Loading...
HomeMy WebLinkAbout2011-102 CONT Chg Order #5-8 - Taylor Site Development RECEIVED MAR 0 3 2011 AYLOR SITEPityotAshland DEVELOPMENT ITa f 33046 inc. CHANGE ORDER REQUEST (CORlli City of Ashland, Jefferson Avenue Improvements Project No. 2005-10 March 1,2011 To: Karl Johnson, City of Ashland, Department of Public Works Work to be done: Additional Plantings per City of Ashland Request Letter_Dated.Novel11ber - --- ---- -- 17,2010.__- .---- ~ Requested By: Taylor_Site Development, Inc. /- . ---- Scone ofWork-Discrintion ofChan2e Reason for Change Plantings for emergent Zone of the Disturbed areas of Knoll Creek. Exclusions: Not responsible for any deviation (if any) from existing DSL permit. Cost Summary: Proposed Cost & Time: Change in Contract Amount Change in Contract Time Impact Costs: Work is Pending Landscaping Contractor Plant and Provide 1120 plants Taylor Site Development, Inc. P&O (10/10) Total $3,480.00 added 2 days added Deferred _ _ Need agreement as S()Onairpossible, $2,912.00 568.00 $3,480.00 Comments: For the added 2 days, please take in consideration the difficulty of planting 1120 plants on a slick & steep slope. Per the contract please approve as soon as possible so we can start the work. . . Sint.~relY~ ~iut1aYlOr, President 1501 Sage Rd., Medford, OR 97501 Ph. 5417793565 Fax 541 8587031 E-Mail tsdmedford[a)aol.com CITY Of ASHLAND April 6, 2011 Mark Taylor Taylor Site Development 1501 Sage Road, Suite B Medford, OR 97501 RE: Jefferson Avenue Extension (2005-10) - Landscaping in General & Change Order #05 Dear Mark, The City of Ashland would like to convey some additional information in response to some e-mails that have circulated recently. 1. Landscalle Subcoutractor A. The City of Ashland still requests the proper information be submitted regarding the addition of a _~- -landscape suhcontracto.!:a..s.1aid,out in section 00180.21 ofthe ODOT Specifications. B. The City of Ashland did look at the State-of Oregon Landscape Contractors Board website to view the information for Bear Claw Services of Central Point. The City will still require a copy of their license to be submitted and they will also need toacquir.e a City of Ashland business license ifthey have not already gotten one. ---- 2. Irri!!ation - . ~ A. The City of Ashland was asked about the number of emitters for the plantings requested for the emergent zone. Laurie Sager passed on the following information to me recently: "...in terms o/the drip emitters/or this zone, the plugs need only 1 per plant, shrubs need 2, and trees need 3 emitters. " 3. Other A. - The City of Ashland still needs a written estimate of the additional costs for the changes being requested as part of Change Order #5. B. At your earliest convenience please provide the City with ail updated schedule of when the on- site irrigation will be installed. C. Sco!!: 1;.nglish will need to be consulted with by Taylor Site Development in reference to the mitigation planting. Scott has also requested that mulch be placed around the plugs in the emergent zone once planting is completed. s;"~~ Karl Johnson, EI Assistant Engineer cc: Laurie Sager, Laurie Sager & Associates PUBLIC WORKS/ENGINEERING DIV. 20 East Main Street Ashland, Ore90n 97520 www.ashland.or.us Tel: 541-488-5347 Fax: 541-488-<5006 nY: 800-735-2900 r~' Karl Johns.on From: Sent: To: Subject: Taylor Site Development [tsdmedford@aol.com] Wednesday. May 25. 