ENGINEERING SERVICES CONTRACT
~ AMENDMENT NO.2.
)
Engineering services contract made on the date specified ~elow in Recital A between
the City and Engineer as follows:
Recitals:
A. The following information applies to this contract:
CITY: CITY OF ASHLAND ENGINEER: KAS & Associates, Inc.
City Hall 327 SE 'J' Street, Suite B
20 E. Main St. Address; Grants Pass, OR 97526
Ashland, Oregon 97520
(541) 488-5347 FAX: (541) 488-6006 Tele: 541/479-5801 Fax: 541/479-5987
Date of this agreement: June 7, 2011 B: RFP Date: NIA
Proposal Date: November 17, 2009
1(2.3 City Contracting Officer: Michael R. Faught, Director of Public Works
'IJ2.4. Project: Jefferson Avenue
'116.1. Engineer's Representative: Gary Van Dyke, PE
1(8.3. Maximum Contract Amount $28,425.00 (original)
B. AMENDMENT NO.2
1. Modification to .Services to be provided>>
Add services per attached proposal and cost estimate dated May 19, 2011 and
made a part of this amendment.
2. Modification to "Compensation>>
A. Add cost of extra work = $10,050.00
B. Adjusted total contract amount = $50,495.00
~a:T &ei"
Fed. ID # 33-[ \ (plP \ 1 '0
CITY
BY
-
-
Finance Director
REVEIWED AS TO CONTENT
. BY ~M9-f9--~\-::::>
City Departmen . ead
Date: 10. fer f 80 l(
Coding:
(for City use only)
G:\pub-wrltslllng\05.10 Jefferson 51 ExtensionlA_AdmilllEng Vendor1\Contracl DO<:llmenl&\05-10 CO_Amend Eng 5 2S
11.doe
1
.
~@
Medford, OR 97501
304 S. Holly Street
Tel: (541) 772-5807
Fax: (541) 618-7389
kas@kasinc.com
Grants Pass, OR 97526
237 S.E. 'J' Streel, Suite B
Tel: (541) 479-5801
Fax: (541) 479-5987
kas@kasinc.com
ENGINEERING
SERVICES
CI"11 SlRUCW;;AI PlN...JlG
DESIGN CHANGE NOTICE
ATTN: James H. Olson
Engineering Services Manager
City of Ashland
Ashland P.O. 09330, 11118/09
Issued by: Gary Van Dyke, P.E.
Project No.:
Design Change No.:
Date:
A09-01
One
May 12,2011
Revised May, 19,2011
Description of Change Additional work required to respond to subgrade problems experiences with
bridge construction and miscellaneous construction services.
Reason for Change Resolution of unanticipated questions from contractor during construction,
Excessive moisture encountered during bridge excavation. Utility conduit stake-out calculations and
staking preformed at contractor request. Staking of road taper (extra work approved in field by city
representative).
Fee Adjustment
Add the following fees: Polaris Surveying - $2,500
Laurie Sager & Associates - $350, KAS & Associates - $7,200
Total $10,050
By signing and dating below, you are confirming that you have read and agree with KAS &
Associates, Inc. Standard Terms and Conditions and Standard Billing Policy, attached. Please
acknowledge your approval of services and additional fees associated with this Design Change Notice
by having an authorized representative sign and date in the space provided' below and return one copy
to our office.
Signature:
Date:
www.kasinc.com
CITY OF
ASHLAND
Council Communication
Meeting Date:
Department:
Secondary Dept.:
Approval:
Approval of Amendment No.2 to the Engineering Services Contract for the
Jefferson Avenue Improvement Project
June 7, 20 II Primary Staff Contact:
Public Works E-Mail:
Finance Secondary Contact:
Martha Bennett Estimated Time:
James Olson
olsoni@ashland.or.us
Karl Johnson
Consent
Question:
Will the Council approve a $10,050 amendment to the existing contract with KAS & Associates, Inc.
for design and construction engineering services for the Jefferson Avenue project?
Staff Recommendation:
Staff recommends approval ofa $10,050 amendment to the existing contract with KAS & Associates,
Inc. for design and construction engineering services for the Jefferson A venue Improvement project.
