HomeMy WebLinkAbout1981-059 Change Order - Sage Pipelines . ter CITY OF ASHLAND DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 1 PROJECT: 1981 Street Improvement DATE : 31 August 1981 LOCATION: Beswick Way PROJECT NO. : 81 -01 CONTRACTOR: Sage Pipelines Company You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by' the Engineer : ITEM UNIT NO. DESCRIPTION QUANTITY PRICE AMOUNT 1 Install 6" P.V.C. drain (ASTM 285 L.F. $7 . 00/L . F. $1995 . 00 Spec . D3034) , backfill shall be native; incl . necessary fittings 2 . Install 4" P .V. C . drain, per- 350 L . F. $6 . 25/L.F. $2187 . 50 forated; backfill shall be 3/4" drain rock. Total this change order $4182 . 50 Previous change orders -0- Revised contract total $121592 . 39 The time provided for completion of this contract is ( R-e ) (increased) (d-sad) by 2 calendar days . This document shall become an amendment to the contract and all provisions of the contract will apply. Recommended by : Eng neer, James H. Olson Date Approved by: 'Al� - / - / Owner Cit Ashland Date Accepted by : it, - /- on ra r Date Sage Pipelines Co . 11 S . Frontage Rd. Gold Hill , OR 97525 CITY OF ASHLAND ' DEPARTMENT OF PUBLIC WORKS CONTRACT CHANGE ORDER NO. 2 PROJECT: 1981 street Improvement DATE : 9- 2-81 LOCATION: Cedar Way PROJECT NO. : 81-01 CONTRACTOR: Sage Pipelines You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the Engineer : ITEM UNIT NO. DESCRIPTION QUANTITY PRICE AMOUNT 1 Adjust (raise) existing catch Lump Sum $100 . 00 . basin grate at N. Main and Cedar Way Total this change order '_ .$100 . 00 Previous change orders ,:_.$4182 . 50 Revised contract total $121692 . 33 The time provided for completion of this contract is (unchanged) (axmxexsxd) (d.uxxjRxxe9) -by -0- calendar days . This document shall become an amendment to the contract and all provisions of the contract will apply. Recommended by: gineer , James H. Olson Date Approved by : GWVw— 9— 3-8/ wner, City of Ash d Date Accepted by : - Contracto Date Sage Pipelines Co . 11 S . Frontage Rd. Gold Hill , OR 97525