20114:05 PM johnsonk@ashland.or.us Jefferson Ave, Inprovements-Irrigation and Plants, Change Order # 5 Karl: Rather than prepare a separate Change Order Request we request that you add $3,400.00 to our not yet approved Change Order Request NO.5. This additional amount is for the provision and installation of Irrigation piping and emitters in the 4 emergent (mitigation) zone areas for the plants included in the Change Order. We are still waiting for information on the number & species of shrubs, rushes, sedges and trees that are to be planted in the above zones, which is why we did not include irrigation in COR #5. We will appreciate a quick turnaround on this request. Sincerely, Mark Taylor Karl Johnson From: Sent: To: Cc: Subject: Ray O. [tsdmedford@aol.com] Tuesday. April 19. 2011 3:22 PM j ohnsonk@ashland.or.us markttsd@aol.com Jefferson A venue Extension (2005-1 OJ-Change Order #06 Karl: Regarding your Memo of April 15, 2011. Item 1, When we obtained the quote from Knife River we provided them with an approximate amount of installed asphalt to establish a per/ton price. The 18 tons we included in our C/O is more exact allowing for a 6" overlap where the new patch joins the existing asphalt. When the work is completed by Knife River we will provide their invoices that will reflect the actual and adjustments can be made at that time. Item 2. We did not include conduit trenching in our change order request. In addition we did not include pipe bedding and pipe zone rock. Original job only included native material above the pipe zone. Our C/O request includes 2' of rock backfill to support the new asphalt. We will provide rock tickets showing delivered price of $12.00/ton. Adjustments if needed can be made at that time. Our C/O included 2 hours of labor (1 operator and 1 laborer) for the removal of asphalt, rock compaction and truck loading. It also includes Machinery costs of $71.00 for an excavator, a skid steer and a walk behind compactor. These two items total $250.00 Trucking requires trips to Central Point which is the closest asphalt accepting dump site. Asphalt does not pack well in a dump truck so it will require 2 hours of trucking @$85.00/hr. Two flaggers will be required. One for controlling traffic exiting a very busy exercise Gym and one for a blind curve as you approach the site. Additional signs will be required. Flagging labor will be 650.00 and signs $71.00. We did not include any supervision costs for either the preparation or installing of the asphalt by Knife River. Again, this is additional work & deemed Special Contractor by ODOT. None of the work involving this change order was included in the original bid items or in the contract. It is a'distinct item that should be treated separately deserving of 2 days extension of contract time. If you insist we will sacrifice one day. There is definately more work & remember, Karl, the rock will have to to be placed and compacted twice. Using the OR 00197.80 method for Percentage Allowance the amount that can be charged for this work is $1,202.00. We consider our charge of $990.00 as not unreasonable. t<arl, we did not get "windy" on all of this for any other reason than to show that we are fair with our price. CITY Of ASHLAND April 15, 2011 Mark Taylor Taylor Site Development 1501 Sage Road, Suite B Medford, OR 97501 RE: Jefferson Avenue Extension (2005-10) - Change Order #06 - Electrical Underground Conduit Location Change Dear Mark, The City of Ashland has received a copy of your proposal and would like to accept it with the following changes and comments. 