Background:
Summary
The Jefferson Avenue Improvement Project is now approximately 75% complete. The excavation for
the road sub grade and the creek arch structure uncovered large pockets of very weak soil. ;rhe engineer
was required to redesign the support structure for the creek arch and sections of the street requiring
extra and "out -of-scope," work. The engineering team is requesting compensation for this extra work in
the amount of $10,050.
Additional Work
Construction of the Jefferson Avenue project was commenced last September. The multi-plate arch
culvert was the fust item of construction since all work within the creek area was allowed through a
permit issued by the Department of State Lands (DSL) which expired on October 15th. The soil under
the arch supports proved to contain large amounts of wet clay material. It was necessary to remove the
clay material and redesign a support base for the arch. Other areas of moisture arid weak soils within
the roadbed also required that the design team crate additional drainage features and road base designs
to accommodate the unexpected conditions.
The additional work under this proposed change order is allocated to the following subconsultants:
. Polaris Land Surveying $ 2,500:00
. Laurie Sager and Associates $ 350.00
. KAS & Associates, Inc. (prime) $ 7200.00
TOTAL $10,050.00
Proiect Description
Currently Jefferson Avenue exists as two "dead end" sections of street connecting to Washington
Street. Connecting the two existing sections requires a 606 foot long extension which would
necessitate crossing Knoll Creek. The proposed crossing will be accomplished by constructing a large
Page 1 of3
G:lpub-wrkslengI05-10 Jefferson St ExtensionlA Admin105-10 CC !(AS Amendment 2.doc
~..
IJ_~
CITY OF
ASHLAND
multi-plate arch structure with an improved native bottom. The proposed improvements will also
include concrete curbs and gutters, sidewalks, an asphalt street surface, water and sewer mains, a storm
drain system with filtration treatment and electrical and related dry utilities including street lights. An
extensive landscaping element is also included as mitigation for wetlands removal (described below).
Proiect Schedule
A small intermittent creek, locally known as Knoll Creek bisects the Brammo property in a north/south
direction. The creek only flows during times of heavy rain or with irrigation overflows. The
intermittent flow has created a wetland area which will be impacted by the construction and must be
mitigated. The removal of wetland growth and any other work within the stream corridor must be
completed in accordance with DSL Permit No. 43449cRF. The permit requires that this work be
completed within the "in water" work period (June 15 to Sept 15). Due to ongoing changes in the City
public contracting laws, Staff was unable to bid this project until mid August, nearly halfway through
our specified work period. Staff requested an extension to the "in water" work period which was
approved by DSL on September 7, 2010.
On September 7th, the Council also awarded a contract to Taylor Site Development Inc. to construct the
Jefferson Avenue Improvement project. Taylor, with a bid of$514,789.00, was the low of five bids
received. A pre-bid conference, which is required prior to construction start-up, was held on
September 15th and the actual construction commenced on Thursday September 16th. The project is
scheduled for completion on June 30, 2011.
Proiect Funding
On December 7, 2010 a special public works funding in the amount of $700,000 was authorized
through the Oregon Economic and Community Development Department (OECDD) to construct the
extension of Jefferson Avenue thereby providing services and access to the proposed Brammo
Motorsport facility. The fund is a $300,000 loan and a $400,000 grant and is detailed under Contract
No. B06003. Under this agreement the City is listed as the borrower, but economic development is
dependent upon the construction of the Brammo Motorsport facility owned by Craig Bramscher.
Related City Policies:
The Council acts as the Local Contract Review Board (LCRB) under authority granted by ORS 279A,
279B and 279C as well as under AMC 2.50. The Council approves contract amendments in excess of
25 percent of the original contract.
Council Options:
. Council may approve a $10,050 amendment to the existing KAS contract for design and
construction services for the Jefferson Ave. Improvement project
. Council may decline to approve the contract amendment
Potential Motions:
. Move to approve a $10,050 amendment to the existing KAS contract for design and
construction services for the Jefferson Ave. Improvement project
Page 2 of3
G:lpub-wrkslengI05-10 Jefferson SI ExtensiooIA Adrnin105-10 CC KAS Amendment 2.doc
r.l'
. .
