Loading...
HomeMy WebLinkAboutNevada_255_PA-2011-00970 i CITY September 21,2011 City of Ashland Electric Department 90 N.Mountain Avenue Ashland, OR 97520 RE: Planning Action#2011-00970 Notice of Final Decision On September 21,2011 the Staff Advisor for the Ashland Planning Division administratively approved your request for the following: PLANNING ACTION: 2011-00970 SUBJECT PROPERTY: 255 East Nevada APPLICANT: City of Ashland DESCRIPTION: A request for Site Review approval and a modification of an existing Conditional Use Permit to construct a 240 square foot electric substation control room at the Ashland Electric Substation property located at 255 E.Nevada.The property is zoned Single Family Residential and the construction of a new, non-residential structure requires a Site Review approval and there is an existing Conditional Use Permit on site for the original construction of the substation. COMPREHENSIVE PLAN DESIGNATION: Single Family Residential;ZONING: R-1-5; ASSESSOR'S MAP: 39 lE 04AC; TAX LOT: 1200 The Staff Advisor's decision becomes final and is effective on the 13th day after the Notice of Final Decision is mailed. Prior to the final decision date, anyone who was mailed this Notice Of Final Decision may request a reconsideration of the action by the Staff Advisor as set forth in the Ashland Land Use Ordinance (ALUO) 18.108.070(B)(2)(b)and/or file an appeal to the Ashland Planning Commission as provided in the ALUO 18.108.070(B)(2)(c). An appeal may not be made directly to the Land Use Board of Appeals. Oregon law states that failure to raise an objection concerning this application,by letter, or failure to provide sufficient specificity to afford the decision maker an opportunity to respond to the issue,precludes your right of appeal to LUBA on that issue. Failure to specify which ordinance criterion the objection is based on also precludes your right of appeal to LUBA on that criterion. Failure of the applicant to raise constitutional or other issues relating to proposed conditions of approval with sufficient specificity to allow this Department to respond to the issue precludes an action for damages in circuit court. The application, all associated documents and evidence submitted, and the applicable criteria are available for review at no cost at the Ashland Community Development Department, located at 51 Winburn Way. Copies of file documents can be requested and are charged based on the City of Ashland copy fee schedule. I If you have any questions regarding this decision,please contact the Community Development Department between the hours of 8:00 am and 4:30 pm,Monday through Friday at(541)488-5305. I i cc: Parties of record and property owners within 200 ft COMMUNITY DEVELOPMENT DEPARTMENT Tel:541488-5305 51 Winburn Way Fax:541-552-2050 Ashland,Oregon 97520 TTY: 800-735-2900 www.ash land.or,us ASHLAND PLANNING COMMISSION FINDINGS & ORDERS PLANNING ACTION: 2011-00970 SUBJECT PROPERTY: 255 East Nevada APPLICANT: City of Ashland DESCRIPTION: A request for Site Review approval and a modification of an existing Conditional Use Permit to construct a 240 square foot electric substation control room at the Ashland Electric Substation property located at 255 E.Nevada. The property is zoned Single Family Residential and the construction of a new, non-residential structure requires a Site Review approval and there is an existing Conditional Use Permit on site for the original construction of the substation. COMPREHENSIVE PLAN DESIGNATION: Single Family Residential; ZONING: R-1-5; ASSESSOR'S MAP: 39 lE 04AC; TAX LOT: 1200 SUBMITTAL DATE: July 19, 2011 DEEMED COMPLETE DATE: August 10, 2011 STAFF APPROVAL DATE: September 21, 2011 FINAL DECISION DATE: October 3, 2011 APPROVAL EXPIRATION DATE: October 3, 2012 DECISION The subject property is located on the north side of East Nevada Street near the end of Nevada which dead ends at its confluence with Bear Creels to the east. The property is zoned R-1-5, the properties to the south, east and west are also residentially zoned. The property to the north is outside of the City limits. Electric facilities have been on the parcel since the early 1960s (see attached photo 3/17/1962)prior to current land use zoning. In 1977, Pacific Power and Light(PPL) obtained a Conditional Use Permit and Site Review approval to expand their facilities to the south side of East Nevada, across the street from the subject property. The approvals were necessary in 1977 since the property was then zoned residential. At that time they deeded the subject site to the City of Ashland. There is an existing structure on the site near the front property line. The City of Ashland Electric Division has operated the site as an electric department substation facility since 1977. There has been Electric Department use of the structure and subject site continuously in various forms since the early1960s. The applicant is requesting a Site Review and a Conditional Use Permit(CUP) approval to modify the site to allow for the construction of a 240 square foot electric substation control room. Current control facilities are across the street, out of doors. This structure would provide for the control facilities to be housed within a weather resistant structure. A Site Review approval is required for all new non- residential structures; the Conditional Use Permit is required for public utility buildings in the residential zones. The structure is proposed to be located 6-feet behind the existing control building and 10-feet from the east property line. The proposed location of the structure complies with setbacks for the zone. The proposed structure is a 12-foot by 20-foot, 240 square feet, pre-fabricated metal structure. The structure will have a 10-foot ceiling height and a low pitch roof. The structure will be constructed out of metal and painted a light grey color. There will be a small air conditioning unit on the rear wall of the structure. j PA 92011-00970 225 East Nevada/adg Page 1 The property is completely surrounded by a six foot chain link metal fence with screening slats. In order to further screen the property a condition requiring a vegetative screen of a shrub type plant (arborvitae, laurel, cotoneaster, etc) along the east and west property lines has been added. Additionally, a condition regarding an irrigation plan for the screening plantings has also been added. The property is an existing parcel on an unpaved portion of East Nevada Street. It is served by water, sewer and electric. The storm'water drainage plan will be addressed with the building permit submittals and will likely be an alternate method as permitted within the Oregon Structural Specialty Code as public storm drain facilities are not installed on the unpaved portion of East Nevada Street. The proposed structure will be significantly