1. The attached quote from Knife River Materials has a quote for 15 tons of AC, at a unit price of $170.00, for a total cost of $2,550.00. Your cost summary had the numbers changed to reflect 18 tons being used for a total of $3,060.00. The City of Ashland will change the Cost Summary to match the proposal from Knife River Materials. 2. The City of Ashland does not agree that an additional $990.00 is warranted for "Taylor Site Development, Inc. P&O. This should be incidental to either portions of the change order or existing bid items that will be used. 3. The City of Ashland does not agree that the change in location of the conduit, other than the addition of saw-cutting, will add an additional two days of work to the project. Trenches were still going to be excavated to the end location so the additional two days that was asked for will not be added to the contract completion date. After adjusting the Cost Summary the new total for Change Order #6 will be: $2,550.00 [ $1,890.00 $4,440.00 As halt Contractor, 15 tons ~ging, Demolition, Rock, Trucking and Saw Cutting Total ' Feel free to let me know if you have any questions or comments. --- Assistant Engineer Cc: Jim Olson, City of Ashland Scott Fleury, City of Ashland PUBLIC WORKSfENGINEERING DIY. 20 East Main Street Ashland. Oregon 97520 w<<w.ashland.or.us Tel: 541488-5347 Fax: 541488-0006 ffi: 800-735-2900 ~~, AYLOR SITE - DEVELOPMENT a:u 133046 inc. April 14, 2011 RECEIVED City of Ashland Department of Public Works 51 Winburn Way Ashland, OR 97520 APR 1 4 2011 City of Ashland Attn: Karl Johnson Re: Jefferson Avenue Improvements Karl, Enclosed is our Change Order No.6 dated April 8, 2011 for work related to the changed location of the Main Electrical Feed conduit pipe. We will appreciate expedited processing of this request as this will be important for our job scheduling. . Sincerely, )l/~~ /M~&9 1501 Sage Rd., Medford,OR97501 Ph. 5417793565 Fax 541 8587031 E,Mail tsdm~dford@aol.com AYLOR SITE DEVELOPMENT ITB . 33046 inc.. RECEIVED April 8, 2011 APR 1 4 2011 Chaoe:e Order Request (COR~ City of Ashland City of Ashland Avenue Improvements Project No. 2005-10 To: Karl Johnson, City of Ashland, Department of Public Works Work to be done: Change in location ofPRI underground conduits from job site (West End) to PP&L point of connection. Changed from inside of curb & sidewalk (native soil surface) to new location in the adjoining paved street. Requested By: Taylor Site Development, Inc. Scope of Work-Description of Chan2e Reason for Change: Danger of harming or having to remove trees if work is performed as per original plans. Per discussions with Scott Fluery and Dave Tygerson. Exclusion: Slurry will not be used for backfill. Proposed Cost &Time: Change in Contract Amount Change in Contract time Impact Costs Asphalt Contractor, 18 Tons Flagging, Demolition, Rock, Trucking and Saw Cutting $5,940.00 added 2 days added Deferred $3,060.00 Cost Summary: 1.890.00 $4,950.00 Taylor Site Development, Inc. P&O 990.00 Total $5,940.00 Comments: We did not include trench excavation nor pipe zone rock as these were included in our original Bid. See enclosed Cost Breakdown. 