HomeMy WebLinkAbout2011-319 CONT Addendum - Peck Smiley Ettlin ADDENDUM TO AGREEMENT BETWEEN OWNER (CITY OF ASHLAND) AND
ARCHITECT (PECK SMILEY ETTLIN ARCHITECTS)
Dated June 14, 2006 and amended by letter Dated May 20, 2009
Addendum made this 1--2- day of 0e LeP-'L- "' , 2011, between the City of
Ashland ("Owner") and PECK SMILEY ETTLIN ARCHITECTS ("Architect").
Recitals:
A. On or about June 14, 2006 the Parties entered into an agreement (the "Agreement")
to plan and design for the construction of Station 2 for Owner's fire department (the
"Project") for presentation to the voters for passage of a bond levy to fund the Project.
The levy did not pass and, on or about May 20, 2009, the Parties amended the
Agreement by reducing the scope of Project and, respectively, the cost of Architect's
services to complete the terms of the Agreement.
B. The parties desire to amend the agreement again to specifically state:
• The time period for Architect to complete the terms and conditions of the
Agreement:
• How the Project is to be modified; and
• The amount of compensation to be paid to Architect to complete its services
under the Agreement.
City and Consultant agree to amend the agreement in the following manner:
1. The date for completion as specified in Article 11.5 of the Agreement is as provided
in Exhibit "A" herein attached and incorporated.
2. The scope of services as specified in Article 2 is modified as provided in Exhibit "B"
herein attached and incorporated.
3. The maximum price and schedule of payments as specified in Article 11 of the
Agreement is as provided in Exhibit"C" herein attached and incorporated. Any
unauthorized expenditure, if any, so far made pursuant to this Agreement is ratified
upon City Council approval after this Addendum is signed by both Owner and Architect.
4. Except as modified above the terms of the agreement shall remain in full force and
effect.
ARCHITECT: OWNER:
BY '�/ a 12-2-2011 BY
Date Department Head Date
Its
1-CITY OF ASHLAND,ADDENDUM TO CONTRACT FOR PERSONAL SERVICES
Exhibit A
AGREEMENT BETWEEN OWNER (CITY OF ASHLAND) AND ARCHITECT (PECK
SMILEY ETTLIN ARCHITECTS) FOR TIME FRAME OF COMPLETED SERVICES
The Architect agrees to have services completed on or before March 1, 2013, and
amends 11.5.1 of the original June 14, 2006 contract specified in this agreement
referencing pre and post bond performance dates.
The Architect agrees to keep the Owner updated on progress of services provided
along with projected benchmark dates.
ARCHITECT: OWNER:
BY 'VL a 11-22-11 BY �' r
D
l" "� ��'�O- //
Hans O. Ettlin Date Department Head Date
Its
Exhibit B
AGREEMENT BETWEEN OWNER (CITY OF ASHLAND) AND ARCHITECT (PECK
SMILEY ETTLIN ARCHITECTS) FOR SCOPE OF WORK
The Architect's basic services consist of those described in the June 14, 2006
agreement described in Paragraphs 2.2 through 2.6 and other services identified in
Article 12. Those services include normal structural, mechanical and electrical
engineering services and all other services that are normally or customarily furnished
and reasonably necessary for the Project. Exceptions to the June 14, 2006 agreement
are as follows:
1. The fees and scope of work are as per the attached Fee Breakdown dated June
gth, 2011 and are listed in Exhibit C.