smaller than the residential structures on adjacent properties and will be behind the existing single-story structure. Between the two small stature structures the parcel has less coverage than a typical single-family development. The construction of the proposed control room will not generate additional traffic. The structure will also not affect air quality. The structure will have residential style exterior light fixtures. The fixtures will be.required to be shielded in a manner which will prevent light from directly illuminating adjacent properties. Any heating, air conditioning or ventilation equipment is required to be compliant with the noise ordinance and at no point exceed 45 decibels. The proposal appears to comply with the zoning code requirements, the Site Review chapter and the Conditional Use Permit criteria. The site has been used as an electric substation facility since the early 1960s and pre-dates the residential zoning. The electric facility uses on the site have decreased in intensity on this particular piece of property as technology has evolved. Though the property will never truly be compatible due to the very nature of the use, with the installation of down-shielded lights and addressing the odor created by the treated poles on the property the impacts from the proposed structure will be minimized. The criteria for Site Review Approval are described in AMC Chapter 18.72.070, as follows: A. All applicable City ordinances have been met or will be met by the proposed development. B. All requirements of the Site Review Chapter have been met or will be met. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. D. That adequate capacity of City facilities for water, sewer,paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. i The criteria for Conditional Use Permit Approval are described in AMC Chapter 18.104.050,-as follows: A. That the use would be in conformance with all standards within the zoning district in which the use is proposed to be located, and in conformance with relevant Comprehensive plan policies that are not implemented by any City, State, or Federal law or program. B. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. C. That the conditional use will have no greater adverse material effect on the livability of the impact area when compared to the development of the subject lot with the target use of the zone. When evaluating the effect of the proposed use on the impact area, the following factors of PA#2011-00970 225 East Nevada/adg Page 2 livability of the impact area shall be considered in relation to the target use of the zone: 1. Similarity in scale, bulk, and coverage. 2. Generation of traffic and effects on surrounding streets. Increases in pedestrian, bicycle, and mass transit use are considered beneficial regardless of capacity of facilities. 3. Architectural compatibility with the impact area. 4. Air quality, including the generation of dust, odors, or other environmental pollutants. 5. Generation of noise, light, and glare. 6 The development of adjacent properties as envisioned in the Comprehensive Plan. 7. Other factors found to be relevant by the Hearing Authority for review of the proposed use. The application with the attached conditions complies with all applicable City ordinances. Planning Action 2011-00970 is approved with the following conditions. Further, if any one or more of the following conditions are found to be invalid for any reason whatsoever, then Planning Action 2011- 00970 is denied. The following are the conditions and they are attached to the approval: 1) That all proposals of the applicant shall be conditions of approval unless otherwise modified here. 2) That the plans submitted for the building permit shall be in substantial conformance with those approved as part of this application. If the plans submitted for the building permit are not.in substantial conformance with those approved as part of this application, an application to modify the Site Review approval shall be submitted and approved prior to issuance of a building permit. 3) That the structure shall be painted in a muted, neutral shade. A sample of the proposed color shall be submitted for review and approval by the Staff Advisor. 4) That any and all mechanical equipment used to operate the control room structure shall be shielded from view from the public right-of-way and adjacent properties. 5) All mechanical equipment shall not exceed 45 decibels when measured from the nearest property line. 6) That the proposed exterior lights be shown on the building permit submittals and shall be shown to have shields which direct the light downward and shall not directly illuminate adjacent properties. 7) That the City of Ashland Electric Division shall implement measures to eliminate the odor from the treated electric utility poles stored on-site upon neighboring residentially-zoned propeties. Those measures may include, alternate placement on-site, covering the poles, utilizing newer technology for pole treatment which has less odor or storing the poles off-site. 8) That a storm drainage plan shall be submitted with the building permit submittals indicating how new run-off generated by the building will be directed to a system approved by the City of Ashland Building Division. I _q 0 If Bill Molnar Director Date Department of Community Development i PA#2011-00970 225 East Nevada/adg Page 3 i PA-2011-00970 391 E04AC 1900 PA-2011-00970 391 E04AC 1400 PA-2011-00970 391 E04AC 1000 ABBOTT CECILE D TRUSTEE FBO CITY OF ASHLAND BREON RICHARD E TRUSTEE ET AL 205 E NEVADA ST DAVID TYGERSON, ELECTRIC DEPT 4182 MANUELA AVE ASHLAND, OR 97520 20 E MAIN STREET PALO ALTO, CA 94306 ASHLAND, OR 97520 PA-2011-00970 391 E04AC 3200 PA-2011-00970 391 E04AC 3400 PA-2011-00970 391 E04AC 1600 FEDERAL NATIONAL MORTGAGE MARSHALL RICHARD G JR/LAURA MAllI VINCE ASSOCIATION RECONTRUST COMPANY 214 E NEVADA ST 245 NEVADA ST 400 COUNTRYWIDE WAY SV-35 ASHLAND, OR 97520 ASHLAND, OR 97520 SIMI VALLEY, CA 93065 PA-2011-00970 391 E04AC 1600 PA-2011-00970 391 E04AC 3300 PA-2011-00970 391 E04AC 1700 MAllI VINCE MEHTA VINOD/SEEMA MEIER HARVEY A TRUSTEE ET AL 273 LAUREL 1142 BROOKDALE AVE 410 NEVADA ST ASHLAND, OR 97520 MEDFORD, OR 97504 ASHLAND, OR 97520 PA-2011-00970 391 E04AC 1800 PA-2011-00970 391 E04AC 3500 PACIFIC 391 E04AC 1100 OEHLER ELIZABETH PACIFIC POWER/LIGHT CO REGLER THOMAS L ATTN: ROBERT G STRONG 21E E NEVADA ST 275 E NEVADA ASHLAND, OR 97520 700 NE ND, OR 972 2 700 ASHLAND, OR 97520 PORTLAND, OR 97232 PA-2011-00970 391 E04A 1000 PA-2011-00970 391 E04A 800 PA-2011-00970 SCHULTZ PETER/SCHULTZ LAURA WILLIAMS JERRY KEN/CAROL A WITKOWSKI JERRY 375 E NEVADA ST 1154 OAK ST 1600 SW WESTERN BLVD ASHLAND, OR 97520 ASHLAND, OR 97520 CORVALLIS, OR 97333 255 E NEVADA 9/21/2011 NOD 15 I i wry , < `a �"f ,e"a��,�� e' � � k.