Loading...
HomeMy WebLinkAbout1981-063 Permit - Water Walker Ave112154 JACKSON COUNTY Medford, Oregoii UTIIITY 1NSTALLATION PERMIT �•1+r�oCri c_��_,! .j �'CJ� IJT;LI 7 �.�!,.'�T�Q�S H�..i;l;� 3�' YQIJ DIG NA�� CITY OF ASHLAND ATTN: Jim Roberts DATE September 28 19 81 (Contracting Agencg Owner) T ADDRESS City Hall Ashland, OR 97520 PHONE This permit is oranted to you subject to the General Condi.tions stated below and the Spzcial Cor.ditzoas at*_ached. Violation of any of said conditions will constitute sufficient cause for �err,:i� c�nc�latio�. AiJY WORK ON ANY POP.iION OF TH� IPJSTALLATICN D�SCRIBED BELOW Wi��^'� '.'r',''-.L�D °t?:'il CO\SiiTUIcS A VICLA.TION OF 0.°.S. 374.350, A CRIMINAL MISDEMEANOR. Description of installation Water service in slioulder Location'of installation GENERAL CONDITIONS: 155 WALKER AVENUE 1. This permit is granted for use only on roads under the jurisdiction of the Jackson County Board of Commissioners and is not valid upon any federal highway, state highway, city or town street, or any road not on the county road system of Jackson County. 2. The Jackson County Department of Public Works is to be notified a minimum of 24 hours prior to starting work within a County road right-of-way (776-7268 or 826-3122). 3. As provided in O.R.S. 758.010 the Public Works Department, acting on behalf of the County Board of Commissioners, may designate where utilities may be located within a County road right-of-way and may order the location of such facility changed if deemed expedient. 4. Permittee shall be responsible for all damages caused by any operations associated with the utility installation. All damaged areas shall be restored to an "as good as, or better than" condition as existed prior to the utility installation. 5. Permittee agrees to hold the County of Jackson harmless and blameless from any damages that may be caused by the installation, maintenance, or operation of the above-described utility. 6. Permittee shall be responsible for restoration and maintenance of all areas adversely affected by the utility installation for a period of two (2) years after completion of the project. ACCEPTED: Q ;(1 4'/ 19 $Y �x a (Authorize Repre$ ntative) For: ��.T� r•'� �/,��e✓:��1 (Ent��ty to Whom Issued) EXPIRATION DATE: December 31, 1981 sdw APPROVER: October 5 19 81 BY� i�� L��'�( Richard V. Croft, Uti `ty Inspector For: Robert J. Carstensen Director of Public Works 8-19-81 WJG/sdw TYPICAL SECTION FO R TRENCHES WITHIN FtOADW/�Y REVISED 8-20-81 CLASS ��C��ASPHALTIC CONCRETE II I4 MATCH EXIST. THICKNESS 2�� MINIMUM. OVER 2��- CONSTRUCT IN 2 LIFTS TACK EDGES OF OLD PAVEMENT 95% MAXIMUM DENSITY OSHD PP.00EDURE FOR GP.ANULAP. h7:.TERIALS 95% �90% BELOW 36��) RELATIVE MAXIMUM DENSITY AT OPTIMUM MOISTURE. OSHD�METHOD AASHO T-191 BASE N. MATERIAL PAIN. TRENCH BACKFILL 6�� MAX. 1 PIPE ZONE J 12" 3/4�=0 CRUSHED ROCK �1 �4 3/4�� 0 CRUSHED ROCK �I DECOMPOSED GRANITE OR SAND /1 I3 PIT RUN BASALTIC SHALE �I 74 BAR RUN GRAVEL II �4 EXCAVATED MATERIAL I5 BORROW I5 GRANULAR MATERIAL AS SPECIFIED BY PERMITTEE II FAILURE TO OBTAIN A PERMIT OR NON-COMPLIANCE WITH THE PERMIT CONDITIONS IS A MISDEMEANOR, O.R.S. 374.305-374.310. /1 P9aterial used shall comply with the Public Works Department's Standard Specifications. /2 /3 /4 Requires prior approval of the Public Works Director. Water settlement method of compaction may be used only with prior approval of the-Public Works Director. Methods of construction shall comply.with the Public Works Department's Standard Specifications. /5 Material and method of construction shall comply with the Public Works Department's Standard Specifications for County Roads. TRENCH BACKFILL MATERIAL The moisture content of materials to be mechanically compacted shall be within Plus 2 or Minus 4 percentage points of optimum moisture at the time of compaction. SPECIAL CONDITIONS 1 30�� MINIMUM L -----------------------------1---- PIPE OR OTHER UTILITY L 36�� MINIMUM FOR ELECTRIC POWER CABLES TYPICAL SECTION FOR TRENCHES OUTSIDE ROADWAY MOUND TO ALLOW FOR SETTLEMENT UNLESS OTHERWISE DIRECTED I 12 30 MINIMUM PIPE ZONE SHALE OR COARSE ROCK UNDER ROADSIDE DITCH WHEN RE�UIRED TOPSOIL WHEN REQUIREO EXCAVATED MATERIAL 0 SPECIAL CONDITIONS 2 'NIW 3 W 2 2 I�1 -'.O',� V '�o A.'- :�'•d �o::::o::. p 0��:.'. 'a: o: c; 1 o:: 0 z �w ��w U (n a y a O U J�O� O J N I UuW� F-V O� W W F M U m h-f zr3a p Q p J U V W O Z l W O o• J H z a:� w o, o Q o .:Q.. 6 D �:.o:.',• '0 0 .o� ,'.0�,' .:O'.'.•. i ii m I a i i m I z y I II O i W i N 3 Q yJ U�.:O:.': Z 2 m �1 p:.0,'.:0; .O.:;I �0..�.�:•�.•„�� ::�o.�:�'�O-. .0:.;�:'.�� �,�'o�.•::. ..::�o: :::o�.:• '.�.4'.:�;.:.... :'�0:. :::D:::'.'.::,::.. •.o:•'.:, a. �0' .�0:�:"�:.;. :�,�'0:.:. W r':' p J �;:0�.�.�::� :�Q: p 2 ��'D Z p: Q :p: :',�Q,- D�' �:.9.