2. LEED design and application services have been deleted from the scope of work.
ARCHITECT: OWNER:
BY %6L a 11-21-11 BY =ha
Hans O. Ettlin Date De artment Head Date
Its
Exhibit C
AGREEMENT BETWEEN OWNER (CITY OF ASHLAND) AND ARCHITECT (PECK
SMILEY ETTLIN ARCHITECTS) FOR FEES FOR SERVICE
The fee and schedule of payments as specified in Article 11 of the June 14, 2006
Agreement are amended as indicated on the table to follow:
ARCHITECT: OWNER:
OWNER:
BY $9L a 11-21-11 BY �' 0= -�D-//
Hans O. Ettlin Date Department Head Date
Its
�yN�• v min f}ANY ifi Ki iff ° m !A. a^�^ l9
j 6R
I HIP r
q m i N� m
G@ 9 oo
a
A � O r ® r At O O O O . O n
Y I I to
Eau RalgAIRM . A. , 9110
a y
F
fig
o 0 0 0 0 o m o m m m
m 8
T8 t�
D�D �� � t°aoo oY m' ww ww mo' r tl � Yo
M f i g r
a
N
w F
9 y d
A
� m Zl o00 00 " 0 ' on o00 � S
� N N
F
CITY R5C RDER Page 1 / 1
�. CITY OF
CITY
AS H LAN D DATE.?--3. -.`.'P.O NUMBER' ,
20 E MAIN ST. 10/20/2011 1 10508
ASHLAND, OR 97520
(541)488-5300
VENDOR: 000904 SHIP TO: Ashland Fire Department
PECK SMILEY ETTLIN (541)482-2770
4412 SW CORBETT AVE 455 SISKIYOU BLVD
PORTLAND, OR 97201 ASHLAND, OR 97520
FOB Point: Req.No.:
Terms: Net 30 days Dept.:
Req.Del.Date: Contact: John Karns
Special Inst: Confirming? No
.. .. _ ...
'DeScri -tion e `'Unit Price. ,, `;', Ezt.Price;,".
THIS IS A REVISED PURCHASE ORDER
Fire Station#2-Architectural 22,500.00
Services Invoice No: 1107.00-1, Aug
17, 2011
PO issued for past due amount. Pending
Legal review of contract.
Processed change order Dec 2, 2011 243,130.00
Balance of contract for architectural
services. Original contract approved by
Council on June 6, 2006.
Amended by letter on May 20, 2009.
Amended bq contract amendment on or
about Nov 30, 2011.
SUBTOTAL 265 630.00
31LL TO:Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2028 TOTAL 265,630.00
ASHLAND, OR 97520
.,, Account Numbers!?sf _ o'--rojact Number , ,Amount •_Account Numtier '.:ProlectNumber
E 410.08.24.00.70420 E 000175.100 265 630.00
V-
Authorized -
Authorized Signature VENDORCOPY
FORM #3 CITY OF
A request for a Purchase Order ASHLAND
REQUISITION Date of request: 1z-of-zo11
Required date for delivery:
Vendor Name Peek Smiley Etlin Architects
Address,City,State,zip 4412 SW Corbett Protland OR 97201
Contact Name&Telephone Number Hans Etlin 503 248-9170 Fax: 503 248-0223
Fax Number
SOLICITATION PROCESS
❑ Exempt from Competitive Bidding ❑ Emergency
Written Findings(Form attached) ❑ Invitation to Bid (Copies on file) ❑ Written findings attached
Quote or Proposal attached Date approved by Council: ❑ Quote or Proposal attached
❑ Small Procurement Cooperative Procurement
Less than$5,000 ❑ Request for Proposal (Copies on file) ❑ Slate of Oregon
Note:Total contract amount,including any Date approved by Council: Contract#
amendments may not exceed$6,000 ❑ State of Washington
Intermediate Procurement ❑ Sole Source Contract#
GOODS&SERVICES ❑ Written Findings(Form attached) ❑ Other government agency contract
$5,000 to$100,000 ❑ Quote or Proposal attached Agency
[3 (3)Written quotes attached I Contract#
PERSONAL SERVICES ❑ Special Procurement ❑ Intergovernmental Agreement
$5.000 to$75,000 ❑ Written Findings(Form attached) Agency
❑ Less than$35,000,by direct appointment ❑ Quote or Proposal attached Contract#
❑ 3 Written proposals attached I Date approved by Council: Date approved by Council:
Description of SERVICES Total Cost
Architectural services for Fire Station#2 $ 243,130 00
Item # Quantity Unit Description of MATERIALS Unit Price Total Cost
.'TOTAL COST;"
❑ Per attached quotelproposal
Project Number:000175„999' Account Number___-__-__-__-______
Account Number: 410.08.24.00.704200 Account Number -__-__-__-______
`Expenditure must be charged to the appropriate account numbers for the financials to accurately reflect the actual expenditures.
IT Director in collaboration with department to approve all hardware and software purchases:
IT Director Date
By signing this requisition form,I certify that the information provided above satisfies the City's public contracting requirements,and the documentation can be
provided upon request.
a/T�
Employee Signature: Department Head Signature:
Additional signatures(if applicable): / J
Funds appropriated for current fiscal year: 0/ NO ��^--� i ziZ
Finance Director Date
Comments:
G:FinanoeTrocedurOAPTomislForm#3•Requisifion.doc Updated on:12112011