� r a ',��a 3�=€':s'x �'�^•' �``��h.,-�"�v"'s j '� .-> � r �-a �� .;�r"?� �r�,�,r �y �� �.,,.. �, wa �4�� x�Via' �r��� ��a ✓vm" :� a s �^, �"� �i'� ,� .� �' �r'r' � � ,NSA � "�'� � 6 �� �"�.'�,1:�` �,�? x& � s .>,., a B�'.;°:� .3 �r„+„ ? �.m'-`-:�"' -vi�'� � � �z:,,�.a 1 5�%x �u���'.a'"`'�.a,� Y y z✓. a t 'x,-� ' `.°°c yam` r^' � p,•x a ..� } �, r ;� •�h r'' t -��.��,�, �- �.: fix'•��*� s��� �`�" �. a ,,� � �wr z,,„� # -'vr✓; `�,�'���,-�, '� �, ,�-a' ..EE�"ti�f`.:. a � ✓ .. *�. v r, '•=-��, z-f�.-a'ir„��f �;���„�f`-�"r"T �a�"�~ " i y...� "'�r icy 'a �" � `3w"-ax�.�' � 3 ' x � .� �n� �r .�� � s ;:a'��^ '=i�� ? as ✓ �' x �o, '"'z. ,: , I to ?3.3 vz �.✓� ,�"�, � � ,� -€f as ..ter-����a � �` �� " `� = „ ,�° �`rn'�"�a✓u� �.z a� + ✓ c ` gv j,bA Map wy —Ail x IN,tz PS : �' a! ;-° - rv�zr "ay,-y; F9 M Opt- * " a s' a"� ter, c.., y M Too. 1-v �Qowyn' a ;` ,. " Al { ' v c 11 k rr^ via M� f a# i T%� a 1 r r WON KW Ito 4 , . y '✓ y. " is �r- BMW FW . .. r 7 40A W cow , VV h a r4' { 4M qpw� six s :" r "W- A_ `�i �#� x�a,r- ry, �-�,� � �.;' " z.. . ft -, L1111,1 -x Y a, f � x f 3 y xb�r 'S L � m 5 v a, r w f ;. Jj- WIP w yK M1; MF ' 3 �F r" a r. ti w � u.0 F- r r m �F r' ry v 2- r r. r A I + w �N + / N yr d4 5� } I a. Zimbra https://zimbra.ashland.or.us/zimbra/b/printmessage?id=34935 Zimbra guntera @ashland.or.us + Font size- comment on planning action 2011-00979 255 East Nevada From :Vince Mazzi <vpmazzi @gmail.com> Wed,Aug 17, 2011 10:19 PM Subject:comment on planning action 2011-00979 255 East Nevada To :guntera @ashland.or.us Hi Amy, Thanks so much for helping me the other day. I just wanted to send in my comments on the pending planning action for 255 East Nevada St: site review approval and modification to the conditional use permit. If the addition of the 240 sq foot substation control room will help the electrical department in their mission to improve service to the community,I am happy to support it. I only ask the property be used in accordance with the planned use as close as possible,so as not to lower livability and property value of the neighborhood, i.e. 1. Lighting : use of low Kelvin temperature residential style lighting design. 2. Sound: please no sound increases,especially any outdoor transformers. (Already,the current transformer noise from the Pacific power substation is 60dB, measured from the street). 3. Health/environmental: please prohibit/remove carcinogenic materials stored at the yard. Please,no toxic pesticide spray for weed control. 4. Request no Large trucks idling inside the yard. 5. Request no use of county jail inmates for yard maintenance (I've had 2 home break-ins resulting in property left in the last 3 years,causing my home insurance to triple.) 6. Good appearance: I request the property not be used as a storage yard. I had a recent appraisal which lowered my property value due to the yard appearance.As a result,I could not take advantage of the lower mortgage rates currently available even though I qualified for the refinance. (see site comments below). I believe the planting of some curb shrubs and removal of barbed wire fencing would be very helpful and much appreciated. Thanks, Vince Mazzi 245 East Nevada St, ashland 541-292-4385 From appraisal for my property at 245 East Nevada,Jan 2011: Site Comments The subject is located across the street from a Pacific Power electrical sub-station and adjacent(on 2 sides, back and Eastern side) to the City of Ashland's"telephone pole"maintenance yard. While the location is not affected by easements, encroachments, or external environmental conditions, it's location can be considered to be somewhat less than desirable due to the"Power Sub-Station"and"Maintenance Yard"(See Additional Photos Addendum). As a result of the subject's location, a deduction for location will be applied in the sales comparison grid to reflect the estimated value difference from a normal"neighborhood"type location that would be available to potential buyers. Associated Appraisers, LLC Medford, OR 1 of 1 8/18/2011 12:14 PM y • Save money with pre-fabricated "turn-key" steel r buildings by reducing engineering and procurement } costs. • Pre-fabricated electrical enclosures are factory built, with "state of the art" precision and control. • Pre-fabricated buildings assure exact delivery dates, permitting accelerated project completion not attainable �. with on site construction. 0 Pre-fabricated buildings minimize on site construction time in hazardous substation environments, reducing the chance of safety violations and accidents. • Pre-fabricated buildings permit optional factory integrated control systems. • Pre-fabricated buildings limit subcontracting requirements and the number of trades required. The POWERHOU Modular Building Solution-, A Trachte POWERHOUSE modular building in grates the permanence and flexibility of a site - _ bui t structure with the quality and project " ( ma agement of factory built pre-assembled wat rproof electrical enclosure. This combination pro ides quite simply the "best of both worlds" r, for he customer, resulting in smoother, faster an ultimately more efficient electrical control h ses built from start to finish. i hft // r ht owerhouse.corn Betiefits Difference I Specs RFQ I I i I I i i 2 ti Planning Department,51 WinbO ay,Ashland,Oregon 97520 CITY OF 541-488-5305 Fax:541-552-2050 www.ashland,or,us TTY: 1-800-735-2900 NOTICE OF APPLICATION PLANNING ACTION: 2011.00970 SUBJECT PROPERTY: 255 East Nevada APPLICANT: City of Ashland DESCRIPTION: A request for Site Review approval and a modification of an existing Conditional Use Permit to construct a 240 square foot electric substation control room at the Ashland Electric Substation property located at 255 E. Nevada.The property is zoned Single Family Residential and the construction of a new, non-residential structure requires a Site Review approval and there is an existing Conditional Use Permit on site for the original construction of the substation. COMPREHENSIVE PLAN DESIGNATION: Single Family Residential; ZONING: R-1.5; ASSESSOR'S MAP: 391E 04AC; TAX LOT: 1200 NOTICE OF COMPLETE APPLICATION: August 10, 2011 DEADLINE FOR SUBMISSION OF WRITTEN COMMENTS: August 24, 2011 „51 [1154 IF3 ---- SUBJECT PROPERTY 255 E NEVADA 381 E 040A 1200 - 235 — 20 } p 17990 9U HO % ( — . ,13u � LL 1 �� — FSroperly lines mafor ref mce�ntg nut sealaable 0 1630 60 Feet I The Ashland Planning Division Staff has received a complete application for the property noted above. Any affected property owner or resident has a right to submit written comments to the City of Ashland Planning Division, 51 Winburn Way, Ashland, Oregon 97520 prior to 4:30 p.m. on the deadline date shown above. Ashland Planning Division Staff determine if a Land Use application is complete within 30 days of submittal. Upon determination of completeness, a notice is sent