1f/!f~' 1501 Sage Rd., Medford, OR 97501 Ph. 5417793565 Fax 541 8587031 E-Mail tsdmedfordlalaol.com =f COST BREAD OWN COR-6 Saw cutting: Asphalt Removal: Asphalt Patch (18tons) Flagging Rock Total P&O COR Amt. 210.00 420.00 3060.00 720.00 540.00 4,950.00 990.00 5,940.00 From:KRM-Medford 541 664 4567 04/07/2011 16:17 #381 P. 001/001 Change Order LTM.INCORPORATEDdba ~:;a KNIFE RIVER ~ ~MATERIALS AN MDU RESOURCES COMPANY P.o. Box 1145 Medfonl, Oregon 97501 EaLW. 0PPaRTUNlTV EMPlOYER PROPOSAl SUBMITTED TO: Oregon Ucense #56603 California Ucense #5OT135 Telephone 17()"2960 Fax 664-4561 Date: 92101/11 JOB NAME DESCRlPTIONILOCAll0N: Taylor Site DeWllopment Attn: Mr. Mark Taylor Tel: 541- Jefferson Avenue Improvements Electrical Trench Patching DESCRIPTION QTY UNIT PRIce TOTAL PRIce 1 4' Wufa Electrical Trench Patch; : Patch back 690 SF 4" X 1 of lnlnch with 4" of Class "C" as t in two 1IftD. LewI 2 1/2'" Dense HMAC with PG64-22 Binder . 15 TN $170.00 $2 550.00 2 2' WIde Etec1rical Trem:h Patchin : Patch back 300 SF 2' X 150' of lnlnch with 4" of Class -Co as halt in two lifts. 2. 1/2'" Dense HMAC with PG64-22 Binder. 8 TN $240.00 $1 920.00 General Conditions 1 Bond tees are excluded.. Please add 1% If required. AI construction fees & permits excluded. 2 Grading and c;ompadion of aggregates, asphalt paving seal coat. prime coat and soli steriIanl aIB _uded. 3 Asi>haIl price adjustments for gradation, de1sily, smoothness. etc. earned in Ihe manufaclurlng and placement of HMAC shall be due and payable to KRM at 100% of the ammmt paid by OIlOT, If applicable. 4 Exclusions: baffle control: temporary or permanent pavement markings of any kind: adjusbnenls of utilities: surveying or layout; pavement cteanfng or sweeping; trench prep before paving. 5 Based on free and clear access. """"Ill hindrance by oIher operallons. 6 Sanilely fa_as to be pnwlded by oIhe",. 7 Project s_ b> be rev_ and approved by KRM prior to SUbmission to owner and mutually agreed upon pIIcr to KRM s1ar1Jng Mlr1<. 8 Excludes asphalt (hot or cold nUx) wedges, tapers &. ramp installatfon & removals. 9 Asphalt 08 & fuel escaIatIona are due and payable for OIIr items above per section OOOT Spec 00195. If applicable. 10 Excludes cofd plane pavement removal, and crack sea" ' 11 Any barrier rail moves required for top lifts of paving or other required roathwrk or access to be performed by General Contractor, not KRM. 12 DBE PaJticipation Included in thls subquote Is: $0 13 Temporary protection of valley gutters. concrele crosswalks, & conaele aprons by 0Ihers. 14 If Owner or PrIme Contractor insists upon completion of 1he work against lhe adVIce of LTM.lnc. regarding weather or subsurface conditions, Iha Owner or Prime Contractor shall assume BIJ risk of defects due to weather or subsuface condRlons. Submiltedby: gyo;;l'!/~ Date: t/ - 7- II David v~ -'i~J';bs Estimator Phone: 541.7322737 Owners Acceptance: Date: AYLOR SITE - - DEVELOPMENT CJ:B t 33046 inc. CHANGE ORDER REQUEST #7 City of Ashland Jefferson Avenue ImDrovements Proiect No. 2005-10 June 2,201 I . To: Karl Johnson, City of Ashland Department of Public Works. Work to be done: Remove additional existing AlC pavement, 14ft X 30ft, West of Sta 1+100 and broken existing curb&gutter and sidewalks in the same area. Requested By: Taylor Site Development, Inc.