�:. .•.D�'.:'.:':: p'.:.:: '.O,•....::0...., :•o �.'0�: O• :;:Q;� ��.'�O .O'.. O.'.'. .:.':..�:I .':':.:'.'oYr:.... �_.:.::0::�:.Q:.::•,I K O Q K W 2 r 0 W r N^ Z W Q 1- x r �i w3 a WW Q LL K O r 7 Z w c� m z 0 J Z Q O W y O N W U Q W (q Q N Z' N W a F V W O o�c 3 �°o N J O SPECIAL CONDITIONS 3 SPECIAL CONDITIONS FOR UNDERGROUND UTILITIES WITHIN COUNTY ROAD.RIGHT5-OF-WAY 1. MINIMUM LENGTH OF OPEN TRENCH Unless otherwise approved'by the Director, backfilling of longitudinal trenches shall be accomplished so that no more than 200 feet of trench is left open at any time.. No more than half the road may be closed at any time for either longitudinal or transverse trenches. 2. BACKFILL MAINTENANCE The surface of the backfilled trench shall be watered and graded as often as necesszry to keep the traveled way smoc±h and dust free. I£ required by the Public Works Director, an approved dust palliative shall be applied. 3. TEMPORARY PAVEMENT REPLACEMENT Cross trenches or other local pavement cuts shall be repaved immediately except that i£ the contractor chooses to wait until all trenching and backfilling is completed, a temporary asphalt covering (cold mix) may be constructed, The temporary surfacing shall be removed in its entirety before placement of the permanent pavement. 4. COMPP;CTION TESTING Compaction testing shall proceed within a short distance behind the compaction phase: Permittee shall perform t�e testinq at such locations and elevations as will be representative of the entire backfill. Final decision as to the location,arid frequency of testinq shall reside entirely with the County Public Works Director or his authorized representative. Areas showing failing compaction tests shall receive further attention without undue delay. Further attention may involve additional compactive effort, other compactive methad or removal of the backfill material. In no case shall the main excavation phase proceed until the failing section has been corrected unless otherwise approved by the County Public Works Director. 5. PROSECTUION AND PROGRESS OF ROAD RESTORATION Traffic safety and convenience shall receive utsnost consideration at all times. Permittee shall ensure that road restoration work is prosecuted diliqently and completed as quickly as practicable after trench compaction and testing. On lengthy projects complete road restoration may be required on one section prior to continuance of the excavation phase on another. SPECIAL CONDITIONS 4 6. INSPECTION AND SUPERINTENDENCE When required by the Public Works Director, permittee shall provide for a full time representative on the project. The representative shall be an experienced inspector or engineer who will be responsible to ensure compliance with the contract documents and the County's General and Special Conditions of the project permit. 7. STANDARDS AND SPECZFICATIONS Except as otherwise shown or referred to in these Special Conditions or as otherwise approved by the Public Works Director all �aork and materials affecting roads and road structures shall conform to the County's "Standards and Specifications for County Roads". Said standards and specifictions include, by reference, the Oregon State Highway "Standard Specifications for Highway Construction" and "Manual on Uniform Traffic Control Devices" (M.U.T.C.D.). In case of con£lict between the project plans and contract documents and the "Terms and Conditions of this Permit", the latter shall prevail. 8. CLEANUP AND REPAIR All areas,affected by the construction shall be brought to.an "as good as or better" condition prior to completion of the project. Repairs shall include, but are not limited to: A. Roadway Repairs In addition to road reconstruction within the trench area, the permittee shall ensure the repair of any other pavement, base material or subgrade damaged as a result of project operations. This includes damage.to shoulders and pavement edges caused by detouring tra£fic and equipment around the work area. In case of excessive damage, reconstiuction or an asphaltic overlay may be required. B. Replacement of Contaminated Gravel All gravel surfaces contaminated with mud, dirt, oversize rock or other foreign material shall be removed and replaced with 3/4"-0 crushed rock meeting t'he requirements hereinabove set forth. C. Slopes and Roadside Ditches Shall be trimmed, smoothed and compacted to the original lines and grades. D. Driveways, Culverts and Ditches Shall be replaced to the original lines and grades. SPECIAL CONDITIONS 5 8. CLEANUP AND REPAIR (Continued) E. General Cleanup The contractor shall at all times during the work keep the roadway clean and orderly. All broken pavement, concrete, excess excavation material or other objectionable material shall