to surrounding properties within 200 feet of the property submitting application which allows for a 14 day comment period. After the comment period and not more than 45 days from the application being deemed complete, the Planning Division Staff shall make a final decision on the application. A notice of decision is mailed to the same properties within 5 days of decision. An appeal to the Planning Commission of the Planning Division Staff's decision must be made in writing to the Ashland Planning Division within 12 days from the date of the mailing of final decision. (AMC 18.108.040) The ordinance criteria applicable to this application are attached to this notice. Oregon law states that failure to raise an objection concerning this application, by letter,or failure to provide sufficient specificity to afford the decision maker an opportunity to respond to the issue, precludes your right of appeal to the Land Use Board of Appeals(LUBA)on that issue. Failure to specify which ordinance criterion the objection is based on also precludes your right of appeal to LUBA on that criterion. Failure of the applicant to raise constitutional or other issues relating to proposed conditions of approval with sufficient specificity to allow this Department to respond to the issue precludes an action for damages in circuit court. A copy of the application, all documents and evidence relied upon by the applicant and applicable criteria are available for inspection at no cost and will be provided at reasonable cost, if requested. All materials are available at the Ashland Planning Division, Community Development & Engineering Services Building,51 Winburn Way,Ashland,Oregon 97520. SITE DESIGN AND USE STANDARDS 18.72.070 Criteria for Approval The following criteria shall be used to approve o r deny an application: A. All applicable City ordinances have been met or will be met by the proposed development. B. All requirements of the Site Review Chapter have been met or will be met. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. D. That adequate capacity of City facilities for water,sewer, paved access to and through the development, electricity,urban storm drainage, and adequate transportation can and will be provided to and through the subject property, All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88, Performance Standards Options. (ORD 2655,1991;ORD 2836,1999) CONDITIONAL USE PERMITS 18.104.050 Approval Criteria A conditional use permit shall be granted if the approval authority finds that the proposed use conforms,or can be made to conform through the imposition of conditions,with the following approval criteria. A. That the use would be in conformance with all standards within the zoning district in which the use is proposed to be located, and in conformance with relevant Comprehensive plan policies that are not implemented by any City, State, or Federal law or program. B. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. C. That the conditional use will have no greater adverse material effect on the livability of the impact area when compared to the development of the subject lot with the target use of the zone.When evaluating the effect of the proposed use on the impact area,the following factors of livability of the impact area shall be considered in relation to the target use of the zone: 1. Similarity in scale,bulk, and coverage. 2. Generation of traffic and effects on surrounding streets, Increases in pedestrian, bicycle, and mass transit use are considered beneficial regardless of capacity of facilities. 3. Architectural compatibility with the impact area. 4. Air quality, including the generation of dust,odors,or other environmental pollutants. 5. Generation of noise,light,and glare. 6. The development of adjacent properties as envisioned in the Comprehensive Plan. 7. Other factors found to be relevant by the Hearing Authority for review of the proposed use. PA-2011-00970 391 E04AC 1900 PA-2011-00970 391 E04AC 1400 PA-2011-00970 391 E04AC 1000 ABBOTT CECILE D TRUSTEE FBO CITY OF ASHLAND BREON RICHARD E TRUSTEE ET AL 205 E NEVADA ST DAVID TYGERSON, ELECTRIC DEPT 4182 MANUELA AVE ASHLAND, OR 97520 20 E MAIN STREET PALO ALTO, CA 94306 ASHLAND, OR 97520 PA-2011-00970 391 E04AC 3200 PA-2011-00970 391 E04AC 3400 PA-2011-00970 391 E04AC 1600 FEDERAL NATIONAL MORTGAGE MARSHALL RICHARD G JR/LAURA MAllI VINCE ASSOCIATION RECONTRUST COMPANY 214 E NEVADA ST 245 NEVADA ST 400 COUNTRYWIDE WAY SV-35 ASHLAND, OR 97520 ASHLAND,OR 97520 SIMI VALLEY, CA 93065 PA-2011-00970 391 E04AC 1600 PA-2011-00970 391 E04AC 3300 PA-2011-00970 391 E04AC 1700 MAllI VINCE MEHTA VINOD/SEEMA MEIER HARVEY A TRUSTEE ET AL 273 LAUREL 1142 BROOKDALE AVE 410 NEVADA ST ASHLAND, OR 97520 MEDFORD, OR 97504 ASHLAND, OR 97520 PA-2011-00970 391 E04AC 1800 PA-2011-00970 391 E04AC 3500 PA-2011-00970 391 E04AC 1100 OEHLER ELIZABETH PACIFIC POWER/LIGHT CO REGLER THOMAS L ATTN: ROBERT G STRONG 21 E E NEVADA ST 275 E NEVADA ASHLAND, OR 97520 700 NE MULTNOMAH STE 700 ASHLAND, OR 97520 PORTLAND, OR 97232 PA-2011-00970 391 E04 1000 PA-2011-00970 391 E04 800 PA-2011-00970 SCHULTZ PETER/SCHULTZ LAURA WILLIAMS JERRY KEN/CAROL A WITKOWSKI JERRY 375 E NEVADA ST 1154 OAK ST 1600 SW WESTERN BLVD ASHLAND, OR 97520 ASHLAND, OR 97520 CORVALLIS, OR 97333 255 E NEVADA 8/10/2011 NOC 15 AFFIDAVIT OF MAILING STATE OF OREGON ) County of Jackson ) The undersigned being first duly sworn states that: 1. I am employed by the City of Ashland, 20 East Main Street, Ashland, Oregon 97520, in the Community Development Department. 2. On August 10, 2011 1 caused to be mailed, by regular mail, in a sealed envelope with postage fully prepaid, a copy of the attached planning action notice to each person listed on the attached mailing list at such addresses as set forth on this list under each person's name for Planning Action #2011-00970, 255 E Nevada. Signature of Employee Document5 811012011 • • Ji INFORMATION TECHNOLOGY no Map Maker Application 5t}t Front Counter Legend Highlighted Feature _°; theBuKer theBufferTarget Tax Lot Outlines Tax Lot Numbers 400 It 6 _ wr v A '290 j t , 2100 U0 t m 416 i` 1 t t 6°dBYMl7m'1' ! vTa1J ? I�6 r Y'. It�1Y i` 1 „ f 4F I 411) p ti 1601 4 400 410 j FAIR cvWS 4,1100 i I � _ 1 g 4202 4 1F ! t I w i 4 415 i i3U5 �t i a ,ra 00 I it}t 4 1a � t ll JACKSON COUNTY 48 oregoit � .... This map is based on a digital database compiled by Jack son County From a variety Jj t y of sources.Jackson County cannot accept 4011 �f�• � L :. positional accuracy.Ther are no or • �! � 9S Pk positional accuracy.There are no � warranties,expressed or Implied. Please recycle with colored office grade paper Created with MapMaker Map created on 811012011 10:50:17 AM using web.1acksoncounty.org City of Ashland Planning Division, Applicati®n Request Narrative f®r the City of Ashland Electric