CITY OF
ASHLAND
. Move to deny a $10,050 amendment to the existing KAS contract for design and construction
services for the Jefferson Ave. Improvement project
Attachments:
. Contract Amendment No.2
Page 3 of3
G:\pub-wrks\eng\05-10 Jefferson St ExtensinnIA Admin\05-1O CC KAS Amendment 2.doc
r.l'
CITY RECORDER
Page1/1
r~'
CITY OF
ASHLAND
20 E MAIN ST.
ASHLAND, OR 97520
(541) 488-5300
";,,;LiDATE.::'2. ,',-
8/9/2010
'''~0NUMElER;'''"
09734
VENDOR: 014842
KAS & ASSOCIATES INC
304 SOUTH HOllY STREET
MEDFORD, OR 97501
SHIP TO: Ashland Public Works
(541)488-5587
51 WINBURN WAY
ASHLAND, OR 97520
FOB Polnl:
Tenn_: Net
Req. Del. Date:
Speclalln_l:
Req. No~:
Dept.:
Conlacl: Jim Oison
Confinning? No
r- ~'Qua:nti'W.~:~.; r~~:iJn'it\H~ ~';f:::":~:',;:.r,-r:\i . -.:,_} I ,':~" :j'~,":'.\-,:~:,.,:J.:~[)fisC'ri~tion"~;-':;;::-_;"-"_~) . .;.; ~,::"~:._:I:':l' ~ :.Ji'.~;~.~.-;: {?':;onifp.rice1;~E
E:G~-EExffiP1jc";{:-:~~<f.
THIS IS A REVISED PURCHASE ORDER
BALANCE OF PO 09339 CARRIED FORWARD TO 7,672.75
FY 2010-2011
Preliminary and construction
engineering services for the completion
of the Jefferson Avenue extension
project. Project 2005-10, Contract for
Personal Services, Beginning date:
11/18/2009, Completion date:
11/18/2010, Insurance certificates
required/On file, Approved by City .
Council on November 17, 2009.
Initial amount of PO: $28,425.00
Amount paid in FY 2010: $20,752.25
Processed change order 10/26/2010 12,020.00
Change Order No. 1
Approved by Council 10/05/2010
Processed change order 06/16/2011 10,050.00
Change Order NO.2
Approved by Council 06/07/2011
BILL TO: Account Payable
20 EAST MAIN ST
541-552-2028
ASHLAND OR 97520
SUBTOTAL
TAX
FREIGHT
TOTAL
29742.75
0.00
0.00
29,742.75
,
~;i;}A"ccoWif,Num6er~ ~~!:~~rciject;N-umiiei1:rlr~i: J};~i~W.},~~ ~g~?:CcounfNum~~ \'r\t?1iP'roJeci1Num~ _lUliounl......f
E 260.08.12.00.70420 E 200510.100 29 742.75
~ ~,.-~_____~h
Autho ed Signa u er
VENOOR COPY
CITY OF
ASHLAND
A request for a Purchase Order
REQUISTION FORM
Date of Request I~.'-I, I
THIS IS A REQUEST FOR A:
[X ] Change Order (existin9 POO 9734 )
Required Date of Delivery/Service: IAsi\P~;;"" : I
Vendor Name:
Address:
City, State, Zip
Phone:
Project Title:
Project Number:
KAS & Associates Inc.
304 South Holly Street
Medford, OR 97501
541-772-5807 (Medford Office), 541479-5801 (Grants Pass Office)
Jefferson Avenue Improvement
2005-10
Services Only Solicitation Process:
Approved by council 1015110 [] Exempt r J 3 Written Quotes (copies
attached)
Amendment No 2, Approved by Countl 6/7/11 [ J Sole Source ( J Invitation to Bid (caple.s on
rue)
{ ) Less than $5000 [ J Request for Proposal (copies
on f~e)
Description
Change Order NO.1
Change Order NO.2
Accounl Number
260.08.12.00.704200
.Please attBCh the Original signed contract and Insurance Certificates.
~,.....---:~fi:J!---- ~---_., ~."QlL -L =--
NOTE: By signing . - n fonn, certify tha the above request meets wffh Ctiy of Am/and So/icitiation Process requirements and can be provided when necessaIY.
G:Pubwrk.s\Eng\05-10 KAS Chang9 Order 2 Requisition.xls
Updated on: 7115102