\ ScoDe of work- DescriDtion of Chanl!e Reason for Change: Deteriorated condition of sidewalks, curb and gutter & existing road Exclusions: Replacement of asphalt, curb&gutter and sidewalks. Cost for their replace- ment will be added (included) in Bid Items 27, 28, & 29 when that work is done. Cost and Time: Change in Contract Amount Change in Contract Time Impact costs $762.00 added none deferred Cost Summary: Saw Cutting Machinery (operated) 3hrs @ $125.001hr Trucking, 2hr@ $85.001hr $ 90.00 375.00 170.00 $635.00 P&O (10/10) $127.00 Total $762.00 This work was considered necessary and agreed to by Scott Fleury. Trucks have a long trip to No. Central Point as that is the nearest point allowed for disposal of the removed asphalt. RECEIVED Comments: Sincerely, JUN - 2 2011 Mark Taylor, President City of Ashland 1501 Sage Rd., Medford, OR 97501 Pb. 5417793565 Fax 541858 7031 E-Mail tsdmcdfordraJaoI.col11 CITY OF ASHLAND Memorandum DATE: TO: FROM: RE: June 6, 2011 Jim Olson Karl Johnson~ Jefferson Avenue Improvement Project - Change Order #08 The Jefferson Avenue Improvement Project is nearing its completion and to date, six bid items have exceeded the original bid item amounts. A summary of the bid items is included below: Bid Item Description Overage 4 Clearing & Grubbing $1,000.00 22 Install Keystone Wing Walls $935.00 24 4 Inch - 0 Aggregate ,Base $14,250.44 25 I Inch - 0 Aggregate Base $564.00 35 3-Phase Primary Cabinet Assy. (575-Sect) $3,400.00 38 8" Ductile Iron Water Pipe, Fittings, Couplings and Backfill $2,576.24 All of the above bid items needed additional quantities due to under estimation by KAS & Associates on the original bid schedule that was supplied to the City of AsWand. PUBLIC WORKS/ENGINEERING DIY. 20 East Main Street Ashland. Oregon 97520 www.ashland.Or.us Tel: 541488-5347 Fax: 541488<;006 m: 800-735-2900 ~~, G:\pub--wrks\eng\05-10 Jefferson 8t Extension\A_Admin\Taylor\Payments\Change Orders\Change Order#08. Explanation.dacx ---~- 00..,00"1' 0=.....00... ~~~~~~~ 6::::.-;-:i~ ~~~""...,"'! ~OO"'OO'<t ~OO'<tOON E8~~~~~ i1 O\.cO;;.""-:i~ ,Q.,..................~.... . g-S "'~ ~ . ~ 000 ~oo ":-io ~NO ~~~ '<t.~.~. ........................... 8 [jg ~ "'~- ~ ~ ~ M g ~- ......................... g-:g "'~ ~ ~ ~ ~ g ~ .... ~................ ~ l~ ~ ~ ......................... g-a "'~ ~ ~ ......................... . . ~S "'~ ~ . ~ 8888 0"'00 3~~~ .......................... l~ ~ ~ o o ~ .,; ........................ "'" 88gggg ~5@~~~~~ .. 0 "". r:--. 0\' 0 o e - N r<<......................... ~88gggg o..~...;:!~~q .;:"". ...; :::>......................... ;g~e;(;G~:J .;:-~~~...,~ ~ r:--.....'" '" . o i ~ ~ ~ ~ . . ~ =g Jl8 ~ g :-ii: ~ r.i ~ ~.~ till ~~ ~] t ]:i ~ ~t:l... ~ ~ e ~ ~~ o 0 ~ till E 0 ..7d &~ ~ J: ~ ~~ I I .. " .~ ~ -5 -5 ~ 0 U.5;:~o., ~ ;'<t~~:1~~ iO 00 '<> .,; '" ... N '" . .. ~ '" ....l ...: f-< o f-< 00 '" " '" Q " o '" " z ...: :t U ~ N .,; 8 ~ 8 8 ~ M M ~ . I ~ ~ ~ ~ j J ~ ! . ~ I ~ ~ ~' ; ~ ;; ! ~ o ~ ~ , J o Karl Johnson From: Sent: To: Subject: Taylor Site Development [tsdmedford@aol.com] Friday. May 27, 20111:09 PM j ohnsonk@ashland.or.us Jefferson Ave. Improvements, Time Adjustment Change Order 5/1 Sill Categories: 05-10 Jefferson Ave Karl, Thanks for your response to our Time Adjustment Request. We do have a question on the Revised Contract Total of $562,140.40 included the document we are asked to accept. The total we have is $586,032.96 as of the same date. The difference appears to be because the adders to the Bid Schedule are not included in your amount: Item #23 