Loading...
HomeMy WebLinkAbout2011-059 CONT AMND #1 - Thornton Engineering a . ,;........ ENGINEERING SERVICES CONTRACT AMENDMENT NO.1 Engineering services contract made on the date specified below in Recital A between the City and Engineer as follows: Recitals: A. The following infonnation applies to this contract: CITY: CITY OF ASHLAND ENGINEER: Thornton Engineering City Hall , 20 E. Main St. Address: POBox 476 Ashland, Oregon 97520 (541) 488-5347 FAX: (541) 488-6006 Telephone: Jacksonville, OR 97530 Date of this agreement: April 11 , 2011 B: RFP Date: Sept. 30, 2009 Proposal Date: Nov. 5,2009 112.3 City Contracting Officer. Michael R. Faught, Director of Public Works 112.4 . Project: Laurel Street Sidewalk Improvement Project No. 2006-18 116.1. Engineer's Representative: Michael P. Thornton PE, President 118.3. Maximum Contract Amount: $22,865.00 B. AMENDMENT NO.1 1. Modification to .Services to be provided" Add services per attached proposal and cost estimate dated October 10, 2010 and made a part of this amendment. 2. Modification to 'Compensation" A. Add cost of extra work = $4,040.00 B. Adjusted total contract amount = $26,905.00 CONSULTANT Bv!11-A//L Fed.ID# o;}-/7tJf5/1 CITY'~~1 Cfty Department ----- Date: -.:tk:l- I >>t \ Coding: (For City use only) ""...... ....'. ............. ..a... ." ............. ...... .. . . h. .............. .'''''' .I~ ~....#'O ~.. ...... . .... _ ""_ .... .; a .. . . .. .'. . ".... ;/~,- REVISED COST OF SERVICES Laurel Street Sidewalk Improvemen/ Project Thorn/on Engineering, Inc. -ITEM TASK STAFF ~ RATE TOTAL 1 Preliminary Desi""n Meetin,," Principal Engineer 1 $105.00 $105.00 Senior Engineer 1 $95.00 $95.00 2 Field and Record Research Senior Engineer 1 $95.00 $95.00 Project Engineer 2 $85.00 $170.00 Surveyor $300.00 3 Tooo~roohic SlIrvev Senior Engineer 1 $95.00 $95.00 Project Engineer 2 $85.00 $170.00 Surveyor $1,500.00 4 Utility Location and Monnin,," Project Engineer 2 $85.00 $170.00 5 Reference Centerline Survey Project Engineer 1 $85.00 $85.00 6 Prepare & Submit Preliminary Desiun Drawinus, 30% & 90% Senior Engineer 4 $95.00 $380.00 Project Engineer 40 $85.00 $3,400.00 7 Attend Neiuhborhood Desivn Meetinus (2) Principal Engineer I 4 $105.00 $420.00 8 Plan Revisions Senior Engineer 1 $95.00 $95.00 Project Engineer 8 $85.00 $680.00 9 Final Proiect Plan' Principal Engineer 1 $105.00 $105.00 Senior Engineer 4 $95.00 $380.00 Project Engineer 20 $85.00 $1.700.00 10 Specifications & Contract Documents Principal Engineer 1 $105.00 $105.00 Senior Engineer 4 $95.00 $380.00 II Publish Snecification, Bid Documents and Construction Drawin[7s Senior Engineer 1 $95.00 $95.00 Project Engineer 1 $85.00 $85.00 12 Pre-Bid and Pre-Construction Confe~ence Prinicipal Engineer 2 $105.00 $210.00 Senior Engineer 2 $95.00 $190.00 14 Construction Stakin;(i 0 hoursJ Survey Field Crew 10 $120.00 $1,200.00 Survey Technician 2 $75.00 $150.00 15 Construction Inouiries "As-needed" Senior Engineer 2 $95.00 $190.00 16 Provide "As-Built" Drawimls Senior Engineer 1 $95.00 $95.00 Project Engineer 4 $85.00 $340.00 Subtotal: $12,985.00 Additional Services (as requested by City) 17 Engineer's Construction Cost Estimate Project Engineer 8 $95.00 $760.00 18 Respond to Bid-Inquiries Senior Engineer 4 $95.00 $380.00 19 Right-aI-way & Survey Control Network - Additional Surveyor $2.500.00 20 Tonouranhic Survev - Additional