be promptly removed from the County road right-of-way. 9. MISCELLANEOUS CONDITIONS A. Detours All request for detours shall be submitted well in advance with a detour plan showing traffic signing proposed. No detour will be permitted until approval of the plan by the County Public Works Director. When the plan is approved the permittee shall notify all emergency agencies, school districts.and postal carriers concerning the location and duration of the detour. B. Backfill Compaction by Water Settlement Method The use of the water settlement method of compaction for certain granular materials, as noted on the typical section, may be allowed under the followinq conditions: 1. Permittee shall, prior to backfilling any significant portion of trench, demonstrate by.approved tes'ting methods, that the specified compaction is obtainable. (a) Excessive qroundwater infiltration or retainage o£ water in the backfill material will not serve as sufficient reason for not achievinq specified compaction. 2. Water settlinq (jetting or pondinq) shall proceed within a short distance behind the backfilling operation. Lateral trenches, other new excavation or re-excavation which may occur at a l.ater time shall be compacted separately and, if necessary, by mechanical means in order to achieve the specified compaction. 3. Compaction testing shall proceed within a.short distance behind the'compaction phase. Permittee shall perform the testing at such locations and at such elevations as shall be representative of the entire backfill. Final decision as to the adequacy arid frequency of testing shall reside entirely with the County Public Works Director or his authorized representative. SPECIAL CONDITIONS 6. MISCELLANEOUS CONDITIONS (Continued) B. Backfill Compaction by Water Settlement�Method (Continued) 4. Areas showing failing compaction tests shall receive further attention without undue delay. FuYther attention may involve additional water settlement, dewatering, other compactive method or removal of the backfil7. material: Tn no case shall.the main excavation phase proceed.until the failing section has been corrected unless otherwise approved by the County Public Works Director. C. Pavement Replacement Imneliately prior to patch'ing the trench with aspIialtic concr?te the existing pavement shall be neatly cut with a pavement saw or other approved breaker. All cracked or ravelled pavement shall be removed without creating abrupt jogs in the cut line. Pavement trimming, finishing of the gravel surface, tacking the edges and pavement replacement shall be performed enly under. the ir,imediate supervision of the Public.Works Director or his authorized representative. Unless otherwise approved by the D:irector, all treriches within a paved, travelled way shall be resurfaced with asphaltic concrete within 10 calendar days after testing and approval of the backfill. The finished surface of the new pavement, when tested with a 10-foot straightedge, shall not vary from the testing edge by more than 1/4 inch at any point. The top course of asphalt shall be constructed only by workmen thoroughly familiar with asphalt finishing work. On longitudinal trenches, unless otherwise approved by the Director, the existing pavement shall be removed and replaced to full paving machine width (normally 10 feet). Drag boxes or other pull-type asphalt spreaders will not be permitted for longitudinal trench pavement replacement. Mar.hol.e anci Valce Aox Adjustmen Manholes and valve boxes shall be installed below finish grade initially. After the finish surface has been satisfactorily constructed the structures are to be adjusted (including construction of concrete collars) in accordance with the department's standard drawing "Manhole or Valve Box Adjustment" 10. ADDITIONAL SPECIAL CONDITIONS SPECIAL CONDITIONS 7 i�. Failure of the permit conditions. revocation of the rights-of-way. REVOCATION OF PERMIT permittee to ensure strict conformance with all shall be considered good and sufficient cause for permit allowing work within the County road Revocation'of the permit will result in a"STOP WORK ORDER" on all or portions_of the project. ir'o=k p�-=or�e�? w-th?n the County road rignt-of-way without a -.=.�d �e_�?cit is a�ola�ion o= Cregon Revised Statute 374.350, Cr�.?i11P.�1 misdem�a:.o= for a11 parLicipants. The maximum penalty Fr�aich may be imposed upon conviction is one year in jail and/or a fine of $1,000.00. AGREEMENT TO PERMIT CONDITIONS BY ACCEPTANCE OF TI3IS PERL�;IT, PERAiSTTRE 11GREES TO E� RESPON �I13LE FOR ALL PERMIT CONDITIONS, INCLUDING THESE SPECIAL COPdDIT10NS� AND SAID RESPONSIBILITY SHALL SURVI�IE THE TERMINATIION OF THE PERMIT. ACCEPTED THIS DAY OF 19 0� By C R l�C.��t�C-�~Y�� BY �-L SPECIAL CONDITIONS 8 w r rn