Department, Ashland Substation Control Building This narrative describes the proposed installation of a new prefabricated Substation Control Building to be owned by the City of Ashland and operated and maintained by the City's Electric Department. The Control Building will be an unmanned facility. The purpose of this building will be to house control and metering equipment, and to provide safe operational control and monitoring of the existing and future switchyard equipment. Presently there is no building that houses these facilities and the existing control and metering devices are located outdoors in the substation yard. This new building will allow safer remote control of high-voltage equipment. At present, switching operations must be performed outdoors near the equipment being switched. In addition,the building will provide a weather-protected, climate- controlled enclosure to house the control and metering equipment, and provide an additional barrier against vandalism and unauthorized entry. The Control Building will be a steel-frame all-metal pre-fabricated facility that will set on a concrete foundation slab. The building arrangement and specifications including the foundation will be designed by qualified registered professional engineers. The specifications will call for a factory designed, manufactured, assembled,tested, delivered and installed pre-fabricated building.The building will be fabricated to comply with the latest applicable codes and standards. Although the building has not yet been designed it will be a single level facility and is expected to have a footprint of approximately 12' x 20' or smaller,maximum square footage of 240 sq-ft,with a ceiling height of 10' and a flat, slight-pitched roof,with slopped to drain gutters and downspouts. The building will meet or exceed all insulation requirements,the exterior will be 12-gauge galvanized steel painted light gray, and will have two access doors with a half-height wire-mesh safety glass windows and keyed locks. The only exterior infrastructure interface will be with AFN(fiber) for the City's telemetry and possibly Qwest(phone)for BPA's telemetry. The building will house the following major equipment: • AC and DC wall-mounted distribution panelboards. • DC Power system with batteries,battery charger, and battery support racks. • Switchgear Relay and Metering Control Panels (2). • BPA Revenue Metering Rack(1). • Telemetery and supervisory control and monitoring devices. • HVAC unit. • All necessary internal and external building normal and emergency lighting and receptacles, and miscellaneous materials required to make the building complete. The building will be located on existing City of Ashland fenced property situated north of E.Nevada Street opposite the existing Ashland Substation. The specific building location has not yet been finalized but is expected to be adjacent,within a few feet, of the existing City-owned shed on this property. Refer to the attached aerial view of the subject property which identifies the site and expected building location. Zoning District Requirements: Landscaping Requirements: 50 percent of the site is required to be surfaced in natural landscape materials which permit the natural infiltration of water into the soil below. A size, and species specific landscaping& irrigation plan required at tune of formal application. Where possible, avoid using lawn. Provide irrigation system. Response: The proposed property to house the Electric Department Control Building is currently City awned property th tit i vas a previous vious substation site. There is no plan to add any landscaping or irrigation. Parking,Access and Internal Circulation: As per the requirements of Chapter 18.92 Off Street Parking. Response: The proposed property to house the Electric Department Control Building is currently City oivnedpropert 1 that was a previous substation site. There isno plant tomodifi, access or parking acconiniodations. Lot Coverage: A maximum of 50% if the lot may be covered with buildings, driveways, parking areas, walkways, and. other forms of lot coverage. Response: A srnallpercenft�,,Ye qf'the lot will be covered with the building, driveway and parking areas, which is estimated to be less than 20%. Setbacks: Front yards shall be a minimum of 15 feet excluding garages. Unenclosed porches shall be permitted with a minimum setback of eight feet or the width of any existing public utility easement, whichever is greater, from the front property line. All garages accessed from the front shall have a minimum setback of 20 feet from the front property line; side yards, six feet; the side yard of a comer lot abutting a public street shall have a ten foot setback-, rear yard, ten feet plus ten feet for each story in excess of one story. In addition, the setbacks must comply with Chapter 18.70 which provides for Solar Access. Response: The building is expected to have a setback of approxiniate4y 30'from the front properly line. PROCEDURE: Type I - Administrative Approval, subject to hearing upon appeal. APPLICATION MATERIALS: The application is required to include drawings of the proposal(i. e.plan requirements) as ii,ell as written findings addressing the applicable approval criteria in accordance with the Ashland Land Use Ordinance (AL UO), Chapter 18 Land Use of the Ashland Municipal Code, The following section includes the requirements for plans and approval criteria which are applicable to the proposal as described in the pre-application submittals. When inore than one planning approval is required for the proposal, multiple sections of the AL UO may apply. The burden ofproof is on the applicant(s) to ensure that all applicable criteria are addressed in writing and that all required plans, written findings, and other materials are submitted even if those items were not discussed in specific, itemized detail during this initial pre-application conference Plan Requirements: RECEIVED JUL 19 2011 City of Ashland Two (2) copies of the plans below on paper no larger than 11"x 17". Note: These copies are used for the Planning Commission packet and for the notices mailed to neighbors. Please submit clear, reproducible copies. Two (2) Copies of Plans as required for Conditional Use Permit approval in 18.104.040. A. The plan or drawing accompanying the application shall include the following information: 1. Vicinity Map Shown on Site map. 2. North Arrow Shown on Site map. 3. Depiction and names of streets abutting the subject property. Shown on Site map. 4. Depiction of the subject property, including the dimensions of all lot lines. Shown on Site map. 5. Location and use of all buildings existing and proposed on the subject property and schematic architectural elevations of all proposed structures. Shown on Site map and Building drawing, also re fer°to Application Narrative. 