Surveyor $2,000.00 21 Righl-oi-woy & Topooraphic Maooin~ - Additional Surveyor $1,500.00 22 Monument Recover)!. MaE of Survey Surveyor $1,200.00 23 Limited Construction Qualitv Control Senior Engineer 2 $95.00 $190.00 24 Construction Stakino - Additional Survey Field Crew 10 $120.00 $1,200.00 Survey Technician 2 $75.00 $150.00 Subtotal: $22,865.00 10-20-10: Revisions - Not in Oripinal Scone (NeiJJhbor reouested revisions, Otis Street - \Vest Side, Mtn. View Sidewalk) 25 Neiuhborhood renuested revisions Project Engineer I 10 I $95.00 $950.00 26 Otis Street - Additional Tonovranhic Survev Surveyor. covered by item #20 above 27 Otis Street - Additional Deslryn Project Engineer 12 $95.00 $1,140.00 28 Otis Street - Construction Stakinu Surveyor $1.000.00 29 Mountain View - Additional Tonouranhic Survev Project Engineer 4 $95.00 $380.00 30 Mountain View - Additional DesiI!n Project Engineer 6 $95.00 $570.00 Subtotal: $4,040.00 I I Revised Total: $26,905.00 Cost of Services .1 ~~, CITY OF ASHLAND 20 E MAIN ST. ASHLAND, OR 97520 (541) 488-5300 CITY RECORDER Page 1/1 7/1/2010 PO NUMBER 09552 ~. ,DATE /'.:-~. :/:. VENDOR: 003753 THORNTON ENGINEERING, INC PO BOX 476 JACKSONVILLE, OR 97530-0476 SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: Speciallnst: Req. No.: Dept.: Contact: Jim Olson Confirming? No (.i':Quanti~}}3 ,:;[Urlifl;:i :,;:,,;'7;':;::;:f~-'c;-'~?':" ,,',' ;.:"i',:";'-"': -'Descririiiorr:.;:,~,--:-' ,':'~' :'.. :',:~ --'.;\;j.~~,. ;'jl ~~:-; ~rL'~Unit PriceJ/.,j :i;;};,"Ext:Fiffce ~r; ,;~: THIS IS A REVISED PURCHASE ORDER Engineering services for the design and 22,865.00 development of the Laurel Street sidewalk construction project. Approved by the City Council on May 4,2010. Contract for Personal Services Beginning date: March 17, 2010 Completion date: March 17, 2011 Insurance required/On file Processed change order 04/13/2011 4,040.00 Change Order No.1. - Additional services SUBTOTAL 26 905.00 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2028 TOTAL 26,905.00 ASHLAND, OR 97520 ~~':~Acc~ount.~Numller.';~tiLl (~- !?t~: P.ro}ec"fN urn b'er: J,~: ::~;~: ~ur.I;' .:Amoluif,,' ,:;: , ~ ;Account-Number:,'. - ;,:;' ~.Rroje#fNumller_~' ::--., 1.;::,::~Am~ounii;:):r.;:; - ,. ." . E 260.08. 12.00.70420 E 20061 8.1 00 26 905.00 .~t % ~ J.. AU~d Sign~:e VENDOR COPY CITY OF ASHLAND A request for a Purchase Order REQUISTION FORM Date of Request:11:4h1j1)20~:111 THIS IS A REQUEST FOR A: Required Date of DeliverylSelVice: I [X ] Change Order (existing PO# 9552 ) Vendor Name: Address: City, State, Zip Phone: Project Title: Project Number: Thornton Engineering, Inc. P.O. Box 476 Jacksonville, OR 97530 541-899-1489 Laurel Street Sidewalk Improvement Project 2006-18 Services Only Solicitation Pr:ocess: [ I Exempt [ J 3 yvritten Quotes (copies I attached) I ] Sole Source [ ] Invitation to Bid (copies on file) I J less than $5000 [Xl Request for Proposal (copies entire) Description Total Cost Change Order No.1 Account Number 260.08.12.00.704200 .Please attach the Original signed contract and Insurance Celtificates. \ SupervisorJ Oept Head Signature: ~ t2. --\.~ rtify tha the above request meets with Ctiy of Ashland SoDcitiation Process requirements and can be provided when necessal)'. G:Pubwrks\Eng\DeptAdmin\Englneer\Project\99.3B ScI1edule A Change Orders\06-1 a Thornton Change order Requisition.xls Updatec:lon: 10113103