87 additional CY of 4" shale for the Digouts Item #24A 1,000+/- CY to fill ravine (Qty.determined in field with Scott Fleury) . Item #25A 87.5 CY 1" rock extra to fill ravine Item #35A Electrical 575 Vault Item #38A Additional 93" of 8" Waterline Total $ 1,566.00 14.250.46 2,100.00 3,400.00 2,576.10 $23,892.56 amount to be added to contract. Let us know if you agree with the above as soon as possible. Mark/Ray ~~, CITY OF ASHLAND 20 E MAIN ST. ASHLAND. OR 97520 (541) 488-5300 CiTY RECORDER I' 9;2~~;~10. I I' Page 1/1 . PO NUMBER" " 09806 'VENDOR: 001735 TAYLOR SITE DEVELOPMENT INC 1501 SAGE RD SUITE B MEDFORD, OR 97501 SHIP TO: Ashland Public Works (541) 488-5587 51 WINBURN WAY ASHLAND, OR 97520 FOB Point: Terms: Net Req. Del. Date: Speciallnst: Req. No.: Dept.: Contact: Mike Faught Confirming? No '.~' Quantltv . -'Unit" ; ., '?'.-' . , . .~ . . ~'," . . Oeser-loti-on..' :. . . , ,. unit Price " '.. .Ext.: Price'-,; . THIS IS A REVISED PURCHASE ORDER Construct Jeffe(son Avenue Improvement 514,789.00 Project No. 2005-10 Approved by Council on 9/07/2010 Processed change order 10/27/2010 2,340.00 Change Orde( NO.1 P(ocessed change o(der 11/17/2010 41,516.40 Change Order NO.2 Processed change order 11/17/2010 2,445.00 Change Order NO.3 Processed change order 11/17/2010 1,050.00 Change Order No, 4 Processed change order 06/22/2011 6,880.00 Change Order NO.5 Change Order No.6 5,940.00 Change Order No. 7 762.00 Change Order NO.8 22,725.68 SUBTOTAL 598448.08 31LL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2028 TOTAL 598,448,08 ASHLAND, OR 97520 [~ :;Ac'c~ount:Numtier~~",~:~~ ttJ~~:'p,-r_oiecfN-umbeh .., 'Amount , . Account Number ~rojectNum'be'r :-' " '-< .;Amol"-i1i~i: ~':,-::~ , , E 260.08.12.00.70420 E 200510.120 598 448.08 ,61,fi ~ %~.? Aut r ad Signature (t" VENDOR COpy CITY Of ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. #5,6, 7 & 8 PROJECT: Jefferson Avenue Improvement Project LOCATION: Jefferson Avenue CONTRACTOR: Taylor Site Development You are requested to perform the following described work upon receipt of an approved copy of this document or as described by the Engineer: DATE: PROJECT NO.: 6/6/20 Ii 2005-10 I Item No. II Description II Quantity II Unit Price II Amount I LandsC30inl! Chan2cs - Additional plants and irrigation Item #5 added bv landscaoe architect 1 LS $ 6.880.00 $ 6.880.00 Electrical Conduit Location Chanl!e - Relocated electrical trench from behind sidewalk to Item #6 in front of Quttef 1 LS $ 5,940.00 $ 5,940.00 Additional SidewalklAC Removal - Replacement of sections of existing pavement, Item #7 curb, gutter and sidewalk 1 LS $ 762.00 $ 762.00 Bid Item Adjustment- Item #8 Overa!!cs on various bid items 1 LS $ 22.725.68 $ 22.725.68 T olal this Change Order Previous Change Order Original Contract Total Revised Contract Total $ $ $ $ 36.307.68 47.351.40 514,789.00 598,448.08 16.3% PERCE~'T CHANGE OF ORIGINAL CONTRACT Recommended By: This document shall become an amendment to the The time provided for completion of this contrac contract and all provisions of the contract an Approved By: Project ~~~--L Public Works Director ~J~ Date L, (a.c J ~I Date Accepted By: ~ j/V /11 Date ' ENGIl\'EERlNG 20E.MaiDSmd Ashlla>d,~97520 www.ashIand.or.us Tcl:541-tU..B47 f...:541-4S8-6006 TrY: 800-735.2900 -. ... r.." G:~d:s'erlg1j}5.10Jcffcr.;ooStEncnsioo\A_AdmiD\T""~_\Chqe0rdc:.--.1j}5.10Jeff<:nonA,~,,,,-(bangeOrd<:rN07'()8.dsx