6. Location of all parking areas, parking spaces and ingress, egress and traffic circulation for the subject property. Shown on Site map. 7. Schematic landscaping plan showing area and type of landscaping proposed. Not applicable to this property. 8. A topographic map of the site showing area and type of landscaping proposed. Shown on Site map,no landscaping proposed. 9. Approximate location of all existing natural features in areas which are planned to inch dbh, any natural drainage ways, ponds or wetlands, and any substantial outcroppings of rocks or boulders. Not applicable to this property. B. An application for conditional use permit may, but need not be made concurrently with any required application for site design approval under Chapter 18.72. The provisions of paragraph (1) above are not intended to alter the detailed site plan requirements of section 18.72.040 for site design approval. Not applicable. Two (2) Copies of Plans as required for Site Review in 18.72.060. A. Project name. Ashland Substation —Control Building (City Electric Department®caned) B. Vicinity Map. Shown on Site map. C. Scale(the scale shall be at least one inch equals fifty feet or larger).The Staff Advisor may authorize different scales and plan sheet sizes for projects,provided the plans provide sufficient information to clearly identify and evaluate the application request. Shown on Site map. RMFnirn D. North Arrow Shoivrt on Site map. ) 20111 E. Date m ,Shown. oil Site map. F. Street names and location of all existing and proposed streets within or on the boundary of the proposed development. Shown on Site map. G. Lot layout with dimensions for all lot lines. Shorvn'on Site map. H. Zoning designations of the proposed development. Proposed property is for substation control building, there is no designation for substation property. I. Zoning designations adjacent to the proposed development. Residential and existing substation. J. Location and use of all proposed and existing buildings,fences and structures within the proposed development.Indicate which buildings are to remain and which are to be removed. Shown oil Site map, use is for substation equipment monitor and control, refer to the Application Narrative. K. Location and size of all public utilities in and adjacent to the proposed development with the locations shown of: 1. Water lines and meter sizes. -%-inch water service to property. 2. Sewers,manholes and cleanouts. 4-inch sanitary sewer lateral to property. 3. Storm drainage and catch basins. Existing storm drain catch basin at south-west corner of property. 4. Opportunity-to-recycle site and solid waste receptacle,including proposed screening. Recycle opportunity-not applicable. L. The proposed location of: 1. Connection to the City water system. No additional planned water facilities on property. 2. Connection to the City sewer system. No additional planned sewer facilities oil property 3. Connection to the City electric utility system. Only electrical connection will be to the substation distribution system. 4. The proposed method of drainage of the site. Proposed building doivraspouts are intended to be natural drain. (COA okay?) M. Location of drainage ways or public utility easements in and adjacent to the proposed development. Shown on Site map and attached Survey. N. Location,size and use of all contemplated and existing public areas within the proposed development. No public areas planned within property. O. All fire hydrants proposed to be located near the site and all fire hydrants proposed to be located within the site. Shown on Site map. P. A topographic map of the site at a contour interval of at least five(5)feet. Shorvrr on Utility map. Q. Location of all parking areas and all parking spaces,ingress and egress on the site and on-site circulation. Shown on Site map. R. Use designations for all areas not covered by building. Property areas not covered by building are to remain am.der City's calrr jK81 _- JUL 20111 a _', S. Locations of all existing natural features including,but not limited to,any existing trees of a caliber greater than six inches in diameter at breast height,except in forested areas,and any natural drainage ways or creeks existing on the site,and any outcroppings of rocks,boulders,etc.Indicate any contemplated modifications to a natural feature. No modifications contemplated. T. A landscape plan showing the location,type and variety, size and any other pertinent features of the proposed landscaping and plantings.At time of installation,such plans shall include a layout of irrigation facilities and ensure the plantings will continue to grow. No landscape or irrigation planned U. The elevations and locations of all proposed signs for the development. Signage® (%f necessary need information front COA) V. For non-residential developments proposed on properties located in a Historic District,an exterior wall section,window section and drawings of architectural details(e.g.column width,cornice and base detail, relief and projection,etc.)drawn to a scale of three-fourths(3/4)of an inch equals one(1)foot or larger. Not applicable to this property. W. Exterior elevations of all buildings to be proposed on the site. Such plans shall indicate the material, color,texture,shape and other design features of the building,including all mechanical devices. Elevations shall be submitted drawn to scale of one inch equals ten feet or greater. Shown on Building Drawing and noted in fabrication Technical Specifications. X. A written summary showing the following: 1. For commercial and industrial developments: Questions covered in above responses. a. The square footage contained in the area proposed to be developed. b. The percentage of the lot covered by structures. C. The percentage of the lot covered by other impervious surfaces. d. The total number of parking spaces. e. The total square footage of all landscaped areas. 2. For residential developments: Not applicable to this property. a. The total square footage in the development. b. The number of dwelling units in the development(include the units by the number of bedrooms in each unit,e.g.,ten one-bedroom,25 two-bedroom,etc). C. Percentage of lot coverage by: i. Structures ii. Streets and roads. iii. Recreation areas. iv. Landscaping. V. Parking areas. 3. For all developments,the following shall also be required: The method and type of energy proposed to be used for heating,cooling,and lighting of the building,and the approximate annual amount of energy used per each source and the methods used to make the approximation. All electric, estimated 300-Milino, or 3,600mkwli annually. j Approval Criteria Applicants are advised that in addition to required plans, written findings addressing how the ordinance criteria are satisfied in narrative format are required. The applicable criteria are included below. 