumljeim lftl\Il!P,i'OjOctlNjjjj[lje._
E 260.08.35.00.70420 E 200421.120 32371.36
E 260.08.41.00.70420 E 200421.120 147469.45
,o;moun_
#- ~' ;74"
Auth ized Signature
VENDOR COPY
CITY OF
ASHLAND
A request for a Purchase Order
REQUISTION FORM
Date of Request: 1.2~1'/20;1;II
THIS IS A REQUEST FOR A:
Required Date of Delivery/Service: I
[X ] Change Order (existing PO #9585
Vendor Name:
Address:
City, State, Zip
Phone:
Project Title:
Project Number:'
Visar Construction Co. Inc.
PO Box 3101
Central Point, OR 97502
Phone: 541-664-3032 Cell: 541-944-9060
Liberty Street Improvement
2004-21
Services Only .. .
~oli~!~tion Process:
[ I Exempt [ J ~. ~~tten Quotes (copies
attached)
II Sole Source (X] Invitation to Bid (copies on
fite) .
[ ] less t.han $5000. ,. [ ] Request for Proposal (copll~s
.orifile)
Description
Totai Cost
Original Contract Amount
Prior Change Orders No.1 & 2 & 3
Change Order No.4
Account Number
Account Number
260.08.35.00.704200 (18%)
260.08.41.00.704200 (82%)
"Please attach the Original signed contract and Insurance Certificates.
Employee Signature:
Supervlsorl Depl Head Signature:
~ Q- -:\<..-
G:\pub-wrks\eng\04-21 liberty Street\A_Admin\04-21 Change order 4 Req Visar.xls