77 r _ tr JIUL 19 2011 ILO Y ln j J } J Two (2) Copies of written findings addressing the following criteria from Chapter 18.104.050 for a Conditional Use Permit: A. That the use would be in conformance with all standards within the zoning district in which the use is proposed to be located, and in conformance with relevant Comprehensive plan policies that are not implemented by any City, State or Federal law or program. B. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. C. That the conditional use will have no greater adverse material effect on the livability of the impact area when compared to the development of the subject lot with the target use of the zone. When evaluating the effect of the proposed use on the impact area,the following factors of livability of the impact area shall be considered in relation to the target use of the zone. 1. Similarity in scale, bulk and coverage. 2. Generation of traffic and effects on surrounding streets. Increases in pedestrian, bicycle, and mass transit use are considered beneficial regardless of capacity of facilities. 3. Architectural compatibility with the impact area. 4. Air quality, including the generation of dust, odors, or other environmental pollutants. 5. Generation of noise, light, and glare. 6. The development of adjacent properties as envisioned in the Comprehensive Plan. 7. Other factors found to be relevant by the Hearing Authority for review of the proposed use. i Two (2) Copies of written findings addressing the following criteria from Chapter 18.72 for a Site Review approval: i A. All applicable City ordinances have been met or will be met by the proposed development. B. All requirements of the Site Review Chapter have been met or will be met. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. NOTE: The following sections of the Site Design and Use Standards must be addressed in the written findings. i -Basic Site Review Standards for Commercial Development, pp. 17-19 -Street Tree Standards, pp. 31-32 D. That adequate capacity of City facilities for water,sewer,paved access to and through the development, electricity,urban storm drainage,and adequate transportation can and will be provided to and through the subject property.All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18,88.Performance Standards Options. i UPCOMING APPLICATION DEADLINES: First Friday of each month , F -�� ; i_. UPCOMING PC MEETINGS: Second Tuesday of each month JUL 19 2011 qty Of AS n i a i �. FEES: CUP - $ 938.00 Site Review- $938.00 *NOTE: Applications are accepted on a first come-first served basis. All applications received are reviewed by staff, and must be found to be complete before being processed or scheduled at a Planning Commission meeting. Applications will not be accepted without a complete application form signed by the applicant(s) and property owner(s), all required materials and full payment. Applications are reviewed for completeness in accordance with ORS 227.178. The first fifteen COMPLETE applications submitted are processed at the next available Planning Commission meeting. For further information, please contact: June 8, 2011 Amy Gunter,Assistant Planner Date City of Ashland, Department of Community Development Phone: 541-552-2044 or e-mail: guntera@ciashland.or.us I i L 19 2011 S' Two (2) Copies of written findings addressing the following criteria from Chapter 18.104.050 for a Conditional Use Permit: A. That the use would be in conformance with all standards within the zoning district in which the use is proposed to be located, and in conformance with relevant Comprehensive plan policies that are not implemented by any City, State or Federal law or program. The use is for an electrical substation control building and it is doubtfill any existing standards pertain to this specific usage, but the facility will conform with zoning district standards. B. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. There is no water and no sewer facilities in the proposed building, and there is no change planned to the property access and no change in transportation activity. The building downspout storm drainage will be designed to comply with applicable requirements. C. That the conditional use will have no greater adverse material effect on the livability of the impact area when compared to the development of the subject lot with the target use of the zone. When evaluating the effect of the proposed use on the impact area, the following factors of livability of the impact area shall be considered in relation to the target use of the zone. 1. Similarity in scale, bulk and coverage. The building is a small non-manned facility and will have no impact on livability in the area. 2. Generation of traffic and effects on surrounding streets. Increases in pedestrian, bicycle, and mass transit use are considered beneficial regardless of capacity of facilities. After construction the building will have no impact on increased traffic since it is replacing existing outdated outdoor infrastructure. 3. Architectural compatibility with the impact area. The building design and style is intended to be compatible within the area. 4. Air quality, including the generation of dust, odors, or other environmental pollutants. The building will have no impact on air, odor or environmental quality. 5. Generation of noise, light, and glare. The building will have no impact on noise or visual quality. 6. The development of adjacent properties as envisioned in the Comprehensive Plan. There will be no other buildings on this site. 7. Other factors found to be relevant by the Hearing Authority for review of the proposed use. There are no other factors that should be relevant to the Hearing Authority other than to recognize that this building will help improve electric service reliability to the City's electric customers. Two (2) Copies of written findings addressing the following criteria from Chapter 18.72 for a Site Review approval: A. All applicable City ordinances have been met or will be met by the proposed development. To our knowledge all applicable City ordinances will be met during this development. B. All requirements of the Site Review Chapter have been met or will be met. To our knowledge all applicable Site Review requirements will be met during this development. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. To our knowledge all applicable Site Design requirements will be met during this development. NOTE: The following sections of the Site Design and Use Standards must be addressed in the written findings. -Basic Site Review Standards for Commercial Development, pp. 17-19 -Street Tree Standards, pp. 31-32 D. That adequate capacity of City facilities for water,sewer,paved access to and through the development, electricity,urban storm drainage,and adequate transportation can and will be provided to and through the subject property.All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88.Performance Standards Options. Refer to the Application Narrative. M f t I �2 5 M � 245 27 j 255 255 E Nevada m I 1 i t I /• ts, it 4 ,I i t I 1 St Hydrant Taxlots RECEIVED Sanitary Sewer Utility features Streets Electric features r July 14, 2011 Building i. � a�� Storm Water Utility features 1:720 , �°� , �. Water Utility features Contour 1 inch = 60 f y 'i m 2 ft interval Mapping y y y Public Utility Easement 10 ft interval pp' g is schematic only and bears no warrant of accuracy. All features,structures,facilities,easement or roadway locations should be independently field verified for existence and/or location. o m Z Z IIII zo o °� nom ° -< �: III= Z." Z 0 o¢ ^ ra Uz W S W O Ig P-'{y, z z ° 35 wo<LL>pE maw w r x 1',E a °w maw H N o z z�a Soir�a - Er O U U) o J —III W Z o € 0 9 0 s a° 3`F O- o — m L I— W S N Z U U) U.. oeS O Q S o I III oa o;I J I IIII° Zw Oa d z �Ww �Uao v e°g �o o �\ 19 o f IIII ®� - IIII sly\ = O 9g T Z C) J of I 0 ® h W I �3 o II o ® � Z m o Z o 0 4� Vw Cl) W ® FO--.� D 0 W O n TT o< IIII 0< U 1 1 1 l= U" .s z� -- )1�1 NIWl�3dd w o -- G o D ' � n m �Q m mm z �Q Z �I o � I o> - a »_ �c € o Y J,�JVNIN1-1121d o 9 w El pQ�ALLW Q uw N W m o ° X30 oQ=w o m a _ �w a a °o _ o`20 0 z- So s w N r°o s^ �w 2 O ° j am9 Z o,a J �. PEP 90 \iv Q r' x°s� ° 0 110 ° —z -- S UFO¢3 mQ2 acgi 412H mrc 0Ta�m W a II °z Z zm f °Iz W <° ° S oaw U) ens o� o SIR s ELI w v ® I CY W m L Lv ,. J W W - �I (n I W to »a 31BV1 m e - t M t m m` _37 V1 O C II Q wf j13H9 y` ! MIT Q II 77 IQg�. ¢o G ZH �ks3'L! M_l£.00.0s _ ion sa:;!■an:k _ a2 awn ra ry T �Ja'i n. q. 1�P0 Yr F7�.md 00'001 3 1£_0OAN d" fa T �o� o d a . � \ •�md W� �: 'W 9NY:�b� b.: C� - /m moo• N4.^,: WO n Ll,` `T LL'OY OS'9z 00'001 I u e Wa zr,zgi a Ai.6F.00.02) ... - LU o dz o Uof. r lm b'OJf"SLZ"d '60/A I `o z – a a ;,Ga 210,0/' 'SF9'd 'L8Z'A I o} W +a n o4� _ �.nn LLI >Y 3.6£.00.05 k W 0 ZI s .. .. I- •'s L6'091 3_6£.OO.0.OS C •C h: N u N ^ _T O C so Ys oo'!z -sz A1.6£. OG rz- °1 .o 9m < m e C �= -W � jT m� a y t661-b1-dadd gad Z T`e G N p dsdd. *661-kf- imd .. "d � A d ° n G �• n o _:2 s a ui m'�t m b o � C Mnn"° nn– N l2WQ o L euoi� B/86C/ 6Vi Ia oNNaN '�,n –lY9LflSH 3_IZ.LS.ZNJ YO'L£1 3_Of.YS o o s n ° u-2 2 � �UnE4 T W4tiN m E •vl:k " mono •e oo � Planning Division ZONING PERMIT APPLI I CATON 51 Winbum Way,Ashland OR 97520 FILE r-"A - ') -0 0 97 CITY OF 541-488-5305 Fax 541-488-6006 # 4A -ASHLAND DESCRIPTION OF PROJECT kl1,59LA�lkl,9 5065,-97_101\1 DESCRIPTION OF PROPERTY Pursuing LEED@ Certification? ❑YES ❑ NO Street Address E, IVO-VA))A .27L Assessor's Map No.391E jde- Tax Lot(s) Zoning Comp Plan Designation APPLICANT Name Of 06"HL41VZ) Phone �-5-36-7 E-Mail QA\1F- 7 451-IMM M-QS I Address C-10 Al, 1111,-I,,117-7 Wlil ALL- city r-45HZ1PVZ) zip 7S-20 PROPERTY OWNER Name C-r F 11SIll-AK0, Flee?� PZ:_,077 Phone 5411-qV-5357 E-Mail DAV6 T8 4SXJM1V0 City lq5h�L&V,9., 012- 1? Address 90 Al, h16(111F16t1;V Avr zip— 73-20 SURVEYOR,ENGINEER,ARCHITECT,LANDSCAPE ARCHITECT,OTHER Titles r'c t Name h1510 Phone 5111-1-6-2 ZeZ'V E-Mail a r W�itl,(OLU,5K I e cvoc5 Address- //_100 �tv noTe city Cc;r\.m11AX Zip C�73-S3 Title Name Phone E-Mail Address city Zip I hereby certify that the statements and information contained in this application,including the enclosed drawings and the required findings of fact,are in all respects, true and correct. I understand that all property pins must be shown on the drawings and visible upon the site inspection. In the event the pins are not shown or their location found to be incorrect, the owner assumes full responsibility. I further understand that if this request is subsequently contested, the burden will be on me to establish: 1) that I produced sufficient factual evidence at the hearing to support this request; 2) that the findings of fact furnished justifies the granting of the request; 3) that the findings of fact furnished by me are adequate;and further 4) that all structures or improvements are properly located on the ground. Failure in this regard will result most likely in not only the request being set aside, but also possibly in my structures being built in reliance thereon being required to be removed at my expense. If I have any doubts,I am advised to seek competent professional advice and assistance. Applicant's Signature Date As owner P of property involved in this request, I have read and understood the complete application and its consequences to me as a property wne le P(operty Owner's/Signature (required) Date' [To be completed by City Slal j �611 I 'I I . I Filing Date Received Zoning Permit Type Fee$ OVER 0 (`Mn­­nm and qeitini,q%liicasm\De k-tn6�Zonina Permit Armlication.doc Job Address: 255 E NEVADA Contractor: ASHLAND OR 97520 Address: Owner's Name: CITY OF ASHLAND ®• Phone: Customer#: 06310 State Lic No: CITY OF ASHLAND City Lic No: L Applicant: >� Address: A Sub-Contractor: Phone: Address: Applied: 07/19/2011 Q Issued: R Expires: 01/15/2012 Phone: State Lic No: Maplot: 391 E04AC1200 City Lic No: DESCRIPTION: Ashland Substation Control Building Bill Fees VALUATION '. Occupancy Type Construction Units Rate Amt Actual Amt Constuction Description Total for Valuation: IF MECHANICAL IFELECTRIGAL STRUCTURAL PERMIT FEE DETAIL Fee Description Amount Fee Description Amount Type 1 1,876.00 CONDITIONS OF APPROVAL COMMUNITY DEVELOPMENT Tel: 541-488-5305 20 East Main St. Fax: 541-488-5311 Ashland,OR 97520 TTY: 800-735-2900 www.ashland.or.us Inspection Request Line: 541-552-2080 IT' Y OF ASHLAND I I I I i I hereby certify the contents of this application to be correct to the best of my knowledge, and furthermore, that I have read, Fee Summary Paid Amounts understood and agreed to the following: Building: $ 0.00 $ 0.00 1. This permit shall remain valid only in accordance with code State Surcharge: $ 0.00 $ 0.00 or regulation ulatti)ion provisions relating to time lapse and revocation (180 Development Fees: $ 0.00 $ 0.00 2. Work shall not proceed past approved inspection stage. All Systems Development Charges: $ 0.00 $ 0.00 required inspections shall be called for 24 hours in advance. Utility Connection Fees: $ 0.00 $ 0.00 3. Any modifications in plans or work shall be reported in advance to the department. Public Works Fees: $ 0.00 $ 0.00 4. Responsibility for complying with all applicable federal, state, Planning Fees: $ 1,876.00 $ 0.00 or local laws, ordinances, or regulations rests solely with the j applicant. Sub-Total: $ 1,876.00 Fees Paid: $ 0 Applicant Date Total Amount Due: $ 1,876.00 COMMUNITY DEVELOPMENT Tel: 541-488-5305 20 East Main St. Fax: 541-488-5311 Ashland,OR 97520 TTY: 800-735-2900 www.ashland.or.us Inspection Request Line: 541-552-2080 CITY F ASHLAND